TRINITY TOWERS
2-A PT OF VILLAGE POWAI, Andheri, 400076
- 1 appeal at MahaREAT. 1 complaint against this project has been escalated to the appellate tribunal (MahaREAT) β a stronger signal than the complaint being merely filed.
- Recovery warrants issued. MahaRERA has issued 2 recovery warrants against this project β the strongest enforcement action on record.
- 9 RERA complaints. 9 complaint records are disclosed against this project on MahaRERA.
- Behind schedule. Possession is due Dec 2026 but construction is only at 27.7%.
- Promised amenities not started. Landscaped Garden is at 0% build with possession due Dec 2026 per the RERA filing.
Area guide
What it's like to buy in Andheri
Tap any point for how it was derived. IGR points are computed from real government property-registration records; RERA points come from this project's own MahaRERA filing; EDITORIAL points are PropPin's own area judgement, not data.
Lakeside planned township with an IT/startup ecosystem.
- Growth drivers:
- Hiranandani stock, IIT-B halo, LBS/JVLR connectivity.
- Who buys here:
- Tech professionals and startup founders.
PropPin area guide β editorial, not a RERA disclosure.
Promoter
Builder profile
View the promoterβs full developer profile and other projects under the same builder group.
No other projects are linked to this promoter yet.
Official RERA facts
- Registration
- P51800008384
- Status
- Ongoing
- Stage
- Certificate Signed
- Possession
- December 2026
- Construction
- 27.7% complete
- Units sold
- 0 of 0
Similar projects in Andheri
Other MahaRERA-registered projects in the same locality β useful for a like-for-like comparison.
Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.