LINKPARK
by ADARSH INDUSTRIAL ESTATE PRIVATE LIMITED
Residentail building No 2 under SRA Scheme on Plot bearing CTS no 335/1 Malad Mumbai, Borivali, 400064
- Litigation pending (4). MahaRERA's litigation disclosure lists 4 pending cases against this project.
- 16 appeals at MahaREAT. 16 complaints against this project have been escalated to the appellate tribunal (MahaREAT) — a stronger signal than the complaint being merely filed.
- 41 RERA complaints. 41 complaint records are disclosed against this project on MahaRERA.
- Behind schedule. Possession is due Oct 2026 but construction is only at 10.2%.
- Promised amenities not started. Landscaped Garden is at 0% build with possession due Oct 2026 per the RERA filing.
Area guide
What it's like to buy in Borivali
Tap any point for how it was derived. IGR points are computed from real government property-registration records; RERA points come from this project's own MahaRERA filing; EDITORIAL points are PropPin's own area judgement, not data.
Retail-and-BPO hub with dense mid-income housing on both sides.
- Growth drivers:
- Mindspace offices, Link Road retail, Metro 2A.
- Who buys here:
- Mid-income families, first-time buyers.
PropPin area guide — editorial, not a RERA disclosure.
Promoter
Builder profile
View the promoter’s full developer profile and other projects under the same builder group.
Official RERA facts
- Registration
- P51800005832
- Status
- Ongoing
- Stage
- Certificate Signed
- Possession
- October 2026
- Construction
- 10.2% complete
- Units sold
- 0 of 0
Similar projects in Borivali
Other MahaRERA-registered projects in the same locality — useful for a like-for-like comparison.
Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.