RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 9 of 59
- SHREE RIDDHI SIDDHI DEVELOPERS7.8 yr overdueSHREE RIDDHI SIDDHI DEVELOPERS · Nashik (M Corp.), NashikP51600008972· 63.8% built
- ARIJEET RESIDENCY7.8 yr overdueRAHUL BUILDERS AND DEVELOPERS · Nachane (CT), RatnagiriP52800001942· 90.9% built
- YASHSHANTI7.8 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane, ThaneP51700005767· 70% built· 1 complaint
- MEERA BHAKTI RESIDENCY7.8 yr overdueSHP Properties Private Limited · A WARD, KolhapurP53000000915· 66.7% built
- RAJ RESIDENCY H7.8 yr overdueMR SANJAY BALAPRASAD BIYANI · Nanded Waghala (M Corp.), NandedP51100006613· 47.3% built
- VIVA HALLMARK PHASE 17.8 yr overdueM/S. VIVA SWARAJ · PUNE, PuneP52100006330· 98% built· 1 complaint
- Jinkushal Residency7.8 yr overdueM/s Prakash Spaces · Haveli, PuneP52100008396· 75% built
- ESTORIA HEIGHTS7.8 yr overdueSANGHVI REALTECH PVT LTD · Mumbai City, Mumbai CityP51900005280· 60% built
- RAM-TECH HEIGHTS7.8 yr overdueBANGAD BUILDERS PVT.LTD · Akola (M Corp.), AkolaP50100003967· filed Dec 2017 → now Oct 2018· 90.9% built
- CHAITANYA LAXMI7.8 yr overdueVYANKATESH DEVELOPERS · Satara (M Cl), SataraP52700005029· 90.9% built
- Vikram Goldmine7.8 yr overdueVikram Venkatrao Gaikwad · Pune City, PuneP52100004105· 81.8% built
- VIJAYA BHUVAN7.8 yr overduePUSHPA M PAREKH · Mumbai City, Mumbai CityP51900000105· 82.7% built
- Sakshi Varad Vinayak Phase II7.8 yr overdueSAKSHI BUILDERS · AURANGABAD, AurangabadP51500006213· 90.9% built
- Essenseia27.8 yr overdueAruna Ashok Bhat · kondhwa BK, PuneP52100006735· filed Apr 2018 → now Oct 2018· 90.9% built
- SAI VIDHI7.8 yr overdueVARDHAMAN ASSOCIATES · Pune City, PuneP52100012531· 56.4% built
- ADIGURU7.8 yr overdueMAHAJAN BUILDCON · Nashik, NashikP51600003687· 90.9% built
- LAXMINARAYAN APARTMENT7.8 yr overdueMAYUR VILAS SHAH HUF · Ichalkaranji (M Cl), KolhapurP53000002792· 54.5% built
- 92 BELLEVUE7.8 yr overdueNRS Developers · Borivali, Mumbai SuburbanP51800006106· 90.9% built
- KESHAV WINDS7.8 yr overdueWINDFIELD STOCKS AND SECURITIES PVT LTD · Panvel, RaigarhP52000008209· filed Apr 2018 → now Oct 2018· 95.9% built
- GLORIOUS PLAZA III7.8 yr overdueDREAMLAND REAL ESTATE DEVELOPERS · Ghogali, NagpurP50500011363· 81.4% built
- SAI KRISNA7.8 yr overdueBAJAJ&JAIN ASSOCIATES · kondhwa BK, PuneP52100000996· 90.9% built
- JEET PARADISE7.8 yr overdueJEET INFRASTRUCTURE · Daund, PuneP52100003996· 63.6% built
- KSHITIJ CO OP HOUSING SOCIETY LIMITED7.8 yr overdueYOG BUILDERS AND DEVELOPERS · Nashik, NashikP51600012914· 73.2% built
- NAVKAR DARSHAN7.8 yr overdueABHAY POPATLAL DHOKA · Pimpri Chinchawad (M Corp.), PuneP52100008176· 53.6% built
- SAMRUDDHI APARTMENT7.8 yr overdueChirayu Properties LLP · Deulwadi, SindhudurgP52900004545· 53.9% built
- Landmaark Lexus7.8 yr overdueSagar Ravindra Malwade · Ulawe, RaigarhP52000007361· 90.9% built
- PRIDE VILLA7.8 yr overduePride Builders · Ulawe, RaigarhP52000003405· 90.9% built
- SUN SET AVENUE7.8 yr overdueRENAISSANCE DEVELOPERS · Baner, PuneP52100011228· filed May 2018 → now Oct 2018· 76.8% built
- SARLA AVENUE7.8 yr overdueSANDEEP MAHENDRA KANAKIA · Borivali, Mumbai SuburbanP51800002489· 90.9% built
- SAI SUNDARAM7.8 yr overdueGURUSAI DEVELOPERS ·P52100008044· 44.5% built
- SIMPLICITY - E4 AND E57.8 yr overdueJ K P DEVELOPERS UNIT NO 2 · Haveli, PuneP52100000504· 90.9% built
- SAI PRIME7.8 yr overdueSAI TAPASWI BUILDERS · Chiplun (M Cl), RatnagiriP52800004475· 58.2% built
- SIDDHIVIINAYAK APARTMENT7.8 yr overdueVARUN ENTERPRISES · Sawantwadi (M Cl), SindhudurgP52900003899· 58.2% built
- Mahalaxmi Arcade7.8 yr overdueSandeep Shashikant Nerlekar · Rahataghar, RatnagiriP52800009999· 71.8% built
- GALAXY BLDG 1 AND 27.8 yr overdueBRIGHT SKY HEIGHTS BUILDERS AND DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700005683· filed May 2018 → now Oct 2018· 90.9% built· 6 complaints
- GOURI VARADVINAYAK7.8 yr overdueSHANKAR SADU MHATRE · Khopoli, RaigarhP52000011255· 41.3% built
- Chaitanya Residency7.8 yr overdueEthics Infra Development Pvt Ltd · Borivali, Mumbai SuburbanP51800000886· filed Apr 2018 → now Oct 2018· 81.8% built
- ANAND RESIDENCY7.8 yr overdueANURAG DEVELOPERS · Bhandara (M Cl), BhandaraP50600002778· 60.9% built
- JAI NEELKANTH7.8 yr overdueM/S JAI DEVELOPERS · Panvel, RaigarhP52000007385· 54.5% built
- Dorabjees Royale Heritage Mall7.8 yr overdueJehangir Nariman Dorabjee · MOHAMMEDWADI, PuneP52100008824· filed Dec 2017 → now Oct 2018· 81.8% built
- TULIP7.8 yr overdueD.P.DEVELOPERS · Pune (M Corp.), PuneP52100012336· 89.5% built
- Panchamrut Bldg. No. 17.8 yr overdueShree Abhilasha Nirmiti · Titwala west, ThaneP51700005211· filed Mar 2018 → now Oct 2018· 90.9% built
- SHREE GANESH RACHANA7.8 yr overdueRAJAN CHANDRAKANT TIPNIS HUF · Kurla, Mumbai SuburbanP51800003279· 67.5% built
- PATIL PLAZA7.8 yr overdueSHIRKE AND PATIL ASSOCIATES · Haveli, PuneP52100004218· 81.4% built
- GALAXY APARTMENT7.8 yr overdueSharayu Associates · CHARHOLI, PuneP52100010982· 52.3% built
- SHIVAMS DWARKA7.8 yr overdueSHIVAM DEVELOPERS · Shirwal, SataraP52700012092· 81.8% built
- VRUNDAVAN7.8 yr overdueSILVASSA ASBESTOS CEMENT PRODUCT · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000010· 50.5% built
- AB EXOTICA7.8 yr overdueAB BUDGET HOMES · Uran, RaigarhP52000009570· 49.1% built
- SHIVAMRIT COMPLEX7.8 yr overdueBHARATI DHARMA JOSHI · Ulawe, RaigarhP52000005184· 65.1% built
- GOVINDAM APARTMENTS7.8 yr overdueM/s. Paul Brothers · Kadbi chowk, NagpurP50500008210· 92.7% built
- Kuber Kunj7.8 yr overdueMahalaxmi Realtors · Palghar, PalgharP99000009752· 50% built
- CELEBRIA7.8 yr overdueVISHNU VENTURES · Pune (M Corp.), PuneP52100005241· filed Jan 2018 → now Oct 2018· 60% built
- VARD VINAYAK7.8 yr overdueSHREE VARDVINAYAK ENTERPRISES · Karanjade, RaigarhP52000003001· 68.2% built
- Aura City D3,D47.8 yr overdueBhagvati infra · Shirur, PuneP52100004141· 75.5% built
- Greens - Beech - GH7.8 yr overdueAMJ Land Developers · Chinchwad, PuneP52100002813· 72.7% built
- Fortune Heights7.8 yr overdueShree Maa Mahalakshmi Infraventures Private Limited · Nagpur (M Corp.), NagpurP50500003586· 28.5% built
- SWOJAS CHINTAMANI7.8 yr overdueSWOJAS PROPERTIES · ERANDWANA, PuneP52100015937· 36.4% built
- Rachana Park Wing E7.8 yr overdueShree Construction Builders and Developers · Rachana Park, AhmednagarP52200012570· 90.9% built
- Sai Radiance7.8 yr overduePRASAD ESTATE · Panvel, RaigarhP52000006076· 36.9% built
- SUDAMA REGENCY BUILDING NO 1, 57.8 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700000953· 71.4% built· 1 complaint
- SAIVED APPARTMENTS7.8 yr overdueVIJAY ANAND RANE · Kankavali, SindhudurgP52900008461· 59.5% built
- ARYAN ONE WING I AND J7.8 yr overdueKonark Lifespaces · SHIRGAON, ThaneP51700015793· 79.9% built
- Raman Park - Phase - I7.8 yr overdueARHAM CONSTROTECH PVT LTD · Yeola, NashikP51600004598· 56.4% built
- RR HEIGHTS7.8 yr overdueRAVIRAM BUILDERS AND DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000006470· 76.8% built
- SUDHANSHU CHS LTD7.8 yr overdueHARIOM DEVELOPERS · Andheri, Mumbai SuburbanP51800004339· 90.9% built
- SHUBH SRUSHTI7.8 yr overdueVINAYAK ENTERPRISES · Badlapur (M Cl), ThaneP51700010469· 55.5% built
- FORTUNE HOUSE7.8 yr overdueFORTUNE DEVELOPERS · Pune (M Corp.), PuneP52100005111· 71.8% built
- Aura City D5,D67.8 yr overdueBhagvati infra · Shirur, PuneP52100003585· 76.4% built
- Shri Pinglai Heights7.8 yr overdueUnnati Infraspace Private Limited · Amravati (M Corp.), AmravatiP50300012628· 37% built
- premia B-1 Phase II7.8 yr overdueC.D. Developers · NARHE, PuneP52100008990· 43.6% built
- R N GOLI CELEBRATION7.8 yr overdueSHRI R N GOLI DEVELOPERS · Solapur (M Corp.), SolapurP52600005031· 89.5% built
- A-14, A Wing Petunia Apts, Bindra Complex7.8 yr overdueAccord Land Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800003133· 90.9% built
- MAULI HEIGHTS7.8 yr overdueONKAR SURESH JOSHI · Ahmadnagar (M Corp.), AhmednagarP52200005564· 16.4% built
- Malkans7.8 yr overdueGokhale Builders LLP · Pune (M Corp.), PuneP52100006798· 80.5% built
- KARAN HEIGHTS7.8 yr overduePALLADIUM REALITY · Pune (M Corp.), PuneP52100004687· 90.9% built
- Raj Laxmi7.8 yr overdueJANOEYA CONSTRUCTION · Nashik, NashikP51600011657· 90.9% built
- SHREY PARADISE7.8 yr overduePRAVIN MOTILAL SONIGARA ·P52100002273· 76.4% built
- NISARG SRUSHTI7.7 yr overdueNISARG DEVELOPERS · MANJARI Bk, PuneP52100001446· 88.2% built
- Vasukamal Solitaire7.7 yr overdueNarendra Ziprulal Kabra · Near GST Bhavan, JalgaonP49900009627· 90.9% built
- SAI PARADISE7.7 yr overdueKAPILESHWAR DEVELOPERS · Nagapur (CT), AhmednagarP52200003454· 90.9% built
- Anita Apartment7.7 yr overdueArifuddin Nooruddin Siddiqui · Aurangabad (M Corp.), AurangabadP51500013489· 27.3% built
- VARAD SAHANIWAS7.7 yr overdueVARADDEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100012598· 32.7% built
- KESHAV RUKMINI SANKUL7.7 yr overdueBHUMKAR PROMOTERS AND BUILDERS · NARHE, PuneP52100012696· 62.3% built
- MAITRI PRASAD7.7 yr overdueMAITRI CONSTRUCTION · Kalyan, ThaneP51700003086· 81.8% built
- MAITRI SAI SAMARTHA7.7 yr overdueMAITRI RACHANA · Kalyan, ThaneP51700003061· 90.9% built
- NEELS RESIDENCY7.7 yr overdueS.A. SINGH BUILDERS AND DEVELOPERS · Ambarnath(M Cl), ThaneP51700013572· 59.1% built
- Swarupa Residency7.7 yr overdueM/s Pavanand JH construction co · Khedshi, RatnagiriP52800001620· 90.9% built
- SUPREME POINT PHASE I7.7 yr overdueK K INFRASTRUCUTRE · Palghar, PalgharP99000002058· filed Apr 2018 → now Nov 2018· 90.9% built
- YASHRAJ TOWER7.7 yr overdueRUTUJA DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500005659· 85.9% built
- SILVER PEARLSS7.7 yr overdueVIKAS LAXMAN CHAUDHARY · Aurangabad (M Corp.), AurangabadP51500001320· 90.9% built
- Devi Darshan Phase I7.7 yr overdueShreeram Builders & Developers · Vengurla (M Cl), SindhudurgP52900012306· 86.4% built
- Reverie Phase II7.7 yr overdueEspree Landmarks ·P52100001756· 81.8% built
- EKDANTAY7.7 yr overdueR K BUILDCON · Titwala, ThaneP51700009599· filed Dec 2017 → now Nov 2018· 90.9% built· 1 complaint
- PARIVARTAN PLAZA7.7 yr overdueANKIT BUILDERS AND DEVELOPER · Khutala, ChandrapurP50900007040· 55.5% built
- Bhaveshwar Arcade Annexe7.7 yr overdueBhaveshwar Properties Pvt Ltd · Kurla, Mumbai SuburbanP51800000967· 90.9% built
- AKSHAR ALVARIO7.7 yr overdueTHALIA AKSHAR DEVELOPERS · Thane, ThaneP51700006864· 87.6% built
- SPRING DIVISHA7.7 yr overdueSIDDHARTH DEVELOPERS · Akoli Bk., AkolaP50100000435· 81.8% built
- AKSHAD PURAM7.7 yr overdueVANSH BUILDCON · Gangapur Jahagir, AurangabadP51500007853· 78.2% built
- KAVERI APARTMENT7.7 yr overdueMANOJA CONSTRUCTION · Phaltan (M Cl), SataraP52700002173· 90.9% built
- LANDSCAPE GARDEN7.7 yr overdueLANDSCAPE VENTURES · Ambarnath, ThaneP51700005570· 90.9% built
- MARIGOLD7.7 yr overdueSWAPNIL PRAKASHRAO KSHIRSAGAR · Haveli, PuneP52100005576· 90.9% built
- SHREE TULJABHAVANI RESEDENCY7.7 yr overdueMANGESH RAJARAM MANKAR · Wayari, SindhudurgP52900010546· 90.9% built
- Anand Prospera C wing7.7 yr overdueVIHANG ASHOK SHAH · Kolhapur (M Corp.), KolhapurP53000000357· filed May 2018 → now Nov 2018· 90.9% built
- Rivers Edge7.7 yr overdueKOKANE BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100010937· 90.9% built
- Arihant Heights7.7 yr overdueJAS DEVELOPERS · Haveli, PuneP52100005332· 72.7% built
- RAVIKIRAN PHASE I7.7 yr overdueDREAMHOUSE CONSTRUCTIONS PRIVATE LIMITED · Wadmukhwadi, PuneP52100000492· 90.9% built
- KAPILVASTU7.7 yr overdueANIL ANANDRAO PATIL · Haveli, PuneP52100012615· 94.5% built· 1 complaint
- KUMAR VISTA7.7 yr overdueBINOD KUMAR RAI · LOHGAON, PuneP52100005133· 12.7% built
- SHIVNERI7.7 yr overdueHESTIA DEVELOPER PRIVATE LIMITED · Kodoli (CT), SataraP52700011480· 43.6% built
- SAI HEIGHTS7.7 yr overdueKRISHNADEEP BUILDERS & DEVELOPERS · Nashik, NashikP51600011048· 89.1% built
- SHUBH VATIKA7.7 yr overdueSHUBH ENTERPRISES · Badlapur (M Cl), ThaneP51700009684· 90.9% built
- PRIMEROSE7.7 yr overdueGURUKRUPA DEVELOPERS · AMBEGAON, PuneP52100008282· 90.9% built· 1 complaint
- KRISHNA RESIDENCY7.7 yr overdueKRISHNA ENTERPRISES · Badlapur (M Cl), ThaneP51700012391· 56.4% built
- PARAG7.7 yr overdueVARDAAN ASSOCIATES · Pune City, PuneP52100005661· filed Jun 2018 → now Nov 2018· 81.8% built
- DEV RESIDENCY PHASE 17.7 yr overdueSHRADDHA CONSTRUCTION · URULI DEVACHI, PuneP52100015506· 84.5% built· 3 complaints
- ATLANTA EDENWORLD PHASE I7.7 yr overdueSAI BALAJI DEVELOPER · Thane, ThaneP51700003328· filed Dec 2017 → now Nov 2018· 90.4% built
- Sai Paradise7.7 yr overdueSai Paradise · Palghar, PalgharP99000010380· 47.4% built
- AKSHAY BUSINESS SQUARE7.7 yr overdueMANGILAL GANESHMAL BAFNA · Pune (M Corp.), PuneP52100010084· 80.9% built
- Vighnaharta Sankul7.7 yr overdueVighnaharta Construction · Haveli, PuneP52100013166· 72.7% built
- SHREE SIDDHIVINAYAK ENTERPRISES7.7 yr overdueSHREE SIDDHIVINAYAK ENTERPRISES · Thane, ThaneP51700004774· 60% built· 1 complaint
- Shri Samarth Sai Niwas7.7 yr overdueShri Sai Samartha Constructions · SANSARI, NashikP51600009839· 84.8% built
- Shree Dattakrupa Height Buidling No 1257.7 yr overdueEkdanta Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800012504· 89.1% built
- VARAD VINAYAK COMPLEX7.7 yr overdueSHREE BALAJI BULDERS AND DEVELOPERS · Ambarnath, ThaneP51700003008· 70% built
- Aathley Sankul7.7 yr overdueArihant Vastu Nirman Pvt. Ltd · Rahataghar, RatnagiriP52800000018· 84.8% built
- Bafna Meadows Phase 17.7 yr overdueSuvidha Realtors · Palghar, PalgharP99000006123· 79.7% built
- Jay Enclave7.7 yr overdueJay Developers · Kolhapur (M Corp.), KolhapurP53000008131· 68.2% built
- Vighnaharta Residency7.7 yr overdueVikas Bhimdev Kale · Baramati (M Cl), PuneP52100008577· 62% built
- BLISS INDUSTRIAL ESTATE -027.7 yr overdueBLISS DEVELOPERS · Vasai, PalgharP99000004226· 34.5% built
- SAI ENCLAVE, Phase II Bldg A7.7 yr overdueSSD BUILDERS ·P52100013826· 81.8% built
- 25 GLORY7.7 yr overdueVIJAYRAJ ASSOCIATES · Haveli, PuneP52100008877· 80% built
- HILLTOP ESTATES7.7 yr overdueUNITY ASSOCIATES · Nachane (CT), RatnagiriP52800003033· 90.9% built
- SIDDHACHAL MALAD MAMLETDARWADI7.7 yr overdueBUCON ENGINEERS & INFRASTRUCTURE PVT. LTD. · Borivali, Mumbai SuburbanP51800008815· filed Dec 2017 → now Dec 2018· 90.9% built
- SHIV PARADISE7.7 yr overdueHIMANSHU SHAM TENDULKAR · saaki naka, PalgharP99000011602· 72.7% built
- SWASTIK MANGAL7.7 yr overdueSWASTIK CONSTRUCTION · Mahalunge, PuneP52100009924· 48.2% built
- SAUDA HEIGHTS7.7 yr overdueM.K. INDIA ENTERPRISES · Ward E, Mumbai CityP51900012238· 57.1% built
- VRUNDAVAN PARK7.7 yr overdueVEDANT DEVELOPERS · Baramati (M Cl), PuneP52100006477· 82.7% built
- Vedant Heights7.6 yr overdueMoraya Developers · Pimpri Chinchawad (M Corp.), PuneP52100011636· 51.8% built· 3 complaints
- Construction of 86 Tenements out of 430 MIG tenements of old Magathane village Borivali7.6 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000063· 90.9% built
- SHIV GANESH SADAN7.6 yr overdueM/S SHIVGANESH BUILDERS & DEVELOPERS · Kalyan, ThaneP51700011175· 67.7% built
- Vardhaman Residency7.6 yr overdueSwastik Builders · Talegaon Dabhade (M Cl), PuneP52100004534· 43.6% built
- PRAKASH ESTATES7.6 yr overdueM/S REALTY SHAPERS · Jalgaon (M Corp.), JalgaonP49900002142· 99.1% built
- Parasmani - A7.6 yr overdueParasmani Constructions Pvt .Ltd · Mumbai City, Mumbai CityP51900010014· 90.9% built
- PRATIK TOWER7.6 yr overdueKAMAL DIGRILAL MALVIYA · AMRAVATI, AmravatiP50300003680· 90.9% built
- DODKE SHOBHAN7.6 yr overdueDODKE REALTORS · Haveli, PuneP52100008770· 53% built
- DARPAN TOWER APARTMENT7.6 yr overdueDILIP KARBHARI BHAMARE · PANCHAVATI, NashikP51600002845· 90.9% built
- N G Silver Spring7.6 yr overdueRNA Builders (NG) · Thane, ThaneP51700000009· 90.9% built· 1 complaint
- Rani minnat enclave7.6 yr overdueAMKB BUILDER AND DEVELOPERS · Dahanu, PalgharP99000012845· 78.8% built· 4 complaints
- Raviraj Spring7.6 yr overdueMIra Housing Development Corporation · Mira-Bhayandar (M Corp.), ThaneP51700010445· 77.3% built
- Muktangan Niwas7.6 yr overdueRavindra Arun Kate · Pimpale Saudagar, PuneP52100011365· 90.9% built
- RAVIRAJ SPRING7.6 yr overdueM/s RAVIRAJ HOUSING (PRINCE CITY) · Mira-Bhayandar (M Corp.), ThaneP51700011396· 77.3% built
- UTTARA RESIDENCY CONDOMINIUM7.6 yr overdueNAKSHATRA BUILDERS & DEVELOPERS · Amravati (M Corp.), AmravatiP50300006488· 67.7% built
- VINAYAK APPARTMENT7.6 yr overdueRAVINDRA PANDHARINATH DAMLE · Ratnagiri (M Cl), RatnagiriP52800001615· 65% built
- Futura7.6 yr overdueEon Hadapsar Infrastructure Pvt Ltd · Hadapsar, PuneP52100001536· 74.5% built
- DESTINY7.6 yr overdueBALAJI REALTORS · Pimpale Saudagar, PuneP52100012186· 99.5% built
- SHARAYU SANKUL7.6 yr overdueSOHAM PROMOTERS AND BUILDERS · Ratnagiri (M Cl), RatnagiriP52800001432· 81.8% built
- SHREE GURU PUSHP AMRUT PARIWAR7.6 yr overdueSudhir Rameshrao Wakode · Amravati (M Corp.), AmravatiP50300010072· 46.4% built
- Amar Developers and Construction7.6 yr overdueRahul Balasaheb Gavali · Haveli, PuneP52100012296· 44.5% built
- MORAJ MAA SHRISHTI7.6 yr overdueMORAJ INFRATECH PRIVATE LIMITED · Khalapur, RaigarhP52000000480· 32.7% built
- Vistaar Shubharambh7.6 yr overdueMarathwada Developers · Balewadi, PuneP52100002463· 81.8% built
- subodh hights7.6 yr overdueS M BUILDERS AND DEVOLOPERS · Bhagur Rural, NashikP51600010874· 43.2% built
- USHA KAAL7.6 yr overdueMILIND KESARINATH RAUL · Kurla, Mumbai SuburbanP51800008807· 67.5% built· 4 complaints
- GLENDALE COPERATIVE HOUSING SOCIETY LIMITED7.6 yr overdueGLENDALE COOPERATIVE HOUSING SOCIETY LIMITED · Nashik (M Corp.), NashikP51600007451· 76.4% built
- BHushan Plaza CHSL7.6 yr overdueBhushan Enterprises · Borivali, Mumbai SuburbanP51800012726· 90.9% built
- Vidya Vihar7.6 yr overdueJ.R.P. Constructions · Mahalaxmi Chowk Government Colony, SangliP53100000554· 24.5% built
- SHREE SAI ENCLAVE7.6 yr overdueSHREE SAI ASSOCIATES · Nashik (M Corp.), NashikP51600009958· 58.2% built
- Sai Bhadra Residency7.6 yr overdueSai Builders · Aurangabad (M Corp.), AurangabadP51500001293· 90.9% built
- AARTI PRIDE7.6 yr overdueRAMESH BANDU RETAREKAR · UPPER KHOPOLI, RaigarhP52000015340· 58.2% built
- SHLOK APPARTMENT7.6 yr overdueSWATI PRASHANT DHATRAK · Chandrapur, ChandrapurP50900012515· 90.9% built
- VOSKI EMERALD7.6 yr overdueVOSKI GROUP · KHARADIP52100004948· 39.1% built
- CRYSTAL RESIDENCY7.6 yr overdueSNG HOUSING SCHEME PVT LTD · Kankavali, SindhudurgP52900003949· 42.4% built
- SUKRITI APPARTMENT PHASE 17.6 yr overdueNITIN MACHINDRA SHEWALE · Vadgaongupta, AhmednagarP52200013325· 31.8% built
- Nirmiti Vasundhara Park7.6 yr overdueVasundhara Nirmiti Homes · Baramati (M Cl), PuneP52100006128· 88.2% built
- INSPIRA PHASE I7.6 yr overdueANAND REALTIES · Kondhwa Budruk, PuneP52100006715· 56.6% built
- Grand County Bldg A 17.6 yr overdueBhujbal Constron · Sidhanathwadi (Rural), SataraP52700009237· 78.6% built
- MERU BHOOMI7.6 yr overdueAMIT BUILDERS · Deolali (CB), NashikP51600006374· 43.7% built
- UJWAL DHAM7.6 yr overdueNIWARA GRUHNIRMAN PVT LTD · Latur (M Cl), LaturP52400015317· 9.8% built
- Lotus Pride7.6 yr overdueLotus Buildcon · Pandav Nagri, NashikP51600007403· filed Dec 2017 → now Dec 2018· 90.9% built
- KAKADE PARK7.6 yr overdueSuryakant Kakade · Chinchwad, PuneP52100007904· 90.9% built
- OM IMPERIA7.6 yr overdueCAPITAL ASSOCIATES · Karanjade, RaigarhP52000003265· 75% built· 1 complaint
- DHARTI VILLA7.6 yr overdueRHYTHM ENTERPRISES · Ulawe, RaigarhP52000001102· 66.5% built
- DATTAMORESHWAR BHAVAN7.6 yr overdueDHANANJAY DATTATRAY KULKARNI · Sangli Miraj Kupwad (M Corp.), SangliP53100002583· 40.9% built
- GURU DEV7.6 yr overdueSHREE SAMARTH SATAM MAHARAJ DEVELOPERS · Ambernath, ThaneP51700008312· 90.9% built
- River edge7.6 yr overdueS K ASSOCIATES · Shirur, PuneP52100005662· 49.1% built
- ROYAL PLAZA7.6 yr overdueRoyal Enterprise · Khopoli, RaigarhP52000011853· 68.9% built
- CAPITAL CORNER7.6 yr overdueKACHA DEVELOPERS · BEHIND VISHAL LAWNS, PuneP52100004801· 75.5% built
- SHREERAM TRADECON7.6 yr overdueSHREERAMTRADECON · Chakan, PuneP52100003029· 65% built
- SAMARTH VATIKA7.6 yr overdueSHREE SAMARTH ASSOCIATES · Badlapur (M Cl), ThaneP51700009325· 83.2% built
- SHREE GANESH HILLVIEW7.6 yr overdueMUKESH JAGDISH GOYAL · CHARHOLI, PuneP52100005537· 40.9% built
- DWARKA7.6 yr overdueCUBIX DEVELOPERS · Pune (M Corp.), PuneP52100007405· 79.1% built
- MOTKARIS GRAVITY7.6 yr overdueMOTKARI CONSTRUCTIONS PRIVATE LIMITED · Govind Nagar, NashikP51600007839· 90.9% built
- HORIZON RESIDENCY B BUILDING7.6 yr overdueARHAM DEVELOPER · Silvassa, Dadra & Nagar HaveliP49600000036· 66.4% built
- Amrut Darshan7.6 yr overdueArham Developers · Zadgaon CT, RatnagiriP52800014554· 90.9% built
- Kiran Shubhamkaroti B7.6 yr overdueM/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE · Sus, PuneP52100010215· 53.2% built
- Shankar Heights, Phase 37.6 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010807· 90% built
- IMPERIO7.6 yr overdueBLUESTONE PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100002929· filed Jun 2018 → now Dec 2018· 52.7% built
- Jijaushrrusti7.6 yr overdueJijaushrusti · Rui, PuneP52100012782· 81.8% built
- Mahalaxmi Sankul7.6 yr overdueMAHALAXMI DEVELOPERS · Satara (M Cl), SataraP52700011199· 72.5% built
- Disha Heights7.6 yr overdueDinesh Prabhakar Baravkar · Daund, PuneP52100009125· 84.1% built
- SAI AANGAN7.6 yr overdueRAJESH MAHADEO MANE · Satara, SataraP52700010269· 50% built
- Sun Orchid7.6 yr overdueMOHAMMED SIRAJ BASHEER · Thane, ThaneP51700013513· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.