ALLURE WINGS A TO E
1196 B, Kurla, 400042
- Litigation pending (1). MahaRERA's litigation disclosure lists 1 pending case against this project.
- 5 appeals at MahaREAT. 5 complaints against this project have been escalated to the appellate tribunal (MahaREAT) — a stronger signal than the complaint being merely filed.
- 9 RERA complaints. 9 complaint records are disclosed against this project on MahaRERA.
- Possession date passed. The proposed possession date (Dec 2021) has passed with construction at 63.6%.
Where it is · 1196 B, Kurla
Area guide
What it's like to buy in Kurla
Tap any point for how it was derived. IGR points are computed from real government property-registration records; RERA points come from this project's own MahaRERA filing; EDITORIAL points are PropPin's own area judgement, not data.
Emerging eastern corridor between Powai and Mulund.
- Growth drivers:
- Metro 6 (JVLR), large land parcels turning into townships.
- Who buys here:
- Value-hunters betting on the corridor's growth.
PropPin area guide — editorial, not a RERA disclosure.
Promoter
Builder profile
View the promoter’s full developer profile and other projects under the same builder group.
Official RERA facts
- Registration
- P51800008521
- Status
- Ongoing
- Stage
- Certificate Signed
- Possession
- December 2021
- Construction
- 63.6% complete
- Units sold
- 0 of 0
Similar projects in Kurla
Other MahaRERA-registered projects in the same locality — useful for a like-for-like comparison.
Keep exploring
Where this project sits, who built it, and how Kurla compares.
In Kurla
The developer
Research
Data sourced from the official MahaRERA portal; complaints last synced 14 Aug 2026. PropPin surfaces public disclosures verbatim and is not affiliated with MahaRERA.