RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 7 of 59
- Siddharth Nagar Sukhvilla CHS Ltd8.1 yr overdueDILIP HIRALAL DOSHI · Borivali, Mumbai SuburbanP51800009426· 99.7% built· 1 complaint
- TREEMOUNT8.1 yr overdueRENAISSANCE ENTERPRISES · Dabhade, PuneP52100015410· 81% built· 1 complaint
- Datta Prayag Apartment8.1 yr overdueMilind Dattatraya Mavle · Dahanu (M Cl), PalgharP99000007660· 37.7% built
- USSH KIRAN8.1 yr overdueMangesh Dashrath Gaikar · Nashik (M Corp.), NashikP51600012292· 90.9% built
- Tirumala Height8.1 yr overdueMANAS DEVELOPERS · Varale, PuneP52100004755· filed Dec 2017 → now Jun 2018· 55.4% built
- Mount Unique A Wing8.1 yr overdueAnand Realtors · Baner, PuneP52100009362· 90.9% built· 1 complaint
- NEPTUNE SWARAJYA SECTOR 1-A38.1 yr overdueNEPTUNE DEVELOPERS LIMITED · Kalyan-Dombivali (M Corp.), ThaneP51700011861· 59.8% built
- SILVER OAK8.1 yr overdueAnand Properties · Pimpri Chinchawad (M Corp.), PuneP52100000045· 90.9% built
- GAJANAN8.1 yr overdueSIDDHARTH RAMESH SHAH · Nashik (M Corp.), NashikP51600006982· 75.9% built
- PHOENIX AVENUE8.1 yr overduePHOENIX INFRASTRUCTURE AND DEVELOPERS · Gandhare, ThaneP51700012079· 68.6% built
- Gagangiri Dreamland8.1 yr overdueSuresh Gopal Jadhav · Wakad, PuneP52100012195· 40.9% built
- Swapnshree Anmol8.1 yr overdueSwapnShree Builders & Developers · Junnar, PuneP52100011566· 59.5% built
- Aaradhya Residency8.1 yr overdueAaradhya Developers · Ahmadnagar (M Corp.), AhmednagarP52200000608· 81.8% built
- Kushal Vatika Phase II8.1 yr overdueKushal Constructions · Haveli, PuneP52100003826· 65.5% built
- LAKE HOMES WING A8.1 yr overdueRAYS INFRA · AMBEGAON KH, PuneP52100004836· 49.1% built
- 18 Latiiude8.1 yr overdueG D Square Developers · Baner, PuneP52100007318· 81.8% built
- Pratiraj Towers8.1 yr overduePRATIK TOWNSHIP & INFRA PROJECTS PVT LTD · Kolhapur (M Corp.), KolhapurP53000003111· 55.5% built
- SAI DHAM8.1 yr overdueNAMDEV KASHINATH PATIL · Panvel, RaigarhP52000008443· 80% built
- SPRINGFIELD8.1 yr overdueVASUNDHARA CONSTRUCTION · Nashik, NashikP51600011544· 51.8% built· 2 complaints
- BLUE HAVEN8.1 yr overdueTALWARE BUILDERS PRIVATE LIMITED · Aanandwali, NashikP51600014066· 73.6% built
- PRIVIA SQUARE NX8.1 yr overdueELLORA ASIAN REALTY PRIVATE LIMITED · MOSHI, PuneP52100009616· 81.8% built
- Shree Krishna Residency8.1 yr overdueHemant Enterprises · Nashik, NashikP51600008003· 90.9% built
- COMFORT ZONE NEST8.1 yr overdueADITYA SHAGUN DEVELOPERS · Balewadi, PuneP52100005265· 81.8% built
- Rohan Development8.1 yr overdueM/s Rohan Development · Borivali, Mumbai SuburbanP51800004819· 90.9% built· 15 complaints
- DIWAPRABHU RESIDENCY8.1 yr overdueDiwaprabhu Homes · Borivali, Mumbai SuburbanP51800004311· 90.9% built
- Radha Krishna8.1 yr overdueBharat Lalji Mawani · Nashik, NashikP51600005317· 72.7% built
- Encourage Pride8.0 yr overdueEncourage constructions · Sangli Miraj Kupwad (M Corp.), SangliP53100008338· 69.5% built
- BHAGYA HARI ROW BUNGLOW8.0 yr overdueBHAGYA DEVELOPER · Nashik, NashikP51600005560· 63.6% built
- UNITY PARK8.0 yr overdueSHIV ASSOCIATES · Haveli, PuneP52100001329· 81.8% built
- Westernhills B 3 - B 4, D 1 - D 48.0 yr overdueHigh Seas Properties Private Limited · Sus, PuneP52100001103· filed Mar 2018 → now Jul 2018· 72.1% built
- Pushp Kunj Residency8.0 yr overdueSandip Shivajirao Jadhav HUF · Kodoli (CT), SataraP52700013223· 53.6% built
- Prithvi - H18.0 yr overdueSukumar Township Development Private Limited · kondhwa khurd, PuneP52100001317· 90.9% built
- CONSTRUCTION OF 16 SHOPS 48 MIG TS 32 LIG TS8.0 yr overdueNASHIK HOUSING AND AREA DEVELOPMENT BOARD ·P51600012853· filed Jan 2018 → now Jul 2018· 77.3% built
- SAMARTH PLAZA8.0 yr overdueTUKARAM TANAJI WAGH · Nashik, NashikP51600012058· 90.9% built
- BHASKAR AVENUE8.0 yr overdueTUKARAM TANAJI WAGH · Nashik (M Corp.), NashikP51600012842· 90.9% built
- RELIABLE ALEEN A,B,C WING8.0 yr overdueRELIABLE HOMES · Vasai-Virar City (M Corp), PalgharP99000010362· 89.1% built
- NAKSHATRA - C BUILDING8.0 yr overdueJAY PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100011024· 90.9% built
- GURU KRUPA8.0 yr overdueSHREE SAMARTH SATAM MAHARAJ ENTERPRISES · Majgaon (CT), SindhudurgP52900007558· 81.8% built
- RAGHUNDAN DNYNESHWARI PARK8.0 yr overdueSHRADDHA ASSOCIATES · dighiP52100008245· filed Dec 2017 → now Jul 2018· 90.8% built
- KALPRAJ APARTMENT8.0 yr overdueAKAR DEVELOPERS · Deolaligaon, NashikP51600008297· 90.9% built
- TIARA MEADOW PHASE I8.0 yr overdueTIARA HOUSING · Chakan (CT), PuneP52100012422· 90% built
- DAISY GARDENS SURVEY NO 12 PHASE II8.0 yr overdueANKITA BUILDERS · Ambarnath, ThaneP51700009095· 89.1% built
- PATEL PLANET - JUPITER8.0 yr overdueDHANLAXMI DEVELOPERS · Ambarnath, ThaneP51700000352· 51.8% built
- Ved Mantra8.0 yr overdueRajesh Baburao Dole · Aurangabad (M Corp.), AurangabadP51500006217· 81.4% built· 1 complaint
- GANANAYAK RESIDENCY8.0 yr overdueSANJAY MANSING SALUNKHE · Nashik (M Corp.), NashikP51600004992· 81.8% built
- STAR SKY DHANLAXMI DEVELOPERS8.0 yr overdueSTAR SKY DHANLAXMI DEVELOPERS · Kurla, Mumbai SuburbanP51800008867· 90.9% built
- PATEL RESIDENCY NX8.0 yr overdueNAVNIRMAN DEVELOPERS · Ambarnath, ThaneP51700000745· 46% built
- PANDIT CORNER8.0 yr overdueSAGAR PANDIT TADE · Jalgaon (M Corp.), JalgaonP49900000250· 90.9% built
- HORIZON HEIGHTS D8.0 yr overdueSHREENATH ENTERPRISES · Thane, ThaneP51700010444· 84.1% built
- Construction of 240 T/S under LIG8.0 yr overdueMHADA(Nagpur Board) · Waddhamna, NagpurP50500000792· 81.8% built
- Sanghavi Paradise B and C Building8.0 yr overdueSanjay Walchand Sanghavi · Baramati (M Cl), PuneP52100001528· 73.1% built
- Discover Condos8.0 yr overdueSilvex Realty Private Limited · Karjat, RaigarhP52000006498· 78.2% built
- MAGNUM PINE8.0 yr overdueNISAR HASSAN WAGLE · Ratnagiri (M Cl), RatnagiriP52800012847· filed Mar 2018 → now Jul 2018· 54.5% built
- Kiran Shubhamkaroti A8.0 yr overdueM/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE · Sus, PuneP52100010995· 81.8% built
- LAXMI ANGAN8.0 yr overdueSANJAY KRISHNA PATIL · Mawal, PuneP52100006865· 71.4% built
- PANACHE8.0 yr overdueTRIMURTI SAI NATH INFRAS LLP · Katraj, PuneP52100006198· 81.8% built
- LOTUS PARK APARTMENT8.0 yr overdueLOTUS REALTY · Nashik (M Corp.), NashikP51600004238· 90.9% built
- Hubtown Greenwoods - C Wing8.0 yr overdueHubtown Limited · Thane, ThaneP51700012016· 90.4% built
- KUSHI RESIDENCY8.0 yr overdueSHRI R N GOLI DEVELOPERS · Solapur (M Corp.), SolapurP52600007050· 66.4% built
- SIDDHA SAI8.0 yr overdueDATTAKRUPA ASSOCIATES · CHARHOLI, PuneP52100008434· 72.5% built
- OM ATHARVA APARATMENT8.0 yr overdueSUDHIR BABURAO KALE · Godhani (Railway), NagpurP50500006831· 90.9% built
- SHARAYU NILAY8.0 yr overdueSHARAYU DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013958· 75.9% built
- Amrut Sai Kalpavruksha8.0 yr overdueAmrut Developers · Near A S Club, AurangabadP51500008665· 90.9% built
- MAHANANDA RESIDENCY8.0 yr overdueNITIN PRAMODRAO HANDE · Nagpur (M Corp.), NagpurP50500013993· 58.6% built
- Construction of 320 flats under HIGHS at MHADA City Empress Mill No.-5, Subhash Road, Nagpur. Ph I8.0 yr overdueMHADA(Nagpur Board) · Nagpur (M Corp.), NagpurP50500012639· 90.9% built
- NEELA CO HSG SOCIETY8.0 yr overdueSHIVOM CONSTRUCTIONS · Mumbai City, Mumbai CityP51900008899· 90.9% built· 2 complaints
- Shiv Krupa8.0 yr overdueR K ENGINEERS · Mumbai City, Mumbai CityP51900009182· 84.1% built· 1 complaint
- DURGATERRACE8.0 yr overdueSAIRAJ · Talegaon Dabhade (R), PuneP52100011518· 72.3% built
- REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL8.0 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800002378· 90.9% built
- PUSHPAM A8.0 yr overdueARHAM REALTORS · Vasai, PalgharP99000005979· 90.9% built
- SAMRUDDHI NABHANGAN8.0 yr overdueSAMRUDDHI REALITY · Kivale, PuneP52100007319· 90.9% built
- SHREERAM CASTLE8.0 yr overdueSHREERAM BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006998· 90.9% built
- PALAVA ELITE K TO T8.0 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000389· 78.2% built· 10 complaints
- BRAMHA RESIDENCY B8.0 yr overdueSHREE BRAMHA ENTERPRISES · Mamdapur, RaigarhP52000006789· 59.1% built
- NAMEER APARTMENT8.0 yr overdueSIKANDAR YUNUS MOOSA · Khed (M Cl), RatnagiriP52800006749· 42.7% built
- Mont Vert Avion8.0 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100002448· filed Dec 2017 → now Jul 2018· 90.9% built
- Alok Heritage8.0 yr overdueBHAKTI BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100000289· 90.9% built
- FORTUNE SIDDHIPRIYA8.0 yr overdueFORTUNE GROUP · PUNE, PuneP52100002108· 90.9% built
- PRABHU RAM RESIDENCY8.0 yr overdueSANJAY NAMDEV BHIRUD · Bhusawal (CT), JalgaonP49900008914· 72.7% built
- Klassic Heights8.0 yr overdueVimla Jashanmal Jagger · Nashik, NashikP51600007189· 90.9% built
- SIGNATURE8.0 yr overdueLAKHANI BUILDERS PVT LTD · Mumbai, Mumbai SuburbanP51800001227· 90.5% built· 1 complaint
- VAKRATUNDA APPARTMENT8.0 yr overdueICCHAMANI DEVELOPERS · Nashik, NashikP51600006394· 55.9% built
- UNITY HEIGHTS8.0 yr overdueUNITED DEVELOPERS · Borivali, Mumbai SuburbanP51800008199· 90.9% built
- SANKALP RESIDENCY8.0 yr overdueRAVINDRA SUPADU PAWAR · Bhusawal (CT), JalgaonP49900008721· 90.9% built
- Snehadeep Co-Operative Housing Society Ltd8.0 yr overdueJOSHI ENTERPRISES · Thane, ThaneP51700013473· filed Dec 2017 → now Jul 2018· 90.9% built· 4 complaints
- SILVER DREAMS8.0 yr overdueSHREE ENTERPRISES · Pune (M Corp.), PuneP52100004378· 76.8% built
- Construction of 42 MIG Ts at Surabardi S.No.20/1,20/28.0 yr overdueMHADA(Nagpur Board) · Surabardi, NagpurP50500000920· 67.3% built
- Shiv Elite Phase I8.0 yr overdueOm Shivam Buildcon Private Limited · Shankarpur, NagpurP50500009639· 89.1% built
- SAHAJANAND HEIGHTS8.0 yr overdueSHYAM CORPORATION · PANCHAVATI, NashikP51600005263· 90.9% built
- SAMARTH RESIDENCY8.0 yr overdueAKSHAY BUILDERS AND DEVELOPERS · Shendra Kamangar, AurangabadP51500005674· 25.5% built
- BEAUTY LANDMARK8.0 yr overdueBEAUTY GANRAJ CONSTRUCTION LLP · Kurla, Mumbai SuburbanP51800008233· 90.9% built
- Dattakala Park8.0 yr overdueDipali Ramdas Jadhav · Gopalwadi, PuneP52100008688· filed Mar 2018 → now Jul 2018· 72.7% built
- Amrut Sai Jais Ekdant8.0 yr overdueAmrut Developers · Osmanpura, AurangabadP51500012339· 89.1% built
- RME PLAZA8.0 yr overdueRME ASSOCIATES · Vasai, PalgharP99000005850· 84.5% built
- SHANTI VISTA8.0 yr overdueSHAH REALTY AND INFRA · BOISAR, PalgharP99000010164· 90.9% built
- YASH ROYAL8.0 yr overdueYASH PROMOTOR & BUILDER · Jadhavwadi (563301), SataraP52700001519· 90.9% built
- PALAVA LAKESIDE A to H8.0 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000384· 78.2% built· 10 complaints
- MARVEL ZEPHYR BUILDING U8.0 yr overdueMARVEL LANDMARKS PVT LTD ·P52100010976· 90.9% built· 3 complaints
- Arham Vatika8.0 yr overdueArham Enterprises · Badlapur (M Cl), ThaneP51700008943· 82.7% built
- K R SUNCITY8.0 yr overdueKREATIONS ENTERPRISES PRIVATE LIMITED · Khamgaon, NandurbarP49700013238· 70.3% built
- SWAMINARAYANPARK8.0 yr overduePRAMOD VASUDEO ZAMBRE · Nashik (M Corp.), NashikP51600012604· 71.8% built
- SIDDHIVINAYAK8.0 yr overdueSHREE GAJANAN DEVELOPERS · Nagpur (M Corp.), NagpurP50500007623· 38.2% built
- THE ROYAL PLAZA8.0 yr overduePRAKASH RAJARAM JAITAPKAR · Rajapur (M Cl), RatnagiriP52800003475· 18.5% built
- SHREE PARK8.0 yr overduePRASAD BABANRAO ANDHALE · Ahmadnagar (M Corp.), AhmednagarP52200002195· 90.9% built
- Casa Royale - Grande8.0 yr overdueLodha Buildcon Private Ltd (Lodha Develoopers Pvt Ltd) · Thane, ThaneP51700001517· filed Jan 2018 → now Jul 2018· 81.8% built· 9 complaints
- SAMRUDDHI KAUSTUBH8.0 yr overdueSAMRUDDHI HOMES · Kivale, PuneP52100005454· 62.3% built· 2 complaints
- SHIVANGAN8.0 yr overdueROYAL CONSTRUCTION · CHARHOLI, PuneP52100006243· 71.4% built
- Prathamesh Novellus building of chaya heights CHS8.0 yr overduePrathamesh Constructions · dahnukar colony, PuneP52100003707· 90.9% built
- UMA ASHISH B WING8.0 yr overduePARASIYA DEVELOPES · Ambarnath, ThaneP51700002434· 88.2% built
- KASHI APARTMENTS8.0 yr overdueB M DEVELOPERS · Vasai, PalgharP99000011473· 75.3% built
- SAIDATT RESIDENCY8.0 yr overdueSAIDATT ASSOCIATES · Baner, PuneP52100009242· 60.6% built
- Shivnath Habitats8.0 yr overdueSHIVNATH DEVELOPER · Thane, ThaneP51700009343· 90.9% built· 12 complaints
- DURGA APARTMENT8.0 yr overduePRABHUDAS LAXMAN PATEL · Jail Road, NashikP51600008548· 90.9% built
- Capitol Homes8.0 yr overdueAmbika Buildtech Private LImited · Bokhara, NagpurP50500007267· 90.9% built
- VISHWAVILLA8.0 yr overdueGLASSWOOD AND LUCKY DEVELOPERS · Borivali, Mumbai SuburbanP51800012317· 72.7% built
- SNEH SHRADDHA8.0 yr overdueM/S. K K CONSTRUCTION · Dhayari (Part), PuneP52100002426· 56.8% built
- Polys Cooperative Housing society8.0 yr overduePARSH HOUSING PVT LTD · Borivali, Mumbai SuburbanP51800009952· 59.1% built
- Omkar Apartments8.0 yr overdueDurvankur Developers · Panvel, RaigarhP52000012831· 80.9% built
- Hubtown Greenwoods B wing8.0 yr overdueHubtown Limited · Thane, ThaneP51700004458· 85.1% built
- IMPACT IMPERIAL8.0 yr overdueIMPACT DEVELOPERS · LOHGAON, PuneP52100008652· 76.4% built· 1 complaint
- ROOP RAJAT PARK PHASE 18.0 yr overdueMAHAVIR ASSOCIATES · Palghar, PalgharP99000009521· 82.7% built
- VAKRATUND8.0 yr overdueSHREE SIDDHI VINAYAK DEVELOPERS · Thane, ThaneP51700012072· 90.9% built
- MADHUKUNJ8.0 yr overdueDHARA CONSTRUCTION · Borivali, Mumbai SuburbanP51800007837· filed Mar 2018 → now Jul 2018· 81.8% built
- VAKRATUNDA RESIDENCY8.0 yr overdueS CUBE BUILDCON · Kalundre (CT), RaigarhP52000013046· 36.8% built
- PRABHAVATI COMPLEX8.0 yr overdueRAHIL ROSHAN SOMJEE · Pen (M Cl), RaigarhP52000012067· 55.5% built
- NATH RESIDENCY8.0 yr overdueMAHALAXMI CONTRUCTIONS · Ahmadnagar (M Corp.), AhmednagarP52200010421· 51.8% built
- Shubhshree Residency8.0 yr overdueShree Developers · Pune City, PuneP52100003686· filed Dec 2017 → now Jul 2018· 31.8% built
- SILVER PARK8.0 yr overdueSUDESH RANCHODDAS VAISHNAV · Near Sai Mandir, AurangabadP51500006425· 90.9% built
- CHINCHKAR COMMERCIAL COMPLEX8.0 yr overdueSHRI DATTA KRUPA DEVELOPERS · Baramati (M Cl), PuneP52100009530· 90.9% built
- CHINTAMANI RESIDENCY8.0 yr overdueSHREE CHINTAMANI DEVELOPERS · Chandrapur (M Cl), ChandrapurP50900004838· 81.8% built
- Casa RIO Phase I8.0 yr overdueYASHODEEP ENGINEERS & BUILDERS · Chikhali Bk., PuneP52100013113· 90.9% built
- OM AARADHYA APARTMENT8.0 yr overdueINFINITI INFRAVENTURES · Godhani (Railway), NagpurP50500002860· 90.9% built
- RIDDHI SIDDHI HEIGHTS8.0 yr overdueR R LUNKAD BUILDCON · Wakad, PuneP52100002501· 97.7% built
- NISARG GARDEN8.0 yr overdueDILIP DEVICHAND CHAUDHARI · Chandur, AkolaP50100000101· 75.5% built
- BHAGIRATHI TOWER8.0 yr overdueBALI CONSTRUCTIONS · Thane, ThaneP51700011738· 76% built
- IXORA8.0 yr overdueJayshree Builders · Baner, PuneP52100010092· 90.9% built
- SARYASH APARTMENT8.0 yr overdueSARYASH CONSTRUCTIONS · GANGADHAR NAGAR, SolapurP52600016056· 81.8% built
- Zinnia8.0 yr overdueAdhiraj Constructions Private Limited · Panvel, RaigarhP52000009171· 72.7% built
- VITHAI COMPLEX8.0 yr overdueRAJENDRA VITTHAL AHINAVE · Otur, PuneP52100010664· filed Dec 2017 → now Jul 2018· 89.1% built
- HARI GANGA 28.0 yr overdueBHARAT CHINTAMANI PATIL · Vasai-Virar City (M Corp), PalgharP99000008327· 45.5% built
- KRISHNA HEIGHTS8.0 yr overdueKRISHNA INFRASTRUCTURE COMPANY · Pirwadi, SataraP52700009472· 54.5% built
- Bajaj Enchante - Panchsheel CHSL8.0 yr overdueBAJAJ INTERNATIONAL REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000817· filed Dec 2017 → now Jul 2018· 90.9% built
- Gurbani B8.0 yr overdueHeena Construction Co · Kurla, Mumbai SuburbanP51800010088· 86.4% built
- JAMDAR TOWER8.0 yr overdueVilas Baburao Jamdar · Kolhapur (M Corp.), KolhapurP53000007323· 81.8% built· 2 complaints
- Shivnath Sky City8.0 yr overdueSHIVNATH DEVELOPER · Thane, ThaneP51700008666· 89.5% built
- VEDA8.0 yr overdueParshwa Developers ·P52100003939· filed Mar 2018 → now Jul 2018· 80% built
- ASHWAMEDH INTEGRA8.0 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Baner, PuneP52100006694· 50% built
- SHREE SATI ASHISH CO OP HOUSING SOCIETY8.0 yr overdueSUN-VUB · Kurla, Mumbai SuburbanP51800007372· 80% built
- Nimbalkar Residency8.0 yr overdueBalaji Houses Builders and Developers · Kolhapur (M Corp.), KolhapurP53000006737· filed Jul 2017 → now Jul 2018· 90% built
- URBAN BALANCE8.0 yr overdueVTP URBAN PROJECTS (PUNE) LLP · Hadapsar, PuneP52100000329· filed Jun 2018 → now Jul 2018· 74.2% built· 2 complaints
- FORTUNE SRUSHTI8.0 yr overdueFORTUNE ASSOCIATES · Pune (M Corp.), PuneP52100010931· 93.9% built
- Apurv Plaza8.0 yr overduemsdevelopers · Nanded Waghala (M Corp.), NandedP51100010599· 90% built
- SAI SAHARA PHASE 1 WING B AND C8.0 yr overdueSAI JYOT ENTERPRISES · Titwala, ThaneP51700013397· 88% built
- Wisteria Commercial Hub8.0 yr overdueVastuyog Suma Associates · Mundhawa, PuneP52100006986· 39.5% built
- Vinayak Residency8.0 yr overdueM/S Vishwa Developers · Baner, PuneP52100000968· 90.5% built
- SIDDHIVINAYAK RESIDENCY8.0 yr overdueVIJAY AMRUTRAO SALVI · Ulawe, RaigarhP52000012280· 71.4% built
- SHUBH HILLS8.0 yr overdueVARDHMAN ENTERPRISES · Badlapur (M Cl), ThaneP51700012310· 63.6% built
- Shiv Elite Phase II8.0 yr overdueOm Shivam Buildcon Private Limited · Shankarpur, NagpurP50500007132· 89.1% built
- ROSABELLA BUILDING NUMBER 28.0 yr overdueSVS GROUPS · Karjat, RaigarhP52000007466· 90.9% built
- SHREE HARI APARTMENT8.0 yr overdueKISHOR JIVRAJBHAI JETHVA · Nashik, NashikP51600006111· 80.9% built
- Construction of 29 HIG Bunglow at Waddhamna,Nagpur8.0 yr overdueMHADA(Nagpur Board) · Hingna, NagpurP50500000774· 72.9% built
- AMAR GEEJAY CO OPERATIVE HOUSING SOCIETY LIMITED8.0 yr overdueK T SONS · Borivali, Mumbai SuburbanP51800002603· 90.5% built· 2 complaints
- SHANTI GOPAL AVENUE8.0 yr overdueYashraj sukesh nashikkar · CHARHOLI, PuneP52100006031· filed Dec 2017 → now Jul 2018· 81.8% built
- Lodha Belmondo St. Andrews B,C,D Villa 1 to 288.0 yr overdueLodha Developers Limited · ., PuneP52100000283· 76.7% built· 9 complaints
- VIVA8.0 yr overdueICON REALTY · Hinjavadi, PuneP52100001673· 81.8% built
- DAMODAR HEIGHTS8.0 yr overdueSUBHAM BABULAL DHOLU · RANE NAGAR, NashikP51600011058· 68.2% built
- GANESH SHRUSHTI8.0 yr overdueSHREE GANESH CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100009710· 88.6% built
- Nakshtra Bungalows8.0 yr overdueShree Construction & Developers · Vadgaon Kasba (M Cl), KolhapurP53000003726· 72.7% built
- YASH TOWER8.0 yr overdueYASH INFRASTRUCTURE · Aurangabad (M Corp.), AurangabadP51500001341· 81.8% built
- PRATIMA CO-OPERATIVE HOUSING SOCIETY8.0 yr overdueSUBHASH VELJI CHAWDA · Andheri, Mumbai SuburbanP51800010091· 21.5% built
- SHREE SARASWATI ARCADE8.0 yr overdueJITENDRA GOVARDHAN MHATRE · Panvel, RaigarhP52000011021· 90.9% built
- Divine8.0 yr overdueMillennium Developers · BORHADEWADI, PuneP52100000055· 77.3% built
- Vedant Residency8.0 yr overdueATUL PRATAPRAO ZINE · Ahmadnagar (M Corp.), AhmednagarP52200010981· 90.5% built
- Prestige Residency8.0 yr overdueK For Kathiyawad Developers · Nashik, NashikP51600006827· 68.2% built
- SHANTADURGA APARTMENT8.0 yr overdueSHANTADURGA DEVELOPERS · Sawantwadi (M Cl), SindhudurgP52900007815· 75% built
- SAI IMPERIA8.0 yr overdueSADASHIV INFRA · Ambarnath, ThaneP51700005142· 79.4% built
- Vithai Apartments8.0 yr overdueAmar Constructios · Nanded Waghala (M Corp.), NandedP51100002164· 58.2% built
- Sea Breeze8.0 yr overdueSandeep Shashikant Nerlekar · Nachane (CT), RatnagiriP52800008367· 90.9% built
- GREEN CITY8.0 yr overdueSWATI TUSHAR DOSHI · NEAR MANGESH MEMORIAL SCHOOL, PuneP52100010123· 72.7% built
- Mahindra The Serenes- 8 Villas8.0 yr overdueMahindra Lifespace Developers limited · Nagaon, RaigarhP52000000461· filed Jun 2018 → now Aug 2018· 78.2% built
- Husaini Tower8.0 yr overdueCITIZEN CONSTRUWELL · Nashik, NashikP51600010969· 90.9% built
- Jaylaxmi CHSL8.0 yr overdueJaywant Ramchandra Keni · Borivali, Mumbai SuburbanP51800005945· 90.9% built
- LUXURIA7.9 yr overdueBASERA BUILDCON · Akola (M Corp.), AkolaP50100001467· 88% built
- SAMRUDDHI GURUPRASAD7.9 yr overdueSAMRUDDHI DEVELOPERS · Kalyan, ThaneP51700003156· 90.9% built
- subhlaksh Residency7.9 yr overdueLaxmi Construction Co · Haveli, PuneP52100006890· 81.8% built
- Construction of 100 Flats under MIG on site No.134 at New Chandrapur7.9 yr overdueMHADA(Nagpur Board) · Datala, ChandrapurP50900003200· 89.1% built
- CHAITANYA ARYAN CITY7.9 yr overdueRAHUL BASWANT NANDGAWALI · Tisgaon, AurangabadP51500007926· 90.9% built
- Matoshree Park7.9 yr overdueSHREE TRUPATI BALAJI REALTORS · JUVELI VILLAGE, Mumbai SuburbanP51800007951· 55.5% built
- LOTUS7.9 yr overdueNitin Jayram Bhaskar · dhanoriP52100003922· 72.7% built
- Greenwood Residency7.9 yr overdueGuruprabhu Builders and Developers · Vasai, PalgharP99000008823· 90.9% built
- SHREE TIRUMALA VASANT APARTMENT7.9 yr overdueSHREE TIRUMALA DEVELOPERS · Nashik, NashikP51600001697· 81.8% built
- ANANDBAN7.9 yr overdueM/s. Govardhan Developers · ravet, PuneP52100002259· filed May 2018 → now Aug 2018· 90.9% built
- RAJVIR ESTATE NO. 17.9 yr overdueRAJVIR REALTY · VEVOOR, PalgharP99000014513· 81.8% built
- YASH HOMES7.9 yr overdueNILESH NAIK · Navade, RaigarhP52000010629· 75.9% built
- SHUBHAM7.9 yr overdueSagar Enterprise · Thane, ThaneP51700001323· 72.7% built
- SHRIPAD RESIDENCY7.9 yr overdueVAASTU VAIBHAV CONSTRUCTIONS · Panchak, NashikP51600008644· 90.9% built
- Anjana Phase II7.9 yr overdueSURESH TOTARAM SUKHWANI · Rahatani, PuneP52100016735· 61.8% built
- Thakkers Paradise7.9 yr overdueMotel Kutir Nirman Pvt. Ltd. · Nashik, NashikP51600003938· 70.5% built
- Shantai Apartment7.9 yr overdueArun Anna Patil · KHANBHAG, SangliP53100014815· 66.4% built
- One7.9 yr overdueE D Developers Private Limited · Andheri, Mumbai SuburbanP51800011338· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.