LAKADAWALA HEIGHTS
1456, Mumbai City, 400008
- Litigation pending (3). MahaRERA's litigation disclosure lists 3 pending cases against this project.
- 1 appeal at MahaREAT. 1 complaint against this project has been escalated to the appellate tribunal (MahaREAT) — a stronger signal than the complaint being merely filed.
- Possession delayed ~5 yrs. Originally promised Dec 2021, now proposed Dec 2026 per the RERA filing.
- Behind schedule. Possession is due Dec 2026 but construction is only at 7.9%.
Area guide
What it's like to buy in Mumbai City
Tap any point for how it was derived. IGR points are computed from real government property-registration records; RERA points come from this project's own MahaRERA filing; EDITORIAL points are PropPin's own area judgement, not data.
Racecourse views and some of the city's tallest residences.
- Growth drivers:
- Scarcity, racecourse frontage, South Bombay prestige.
- Who buys here:
- Ultra-HNI trophy purchases.
PropPin area guide — editorial, not a RERA disclosure.
Promoter
Builder profile
View the promoter’s full developer profile and other projects under the same builder group.
No other projects are linked to this promoter yet.
Official RERA facts
- Registration
- P51900005993
- Status
- New
- Stage
- Certificate Signed
- Possession
- December 2026originally December 2021
- Construction
- 7.9% complete
- Units sold
- 0 of 0
Similar projects in Mumbai City
Other MahaRERA-registered projects in the same locality — useful for a like-for-like comparison.
Data sourced from the official MahaRERA portal; complaints last synced 24 Jul 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.