RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 8 of 61
- EKDANT SQUARE-RIDDHI WING8.2 yr overdueKALPSHREE DEVELOPERS · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000037· 90.9% built
- Regency Sarvam Phase - 88.2 yr overdueREGENCY NIRMAN LTD · Titwala, ThaneP51700002824· 90.9% built
- Arsh Residency8.2 yr overdueTabeer Properties · Rehnuma Nagar, NashikP51600005289· 90.9% built
- NIRMITI VIHAR8.2 yr overdueNIRMITI ASSOCIATES · Rui, PuneP52100005795· 77.1% built
- ABHISHRI ENCLAVE8.2 yr overdueAbhishri Landmark · Goleshwar, SataraP52700012923· 90.9% built· 3 complaints
- KRISHNA KUNJ8.2 yr overdueGLOBE HITECH BUILDERS · Panvel, RaigarhP52000003790· 61.4% built
- The Leaf8.2 yr overdueShree Pushkar Developers · YAWALEWADI, PuneP52100001414· 87.3% built
- SHULPANI8.2 yr overdueSHREE BALAJI BUILDERS & DEVELOPERS · Badlapur (M Cl), ThaneP51700005731· 30% built
- VENKATESH PLAZA8.2 yr overdueM/S VENKATESH PROMOTERS AND BUILDERS · Jadhavwadi (563301), SataraP52700013387· 60% built
- Kute Fortune - B Building8.2 yr overdueSHIVKAILAS DEVELOPMENT CORPORATION · Pimpri Chinchawad (M Corp.), PuneP52100005618· 81.8% built
- SAI PRERNA APARTMENT8.2 yr overdueJATINBHAI GOPALBHAI GOL · Nashik (M Corp.), NashikP51600011931· 90.9% built
- DHARMARAJ PLAZA8.2 yr overdueM/S. SHREENIVAS ENTERPRISES · Junnar, PuneP52100012872· 45.2% built
- VIGNESH VERETX8.2 yr overdueVIGNESH NIRMAN · Nagpur (M Corp.), NagpurP50500011674· 90.9% built
- ADITYA VIVAAZ8.2 yr overdueADITYA PROMOTERS · Pimpri Chinchawad (M Corp.), PuneP52100001419· 81.8% built
- Thakkers Paradise8.2 yr overdueMotel Kutir Nirman Pvt. Ltd. · Nashik, NashikP51600003938· 70.5% built
- PARTH ENCLAVE E BUILDING8.2 yr overduePARTH DEVELOPERS · Haveli, PuneP52100000678· 81.8% built· 1 complaint
- ABHINAV RESIDENCY8.2 yr overdueNANAKCHAND R AGRAWAL · Nagpur (M Corp.), NagpurP50500002521· 54.9% built
- VAISHNAVI8.2 yr overduePRAMOD VASANT BHOIR · Uran, RaigarhP52000008787· 85.5% built
- MISRI VILLA HEIGHT8.2 yr overdueSHREY INFRA PROJECT · Uran, RaigarhP52000003140· filed May 2018 → now Aug 2018· 72.8% built
- KATE CENTRAL8.2 yr overdueM/S Kate Construction · Haveli, PuneP52100013078· filed Dec 2017 → now Aug 2018· 81.8% built
- PARIJAT SAHNIWAS8.2 yr overdueANIKET ANANT PATIL · Nashik (M Corp.), NashikP51600005366· 90.9% built
- MULIK LUXURIA B WING8.2 yr overdueTUKARAM SOPANRAO MULIK · Pune (M Corp.), PuneP52100011511· 90.9% built
- Cheryl8.2 yr overdueKOLTE-PATIL REAL ESTATE PRIVATE LIMITED ·P52100000700· 81.8% built
- AUREATE - PHASE 28.2 yr overdueRAVIRAJ VENTURES · Pimpale Saudagar, PuneP52100009424· filed Mar 2018 → now Aug 2018· 46.6% built
- Moreshwar Apartments8.2 yr overdueWHITE LOTUS REALTORS PRIVATE LIMITED · Near Vaghulsar Mandir, PalgharP99000008251· 90.9% built
- DEEP PRIDE8.2 yr overdueKIRTI SHAH · Karanjade, RaigarhP52000000770· 72.7% built
- SAI SNEH PHASE-II8.2 yr overdueGS DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100002952· 63.6% built
- GOLDEN HEIGHTS8.2 yr overdueM/S BHAGAT LANDMARKS · Junnar, PuneP52100007012· 70.9% built
- SHIVANSH COMPLEX 28.2 yr overdueSOMNATH TUKARAM JAGDALE · Shirur, PuneP52100012686· 90.9% built· 2 complaints
- NINE REALTORS8.2 yr overdueNine Realtors · Vasai, PalgharP99000008995· 90.9% built
- Royal Empire8.2 yr overduePekhale Patil Construction · Nashik (M Corp.), NashikP51600005059· 90.9% built
- Shraddha Orchid8.2 yr overdueD.A.BORADE AND SONS · Pimpri Chinchawad (M Corp.), PuneP52100007519· 90.9% built
- 71 RAINTREE8.2 yr overdueBRIGHTSHINE BUILDERS LLP · Ward FNorth, Mumbai CityP51900004470· filed Mar 2018 → now Aug 2018· 68.6% built
- ROSHAN ONE WING B8.2 yr overdueRAHUL BHAGWANDAS SANKLA · Varale, PuneP52100004526· 81.8% built
- Shri Sai Park8.2 yr overdueSairam Builders And Developers · WAKAD, PuneP52100013343· 43.6% built· 1 complaint
- SHRIPAD RESIDENCY8.2 yr overdueVAASTU VAIBHAV CONSTRUCTIONS · Panchak, NashikP51600008644· 90.9% built
- KUMAR RESIDENCY8.2 yr overdueKumar Properties · Miraj, SangliP53100009265· 80.9% built
- VARDHMAN VATIKA8.2 yr overdueKashyap And Associates · Karanjade, RaigarhP52000003204· 62.7% built
- Thakkers Richmond Heights8.2 yr overduePratap Marketing Pvt Ltd · Nashik, NashikP51600008267· 81.8% built
- Shantai Apartment8.2 yr overdueArun Anna Patil · KHANBHAG, SangliP53100014815· 66.4% built
- ALCON RETHOS8.2 yr overdueALCON SPACES · KHARADI, PuneP52100017327· 90.9% built
- AMARPREET8.2 yr overdueAMARDEEP DEVELOPERS · Mamdapur, RaigarhP52000008784· 85.7% built
- Crescent Bay - T48.2 yr overdueL&T Parel Project LLP (JV with ORDPL) · Ward FSouth, Mumbai CityP51900006593· 88.9% built· 4 complaints
- AKASH RAJ PHASE ONE8.2 yr overdueNIRMAN PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100002839· filed Dec 2017 → now Aug 2018· 79.1% built
- SAHAKAR NIWAS8.2 yr overdueJNM ENTERPRISES · Thane, ThaneP51700005696· 88.6% built
- PRISTINE PACIFIC PART-28.2 yr overdueMelange Developers · AMBEGAON Bk, PuneP52100000275· 90.9% built
- SHREE JAGADAMB8.2 yr overdueRAKHI PRASHANT KHAMKAR · Koregaon (CT), SataraP52700011850· 90.9% built
- Crescent Bay - T58.2 yr overdueL&T Parel Project LLP (JV with ORDPL) · Ward FSouth, Mumbai CityP51900004544· 88.1% built· 3 complaints
- One8.2 yr overdueE D Developers Private Limited · Andheri, Mumbai SuburbanP51800011338· 90.9% built
- Uttam Townscapes8.2 yr overdueFORTUNE DEVELOPERS AND INFRASTRUCTURES · Haveli, PuneP52100002613· 89.3% built
- DEEP RISE8.2 yr overdueKIRTI SHAH · Panvel, RaigarhP52000000516· 72.7% built
- SHREE YOG ROW BUNGLOW8.2 yr overdueSHIVAM REALTORS · Nashik, NashikP51600008328· 90.9% built
- Aura City D1,D28.2 yr overdueBhagvati infra · Shirur, PuneP52100003069· 76.4% built
- Gomes Garden8.2 yr overdueJudith Builders & Devlopers · Vasai, PalgharP99000008786· 90% built
- Lavish8.2 yr overdueKALBHOR AND CHAVAN DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100007409· 81.8% built
- Anjana Phase II8.2 yr overdueSURESH TOTARAM SUKHWANI · Rahatani, PuneP52100016735· 61.8% built
- SHREE HINGAD PALACE8.2 yr overdueS.M. DEVELOPERS · Dhamote, RaigarhP52000008554· 73.6% built
- AIREZO DEVELOPERS8.2 yr overdueRAMCHANDRA VITTHAL SATRE · Majgaon (CT), SindhudurgP52900005936· 90.9% built
- Shreenivas Park Phase I8.2 yr overdueMangal Ramchandra Randive · Vadgaon Kasba (M Cl), KolhapurP53000004694· 84.1% built
- SIDDHIVINAYAK RESIDENCY8.2 yr overdueM/S. SIDDHI VINAYAK CONSTRUCTION · NASHIK MUNICIPAL CORPORATION, NashikP51600015942· 72.7% built
- HILL VIEW8.2 yr overdueGAD REALTY · NERAL, RaigarhP52000015312· 64.3% built
- AKSHAR8.2 yr overdueAKSHAR ASSOCIATES · Talegaon Dabhade (M Cl), PuneP52100008202· 90.9% built
- Anjana8.2 yr overdueSURESH TOTARAM SUKHWANI · Haveli, PuneP52100000328· 66.4% built
- SONIGARA LANDMARK8.2 yr overdueSONIGARA PROMOTERS · Wakad, PuneP52100001618· 61.8% built
- SHIVALIK RESIDENCY8.2 yr overdueBHARAT VITHALBHAI AJUGIA · Nashik Road, NashikP51600007978· 51.5% built
- FUSION CITY8.2 yr overdueKUMBARE ENTERPRISES · Haveli, PuneP52100007763· 90.9% built
- Dinashree8.2 yr overdueAmeya Arun Joshi · Parvati, PuneP52100004054· 90.9% built
- MEHTA RESIDENCY8.2 yr overdueHUKAMRAJ MOHANLAL MEHTA · Ward FNorth, Mumbai CityP51900003195· 60.5% built
- Suvidha Galaxy8.2 yr overdueSuvidha Developers · Solapur (M Corp.), SolapurP52600008428· 81.8% built
- SHREYA APARTMENT8.2 yr overdueDUNU MEGHAWAT · MOHAN NAGAR, PuneP52100014832· 19.5% built
- BELIEVE HOMES8.2 yr overdueRAHUL SHIVLAL PATEL · Talegaon Dabhade (M Cl), PuneP52100010536· 47.3% built
- SHREE SAI RESIDENCY8.2 yr overdueSHREE SAI CONSTRUCTIONS · Nashik (M Corp.), NashikP51600009143· 58.6% built
- BUILDING NO. 10 PEREIRA HOUSING COMPLEX8.2 yr overdueTHE ALPS DEVELOPERS · Vasai, PalgharP99000011259· 72.3% built
- KULSWAMINI KASTURI8.2 yr overdueSHANKAR BABAN GAWADE · medankarwadi, PuneP52100012222· 81.8% built· 2 complaints
- HARI NAMAN8.2 yr overdueDHARAN INFRA-EPC LIMITED · Deolaligaon, NashikP51600000228· filed Dec 2017 → now Sept 2018· 81.8% built
- ADORN BUSINESS CENTRE8.2 yr overdueHASIB AHMED SHAIKH · Pune City, PuneP52100002403· 81.8% built
- OM BHAGYASHREE CONSTRUCTION8.2 yr overdueAJITKUMAR SURESH LONDHE · PUNEP52100015486· 98.2% built
- Bloomdale Duplex Home 38.1 yr overdueMahindra Bebanco Developers Limited · Kahpri, NagpurP50500007843· filed Jun 2018 → now Sept 2018· 81.8% built
- VIJAYADURGA APARTMENT8.1 yr overdueVIJAYDURGA DEVELOPERS · Kolgaon, SindhudurgP52900004162· 80.9% built
- Prachi Apartment8.1 yr overdueOm Siddhi Associates · Lingali, PuneP52100010681· 90.9% built
- UTSAV RESIDENCY8.1 yr overdueKAILASH RADHAKRISHNA KSHIRSAGAR · Jalna (M Cl), JalnaP51400013069· 44.4% built
- DEVDATTA HIGHT8.1 yr overdueROCKINFRA CONSTRUCTION LLP · Sangli Miraj Kupwad (M Corp.), SangliP53100001679· 81.8% built
- PHALKE CORNER8.1 yr overdueSVOJAS BUILDERS AND DEVELOPERS · Saidapur, SataraP52700012371· 81.8% built
- GLORIA VISTA8.1 yr overdueMADIREDDY KONDA REDDY · Thane, ThaneP51700007581· 86.8% built
- ALCOVE8.1 yr overdueZENDE PROPERTIES · Pune (M Corp.), PuneP52100000822· 89.7% built
- SARISHA8.1 yr overdueSAI SAMARTTHA PROPERTIES · Punawale, PuneP52100010390· 50% built
- ACHAL PROMOTERS AAKASH8.1 yr overdueACHAL PROMOTERS AAKASH · Pune (M Corp.), PuneP52100004363· filed Mar 2018 → now Sept 2018· 72.7% built
- TREVEDIA VUEPOINT8.1 yr overdueS.B.BROTHERS DEVELOPERS · Ward GNorth, Mumbai CityP51900008501· filed Jul 2018 → now Sept 2018· 98.2% built· 2 complaints
- SPRING DALE8.1 yr overdueSunrise Associates · Malad (W), Mumbai CityP51900001230· 88.5% built
- Hubtown Greenwoods A wing8.1 yr overdueHubtown Limited · Thane, ThaneP51700000365· filed Jul 2018 → now Sept 2018· 87% built
- VISION KALPAVRIKSHA PHASE 28.1 yr overdueVISION ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100007200· 90.9% built
- SONBAHAVA - PHASE 28.1 yr overdueMega Realtors · Majgaon (CT), SindhudurgP52900007661· 55.2% built
- SOHAM PURANDAR HEIGHTS8.1 yr overdueSOHAM PROPERTIES · Hadapsar, PuneP52100002553· 37.3% built
- SHIV SADAN8.1 yr overdueSANIYA DEVELOPERS · Pen (M Cl), RaigarhP52000010956· 38.2% built
- MAHAVIR PRIDE8.1 yr overdueMAATRU KRUPA ENTERPRISES · Ambarnath, ThaneP51700003354· 87% built
- AVANI NILAY8.1 yr overdueABG CITY · Shirur, PuneP52100007735· 90.9% built
- ANJANEY RESIDENCY8.1 yr overdueANJANEY LANDMARKS LLP · Jalna (M Cl), JalnaP51400009087· 84.5% built
- GURU ASHISH APARTMENT A WING8.1 yr overdueVELANI DEVELOPERS · CHEHADI PUMPING ROAD, NashikP51600011898· 66.4% built
- BHAKTI GENESIS D WING8.1 yr overdueMAHAVIR CONSTRUCTIONS AND DEVELOPERS · SHEDGE WASTI, PuneP52100002159· 81.8% built
- SHREE GANESH RESIDENCY8.1 yr overdueARCHANA SANDEEP GHARE · Sawantwadi (M Cl), SindhudurgP52900014070· 74.5% built
- SHRADDHA HEIGHTS8.1 yr overdueRAJENDRA BALASAHEB JAMBHULKAR · Talegaon Dabhade (M Cl), PuneP52100011988· 59.1% built
- TRIVENI8.1 yr overdueSHREENATH INFRAPROJECTS · Andheri, Mumbai SuburbanP51800010070· filed Mar 2018 → now Sept 2018· 82.8% built
- Aishwarya Heights8.1 yr overdueGauri Vinayak Builder and Developers Pvt Ltd · Kalyan, ThaneP51700012271· 82.7% built
- TULSI AASHRAY8.1 yr overdueSHUBH ENTERPRISES · Pashane, RaigarhP52000000020· 90.9% built
- Medinee CHS Ltd8.1 yr overdueShamik Enterprises Pvt Ltd. · Andheri, Mumbai SuburbanP51800001664· filed Dec 2017 → now Sept 2018· 90.9% built
- Saijeevan8.1 yr overdueTRICON CONSTRUCTION COMPANY · Katraj, PuneP52100014544· 50% built
- SHREE GANESH8.1 yr overdueNAVEEN OMPRAKASH JAISWAL · Panvel, RaigarhP52000009973· 90.9% built
- ADITYA VIHAR8.1 yr overdueADITYA ASSOCIATES · Talegaon Dabhade (R), PuneP52100002988· 82.7% built
- SBH Wakad C-3 1st and 2nd Floor8.1 yr overdueClassic Promoters and Builders Private Limited · Wakad, PuneP52100007034· filed Mar 2018 → now Sept 2018· 81.8% built
- Seven Eleven Construction Apna Ghar8.1 yr overdueNarendra Lalchand Mehta · Thane, ThaneP51700002976· 61.8% built· 2 complaints
- VIVA SAROVAR PHASE 18.1 yr overdueM/S. VIVA SWASTIK ASSOCIATES · Pune (M Corp.), PuneP52100007659· 99.8% built
- Green Avenue 1A8.1 yr overduePARAM DEVELOPERS · Thane, ThaneP51700006566· 90.9% built· 1 complaint
- SAI SANKULPHASE II8.1 yr overdueTIRUPATI BUILDERS AND DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500007119· 86.8% built
- AMOGH METIL RESIDENCY8.1 yr overdueRanjit Rangrao Patil · Kolhapur (M Corp.), KolhapurP53000003116· 53.2% built
- Aishwarya Villa8.1 yr overdueAishwarya Developers · Haveli, PuneP52100011035· 90.5% built
- NIRMAN RESIDENCY8.1 yr overdueNIRMAN GROUP · Ambegaon, PuneP52100009602· 57.9% built
- SAHYADRI TOWERS8.1 yr overdueSuraj Ashok Ghadge · Ahmadnagar (M Corp.), AhmednagarP52200012838· 47.7% built
- MAHAKALI HIGHTS PHASE III8.1 yr overduePRAVIN DNYANESHWAR MALI · Kavathe Mahankal, SangliP53100011787· 34.5% built
- 24K Sereno Buildings C and D8.1 yr overdueNOW Realty Promoters and Builders Private Limited · Baner, PuneP52100005080· 90.9% built· 1 complaint
- SAIRAJ GOLDEN VIEW8.1 yr overdueSHIVAM DEVELOPER · Panvel, RaigarhP52000006625· filed Dec 2017 → now Sept 2018· 56.9% built
- SHUBHASHREE PRIDE8.1 yr overdueSHUBHASHREE INFRASTRUCTURE · MANGALWAR PETH, SataraP52700014996· 86.4% built
- SHUBHANKAROTI8.1 yr overdueShivteerth Associates · CHARHOLIP52100011729· 78.2% built
- HANS ELEGANCE8.1 yr overdueSHREE HANS REALTORS LLP · Andheri, Mumbai SuburbanP51800003370· 56.4% built
- SHREE NAVNATH APARTMENT8.1 yr overdueRAGHU BAPUJI KUDE · Wadagaon (CT), PuneP52100008550· 90.9% built
- Aaradhya residency8.1 yr overdueShrilaxmi Ventures Private Limited · Kudal (CT), SindhudurgP52900003293· 81.8% built
- Kaveri Krishna8.1 yr overdueShree Shakti Developers · Chavindra, ThaneP51700005237· filed Dec 2017 → now Sept 2018· 72.7% built
- PAVAN PARK8.1 yr overdueSATISH APPAJI SAWANT · MOHAMMADWADI, PuneP52100012803· 51.5% built
- MANTRI ETERNITY B8.1 yr overdueOMEGA PREMISES PVT LTD · Haveli, PuneP52100011690· filed Dec 2017 → now Sept 2018· 99.9% built· 3 complaints
- LANDMARK8.1 yr overdueLANDINFRA DEVELOPERS · Karanjade, RaigarhP52000001621· 56.4% built
- The Metrozone Aspen C18.1 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600005208· filed Mar 2018 → now Sept 2018· 90.9% built· 1 complaint
- SUVIDHA DNYANGANGA PHASE-II8.1 yr overdueSUVIDHA PROJECTS · Wadgaon Budruk, PuneP52100003146· 81.8% built
- Matoshree Ankur8.1 yr overdueMatoshree Infrastructure Private Limited · Mumbai City, Mumbai CityP51900007859· 90% built
- NIDHAAN CINEPLAZA8.1 yr overdueM/S. NIDHAAN BUILDCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800014315· 63.2% built
- Redevelopment of Prateeksha CHS Ltd8.1 yr overdueASHIANA ENTERPRISES · Borivali, Mumbai SuburbanP51800016261· 90.9% built
- SIGNATURE C - CREST8.1 yr overdueANS REALTY · Palghar, PalgharP99000008275· 90.9% built
- GOVIND CHHAYA8.1 yr overdueEURO REALITY · Navade, RaigarhP52000012790· 76.4% built
- Visions Indradhanu Phase 28.1 yr overdueVISION DEVELOPERS · Haveli, PuneP52100001900· 88.6% built· 1 complaint
- JAGDAMB HEIGHTS8.1 yr overdueARIHANT RAHI PROMOTERS · Pune (M Corp.), PuneP52100011801· 28.6% built
- SAI SHIVAM8.1 yr overdueMANGAL MURTI DEVELOPERS PROP NARESH THAKURDAS WADHWANI · RAHATANI, PuneP52100002125· 77.3% built
- KHALIDA AMIN COMPLEX8.1 yr overdueAMIR AHMED ABUJI · NIZAMPUR BEHIND ABUJI COMPLEX, ThaneP51700016280· 44.1% built
- HIMALAYA COMPLEX8.1 yr overdueHIMALAYA BUILDERS AND DEVELOPERS LLP · Pashane, RaigarhP99000004617· 84.1% built
- The Metrozone Athens A18.1 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600005033· filed Mar 2018 → now Sept 2018· 90.9% built· 5 complaints
- AARSH AVENUE8.1 yr overdueSHREE DEVELOPERS · Ambarnath, ThaneP51700008655· 90.9% built
- Defence Colony Pune Phase28.1 yr overdueDefence Colony Pune · WAGHOLI, PuneP52100007420· filed Dec 2017 → now Sept 2018· 96.4% built
- YASHASHREE RESIDENCY8.1 yr overdueM/S OM DEVELOPERS · Junnar, PuneP52100010456· filed Dec 2017 → now Sept 2018· 68.2% built
- MEERA ENCLAVE8.1 yr overdueSUNRAYS CONSTRUCTIONS · Panvel, RaigarhP52000010678· 47.3% built
- ROHAN LEHER 2 WING B C DE8.1 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Pune City, PuneP52100000796· 90.9% built
- AARYAVARTA SECTOR 4 - B TO H8.1 yr overdueLINKER SHELTER PRIVATE LIMITED · Nashik, NashikP51600002169· filed May 2018 → now Sept 2018· 90.9% built· 12 complaints
- UNIQUE AURUM-II8.1 yr overdueUNIQUE SHANTI DEVELOPERS LLP · Thane, ThaneP51700006770· 81.8% built
- Shivarekar Heights8.1 yr overdueAvani Realtors & Developers · Nachane (CT), RatnagiriP52800011077· 51.8% built
- Vrundavan Park8.1 yr overdueSampada Dilip Deshpande · Ahmadnagar (M Corp.), AhmednagarP52200004119· 81.8% built
- SAI GHARKUL8.1 yr overdueTIRUPATI DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500007496· 85.5% built
- VASTUSHILP 28.1 yr overdueBETTER CREATION · CHARHOLI, PuneP52100005612· 90.9% built
- ATHARVA VILLAMENTS8.1 yr overdueATHARVA INFRASTRUCTURES · Pipla, NagpurP50500002215· 90.9% built
- ENTILLA BY DEV8.1 yr overdueDEV KONARK CORPORATION · Ambarnath, ThaneP51700003667· 80.2% built
- LAXMI COMPLEX8.1 yr overdueSHUBHLAXMI REALTORS · Palghar, PalgharP99000001371· filed Mar 2018 → now Sept 2018· 81.8% built
- The Metrozone Hampston B18.1 yr overdueSanklecha Construction Private Limited · INDIRA NAGAR, NashikP51600007133· filed Mar 2018 → now Sept 2018· 90.9% built
- SHIVAM COMPLEX WING D AND E8.1 yr overdueUMIYA ENTERPRISES · Badlapur (M Cl), ThaneP51700005023· 81.8% built
- DURGA RESIDENCY8.1 yr overdueSHREE GANESH BUILDERS & DEVELOPERS · Panvel, RaigarhP52000011005· 50% built
- AHIMSA HEIGHTS8.1 yr overdueAHIMSA BUILDER · Borivali, Mumbai SuburbanP51800007486· 72.7% built· 3 complaints
- VISHNU HEIGHTS8.1 yr overdueJAIDEEP CONSTRUCTION · Ambarnath(M Cl), ThaneP51700012586· 44.1% built
- UPKAR CHS LTD8.1 yr overdueTEJAS DINESH SHAH · Borivali, Mumbai SuburbanP51800010621· 80.5% built
- LODHA BELMONDO Pebble Beach E, Estancia A8.1 yr overdueLodha Developers Limited · Gahunje, PuneP52100000350· 90.9% built· 2 complaints
- DELHOUSE CO.OP. HSG. SOC.LTD.8.1 yr overdueAUM SHIV ENTERPRISES · Andheri, Mumbai SuburbanP51800002780· 90.9% built
- Panchtirth8.1 yr overdueShree Siddhagiri Developers · Hagawane Nagar, PuneP52100003520· 90.9% built
- SIDDHIVINAYAK APARTMENT8.1 yr overdueH N BUILDERS · Khed (M Cl), RatnagiriP52800008061· 51.8% built
- AKASHGANGA8.1 yr overdueAKASH PROMOTER AND DEVELOPERS COMPANY PROPRIETOR KISHOR GENBHAU DANGAT · Ale, PuneP52100011456· 78.2% built
- PRITHVI SRUSHTI PHASE 18.1 yr overduePRITHVI ANAND REALTY · Palghar, PalgharP99000012951· 46.6% built
- SKYLINE-II8.1 yr overdueUNIQUE SHANTI NEMINATH DEVELOPERS LLP · Thane, ThaneP51700003362· filed Jun 2018 → now Sept 2018· 89.1% built
- Anand Bhavan - Pristino8.1 yr overdueShri Sati Builders and Developers Private Limited · Kurla, Mumbai SuburbanP51800008855· filed Dec 2017 → now Sept 2018· 81.8% built
- GOLDEN STAR RESIDENCY BUILDING NO 28.1 yr overdueARUNDHATI AJAY KADAM · CHIPLUN, Mumbai SuburbanP51800005343· 90.9% built
- NISHIGANDH APRATMENTS8.1 yr overduePranav Buildcon Pvt. Ltd. · Sangli Miraj Kupwad (M Corp.), SangliP53100003003· 90.9% built
- Paramount8.1 yr overduePrakash Housing Pvt Ltd · Kurla, Mumbai SuburbanP51800003917· 90.9% built
- AZALEA8.1 yr overdueACME SAWANT VENTURES · BHILAREWADI, PuneP52100004621· 36.3% built
- LALCHAND NAGAR8.1 yr overdueNAVKAR DEVELOPER · Daund, PuneP52100011134· 65% built
- ATHARVA CASTLE8.1 yr overdueATHARVA INFRASTRUCTURES · Pipla, NagpurP50500001987· 81.8% built
- krishnakunj phase - I8.1 yr overdueKrishna developr · Jalna (M Cl), JalnaP51400001484· 78.2% built
- Ivy Estate Umang Premier8.1 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · WAGHOLI, PuneP52100000655· 90.9% built
- Peninsula Technopark Building D8.1 yr overdueSwan Energy Limited · Kurla, Mumbai SuburbanP51800001195· 81.8% built
- 7 Gulmohar8.1 yr overdueCrystalstar Landscapes LLP · Pune City, PuneP52100008432· 90.9% built
- PLENUM PARK PART 28.1 yr overdueP & M DEVELOPERS · Keshavnagar-Mundwa, PuneP52100008219· filed Dec 2017 → now Sept 2018· 72.7% built
- Odhav Baug8.1 yr overdueS. K. CONSTRUCTION · Kurla, Mumbai SuburbanP51800011780· 68.2% built
- SPACE ORION BUILDING E8.1 yr overdueSPACE DEVELOPERS CORPORATION JOINT VENTURE · Dada Saheb Phalke Road, NashikP51600005108· 90.9% built
- GRANDBAY A5 A6 B38.1 yr overduePRAKASH HARAKCHAND PARAKH · PUNE, PuneP52100002050· filed Mar 2018 → now Sept 2018· 90.9% built· 2 complaints
- ANAND VIHAR8.1 yr overdueSHREE GANESH CONSTRUCTION · Talegaon Dabhade (M Cl), PuneP52100006140· 57.3% built
- NAVJEEVAN HEIGHTS8.1 yr overdueKonark Shakti Group of Companies · malad east, Mumbai SuburbanP51800010116· 90.9% built
- RAJASHREE8.1 yr overduePANDIT JAVDEKAR ASSOCIATES · NEAR KASTURKUNJ, PuneP52100000457· 81.8% built
- AURA VILLE8.1 yr overdueSai Developers · Pune City, PuneP52100007565· 38.9% built
- Riddhi Residency8.1 yr overdueATMIYA ENTERPRISES · Talegaon Dabhade (M Cl), PuneP52100003883· 82.7% built
- Shree Hari Park8.1 yr overdueHari Chandra Construction · Aurangabad (M Corp.), AurangabadP51500011569· 63.6% built
- SIDDHASHRAM CHS LTD8.1 yr overdueSTANDARD INFRASTRUCTURE · Thane, ThaneP51700015588· 37.7% built· 23 complaints
- MADHAVI RESIDENCY8.1 yr overdueSATYAM CONCAST PRIVATE LIMITED · Thane, ThaneP51700008257· 78.9% built
- VINAYRAJ REGENCY8.1 yr overdueSHUBH ASSOCIATES · Palghar, PalgharP99000007254· 88% built
- Vishal Greens8.1 yr overdueGreystone Landmark · Hadapsar, PuneP52100004064· 90.9% built
- Construction of 33 Ts MIG on S. No. 300/1 B at Sakegaon, Bhusawal, Dist. Jalgaon8.1 yr overdueNashik Housing And Area Development Board · Sakegaon, JalgaonP49900007208· 48.2% built
- Goodwill Nirmiti A Building8.1 yr overdueUnique Choice Ventures · LOHGAON, PuneP52100002683· 90.9% built
- Mulund Mahavir Darshan8.1 yr overdueChheda Lifestyles · Kurla, Mumbai SuburbanP51800002234· 72.7% built
- DEVYANI8.1 yr overdueM/S KHARDE PATIL · Kothrud, PuneP52100013394· 76% built
- KALYANI8.1 yr overdueM/S KHARDE PATIL · Kothrud, PuneP52100013317· 82.2% built
- BHAIRAVI8.1 yr overdueM/S KHARDE PATIL · Kothrud, PuneP52100013401· 82.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.