LODHA DEVELOPERS LIMITED
321 MahaRERA-tracked projects in Mumbai
321
Tracked projects
491
Complaint records
0
Recovery warrants
Computed only from official MahaRERA disclosures across this builder's (spelling-matched) portfolio.
Projects (321)
- 100 · A+Lodha Amara - Wing 40 and 41BalkumPossession Nov 202581.6% built1 complaints
- 100 · A+UPPER THANE - WOODLANDS C AND D.Possession Nov 202681.8% built1 complaints
- 100 · A+Lodha Quality Home Tower 7majiwada thanePossession Mar 202681.8% built
- 100 · A+iThink Tower-AThanePossession May 2022100% built
- 100 · A+Lodha Miraroad Tower - 1 and Tower - 2Ghodbunder RoadPossession Mar 2027123.1% built4 complaints
- 100 · A+Liana CKalyanPossession Sept 202672.1% built
- 100 · A+Upper Thane-Casa EdenSurai Mankoli BhiwandiPossession Sept 202681.8% built4 complaints
- 100 · A+Upper Thane-IRIS Wing A.Possession Dec 202734.5% built
- 100 · A+Lodha Crown Kolshet-Tower 1DhokaliPossession Sept 202681.8% built1 complaints
- 100 · A+UPPER THANE-IRIS WING BANJURPossession Mar 202834.1% built
- 100 · A+Jardino BDombivaliPossession Aug 20280% built
- 100 · A+Lodha Sterling - Tower CThanePossession Mar 20300% built
- 100 · A+Lodha Crown Kolshet - Tower 3KolshetPossession Sept 202844.3% built
- 100 · A+Upper Thane-IRIS Wing DAnjur StreetPossession Oct 202753.2% built
- 100 · A+Upper Thane-IRIS Wing CAnjurPossession Dec 202660% built
- 100 · A+Upper Thane-SupremusAnjurPossession May 202811.8% built
- 100 · A+Lodha Panacea IIIBhoparPossession Jun 202690.9% built1 complaints
- 100 · A+Lodha Signet B - KolshetBalkumPossession Nov 202730.9% built1 complaints
- 100 · A+Upper Thane - Eden ESuraiPossession May 202781.4% built
- 100 · A+TulipKhoniPossession May 202780.3% built1 complaints
- 100 · A+Belvedere DKalyanPossession Feb 202827.7% built
- 100 · A+Belvedere HKalyanPossession May 202752.3% built
- 100 · A+Upper Thane-IRIS Wing GAnjurPossession May 202829.5% built
- 100 · A+Fiora KKalyanPossession Jan 202872.2% built
- 100 · A+Upper Thane - Tiara GMankoliPossession Jan 20280% built
- 100 · A+Belvedere-B and CKalyanPossession Nov 202755% built
- 100 · A+Thane ProjectMajiwadePossession Jul 202948.8% built
- 100 · A+PearlKalyanPossession Mar 202844.7% built
- 100 · A+Upper Thane - Eden DSuraiPossession Mar 202847.7% built
- 100 · A+Lodha Villa Royale TDLR 2Sarang,Mankoli & SuraiPossession Dec 20271 complaints
- 100 · A+Dombivli ArcadeNiljePossession Oct 20270% built
- 100 · A+Golf ViewNiljePossession Aug 202837.1% built
- 100 · A+Upper Thane-Verdura ASuraiPossession Jul 202835% built
- 100 · A+Crown Dombivli 4MangaonPossession Jun 202821.5% built
- 100 · A+Hanging Garden PalavaKhoniPossession Mar 203030.3% built
- 100 · A+Foresta EMangoanPossession Aug 202827.6% built
- 100 · A+Jasper C and DMangaonPossession Aug 20280% built
- 100 · A+Emerald A and BmangaonPossession Aug 20280% built
- 100 · A+OPULIS CKolePossession Nov 203029.4% built
- 100 · A+OPULIS BKolePossession Nov 203027.3% built1 complaints
- 100 · A+OPULIS AKolePossession Nov 203027.3% built
- 100 · A+OPULIS EKolePossession Apr 20319.1% built
- 100 · A+OPULIS DKolePossession Nov 203028.9% built
- 100 · A+Daffodil K and LKhoniPossession Sept 20300% built
- 100 · A+Lily A and BThanePossession Sept 20300% built
- 100 · A+Lily E and FThanePossession Sept 20340% built
- 100 · A+Lily G and HKalyanPossession Sept 20300% built
- 100 · A+Daffodil A and BThanePossession Sept 20300% built
- 100 · A+Lily I and JThanePossession Sept 20300% built
- 100 · A+Daffodil I and JKhoniPossession Sept 20300% built
- 100 · A+Lily K and LKalyanPossession Sept 20350% built
- 100 · A+Daffodil G and HKalyanPossession Sept 20309.1% built
- 100 · A+Lily C and DThanePossession Sept 20300% built
- 100 · A+Daffodil M and NKhoniPossession Sept 20300% built
- 100 · A+Daffodil E and FKhoniPossession Sept 203031.8% built
- 100 · A+Daffodil C and DThanePossession Sept 202930% built
- 100 · A+The Baya SanctumKurlaPossession Jun 20280% built
- 100 · A+Lodha Kandivali Project - Tower 3Akurli VillagePossession Jun 202681.8% built
- 100 · A+Lodha Mulund Project Tower 1KurlaPossession Sept 202781.8% built2 complaints
- 100 · A+Lodha Kandivali Project - Tower 5BorivaliPossession Jul 202681.8% built
- 100 · A+Lodha Bellagio-Tower CKurlaPossession Dec 2026100% built
- 100 · A+Lodha Bellagio-Tower DKurlaPossession Dec 2026100% built
- 100 · A+Lodha Kandivali Project-Tower 1BorivaliPossession Feb 202846.4% built1 complaints
- 100 · A+Lodha Woods - Tower 7BorivaliPossession Jul 202781.8% built1 complaints
- 100 · A+Lodha Woods - Tower 6BorivaliPossession Nov 202753.6% built1 complaints
- 100 · A+Vikhroli ASPI Project 1KurlaPossession Sept 202934.5% built
- 100 · A+Vikhroli ASPI Project 3KurlaPossession Sept 202934.9% built
- 100 · A+Vikhroli ASPI Project 2KurlaPossession Jan 202935.2% built
- 100 · A+Vikhroli Tower C3KurlaPossession Dec 202949.4% built
- 100 · A+CullinanAndheriPossession Dec 202835.7% built
- 100 · A+Woods Tower 9BorivaliPossession Dec 20296.4% built
- 100 · A+AltusBorivaliPossession Dec 203038.1% built
- 100 · A+Vikhroli ASPI Project 4KurlaPossession Dec 203019.5% built
- 100 · A+Lodha MalabarMumbai CityPossession Jun 202758.1% built
- 100 · A+Bellissimo MatungaWard FNorthPossession Dec 202773.8% built
- 100 · A+Bellissimo Matunga-Tower 2SionPossession Dec 202768.4% built
- 100 · A+Bellissimo Matunga-Tower 3SionPossession Dec 202762.6% built
- 100 · A+Lodha MatungaSionPossession Apr 202843.8% built
- 100 · A+Sea FaceMumbai CityPossession Feb 202910.2% built
- 100 · A+Matunga SignetMatungaPossession Sept 202911.8% built
- 100 · A+Matunga Wing BSionPossession Mar 202939.8% built
- 100 · A+Alibaug ProjectDhokawadePossession Mar 20300% built
- 100 · A+Alibaug TownhousesDhokawadePossession Aug 20298.7% built
- 100 · A+Alibaug Residential ProjectDhokwadePossession Dec 20309.1% built
- 100 · A+Alibaug PlotsDhokawade StreetPossession Aug 2029
- 100 · A+Lodha Belmondo - Tower 30MawalPossession Dec 202690.9% built
- 100 · A+Lodha Pune NIBM Project-Tower 10HaveliPossession Apr 202756.4% built
- 100 · A+Lodha Pune NIBM Project-Tower 5HaveliPossession Dec 202674.1% built
- 100 · A+Lodha Pune NIBM Project- Tower 7,8 and 9HaveliPossession Dec 202734.5% built2 complaints
- 100 · A+Lodha Belmondo Townhouse 2GahunjePossession Nov 202678.8% built
- 100 · A+Kharadi Pune Phase I -Tower 5HaveliPossession Sept 202741.3% built
- 100 · A+Kharadi Pune Phase II Tower 7HaveliPossession Sept 202741.4% built
- 100 · A+HINJEWADI PROJECTPUNEPossession Jun 202758% built2 complaints
- 100 · A+Bund Garden ProjectHaveliPossession Apr 202835.8% built
- 100 · A+Hinjewadi Project-Tower 4 and 5HinjawadiPossession Jun 202841.8% built1 complaints
- 100 · A+Kharadi Pune P2HaveliPossession Oct 202743.6% built2 complaints
- 100 · A+Hinjewadi Premium-Tower 7HinjawadiPossession Dec 202834.1% built
- 100 · A+Hinjewadi Premium - Tower 8Hinjawadi - MulashiPossession Jan 202934.1% built
- 100 · A+Hinjewadi Project-Tower 6HinjawadiPossession Sept 202835.9% built
- 100 · A+Casa Supremo RetailGhodbanderPossession Mar 2027
- 100 · A+Vikhroli Premium Tower A1KurlaPossession Dec 2030
- 100 · A+Kothrud Pune -Tower A and BKothrudPossession Sept 2029
- 100 · A+Hinjewadi Project-Tower BHinjewadiPossession Jun 2031
- 100 · A+Belmondo Townhouse 4GahunjePossession Aug 2030
- 100 · A+Opulis FKolePossession Dec 2031
- 100 · A+Adelphi A and BMankoliPossession Mar 2031
- 99 · A+Codename One and Only.Possession Jun 20262 complaints
- 99 · A+Crown Dombivli 1KalyanPossession Dec 202830.8% built2 complaints
- 99 · A+Crown Dombivli 2KalyanPossession Dec 202856.4% built3 complaints
- 98 · A+Lodha Crown Kolshet-Tower 4KolshetPossession May 202681.8% built2 complaints
- 98 · A+Lodha Kandivali Project - Tower 2Akurli VillagePossession Jul 202681.8% built2 complaints
- 98 · A+Pune Wakad ProjectWakadPossession Jun 203117.3% built1 complaints
- 98 · A+Hinjewadi Project-Tower AHinjewadiPossession Jun 20311 complaints
- 97 · A+CASA UNIVIS - CIELO DThanePossession Mar 201890.9% built
- 97 · A+LODHA FRESHIA WING D, EKalyanPossession Dec 201990.9% built
- 97 · A+PALAVA RIVER VIEW E AND FKalyanPossession Dec 2017100% built4 complaints
- 97 · A+Upper Thane - Tiara CBhiwandiPossession Sept 202381.8% built
- 97 · A+Mhatre CompoundPalavaPossession Jun 201886.4% built
- 97 · A+Lodha Panacea IKalyanPossession Dec 202190.9% built
- 97 · A+UPPER THANE - Tiara IBHIWANDIPossession Mar 202481.8% built
- 97 · A+UPPER THANE - Woodlands E and FBHIWANDIPossession Mar 202481.8% built
- 97 · A+Upper Thane - Tiara E, FBhiwandiPossession Jun 202581.8% built
- 97 · A+Palava Serenity CPalavaPossession Mar 202581.8% built
- 97 · A+UPPER THANE -SERENO A1.Possession Jul 202481.8% built
- 97 · A+Magnolia A B and CBhiwandiPossession Nov 202381.8% built
- 97 · A+Upper Thane - Sereno A1, C & C1.Possession May 202681.8% built
- 97 · A+Elite 2 Shops.Possession Jul 202081.8% built
- 97 · A+Elite 1 Shop.Possession Jul 202081.8% built
- 97 · A+Regalia Shops.Possession Jul 202081.8% built
- 97 · A+Urbano 2 Shops.Possession Jul 202081.8% built
- 97 · A+Lakeside 1 Shops.Possession Jul 202081.8% built
- 97 · A+Lodha Amara MLCP RetailKOLSHAT AND DHOKALIPossession Jul 202281.8% built
- 97 · A+Lodha Quality Home Tower 6Majiwada ThanePossession Sept 202581.8% built
- 97 · A+Foresta FKalyanPossession Jan 202681.8% built
- 97 · A+Fiora DKalyanPossession Jan 202666.8% built
- 97 · A+PEARL AKalyanPossession Dec 202581.8% built
- 97 · A+Liana DKalyanPossession Aug 202667% built
- 97 · A+Fiora FKalyanPossession Aug 202663.6% built
- 97 · A+Lodha Crown Kolshet - Tower 2DhokaliPossession Jul 202741.6% built
- 97 · A+Crown Dombivli 3KalyanPossession Aug 202734.5% built
- 97 · A+Palava -Signet 2KolePossession Jul 202731.4% built
- 97 · A+Lodha Kandivali Project - Tower 4AKURLI VILLAGEPossession May 202581.8% built
- 97 · A+Lodha Venezia- wing CWard FSouthPossession Dec 202390.9% built
- 97 · A+LODHA BELMONDO SAWGRASS BGahunjePossession Apr 201881.8% built
- 97 · A+LODHA BELMONDO - ESTANCIA BPunePossession Aug 201890.9% built
- 97 · A+Lodha Belmondo - Sawgrass ABELMONDOPossession Jun 201987.7% built
- 97 · A+Lodha Belmondo Townhouse 3GahunjePossession Mar 202681.8% built
- 97 · A+Hinjewadi Project-Tower 1HinjawadiPossession Jun 202748.2% built
- 97 · A+Kharadi Pune Phase II -Tower 6HaveliPossession May 202739.9% built
- 95 · A+PALAVA URBANO G AND HKalyanPossession Dec 202281.8% built1 complaints
- 95 · A+Upper Thane - Sereno D and ESuraiPossession Mar 202381.8% built1 complaints
- 95 · A+Upper Thane - Ecopolis AUpper thanePossession Sept 202281.8% built1 complaints
- 95 · A+Fiora A, B and CKalyanPossession Nov 202581.8% built1 complaints
- 95 · A+Foresta A, B, H and IKalyanPossession Nov 202581.8% built1 complaints
- 95 · A+Fiora EKalyanPossession Mar 202660.9% built1 complaints
- 95 · A+Olivia Tower -BKhoniPossession Mar 202730.5% built
- 95 · A+Olivia Tower - AKhoniPossession Jun 202739% built
- 95 · A+Lodha Woods- Tower 8BorivaliPossession Nov 202842.7% built1 complaints
- 95 · A+Lodha NCP Tower - 2Ward FNorthPossession Jun 203029.5% built
- 95 · A+LODHA BELMONDO ST. ANDREWS EGahunjePossession Dec 201990.9% built1 complaints
- 93 · A+Upper Thane - Sereno A, B, B1SuraiPossession Sept 202381.8% built2 complaints
- 93 · A+PALAVA SERENITY DPALAVAPossession Apr 202481.8% built2 complaints
- 93 · A+Bellissimo Mulund T2KurlaPossession Jun 202745.9% built1 complaints
- 93 · A+Lodha Vikhroli - Tower C1KurlaPossession Dec 202864.7% built2 complaints
- 93 · A+LODHA BELMONDO AUGUSTA BGahunjePossession Jun 201990.9% built2 complaints
- 93 · A+LODHA BELMONDO ASHBRIDGE D, EGahunjePossession Dec 201790.9% built2 complaints
- 93 · A+Lodha Belmondo St. Andrews ABelmondoPossession Feb 202790.9% built
- 93 · A+Kharadi Pune P3WagholiPossession May 202839.1% built
- 92 · A+PALAVA SERENITY APalavaPossession Nov 202573.6% built
- 92 · A+Liana BKalyanPossession Feb 202673% built
- 92 · A+Jardino ADombivaliPossession Aug 20270% built
- 92 · A+Fiora G and HKalyanPossession Feb 20270% built
- 92 · A+Upper Thane-Tiara HMankoliPossession Jul 202728% built
- 92 · A+Upper Thane-Woodlands BAnjurPossession Jun 202931.8% built
- 92 · A+MLCP 3 Retail ShopsKhoniPossession Dec 202463.6% built
- 92 · A+Fiora IHedutanePossession Feb 203017.3% built
- 92 · A+Lodha Signet Lower Parel Wing BWard GSouthPossession Aug 202650.2% built
- 91 · A+UPPER THANE - TIARA A to BBhiwandiPossession Oct 202281.8% built1 complaints
- 91 · A+Lodha Global ParkKalyanPossession Dec 202290.9% built1 complaints
- 91 · A+PALAVA SERENITY BPALAVAPossession Jul 202581.8% built3 complaints
- 91 · A+Foresta C, D and GKalyanPossession Apr 202681.8% built3 complaints
- 91 · A+Liana AKalyanPossession Feb 202681.8% built3 complaints
- 91 · A+Casa BelvedereKalyanPossession Oct 202663.6% built1 complaints
- 91 · A+LODHA BELMONDO AUGUSTA CGahunjePossession Dec 201790.9% built3 complaints
- 91 · A+Lodha Pune NIBM Project-Tower 6HaveliPossession Dec 202670% built
- 90 · A+Lodha Signet Palava-Signet 1Gharivali & KolePossession Dec 202554.5% built1 complaints
- 90 · A+Pearl BKhoniPossession Jul 202653.2% built1 complaints
- 90 · A+Lodha NCP Tower - 1Ward FNorthPossession Dec 202681.8% built2 complaints
- 90 · A+Lodha Bella Vita SignetHaveliPossession Dec 202630.9% built1 complaints
- 89 · AUpper Thane Ecopolis A - BBhiwandiPossession Sept 202277.3% built2 complaints
- 89 · AUPPER THANE - WOODLANDS A, B AND J.Possession Oct 202672.7% built
- 89 · ALodha Quality Home Tower 4majiwada thanePossession Sept 202481.8% built4 complaints
- 89 · AFiora JKalyanPossession Jan 202935.1% built
- 89 · AUpper Thane-MLCP C ShopsMankoliPossession Dec 202681.8% built
- 89 · ABelvedere JHedutanePossession Dec 202910.5% built
- 89 · ABelvedere EhedutanePossession Sept 20299.1% built
- 89 · ABellissimo Matunga -Tower 4 and Tower 5SionPossession Mar 20300% built
- 89 · ALodha Belmondo - Tower 32MawalPossession Oct 202846.3% built
- 88 · ALodha Sterling - Tower GThanePossession Sept 202590.9% built
- 88 · AWaterviewMumbai CityPossession Jun 202857.5% built
- 88 · AVilla ImperioKhoniPossession Dec 2030
- 87 · ALodha Vikhroli-SignetKurlaPossession Jun 202951.5% built
- 87 · AMarqMumbai CityPossession Nov 202828.5% built
- 86 · AViolet G, H and ITalojaPossession Apr 202649.7% built1 complaints
- 86 · ABelvedere-KHedutanePossession Sept 202911.4% built
- 86 · ALODHA PARK - TOWN HOUSESWard GSouthPossession Dec 202167.3% built1 complaints
- 85 · ALODHA SPLENDORA - PLATINO - BThanePossession Mar 201981.8% built
- 85 · APALAVA SAVANA AND SIENAKalyanPossession Feb 202190.9% built6 complaints
- 85 · ALODHA FRESHIA WING A, B, CKalyanPossession Dec 201790.9% built
- 85 · ALodha Supremus - Thane, KolshetKolshetPossession Jul 2022100% built1 complaints
- 85 · AApollo RetailThanePossession Sept 202081.8% built
- 85 · AUPPER THANE - TIARA DBHIWANDIPossession Mar 202481.8% built
- 85 · AUpper Thane - Tiara HDombivaliPossession Nov 202535.5% built
- 85 · AUpper Thane - Meadows E, F, GDombivaliPossession Oct 20250% built
- 85 · APALAVA OLIVIA APalavaPossession Nov 20250% built
- 85 · AUpper Thane - Meadows ADombivaliPossession Sept 20250% built
- 85 · ACasa Selva A to CDombivaliPossession Mar 20254.5% built
- 85 · AClara Shops.Possession Jul 202081.8% built
- 85 · ALakeside 2 Shops.Possession Jul 202081.8% built
- 85 · ALodha iThink BPalava.Possession Feb 202281.8% built
- 85 · ACrown Splendora - Tower 1BHAYANDARPADAPossession Nov 20251.4% built
- 85 · ANEW CUFFE PARADE - LODHA ESTRELLAWard FNorthPossession Jan 201981.8% built6 complaints
- 85 · ANCP Commercial Tower 1 - Floors 24 to 28Ward FNorthPossession Jun 201981.8% built
- 85 · ANCP Commercial Tower 1 - Floor 23rdWard FNorthPossession Sept 201981.8% built
- 85 · ANCP Commercial Tower - SupremusWard FNorthPossession Mar 202481.8% built
- 85 · ANCP Commercial Tower 1 - up to 22nd FloorWard FNorthPossession Dec 201981.8% built
- 85 · ABellevue Tower - 3Mumbai CityPossession Dec 202774.1% built
- 85 · ALodha Belmondo - Tower 31BelmondoPossession Mar 202590.9% built
- 85 · AHinjewadi Premium - Tower 9HinjewadiPossession Jun 2031
- 85 · AHinjewadi Premium - Tower 10HinjewadiPossession Jul 2032
- 84 · ALodha Kolshet A2 - Tower 3DhokaliPossession Sept 20310% built
- 84 · ALodha BellevueMumbai CityPossession Sept 202876.8% built2 complaints
- 83 · APALAVA URBANO D AND EKalyanPossession Oct 202278.9% built1 complaints
- 83 · ALodha Kolshet Plot A - Tower JThanePossession Dec 202281.8% built
- 83 · AUpper Thane - Woodlands G,H,IAnjurPossession Sept 202381.8% built5 complaints
- 83 · AForesta & FioraDombivaliPossession Aug 20230% built1 complaints
- 83 · APalava Olivia CKalyanPossession Aug 202381.8% built
- 83 · ALodha Amara - Tower 46KolshetPossession Jul 202481.8% built
- 83 · ALODHA AMARA - TOWER 23KOLSHETPossession Dec 202281.8% built
- 83 · ALodha Sterling - Tower HThanePossession May 202481.8% built
- 83 · ALodha Quality Home Tower 2Majiwada ThanePossession Jul 202481.8% built
- 83 · ANorth MLCP ShopPALAVAPossession Jul 202081.8% built
- 83 · ALodha Clariant C3BalkumPossession Jun 202381.8% built
- 83 · ALodha Villa Royale PalavaKhoni & AntarliPossession Sept 20251 complaints
- 83 · AAcenza Tower A and BAndheriPossession May 2027
- 83 · AAcenza Tower CAndheriPossession Dec 202770.5% built
- 83 · ANEW CUFFE PARADE -LODHA ALTIAWard FNorthPossession Mar 202281.8% built5 complaints
- 83 · ALodha Signet Lower Parel Wing AWard GSouthPossession May 202540.5% built1 complaints
- 83 · ALodha Belmondo - Tower 29BelmondoPossession Sept 202490.9% built1 complaints
- 83 · AKharadi Pune P1WagholiPossession Jun 202929.9% built
- 83 · AKharadi SignetWagholiPossession Aug 20280% built
- 83 · AKharadi New Project - Tower 1WagholiPossession Mar 2030
- 83 · AKharadi New Project -Tower 2WagholiPossession Mar 2030
- 83 · AKHARADI NEW PROJECT -TOWER 11WagholiPossession Nov 2030
- 82 · ALodha AdrinaWard GSouthPossession Jun 202688.6% built1 complaints
- 81 · ALODHA AMARA - TOWER 29,31ThanePossession Jul 202281.8% built1 complaints
- 81 · AUpper Thane Greenville A - E, E1, F - IBhiwandiPossession Sept 202275.2% built8 complaints
- 81 · AUpper Thane Treetops A - C, C1, C2, D - FBhiwandiPossession Sept 202278.2% built8 complaints
- 81 · ALODHA BELMONDO Pebble Beach E, Estancia AGahunjePossession Sept 201890.9% built2 complaints
- 81 · ALodha Belmondo - Pebble Beach DBelmondoPossession Dec 201890.9% built2 complaints
- 80 · AStella-Tower BMajiwadePossession Dec 2030
- 80 · AAcenza-Tower DAndheri (East) ‘K/E’ ward Mumbai.Possession Dec 2029
- 80 · AKHARADI NEW PROJECT -TOWER 4WagholiPossession Mar 2030
- 80 · AKHARADI NEW PROJECT - TOWER 3WAGHOLIPossession Mar 2030
- 80 · AKHARADI NEW PROJECT -TOWER 5WagholiPossession Sept 2030
- 80 · ALVR Palava -Ready Villa's on landKhoni & AntarliPossession Mar 2028
- 79 · BPALAVA CLARA E - IKalyanPossession Dec 202081.8% built1 complaints
- 79 · BLodha Panacea IIDombivaliPossession Oct 202667% built1 complaints
- 79 · BLODHA AMARA - TOWER 38 and 39ThanePossession Jul 202481.8% built2 complaints
- 79 · BLodha Quality Home Tower 3Majiwada ThanePossession Sept 202481.8% built3 complaints
- 79 · BLodha Quality Home Tower - 5MAJIWADA THANEPossession Mar 202581.8% built2 complaints
- 79 · BLodha Supremus - AndheriAndheriPossession Aug 202290.9% built1 complaints
- 79 · BKharadi Pune Phase II Tower 8WagholiPossession Jun 202929.6% built1 complaints
- 78 · BPalava MagnoliaPalavaPossession Dec 202931.3% built
- 77 · BLodha Amara - Tower 36 37.Possession Dec 202281.8% built3 complaints
- 77 · BLodha Splendora - River ViewBHAYANDERPADAPossession Sept 202481.8% built4 complaints
- 77 · BLodha Amara - Tower 45KOLSHETPossession Jul 202481.8% built1 complaints
- 77 · BKharadi Pune Phase I - Tower 1 to 4HaveliPossession Feb 202763.6% built8 complaints
- 75 · BPALAVA CLUSTER 2-06 - A - G, I - NKalyanPossession Jun 202278.2% built2 complaints
- 75 · BLodha Amara - Tower 6, 22KolshetPossession Jan 202481.8% built9 complaints
- 75 · BLodha Amara Tower 47 and 48KolshetPossession Jun 202939.8% built
- 75 · BLodha Amara Tower 49 and 50KOLSHETPossession Dec 202873.9% built3 complaints
- 75 · BLODHA ETERNIS SERENA AAndheriPossession Dec 201990.9% built1 complaints
- 75 · BLODHA ETERNIS NATURA AAndheriPossession May 202290.9% built1 complaints
- 75 · BLodha Pune NIBM ProjectMohamadwadiPossession Jul 202669.7% built2 complaints
- 74 · BLodha Bellavista - Wing B2Off. Ghodbunder Road, ThanePossession Jul 20281 complaints
- 74 · BElanor - Tower 2DhokaliPossession Dec 20317.7% built1 complaints
- 74 · BNew Cuffe Parade - Lodha GardeniaMumbai CityPossession Mar 202371.4% built3 complaints
- 73 · BPalava Clara J-MKalyanPossession Oct 202281.8% built2 complaints
- 73 · BLODHA AMARA - TOWER 32,33ThanePossession Aug 202281.8% built5 complaints
- 73 · BLodha Kolshet Plot A - Tower KThanePossession Jun 202281.8% built5 complaints
- 73 · BLodha Lower Parel ProjectWard GSouthPossession Jun 202590.9% built5 complaints
- 72 · BBelvedere IHedutanePossession Dec 20301.8% built
- 72 · BLODHA ETERNIS IDYLLIA AAndheriPossession Jun 202783% built1 complaints
- 71 · BLODHA SPLENDORA - PLATINO - DThane (M Corp.)Possession Sept 20220% built
- 71 · BLodha Amara Tower 24 and 25BALKUM Thane WestPossession Mar 202881.8% built
- 71 · BLODHA ETERNIS IDYLLIA B, SERENA B, NATURA B AND CAndheriPossession Dec 201890.9% built3 complaints
- 71 · BLODHA ETERNIS SERENA CAndheriPossession Dec 202383.6% built3 complaints
- 71 · BLodha Belmondo - TownhousesPunePossession Jun 20220% built1 complaints
- 70 · BLodha Mahalakshmi - SignetBycullaPossession Aug 20279.1% built1 complaints
- 69 · BPALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to TKalyanPossession Jun 201978.2% built4 complaints
- 69 · BLodha Mira Road Project 1.Possession Nov 202281.8% built8 complaints
- 67 · BPALAVA CLARA A to D, D1KalyanPossession Feb 202281.8% built5 complaints
- 67 · BLodha Amara - Tower 20, 21KolshetPossession Sept 202381.8% built8 complaints
- 67 · BLodha Bellavista - Wing B1Off. Ghodbunder Road, ThanePossession Jul 2028
- 67 · BLodha Belmondo St. Andrews B,C,D Villa 1 to 28.Possession Jul 201876.7% built9 complaints
- 65 · BLodha Quality Home Tower 1ThanePossession Jul 202481.8% built7 complaints
- 64 · CPalava Florea - A to DKalyanPossession Jul 202361.4% built5 complaints
- 63 · CElanor - Tower 1DhokaliPossession Dec 203111.8% built
- 62 · CLodha Amara Tower 44KolshetPossession Jun 202847.9% built
- 59 · CLodha Amara -Tower 42 and 43BALKUM Thane WestPossession Dec 202765% built3 complaints
- 58 · CLODHA AMARA - TOWER 26, 27, 28, 30, 34, 35ThanePossession Dec 202178.2% built18 complaints
- 57 · CLodha FiorenzaBorivaliPossession Jan 201890.9% built5 complaints
- 56 · CLODHA SPLENDORA PLATINO E TO G , VIVANT A TO DThanePossession Jun 201978.2% built14 complaints
- 52 · CNEW CUFFE PARADE - LODHA DIORO AND ELISIUMWard FNorthPossession Jun 201981.8% built38 complaints
- 52 · CNEW CUFFE PARADE - LODHA ENCHANTEWard FNorthPossession Jun 201981.8% built16 complaints
- 41 · DNEW CUFFE PARADE - LODHA EVOQ 41st FloorWard FNorthPossession Dec 202081.8% built8 complaints
- 41 · DLODHA VENEZIA - 49TH TO 65TH FLOORWard FSouthPossession Dec 201890.9% built8 complaints
- 38 · DLODHA AMARA - TOWER 1 - 5, 7 - 19ThanePossession Nov 201978.2% built26 complaints
- 36 · DLODHA PARKWard GSouthPossession Dec 202390.9% built74 complaints
- 34 · DLODHA AZZUROWard FSouthPossession Jun 202290.9% built15 complaints
Data from official MahaRERA public disclosures. Projects are grouped into one developer by the promoter name, the disclosed office and the MahaRERA filing account together, so differently spelt filings by one builder stay together and unrelated firms that merely share a common word do not (slug: lodha-developers). Scores are PropPin's transparent rule-based rating — every factor cites a disclosure. Not investment advice.