RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 5 of 59
- Seven Eleven Residency8.3 yr overdueSeven Eleven Construction Private Limited · Mira-Bhayandar (M Corp.), ThaneP51700011597· 90.9% built
- TIRUPATI HIEGHTS8.3 yr overdueSHRI TIRUPATI REALTY · Bhiwandi, ThaneP51700006941· 79.1% built
- DAFFODILS AVENUE PHASE 28.3 yr overduePENTAGON SHREEMANGAL VISHHRAM VENTURES · Somatane, PuneP52100010781· 88.2% built
- Shreeram Residency8.3 yr overdueSHRIRAM DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100004468· 50.9% built
- Redevelopment of Transit Building No 32 and 33 Sidharth Nagar Goregaon West8.3 yr overdueMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · Andheri, Mumbai SuburbanP51800000030· 56.7% built
- The Address8.3 yr overdueMAGNITON INFRA · khmala, NagpurP50500012771· 90.9% built· 1 complaint
- ALIVE8.3 yr overdueNIMANI CONSTRUCTIONS · Pune (M Corp.), PuneP52100004256· 81.8% built
- AMRUT SMRUTI8.3 yr overdueOM BUILDCON · Ward FNorth, Mumbai CityP51900011560· 90.9% built
- PRANAV APARTMENT8.3 yr overdueAARYA DEVELOPERS · Palghar, PalgharP99000004490· 90.9% built
- BALAJI GARDEN8.3 yr overdueSHREE BALAJI ENTERPRISES · Malyan, RaigarhP52000009986· 90.9% built
- Siddharth Apartment8.3 yr overdueRohan Gruh Nirman · Badlapur (M Cl), ThaneP51700013427· 60.9% built
- GOLDEN NEST8.3 yr overdueAZIZ MEHBOOB BAGWAN · Baramati (M Cl), PuneP52100006554· 72.7% built
- SHRADDHA ORCHID AVENUE8.3 yr overdueSHRADDHA LANDMARK PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800012384· filed Dec 2017 → now Apr 2018· 89.5% built· 1 complaint
- OM APPARTMENT8.3 yr overdueVijay Kashinath Chilekar · Ratnagiri, RatnagiriP52800004555· 63.6% built
- kalyani classic8.3 yr overdueBhagwan pandurang Ghadge · Aurangabad (M Corp.), AurangabadP51500006528· 63.6% built
- Shaswat Residency8.3 yr overdueShaswat Realty · Kurla, Mumbai SuburbanP51800008668· 44.5% built
- UNITY RESIDENCY8.3 yr overdueDHANRAJ BHAGWANSING KHOT · Junnar, PuneP52100001016· 86.4% built
- VISION WOODS 1 PHASE II8.3 yr overdueSHUBBAN REALTORS · Jambhul, PuneP52100007352· filed Mar 2018 → now Apr 2018· 87.2% built
- SAI VISHWA8.3 yr overdueEKNATH BHAU SHINDE · Rajuri, PuneP52100003169· 90.5% built
- Pushpak8.3 yr overdueA R Constructions · Karanjade, RaigarhP52000001781· 90.9% built
- Priyadarshan8.3 yr overdueGangotree Greenbuild · Kothrud, PuneP52100003716· 90.9% built
- Imperial Classic8.3 yr overdueStar Builders · Vasai, PalgharP99000000898· 50% built
- UMIYA ARCADE WING A AND B8.3 yr overdueUMIYA CONSTRUCTION COMPANY · Titwala, ThaneP51700002949· 60.9% built
- Ujwal Paradise8.3 yr overdueUjwal Fine Homes · Dhayari (Part), PuneP52100000768· 90.9% built
- AMRUTYOG HOMES8.3 yr overdueDARRVESH ASSOCIATES · PUNE, PuneP52100014551· 25.5% built
- THE REGENT PARK8.3 yr overdueKAMDHENU INFRASTRUCTURE · PUNE, PuneP52100003421· filed Mar 2018 → now Apr 2018· 92.9% built
- REDEVELOPMENT OF SBI EMPLOYEES KANCHAN MRIG CHS LTD.8.3 yr overdueR R CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800003186· 90.9% built
- KRISHNA PARADISE8.3 yr overdueKRISHNA BUILDER AND DEVELOPERS · Kasar Amboli, PuneP52100005062· 64.5% built
- TULSI CORNER8.3 yr overdueMAHADEV LIFESPACES · Ulawe, RaigarhP52000003668· 80.9% built
- Mellorea8.3 yr overdueNirman Developers · Pimpri Chinchawad (M Corp.), PuneP52100012994· 77.3% built
- SANJAY VILLA8.3 yr overdueSAI DUTTA ENGINEERS & BUILDERS · Tasgaon (M Cl), SangliP53100005772· 72.7% built
- KALPATARU APPARTMENT8.3 yr overdueVIVEK NARENDRAKUMAR CHAWARE · Bhilkheda, WashimP50200013517· 77.3% built
- VANKVANIS BLISS8.3 yr overdueRahul Suresh Vankvani · Ulawe, RaigarhP52000011609· 3.6% built
- DLH METROVIEW8.3 yr overdueDEV LAND & HOUSING PRIVATE LIMITED · ANDHERI WEST, Mumbai SuburbanP51800005170· 81.8% built· 1 complaint
- SARASWATI CASTLE8.3 yr overdueBHUMIKA DEVELOPERS · Kalyan, ThaneP51700004428· 75.9% built
- EXCELLENCE RESIDENCY8.3 yr overdueEXCELLENCE INFRA · Panvel, RaigarhP52000005743· 69.1% built
- Rajesh Presidency8.3 yr overdueSAI SHRI HOME MAKERS · Ulawe, RaigarhP52000011010· 88.2% built· 3 complaints
- Trimurti8.3 yr overdueSugee Developers Pvt Ltd · Ward GNorth, Mumbai CityP51900004360· 90.9% built
- PALAVA VISTA A to D8.3 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000395· 81.8% built· 3 complaints
- JAI GOPI KRISHNA CHSL8.3 yr overdueNav Durga Construction Company · Kurla, Mumbai SuburbanP51800006482· filed Dec 2017 → now Apr 2018· 90.9% built
- Const.378 LIG,331MIG,154HIG T.8.3 yr overduePune Housing and Area Development Board Pune · Haveli, PuneP52100009644· 98.5% built· 1 complaint
- Sai Crystal8.3 yr overdueShraddha Corporation · Ambarnath(M Cl), ThaneP51700012359· filed Dec 2017 → now Apr 2018· 90.9% built
- RIDDHI SIDDHI TOWER A BUILDING8.3 yr overdueR R LUNKAD BUILDERS AND PROMOTERS · CHARHOLI, PuneP52100002304· 90.9% built
- SHRADDHA HEIGHTS8.3 yr overdueSHRADDHA CONSTRUCTIONS · Thane, ThaneP51700008034· 39.5% built
- THARWANI SOLITAIRE PHASE I8.3 yr overdueANIL HARDASMAL THARWANI · Kalyan, ThaneP51700005630· 60.4% built
- SHUBH AARAMBH8.3 yr overduePACIFIC CONSTRUCTION & DEVELOPERS · Badlapur (M Cl), ThaneP51700012478· 50% built
- SHIV DRISHTI8.3 yr overdueSHIVKRUPA ENTERPRISES · Karanjade, RaigarhP52000003991· 77.7% built
- SKY HEIGHTS8.3 yr overduePRAY DEVELOPERS · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000040· 90.9% built
- SHASHWAT SANKUL8.3 yr overdueSAI SMARAN CONSTRUCTION · Bopele, RaigarhP52000007561· 68.6% built
- Desai Enclave8.3 yr overduePrakash Vasudev Desai · Chiplun (M Cl), RatnagiriP52800013051· 89.1% built
- Yashwin Jeevan8.3 yr overdueVilas Javdekar & Sanjeevani Developers LLP · Sus, PuneP52100000011· 90.9% built
- THARWANI ARIANA PHASE II8.3 yr overdueANIL HARDASMAL THARWANI · Ambarnath, ThaneP51700006127· 51.8% built
- Nidhi Palace8.3 yr overdueBhagawati Construction · Palghar, PalgharP99000004975· 50% built
- LODHA BELMONDO SAWGRASS B8.3 yr overdueLodha Developers Limited · Gahunje, PuneP52100000221· 81.8% built
- Harshail Dhanuka Residency8.3 yr overdueHARSHMAAN CONSTRUCTION · Andheri, Mumbai SuburbanP51800000368· 81.8% built
- BALAJI HEIGHTS8.3 yr overdueSHREE BALAJI REALITY · Thane, ThaneP51700004645· 90.9% built
- STATUS POINT8.3 yr overdueJOSHI ZAWAR DEVELOPERS & BUILDERS · Haveli, PuneP52100001237· filed Dec 2017 → now Apr 2018· 90.9% built
- SHIV ASHIRWAD8.3 yr overdueSHIVKRUPA ENTERPRISES · Karanjade, RaigarhP52000010827· 72.5% built
- AASHA RESIDENCY8.3 yr overduePITER SHAMUWEL GHATAGE · Miraj, SangliP53100015072· 21.4% built
- PADMAPRABHA CO OP HSG SOCIETY8.3 yr overdueSHREE MAHAVEER ENTERPRISES · SHIRGAON BADLAPUR, ThaneP51700015031· 90.9% built
- walchand nagar - 28.3 yr overduePRAKASH HAMIRMAL JAIN · Thane, ThaneP51700009826· 56.4% built
- PARVATI AVENUE8.3 yr overdueR D Realtors · Panvel, RaigarhP52000005819· 90.9% built
- GAYATRI PARK8.3 yr overdueVIKRAM BUILDERS · Thane, ThaneP51700010528· filed Dec 2017 → now Apr 2018· 90.9% built· 1 complaint
- INDRAYANIIRA8.3 yr overdueSAUBHAGYA DEVELOPERS · PUNE NASHIK HIGHWAY, PuneP52100014863· 72.7% built
- GAJANAN KRUPA8.3 yr overdueGAJANAN DEVELOPERS · Nashik, NashikP51600005519· 90.5% built
- ARIHANT COMPLEX8.3 yr overdueINDRANEEL SHANTARAM TAMBE · Otur, PuneP52100014213· 52.7% built
- RATTAN GALAXY8.3 yr overdueRATTAN PROPERTIES AND PROJECTS PRIVATE LIMITED · Ambarnath, ThaneP51700003240· 83.6% built
- DHAVLGIRI8.3 yr overduePERFECT BUILDERS · Ambarnath(M Cl), ThaneP51700012227· 53.3% built
- SUMMERSET8.3 yr overdueNEO HOUSING AND INFRASTRUCTURE DEVELOPMENT LIMITED · Borivali, Mumbai SuburbanP51800008467· filed Dec 2017 → now Apr 2018· 88.6% built
- SEA STAR8.3 yr overdueRAJESH AND DSOUZA ASSOCIATES · Ulawe, RaigarhP52000011974· 86.8% built· 4 complaints
- PARADISE PARK8.3 yr overdueCREATIONPROPERTIES · Sangli Miraj Kupwad (M Corp.), SangliP53100003197· 50% built
- SKYLARK8.3 yr overdueGROUP FOUR DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000010097· 87.7% built
- BUILDARCH OLIVE8.2 yr overdueBUILDARCH LAND DEVLOPERS PVT. LTD. · Ward GNorth, Mumbai CityP51900011900· filed Dec 2017 → now May 2018· 72.7% built
- Sai Pooja8.2 yr overdueValse Gholap Associates · Ambegaon, PuneP52100013314· 72.7% built
- PRABHAT APPARTMENT8.2 yr overdueAB DEVELOPERS · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000005· 53.6% built
- Arihant Complex8.2 yr overdueAdya Constructions · Gandhi Nagar, SolapurP52600014946· 72.7% built
- SABHARI CO-OP HSG SOCIETY8.2 yr overdueSHUBHAM ENTERPRISES · ULWE, RaigarhP52000010782· 90.9% built
- Ekadanta8.2 yr overdueKelkar Developers · Pune (M Corp.), PuneP52100001006· 90.9% built
- RAVI DARSHAN8.2 yr overdueRAVI DEVELOPERS · Badlapur (M Cl), ThaneP51700011461· 66.4% built
- BHOSALE DAFFODIL8.2 yr overdueBHOSALE HOMES · Ulawe, RaigarhP52000005903· 75.5% built
- SAMARTH HEIGHTS8.2 yr overdueSAMARTH VASTUPURTI · Aurangabad (M Corp.), AurangabadP51500012554· 78.6% built
- NEEL VIHAR WING-B8.2 yr overdueNeel Gagan Developers · Nagpur (M Corp.), NagpurP50500008240· 90.9% built
- NILGIRI8.2 yr overdueSHIVAM DEVELOPER · Ambarnath, ThaneP51700003872· 72.7% built
- GLORIS RESIDENCY8.2 yr overdueSahakar Developers · Borivali, Mumbai SuburbanP51800003895· 90.9% built
- WEEKENDER BIRDS VIEW8.2 yr overdueNAMRATA DEVELOPERS PVT. LTD · Talegaon Dabhade (M Cl), PuneP52100001626· 90.9% built
- SAMARTH SRUSHTI8.2 yr overdueSWAMI SAMARTH DEVELOPERS · Wadagaon (CT), PuneP52100012037· 89.5% built
- 219 Boat Club8.2 yr overdueMERINT DEVELOPERS PVT LTD · Mumbai City, Mumbai CityP51900010179· 84.5% built
- RIDDHI SIDDHI8.2 yr overduemotilal laxminarayan construction pvt. ltd. · Kolhapur (M Corp.), KolhapurP53000003011· 98.8% built
- PRATIMA8.2 yr overdueKARBHARI UTTAMRAO MANTE · Baner, PuneP52100013630· 90.9% built
- NILKANTH8.2 yr overdueKALPAK DEVELOPERS · kalmath, SindhudurgP52900007897· 81.8% built
- SUKOOL8.2 yr overdueSHREE SIDDHIVINAYAK CONSTRUCTION · Talegaon Dabhade (M Cl), PuneP52100008373· 64.5% built
- BLUE KEY REALTYS ESCALATE8.2 yr overdueBlue Key Realty · Ulawe, RaigarhP52000003043· 70.6% built
- Shivkripa Residency8.2 yr overdueRohit Developers · Thane, ThaneP51700010093· 77.3% built
- GRACE GILGAL8.2 yr overdueSHAJAN RAPPAI VARIKKASSERY · Nagpur (M Corp.), NagpurP50500006343· 84.1% built
- LAKSHMI RESIDENCY8.2 yr overdueBABASAHEB NEMGONDA PATIL · Sangli Miraj Kupwad (M Corp.), SangliP53100008264· 46.8% built
- SURYA RESIDENCY8.2 yr overdueSURYAPUTRA DEVELOPERS · Junnar, PuneP52100012477· 90.9% built
- Astavinayak Apartment8.2 yr overdueM/s RAJ RIDDHI ASSOCIATES · Palghar, PalgharP99000013684· 40.5% built
- TROPICAL LAGOON - 4 -JACARANDA8.2 yr overdueSOHAM ESTATES · Thane, ThaneP51700008485· 64.1% built· 23 complaints
- Hillside Apartment8.2 yr overduePratik Chandrakant Bhide · Talegaon Dabhade (M Cl), PuneP52100011572· 87.8% built
- Gagangiri Arcade8.2 yr overdueAKRUTI ASSOCIATES · Kalyan, ThaneP51700003151· 84.8% built
- PRAMUKH DARSHAN8.2 yr overduePRAMUKH ENTERPRISES · Dhamote, RaigarhP52000010357· 90.9% built
- VEDANT PARK8.2 yr overduePRASAD BABANRAO ANDHALE · Ahmadnagar (M Corp.), AhmednagarP52200008876· 86.4% built
- ROHAN LEHER 2 WING F G H I J8.2 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Pune (M Corp.), PuneP52100000705· 90.9% built
- Braj Paradise8.2 yr overdueBraj Developer · Palghar, PalgharP99000006122· 61.8% built
- SAI VIHAR PHASE -28.2 yr overdueMANGALMURTI CONSTRUCTIONS · Ahmadnagar (M Corp.), AhmednagarP52200006014· 54.5% built
- HARIDEEP SQUARE8.2 yr overdueHARIDEEP DEVELOPERS · Nashik (M Corp.), NashikP51600010848· 90.9% built
- VARAD RESIDENCY8.2 yr overdueGAJANAN MORESHWAR NILAWAR · Chandrapur (M Cl), ChandrapurP50900009833· 90.9% built
- 64 LIG, 80 MIG, 16HIG and 20 Shops at Sr. No. 491, Res. No. 23 Part, Vengurla, Dist. Sindhudurg8.2 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Andheri, Mumbai SuburbanP51800002323· 69.3% built
- Shams Enclave8.2 yr overdueZhakirhussain Shamshuddin Bargir · Morewadi (CT), KolhapurP53000009172· 86.4% built
- GUNDECHA ASTA PHASE I8.2 yr overdueAnaya Infrastructure Pvt. Ltd. · Andheri, Mumbai SuburbanP51800001504· 88.6% built· 1 complaint
- Vastushilp Exotica8.2 yr overdueM/s Vastushilp Realtors · Shahupuri (CT), SataraP52700002706· 64.1% built
- Ganesh Park8.2 yr overdueGanesh Developers & Company · AMBEGAON Bk, PuneP52100003030· 44% built
- Parijat Plaza Type B8.2 yr overdueM/s Parijat Constructions · Badlapur (M Cl), ThaneP51700010993· 80% built
- kute sukhvastu8.2 yr overdueKailas Developers And Builders · near PCMC school, PuneP52100007440· 81.8% built
- kasturi Apt8.2 yr overdueshruti shripad kulkarni · NARHE, PuneP52100001009· 99.5% built· 2 complaints
- Plot No 888.2 yr overdueJitesh Bhawarlal Jain · Borivali, Mumbai SuburbanP51800006523· 87.3% built
- SHRI CHATRAPATI SHIVAJI MAHARAJ VYAPARI SANKOOL8.2 yr overdueBORSE BROTHERS ENGINEERS AND CONTRACTORS PRIVATE LIMITED · Dhule (M Corp.), DhuleP49800009159· 67.3% built
- BHOSALE TULIP8.2 yr overdueBHOSALE GROUP · Ulawe, RaigarhP52000012566· 78.2% built
- NANDRAJ NAGARI TYPE E8.2 yr overdueSWARAJ DEVELOPERS · Badlapur (M Cl), ThaneP51700009908· 81.8% built
- Building C - D8.2 yr overdueShreenath Constructions · Aurangabad (M Corp.), AurangabadP51500009104· 90.9% built
- SATU AURA8.2 yr overdueSATU REALTY · Palghar, PalgharP99000009278· 90.9% built
- SAI NIRMAL APPARTMENT8.2 yr overdueSAMRUDDHI CONSTRUCTION · Nashik, NashikP51600004394· 47.7% built
- Amrutvel Greens Phase I8.2 yr overdueErande Bhave Associates · Haveli, PuneP52100008225· 68.1% built· 2 complaints
- Kai. Abasaheb R R Patil Vyapari Sankul8.2 yr overdueBORSE BROTHERS ENGINEERS AND CONTRACTORS PVT LTD · Dhule (M Corp.), DhuleP49800007544· 67.3% built
- MOTIRAM PRIVILEGE8.2 yr overdueVANITA ENTERPRISES · Ambarnath, ThaneP51700003347· 90.9% built
- Vizion Galaxy C8.2 yr overdueVIZION CONSTRUCTION · Junnar, PuneP52100005061· 90.9% built
- NAKSHATRA RESIDENCY8.2 yr overdueJMD GROUP BUILDERS & DEVELOPERS · Chiplun (M Cl), RatnagiriP52800009936· 62.7% built
- KRISHNAI PLAZA8.2 yr overduenitin shamrao patil · Haveli, PuneP52100014765· 97.3% built
- SHREE MAHALAKSHMI PARK BUILDING NO 18.2 yr overdueSHREE MAHALAXMI HOME MAKERS · Dhamote,Neral, RaigarhP52000010984· 90.9% built
- PEARL HAZELINE8.2 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800003301· 90.9% built
- Venkatesh Joynest Phase 28.2 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100000990· 90.9% built
- BHUVANESHWAR PLAZA8.2 yr overdueOM BUILDERS · Bhuwaneshwar (CT), RaigarhP52000010401· 80% built
- SAINATHVILLA Phase II8.2 yr overdueSainath Builders & Developers · Sundarwadi, AurangabadP51500011537· 93% built
- DNYANRAJ APPARTMENT8.2 yr overdueNitiraj Vijay Ovhal · Pimpri Chinchawad (M Corp.), PuneP52100011505· 90.9% built
- OM SAVAI NIKETAN8.2 yr overdueSAGAR SUPER STRUCTURES PRIVATE LIMITED · BADLAPUR, ThaneP51700009373· 73.6% built
- Mahavir Solitaire8.2 yr overdueInfinity Construction Co. · Kurla, Mumbai SuburbanP51800000404· 78.6% built
- LIBERTY NIWAS8.2 yr overdueSHRISHTI BUILDCON · Nashik, NashikP51600003961· 90.9% built
- SANJIRI RESIDENCY8.2 yr overdueZUBAIR HAJI BASHIR ASHRAFI · Nagpur (M Corp.), NagpurP50500014322· 15.5% built· 1 complaint
- SHRIKRISHNA HERITAGE8.2 yr overdueSHRIKRISHNA VENTURES · Palghar, PalgharP99000009732· 48.2% built
- NAKSHTRA PLAZA8.2 yr overdueSHARVARI BUILDERS & DEVELOPERS · Pen (M Cl), RaigarhP52000011253· 50% built
- ASTER A WING RUCHA VATIKA8.2 yr overdueMILAN HOUSING COMPLEX PVT. LTD. · Titwala, ThaneP51700005590· 60.5% built
- SAI PLANET8.2 yr overdueM K ASSOCIATES · Punawale, PuneP52100003320· 90.9% built
- Unnati8.2 yr overdueSangeet Changediya · Prabhat Road, PuneP52100014558· 88.6% built
- Snehsparsh8.2 yr overduePushkar Realty · Bhor, PuneP52100011416· 41.8% built
- KASTURI NAGAR8.2 yr overdueSKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD. · Gotal Panjari, NagpurP50500002773· 70.1% built
- Aadhar Apartment8.2 yr overdueGIRDHAR DHARAMSIBHAI RATHOD · NAGPUR, NagpurP50500015627· 81.8% built
- CRYSTAL PALLAZO8.2 yr overdueSAURABH CONSTRUCTION · Vasai, PalgharP99000009609· 90.9% built
- KOOL BREEZE PHASE II8.2 yr overdueABHISHEK SHELTERS LTD · Badlapur (M Cl), ThaneP51700010400· 84.5% built
- SAI KANISHK PHASE I8.2 yr overdueOm Sai Infra & Om Sai Group · Thane, ThaneP51700006847· filed Dec 2017 → now May 2018· 90% built· 11 complaints
- AARADHYA RESIDENCY8.2 yr overdueM S GROUP · Zadgaon CT, RatnagiriP52800004581· 60.9% built
- SILICON TOWER8.2 yr overdueSHREE RADHAKRISHNA DEVELOPER · Ambarnath, ThaneP51700004184· 51.8% built
- Malhar Heights8.2 yr overdueNavnath Baban Gawali · Haveli, PuneP52100012854· 27.9% built
- BHARAT RESIDENCY8.2 yr overdueSHIVSAI BUILDERS & DEVELOPERS · KLAYAN, ThaneP51700010262· 51.4% built
- OM SAI VIHAR8.2 yr overdueJai Mahalaxmi Enterprises · Manda, ThaneP51700003493· 87.3% built
- Ratnagiri Residency8.2 yr overdueAAKAR CONSTRUCTIONS AND DEVELOPERS · Nachane (CT), RatnagiriP52800014049· 90.9% built
- ASHWA ANNEX8.2 yr overdueASHWAMEDH CONSTRUCTION · Thane, ThaneP51700002512· 90.9% built
- SAI SHRUSTI8.2 yr overdueSAI ENTERPRISES · Mahad (M Cl), RaigarhP52000008583· 60% built
- Anand Sagar Enclave8.2 yr overdueVPA Developers · Kalyan, ThaneP51700002701· 54.5% built
- Kohinoor Apartment8.2 yr overduePATRICK FRANCIS ALMEIDA · Vasai, PalgharP99000008551· 90.9% built
- GLOBAL ARENA8.2 yr overdueDDPL GLOBAL INFRASTRUCTURE PVT. LTD. · Vasai, PalgharP99000006463· filed Mar 2018 → now May 2018· 90% built· 1 complaint
- V3 VINAMRA8.2 yr overdueV3 INNOVATORS · MANJARI Bk, PuneP52100004156· 56.8% built
- SAI PLATINA8.2 yr overdueSHREE SAI ESTATES · Pimpri Chinchawad (M Corp.), PuneP52100007233· 90.9% built
- SHIVSHANKAR KALASH8.2 yr overdueSURESH SHIVSHANKAR SHARMA · Navi Mumbai Panvel Rigardh (CT), RaigarhP52000010959· 90.9% built
- LEENA APARTMENT8.2 yr overdueHeramb Developers · Ambarnath(M Cl), ThaneP51700012362· 50% built
- LAXMI VILLA8.2 yr overdueLAXMIDEVI DEVELOPERS · Borivali, Mumbai SuburbanP51800002675· 90.9% built
- JUGAI GARDENS8.2 yr overduePRASHANT MANOHAR DINGANKAR · Rahataghar, RatnagiriP52800006258· 90.9% built
- Virtej Apartment8.2 yr overdueVirtej Virdhaval Ghag · Savarde, RatnagiriP52800008808· 56.4% built
- BORIVALI SAHAKAR NIKETAN8.2 yr overdueAMAR ENTERPRISES · Borivali, Mumbai SuburbanP51800011527· 69.5% built· 1 complaint
- A WING B WING8.2 yr overdueVISHWATMAK REALTORS LLP · Haveli, PuneP52100005796· 63.6% built
- OM RISHIKESH CHS Ltd8.2 yr overdueRiddhi Siddhi Enterprises · Ambarnath, ThaneP51700005679· 87.3% built
- TANOAK8.2 yr overdueM/s Vanita Developers · Pimpri Chinchawad (M Corp.), PuneP52100006742· 69.1% built
- IDEAL EMBARK8.2 yr overdueTHE IDEAL CONSTRUCTION · SANEGURUJI KOLHAPUR, KolhapurP53000000132· 90.9% built
- Silver Mist C, D Building8.2 yr overdueNIRMAN BUILDCON · LOHGAON, PuneP52100002817· 90.9% built
- Kate pride8.2 yr overdueSagar Mahadev Kate · Jalochi, PuneP52100009632· 90.9% built
- KRISHNA VIHAR8.2 yr overdueKRISHNA SPACE · Bhiwandi, ThaneP51700005020· 90.9% built
- NAMRATA RESIDENCY8.1 yr overdueUTTAM NAGESH ARAGE · Sangli Miraj Kupwad (M Corp.), SangliP53100004879· 81.8% built
- NANDHA RESIDENCY8.1 yr overdueAMIT C THAKUR · Haveli, PuneP52100012200· 90.9% built
- AZAD NAGAR SHUBHAM CHSL8.1 yr overduePRATHAMESH KRUPA BUILDCON PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800006313· filed Dec 2017 → now Jun 2018· 72.7% built
- SAI KAMAL8.1 yr overdueOM SAI KAMAL BUILDERS AND DEVELOPERS · Waluj Mahanagar 1, AurangabadP51500007461· 90.9% built
- SHIVDHARA8.1 yr overdueGEETA BUILDCON · Adgaon, NashikP51600010746· 78.2% built
- Raj Nirman8.1 yr overdueFERRO BUILD · Borivali, Mumbai SuburbanP51800003531· 55.5% built
- NYATI ELAN WEST I8.1 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100000987· 90.9% built
- SIDDHI ENTERPRISES8.1 yr overdueSIDDHI ENTERPRISES · Bopele, RaigarhP52000004194· 90.9% built
- NEPTUNE SWARAJYA SECTOR 1- A178.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011115· 59.5% built
- SAIDEEP ROW BUNGLOW PHASE 38.1 yr overdueSUNIL BALASAHEB GHEMBUD · KEDGAON, AhmednagarP52200011770· 72.7% built
- NEPTUNE SWARAJYA SECTOR 1- A158.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700005260· 60.9% built
- NEPTUNE SWARAJYA SECTOR 1-A138.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700010783· 60.6% built
- NEPTUNE SWARAJYA SECTOR 1-A58.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700010289· 59.2% built· 1 complaint
- PRAJAPATI VIHAR8.1 yr overduePRAJAPATI CONSTRUCTIONS LIMITED · Uran, RaigarhP52000002200· 90.9% built· 1 complaint
- TREEMOUNT8.1 yr overdueRENAISSANCE ENTERPRISES · Dabhade, PuneP52100015410· 81% built· 1 complaint
- SHREM SILVER BEACH8.1 yr overdueHitesh RamPraksash Chhatwal · Alibag, RaigarhP52000012541· filed Mar 2018 → now Jun 2018· 70.9% built
- SHIV DARSHAN8.1 yr overdueVIJAY MAGANBHAI TANK · Nashik, NashikP51600012900· filed Dec 2017 → now Jun 2018· 52.3% built
- Mount Unique A Wing8.1 yr overdueAnand Realtors · Baner, PuneP52100009362· 90.9% built· 1 complaint
- HERMES8.1 yr overdueSuresh Sakharam Kanchan · Haveli, PuneP52100011667· 90.9% built
- TEJ PLATINUM8.1 yr overdueSuresh Sakharam Kanchan · Haveli, PuneP52100012013· 90.9% built
- ISHWAR ENCLAVE8.1 yr overdueISHWAR ENTERPRISES · AMBARNATH, ThaneP51700014663· 59.1% built
- SHRI GANESH APARTMENTS8.1 yr overdueMATUSHREE REAL ESTATE DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800004536· filed Dec 2017 → now Jun 2018· 72.7% built· 1 complaint
- Shreeram towers B8.1 yr overdueSHREERAM PROMOTERS AND DEVELOPERS · Kolki (CT), SataraP52700008411· 62.7% built
- Bhushan Enclave CHSL8.1 yr overdueBhushan Enterprises · Borivali, Mumbai SuburbanP51800012821· 90.9% built
- Sonai Residency8.1 yr overdueAayushi Enterprises · Karanjade, RaigarhP52000006156· 72.7% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.