RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 9 of 61
- APEX NEST8.1 yr overdueAPEX GROUP · Karanjade, RaigarhP52000005821· 90.9% built
- SHREE RIDDHI SIDDHI DEVELOPERS8.1 yr overdueSHREE RIDDHI SIDDHI DEVELOPERS · Nashik (M Corp.), NashikP51600008972· 63.8% built
- ARIJEET RESIDENCY8.1 yr overdueRAHUL BUILDERS AND DEVELOPERS · Nachane (CT), RatnagiriP52800001942· 90.9% built
- YASHSHANTI8.1 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane, ThaneP51700005767· 70% built· 1 complaint
- MEERA BHAKTI RESIDENCY8.1 yr overdueSHP Properties Private Limited · A WARD, KolhapurP53000000915· 66.7% built
- RAJ RESIDENCY H8.0 yr overdueMR SANJAY BALAPRASAD BIYANI · Nanded Waghala (M Corp.), NandedP51100006613· 47.3% built
- VIVA HALLMARK PHASE 18.0 yr overdueM/S. VIVA SWARAJ · PUNE, PuneP52100006330· 98% built· 1 complaint
- Jinkushal Residency8.0 yr overdueM/s Prakash Spaces · Haveli, PuneP52100008396· 75% built
- ESTORIA HEIGHTS8.0 yr overdueSANGHVI REALTECH PVT LTD · Mumbai City, Mumbai CityP51900005280· 60% built
- RAM-TECH HEIGHTS8.0 yr overdueBANGAD BUILDERS PVT.LTD · Akola (M Corp.), AkolaP50100003967· filed Dec 2017 → now Oct 2018· 90.9% built
- CHAITANYA LAXMI8.0 yr overdueVYANKATESH DEVELOPERS · Satara (M Cl), SataraP52700005029· 90.9% built
- Vikram Goldmine8.0 yr overdueVikram Venkatrao Gaikwad · Pune City, PuneP52100004105· 81.8% built
- VIJAYA BHUVAN8.0 yr overduePUSHPA M PAREKH · Mumbai City, Mumbai CityP51900000105· 82.7% built
- LAXMINARAYAN APARTMENT8.0 yr overdueMAYUR VILAS SHAH HUF · Ichalkaranji (M Cl), KolhapurP53000002792· 54.5% built
- Essenseia28.0 yr overdueAruna Ashok Bhat · kondhwa BK, PuneP52100006735· filed Apr 2018 → now Oct 2018· 90.9% built
- Sakshi Varad Vinayak Phase II8.0 yr overdueSAKSHI BUILDERS · AURANGABAD, AurangabadP51500006213· 90.9% built
- SAI VIDHI8.0 yr overdueVARDHAMAN ASSOCIATES · Pune City, PuneP52100012531· 56.4% built
- ADIGURU8.0 yr overdueMAHAJAN BUILDCON · Nashik, NashikP51600003687· 90.9% built
- Panchamrut Bldg. No. 18.0 yr overdueShree Abhilasha Nirmiti · Titwala west, ThaneP51700005211· filed Mar 2018 → now Oct 2018· 90.9% built
- SIMPLICITY - E4 AND E58.0 yr overdueJ K P DEVELOPERS UNIT NO 2 · Haveli, PuneP52100000504· 90.9% built
- SHUBH SRUSHTI8.0 yr overdueVINAYAK ENTERPRISES · Badlapur (M Cl), ThaneP51700010469· 55.5% built
- Shri Pinglai Heights8.0 yr overdueUnnati Infraspace Private Limited · Amravati (M Corp.), AmravatiP50300012628· 37% built
- SHIVAMRIT COMPLEX8.0 yr overdueBHARATI DHARMA JOSHI · Ulawe, RaigarhP52000005184· 65.1% built
- JAI NEELKANTH8.0 yr overdueM/S JAI DEVELOPERS · Panvel, RaigarhP52000007385· 54.5% built
- ARYAN ONE WING I AND J8.0 yr overdueKonark Lifespaces · SHIRGAON, ThaneP51700015793· 79.9% built
- RR HEIGHTS8.0 yr overdueRAVIRAM BUILDERS AND DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000006470· 76.8% built
- GALAXY BLDG 1 AND 28.0 yr overdueBRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700005683· filed May 2018 → now Oct 2018· 90.9% built· 6 complaints
- Kuber Kunj8.0 yr overdueMahalaxmi Realtors · Palghar, PalgharP99000009752· 50% built
- Dorabjees Royale Heritage Mall8.0 yr overdueJehangir Nariman Dorabjee · MOHAMMEDWADI, PuneP52100008824· filed Dec 2017 → now Oct 2018· 81.8% built
- Aura City D3,D48.0 yr overdueBhagvati infra · Shirur, PuneP52100004141· 75.5% built
- SWOJAS CHINTAMANI8.0 yr overdueSWOJAS PROPERTIES · ERANDWANA, PuneP52100015937· 36.4% built
- AB EXOTICA8.0 yr overdueAB BUDGET HOMES · Uran, RaigarhP52000009570· 49.1% built
- Raman Park - Phase - I8.0 yr overdueARHAM CONSTROTECH PVT LTD · Yeola, NashikP51600004598· 56.4% built
- NAVKAR DARSHAN8.0 yr overdueABHAY POPATLAL DHOKA · Pimpri Chinchawad (M Corp.), PuneP52100008176· 53.6% built
- Aura City D5,D68.0 yr overdueBhagvati infra · Shirur, PuneP52100003585· 76.4% built
- SAIVED APPARTMENTS8.0 yr overdueVIJAY ANAND RANE · Kankavali, SindhudurgP52900008461· 59.5% built
- SAMRUDDHI APARTMENT8.0 yr overdueChirayu Properties LLP · Deulwadi, SindhudurgP52900004545· 53.9% built
- PRIDE VILLA8.0 yr overduePride Builders · Ulawe, RaigarhP52000003405· 90.9% built
- TULIP8.0 yr overdueD.P.DEVELOPERS · Pune (M Corp.), PuneP52100012336· 89.5% built
- ANAND RESIDENCY8.0 yr overdueANURAG DEVELOPERS · Bhandara (M Cl), BhandaraP50600002778· 60.9% built
- SAI PRIME8.0 yr overdueSAI TAPASWI BUILDERS · Chiplun (M Cl), RatnagiriP52800004475· 58.2% built
- GOURI VARADVINAYAK8.0 yr overdueSHANKAR SADU MHATRE · Khopoli, RaigarhP52000011255· 41.3% built
- VARD VINAYAK8.0 yr overdueSHREE VARDVINAYAK ENTERPRISES · Karanjade, RaigarhP52000003001· 68.2% built
- GLORIOUS PLAZA III8.0 yr overdueDREAMLAND REAL ESTATE DEVELOPERS · Ghogali, NagpurP50500011363· 81.4% built
- Landmaark Lexus8.0 yr overdueSagar Ravindra Malwade · Ulawe, RaigarhP52000007361· 90.9% built
- Fortune Heights8.0 yr overdueShree Maa Mahalakshmi Infraventures Private Limited · Nagpur (M Corp.), NagpurP50500003586· 28.5% built
- KSHITIJ CO OP HOUSING SOCIETY LIMITED8.0 yr overdueYOG BUILDERS AND DEVELOPERS · Nashik, NashikP51600012914· 73.2% built
- SAI SUNDARAM8.0 yr overdueGURUSAI DEVELOPERS ·P52100008044· 44.5% built
- SUDHANSHU CHS LTD8.0 yr overdueHARIOM DEVELOPERS · Andheri, Mumbai SuburbanP51800004339· 90.9% built
- PATIL PLAZA8.0 yr overdueSHIRKE AND PATIL ASSOCIATES · Haveli, PuneP52100004218· 81.4% built
- Rachana Park Wing E8.0 yr overdueShree Construction Builders and Developers · Rachana Park, AhmednagarP52200012570· 90.9% built
- SUN SET AVENUE8.0 yr overdueRENAISSANCE DEVELOPERS · Baner, PuneP52100011228· filed May 2018 → now Oct 2018· 76.8% built
- SHREE GANESH RACHANA8.0 yr overdueRAJAN CHANDRAKANT TIPNIS HUF · Kurla, Mumbai SuburbanP51800003279· 67.5% built
- SHIVAMS DWARKA8.0 yr overdueSHIVAM DEVELOPERS · Shirwal, SataraP52700012092· 81.8% built
- Greens - Beech - GH8.0 yr overdueAMJ Land Developers · Chinchwad, PuneP52100002813· 72.7% built
- GOVINDAM APARTMENTS8.0 yr overdueM/s. Paul Brothers · Kadbi chowk, NagpurP50500008210· 92.7% built
- JEET PARADISE8.0 yr overdueJEET INFRASTRUCTURE · Daund, PuneP52100003996· 63.6% built
- SAI KRISNA8.0 yr overdueBAJAJ&JAIN ASSOCIATES · kondhwa BK, PuneP52100000996· 90.9% built
- CELEBRIA8.0 yr overdueVISHNU VENTURES · Pune (M Corp.), PuneP52100005241· filed Jan 2018 → now Oct 2018· 60% built
- Chaitanya Residency8.0 yr overdueEthics Infra Development Pvt Ltd · Borivali, Mumbai SuburbanP51800000886· filed Apr 2018 → now Oct 2018· 81.8% built
- premia B-1 Phase II8.0 yr overdueC.D. Developers · NARHE, PuneP52100008990· 43.6% built
- KESHAV WINDS8.0 yr overdueWINDFIELD STOCKS AND SECURITIES PVT LTD · Panvel, RaigarhP52000008209· filed Apr 2018 → now Oct 2018· 95.9% built
- Mahalaxmi Arcade8.0 yr overdueSandeep Shashikant Nerlekar · Rahataghar, RatnagiriP52800009999· 71.8% built
- SIDDHIVIINAYAK APARTMENT8.0 yr overdueVARUN ENTERPRISES · Sawantwadi (M Cl), SindhudurgP52900003899· 58.2% built
- 92 BELLEVUE8.0 yr overdueNRS Developers · Borivali, Mumbai SuburbanP51800006106· 90.9% built
- GALAXY APARTMENT8.0 yr overdueSharayu Associates · CHARHOLI, PuneP52100010982· 52.3% built
- SARLA AVENUE8.0 yr overdueSANDEEP MAHENDRA KANAKIA · Borivali, Mumbai SuburbanP51800002489· 90.9% built
- VRUNDAVAN8.0 yr overdueSILVASSA ASBESTOS CEMENT PRODUCT · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000010· 50.5% built
- SUDAMA REGENCY BUILDING NO 1, 58.0 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700000953· 71.4% built· 1 complaint
- FORTUNE HOUSE8.0 yr overdueFORTUNE DEVELOPERS · Pune (M Corp.), PuneP52100005111· 71.8% built
- Sai Radiance8.0 yr overduePRASAD ESTATE · Panvel, RaigarhP52000006076· 36.9% built
- R N GOLI CELEBRATION8.0 yr overdueSHRI R N GOLI DEVELOPERS · Solapur (M Corp.), SolapurP52600005031· 89.5% built
- Raj Laxmi8.0 yr overdueJANOEYA CONSTRUCTION · Nashik, NashikP51600011657· 90.9% built
- Malkans8.0 yr overdueGokhale Builders LLP · Pune (M Corp.), PuneP52100006798· 80.5% built
- KARAN HEIGHTS8.0 yr overduePALLADIUM REALITY · Pune (M Corp.), PuneP52100004687· 90.9% built
- SHREY PARADISE8.0 yr overduePRAVIN MOTILAL SONIGARA ·P52100002273· 76.4% built
- MAULI HEIGHTS8.0 yr overdueONKAR SURESH JOSHI · Ahmadnagar (M Corp.), AhmednagarP52200005564· 16.4% built
- A-14, A Wing Petunia Apts, Bindra Complex8.0 yr overdueAccord Land Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800003133· 90.9% built
- NISARG SRUSHTI8.0 yr overdueNISARG DEVELOPERS · MANJARI Bk, PuneP52100001446· 88.2% built
- Vasukamal Solitaire8.0 yr overdueNarendra Ziprulal Kabra · Near GST Bhavan, JalgaonP49900009627· 90.9% built
- SAI PARADISE8.0 yr overdueKAPILESHWAR DEVELOPERS · Nagapur (CT), AhmednagarP52200003454· 90.9% built
- Anita Apartment8.0 yr overdueArifuddin Nooruddin Siddiqui · Aurangabad (M Corp.), AurangabadP51500013489· 27.3% built
- KESHAV RUKMINI SANKUL8.0 yr overdueBHUMKAR PROMOTERS AND BUILDERS · NARHE, PuneP52100012696· 62.3% built
- VARAD SAHANIWAS8.0 yr overdueVARADDEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100012598· 32.7% built
- NEELS RESIDENCY8.0 yr overdueS.A. SINGH BUILDERS AND DEVELOPERS · Ambarnath(M Cl), ThaneP51700013572· 59.1% built
- MAITRI PRASAD8.0 yr overdueMAITRI CONSTRUCTION · Kalyan, ThaneP51700003086· 81.8% built
- MAITRI SAI SAMARTHA8.0 yr overdueMAITRI RACHANA · Kalyan, ThaneP51700003061· 90.9% built
- Swarupa Residency8.0 yr overdueM/s Pavanand JH construction co · Khedshi, RatnagiriP52800001620· 90.9% built
- YASHRAJ TOWER7.9 yr overdueRUTUJA DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500005659· 85.9% built
- SUPREME POINT PHASE I7.9 yr overdueK K INFRASTRUCUTRE · Palghar, PalgharP99000002058· filed Apr 2018 → now Nov 2018· 90.9% built
- AKSHAD PURAM7.9 yr overdueVANSH BUILDCON · Gangapur Jahagir, AurangabadP51500007853· 78.2% built
- Sai Paradise7.9 yr overdueSai Paradise · Palghar, PalgharP99000010380· 47.4% built
- SAI HEIGHTS7.9 yr overdueKRISHNADEEP BUILDERS & DEVELOPERS · Nashik, NashikP51600011048· 89.1% built
- Devi Darshan Phase I7.9 yr overdueShreeram Builders & Developers · Vengurla (M Cl), SindhudurgP52900012306· 86.4% built
- DEV RESIDENCY PHASE 17.9 yr overdueSHRADDHA CONSTRUCTION · URULI DEVACHI, PuneP52100015506· 84.5% built· 3 complaints
- KAVERI APARTMENT7.9 yr overdueMANOJA CONSTRUCTION · Phaltan (M Cl), SataraP52700002173· 90.9% built
- AKSHAY BUSINESS SQUARE7.9 yr overdueMANGILAL GANESHMAL BAFNA · Pune (M Corp.), PuneP52100010084· 80.9% built
- RAVIKIRAN PHASE I7.9 yr overdueDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED · Wadmukhwadi, PuneP52100000492· 90.9% built
- SHREE TULJABHAVANI RESEDENCY7.9 yr overdueMANGESH RAJARAM MANKAR · Wayari, SindhudurgP52900010546· 90.9% built
- KAPILVASTU7.9 yr overdueANIL ANANDRAO PATIL · Haveli, PuneP52100012615· 94.5% built· 1 complaint
- SHIVNERI7.9 yr overdueHESTIA DEVELOPER PRIVATE LIMITED · Kodoli (CT), SataraP52700011480· 43.6% built
- EKDANTAY7.9 yr overdueR K BUILDCON · Titwala, ThaneP51700009599· filed Dec 2017 → now Nov 2018· 90.9% built· 1 complaint
- SILVER PEARLSS7.9 yr overdueVIKAS LAXMAN CHAUDHARY · Aurangabad (M Corp.), AurangabadP51500001320· 90.9% built
- Reverie Phase II7.9 yr overdueEspree Landmarks ·P52100001756· 81.8% built
- Arihant Heights7.9 yr overdueJAS DEVELOPERS · Haveli, PuneP52100005332· 72.7% built
- AKSHAR ALVARIO7.9 yr overdueTHALIA AKSHAR DEVELOPERS · Thane, ThaneP51700006864· 87.6% built
- Bhaveshwar Arcade Annexe7.9 yr overdueBhaveshwar Properties Pvt Ltd · Kurla, Mumbai SuburbanP51800000967· 90.9% built
- Anand Prospera C wing7.9 yr overdueVIHANG ASHOK SHAH · Kolhapur (M Corp.), KolhapurP53000000357· filed May 2018 → now Nov 2018· 90.9% built
- PRIMEROSE7.9 yr overdueGURUKRUPA DEVELOPERS · AMBEGAON, PuneP52100008282· 90.9% built· 1 complaint
- MARIGOLD7.9 yr overdueSWAPNIL PRAKASHRAO KSHIRSAGAR · Haveli, PuneP52100005576· 90.9% built
- PARAG7.9 yr overdueVARDAAN ASSOCIATES · Pune City, PuneP52100005661· filed Jun 2018 → now Nov 2018· 81.8% built
- Vighnaharta Sankul7.9 yr overdueVighnaharta Construction · Haveli, PuneP52100013166· 72.7% built
- LANDSCAPE GARDEN7.9 yr overdueLANDSCAPE VENTURES · Ambarnath, ThaneP51700005570· 90.9% built
- ATLANTA EDENWORLD PHASE I7.9 yr overdueSAI BALAJI DEVELOPER · Thane, ThaneP51700003328· filed Dec 2017 → now Nov 2018· 90.4% built
- KRISHNA RESIDENCY7.9 yr overdueKRISHNA ENTERPRISES · Badlapur (M Cl), ThaneP51700012391· 56.4% built
- Rivers Edge7.9 yr overdueKOKANE BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100010937· 90.9% built
- SHUBH VATIKA7.9 yr overdueSHUBH ENTERPRISES · Badlapur (M Cl), ThaneP51700009684· 90.9% built
- SPRING DIVISHA7.9 yr overdueSIDDHARTH DEVELOPERS · Akoli Bk., AkolaP50100000435· 81.8% built
- PARIVARTAN PLAZA7.9 yr overdueANKIT BUILDERS AND DEVELOPER · Khutala, ChandrapurP50900007040· 55.5% built
- KUMAR VISTA7.9 yr overdueBINOD KUMAR RAI · LOHGAON, PuneP52100005133· 12.7% built
- VARAD VINAYAK COMPLEX7.9 yr overdueSHREE BALAJI BULDERS AND DEVELOPERS · Ambarnath, ThaneP51700003008· 70% built
- Jay Enclave7.9 yr overdueJay Developers · Kolhapur (M Corp.), KolhapurP53000008131· 68.2% built
- SHREE SIDDHIVINAYAK ENTERPRISES7.9 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700004774· 60% built· 1 complaint
- BLISS INDUSTRIAL ESTATE -027.9 yr overdueBLISS DEVELOPERS · Vasai, PalgharP99000004226· 34.5% built
- 25 GLORY7.9 yr overdueVIJAYRAJ ASSOCIATES · Haveli, PuneP52100008877· 80% built
- SIDDHACHAL MALAD MAMLETDARWADI7.9 yr overdueBUCON ENGINEERS & INFRASTRUCTURE PVT. LTD. · Borivali, Mumbai SuburbanP51800008815· filed Dec 2017 → now Dec 2018· 90.9% built
- Aathley Sankul7.9 yr overdueArihant Vastu Nirman Pvt. Ltd · Rahataghar, RatnagiriP52800000018· 84.8% built
- SAI ENCLAVE, Phase II Bldg A7.9 yr overdueSSD BUILDERS ·P52100013826· 81.8% built
- SHIV PARADISE7.9 yr overdueHIMANSHU SHAM TENDULKAR · saaki naka, PalgharP99000011602· 72.7% built
- Shri Samarth Sai Niwas7.9 yr overdueShri Sai Samartha Constructions · SANSARI, NashikP51600009839· 84.8% built
- HILLTOP ESTATES7.9 yr overdueUNITY ASSOCIATES · Nachane (CT), RatnagiriP52800003033· 90.9% built
- Vighnaharta Residency7.9 yr overdueVikas Bhimdev Kale · Baramati (M Cl), PuneP52100008577· 62% built
- Shree Dattakrupa Height Buidling No 1257.9 yr overdueEkdanta Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800012504· 89.1% built
- Bafna Meadows Phase 17.9 yr overdueSuvidha Realtors · Palghar, PalgharP99000006123· 79.7% built
- SWASTIK MANGAL7.9 yr overdueSWASTIK CONSTRUCTION · Mahalunge, PuneP52100009924· 48.2% built
- SAUDA HEIGHTS7.9 yr overdueM.K. INDIA ENTERPRISES · Ward E, Mumbai CityP51900012238· 57.1% built
- VRUNDAVAN PARK7.9 yr overdueVEDANT DEVELOPERS · Baramati (M Cl), PuneP52100006477· 82.7% built
- Construction of 86 Tenements out of 430 MIG tenements of old Magathane village Borivali7.9 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000063· 90.9% built
- Vedant Heights7.9 yr overdueMoraya Developers · Pimpri Chinchawad (M Corp.), PuneP52100011636· 51.8% built· 3 complaints
- Vardhaman Residency7.9 yr overdueSwastik Builders · Talegaon Dabhade (M Cl), PuneP52100004534· 43.6% built
- Parasmani - A7.9 yr overdueParasmani Constructions Pvt .Ltd · Mumbai City, Mumbai CityP51900010014· 90.9% built
- SHIV GANESH SADAN7.9 yr overdueM/S SHIVGANESH BUILDERS & DEVELOPERS · Kalyan, ThaneP51700011175· 67.7% built
- PRAKASH ESTATES7.9 yr overdueM/S REALTY SHAPERS · Jalgaon (M Corp.), JalgaonP49900002142· 99.1% built
- Raviraj Spring7.9 yr overdueMIra Housing Development Corporation · Mira-Bhayandar (M Corp.), ThaneP51700010445· 77.3% built
- Futura7.9 yr overdueEon Hadapsar Infrastructure Pvt Ltd · Hadapsar, PuneP52100001536· 74.5% built
- N G Silver Spring7.9 yr overdueRNA Builders (NG) · Thane, ThaneP51700000009· 90.9% built· 1 complaint
- DARPAN TOWER APARTMENT7.9 yr overdueDILIP KARBHARI BHAMARE · PANCHAVATI, NashikP51600002845· 90.9% built
- Rani minnat enclave7.9 yr overdueAMKB BUILDER AND DEVELOPERS · Dahanu, PalgharP99000012845· 78.8% built· 4 complaints
- UTTARA RESIDENCY CONDOMINIUM7.9 yr overdueNAKSHATRA BUILDERS & DEVELOPERS · Amravati (M Corp.), AmravatiP50300006488· 67.7% built
- VINAYAK APPARTMENT7.9 yr overdueRAVINDRA PANDHARINATH DAMLE · Ratnagiri (M Cl), RatnagiriP52800001615· 65% built
- SHARAYU SANKUL7.9 yr overdueSOHAM PROMOTERS AND BUILDERS · Ratnagiri (M Cl), RatnagiriP52800001432· 81.8% built
- RAVIRAJ SPRING7.9 yr overdueM/s RAVIRAJ HOUSING (PRINCE CITY) · Mira-Bhayandar (M Corp.), ThaneP51700011396· 77.3% built
- PRATIK TOWER7.9 yr overdueKAMAL DIGRILAL MALVIYA · AMRAVATI, AmravatiP50300003680· 90.9% built
- DODKE SHOBHAN7.9 yr overdueDODKE REALTORS · Haveli, PuneP52100008770· 53% built
- Muktangan Niwas7.9 yr overdueRavindra Arun Kate · Pimpale Saudagar, PuneP52100011365· 90.9% built
- DESTINY7.9 yr overdueBALAJI REALTORS · Pimpale Saudagar, PuneP52100012186· 99.5% built
- Subodh Hights7.9 yr overdueS M BUILDERS AND DEVOLOPERS · Bhagur Rural, NashikP51600010874· 43.2% built
- MORAJ MAA SHRISHTI7.9 yr overdueMORAJ INFRATECH PRIVATE LIMITED · Khalapur, RaigarhP52000000480· 32.7% built
- USHA KAAL7.9 yr overdueMILIND KESARINATH RAUL · Kurla, Mumbai SuburbanP51800008807· 67.5% built· 4 complaints
- Vistaar Shubharambh7.9 yr overdueMarathwada Developers · Balewadi, PuneP52100002463· 81.8% built
- SHREE GURU PUSHP AMRUT PARIWAR7.9 yr overdueSudhir Rameshrao Wakode · Amravati (M Corp.), AmravatiP50300010072· 46.4% built
- Amar Developers and Construction7.9 yr overdueRahul Balasaheb Gavali · Haveli, PuneP52100012296· 44.5% built
- BHushan Plaza CHSL7.9 yr overdueBhushan Enterprises · Borivali, Mumbai SuburbanP51800012726· 90.9% built
- GLENDALE COPERATIVE HOUSING SOCIETY LIMITED7.9 yr overdueGLENDALE COOPERATIVE HOUSING SOCIETY LIMITED · Nashik (M Corp.), NashikP51600007451· 76.4% built
- Vidya Vihar7.9 yr overdueJ.R.P. Constructions · Mahalaxmi Chowk Government Colony, SangliP53100000554· 24.5% built
- SHREE SAI ENCLAVE7.9 yr overdueSHREE SAI ASSOCIATES · Nashik (M Corp.), NashikP51600009958· 58.2% built
- Sai Bhadra Residency7.9 yr overdueSai Builders · Aurangabad (M Corp.), AurangabadP51500001293· 90.9% built
- AARTI PRIDE7.9 yr overdueRAMESH BANDU RETAREKAR · UPPER KHOPOLI, RaigarhP52000015340· 58.2% built
- SUKRITI APPARTMENT PHASE 17.9 yr overdueNITIN MACHINDRA SHEWALE · Vadgaongupta, AhmednagarP52200013325· 31.8% built
- Grand County Bldg A 17.9 yr overdueBhujbal Constron · Sidhanathwadi (Rural), SataraP52700009237· 78.6% built
- MERU BHOOMI7.9 yr overdueAMIT BUILDERS · Deolali (CB), NashikP51600006374· 43.7% built
- CRYSTAL RESIDENCY7.9 yr overdueSNG HOUSING SCHEME PVT LTD · Kankavali, SindhudurgP52900003949· 42.4% built
- SHLOK APPARTMENT7.9 yr overdueSWATI PRASHANT DHATRAK · Chandrapur, ChandrapurP50900012515· 90.9% built
- UJWAL DHAM7.9 yr overdueNIWARA GRUHNIRMAN PVT LTD · Latur (M Cl), LaturP52400015317· 9.8% built
- VOSKI EMERALD7.9 yr overdueVOSKI GROUP · KHARADIP52100004948· 39.1% built
- INSPIRA PHASE I7.9 yr overdueANAND REALTIES · Kondhwa Budruk, PuneP52100006715· 56.6% built
- Lotus Pride7.9 yr overdueLotus Buildcon · Pandav Nagri, NashikP51600007403· filed Dec 2017 → now Dec 2018· 90.9% built
- KAKADE PARK7.9 yr overdueSuryakant Kakade · Chinchwad, PuneP52100007904· 90.9% built
- Nirmiti Vasundhara Park7.9 yr overdueVasundhara Nirmiti Homes · Baramati (M Cl), PuneP52100006128· 88.2% built
- DHARTI VILLA7.9 yr overdueRHYTHM ENTERPRISES · Ulawe, RaigarhP52000001102· 66.5% built
- OM IMPERIA7.9 yr overdueCAPITAL ASSOCIATES · Karanjade, RaigarhP52000003265· 75% built· 1 complaint
- DATTAMORESHWAR BHAVAN7.9 yr overdueDHANANJAY DATTATRAY KULKARNI · Sangli Miraj Kupwad (M Corp.), SangliP53100002583· 40.9% built
- GURU DEV7.9 yr overdueSHREE SAMARTH SATAM MAHARAJ DEVELOPERS · Ambernath, ThaneP51700008312· 90.9% built
- River edge7.9 yr overdueS K ASSOCIATES · Shirur, PuneP52100005662· 49.1% built
- ROYAL PLAZA7.9 yr overdueRoyal Enterprise · Khopoli, RaigarhP52000011853· 68.9% built
- Sai Avishkar7.9 yr overdueSUYOG ANJANI AVISHKAR ASSOCIATES · Haveli, PuneP52100004067· 80.9% built
- SAI AANGAN7.9 yr overdueRAJESH MAHADEO MANE · Satara, SataraP52700010269· 50% built
- Shankar Heights Phase 2 Krishna Wing7.9 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010806· 90.5% built
- Bhagatiniwas7.9 yr overdueShri Sadguru construction · Katrap, ThaneP51700009762· 45.5% built
- Shankar Heights, Phase 37.9 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010807· 90% built
- KALA RESIDENCY7.9 yr overdueVIJAY BHASKAR AHIRRAO · Nashik, NashikP51600007667· 90% built
- MOTKARIS GRAVITY7.9 yr overdueMOTKARI CONSTRUCTIONS PRIVATE LIMITED · Govind Nagar, NashikP51600007839· 90.9% built
- Sun Orchid7.9 yr overdueMOHAMMED SIRAJ BASHEER · Thane, ThaneP51700013513· 90.9% built
- 9 KRISHNA7.9 yr overdueISHAAN DEVELOPERS · Ambarnath, ThaneP51700003810· 74.5% built· 1 complaint
- SHREERAM TRADECON7.9 yr overdueSHREERAMTRADECON · Chakan, PuneP52100003029· 65% built
- Shadawal Impression Building C1 C27.9 yr overdueKailash Builders · Palghar, PalgharP99000008322· 74.1% built
- DWARKA7.9 yr overdueCUBIX DEVELOPERS · Pune (M Corp.), PuneP52100007405· 79.1% built
- Disha Heights7.9 yr overdueDinesh Prabhakar Baravkar · Daund, PuneP52100009125· 84.1% built
- Welhome Galaxy Phase 17.9 yr overdueWelhome Properties · WAGHOLI, PuneP52100013204· 72.7% built
- Saivilla Appartment7.9 yr overdueNIRAJ PRALHADRAO PADGILWAR · Chandrapur (M Cl), ChandrapurP50900005775· 90% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.