All RERA projects
🏗️
Under construction
O AND S BUSINESS SUITES
MahaRERA P51800006703Caution
FINAL PLOT NO 11 CTS NO 3214 TPS II, Kurla, 400086
Post your property hereOwn or renting out a unit in O AND S BUSINESS SUITES? List it in seconds — reaches buyers researching this project.Looking to buy or rent here?Post your requirement — sellers & brokers in Kurla come to you.
Jun 2026
Possession
81.4%
Built
0
Complaints
236
Units
Caution
- Possession date passed. The proposed possession date (Jun 2026) has passed with construction at 81.4%.
Ghatkopar / VikhroliUpper-mid
Metro-1 anchor with Godrej's Vikhroli land bank next door.
- Growth drivers:
- Metro 1 interchange, Eastern Express Highway, corporate campuses.
- Who buys here:
- Families wanting east-side connectivity to BKC/Fort.
PropPin area guide — editorial, not a RERA disclosure.
Promoter
Builder profile
SUCHITA ORANGE HDM PROJECT
View the promoter’s full developer profile and other projects under the same builder group.
No other projects are linked to this promoter yet.
Architect
Design profile
DAISARIA AND ASSOCIATES
Browse other projects associated with this architect to compare design and delivery patterns.
Official RERA facts
- Registration
- P51800006703
- Status
- Ongoing
- Stage
- Certificate Signed
- Possession
- June 2026originally December 2025
- Construction
- 81.4% complete
- Units sold
- 65 of 236
Similar projects in Kurla
Other MahaRERA-registered projects in the same locality — useful for a like-for-like comparison.
JVM's Shanay Vista
KurlaPoss. October 2028
Truvy Signature
KurlaPoss. December 2027
Parimal
KurlaPoss. October 2029
NEHRU NAGAR SHIVALAYA CHSL
KurlaPoss. June 20281 complaint
SILVER HOUSE
KurlaPoss. December 2029
Emperia Legacy
KurlaPoss. December 2031
One Uttam
KurlaPoss. December 2029
NOOR RESIDENCY
KurlaPoss. December 2029
Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.