RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 6 of 59
- PACIFIC AURA8.1 yr overduePACIFIC ENTERPRISES · Panvel, RaigarhP52000004638· 90.9% built
- Antheia D48.1 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000416· 90.9% built
- DHAN LAXMI RESIDENCY PHASE D8.1 yr overdueSahebrao Tukaram Borude · Ahmadnagar (M Corp.), AhmednagarP52200007820· 70.9% built
- Simba Tower8.1 yr overdueSimba Enterprises LLP · Borivali, Mumbai SuburbanP51800008506· filed Dec 2017 → now Jun 2018· 90.9% built
- SHRI GANESH APARTMENTS8.1 yr overdueMATUSHREE REAL ESTATE DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800004536· filed Dec 2017 → now Jun 2018· 72.7% built· 1 complaint
- NEPTUNE SWARAJYA SECTOR 1- A168.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700007460· 58.1% built
- RAVECHI COMPLEX8.1 yr overdueLIVE ENTERPRISES · Karanjade, RaigarhP52000003850· 81.8% built
- NISARG PALMS8.1 yr overdueADITYA SHAGUN DEVELOPERS · Bavadhan BK, PuneP52100002025· 81.8% built
- GLITTERATI8.1 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100006257· 37.4% built
- Olympeo Riverside - Phase 18.1 yr overdueOlympeo Riverside Projects LLP · Neral, RaigarhP52000002351· 76.7% built
- SHREE PANCHAM8.1 yr overdueSHREE PANCHAM ASSOCIATES · Mira-Bhayandar (M Corp.), ThaneP51700011256· 80% built
- SHIVGANESH8.1 yr overdueVISHWANATH MADHUKAR MHATRE · Pargaon, RaigarhP52000013379· 65% built
- 16th Avenue8.1 yr overdueMNK Builders LLP · Andheri, Mumbai SuburbanP51800005930· 88.2% built
- SHREE GANESH APARTMENT8.1 yr overdueSUBHADRA PROPERTIES PRIVATE LIMITED · Nashik (M Corp.), NashikP51600007091· 83.6% built
- JAI GANESH RESIDENCY A AND B WING8.1 yr overdueSHREE MORAYA CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100009902· 81.8% built
- RAHEJA VISTAS BUILDING B28.1 yr overdueCavalcade Properties Private Limited · Mohammedwadi, PuneP52100000919· 72.7% built
- GREEN EMPIRE B WING8.1 yr overdueGANRAJ ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100008349· 58.2% built
- TULSI AANGAN8.1 yr overdueTUSHAR NARAYAN PATIL · Wadagaon (CT), PuneP52100000500· 94.5% built
- NEELKANTH SPARKLE8.1 yr overdueNEELKANTH ENTERPRISES · Thane, ThaneP51700005915· 72.7% built
- PRITHVI SRISHTI8.1 yr overduePRITHVI ANAND REALTY · Palghar, PalgharP99000009593· 47.7% built
- PALAVA - PASEO - D to H8.1 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000269· 81.3% built· 1 complaint
- SHALWAK ELITE8.1 yr overdueSHALWAK INFRABULLS · Nagpur (M Corp.), NagpurP50500010251· 90.9% built
- Urban Rise8.1 yr overdueVTP CORPORATION LLP · Pisoli, PuneP52100000278· filed Dec 2017 → now Jun 2018· 76.7% built
- VRINDAVAN8.1 yr overdueVIDYA DIGVIJAY GAIKWAD · 486,MANGALWAR PETH, SataraP52700007664· 48.2% built
- VEDANT8.1 yr overdueMANDAR VASANT DEVARE ·P52100011775· 72.7% built
- PRAJAPATI VIHAR8.1 yr overduePRAJAPATI CONSTRUCTIONS LIMITED · Uran, RaigarhP52000002200· 90.9% built· 1 complaint
- USSH KIRAN8.1 yr overdueMangesh Dashrath Gaikar · Nashik (M Corp.), NashikP51600012292· 90.9% built
- SAI RESIDENCY8.1 yr overdueKALPAVRUKSHA DEVELOPERS · Ambarnath(M Cl), ThaneP51700011113· filed Dec 2017 → now Jun 2018· 81.8% built
- GANGA NIWAS A1 A28.1 yr overdueGANGA HOUSING PRIVATE LIMITED ·P52100005574· 72.7% built
- NEPTUNE SWARAJYA SECTOR 1-A48.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700009803· 59.6% built
- KINJAL COMPLEX8.1 yr overdueKINJAL ENTERPRISES · Palghar, PalgharP99000009135· 90.9% built
- Saheels Fortune Park8.1 yr overdueNeev Sai Associates · Moshi, PuneP52100014507· filed Dec 2017 → now Jun 2018· 90.9% built
- NEPTUNE SWARAJYA SECTOR 1-A38.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011861· 59.8% built
- OMICRON ASPIRE8.1 yr overdueOMICRON DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500004987· 66.6% built
- IMPERIAL TOWER8.1 yr overdueAG CONSTRUCTIONS · MOHAMMADWADI, PuneP52100003986· 54.5% built
- Daulat Heights8.1 yr overdueM/S B.K. DEVELOPERS · Saswad Rural, PuneP52100000693· 54.5% built
- ROYALE VISION8.1 yr overdueNIRMAN VISION · Pimpri Chinchawad (M Corp.), PuneP52100004302· filed Dec 2017 → now Jun 2018· 88.2% built
- KT Garden City - Phase III8.1 yr overdueM/s. Sainagar Development Corporation · Vasai, PalgharP99000003521· 82.4% built
- NIRMAL NAGARI8.1 yr overdueUNIQUE BUILDCORN BUILDERS AND DEVELOPERS · Thane, ThaneP51700007265· 60% built· 2 complaints
- Bhushan Enclave CHSL8.1 yr overdueBhushan Enterprises · Borivali, Mumbai SuburbanP51800012821· 90.9% built
- Neptune Swarajya Sector 1 - 1A8.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011863· 57.8% built
- SMART HEIGHTS8.1 yr overdueMUBIN MOHAMMED IQBAL JUMANI · Khopoli, RaigarhP52000012807· 66.4% built
- SWATI C.H.S. LTD8.1 yr overdueDILIP HIRALAL DOSHI · Borivali, Mumbai SuburbanP51800007302· 90.5% built
- TATER FLORENCE ORCHID8.1 yr overdueTATER REALTY · Karjat, RaigarhP52000003661· 90.9% built
- METRO JAZZ8.1 yr overdueBALAJI REALTY · Baner, PuneP52100005122· 82.1% built
- PATIL HILL VIEW8.1 yr overdueEKDANT DEVELOPERS · Badlapur (M Cl), ThaneP51700011266· 85.9% built
- SHIV DARSHAN8.1 yr overdueVIJAY MAGANBHAI TANK · Nashik, NashikP51600012900· filed Dec 2017 → now Jun 2018· 52.3% built
- Jay Raj Deep Apartement8.1 yr overdueJay raj Deep Corporation · Dronagiri, RaigarhP52000014667· 72.5% built
- Shubharambh Heritage8.1 yr overdueM/s Shubharambh Realty · Panvel, RaigarhP52000009499· 81.8% built
- Regency Sarvam Phase - 98.1 yr overdueREGENCY NIRMAN LTD · Titwala, ThaneP51700007066· 88.6% built
- SAFALYA8.1 yr overdueVITAE CONSTRUCTIONS LLP · Andheri, Mumbai SuburbanP51800004205· 79.5% built
- Sukruti Pinnacle8.1 yr overdueArihant Developers · Jalgaon (M Corp.), JalgaonP49900000226· 83.8% built
- Sarthak Shantiban8.1 yr overdueSarthak & Shanti Associates · NARHE, PuneP52100001780· 81.8% built
- SAPHIRE ORIEL8.1 yr overdueSAPHIRE ASSOCIATES · Karanjade, RaigarhP52000003173· 89.1% built· 1 complaint
- ANANT AURA8.1 yr overdueANANT INFRA · Panvel, RaigarhP52000003434· 90.9% built
- Neel Vihar Wing c8.1 yr overdueNeel Gagan Developers · Narsala, NagpurP50500003714· 89.5% built
- RUBYANA RESIDENCY PHASE 18.1 yr overdueSUDHIR DAMODAR GHATNEKAR · Badlapur (M Cl), ThaneP51700006102· 86.4% built
- Antheia A48.1 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000210· 90.9% built
- SWAROOP ORCHID8.1 yr overdueSWAROOP CONSTRUCTION · Badlapur (M Cl), ThaneP51700010451· 81.4% built
- ESQUIRE SKYTOWER8.1 yr overdueCOSMOS ASHWAMEDH JOINT VENTURE · Kurla, Mumbai SuburbanP51800005840· 67.3% built
- HILL VIEW8.1 yr overdueOMM INFRASTRUCTURE HOUSING CORPORATION · Gimhavane, RatnagiriP52800006468· 55.5% built
- JAI NILAYA BUILDING A8.1 yr overdueNISHA CONSTRUCTIONS · SHAHNOORWADI, AurangabadP51500005563· 81.8% built
- Gagangiri Niwas8.1 yr overdueSuresh Gopal Jadhav · Wakad, PuneP52100006048· 40.9% built
- OMKAR MEADOWS8.1 yr overdueOMKAR LIFESPACES · WAGHOLI, PuneP52100000144· 54.5% built
- The Metrozone Aspen C28.1 yr overdueSanklecha Construction Private Limited · Nashik (M Corp.), NashikP51600009327· 90.9% built· 1 complaint
- BLISS8.1 yr overdueSEA CRESTS BUILDCON LLP · Palghar, PalgharP99000006419· 90.9% built
- SWAMI SADAN8.1 yr overdueMAHESH NARAYAN SASE · Ambarnath, ThaneP51700013676· 36.8% built
- SUMERU MANGALAM8.1 yr overdueNARENDRA PRATAPRAI KINGRANI · Amravati (M Corp.), AmravatiP50300010367· 61.4% built
- ROONGTA TOWNSHIP PHASE IV APARTMENT8.1 yr overdueROONGTA BUILDERS AND DEVELOPERS · NASHIK, NashikP51600001287· 90.9% built
- MADHUKOSH8.1 yr overdueS R PROBUILD PVT LTD · Pune (M Corp.), PuneP52100001643· 81.8% built
- Sharda Sahaniwas8.1 yr overdueSumit Chetna Ventures · Borivali, Mumbai SuburbanP51800002134· filed Mar 2018 → now Jun 2018· 98.6% built· 1 complaint
- AUM VIHAAR8.1 yr overdueMOHAN TOLARAM KESWANI · Pimpri Chinchawad (M Corp.), PuneP52100001720· 81.8% built
- VISHWARAJ CONSTRUCTION8.1 yr overdueVISHWARAJ CONSTRUCTIONS · Rajapur (M Cl), RatnagiriP52800010433· 72.1% built
- SANGHVI VALLEY A1 A28.1 yr overdueSanghvi Premises Private Limited · Thane, ThaneP51700009615· 89.1% built
- Datta Prayag Apartment8.1 yr overdueMilind Dattatraya Mavle · Dahanu (M Cl), PalgharP99000007660· 37.7% built
- ICON RESIDENCY8.1 yr overdueBHUMI DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000012102· 90.9% built
- MERIDEAN ASSOCIATES8.1 yr overdueMERIDEAN ASSOCIATES · Kurla, Mumbai SuburbanP51800003813· filed Dec 2017 → now Jun 2018· 81.8% built
- PALAVA LAGOONA A TO F8.1 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000124· 78.2% built· 2 complaints
- NYATI ELAN WEST I8.1 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100000987· 90.9% built
- SHREM SILVER BEACH8.1 yr overdueHitesh RamPraksash Chhatwal · Alibag, RaigarhP52000012541· filed Mar 2018 → now Jun 2018· 70.9% built
- SAIDEEP ROW BUNGLOW PHASE 38.1 yr overdueSUNIL BALASAHEB GHEMBUD · KEDGAON, AhmednagarP52200011770· 72.7% built
- VANRAJ SUNSHINE8.1 yr overdueABHIJIT VAMANRAO PATIL · Nashik, NashikP51600009694· 81.8% built
- SHABARI8.1 yr overdueGruha Navnirman Developers · Pune (M Corp.), PuneP52100001736· filed Mar 2018 → now Jun 2018· 44.5% built
- NEPTUNE SWARAJYA SECTOR 1-A28.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011191· 61.3% built
- SUDAMA ENCLAVE8.1 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700011514· 60% built
- Krishna Kunj Residency8.1 yr overdueAshoka Infrastructure · Badlapur (M Cl), ThaneP51700008902· 76.4% built
- Construction of 216 Ts EWS and 80 Ts LIG at Shrirampur Ahmednagar8.1 yr overdueNashik Housing & Area Development Board · Near Boravake Nagar, AhmednagarP52200014971· 81.8% built
- Constructing 54 Tenements LIG and 36 Tenements MIG at Gat No 1712 part Dive Taluka Purander Dist Pun8.1 yr overduePune Housing and Area Development Board Pune · Dive, PuneP52100009389· 83.8% built
- Sunrise Glory - Phase I8.1 yr overdueSUNRISE LIFESPACES LLP · Thane, ThaneP51700008298· 90.9% built· 12 complaints
- C BUILDING KK SHREERAM8.1 yr overdueShah Associates and Properties · Haveli, PuneP52100000102· 90.9% built
- APURVA RESIDENCIES8.1 yr overdueSTARWING DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000167· 90.8% built
- Construction of 12 LIG t/s, 06 shops and 03 amenity at S No 894/A/1A-part,Miraj8.1 yr overduePune Housing and Area Development Board Pune · Sangli Miraj Kupwad (M Corp.), SangliP53100009909· 81.8% built
- AMMAR MEADOWS PHASE 28.1 yr overdueMEENAR ASSOCIATES · Thane, ThaneP51700011147· 87.3% built· 1 complaint
- OXY GALAXY8.1 yr overdueVENKATESH ESTATE · Kesnand, PuneP52100001254· 90.9% built
- SHUBHANGAN GREENS8.1 yr overdueSHREE SAI DEVELOPERS · Palghar, PalgharP99000003622· 79.1% built
- ROYALE B C D8.1 yr overdueAshoka Infraways Limited · Wadala, NashikP51600011935· filed Dec 2017 → now Jun 2018· 90.9% built
- NEPTUNE SWARAJYA SECTOR 1- A178.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011115· 59.5% built
- SIDDHI ENTERPRISES8.1 yr overdueSIDDHI ENTERPRISES · Bopele, RaigarhP52000004194· 90.9% built
- HERMES8.1 yr overdueSuresh Sakharam Kanchan · Haveli, PuneP52100011667· 90.9% built
- Aditi Plaza8.1 yr overdueChintamani Construction · Ambarnath, ThaneP51700001865· 90.9% built
- NEPTUNE SWARAJYA SECTOR 1-A58.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700010289· 59.2% built· 1 complaint
- TRIOSE8.1 yr overdueYASHADA GOVIND DEVELOPERS · Pimpale Saudagar, PuneP52100001721· 90.9% built
- VISION KALPAVRIKSHA PHASE 18.1 yr overdueNAVYA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100001754· 90.9% built
- MANGESHI SANSKAR8.1 yr overdueMangesh Dashrath Gaikar · Kalyan, ThaneP51700008382· 90.9% built
- NEPTUNE SWARAJYA SECTOR 1- A158.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700005260· 60.9% built
- NEPTUNE SWARAJYA SECTOR 1-A138.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700010783· 60.6% built
- PLATINUM GREEN8.1 yr overdueUNNATI HOMES INFRACON · Nagpur (M Corp.), NagpurP50500006086· filed Dec 2017 → now Jun 2018· 81.8% built
- Prospero8.1 yr overdueSancheti Sons ·P52100007663· 89.1% built
- TREEMOUNT8.1 yr overdueRENAISSANCE ENTERPRISES · Dabhade, PuneP52100015410· 81% built· 1 complaint
- SHUBHTEJ8.1 yr overdueJITNAT CONSTRUCTIONS · Thane, ThaneP51700014486· 90.9% built
- HARSHWARDHAN RESIDENCY8.1 yr overdueYASHWARDHAN CONSTRUCTIONS PVT LTD · Solapur (M Corp.), SolapurP52600000290· 41.8% built
- YASH ORCHID8.1 yr overdueYASH CONSTRUCTIONS · Nashik (M Corp.), NashikP51600010893· 39% built
- SHREE MANSION8.1 yr overdueSACHIN ASHOK KHARE · AJNI, NagpurP50500014642· 90.9% built
- SIDDHIVINAYAK HIGHTS8.1 yr overdueSAI DEVELOPERS · Sangole (M Cl), SolapurP52600014499· 82.8% built
- TATER FLORENCE OLIVE8.1 yr overdueTATER REALTY · Karjat, RaigarhP52000003313· 90.9% built
- SND SIGNATURE8.1 yr overdueS N DAMANI INFRA PRIVATE LIMITED · ULWE, RaigarhP52000008586· 90.9% built
- 54 Anandwan Sankul8.1 yr overdueRajesh Raghuvir Mantri · Arawali, SindhudurgP52900012680· 74.2% built
- Dreams Aakruti Plot no 3 wings A B8.1 yr overdueDreams Aakruti · Hadapsar, PuneP52100004275· 74.1% built
- HARI OM DARSHAN8.1 yr overdueHARI OM ENTERPRISE · Ulawe, RaigarhP52000012855· 42.7% built
- TEJ PLATINUM8.1 yr overdueSuresh Sakharam Kanchan · Haveli, PuneP52100012013· 90.9% built
- Mount Unique A Wing8.1 yr overdueAnand Realtors · Baner, PuneP52100009362· 90.9% built· 1 complaint
- Datta-Anagha Park8.1 yr overdueDattaraj Constructions · Kolgaon, SindhudurgP52900012863· 40.9% built
- ADITYA ROYAL8.1 yr overduePrashant Aditya Shukla · Ambarnath(M Cl), ThaneP51700009847· 81.5% built· 3 complaints
- Antariksha Signatures8.1 yr overdueAntariksha Developers · Baner, PuneP52100009963· 50.9% built
- Marvel Aurum8.1 yr overdueMARVEL REALTORS AND DEVELOPERS LTD · Pune City, PuneP52100002240· 78.9% built
- Today royal elisium8.1 yr overdueTODAY ROYAL BUILDERS & DEVELOPERS · Karanjade, RaigarhP52000001258· 86.6% built
- WINSPIRE8.1 yr overdueK & S Associates · kondhwa khurd, PuneP52100002214· filed Dec 2017 → now Jun 2018· 90.9% built
- CHANDRALOK NAGARI8.1 yr overdueYASHASHREE ASSOCAITES · Dhayari (Part), PuneP52100007877· 82.7% built
- METRO JAZZ8.1 yr overdueBalaji Realty · mumbay pune expres highway, PuneP52100004070· 88.6% built
- Hill Spring Phase 18.1 yr overdueVelocity · Thane West, ThaneP51700009218· 93.5% built· 1 complaint
- HORIZON CLASSIQUE-I8.1 yr overdueSACHIN ENTERPRISES · Thane, ThaneP51700006371· 84.1% built
- Gagangiri Dreamland8.1 yr overdueSuresh Gopal Jadhav · Wakad, PuneP52100012195· 40.9% built
- SAI VAIBHAV8.1 yr overdueANIL GANGARAM SAWANT · Borivali, Mumbai SuburbanP51800011223· filed Mar 2018 → now Jun 2018· 90.5% built
- SANKALP HEIGHTS8.1 yr overdueSANKALP BUILDERS & DEVELOPERS · Amravati (M Corp.), AmravatiP50300010818· 81.8% built
- NEPTUNE SWARAJYA SECTOR 1- A148.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700009907· 57.5% built
- Parksyde Homes Phase 18.1 yr overdueJaikumar Constructions LLP · Nashik, NashikP51600002640· 97.7% built
- SHIV DARSHAN - B WING8.1 yr overdueSHIV DEVELOPERS · Wakad, PuneP52100014413· 81.8% built
- LANDMARK TOWER8.1 yr overdueLAND MARK DEVELOPERS · Vasai, PalgharP99000011555· 82.7% built
- AADHARSHILA SAPPHIRE8.1 yr overdueAADHARSHILA CONSTRUCTION · Palghar, PalgharP99000006075· 63.2% built
- HARI ANMOL8.1 yr overdueHARI OM ENTERPRISE · Ulawe, RaigarhP52000012646· 41% built
- LAXMAN GOPAL RESIDENCY8.1 yr overdueTATHASTU ENTERPRISES PRIVATE LIMITED · Kasal, SindhudurgP52900006978· 90.9% built
- Playtor Paud A8.1 yr overduePLAYTOR PAUD LANDMARKS PRIVATE LIMITED · Mulshi, PuneP52100001798· 81.8% built· 1 complaint
- Pushkar Orchid Greens Phase I8.1 yr overduePushkar Homes Private Limited · Borkhedi, NagpurP50500006050· 59.8% built· 1 complaint
- Millenium One8.1 yr overdueMillenium Construction · Pune City, PuneP52100001444· 90.9% built
- IMPERIAL GOLD8.1 yr overdueUDAYSINH LAXMAN BHUJBAL · Kothrud, PuneP52100010201· 90.9% built
- AARADHYA RESIDENCY8.1 yr overdueABHAY CHANDMAL JAIN · Deolaligaon, NashikP51600000297· 36.4% built
- HARI VATIKA8.1 yr overdueDHARAN INFRA-EPC LIMITED · SANSARI, NashikP51600000220· 74.5% built
- SHREE RAGHUVEER SAMARTH APARTMENT8.1 yr overdueVED SAMARTH · Vasai, PalgharP99000006023· 90.9% built
- SAMARTH HEIGHTS8.1 yr overdueSHREE SWAMI SAMARTH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100008045· 59.1% built
- SHREE SAI LEELA8.1 yr overdueSHREE SAI BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700000149· 81.8% built
- Trinity Galaxy R1 and R48.1 yr overdueTrinity Developers · Badlapur (M Cl), ThaneP51700007348· 62.3% built
- POLITE CASTELLUM8.1 yr overdueCREATIVE ROYAL ASSOCIATES · DIGHIP52100003477· 90.9% built· 1 complaint
- AMAR ORCHID8.1 yr overdueAMAR REALTY · Kalyan, ThaneP51700002411· 90.9% built
- YOGI NIWAS8.1 yr overdueELITE INFRASTRUCTURE · Ambarnath, ThaneP51700002560· 52.3% built
- Unity Tower Wing B8.1 yr overdueMumbai Shelter Housing Development · Ward GSouth, Mumbai CityP51800001120· 88.5% built· 2 complaints
- Siddharth Nagar Sukhvilla CHS Ltd8.1 yr overdueDILIP HIRALAL DOSHI · Borivali, Mumbai SuburbanP51800009426· 99.7% built· 1 complaint
- PRIDE SQUARE8.1 yr overduePRIDELAND PROPERTIES · Malwan (M Cl), SindhudurgP52900005509· 89.1% built
- DURVANKUR RESIDENCY PHASE-28.1 yr overdueRAJESH SADHURAM GURNANI · WAGHOLI, PuneP52100002617· 59.1% built
- TUSCAN ESTATE8.1 yr overdueTUSCAN REAL ESTATE PRIVATE LIMITED · Pune (M Corp.), PuneP52100000439· 89.4% built
- Shreeram towers B8.1 yr overdueSHREERAM PROMOTERS AND DEVELOPERS · Kolki (CT), SataraP52700008411· 62.7% built
- ICONIA Phase II8.1 yr overdueKunal Sulakshan Associates · Pimpri Chinchawad (M Corp.), PuneP52100002850· 90.9% built
- MAHALAXMI PALACE-18.1 yr overdueVIJAYA VIJAY INGLE · Nagpur (M Corp.), NagpurP50500006859· 69.1% built
- SKY VIEW8.1 yr overdueHarpale Associates · Fursungi, PuneP52100010710· 46.4% built
- Laxmi Eva8.1 yr overdueWeaver Developers · Kudal (CT), SindhudurgP52900004169· 56.5% built
- VENKATESH LAKE LIFE PHASE 18.1 yr overdueSHREE VENKATESH REALTIES · Ambegaon, PuneP52100001126· 90.9% built
- SWAMI DHAM8.1 yr overdueSHREE AYYAPPA CONSTRUCTIONS · Ambarnath, ThaneP51700005616· 76.4% built
- Pyramid City 48.1 yr overduePyramid Ventures India Pvt.Ltd · Besa, NagpurP50500006837· 81.5% built· 1 complaint
- DESTINATION MEMOIR8.1 yr overdueKALBHOR GAVHANE LANDMARKS LLP · Haveli, PuneP52100005692· 81.1% built
- Tirumala Height8.1 yr overdueMANAS DEVELOPERS · Varale, PuneP52100004755· filed Dec 2017 → now Jun 2018· 55.4% built
- Sonai Residency8.1 yr overdueAayushi Enterprises · Karanjade, RaigarhP52000006156· 72.7% built
- OM SHUBH LABH8.1 yr overdueBALI REALTY LLP · Borivali, Mumbai SuburbanP51800006707· 90.9% built
- JAI GANESH ENCLAVE8.1 yr overdueLMK ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100012772· 84.5% built· 7 complaints
- GEM PLAZA8.1 yr overdueGEM PATH DEVELOPERS · Andheri, Mumbai SuburbanP51800011279· 90.9% built
- Om Vatika8.1 yr overdueOm Shiv Enterprises · Badlapur (M Cl), ThaneP51700009019· 90.9% built
- ENIGMA8.1 yr overdueEMERGING LANDMARK REALTY LLP · LOHGAON, PuneP52100014485· 52.2% built
- Skyline riverside wing G8.1 yr overdueSkyline Millars Limited · Karjat, RaigarhP52000003852· filed Dec 2017 → now Jun 2018· 90.9% built
- KRUSHNA SHANTI APARTMENT A WING8.1 yr overdueBALAJI ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100006493· 62.7% built· 1 complaint
- LEELADHAR APARTMENT8.1 yr overdueSHREE KRISHNA BUILDERS · Nashik, NashikP51600006650· 51.8% built
- VIJAYLAXMI BLISS8.1 yr overdueVIJAYLAXMI INFRACON LLP · Andheri, Mumbai SuburbanP51800000896· 76.4% built
- Signature Villas8.1 yr overdueS.K. Infrastructure · Pune (M Corp.), PuneP52100011996· 56.8% built
- Antheia B48.1 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000281· 90.9% built
- Elina Phase 18.1 yr overdueTrimurti Development Company · Sus, PuneP52100002115· 90.9% built
- S H TOWN8.1 yr overdueS P ASSOCIATES · Nagpur (M Corp.), NagpurP50500009890· 21.2% built
- DIGAMBARA RESIDENCY8.1 yr overdueDIGAMBARA RESIDENCY · Pimpri Chinchawad (M Corp.), PuneP52100011530· 90.9% built
- ADVENT PALAZZO8.1 yr overdueADVENT DEVELOPERS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800002649· 86.4% built· 1 complaint
- SILVER OAK8.1 yr overdueAnand Properties · Pimpri Chinchawad (M Corp.), PuneP52100000045· 90.9% built
- ANAND MALHAR8.1 yr overdueSAKORE DEVELOPERS LLP · VADGAONSHERIP52100014821· 62.7% built
- AAI CHS LTD8.1 yr overdueKALASH DEVELOPERS · Kalyan, ThaneP51700003266· filed Dec 2017 → now Jun 2018· 90.5% built
- OLIVE8.1 yr overdueDINSHA BUILDERS AND DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700008260· 56.8% built
- NEPTUNE SWARJAYA SECTOR 1- A188.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011116· 58.8% built
- MOURYA DEVELOPER8.1 yr overdueMOURYA DEVELOPER · Vasai, PalgharP99000006396· 79.1% built
- M/S HIRA PARK8.1 yr overdueRAJASHREE PRAVIN KHIWASARA · Hadapsar, PuneP52100005016· 85.9% built
- LAXMINIVAS8.1 yr overdueLAXMINIVAS · Akola, AhmednagarP52200013433· 93.6% built
- PHOENIX AVENUE8.1 yr overduePHOENIX INFRASTRUCTURE AND DEVELOPERS · Gandhare, ThaneP51700012079· 68.6% built
- CALLISTO8.1 yr overdueTODAY GLOBAL ENTERPRISES · Panvel, RaigarhP52000004871· 81.8% built
- MANJIRI HEIGHTS8.1 yr overdueYASH INFRASTRUCTURE · Kalyan, ThaneP51700012188· 78.2% built
- DATTAKRUPA RESIDENCY8.1 yr overdueCHAYA SUDHAKAR PHAD · Jalna (M Cl), JalnaP51400013829· 90.9% built
- NAKSHATRA-I8.1 yr overdueNAKSHATRA INFRAVENTURE · Pipla, NagpurP50500004090· 70% built· 1 complaint
- SHAMBHAVI CLASSIC8.1 yr overdueN K COMPANY ·P52100011090· 59.1% built
- SATYAM PRIMROSE8.1 yr overdueSURESH CHANGDEV DABADE · Haveli, PuneP52100005513· 72.7% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.