High risk
  • Litigation pending (1). MahaRERA's litigation disclosure lists 1 pending case against this project.
  • Possession delayed ~4 yrs. Originally promised Jan 2021, now proposed Jun 2025 per the RERA filing.
  • Possession date passed. The proposed possession date (Jun 2025) has passed with construction at 91.1%.

Area guide

What it's like to buy in Mumbai

Tap any point for how it was derived. IGR points are computed from real government property-registration records; RERA points come from this project's own MahaRERA filing; EDITORIAL points are PropPin's own area judgement, not data.

Ghatkopar / VikhroliUpper-mid

Metro-1 anchor with Godrej's Vikhroli land bank next door.

Growth drivers:
Metro 1 interchange, Eastern Express Highway, corporate campuses.
Who buys here:
Families wanting east-side connectivity to BKC/Fort.

PropPin area guide β€” editorial, not a RERA disclosure.

Promoter

Builder profile

Builder
Girnar Builders & Developers

View the promoter’s full developer profile and other projects under the same builder group.

No other projects are linked to this promoter yet.

Architect

Design profile

Design
Design Group

Browse other projects associated with this architect to compare design and delivery patterns.

Official RERA facts

Registration
P51800001333
Status
Ongoing
Stage
Certificate Signed
Possession
June 2025originally January 2021
Construction
91.1% complete
Units sold
166 of 204

Similar projects in Mumbai

Other MahaRERA-registered projects in the same locality β€” useful for a like-for-like comparison.

Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.