Meridian Court 1

MahaRERA P51800007441High risk

by Vijaykamal Properties Pvt Ltd

471/A pt, Borivali, 400067

Official record
Dec 2027
Possession
33.3%
Built
33
Complaints
373
Units
High risk
  • Recovery warrant issued. MahaRERA has issued 1 recovery warrant against this project — the strongest enforcement action on record.
  • Possession delayed ~3 yrs. Originally promised Dec 2024, now proposed Dec 2027 per the RERA filing.
  • 33 RERA complaints. 33 complaint records are disclosed against this project on MahaRERA.
  • Promised amenities not started. Clubhouse, Landscaped Garden are at 0% build with possession due Dec 2027 per the RERA filing.
Kandivali / BorivaliMid-income

Self-sufficient Gujarati-dominated family belt beside the National Park.

Growth drivers:
Metro 2A/7, station upgrades, big-brand township launches.
Who buys here:
Families seeking space and community at sane prices.

PropPin area guide — editorial, not a RERA disclosure.

Official RERA facts

Registration
P51800007441
Status
Ongoing
Stage
Certificate Signed
Possession
December 2027originally December 2024
Construction
33.3% complete
Units sold
221 of 373

RERA complaint record33 records

Possession extension history

  • EXT51800027263Revised to December 2025

    delay in approvals and construction

  • EA30012619644Revised to December 2027

    Respected Sir/Madam, I. Grounds for Seeking Extension The Promoter respectfully submits that the delay in completion of the project has occurred due to circumstances beyond the reasonable control of the Promoter, despite continuous efforts to maintain construction progress. Labour Shortages due to Elections and Festivals: A significant portion of the project’s workforce originates from Bihar. During the Bihar Legislative Assembly Elections, large-scale labour migration occurred due to mandatory voting and community obligations, causing acute manpower shortages. This was followed by Chhath Puja, a culturally significant festival, resulting in extended absenteeism of two to four weeks. Labour-intensive works such as masonry, shuttering, and finishing were directly affected. Extended and Unseasonal Rainfall: The project was further impacted by prolonged and unseasonal monsoon conditions. Frequent rainfall disrupted curing cycles, scaffolding, external plastering, waterproofing, and material handling. Safety considerations required suspension of work during high-risk periods, causing unavoidable delays in activities requiring dry conditions. Festive Season and General Labour Unavailability: From Ganesh Chaturthi to Diwali, construction productivity declined due to reduced labour availability, festive holidays, and limited supplier operations. Additionally, overlapping factors such as elections, festivals, and monsoon conditions resulted in inconsistent availability of skilled labour across the region. Despite engaging multiple contractors and offering incentives, sequential construction activities were adversely affected. The above circumstances were external, unavoidable, and beyond the Promoter’s control, cumulatively impacting the project timeline. II. Planning for Completion Substantial progress has been achieved at site, and the project is now being executed as per a revised and realistic schedule. With stabilised labour availability and improved weather conditions, the balance works—including internal finishing, external façade, services installation, and final inspections—will be completed within the extended period. The project continues to be executed strictly in accordance with sanctioned plans, applicable regulations, and MahaRERA guidelines, with full commitment to compliance, transparency, and financial discipline.

Amenities & common facilities

Promised amenities and how complete each one is, from the promoter's MahaRERA disclosure.

Internal Roads & Footpathsnot started
Water Supplynot started
Sewerage (Chamber, Lines, Septic Tank , STP)not started
Storm Water Drainsnot started
Landscaping & Tree Plantingnot started
Street Lightingnot started
Community Buildingsnot started
Treatment And Disposal Of Sewage And Sullage Waternot started
Solid Waste Management And Disposalnot started
Water conservation /Rain water harvestingnot started
Energy managemcntnot started
Fire protection and fire safety requirementsnot started
Electrical meter room, sub-station, receiving stationnot started
Aggregate area of recreational Open Spacenot started

Building & registration

RERA registered
Aug 2017
Floors
27
Unit mix
351 res · 22 comm
Architect
Design Concepts
Public authority
Slum Rehabilitation Authority
Plot / CTS / survey no.
471/A pt
Planning authority
SLUM REHABILITATION AUTHORITY
Approved layout land
764.47 sq.m
Land for this registration
764.47 sq.m
Recreational open space
600 sq.m
Permissible built-up area
21,172 sq.m
Registered office
Laxmi Palace
Plot boundaries
North
12 mt wide internal road
South
471 a pt
East
nalla
West
13 mt wide dp road
Parking

Buyer community

Connect with other buyers and owners of Meridian Court 1 — compare quotes, swap site-visit notes and possession updates, and check construction quality before you commit. No brokers, no sales pitch.

No topics yet — start one and connect with the next buyer researching Meridian Court 1. Real notes from real buyers beat any brochure.

Start a discussion

Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.