All MahaRERA projects
27,983 registered projects with disclosed construction progress or complaint records. Page 21 of 56.
Mumbai Suburban
- AVANT HERITAGE - V · AndheriAVANT HERITAGE - V · P51800053527 · possession Apr 2028 · 29.7% built · 1 complaint
- PRERANA CHSL · AndheriPRERANA CHSL · P51800053537 · possession Jul 2026 · 90.9% built
- EDMONT - AURELIA · BorivaliEDMONT - AURELIA · P51800053546 · possession Dec 2029 · 17.3% built · 1 complaint
- WOODSTOCK GARDENS · AndheriWOODSTOCK GARDENS · P51800053552 · possession Oct 2026 · 95.5% built
- Kalpataru Vivant - South Wing C · AndheriKalpataru Vivant - South Wing C · P51800053558 · possession Apr 2029 · 66.4% built · 1 complaint
- SHIVSAI SRA CHS · AndheriSHIVSAI SRA CHS · P51800053571 · possession Apr 2029 · 25.5% built · 1 complaint
- Rivali Park - Stargaze · BorivaliRivali Park - Stargaze · P51800053578 · possession Feb 2030 · 52.3% built
- Sai Signature · KurlaSai Builders & Developers · P51800053594 · possession Mar 2028 · 8.6% built
- REDEVELOPMENT OF LAKSHMAN TOWER CHSL · BorivaliREDEVELOPMENT OF LAKSHMAN TOWER CHSL · P51800053601 · possession Mar 2027 · 72.3% built
- Park Royale Phase III · AndheriShivranjani Properties LLP · P51800053602 · possession Apr 2027 · 61.9% built
- Sky Estella · KurlaSky Estella · P51800053621 · possession Mar 2027 · 100% built
- VISTA RESIDENCES WING-D TOWER -3 · BorivaliVISTA RESIDENCES WING-D TOWER -3 · P51800053625 · possession Apr 2029 · 43.9% built
- Sanghvi Pride · BorivaliSanghvi Pride · P51800053635 · possession Apr 2031 · 27.3% built
- Proposed Redevelopment of Existing Building Known as Queens Croft CHSL · AndheriProposed Redevelopment of Existing Building Known as Queens Croft CHSL · P51800053638 · possession Jan 2028 · 100% built
- KOYAL GEET CHSL · KurlaKOYAL GEET CHSL · P51800053641 · possession Apr 2027 · 37.1% built
- TATHASTU · AndheriTATHASTU · P51800053645 · possession Jul 2026 · 100% built
- VIVA DHANLAXMI · AndheriVIVA DHANLAXMI · P51800053647 · possession Dec 2026 · 84.5% built
- OSWAL AVENUE · KurlaOSWAL AVENUE · P51800053649 · possession Apr 2027 · 41.8% built
- Manshaya Apartments · KurlaManshaya Apartments · P51800053650 · possession Dec 2026 · 44.1% built
- K.E. HEIGHTS · AndheriK.E. HEIGHTS · P51800053666 · possession Apr 2028 · 18.2% built
- Olive · BorivaliAbdul Hamid Mapkhan Shah · P51800053667 · possession Apr 2028 · 66.5% built
- HARI NIWAS · BORIVALI EASTTORAL RAJ DEVELOPERS · P51800053673 · possession Dec 2025 · 72.7% built
- PALASH · BorivaliPALASH · P51800053688 · possession Dec 2026 · 78.2% built
- Ananda CHS Wing B · KurlaAnanda CHS Wing B · P51800053700 · possession Mar 2027 · 18.2% built
- CHARKOP DR AMBEDKAR COLLEGE TEACHERS CO OPERATIVE HOUSING SOCIETY LTD · BorivaliCHARKOP DR AMBEDKAR COLLEGE TEACHERS CO OPERATIVE HOUSING SOCIETY LTD · P51800053711 · possession Dec 2026 · 63.6% built
- RITA PALACE CHSL · BorivaliRITA PALACE CHSL · P51800053732 · possession Dec 2028 · 69.1% built
- RUNWAL WOODS · KurlaRUNWAL WOODS · P51800053733 · possession Nov 2031 · 1 complaint
- AVANT PARK WEST · AndheriAVANT PARK WEST · P51800053738 · possession Oct 2027 · 39.2% built
- PODDAR HARMONY · KurlaPODDAR HARMONY · P51800053752 · possession Oct 2028 · 68.2% built
- Ganesh Dham · KurlaGanesh Dham · P51800053763 · possession Apr 2030 · 33.5% built
- ANANTA · KurlaANANTA · P51800053780 · possession Aug 2026 · 60% built · 1 complaint
- SAHAKAR VISTA · BorivaliSAHAKAR VISTA · P51800053793 · possession Jul 2026 · 67.3% built
- ROSE BLOSSOM CHSL · AndheriVINI DEVELOPERS · P51800053800 · possession Dec 2026 · 77.3% built
- GURUKRUPA SHARANAM · MUMBAIGURUKRUPA REALCON LIFESPACES LLP · P51800053804 · possession Dec 2026 · 81.8% built
- REDEVELOPMENT OF SHINING STAR CHSL · AndheriREDEVELOPMENT OF SHINING STAR CHSL · P51800053810 · possession Jul 2027 · 68.6% built
- MINT · AndheriMINT · P51800053816 · possession Nov 2026 · 90.9% built
- BORIVALI KESAR KRIPA CHS LTD · BorivaliBORIVALI KESAR KRIPA CHS LTD · P51800053824 · possession Apr 2028 · 67.3% built · 1 complaint
- REDEVELOPEMENT OF SAMRAT CHSL · AndheriREDEVELOPEMENT OF SAMRAT CHSL · P51800053827 · possession Aug 2027 · 69.4% built
- Kalpataru Vivant - South Wing E · AndheriKalpataru Vivant - South Wing E · P51800053828 · possession Apr 2029 · 57.4% built
- DREAM ASPIRE · AndheriDREAM ASPIRE · P51800053836 · possession Dec 2026 · 70.6% built
- Vasupujya Darshan · BorivaliVasupujya Darshan · P51800053877 · possession Apr 2027 · 85.5% built
- Godrej Sky Terraces · KurlaGodrej Sky Terraces · P51800053882 · possession Jul 2029 · 49.5% built
- Anuvidnyan Nagar Co-Op. Housing Society Ltd. · KurlaAnuvidnyan Nagar Co-Op. Housing Society Ltd. · P51800053906 · possession Oct 2027 · 44.6% built
- Gyan Gold Crest · AndheriGyan Gold Crest · P51800053907 · possession Apr 2028 · 37% built · 6 complaints
- Varella Mansion · BorivaliVarella Mansion · P51800053911 · possession Feb 2028 · 43.6% built
- BALI SERENITY · BorivaliBALI SERENITY · P51800053916 · possession Jul 2027 · 76.2% built
- Maitri Enclave · AndheriMaitri Enclave · P51800053925 · possession Apr 2027 · 20.9% built
- GS PEARL · KurlaGS PEARL · P51800053941 · possession Apr 2027 · 42.5% built · 1 complaint
- Sugee Vaayu · KurlaSugee Vaayu · P51800053945 · possession Apr 2032 · 9.1% built
- RATNADEEP · KurlaRATNADEEP · P51800053957 · possession Oct 2027 · 85.9% built
- SANGHVI PALAZZO · AndheriSANGHVI PALAZZO · P51800053991 · possession Apr 2028 · 66.4% built
- West Shore · AndheriWest Shore · P51800053995 · possession Oct 2028 · 21.4% built
- SHANGRILA · MumbaiSHANGRILA · P51800054003 · possession Apr 2027 · 50.5% built
- 12 PEGASUS · Andheri12 PEGASUS · P51800054031 · possession Apr 2029 · 68.8% built · 1 complaint
- NATASHA AVANA · KurlaNATASHA AVANA · P51800054035 · possession Apr 2029 · 44.5% built · 3 complaints
- ATHARV OM CHANDRAMILAN · AndheriATHARV OM CHANDRAMILAN · P51800054052 · possession Apr 2029 · 99.5% built
- SANGHVI HORIZON · BorivaliSANGHVI HORIZON · P51800054086 · possession Apr 2029 · 30.1% built
- REDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSL · BorivaliREDEVELOPMENT OF UNION BANK OF INDIA EMPLOYEES ANKUR CHSL · P51800054093 · possession Feb 2027 · 81.8% built
- Ramaakrishna · AndheriRamaakrishna · P51800054095 · possession Apr 2027 · 100% built
- SIGMA SOLITAIRE · BorivaliSIGMA SOLITAIRE · P51800054097 · possession Apr 2028 · 47.4% built
- Sai Jyoti · AndheriSai Jyoti · P51800054144 · possession Apr 2027 · 63.6% built
- GANESH CHHAYA CO-OPERATIVE HOUSING SOCIETY LTD. · AndheriGANESH CHHAYA CO-OPERATIVE HOUSING SOCIETY LTD. · P51800054151 · possession Dec 2028 · 70% built
- REDEVELOPMENT OF JAMUNA MAHAL CHSL · AndheriREDEVELOPMENT OF JAMUNA MAHAL CHSL · P51800054158 · possession Sept 2027 · 53.6% built
- Piramal Revanta Tower 5 · KurlaPiramal Revanta Tower 5 · P51800054164 · possession Mar 2029 · 37.5% built
- SHUBHAM ATHENA · KurlaSHUBHAM ATHENA · P51800054167 · possession Oct 2026 · 38.5% built
- PARK VIEW · KurlaPARK VIEW · P51800054171 · possession Apr 2028 · 48.7% built
- Sheetal Inder Mohini · AndheriSheetal Inder Mohini · P51800054186 · possession Dec 2026 · 78.2% built · 1 complaint
- ARKADE PEARL 1 · AndheriARKADE PEARL 1 · P51800054195 · possession Apr 2027 · 72.7% built
- ETERNIA · KurlaETERNIA · P51800054205 · possession Apr 2028 · 63.1% built · 1 complaint
- Shreeji Eternity Wing - D · BorivaliShreeji Eternity Wing - D · P51800054233 · possession Oct 2028 · 41.2% built · 1 complaint
- MESACON GREENS · AndheriMESACON GREENS · P51800054234 · possession Oct 2027 · 69.1% built
- ATHARV CASA · AndheriATHARV CASA · P51800054258 · possession Dec 2028 · 81.8% built
- SAYBA ORCHID · KurlaSAYBA ORCHID · P51800054279 · possession Dec 2026 · 90.9% built
- RAGHAV ANANTA · KurlaRAGHAV RAJ BUILDERS & DEVELOPERS LLP · P51800054281 · possession Apr 2028 · 50% built · 1 complaint
- OMKARA UNCHAI · BorivaliOMKARA UNCHAI · P51800054289 · possession Mar 2027 · 56.8% built
- SRUSHTIRAJ SIDDHI SQUARE · KurlaSRUSHTIRAJ SIDDHI SQUARE · P51800054297 · possession Apr 2029 · 4.5% built
- Shreeji Eternity Wing - A, Shreeji Eternity Wing - B, Shreeji Eternity Wing - C · BorivaliShreeji Eternity Wing - A, Shreeji Eternity Wing - B, Shreeji Eternity Wing - C · P51800054310 · possession Oct 2027 · 43% built
- CHIDAKASH · KurlaCHIDAKASH · P51800054316 · possession Apr 2027 · 42.5% built
- OM SHRI JAGANNATH CHSL · BorivaliOM SHRI JAGANNATH CHSL · P51800054351 · possession Apr 2027 · 73.2% built · 1 complaint
- SANDEEP ANKUR RESIDENCY · AndheriSANDEEP ANKUR RESIDENCY · P51800054360 · possession Dec 2026 · 44.5% built
- Nebula Empress · AndheriNebula Empress · P51800054371 · possession Apr 2028 · 79.7% built
- SHUBHAM AURUM · KurlaSHUBHAM AURUM · P51800054393 · possession Oct 2026 · 38.5% built
- BANSI TERRACE CHSL · BorivaliBANSI TERRACE CHSL · P51800054394 · possession Apr 2027 · 90.9% built
- SAI SHANKAR · KurlaSAI SHANKAR · P51800054397 · possession Apr 2029 · 44.5% built · 1 complaint
- ROHA EVA ARIA · KurlaROHA EVA ARIA · P51800054410 · possession Apr 2028 · 13.6% built · 2 complaints
- LAKSHMI SOLITAIRE · AndheriLAKSHMI SOLITAIRE · P51800054412 · possession Dec 2026 · 72.7% built
- INSIGNIA · KurlaINSIGNIA · P51800054415 · possession Apr 2027 · 84.5% built
- VERDANT · AndheriVERDANT · P51800054425 · possession Jun 2029 · 51.8% built
- Ashiyana Apartment CHSL Ltd · BorivaliAshiyana Apartment CHSL Ltd · P51800054430 · possession Jan 2028 · 34.5% built
- MAHANT SAHYADREE · BorivaliMAHANT SAHYADREE · P51800054444 · possession Dec 2027 · 62.7% built · 2 complaints
- Queens Avenue · KurlaQueens Avenue · P51800054458 · possession Apr 2028 · 3.6% built · 1 complaint
- RAGHAV ENCLAVE · KurlaRAGHAV ENCLAVE · P51800054464 · possession Apr 2028 · 51.8% built
- Pratap Liberty One · BorivaliPratap Liberty One · P51800054465 · possession Apr 2028 · 40.7% built
- Luma Tower C · AndheriLuma Tower C · P51800054472 · possession Sept 2027 · 35.5% built
- AARADHYA ONEPARK · KurlaAARADHYA ONEPARK · P51800054477 · possession Nov 2028 · 76.2% built
- KDO CHSL · KurlaKDO CHSL · P51800054480 · possession Mar 2027 · 14.5% built
- VIRA ONE · BorivaliVIRA ONE · P51800054485 · possession Apr 2027 · 57.3% built
- Mangal Varsha · AndheriMangal Varsha · P51800054491 · possession Sept 2026 · 100% built · 1 complaint
- 99 Rajgir · Borivali99 Rajgir · P51800054493 · possession Apr 2029 · 9.1% built
- SWASTIK · BorivaliSWASTIK · P51800054494 · possession Sept 2026 · 100% built · 1 complaint
- MAYFAIR BREEZE · AndheriMAYFAIR BREEZE · P51800054512 · possession Nov 2027 · 81.8% built
- Rodium - Xone · BorivaliRodium - Xone · P51800054521 · possession Oct 2027 · 28.8% built · 1 complaint
- ZODIAC ANJANESHWAR · AndheriZODIAC ANJANESHWAR · P51800054548 · possession Dec 2027 · 59.6% built
- EMPIRE VRINDAVAN · BORIVALI EASTEMPIRE REALTY · P51800054561 · possession Nov 2026 · 45.5% built
- AJMERA BOULEVARD · BorivaliAJMERA BOULEVARD · P51800054569 · possession Apr 2027 · 90.9% built
- DIVYA JYOT REWA ESTATE · KurlaDIVYA JYOT REWA ESTATE · P51800054575 · possession Dec 2028 · 51% built
- MUKTANGAN RESIDENCY · BorivaliMUKTANGAN RESIDENCY · P51800054585 · possession Feb 2028 · 81.8% built
- POLO MATRIX · BorivaliPOLO MATRIX · P51800054588 · possession Apr 2027 · 44% built
- RAMKRISHNA · AndheriRAMKRISHNA · P51800054622 · possession Apr 2027 · 73.6% built
- SIGMA JADE · AndheriNIKETAN VENTURES PRIVATE LIMITED · P51800054626 · possession Apr 2029 · 19% built
- I SPACE URBAN VISTA · BorivaliI SPACE URBAN VISTA · P51800054640 · possession Jun 2029 · 14.7% built
- SEAPLAZA · KurlaSEAPLAZA · P51800054646 · possession Dec 2032 · 45.5% built · 1 complaint
- PARDIS SHINGADIA · KurlaPARDIS SHINGADIA · P51800054651 · possession Aug 2027 · 81.8% built
- Mangal Business Park - Gautam Apartment · BorivaliMangal Business Park - Gautam Apartment · P51800054656 · possession Jul 2027 · 79.5% built
- Godrej Reserve Wing 5 · BorivaliGodrej Reserve Wing 5 · P51800054690 · possession Oct 2030 · 27.3% built · 3 complaints
- Godrej Reserve Wing 4 · BorivaliGodrej Reserve Wing 4 · P51800054691 · possession Oct 2030 · 27.3% built
- 27 VIDYA · Borivali27 VIDYA · P51800054694 · possession Apr 2027 · 40% built
- Godrej Reserve Wing 1 · BorivaliGodrej Reserve Wing 1 · P51800054703 · possession Oct 2030 · 27.3% built
- Anmol Residency · BorivaliAnmol Residency · P51800054713 · possession Apr 2029 · 31.8% built
- Sky Vista · AndheriSky Vista · P51800054717 · possession May 2029 · 29.2% built
- RASHMI SQUARE · BorivaliRASHMI SQUARE · P51800054722 · possession Sept 2027 · 73.2% built
- RANG REKHA · BorivaliRANG REKHA · P51800054737 · possession Apr 2028 · 47.8% built
- ANJANI SHIKHAR · BorivaliANJANI SHIKHAR · P51800054761 · possession Apr 2028 · 60.9% built
- GAMI AND JAYDEEP ESTELLA · KurlaGAMI AND JAYDEEP ESTELLA · P51800054781 · possession Jul 2027 · 67.3% built
- Vallabh Krupa CHSL · BorivaliVallabh Krupa CHSL · P51800054796 · possession Feb 2027 · 51.5% built
- KUBER VILLA · AndheriKUBER VILLA · P51800054808 · possession Oct 2026 · 81.8% built
- Sheetal Sahyog · BorivaliSheetal Sahyog · P51800054809 · possession Oct 2027 · 28.9% built
- Shraddha Imperia · KurlaShraddha Imperia · P51800054815 · possession Sept 2028 · 27.3% built
- The Address by GS Bandra Tower C · AndheriThe Address by GS Bandra Tower C · P51800054828 · possession May 2030 · 27.3% built
- KABRA TIARA - Redevelopment of Dindoshi Darshan CHSL · BorivaliKABRA TIARA - Redevelopment of Dindoshi Darshan CHSL · P51800054840 · possession Apr 2028 · 66.6% built · 1 complaint
- The Address by GS Bandra Tower B · AndheriThe Address by GS Bandra Tower B · P51800054846 · possession May 2030 · 27.3% built
- The Address by GS Bandra Tower A · AndheriThe Address by GS Bandra Tower A · P51800054847 · possession May 2030 · 27.6% built · 1 complaint
- SILICON HOFE B WING · KurlaSILICON HOFE B WING · P51800054852 · possession Jan 2027 · 40.7% built
- ADVENT DEEPAK · BorivaliADVENT DEEPAK · P51800054861 · possession Apr 2028 · 37.3% built
- PEARL BLESSINGS · AndheriPEARL BLESSINGS · P51800054883 · possession Apr 2029 · 64.3% built
- DOTOM HILTON · BorivaliDOTOM HILTON · P51800054884 · possession Dec 2027 · 0% built · 1 complaint
- DEVKI NAGAR CHS LTD. · BorivaliDEVKI NAGAR CHS LTD. · P51800054886 · possession Apr 2028 · 41.8% built
- SHREE KALPTARU CHS LTD · AndheriSHREE KALPTARU CHS LTD · P51800054893 · possession Apr 2027 · 8.9% built
- House of Shreeji Sharan · BorivaliHouse of Shreeji Sharan · P51800054896 · possession Sept 2026 · 100% built
- Shree Ram Residency · MumbaiShree Ram Residency · P51800054905 · possession Dec 2026 · 81.8% built
- Arkade Eden · BorivaliArkade Eden · P51800054908 · possession Dec 2026 · 52.8% built
- THE PANORAMA BY RUSTOMJEE · AndheriTHE PANORAMA BY RUSTOMJEE · P51800054920 · possession Feb 2029 · 53.8% built
- AAI SATIDEVI PARADISE · MULUND WESTSHREENATH DEVELOPERS · P51800054925 · possession Sept 2026 · 78.4% built · 2 complaints
- Om Kailash Ganga CHS LTD · KurlaOm Kailash Ganga CHS LTD · P51800054928 · possession Feb 2028 · 44.5% built
- Ruparel Celestia · KurlaRuparel Celestia · P51800054935 · possession Apr 2027 · 83.6% built · 1 complaint
- DLH DAWN · AndheriDLH DAWN · P51800054960 · possession May 2027 · 100% built
- SHEETAL INFINITY · BorivaliSHEETAL INFINITY · P51800054964 · possession Oct 2027 · 49.5% built · 1 complaint
- GOLDMIST CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliGOLDMIST CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800054965 · possession Apr 2027 · 62.3% built · 1 complaint
- SAMARPAN SANKALP · BorivaliSAMARPAN SANKALP · P51800054977 · possession Apr 2027 · 50.9% built · 1 complaint
- ELYSIUM · MumbaiELYSIUM · P51800054981 · possession Apr 2028 · 88.1% built
- MODI ARCADE · BorivaliMODI ARCADE · P51800054984 · possession Jan 2030 · 55.5% built · 1 complaint
- Sai Shrusti CHS · KurlaSai Shrusti CHS · P51800054989 · possession Apr 2028 · 46.4% built
- Dedhia Avenue · KurlaDedhia Avenue · P51800054991 · possession Sept 2027 · 44.1% built
- WILD TEASEL · AndheriWILD TEASEL · P51800055026 · possession Jan 2028 · 38.2% built
- Royale Rose · AndheriRoyale Rose · P51800055030 · possession Dec 2028 · 38.6% built
- Shraddha Palm · KurlaShraddha Palm · P51800055034 · possession Mar 2027 · 53.7% built
- Antariksh Alpha · KurlaAntariksh Alpha · P51800055041 · possession Jun 2028 · 49.1% built
- SHRIRAM NIWAS · KurlaSHRIRAM NIWAS · P51800055053 · possession Oct 2027 · 81.8% built
- Matrusmruti · BorivaliMatrusmruti · P51800055075 · possession Feb 2027 · 77.7% built
- Ganapati Baug CHSL · BorivaliGanapati Baug CHSL · P51800055078 · possession May 2028 · 24.5% built
- YASH PRATIK · KurlaYASH PRATIK · P51800055080 · possession Apr 2029 · 0.9% built
- SPARKLES MITALI BUSINESS CENTRE · BorivaliSPARKLES MITALI BUSINESS CENTRE · P51800055085 · possession Apr 2028 · 33.5% built · 1 complaint
- RISHAB LAXMI · BorivaliRISHAB LAXMI · P51800055091 · possession Apr 2027 · 29.1% built
- VARDHAMAN BUSINESS BAY · KurlaVARDHAMAN BUSINESS BAY · P51800055109 · possession Apr 2028 · 100% built
- AIRICA TOWER 1 · KurlaAIRICA TOWER 1 · P51800055125 · possession Apr 2030 · 9.1% built · 4 complaints
- DAMYANTI VILLA CO OPERATIVE HOUSING SOCIETY · BorivaliDAMYANTI VILLA CO OPERATIVE HOUSING SOCIETY · P51800055127 · possession Apr 2027 · 10% built
- PRANEETA HEIGHTS · BorivaliPRANEETA HEIGHTS · P51800055133 · possession Dec 2027 · 90.9% built · 1 complaint
- Sai Divine B And C · BorivaliSai Divine B And C · P51800055152 · possession Dec 2027 · 28.1% built
- SILVERBAY · AndheriSILVERBAY · P51800055163 · possession Apr 2028 · 9.5% built
- AIRICA TOWER 4 · KurlaAIRICA TOWER 4 · P51800055166 · possession Apr 2030 · 7.3% built
- VRAJ EMERALD 60-SAIKRUPA · KurlaVRAJ EMERALD 60-SAIKRUPA · P51800055177 · possession Apr 2030 · 42.8% built
- SHANKAR DARSHAN CHS LTD · KurlaSHANKAR DARSHAN CHS LTD · P51800055178 · possession Apr 2027 · 73.2% built
- GOLDEN CASA · AndheriGOLDEN CASA · P51800055181 · possession Apr 2029 · 63% built
- SAMARTH NANDADEEP HEIGHTS · BorivaliSAMARTH NANDADEEP HEIGHTS · P51800055185 · possession Feb 2027 · 25.5% built · 3 complaints
- SAYBA ARCADIA · Kurla WestSTAR EMPIRE · P51800055257 · possession Jul 2026 · 81.8% built
- Misty Heights · KurlaMisty Heights · P51800055265 · possession Dec 2027 · 27.3% built · 1 complaint
- LABH SAPPHIRE · AndheriLABH SAPPHIRE · P51800055284 · possession Dec 2027 · 61.8% built
- FINE HEIGHTS · BorivaliFINE HEIGHTS · P51800055299 · possession Jun 2026 · 70.9% built
- SENROOFS PHASE 5, BUILDING KNOWN AS SENROOFS BOULEVARD · KurlaSENROOFS PHASE 5, BUILDING KNOWN AS SENROOFS BOULEVARD · P51800055320 · possession Dec 2029 · 21.5% built
- AMPPLE-ONE · KurlaAMPPLE-ONE · P51800055324 · possession Jul 2027 · 99.5% built
- 78 LAKE TOWN · Kurla78 LAKE TOWN · P51800055387 · possession Jun 2029 · 32.7% built · 6 complaints
- ADITYARAJ MAJESTIC · CHEMBUR-EASTADITYARAJ HOUSING LLP · P51800055402 · possession Apr 2028 · 46.8% built
- RAJ ONE · BorivaliRAJ ONE · P51800055404 · possession Aug 2027 · 68.2% built · 1 complaint
- GOREGAON ADWAIT CHSL - VIJAY SADAN · BorivaliGOREGAON ADWAIT CHSL - VIJAY SADAN · P51800055423 · possession Apr 2027 · 63.1% built
- Sayba Olympia · KurlaSayba Olympia · P51800055430 · possession Apr 2027 · 22% built
- MALHAR KRISHNA · Mulund WestMulund Krishna Niwas CHSL · P51800055431 · possession Apr 2027 · 36.1% built
- PEARL PLATINUM WING B · AndheriPEARL PLATINUM WING B · P51800055438 · possession Apr 2029 · 53.6% built
- SENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA · KurlaSENROOFS PHASE IV, BUILDING NO D1, WING A KNOWN AS SOLANA · P51800055478 · possession Apr 2031 · 37.9% built · 1 complaint
- SHREEJI FIORA · BorivaliSHREEJI FIORA · P51800055480 · possession Dec 2027 · 10.9% built
- Trimbac · KurlaTrimbac · P51800055483 · possession Oct 2026 · 81.8% built
- Rivali Park - Moonrise · BorivaliRivali Park - Moonrise · P51800055489 · possession Oct 2030 · 48.1% built
- LA52 · AndheriLA52 · P51800055498 · possession Oct 2027 · 51.8% built
- AKSA TOWER · AndheriAKSA TOWER · P51800055503 · possession Jan 2027 · 81.8% built · 1 complaint
- Narang Vivenda · BorivaliNarang Vivenda · P51800055504 · possession Dec 2029 · 44.6% built
- Aurus · KurlaAurus · P51800055507 · possession Jul 2027 · 33.5% built
- JAYHARI CHS LTD · KANHERIDAM BUILDERS AND DEVELOPERS · P51800055510 · possession Apr 2027 · 64.1% built
- ANCHORPOINT AVIARA · MALAD (WEST)YUKTI INFRAPROJECTS LLP · P51800055516 · possession Apr 2029 · 38% built
- Ruparel Pristine · KurlaRuparel Pristine · P51800055522 · possession Apr 2027 · 48.3% built
- MESACON CROWN · AndheriMESACON CROWN · P51800055536 · possession Oct 2027 · 76.4% built
- BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD · BorivaliBALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD · P51800055537 · possession Sept 2027 · 29.4% built
- Advani Skyview · KurlaAdvani Skyview · P51800055544 · possession Apr 2028 · 2.7% built · 1 complaint
- VASANT HERITAGE · BorivaliVASANT HERITAGE · P51800055545 · possession Apr 2027 · 25.9% built
- Horizon Atulya · KurlaHorizon Atulya · P51800055546 · possession Dec 2026 · 86.8% built
- HIVE 97 · BorivaliHIVE 97 · P51800055561 · possession Apr 2030 · 35.9% built
- MOTI MADHAV · AndheriMOTI MADHAV · P51800055563 · possession Sept 2026 · 163.6% built
- Shree Hari Krupa · BorivaliShree Hari Krupa · P51800055568 · possession Sept 2026 · 67.3% built
- KANNAMWAR NAGAR GURUKUL CO-OP. HSG. SOC. LTD. · KurlaKANNAMWAR NAGAR GURUKUL CO-OP. HSG. SOC. LTD. · P51800055601 · possession May 2027 · 49.5% built
- GANGA NIWAS CHS LTD. · AndheriGANGA NIWAS CHS LTD. · P51800055613 · possession Apr 2030 · 57.3% built
- Pratap Harmony · AndheriPratap Harmony · P51800055621 · possession Dec 2027 · 47.4% built
- 27 Pallazzo · Kurla27 Pallazzo · P51800055642 · possession Apr 2027 · 51.8% built
- GAGANSAGAR · BorivaliGAGANSAGAR · P51800055645 · possession Apr 2027 · 74.5% built
- Aim Heritage · AndheriAim Heritage · P51800055664 · possession Apr 2027 · 72.7% built
- OM AMAR SHAKTI · BorivaliOM AMAR SHAKTI · P51800055675 · possession Apr 2028 · 58.1% built
- MOTI NIWAS · AndheriMOTI NIWAS · P51800055679 · possession Apr 2028 · 18.2% built
- ARIHANT VIEW · SANTACRUZ EAST MUMBAIARIHANT LABDHI BUILDERS PRIVATE LIMITED · P51800055681 · possession Aug 2025 · 43.2% built
- ANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2 · BorivaliANAND CO-OPERATIVE HOUSING SOCIETY LTD BUILDING NO 2 · P51800055685 · possession Apr 2027 · 45.9% built
- Godrej Reserve Wing 3 · BorivaliGodrej Reserve Wing 3 · P51800055694 · possession Jun 2030 · 27.3% built
- RDK RIVANTA · KurlaRDK RIVANTA · P51800055705 · possession Sept 2029 · 53.2% built
- VAIDYA WEST WORLD - HARMONY · AndheriVAIDYA WEST WORLD - HARMONY · P51800055721 · possession Jul 2027 · 90.9% built
- SHREE RADHE SHYAM HEIGHTS · BorivaliSHREE RADHE SHYAM HEIGHTS · P51800055735 · possession Apr 2028 · 78.2% built
- NIRVAANA CORAL · KurlaNIRVAANA CORAL · P51800055736 · possession Apr 2028 · 9.1% built
- Sagar Sarita Co-operative Housing Society LTD · BorivaliSagar Sarita Co-operative Housing Society LTD · P51800055739 · possession Apr 2029 · 40% built
- Shraddha Park City · BorivaliShraddha Park City · P51800055750 · possession Apr 2030 · 34.6% built · 1 complaint
- Vighnaharta Infinity · KurlaVighnaharta Infinity · P51800055751 · possession Apr 2028 · 43.1% built
- OM NIWAS · KurlaOM NIWAS · P51800055760 · possession Apr 2027 · 50% built
- SHARANYA · BorivaliSHARANYA · P51800055770 · possession Apr 2027 · 55.5% built
- MEENA HOUSE · BorivaliMEENA HOUSE · P51800055787 · possession Mar 2027 · 90.9% built
- AURIS SERENITY TOWER 4 RESIDENTIAL · BorivaliAURIS SERENITY TOWER 4 RESIDENTIAL · P51800055792 · possession Mar 2030 · 9.1% built · 1 complaint
- GURUKRUPA DHYANAM · AndheriGURUKRUPA DHYANAM · P51800055801 · possession Mar 2027 · 100% built
- Rishabraj Emerald · BorivaliRishabraj Emerald · P51800055814 · possession Apr 2027 · 22.7% built
- SHEETAL KIARA · BorivaliSHEETAL KIARA · P51800055832 · possession Dec 2028 · 46.8% built
- BITCON ELYSIUM · BorivaliBITCON ELYSIUM · P51800055839 · possession May 2029 · 50% built
- SABARI MIRA · CHEMBURSABARI URBAN DEVELOPERS LLP · P51800055844 · possession Apr 2027 · 90.9% built
- VAIDYA WEST WORLD - SERENITY · AndheriVAIDYA WEST WORLD - SERENITY · P51800055855 · possession Dec 2027 · 74.5% built
- NIKITARA · BorivaliNIKITARA · P51800055857 · possession Jan 2030 · 45.5% built
- KAMLA CHANDRA RASHMI · AndheriKAMLA CHANDRA RASHMI · P51800055882 · possession Dec 2027 · 77.3% built
- MK Emerald · KurlaMK Emerald · P51800055884 · possession Dec 2027 · 45.2% built
- SETHIA PRIDE WING B · BorivaliSETHIA PRIDE WING B · P51800055888 · possession Dec 2028 · 39.1% built · 4 complaints
- AKN ANNEXE · AndheriAKN ANNEXE · P51800055901 · possession Jun 2026 · 81.8% built
- Kurla Vijay Rahivashi Sangh Co-op. Hsg.Soc.Ltd. · KurlaVIKAS NARAYAN RAIKAR · P51800055918 · possession Apr 2030 · 55.9% built
- Vardhan Bliss · Mulund WestVardhan Reality Limited · P51800055919 · possession Apr 2028 · 24.5% built
- RIDHI SIDHI SADAN OF RIDHI SIDHI CO OPERATIVE HOUSING SOCIETY LTD · AndheriRIDHI SIDHI SADAN OF RIDHI SIDHI CO OPERATIVE HOUSING SOCIETY LTD · P51800055923 · possession Oct 2028 · 35% built
- Kedarnath Apartments · KurlaKedarnath Apartments · P51800055930 · possession Dec 2027 · 78.2% built
- Adarsh Garden Grove WING B · BorivaliAdarsh Garden Grove WING B · P51800055939 · possession Apr 2029 · 42.7% built
- AURIS NEXUS TOWER 4 COMMERCIAL · BorivaliAURIS NEXUS TOWER 4 COMMERCIAL · P51800055982 · possession Apr 2027 · 12.7% built · 2 complaints
- SHREYAAN HEIGHTS · BorivaliSHREYAAN HEIGHTS · P51800055994 · possession Aug 2031 · 41.1% built
- Prabhu Krupa · AndheriPrabhu Krupa · P51800055997 · possession Apr 2028 · 32.7% built · 1 complaint
- HUM DURGA · BorivaliHUM DURGA · P51800056010 · possession Apr 2027 · 100% built
- ORIGIN CLAREMONT · BorivaliORIGIN CLAREMONT · P51800056047 · possession Apr 2031 · 1.7% built · 2 complaints
- VOGUE77 · BorivaliVOGUE77 · P51800056048 · possession Apr 2028 · 59.8% built
- SEJAL SQUARE · BorivaliSEJAL SQUARE · P51800056052 · possession Apr 2030 · 12.3% built
- PROMONT · KurlaPROMONT · P51800056060 · possession Apr 2029 · 32% built · 3 complaints
- Soham Heights · BorivaliSoham Heights · P51800056062 · possession Dec 2027 · 50.6% built
- VIVAN HEIGHTS · KurlaVIVAN HEIGHTS · P51800056066 · possession Apr 2028 · 37.3% built
- Sai Kripa Ressidency · KurlaSai Kripa Ressidency · P51800056069 · possession Oct 2027 · 21.8% built
- Nirmaan Heena · Vile Parle EastM/s. Ramkripa Enterprises · P51800056079 · possession Dec 2025 · 90.9% built
- MIRCHANDANI GOLD STONE · AndheriMIRCHANDANI GOLD STONE · P51800056099 · possession Jul 2027 · 48.9% built
- MEGHMALA CRYSTA · BorivaliMEGHMALA CRYSTA · P51800056100 · possession Apr 2029 · 81.8% built
- Integrated Ramicon A · BorivaliIntegrated Ramicon A · P51800056120 · possession Apr 2028 · 42.3% built
- TRUSTWORTH MALAD · BorivaliTRUSTWORTH MALAD · P51800056138 · possession Apr 2029 · 12.7% built
- ARTHA · AndheriARTHA · P51800056140 · possession Apr 2028 · 89.1% built
- MODIREALTY ACACIA · BorivaliMODIREALTY ACACIA · P51800056150 · possession Jul 2028 · 71.4% built
- THE ERICA · BorivaliTHE ERICA · P51800056166 · possession Jul 2028 · 100% built
- Shiv Krupa · BorivaliShiv Krupa · P51800056181 · possession Dec 2028 · 63.6% built
- WESTWOOD · AndheriWESTWOOD · P51800056187 · possession Apr 2030 · 36.4% built
- GAUTAM PRABHU · BorivaliGAUTAM PRABHU · P51800056188 · possession Aug 2027 · 48.2% built
- MPR NILESH · BorivaliMPR NILESH · P51800056192 · possession Jan 2027 · 71.4% built
- 259 PARK CREST · Andheri259 PARK CREST · P51800056195 · possession Apr 2027 · 58.6% built · 1 complaint
- Ozone Residency · BorivaliOzone Residency · P51800056206 · possession Apr 2028 · 54.1% built
- Rajaram · BorivaliRajaram · P51800056207 · possession Apr 2028 · 43.5% built
- Silver Stellar · KurlaSilver Stellar · P51800056223 · possession Dec 2028 · 53.3% built
- SHRI MULUND JALARAM CHS LTD · KurlaSHRI MULUND JALARAM CHS LTD · P51800056237 · possession Apr 2028 · 40.9% built
- FLUSHEL PREMISES CO OP SOCIETY LTD · AndheriFLUSHEL PREMISES CO OP SOCIETY LTD · P51800056239 · possession Jun 2027 · 49.5% built
- Om Nandanvan · KurlaOm Nandanvan · P51800056240 · possession Apr 2028 · 65.9% built
- ASHWIN HEIGHTS · BorivaliASHWIN HEIGHTS · P51800056243 · possession Apr 2027 · 52.7% built
- OM NEELDHARA · KurlaOM NEELDHARA · P51800056253 · possession Oct 2028 · 54.5% built
- Dadamiyas Emerald · KurlaDadamiyas Emerald · P51800056273 · possession Mar 2027 · 87.9% built
- Supreme Prana · AndheriSupreme Prana · P51800056274 · possession Apr 2028 · 37% built
- Bhandup Siddhivinayak CHS Ltd · KurlaBhandup Siddhivinayak CHS Ltd · P51800056282 · possession Oct 2028 · 48.5% built
- SHRI SAI KRUPA · AndheriSHRI SAI KRUPA · P51800056283 · possession May 2027 · 56.8% built
- GANESH CHHAYA CHSL · BorivaliGANESH CHHAYA CHSL · P51800056287 · possession Apr 2029 · 18.2% built
- Gold Residences · AndheriGold Residences · P51800056305 · possession Jul 2029 · 6.4% built
- SHIV PALACE · BorivaliSHIV PALACE · P51800056318 · possession Sept 2027 · 69.1% built
- Aakruti Solitaire · KurlaAakruti Solitaire · P51800056319 · possession Jun 2027 · 60% built
- KABRA EMBRAZE - Redevelopment of Shree Sahawas CHSL · Ghatkopar EastKabra and Associates LLP · P51800056320 · possession Dec 2027 · 63.3% built
- Redevelopment of Neelkanth Park · KurlaRedevelopment of Neelkanth Park · P51800056326 · possession Apr 2029 · 73.2% built
- VATIKA SUDARSAN · AndheriVATIKA SUDARSAN · P51800056335 · possession Oct 2026 · 81.8% built
- LIBERTY HEIGHTS · BorivaliLIBERTY HEIGHTS · P51800056340 · possession Apr 2027 · 58.2% built
- Skicity Symphony · MumbaiSkicity Symphony · P51800056359 · possession Apr 2027 · 90% built
- SAHAKAR VATIKA · KANDIVALISAHAKAR BUILDERS & DEVELOPERS · P51800056363 · possession Apr 2028 · 86.7% built
- Amara · AndheriAmara · P51800056369 · possession Sept 2027 · 85.5% built
- SUKH SAAGAR · MULUND WESTR P COMBINES · P51800056375 · possession Dec 2028 · 60% built
- HS Landmark · KurlaHS Landmark · P51800056380 · possession Apr 2028 · 4.5% built
- Horizon Tower · AndheriHorizon Tower · P51800056381 · possession Jul 2027 · 69.1% built
- PREM AJANTA · KurlaPREM AJANTA · P51800056385 · possession Jan 2028 · 43.6% built
- YESHWANT · KurlaYESHWANT · P51800056387 · possession Apr 2027 · 73.6% built
- Cosmopolis Wing B · OSHIWARAJiten Agroland & Farm Private Limited · P51800056389 · possession Apr 2027 · 47.3% built
- Harshail Emerald Apartment · BorivaliHarshail Emerald Apartment · P51800056390 · possession Jan 2027 · 55.9% built
- CRESCENT NEXUS- ASCENT C WING · AndheriCRESCENT NEXUS- ASCENT C WING · P51800056393 · possession Apr 2027 · 45.5% built · 1 complaint
- 21 JEWEL · Borivali21 JEWEL · P51800056398 · possession Apr 2029 · 46.1% built
- RANBIR HEIGHTS · AndheriRANBIR HEIGHTS · P51800056404 · possession Apr 2027 · 39.1% built
- Ambrose Heights · BorivaliAmbrose Heights · P51800056407 · possession Jul 2027 · 67.3% built
- YESHWANT SADAN · MumbaiYESHWANT SADAN · P51800056424 · possession Sept 2026 · 163.2% built
- Sky Heights C-D · AndheriSky Heights C-D · P51800056425 · possession Jun 2028 · 51.6% built · 6 complaints
- Anubhuti Sadan CHSL · BorivaliAnubhuti Sadan CHSL · P51800056431 · possession Apr 2028 · 22.3% built
- Shanti Sadan · AndheriShanti Sadan · P51800056441 · possession Apr 2027 · 59.5% built
- AASAMANTA LAXMI NARAYAN · BorivaliAASAMANTA LAXMI NARAYAN · P51800056447 · possession Jul 2028 · 79.1% built
- Woods Tower 9 · BorivaliWoods Tower 9 · P51800056457 · possession Apr 2030 · 6.4% built
- OM PARAS · AndheriOM PARAS · P51800056462 · possession Apr 2027 · 90% built
- Aneesh Apartment Co.op. Housing Soc. Ltd. · AndheriAneesh Apartment Co.op. Housing Soc. Ltd. · P51800056463 · possession Apr 2028 · 79.5% built
- SAYBA SIGNATURE SPACES · BorivaliSAYBA SIGNATURE SPACES · P51800056477 · possession Oct 2027 · 70.9% built
- S RAHEJA PARK II · AndheriS RAHEJA PARK II · P51800056479 · possession Oct 2029 · 25.5% built
- RAJGOPAL BUILDING · BorivaliRAJGOPAL BUILDING · P51800056481 · possession Jan 2027 · 30.9% built
- GIRNAR RESIDENCY WING B PHASE 1 · AndheriGIRNAR RESIDENCY WING B PHASE 1 · P51800056491 · possession Apr 2027 · 66.4% built
- SADGURU AVIGHNA · BorivaliSADGURU AVIGHNA · P51800056502 · possession Dec 2027 · 66.8% built
- PARK GRANDEZZA · AndheriPARK GRANDEZZA · P51800066462 · possession Jun 2034 · 20% built
- GHANWAT ACCORD · BorivaliGHANWAT ACCORD · P51800066476 · possession Apr 2028 · 64.5% built
- VILE PARLE MAMATA CHSL · VILE PARLE EASTDHRUV INFRASTRUCTURE · P51800066486 · possession Oct 2026 · 63.6% built
- SAKET · AndheriSAKET · P51800066495 · possession Apr 2027 · 38.3% built
- Nanak Niwas · AndheriNanak Niwas · P51800066496 · possession Apr 2028 · 86.4% built
- LA EM By S Raheja · AndheriLA EM By S Raheja · P51800066507 · possession Oct 2029 · 17.3% built
- 103 West · Borivali103 West · P51800066510 · possession Jul 2029 · 79.1% built
- PRIYAM RESIDENCY · BorivaliPRIYAM RESIDENCY · P51800066519 · possession Apr 2028 · 46.6% built · 1 complaint
- Shreeji Laxmi · KurlaShreeji Laxmi · P51800066527 · possession Dec 2027 · 72.7% built
- SWAYAM NIKETAN · BorivaliSWAYAM NIKETAN · P51800066533 · possession Apr 2027 · 74.9% built
- HARI OM · KurlaHARI OM · P51800066536 · possession Oct 2027 · 39.8% built
- EDGE · AndheriEDGE · P51800066562 · possession Apr 2029 · 47.9% built
- Borivali Shiv Sadan CHSL · BorivaliBorivali Shiv Sadan CHSL · P51800066573 · possession Feb 2028 · 66.4% built · 1 complaint
- BORIVALI SAI HILL CHS · BorivaliBORIVALI SAI HILL CHS · P51800076582 · possession Dec 2026 · 80.9% built
- Sai Ashiana · AndheriSai Ashiana · P51800076588 · possession Jul 2029 · 75.5% built
- SHREE · MumbaiSHREE · P51800076595 · possession Apr 2029 · 50.1% built · 1 complaint
- BELLISSIMA · AndheriBELLISSIMA · P51800076596 · possession Apr 2029 · 42.7% built
- NAUMI SHRESHT · AndheriNAUMI DEVELOPERS · P51800076625 · possession Jul 2027 · 31.5% built
- Nandanvan Mohan CHSL · BorivaliNandanvan Mohan CHSL · P51800076629 · possession Apr 2028 · 32.8% built
- Raheja SkyPolis-1A · near inorbit mallRadha Krishna Properties Private Limited · P51800076650 · possession Apr 2035 · 0% built
- CHANDRALOK CHS LTD · KurlaCHANDRALOK CHS LTD · P51800076651 · possession Apr 2028 · 66.6% built
- Lilac · AndheriLilac · P51800076664 · possession Aug 2028 · 18.2% built
- RUSTOMJEE OCEAN VISTA · AndheriRUSTOMJEE OCEAN VISTA · P51800076673 · possession Sept 2029 · 50% built · 2 complaints
- Shreeji Leela · BorivaliShreeji Leela · P51800076677 · possession Oct 2028 · 60% built
- Nav Ashish Premises Co-Operative Society Ltd · KurlaNav Ashish Premises Co-Operative Society Ltd · P51800076681 · possession Aug 2029 · 74.6% built
- SAYBA TULIP · KurlaSAYBA TULIP · P51800076688 · possession Jul 2027 · 81.8% built
- ALLIANCE ETERNIS · BorivaliALLIANCE ETERNIS · P51800076690 · possession Apr 2027 · 90.9% built
- GAURAV GALAXY · BorivaliGAURAV GALAXY · P51800076694 · possession Oct 2028 · 60.9% built
- VANMALA NIVAS CHS LTD · AndheriVANMALA NIVAS CHS LTD · P51800076696 · possession Mar 2027 · 40% built
- Parque Residences · AndheriParque Residences · P51800076707 · possession Apr 2029 · 65.9% built
- Pratap Mithila · BorivaliPratap Mithila · P51800076713 · possession Oct 2027 · 27.3% built
- VISTA RESIDENCES WING C TOWER 2 · BorivaliVISTA RESIDENCES WING C TOWER 2 · P51800076720 · possession Oct 2029 · 42.1% built
- Sai Swaroop · KurlaSai Swaroop · P51800076721 · possession Dec 2027 · 55.5% built
- MASS EMINENCE · KurlaMASS EMINENCE · P51800076726 · possession Apr 2027 · 18.2% built
- BUILDING NO.9 - PHASE II · BorivaliBUILDING NO.9 - PHASE II · P51800076741 · possession Apr 2027 · 52.7% built
- PEARL BLOSSOM · AndheriPEARL BLOSSOM · P51800076745 · possession Apr 2029 · 63% built
- Vira Avenue · AndheriVira Avenue · P51800076751 · possession Apr 2027 · 64.5% built
- THE ALTEZZA · KurlaTHE ALTEZZA · P51800076757 · possession Oct 2029 · 9.1% built · 1 complaint
- BRINDAVAN CHSL · BorivaliBRINDAVAN CHSL · P51800076772 · possession Oct 2028 · 50.5% built · 1 complaint
- Amalfi · AndheriAmalfi · P51800076774 · possession Apr 2028 · 10.9% built
- Dollars Avenue CHSL · BorivaliDollars Avenue CHSL · P51800076786 · possession Mar 2028 · 48.2% built
- NEELAM CHS LTD · KANDIVALI WESTSapriya Developers · P51800076794 · possession Sept 2026 · 90.9% built
- SUNBEAM · AndheriSUNBEAM · P51800076799 · possession Apr 2028 · 55.2% built
- MILAN MANDIR NX · BorivaliMILAN MANDIR NX · P51800076809 · possession Mar 2027 · 55.2% built · 1 complaint
- DIVINE ULTIMUS · KurlaDIVINE ULTIMUS · P51800076816 · possession Apr 2028 · 55% built
- RAMAN CAPITAL · BorivaliRAMAN CAPITAL · P51800076821 · possession Nov 2027 · 39.9% built
- LK ELEGANCE · BorivaliLK ELEGANCE · P51800076823 · possession Mar 2028 · 16.4% built
- ALLIANCE VISTA · AndheriALLIANCE VISTA · P51800076826 · possession Apr 2027 · 81.8% built
- Kranti Heights · KurlaKranti Heights · P51800076833 · possession Jan 2027 · 86.4% built
- SANTA RITTA · AndheriSANTA RITTA · P51800076838 · possession Dec 2027 · 78.2% built
- Sumit KMR Param · BorivaliSumit KMR Param · P51800076840 · possession Mar 2029 · 58.2% built
- Unique Grooves · KurlaUnique Grooves · P51800076865 · possession Jan 2028 · 27.6% built
- Vaswani Avania · AndheriVaswani Avania · P51800076876 · possession Apr 2028 · 60% built
- JAY KRUPA SADAN BY SHREE HARI REALTY · AndheriJAY KRUPA SADAN BY SHREE HARI REALTY · P51800076878 · possession Apr 2027 · 39% built
- UNIQUE REGALIA · BorivaliUNIQUE REGALIA · P51800076881 · possession Oct 2029 · 41.8% built
- KAMAL PARK · KurlaKAMAL PARK · P51800076889 · possession Jul 2028 · 51.8% built
- REDEVELOPMENT OF GLENDON CHSL, SHELDON CHSL, ORLEM LUCIANA CHSL · BorivaliREDEVELOPMENT OF GLENDON CHSL, SHELDON CHSL, ORLEM LUCIANA CHSL · P51800076911 · possession Nov 2027 · 40.9% built
- EDEN 62 · AndheriEDEN 62 · P51800076914 · possession Dec 2026 · 87.3% built
- RAGHUKUL CHSL · BorivaliRAGHUKUL CHSL · P51800076919 · possession Apr 2030 · 52.9% built
- REDEVELOPMENT OF KAVERI CHSL · BorivaliREDEVELOPMENT OF KAVERI CHSL · P51800076922 · possession Jul 2028 · 45.1% built
- ARIHA VINCERE · BorivaliARIHA VINCERE · P51800076927 · possession Oct 2027 · 39.7% built
- SATGURUS KISMET · AndheriSATGURUS KISMET · P51800076939 · possession Apr 2028 · 96.4% built
- SHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTIAL, METRO SQUARE-WING C COMMERCIAL · BorivaliSHAKTI DHAM-WING A, VRINDAVAN-WING B RESIDENTIAL, METRO SQUARE-WING C COMMERCIAL · P51800076946 · possession Dec 2028 · 38.9% built
- SOLITAIRE SARDAR UGAM SADAN · BorivaliSOLITAIRE SARDAR UGAM SADAN · P51800076949 · possession Apr 2029 · 48.6% built
- PEARL GARDENS · BorivaliPEARL GARDENS · P51800076957 · possession Apr 2027 · 81.8% built
- Queens Glory · KurlaQueens Glory · P51800076971 · possession Apr 2028
- SHEETAL · BorivaliSHEETAL · P51800076973 · possession Jul 2029 · 70% built
- Qadri Manzil · KurlaQadri Manzil · P51800076978 · possession Apr 2030 · 49.5% built
- 9 Marina · Andheri9 Marina · P51800076983 · possession Dec 2027 · 27.3% built
- Shreeji Bliss · BorivaliShreeji Bliss · P51800076989 · possession May 2028 · 41.1% built
- UNIQUE PLATINUM · KurlaUNIQUE PLATINUM · P51800076992 · possession Mar 2028 · 16.4% built
- SAYBA CRYSTAL · KurlaSAYBA CRYSTAL · P51800077006 · possession Sept 2027 · 78.2% built
- MEHTA HIGHLAND 1978 · BorivaliMEHTA HIGHLAND 1978 · P51800077015 · possession Apr 2029 · 7.3% built
- ARKADE PEARL 2 · AndheriARKADE PEARL 2 · P51800077017 · possession Apr 2027 · 71.7% built
- VAIDYA WEST WORLD -ONE AEROPOLIS · AndheriVAIDYA WEST WORLD -ONE AEROPOLIS · P51800077018 · possession Oct 2028 · 27.3% built
- PEARL QUEEN · AndheriPEARL QUEEN · P51800077027 · possession Oct 2029 · 25.5% built
- SHEETAL HIRA · BorivaliSHEETAL HIRA · P51800077051 · possession Oct 2027 · 89.1% built
- Om Shreepal · KurlaOm Shreepal · P51800077067 · possession Dec 2026 · 56.4% built
- SRI SAVAA · BorivaliSRI SAVAA · P51800077068 · possession Apr 2028 · 49.2% built
- Godrej Nurture - Tower 2 · BhandupGodrej Properties Limited · P51800077080 · possession Mar 2032 · 0.5% built
- Godrej Nurture - Tower 3 · KurlaGodrej Nurture - Tower 3 · P51800077085 · possession Jul 2032 · 0.5% built
- Dixit Road Datta Niwas CHS Limited · AndheriDixit Road Datta Niwas CHS Limited · P51800077104 · possession Jul 2027 · 20% built
- NOORI HORIZON · AndheriNOORI HORIZON · P51800077125 · possession Apr 2030 · 1.4% built
- SHETH SQUARE · BorivaliSHETH SQUARE · P51800077126 · possession May 2029 · 13.6% built
- ESQUINA PRIVATE RESIDENCE · AndheriESQUINA PRIVATE RESIDENCE · P51800077147 · possession Jun 2029 · 85.9% built
- PRANAMI BLISS · AndheriPRANAMI BLISS · P51800077150 · possession Aug 2027 · 24.5% built
- RIVAAN · MumbaiRIVAAN · P51800077162 · possession Apr 2029 · 48.6% built
- REDEVELOPMENT OF OM MANIKANTA CHSL · BorivaliREDEVELOPMENT OF OM MANIKANTA CHSL · P51800077168 · possession Apr 2028 · 41% built
- Sahakar excel Acropolis - I · AndheriSahakar excel Acropolis - I · P51800077177 · possession Mar 2028 · 46.8% built
- RAJPUTANA RESIDENCY · BorivaliRAJPUTANA RESIDENCY · P51800077200 · possession Dec 2028 · 36% built
- Vaastu Shreya · AndheriVaastu Shreya · P51800077215 · possession Sept 2026 · 51.8% built
- Avdhaan Pride Rock · GhatkoparEastTHOROUGHBRED REALTY LLP · P51800077216 · possession Nov 2029 · 70.5% built
- GOGHARI MANSION · AndheriGOGHARI MANSION · P51800077217 · possession Apr 2028 · 49.1% built
- SATRA NEXUS · AndheriSATRA NEXUS · P51800077218 · possession Apr 2028 · 70.3% built · 1 complaint
- Kalpataru Virtus · KurlaKalpataru Virtus · P51800077219 · possession Apr 2030 · 6.4% built
- ALLIANCE KANCHAN KRUPA · KurlaALLIANCE KANCHAN KRUPA · P51800077232 · possession May 2028 · 57.6% built
- JAYDEEP MARK · KurlaJAYDEEP MARK · P51800077242 · possession Apr 2028 · 27.3% built · 1 complaint
- RASHMI SIGNATURE · BorivaliRASHMI SIGNATURE · P51800077248 · possession Aug 2027 · 66.5% built
- DARSHAN TOWER CHS REDEVELOPMENT PROJECT · BorivaliDARSHAN TOWER CHS REDEVELOPMENT PROJECT · P51800077259 · possession Mar 2028 · 53.5% built · 1 complaint
- LIBERTE64 · BorivaliLIBERTE64 · P51800077265 · possession May 2027 · 60.9% built
- THE WEST · BorivaliTHE WEST · P51800077267 · possession Apr 2027 · 34.1% built
- Green Shadow CHSL · AndheriGreen Shadow CHSL · P51800077271 · possession Apr 2027 · 76.8% built
- BHARAT AURAVISTAS · AndheriBHARAT AURAVISTAS · P51800077277 · possession Nov 2029 · 58.7% built
- Arkade Vistas · BorivaliArkade Vistas · P51800077278 · possession Dec 2027 · 44.1% built
- HS One · KurlaHS One · P51800077285 · possession Apr 2028 · 43% built
- VISAVA HARMONY · KurlaVISAVA HARMONY · P51800077296 · possession Mar 2027 · 42.6% built
- Arkade Views · BorivaliArkade Views · P51800077304 · possession Dec 2027 · 32.9% built
- Arkade Rare · KurlaArkade Rare · P51800077307 · possession Apr 2029 · 38.9% built
- MAGIC HEIGHTS · BorivaliMAGIC HEIGHTS · P51800077308 · possession Apr 2029 · 63% built
- DEEPALI DARSHAN J. P. NAGAR CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliDEEPALI DARSHAN J. P. NAGAR CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800077319 · possession Apr 2027 · 26.4% built
- HANUMAN NAGAR AZAD NAGAR SRA CHS · BorivaliHANUMAN NAGAR AZAD NAGAR SRA CHS · P51800077345 · possession Apr 2030 · 27.3% built
- Center Point · BorivaliCenter Point · P51800077346 · possession Apr 2028 · 32.1% built
- Horizon Garden View · Mulund WestHORIZON PROMOTERS INDIA LTD · P51800077351 · possession Mar 2027 · 90.9% built
- Altus · BorivaliAltus · P51800077358 · possession Dec 2030 · 38.1% built
- NL PARK VIEW · BorivaliNL PARK VIEW · P51800077375 · possession Sept 2028 · 61.8% built
- Vira Signature · AndheriVira Signature · P51800077379 · possession Oct 2027 · 50.7% built
- RUDRAKSH TOWERS WING B · KurlaRUDRAKSH TOWERS WING B · P51800077386 · possession Apr 2034 · 6.5% built
- KRISHNARAJ BUILDCON NEW SURYADARSHAN CO OP HSG. SOC · AndheriKRISHNARAJ BUILDCON NEW SURYADARSHAN CO OP HSG. SOC · P51800077389 · possession Apr 2028 · 20.9% built
- Serenity Heights · KurlaSerenity Heights · P51800077396 · possession Apr 2028 · 53.2% built · 1 complaint
- RAJANIGANDHA CHSL · KurlaRAJANIGANDHA CHSL · P51800077397 · possession Mar 2027 · 50.4% built
- ISLE OF CALM TOWER 2 · KurlaISLE OF CALM TOWER 2 · P51800077401 · possession Jul 2029 · 14.2% built
- NEW KANDIVALI CHSL · BorivaliNEW KANDIVALI CHSL · P51800077407 · possession Apr 2027 · 89.1% built
- RUDRAKSH TOWERS WING A · KurlaRUDRAKSH TOWERS WING A · P51800077411 · possession Apr 2030 · 18.1% built
- Vanita Sadan CHS · KurlaVanita Sadan CHS · P51800077422 · possession Apr 2029 · 34.4% built
- ASIAN NIRMAL · AndheriASIAN NIRMAL · P51800077425 · possession Oct 2028 · 68.2% built
- Construction of MIG t/s on open plot on land bearing S.No.01 pt. on CTS No. 1/3 village kopari powai · Near Shipping corporation india, opposite powai lakeMHADA · P51800077430 · possession Dec 2025 · 98.5% built
- Swastik House - C Wing · BorivaliSwastik House - C Wing · P51800077432 · possession Jul 2030 · 36.4% built
- Mulund Laxmi Narayan CHSL · KurlaMulund Laxmi Narayan CHSL · P51800077435 · possession Jul 2027 · 29.8% built
- Prime Vista Phase - 2 · KurlaPrime Vista Phase - 2 · P51800077437 · possession Oct 2028 · 37.3% built
- AVIRAHI HOMES BUILDING NO 4 WING B · BorivaliAVIRAHI HOMES BUILDING NO 4 WING B · P51800077443 · possession Jul 2027 · 57.3% built
- Forest Hills Ph 1 at The Prestige City · KurlaForest Hills Ph 1 at The Prestige City · P51800077457 · possession Apr 2031 · 0% built · 1 complaint
- KUSH AURA · KurlaKUSH AURA · P51800077462 · possession Oct 2028 · 27.3% built
- 9 ANEMONE HEIGHTS · Kurla9 ANEMONE HEIGHTS · P51800077466 · possession Apr 2028 · 27.5% built
- Juhu Serene · AndheriJuhu Serene · P51800077469 · possession Jan 2030 · 4.5% built
- VISHVA · KurlaVISHVA · P51800077474 · possession Sept 2029 · 39.7% built
- One Meraki Wing E · KurlaOne Meraki Wing E · P51800077475 · possession Apr 2027 · 90% built
- RAHEJA ANTARES - TOWER A · KurlaRAHEJA ANTARES - TOWER A · P51800077483 · possession Mar 2030 · 34.1% built · 2 complaints
- Venue 52 · AndheriVenue 52 · P51800077490 · possession Apr 2030 · 48.6% built
- Regent Aparna Mahal · AndheriRegent Aparna Mahal · P51800077501 · possession Jul 2027 · 79.1% built
- MOHINI ENGINEERS AND CONTRACTORS · AndheriMOHINI ENGINEERS AND CONTRACTORS · P51800077503 · possession Apr 2028 · 27.3% built
- DTG AVENUE 68 · BorivaliDTG AVENUE 68 · P51800077508 · possession Oct 2028 · 58.2% built
- Star Right Infinity · KurlaStar Right Infinity · P51800077521 · possession Apr 2028 · 34.5% built
- Kalpataru Vivant - North Wing F · AndheriKalpataru Vivant - North Wing F · P51800077538 · possession Oct 2029 · 59.4% built
- TRILOK GIRIRAJ KRIPA · BorivaliTRILOK GIRIRAJ KRIPA · P51800077540 · possession Jul 2028 · 45.5% built
- ALLIANCE SEA BREEZE · AndheriALLIANCE SEA BREEZE · P51800077565 · possession Aug 2027 · 61.4% built
- NAVKETTAN PUSHPAANGAN · BorivaliNAVKETTAN PUSHPAANGAN · P51800077566 · possession Jul 2028 · 11.8% built · 1 complaint
- THE VIBE · BorivaliTHE VIBE · P51800077570 · possession Oct 2028 · 33.2% built
- Opulence · BorivaliOpulence · P51800077572 · possession Apr 2030 · 15.2% built
- Ruparel Premia · KurlaRuparel Premia · P51800077584 · possession Apr 2028 · 45.8% built
- JALARAM ENCLAVE · BorivaliJALARAM ENCLAVE · P51800077587 · possession Oct 2027 · 27.3% built · 1 complaint
- OM GN Willows · KurlaOM GN Willows · P51800077593 · possession Jan 2028 · 20% built
- SUSHANKU AVENUE 37 · BorivaliSUSHANKU AVENUE 37 · P51800077600 · possession Apr 2028 · 75.2% built
- Brightland · Bandra WestSambhavparshva Developers Private Limited · P51800077605 · possession Dec 2026 · 87.3% built
- KHANDELWAL LUXOR WING A · BorivaliKHANDELWAL LUXOR WING A · P51800077617 · possession Apr 2030 · 9.1% built
- Pratham - By Shraddha · BorivaliPratham - By Shraddha · P51800077622 · possession Apr 2030 · 12.7% built
- Shraddha Vardaan Plaza · KurlaShraddha Vardaan Plaza · P51800077626 · possession Dec 2029 · 18.4% built
- LEELA BUSINESS PARK - II · AndheriLEELA BUSINESS PARK - II · P51800077630 · possession Apr 2030 · 67.3% built
- Sheetal Uptown · BorivaliSheetal Uptown · P51800077643 · possession Apr 2031 · 35% built · 1 complaint
- PERRY APARTMENT · ORLEM MALAD WEST MUMBAIPANKAJ SHANTILAL PARIKH · P51800077645 · possession Dec 2025 · 90.9% built · 1 complaint
- Regent Kashi Kunj · AndheriRegent Kashi Kunj · P51800077648 · possession Jul 2028 · 52.7% built
- Mahir Enclave · KurlaMahir Enclave · P51800077652 · possession Mar 2028 · 43.8% built
- MODISPACES NILE · BorivaliMODISPACES NILE · P51800077671 · possession Jan 2028 · 52.7% built
- Nirmiti Seasons · KurlaNirmiti Seasons · P51800077706 · possession Apr 2029 · 63.7% built
- AMBE ASHIRWAD · KurlaAMBE ASHIRWAD · P51800077709 · possession Apr 2029 · 56.4% built
- SKYLINE BUSINESS WORLD WING C · AndheriSKYLINE BUSINESS WORLD WING C · P51800077710 · possession Jul 2029 · 68.2% built
- 66 AVENTUS AVENUE · Borivali66 AVENTUS AVENUE · P51800077731 · possession Dec 2029 · 54.1% built
- Suji Ekdant · KurlaSuji Ekdant · P51800077739 · possession Apr 2028 · 0% built · 1 complaint
- METRO EXCELLENCY · BorivaliMETRO EXCELLENCY · P51800077755 · possession Apr 2029 · 34.5% built
- AIRICA TOWER 2 · KurlaAIRICA TOWER 2 · P51800077756 · possession Oct 2030 · 9.6% built · 2 complaints
- SAMRUDDHI · BorivaliSAMRUDDHI · P51800077767 · possession Apr 2030 · 50.1% built
- ALOK · BorivaliALOK · P51800077778 · possession Jan 2027 · 59.5% built
- RISHABRAJ ASTRAL · BorivaliRISHABRAJ ASTRAL · P51800077784 · possession Dec 2029 · 70.5% built
- Namaha A · KurlaNamaha A · P51800077799 · possession Apr 2029 · 12.7% built
- 59 AVENUE · Andheri59 AVENUE · P51800077805 · possession Apr 2027 · 4.1% built
- OSTWAL GALA KUNJ · KurlaOSTWAL GALA KUNJ · P51800077808 · possession Apr 2030 · 40.6% built
- Godrej Square · KurlaGodrej Square · P51800077810 · possession Feb 2029 · 0.3% built
- Blue Zone · BorivaliBlue Zone · P51800077817 · possession Jul 2030 · 27.3% built
- PSK ALTAIR 77 · AndheriPSK ALTAIR 77 · P51800077820 · possession Apr 2028 · 53.3% built
- KAILAS SADAN · AndheriKAILAS SADAN · P51800077824 · possession Mar 2027 · 81.8% built
- Space Grandeur · AndheriSpace Grandeur · P51800077838 · possession Jun 2027 · 43.2% built
- Eknath Gruh · BorivaliEknath Gruh · P51800077854 · possession Oct 2026 · 81.8% built
- KHANDELWAL RESERVE WING A · BorivaliKHANDELWAL RESERVE WING A · P51800077860 · possession Apr 2030 · 49.6% built
- EMPIRE FAIRMONT · BorivaliEMPIRE FAIRMONT · P51800077872 · possession Dec 2026 · 68.6% built
- GOYAL ATLANTIS · AndheriGOYAL ATLANTIS · P51800077887 · possession Nov 2027 · 29.1% built
- WEST AVENUE · AndheriWEST AVENUE · P51800077899 · possession Apr 2027 · 42.7% built