RERA projects past their possession deadline
11,819 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 3 of 60
- SARA SWAPNANGAN - ROW HOUSES8.7 yr overdueSara Infrastructures · Gangapur Jahagir, AurangabadP51500001944· 78.2% built
- KULSWAMINI HEIGHTS8.7 yr overdueHARI OM DEVELOPERS · Kalyan, ThaneP51700005364· 89.4% built
- SITA SADAN8.7 yr overdueSUN CONSTRUCTION · Talegaon Dabhade (M Cl), PuneP52100006393· 81.8% built
- Swami Krupa8.7 yr overdueMeenal Prakash Rao · Wadagaon (CT), PuneP52100012744· 81.8% built
- VIVA AAKANKSHA COMPLEX PHASE 18.7 yr overdueVIVA AAKANKSHA BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007383· 77.5% built
- JP ENIGMA8.7 yr overdueJaiprakash Gurdasmal Khushalani · Nagpur (M Corp.), NagpurP50500013221· 90.9% built
- GANGA ELIKA8.7 yr overdueGOEL AVISHKAR PROMOTERS · Haveli, PuneP52100003750· 90% built
- MANOJ APARTMENT CONDOMINIUM8.7 yr overdueSachiien Arun Kawale · Pune City, PuneP52100005318· 90.9% built
- SATYAM PALACE8.7 yr overdueGEETA BUILDCON · BEHIND NIGAL PARK, NashikP51600012514· 81.8% built
- SBM MYRA8.7 yr overdueSBM PROPERTIES ·P52100004121· 90.9% built
- Green Leaf8.7 yr overdueVIKRANT VIJAYRAO BHUTE · AALODI, WardhaP50400012613· 77% built
- ARYA APPARTMENT8.7 yr overduePURUSHOTTAM MOHAN RAMPARIYA · Nashik (M Corp.), NashikP51600002981· 67.5% built
- AMBAL TOWER8.7 yr overdueARCHANA DAYANAND AMBAL · Solapur (M Corp.), SolapurP52600003886· 72.7% built
- Gangwani Plaza8.7 yr overdueGangwani Constructions Pvt LtdAA · Nagpur (M Corp.), NagpurP50500011201· 85.9% built
- Krushnasundar Residency8.7 yr overdueSanjay Baliram Jadhav · Aurangabad (M Corp.), AurangabadP51500010862· 90.9% built
- ADINATH AURA8.7 yr overdueSHREE RIDDHI SIDDHI CONSTRUCTIONS · Panvel, RaigarhP51700007724· 90.9% built
- SWASTIK DISA CORPORATE PARK- 5TH TO 9TH FLOOR8.7 yr overdueSwastik Realtors · Kurla, Mumbai SuburbanP51800007796· 81.8% built
- SAI ARCADE8.7 yr overdueSAI DEVELOPERS · Badlapur (M Cl), ThaneP51700009522· 90.9% built
- HARI ANAND8.7 yr overdueDHARAN INFRA-EPC LIMITED · Nashik, NashikP51600001348· 90.9% built
- Modispaces Oyster8.7 yr overdueModispaces Real Estate Pvt Ltd · Borivali, Mumbai SuburbanP51800008356· 90.9% built
- DHARTI HILLS8.7 yr overdueKRISHNA ENTERPRISES · Ambarnath(M Cl), ThaneP51700012074· 90.9% built
- Arham Brindavan8.7 yr overdueMahavir Enterprises · Kurla, Mumbai SuburbanP51800004177· 90.9% built
- ATHARVA BLISS PHASE I8.7 yr overdueM/s. Abhay Constructions · Bavadhan BK, PuneP52100006701· 87.9% built
- MAJITHIA SWASTIK GALAXY8.7 yr overdueSWASTIK ASSOCIATES · Vasai, PalgharP99000013190· 89.1% built
- Redevelopment of Office Building no1 Sidharth Nagrar Goregaon West8.7 yr overdueMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · Andheri, Mumbai SuburbanP51800000039· 71.4% built
- RAJ AMBAR8.7 yr overdueRAJ INFRA DEVELOPERS · Karanjade, RaigarhP52000001295· 90.9% built
- Orchid8.7 yr overdueUnicorn Infrabuild LLP. · Chiplun (M Cl), RatnagiriP52800008124· 89.5% built
- SIDHESHWAR COMPLEX BUILDING 1 A WING8.7 yr overdueADESHWAR ASSOCIATES · TITWALA, ThaneP51700011114· 90.9% built
- DATTUSAI COMPLEX BUILDING NO 28.7 yr overdueSAIRAJ ENTERPRISES · DOMBIVLI, ThaneP51700013185· 90% built
- MEGHMANAS8.7 yr overdueRANJEKAR REALTY · Pune City, PuneP52100002654· 96.8% built
- Peshwai Enclave8.7 yr overdueYemul& Sancheti Associates · Pune (CB), PuneP52100009603· 46.5% built· 2 complaints
- CROWN EUREKA8.7 yr overdueASGARALI HUSEINIBHAI CONTRACTOR · Panvel, RaigarhP52000012036· 90.9% built
- Shridhar Residency8.7 yr overdueAadi Developers · Karanje Tarf Satara (CT), SataraP52700004938· 64.5% built
- SUNNY DEVELOPERS8.7 yr overdueSUNNY DEVELOPERS · Nashik, NashikP51600008674· 96.4% built
- THE CUBE8.7 yr overdueAIM KAPADE CREATORS · Kolhapur (M Corp.), KolhapurP53000001448· 90.9% built
- SUKHSAGAR NX8.7 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600012739· 81.8% built
- GURUDEV RANADE SAHANIWAS8.7 yr overdueVARADKRIPA DEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100001998· 77.3% built
- ISHIKA PRIDE8.7 yr overdueNilam suryawanshi · Shahunagar (CT), SataraP52700007670· 81.8% built· 1 complaint
- SHRIKRISHNA ENCLAVE DUPLEX PHASE 18.7 yr overdueSHRIKRISHNA INFRASTRUCTURE · Nagpur (M Corp.), NagpurP50500002555· 88.6% built
- Suresh smruti8.7 yr overduePrasad Prabhakar Waghdhare · Rahataghar, RatnagiriP52800004093· 90.9% built
- Bajrang8.6 yr overdueNarsibhai Mavjibhai Mavani · Nashik (M Corp.), NashikP51600011049· 90.9% built
- J.P. business Plaza8.6 yr overdueD.G.T. Developers · Shirur, PuneP52100012741· 90.9% built
- KEDAR RESIDENCY8.6 yr overdueSHASHIKALA RAMCHANDRA SALUNKHE · Sangli Miraj Kupwad (M Corp.), SangliP53100003176· 90.9% built
- Arron Complex Phase 18.6 yr overdueArron Builders and Developers · Palghar, PalgharP99000006677· 86.4% built
- TANIA PLANET8.6 yr overdueFRENTANIA REALTOUCH BUILDERS PRIVATE LIMITED · Vasai, PalgharP99000008261· 73.6% built
- VASTU SHILP DEVELOPERS8.6 yr overdueVASTU SHILP DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009007· 89.8% built
- ARIHANT PARK PHASE -38.6 yr overdueMADAN NEMICHAND BAFANA · Supa, AhmednagarP52200003497· 90.9% built
- BHOOMI PRIDE8.6 yr overdueMEHTA DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000008331· 90.9% built
- TORNA APARTMENT8.6 yr overdueRAJMUDRA CONSTRUCTION PVT LTD · Borivali, Mumbai SuburbanP51800009548· 90% built
- Lodha Fiorenza8.6 yr overdueLODHA DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800000195· 90.9% built· 5 complaints
- AATREYA REGENCY8.6 yr overdueHARSHALI ANOOP DESHPANDE · Wanadongri (CT), NagpurP50500003312· 55.3% built
- Ramdev Villa8.6 yr overdueRamdev Villa · Thane, ThaneP51700006067· 90.9% built
- Garva Residency-B28.6 yr overdueGarva Developers Pvt Ltd · Warse, RaigarhP52000004481· 43.2% built
- Vizion Galaxy A8.6 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100004006· 90.9% built
- ROYAL BELLEZA8.6 yr overdueANANDKUMAR HARIDAS SONI · Ulawe, RaigarhP52000006588· 90.9% built
- SHREEJI RESIDENCY8.6 yr overdueSHREE HARI DEVELOPER · Panvel, RaigarhP52000004504· 90.9% built
- Saptagiri8.6 yr overdueSaptagiri Developers · Nanded Waghala (M Corp.), NandedP51100002999· 86.4% built
- P SQUARE PHASE 18.6 yr overdueVIJAY CONSTRUCTION NX · Haveli, PuneP52100004354· 60% built
- Swastik Laxmi8.6 yr overdueSwastik Construction · Palghar, PalgharP99000009764· 90.9% built
- Pragati Greenwoods8.6 yr overduePragati Construction · Waksai, PuneP52100008279· 89.1% built
- PALAVA LAKESIDE I TO O8.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000410· 78.2% built· 5 complaints
- Shri Sai8.6 yr overdueSai Ram Builders and Developers · Shirur, PuneP52100010822· 77.7% built
- OM PALACE8.6 yr overdueMADHUSUDAN SITARAM JUNNARKAR · Borivali, Mumbai SuburbanP51800007960· 90.9% built
- SAI AANGAN8.6 yr overdueSAIJYOTBUILDERS&DEVELOPERS · Ulawe, RaigarhP52000003244· 90.9% built
- RAJ RESIDENCY8.6 yr overdueVastu Developers and Promotors · Talegaon Dabhade (M Cl), PuneP52100013370· 90.9% built
- ONYX APARTMENT - REDEVELOPMENT OF KUNFAYAKUN CHSL BUILDING8.6 yr overdueReFAB CONSTRUCTION (INDIA) PVT. LTD. · Borivali, Mumbai SuburbanP51800007695· 68.7% built
- PALAVA - ELITE - A to J8.6 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000125· 78.2% built· 3 complaints
- Gold Coast8.6 yr overdueA SQUARE CONSTRUCTION · Alibag, RaigarhP51800002294· 90.9% built
- OM SAI TOWERS8.6 yr overdueD A CONSTRUCTION · Ambarnath(M Cl), ThaneP51700011648· 44.5% built
- MAHADEV CORNER8.6 yr overdueMAHADEV CONSTRUCTION · Nashik, NashikP51600008031· 90% built
- SWARAJ8.6 yr overdueRAMAN BABASO KHAMKAR · Patas, PuneP52100007657· 78.2% built
- SIDDHIVINAYAK PRIDE8.6 yr overdueSAGAR DILIP RUKARI · MANJARI Bk, PuneP52100000491· filed Dec 2017 → now Feb 2018· 83.6% built
- SAI DURGA HILLS8.6 yr overdueSAI DURGA DEVELOPERS · Bopele, RaigarhP52000003811· 84.5% built
- OMKAR DEEP8.6 yr overdueOMKAR BUIDCON · Nashik (M Corp.), NashikP51600007514· 90.9% built
- SHRI SHRI SAGAR8.6 yr overdueSagar Constructions · Nashik (M Corp.), NashikP51600012595· 81.8% built
- MAHAVIR ANANT8.6 yr overdueRAHUL PUKHRAJ SINGHVI · Ulawe, RaigarhP52000012352· 90.9% built
- ROYAL ORCHID8.6 yr overdueBALAJI BUILDCON · Upnagar, NashikP51600006397· 70.5% built
- SUCHIT SQUARE8.6 yr overdueIMPRESSIONS · Kalyan, ThaneP51700008664· 90.8% built
- construction of 26 shops and 03 halls at khat road Bhandara8.6 yr overdueMHADA(Nagpur Board) · Bhandara (M Cl), BhandaraP50600012640· 81.8% built
- Shalini Vilas Terraces8.6 yr overdueSHRI SAGAR BUILDERS AND DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000003571· 90.9% built
- Shubharambh8.6 yr overdueNIRMAN RESIDENCY · Dehu Road (CB), PuneP52100008363· 63.6% built
- Prathamesh Residency8.6 yr overdueSiddhivinayak Developers · CHARHOLI, PuneP52100002315· 85.5% built
- MAHAKALI HIGHTS PHASEII8.6 yr overduePRAVIN DNYANESHWAR MALI · Kavathe Mahankal, SangliP53100007151· 81.8% built
- SUMUKH8.6 yr overdueBhalchandra Vinayak Wadnerkar · Mumbai City, Mumbai CityP51900004420· 90.9% built· 1 complaint
- ANGAN RESIDENCY8.6 yr overduePRITHVI BUILDERS & DEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100013172· 76.4% built
- KOYANA CONDOMINIUM8.6 yr overdueK J REALTORS · Kothrud, PuneP52100008222· 69% built
- SIDDHIVINAYAK TOWER8.6 yr overdueSIDDHIVINAYAK DEVELOPERS · Vasai, PalgharP99000012579· 81.6% built
- SAI AARADHYA8.6 yr overdueM/S PILLARS INDIA CONSTRUCTIONS · Ulawe, RaigarhP52000010167· 58.5% built
- Aashirwad Complex8.6 yr overdueSaukhyam Constructions · Nachane (CT), RatnagiriP52800009508· 90.9% built· 2 complaints
- Zubeda Imam Ahmed Bharmal Appartment8.6 yr overdueAAMIRBAHAUDDIN · BHIWANDI, ThaneP51700014694· 55.9% built
- SKY POINT PHASE I B AND C WING8.6 yr overdueShubh Enterprises · Mundhawa, PuneP52100007993· 86.4% built
- Dynasty8.6 yr overdueShiv Enterprises · Pimpri Chinchawad (M Corp.), PuneP52100009988· 90.9% built· 3 complaints
- SUWARNALAY8.6 yr overdueNATH ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100012078· 58.6% built
- Samruddhi Park Phase 28.6 yr overdueSANTOSH MACHINDRA SHINDE · Ahmadnagar (M Corp.), AhmednagarP52200011133· 25% built
- Sanghvi Shells8.6 yr overdueMukesh Shantilal Sanghvi · Baner, PuneP52100002539· 72.7% built
- Anandgriha- Phase I8.6 yr overdueKACHHI PROPERTIES · Satara, SataraP52700009557· 89.1% built
- MARBLE ARCH8.6 yr overdueSHINING SUN CONSTRUCTIONS · Panvel, RaigarhP52000013234· 98.2% built· 1 complaint
- Star Woods Phase I8.6 yr overdueVaishnavi Space Creator · Tathwade, PuneP52100007153· 50% built
- SHUBHANGAN8.6 yr overdueS.H.ENTERPRISE · Vasai, PalgharP99000010435· 90.7% built
- YASHWANT NAGAR PLUS8.6 yr overdueNAMRATA MARK VENTURES · Varale, PuneP52100012929· 90.5% built
- Riddhish Residency8.5 yr overdueDamle Gandhe LLP · Baner, PuneP52100009314· 41.2% built
- SALASAR ASHISH8.5 yr overdueSALANGPUR REALTY · Thane, ThaneP51700011018· 90.9% built
- Royal Arcade8.5 yr overdueNitin Sudhakar Talathi · Khed (M Cl), RatnagiriP52800002546· 90.9% built
- SADASHIV PURAM8.5 yr overdueSATYABHAMA DEVELOPERS · Ambarnath(M Cl), ThaneP51700010168· 90.9% built
- DURVESH APARTMENT8.5 yr overdueUNITED BUILDERS AND DEVELOPERS · Sawantwadi (M Cl), SindhudurgP52900014380· 90.9% built
- SAMRUDDHI PRIDE8.5 yr overdueSAMRUDDHI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006644· 81.8% built
- BHAGYALAXMI PLAZA8.5 yr overdueDHEERAJ ADINATH NASALAPURE · Sangli Miraj Kupwad (M Corp.), SangliP53100007892· 47.3% built
- Construction of 20 MIG flats on S.No.42,60 at Nari, Nagpur8.5 yr overdueMHADA (Nagpur Board) · Nagpur (M Corp.), NagpurP50500006157· 90.9% built
- Tulsi Developers8.5 yr overdueTulsi Developers · Nanded Waghala (M Corp.), NandedP51100005078· 98.4% built
- MILAP CO-OPERATIVE HOUSING SOCIETY8.5 yr overdueGOLDEN EYECON · Andheri, Mumbai SuburbanP51800001191· 90.9% built
- JUBILATION8.5 yr overdueAAKANKSSHA ASSOCIEATES · WAGHOLI, PuneP52100007279· 90.9% built
- AAI PRASAD8.5 yr overdueVASANT NIVRUTTI NARWADE · Pimpalgaon (CT), YavatmalP51000011716· 81.8% built
- VISION WOODS 1 PHASE 18.5 yr overdueSHUBBAN REALTORS · Jambhul, PuneP52100012489· 87.2% built
- MONICA CORNER8.5 yr overdueMONICA CONSTRUCTION & BUILDERS · Hadapsar, PuneP52100011180· 77.3% built
- srishtee spaces Phase I8.5 yr overdueSRISHTEES Preet Homes · Pimpale Saudagar, PuneP52100003753· 72.7% built
- LONI CENTRAL8.5 yr overdueRDBANKARREALITY · Loni Bk., AhmednagarP52200002916· 90.9% built
- GAJANAN PALACE8.5 yr overdueSHREE GAJANAN BUILDERS AND DEVELOPERS · Nagpur (M Corp.), NagpurP50500002858· 90.9% built
- Siddhivinayak Arcade Bldg48.5 yr overdueSIDDHIVINAYAK DEVELOPERS · Vasai, PalgharP99000010820· 80.5% built
- Sukruti Elite8.5 yr overdueSukruti Constructions · Nashik (M Corp.), NashikP51600010612· 90.9% built
- Eisha Erica D Bldg8.5 yr overdueEISHA VASTU CONSTRUCTION · Dhayari (Part), PuneP52100003882· 84.6% built· 1 complaint
- CHANDRA AVENUE8.5 yr overdueCHANDRA REALITY · Shirur, PuneP52100006420· 89.1% built
- SOHAM PRATHAMESH8.5 yr overdueSOHAM BUILDERS · Deulwadi, RaigarhP52000012015· 51.4% built
- Hayaat Garden8.5 yr overdueM M Enterprises · Vasai, PalgharP99000006530· 81.8% built
- Jeevan Kanchan Co-Operative Housing Society Ltd.8.5 yr overdueShri Krishna Chaitanya Enterprises · Andheri, Mumbai SuburbanP51800000014· 90.9% built
- ONKARSIDDHI8.5 yr overdueTHAKKAR AND ASSOCIATES · Sangli Miraj Kupwad (M Corp.), SangliP53100006492· 81.8% built
- DATTAKRUPA HEIGHTS8.5 yr overdueDHANANJAY DAMODHAR DAREKAR · Pimpri Chinchawad (M Corp.), PuneP52100005110· 72.7% built
- PRIME NEW HORIZON8.5 yr overduePRASHANT CHANDRAKANT BHOIR · Pen (M Cl), RaigarhP52000004080· 79.5% built
- sAI PLAZA8.5 yr overduesAI CONSTRUCTIONS AND DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000011414· 75.5% built
- George Developers ELITE8.5 yr overdueGeorge Developers · Nagpur (M Corp.), NagpurP50500010620· 89.1% built
- ABM HOMES8.5 yr overdueABM ASSOCIATES ·P52100008869· 54.5% built
- ShriLaxmi Chambers8.5 yr overdueSudhir Tulshiram Thakre · Chandrapur (M Cl), ChandrapurP50900010597· 90.9% built
- MINT MAGNA HOUSING LLP8.5 yr overdueMint Magna Housing LLP · Ward GSouth, Mumbai CityP51900007234· 81.8% built
- Sunshine Palace8.5 yr overdueShantee Housing · Vasai, PalgharP99000000257· 90.9% built
- SAURABH APARTMENT8.5 yr overdueTARACHAND HASTIMAL CHHAJED · Bopele, RaigarhP52000012557· 78.6% built
- Shivalic Heights8.5 yr overdueGeetanjali Construction · Panvel, RaigarhP52000004882· 90.9% built
- ORIANA8.5 yr overdueM/S.Kishor Builders Promoters And Developers · Baner, PuneP52100002537· 81.8% built
- UNITY GARDEN8.5 yr overdueUNITY LAND DEVELOPERS · Palghar, PalgharP99000007688· 51.4% built
- VASTU VINTAGE PHASE 18.5 yr overdueVASTUSHILPBUILDERS & DEVELOPERS · medankarwadi, PuneP52100012756· 81.4% built· 3 complaints
- SHREE UMA SHANKAR APARTMENT8.5 yr overdueSHREE SAI AASHRAY DEVELOPERS · Badlapur (M Cl), ThaneP51700005680· 90.9% built
- KENORITA GARMENT HUB8.5 yr overdueKeshvi Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800011101· 82.3% built
- SHIVRAM HEIGHTS8.5 yr overdueSHIVRAM PROPERTIES · Punawale, PuneP52100011332· 77.7% built
- JAI SANTOSHI MATA HEIGHTS8.5 yr overdueRAJIV THAKUR & ASSOCIATES · DOMBIVLI, ThaneP51700012270· 77.3% built
- Varun Residency8.5 yr overdueVARUN RESIDENCY · nakashtrawadi, AurangabadP51500007831· 73.2% built
- Vasundhara Prime8.5 yr overdueVasundhara Prime · Narsoba Nagar, SataraP52700002041· 81.8% built
- Madhuban8.5 yr overdueM/s Kakkad Developments · Pune (M Corp.), PuneP52100011669· 81.8% built
- Sukh Vastu8.5 yr overdueA V Bhat Builders Pvt Ltd · Haveli, PuneP52100005379· 90.9% built· 3 complaints
- NYATI ETERNITY COMMERCIAL I8.5 yr overdueNITIN DWARKADAS NYATI · UNDRI, PuneP52100000954· 81.8% built
- KRISHNA KUNJ8.5 yr overdueRAJ MANOHAR WADHWA · Badlapur (M Cl), ThaneP51700006536· 75% built
- Atmaram Sadan8.5 yr overdueAditya Associates · Thane, ThaneP51700011909· 63.4% built
- ROYAL MAJESTIC8.5 yr overdueFive Star Construction Company · Haveli, PuneP52100000548· 90.9% built
- ALIVE8.5 yr overdueNIMANI CONSTRUCTIONS · Pune (M Corp.), PuneP52100004256· 81.8% built
- Bloomdale Building 048.5 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500006445· 90.9% built· 5 complaints
- ROYAL PRIDE8.5 yr overdueROYAL BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000002329· 90.9% built
- Construction of 232 LIG TS on S.No. 263 p C.T.S No. 3525p Nr Bus depo Malwani Malad west Mumbai 958.5 yr overdueMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · Borivali, Mumbai SuburbanP51800000033· 90.9% built· 1 complaint
- Suman Vastu Apartment8.5 yr overdueFamid Himamudin Shaikh · Ibhadpada, PalgharP99000010050· 33.6% built
- Suniket Business Center8.5 yr overdueSuniketBuildersandDevelopers · Nashik (M Corp.), NashikP51600012237· 81.8% built
- INDUS CLASSIC8.5 yr overdueINDUS DEVELOPERS · Kolki (CT), SataraP52700003123· 38.2% built
- NEEL GALAXY8.5 yr overdueNEELKANTHESHWAR CONSTRUCTION · Karanjade, RaigarhP52000007270· 79.2% built
- SRISHTI OASIS PH 1 WING A PALMS8.5 yr overdueSHIV KRUPA ENTERPRISE · Kurla, Mumbai SuburbanP51800003982· 90.9% built
- KHADGE ENCLAVE8.5 yr overdueWasudeo Wamanrao Khadgi · Nagpur (M Corp.), NagpurP50500014344· 54.5% built
- NANDAN AMAIRA8.5 yr overdueNANDAN ASSOCIATES · Pune (M Corp.), PuneP52100000883· 90.9% built
- Falcon8.5 yr overdueTanish Nirmiti LLP · Sus, PuneP52100005334· 90.9% built
- AADITYA HEIGHTS8.5 yr overdueANAND DEVELOPERS · Pune (M Corp.), PuneP52100001408· 49.1% built
- SHREE GANESH TOWER - UNIT D8.5 yr overduePOLITE DEVELOPERS · MOSHI, PuneP52100005276· 90.9% built
- SKYLINE-II-MHADA8.5 yr overdueUNIQUE SHANTI NEMINATH DEVELOPERS LLP · Thane, ThaneP51700004954· 96.5% built
- SAKET RESIDENCY CO OP HSG SOC LTD8.5 yr overdueREGENT BUILDERS · Andheri, Mumbai SuburbanP51800007061· 85.5% built
- SKYLINE CORNER8.5 yr overdueSKYLINE DEVELOPERS · Karanjade, RaigarhP52000007766· 90.9% built
- SHREE SAMARTH RESIDENCY8.5 yr overdueM/s. Dampdar Pote And Associates · Pirangut, PuneP52100014342· 47% built
- VASTU SQUARE8.5 yr overdueVASTU BUILDERS · Badlapur (M Cl), ThaneP51700009315· 72.7% built
- VANKVANIS ELA8.5 yr overdueSuresh Vankvani · Ulawe, RaigarhP52000007221· 49.5% built· 4 complaints
- Vile Parle Kalpavriksha cooperative Housing Society Limited8.5 yr overdueRelcon Infraprojects Ltd · Andheri, Mumbai SuburbanP51800000188· 90.9% built
- PRIMERO CASA8.5 yr overdueGAURI LIVELY SPACES · Pimpri Chinchawad (M Corp.), PuneP52100012820· 71.4% built
- SAI SHRUTI8.5 yr overduePINNACLE CONSTRUCTIONS · Badlapur (M Cl), ThaneP51700006060· 90.9% built
- VASTU SHILP8.5 yr overdueVASTU HOMES · Badlapur (M Cl), ThaneP51700013407· 72.7% built
- ADITYA VILLA8.5 yr overduePrashant Aditya Shukla · Ambarnath(M Cl), ThaneP51700005239· 81.8% built
- PRATHAMESH PHASE 2-ALANKAR RESIDECY8.5 yr overdueVASTU DEVELOPERS AND BUILDERS · Talegaon Dabhade (M Cl), PuneP52100013849· 68.2% built
- Malwani Asha Jeevan CHS LTD8.5 yr overdueMalwani Asha Jeevan CHS LTD · Borivali, Mumbai SuburbanP51800012990· 90.9% built
- Gyan Kutir8.5 yr overdueSungreens Corp · Borivali, Mumbai SuburbanP51800006548· 90.9% built
- VISION BOULEVARD - Phase I8.5 yr overdueVISION HOMES PROJECT · Pimpale Saudagar, PuneP52100006755· 85.3% built
- MAYUR VIHAR APARTMENT8.5 yr overdueHERAMB BUILDERS AND DEVELOPERS · Gadhinglaj, KolhapurP53000013377· 83.6% built
- Sadguru Residency8.5 yr overdueSADGURU INFRA · Ambarnath, ThaneP51700004161· 90.9% built
- LIFE MONTAGE PHASE 18.5 yr overdueGHODAWAT INFRA LLP · Sus, PuneP53000007829· 64.3% built
- PRAMUKH PARADISE8.5 yr overduePRAMUKH DEVELOPERS · Panvel, RaigarhP52000004384· 90.9% built
- Ashiyana C.H.S Redevelopment8.5 yr overduePUNIT ENTERPRISES · Panvel, RaigarhP52000007021· 90.9% built
- ROYAL ARCADE8.5 yr overdueNATIONAL BUILDERS AND DEVELOPERS · Nagpur (M Corp.), NagpurP50500008878· 81.8% built
- SAI SHRADDHA ENCLAVE8.5 yr overdueS K DEVELOPERS · Palghar, PalgharP99000013487· 90.9% built
- MAGNUM8.5 yr overdueJITESH KAMLESH PATEL · Thane, ThaneP51700006334· 90.9% built
- VRINDAVAN HEIGHT8.5 yr overdueSHIVSAI BUILDCON · Nashik, NashikP51600008519· 90.9% built
- ISHWAR PRESTIGE8.5 yr overdueSHANKAR GHANSHYAMDAS SAMNANI · Aanandwali, NashikP51600012272· 72.7% built
- Nayana Niwas8.5 yr overdueH.D.Associates · Borivali, Mumbai SuburbanP51800004622· 60% built
- DEVKI PLAZA8.5 yr overduePOWER INFRA DEVELOPERS · Panvel, RaigarhP52000009782· 76.4% built
- DIVYARAJ VALUEHOMES - BLDG C & D8.5 yr overdueDIVYARAJ REAL ESTATE SERVICES LLP · Palghar, PalgharP51800002045· 81.8% built
- GAGAN NULIFE PHASE 18.5 yr overdueGAGAN LIFESPACE · Kamshet, PuneP52100009642· 81.8% built· 7 complaints
- SANSKRUTI8.5 yr overdueSHREE SAI VENKATESH DEVELOPERS · Haveli, PuneP52100003985· 90.9% built
- CHARMS MEADOWS PHASE I8.5 yr overdueCHARMS PRIDE · Asangaon (CT), ThaneP51700010110· 90.5% built· 3 complaints
- SAI PANACH8.5 yr overduePANACH RELATORS · Bhiwandi, ThaneP51700012012· 90.9% built· 2 complaints
- PALACINO8.5 yr overdueRISHABH DEVELOPERS · Mumbai City, Mumbai CityP51900006519· 69.1% built· 1 complaint
- BLUE SAPPHIRE8.5 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100007703· 90.9% built
- PRANAV APARTMENT8.5 yr overdueAARYA DEVELOPERS · Palghar, PalgharP99000004490· 90.9% built
- SHRAVANAM RESIDENCY8.5 yr overduePRADEEP NARAYAN PAWAR HUF · Aanandwali, NashikP51600009252· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.