RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 10 of 61
- Amrut Darshan7.9 yr overdueArham Developers · Zadgaon CT, RatnagiriP52800014554· 90.9% built
- APEKSHA SHOPPING CENTRE7.9 yr overdueKOTHARI CONSTRUCTION CO · Vasai-Virar City (M Corp), PalgharP99000010073· filed Dec 2017 → now Dec 2018· 78.2% built
- TRADEMARK LIFE7.9 yr overdueNEW FRONT PRABHAVEE VENTURES · Mulshi, PuneP52100008152· filed Mar 2018 → now Dec 2018· 90% built
- Chandra Mukkut7.9 yr overdueCHANDRA REALITY · WAGHOLI, PuneP52100011295· 81.8% built
- SHREERAM TRADECON7.9 yr overdueSHREERAMTRADECON · Chakan, PuneP52100003029· 65% built
- Shankar Heights, Phase 37.9 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010807· 90% built
- ARIHANT ANAIKA PHASE I7.9 yr overdueARIHANT VATIKA REALTY PRIVATE LIMITED · Panvel, RaigarhP52000001869· 89.1% built· 1 complaint
- GOLDEN BELLS PHASE II7.9 yr overduePIONEER CONSTRUCTIONS · Haveli, PuneP52100003229· 90.9% built
- MOTKARIS GRAVITY7.9 yr overdueMOTKARI CONSTRUCTIONS PRIVATE LIMITED · Govind Nagar, NashikP51600007839· 90.9% built
- Mahalaxmi Sankul7.9 yr overdueMAHALAXMI DEVELOPERS · Satara (M Cl), SataraP52700011199· 72.5% built
- IMPERIO7.9 yr overdueBLUESTONE PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100002929· filed Jun 2018 → now Dec 2018· 52.7% built
- Bhagatiniwas7.9 yr overdueShri Sadguru construction · Katrap, ThaneP51700009762· 45.5% built
- Kiran Shubhamkaroti B7.9 yr overdueM/S KIRAN CREATORS & DEVELOPERS THROUGH PROPRIETOR MR. KASHINATH GANESH NEHETE · Sus, PuneP52100010215· 53.2% built
- Muneera Heights7.9 yr overdueIsmail Hamdule · Kamothe, RaigarhP52000009492· 90.9% built
- SAMARTH VATIKA7.9 yr overdueSHREE SAMARTH ASSOCIATES · Badlapur (M Cl), ThaneP51700009325· 83.2% built
- Shadawal Impression Building C1 C27.9 yr overdueKailash Builders · Palghar, PalgharP99000008322· 74.1% built
- SHREE GANESH HILLVIEW7.9 yr overdueMUKESH JAGDISH GOYAL · CHARHOLI, PuneP52100005537· 40.9% built
- CAPITAL CORNER7.9 yr overdueKACHA DEVELOPERS · BEHIND VISHAL LAWNS, PuneP52100004801· 75.5% built
- Saivilla Appartment7.9 yr overdueNIRAJ PRALHADRAO PADGILWAR · Chandrapur (M Cl), ChandrapurP50900005775· 90% built
- AVADHUT VIHAR B WING7.9 yr overdueAVADHUT BUILDERS · Godoli (CT), SataraP52700013985· 56.4% built
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED7.9 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002752· 83.6% built
- Shree Madhusudan CHSL7.9 yr overdueSpark Builders & Infra Projects Pvt Ltd · Andheri, Mumbai SuburbanP51800005040· filed Dec 2017 → now Dec 2018· 90.9% built
- VENU ENCLAVE7.9 yr overdueOM SAI BUILDER & DEVELOPERS · Nagpur (M Corp.), NagpurP50500010162· 81.8% built
- Palm Glory7.9 yr overdueSachin Gopalrao Sabale · Kolhapur (M Corp.), KolhapurP53000005449· 90.9% built
- BALAJI AANGAN SHIVAM-A WING7.9 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700011189· 78.6% built
- LAXMI ICON7.9 yr overdueANIRUDDHA BUILDERS AND DEVELOPERS · Navi Mumbai (M Corp.), ThaneP51700005005· 97.3% built
- VISHVA RUKHMA APARTMENT7.9 yr overdueSHREE GANESH CONSTRUCTION BUILDERS AND DEVELOPERS · Nagpur (M Corp.), NagpurP50500012593· filed Dec 2017 → now Dec 2018· 89.1% built
- IMPERIAL HEIGHTS7.9 yr overdueSHYAM BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000009768· 67.3% built
- Zafeera Estates7.9 yr overdueZafeera Estates · Chiplun (M Cl), RatnagiriP52800004349· 83.6% built
- SATYAM IMPERIAL HEIGHTS7.9 yr overdueSATYAM BUILDERS AND DEVELOPERS · Thane, ThaneP51700004307· 90.9% built
- RAJHANS KSHITIJ, ASPEN, WING C7.9 yr overdueAJMERA DEVELOPERS · Vasai, PalgharP99000006700· 90.9% built
- ROHAN KRITIKA WINGS A C7.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Pune (M Corp.), PuneP52100000486· 76.4% built
- Ekunj Residency7.9 yr overdueMadhuban Infracon and Developers · Pune (CB), PuneP52100002630· 81.8% built
- Vaishnav Residency7.9 yr overdueVaishnav Residency · Haveli, PuneP52100000750· filed Mar 2018 → now Dec 2018· 90.9% built
- INFINITI INDUSTRIAL ESTATE I7.9 yr overdueACETRON CONSTRUCTION LLP · Vasai-Virar City (M Corp), PalgharP99000002356· 32.1% built
- SOLITAIRE7.9 yr overdueKAPIL NANDKISHOR NATHANI · Nagpur (M Corp.), NagpurP50500012837· 81.8% built
- WHITE CARNATION7.9 yr overdueSPS CONSTRUCTION · ULWE, RaigarhP52000001088· 90.9% built
- SHIVGIRI CO OP HSG SOC LTD7.9 yr overdueHEALTH COLONIES & CONSTRUCTION PVT.LTD. · Kurla, Mumbai SuburbanP51800002023· 90.9% built
- VEDANT PINAKIN7.9 yr overdueVEDANT BUILDERS · MANJARI Bk, PuneP52100009780· 65.5% built
- AURANGABAD TRADE CENTRE7.9 yr overdueAURANGABAD TRADE CENTRE · MITMITA,AURANGABAD, AurangabadP51500015009· 90.9% built
- ROMELL SHRADDHA7.9 yr overdueSHRADDHA SHIVSHAKTI DEVELOPERS · Borivali, Mumbai SuburbanP51800001420· 90.9% built
- SHIVSHAKTI7.9 yr overdueSAMARTH ERECTORS & DEVELOPERS · Borivali, Mumbai SuburbanP51800006063· 88.5% built
- Ambrosia building 17.9 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000007608· 41.8% built
- FUTURE GOLD7.9 yr overdueFUTURE HOMES DEVELOPERS · Thane, ThaneP51700007006· 90.9% built
- LIGHTHALL D WING7.9 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800002737· 90.9% built
- Chembur Shri Sai Shraddha CHS7.9 yr overdueUnity Land Consultancy · Opp. Kurla ST Depot, Mumbai SuburbanP51800009369· 81.4% built
- Palace Orchids Phase-I7.9 yr overdueSiddhant Infrastructure · Raman Mala,, KolhapurP53000000108· 90.9% built
- Tapasya7.9 yr overdueKotibhaskar Builders · Sangli Miraj Kupwad (M Corp.), SangliP53100006819· 90.9% built
- DEGAONKAR APARTMENT7.9 yr overduePRASAD PRAKASH DEGAONKAR · NORTH KASABA PETH, SolapurP52600014611· 81.4% built
- KOTESHWARI HERITAGE7.9 yr overduePDDEVELOPERS · Murud Janjira (M Cl), RaigarhP52000008481· 67.7% built
- ASHAR 16 WING A PHASE V7.9 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001159· 90.9% built
- Radha Regency7.9 yr overdueV.R. Construction Co. · Mira-Bhayandar (M Corp.), ThaneP51700011369· 73.6% built· 1 complaint
- SOLITAIRE HIGHWAY7.9 yr overdueAAKAR REALTORS · VASAI, PalgharP99000012069· 81.8% built
- VENKATESH LAKE ORCHID7.9 yr overdueSHREE VENKATESH BUILDCON PVT LTD · AMBEGAON KHURD, PuneP52100000977· 86.4% built
- SHREE SAMARTH GALAXY SRA CHS LTD7.9 yr overdueShree S S Developers Private Limited · Kurla, Mumbai SuburbanP51800009435· 90.9% built
- SHAHS GOVIND APARTMENT PHASE I7.9 yr overdueSHAH BUILDERS AND DEVELOPERS · NEAR RENUKA MATA MANDIR, NashikP51600007197· 72.7% built
- Shantiniketan Wing A7.9 yr overdueAnmol Associates · Kalyan, ThaneP51700010899· 87.2% built
- QUEENSLAND7.9 yr overdueMOTI UDHARAM PANJABI · Moshi-Boradewadi, PuneP52100001606· 86.5% built
- TREASURE PARK PHRASE -17.9 yr overdueKANAKLAXMI DEVELOPERS · Nashik, NashikP51600006300· filed Dec 2017 → now Dec 2018· 72.7% built
- STAR HOMES7.9 yr overdueSTAR HEIGHT BUILDERS LLP · Bokadvira, RaigarhP52000013196· 66.4% built· 2 complaints
- Amar CHSL7.9 yr overdueShiva Shakti Enclaves Private Limited · Andheri, Mumbai SuburbanP51800003597· 53.9% built· 2 complaints
- Dattakrupa Apartment7.9 yr overdueVaibhav Vijay Naik HUF · Kankavali, SindhudurgP52900011920· 90.9% built
- RATNAPADMA7.9 yr overdueANGAL & CO · Sheela Vihar Colony, PuneP52100000527· 81.8% built
- FORTUNE MIGNAS7.9 yr overdueNamla Developers Private Limited · Ward E, Mumbai CityP51900009466· 81.8% built
- VISHWESHWAR NAGAR PHASE - 17.9 yr overdueM/S. VISION GROUP · ALANDI, PuneP52100006647· 81.8% built
- RICOVERA7.9 yr overdueSUNANDA MAHADEV KOLI · Panvel, RaigarhP52000011899· 90.9% built
- NANDVIHAR7.9 yr overdueBhagwati Developers · Khalapur, RaigarhP52000009560· 74.5% built
- AERA7.9 yr overdueRE Infra Pvt Ltd · Kurla, Mumbai SuburbanP51800004542· 34.5% built
- DREAM MAX7.9 yr overdueMOZE PROPERTIES · LOHGAON, PuneP52100010600· 90.9% built
- ROHAN ABHILASHA BUILDING E7.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000832· 90.7% built· 3 complaints
- GANRAYA PLAZA7.9 yr overdueVASANT VISHNU BANKHELE WITH ATUL BALIRAM THORAT ASSOCIATION OF PERSONS · Ambegaon, PuneP52100009301· 64.5% built
- SADGURU KRIPA APARTMENT7.9 yr overdueSADGURU DEVELOPER · Ambarnath, ThaneP51700009917· 40.9% built
- VIHANG APPARTMENT7.9 yr overdueSUDHAKAR DEVELOPERS PVT. LTD. · Kolhapur (M Corp.), KolhapurP53000000963· 81.8% built
- Anika Mangalam7.9 yr overdueArun Sheth Properties · Pune City, PuneP52100002636· 90.9% built
- MANDLIK NAGAR CHS LTD PHASE II REHAB WING E PT AND F7.9 yr overdueTRIUMPH BUILDERS LLP · Borivali, Mumbai SuburbanP51800004077· 46.8% built
- GURU CHAYA7.9 yr overdueYogesh Ramakant Mahaddalkar · Kalambaste, RatnagiriP52800011087· 51.8% built
- SHREE SIDDHI VINAYAK APPARTMENT7.9 yr overdueRIDDHI SIDDI DEVELOPERS · Nashik (M Corp.), NashikP51600004980· 90.9% built
- BELLEZZA7.9 yr overdueSIDDHISHREE BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100002229· 81.8% built
- SEAGULL BLDG 37.9 yr overdueDANGE DEVELOPERS · Vasai, PalgharP99000007599· filed Dec 2017 → now Dec 2018· 78.1% built
- PRAJOL ICON7.9 yr overdueRAJESH MARUTI KADAM · Haveli, PuneP52100002454· 16.4% built
- Blue Crest7.9 yr overdueElinor Infra LLP · Karanjade, RaigarhP52000009702· 80.3% built· 1 complaint
- GOOD RELATION -WING B7.9 yr overdueSkyrise Enterpirses · Kurla, Mumbai SuburbanP51800000112· 95.5% built
- OM RESIDENCY APPARTMENT7.9 yr overdueSIDDHIVINAYAK BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012992· 90.9% built
- RIVERA ESTATES7.9 yr overdueOmega Constructions · Khalapur, RaigarhP52000010090· 41.8% built· 1 complaint
- DELTA RACHANA7.9 yr overdueDELTA RACHANA · Pimpri Chinchawad (M Corp.), PuneP52100013828· 32.7% built· 1 complaint
- Green Vista7.9 yr overdueVaibhavLaxmi Builders and Developers · Kurla, Mumbai SuburbanP51800008487· 64.3% built
- Ozarde Complex7.9 yr overdueOnkar Developers · Baramati (M Cl), PuneP52100009428· 80% built
- VIGHNHARTA RESIDENCY7.9 yr overdueSANJAY BUILDCON · PUNE, PuneP52100012592· 90.9% built
- MALHAR RESIDENCY7.9 yr overduePRASHANT S THORAT · Panvel, RaigarhP52000008729· 95.5% built
- Diamond Residency7.9 yr overdueP. H. REALTY · Borivali, Mumbai SuburbanP51800002306· 85.5% built
- Royal Palm7.9 yr overdueTabeer Properties · Khode Nagar, NashikP51600010474· 90.9% built
- Nana Peer Complex7.9 yr overdueSuhas Damodar Sathe · Chiplun (M Cl), RatnagiriP52800000434· 68.6% built
- OM SAI SHAHA TOWERS7.9 yr overdueOM SAI ASSOCIATES · Vaduj, SataraP52700013606· 81.8% built
- Kalp Homes7.9 yr overdueDwarkamai Enterprises · Chakan, PuneP52100014270· 90.9% built
- MARUTI PRAKRUTI DHAM7.9 yr overdueAVISHKAR DEVELOPERS · Ambarnath, ThaneP51700003338· 49.6% built
- Navpad Nidhi7.9 yr overdueNavpad Realtors · Palghar, PalgharP99000007326· 90.9% built
- Shri Krishna Kunj CHS Ltd7.9 yr overdueEllora Developers · Andheri, Mumbai SuburbanP51800001311· 90.9% built
- PARADISE HEIGHT7.9 yr overdueFRIENDS GROUP · Thane, ThaneP51700009471· 90.9% built
- Sejal Harmony7.9 yr overdueR R CONSTRUCTIONS · Nashik (M Corp.), NashikP51600012494· 81.8% built
- Joy Alka7.9 yr overdueJoy Realty Limited · Andheri, Mumbai SuburbanP51800000728· 90.9% built
- Marvel Selva Ridge A,B Building7.9 yr overdueMARVEL OMEGA BUILDERS PVT LTD · Bavdhan Kh., PuneP52100003648· 90.9% built· 11 complaints
- Anmol Nayantara City One Phase 17.9 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000539· 79.6% built· 1 complaint
- INDRADHANU-A7.9 yr overduePARTHRAJ DEVELOPERS PVT. LTD. · Tisgaon, AurangabadP51500009346· 90.9% built
- Palladium Exotica Phase- II- D7.9 yr overduePalladium Developers ·P52100004221· 81.8% built
- Matoshree Nandadeep7.9 yr overdueMatoshree Infrastructure Private Limited · Mumbai City, Mumbai CityP51900004442· 65% built
- Mauli Residency7.9 yr overdueMauli Enterprises · Panvel, RaigarhP52000007675· 90.9% built
- ZELAM7.9 yr overdueDARODE JOG BUILDERS Pvt Ltd · Pune (M Corp.), PuneP52100003665· 53.6% built
- Vasukamal Samruddhi7.9 yr overdueVasukamal & Associates · Jalgaon, JalgaonP49900000069· 87.3% built· 1 complaint
- Whitespring7.9 yr overdueCCI PROJECTS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800002287· 99.2% built· 10 complaints
- KOHINOOR7.9 yr overdueSALEJI CONSTRUCTION PRIVATE LIMITED · Khalapur, RaigarhP52000009096· 89.1% built
- 21 HILLS7.9 yr overdueAMAR DEVELOPERS · Borivali, Mumbai SuburbanP51800006364· filed Jun 2018 → now Dec 2018· 93.2% built
- SHEETAL PLAZA7.9 yr overdueSachin Suresh Jirapure · Yavatmal (M Cl), YavatmalP51000004005· 59.6% built
- HARI KIRAN7.9 yr overdueKARDA BUILDCON PRIVATE LIMITED · VIHITGAON, NashikP51600000349· 90.9% built
- TULSI NANDAN7.9 yr overdueTULSI ESTATES · Mamdapur, RaigarhP52000004347· 71.8% built
- Pushkar Govind and Narayan Apartment7.9 yr overduePushkar Homes Private Limited · Zinga Bai Takli, NagpurP50500005009· filed Dec 2017 → now Dec 2018· 72% built
- SPRING HEIGHTS7.9 yr overdueSHRI GANESH DEVELOPERS · AMBEGAON Bk, PuneP52100003315· 75% built
- Skyline Status7.9 yr overdueSKYLINE ENTERPRISES · Kurla, Mumbai SuburbanP51800008604· 81.8% built
- MELANGE RESIDENCES - PHASE I7.9 yr overdueRAMA SYNERGY SPACES · Hinjawadi Phase III, PuneP52100002877· 91.8% built· 1 complaint
- Varad Vinayak Vrundavan7.9 yr overdueOM SAI DEVELOPERS · CHARHOLI, PuneP52100013217· 38.2% built
- Platinum7.9 yr overdueSilver Enterprises · Thane, ThaneP51700001981· 81.8% built
- VIGNESH SQUARE7.9 yr overdueVIGNESH NIRMAN · Nagpur (M Corp.), NagpurP50500008258· 41.4% built
- Zion7.9 yr overdueSai Mahaavir Developers · Panvel, RaigarhP52000001426· 90.9% built
- Panvelkar Crown7.9 yr overdueRahul Vijay Panvelkar · Ambarnath, ThaneP51700000598· 90.9% built
- ONELLA-27.9 yr overdueNimhan Associates · Sus, PuneP52100007329· 56% built
- ATHASHRI BANER COMMERCIAL7.9 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Baner, PuneP52100002667· filed Dec 2017 → now Dec 2018· 81.8% built
- Shri Sai Palace7.9 yr overdueAbhijit Madhukar Jagtap · Saswad Rural, PuneP52100005801· 16.7% built
- RELIABLE TOWNSHIP /RT-C TO K WING7.9 yr overdueRELIABLE REALTORS · Vasai, PalgharP99000007052· filed Dec 2017 → now Dec 2018· 78.2% built
- TOWN SQUARRE7.9 yr overdueNIRMITI BUILDTECH · Panchavati, NashikP51600012818· 63.6% built
- ASHAR 16 WING E PHASE I7.9 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001081· 90.9% built
- Gopalkrupa7.9 yr overdueLAGOO APTE · Haveli, PuneP52100003479· 81.8% built
- TIRUMALLA GLORY7.9 yr overdueSHREE VENKATESH DEVELOPERS · Nashik (M Corp.), NashikP51600011071· 90.5% built
- ADITYA APARTMENTS7.9 yr overdueNAVIN NARANJI JAIN · Bapsai, ThaneP51700010512· 90.9% built
- YASH COMPLEX7.9 yr overdueYASH DEVELOPERS · Pen (M Cl), RaigarhP52000010152· 62.7% built
- VASAI ONE -BLDG 27.9 yr overdueVASAI ONE REALTY · Vasai, PalgharP99000008656· 90% built
- Sahakar Residency7.9 yr overdueSahakar Infracon Projects Private Limited · Vasai, PalgharP51700009131· filed Dec 2017 → now Dec 2018· 90.9% built
- Xenia7.9 yr overdueKOLTE-PATIL REAL ESTATE PRIVATE LIMITED ·P52100000575· 90.9% built
- KOTHARI CHAMBERS7.9 yr overdueNITIN DAYALAL KOTHARI · Nashik, NashikP51600006974· 89.1% built
- SUBHADRA APARTMENT7.9 yr overdueSPM UNIQUE CONSTRUCTION · Dhamandivi, RatnagiriP52800005997· 37.5% built
- Venkatesh Paradise A Wing7.9 yr overdueSANJAY DNYANOBA JAGTAP · Pisoli, PuneP52100001162· 89.1% built· 3 complaints
- Shree Ganesh Residency7.9 yr overdueAV Associates · TALEGAON, PuneP52100005787· 90.9% built
- AMI CHSL7.9 yr overdueMEHTA GROUP · Borivali, Mumbai SuburbanP51800008106· 72.7% built
- M M VALLEY C17.9 yr overdueALFA ENTERPRISES · Thane, ThaneP51700009447· 90.9% built· 5 complaints
- SAI NIWAS7.9 yr overdueMEDAPARAMPIL GANGADHARAN SADASHIVAN · Bamandongri, RaigarhP52000011554· 9.1% built
- Green County Phase II Wing-C7.9 yr overdueAnand Developers · Fursungi, PuneP52100011772· 82.7% built· 1 complaint
- Shri Gajanan Maharaj Pushp Sankul7.9 yr overdueVishal Developers · Kolhapur (M Corp.), KolhapurP53000010715· 63.6% built
- GLOBAL SQUARE7.9 yr overdueGlobal Square Realty LLP · Pune City, PuneP52100005129· 63.2% built
- AASTHA7.9 yr overdueRADHE DEVELOPERS · Haveli, PuneP52100014227· 55.1% built
- RADHIKA PRIDE7.9 yr overdueBRIJWASI BUILDCON · Nashik (M Corp.), NashikP51600010716· 90.9% built
- Orchid Court7.9 yr overduePranjee Properties Pvt. Ltd. · Greater Mumbai (M Corp.) (Part) (802794), Mumbai SuburbanP51800007751· filed Dec 2017 → now Dec 2018· 90.9% built· 3 complaints
- SHREE HARI RESIDENCY7.9 yr overdueM/s SHREE ODHAV DEVELOPERS · Kalyan, ThaneP51700004461· filed Jun 2018 → now Dec 2018· 90.9% built
- APTE HOMES7.9 yr overdueSHREE SIDDHI DEVELOPERS · Badlapur (M Cl), ThaneP51700005931· 70% built
- AMAR WESTVIEW7.9 yr overdueINC DEVELOPERS · Pune City, PuneP52100000170· 90.9% built
- SPOT 97.9 yr overdueRAMNIKLAL GOPAL GANGANI · Wadagaon (CT), PuneP52100006534· 90.9% built
- Gurnani Palms Wing A7.9 yr overdueInterintel Constructions · Andheri, Mumbai SuburbanP51800005611· 90.8% built
- SAIRAJ COMPLEX7.9 yr overdueSHOBHA ATUL BALGUDE · Baramati (M Cl), PuneP52100003625· 33.3% built
- Laxmi Business Park7.9 yr overdueLaxmi Industrial Estate · Andheri, Mumbai SuburbanP51800009704· 68.2% built
- Mittal Enclave Mittal Centre Shopping B-37.9 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000005104· 72.7% built
- INSIGNIA7.9 yr overdueShagun Realty · Ulawe, RaigarhP52000005695· 48.6% built
- NADMOHAN7.9 yr overdueBhagwati Developers · Khopoli, RaigarhP52000011622· 90.9% built
- RAMBHUVAN RESIDENCY7.9 yr overdueABHAY ANANT KAMAT · Kalyan, ThaneP51700008571· filed Dec 2017 → now Dec 2018· 81.7% built
- GANGADHAR NAGAR A WING7.9 yr overdueONKAR NIVRUTTI MAHALE HUF · Nashik, NashikP51600013925· 55.5% built
- Mittal Enclave Mittal Centre Shopping B-17.9 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai-Virar City (M Corp), PalgharP99000008632· 72.7% built
- VISHWAVARAD RESIDENCY7.9 yr overdueVARSHA NARESH LALWANI · Karanjade, RaigarhP52000012442· 65% built
- SARSAN PLAZA7.9 yr overdueSARSAN DEVELOPERS · Pune (M Corp.), PuneP52100003526· 90.9% built
- SIMRAN MAJESTIC7.9 yr overdueVIKRANT VIKAS RAIKAR · Panvel, RaigarhP52000002117· filed Jun 2018 → now Dec 2018· 82% built
- LABH SHRIVALLI7.9 yr overdueLABHARTI INFRASTRUCTURE · Andheri, Mumbai SuburbanP51800012182· 84.5% built
- SAMRUDDHI APARTMENT7.9 yr overdueAMOL ABHIJEET KAMBLE · Nagpur (M Corp.), NagpurP50500011027· 70.5% built
- SAI SAGAR7.9 yr overdueSAI INFRA · Ulawe, RaigarhP52000006739· 68.2% built
- RININE7.9 yr overdueJKG Associates · Pune (M Corp.), PuneP52100006855· 83.6% built
- AUDUMBER7.9 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700012435· 89.5% built
- Pankaj Height7.9 yr overdueM/S Volition Investments Private Limited · Ward ABCD, Mumbai CityP51900003718· 85.5% built
- REDEVLOPMENT OF SUNDRESH CHS LTD7.9 yr overdueRAJ CORPORATION · Borivali, Mumbai SuburbanP51800010206· filed Dec 2017 → now Dec 2018· 72.7% built
- MAHALAXMI APARTMENT7.9 yr overdueMAA VAISHNAVI CITY DEVELOPER · Wardha (M Cl), WardhaP50400011039· 81.8% built
- TULIP RESIDENCY7.9 yr overdueBRRIGHT REALTORS · Palghar, PalgharP99000002162· filed Mar 2018 → now Dec 2018· 90.9% built
- Bindu / Vidyavihar7.9 yr overdueKurla, Mumbai SuburbanP51800002800· 90.9% built
- Atulya Shubh Vastu7.9 yr overdueATULYA TOWNSHIP BUILDCOM PVT LTD · Aatgaon Station, ThaneP51700011737· 10% built
- FIVE ELEMENTS-VAYU7.9 yr overdueLOKESH SATYAPRAKASH SHIVHARE · besa, NagpurP50500014883· 76.4% built
- Runwal Elina7.9 yr overdueRUNWAL DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800000072· filed Dec 2017 → now Dec 2018· 70.3% built· 2 complaints
- PLATINUM7.9 yr overdueRohit Infra · KALA KADAK, PuneP52100016424· 90.9% built
- ORION SQUARE TYPE C7.9 yr overdueSQUARE FEET REAL ESTATE · Ambarnath, ThaneP51700009388· 81.8% built
- VRINDAVAN NIKETAN7.9 yr overduePRAKASH BHOJRAJ SHEWANI · Badlapur (M Cl), ThaneP51700010990· 78.2% built
- VASTUSRUSHTI NIRVANA7.9 yr overdueOrion Realtors · Palghar, PalgharP99000003358· 8.4% built
- Vasundhara7.9 yr overdueInfinity Construction Co. · Kurla, Mumbai SuburbanP51800000451· 74.5% built
- EMANUEL BUILDING7.9 yr overdueD & M BUILDERS · Vasai, PalgharP99000008922· 90.9% built
- GOPALDHAM7.9 yr overdueSHREE HARI DEVELOPERS · Thane, ThaneP51700011339· 34.1% built
- KOASTAL APARTMENTS7.9 yr overdueSAIVAS BUILDCON · Nagpur (M Corp.), NagpurP50500004155· 90.9% built
- SAINATH MADHUBAN7.9 yr overdueSAINATH LAND DEVELOPERS PVT. LTD. · Kurla, Mumbai SuburbanP51800000752· 90.9% built
- PRIDE PALMS MAJESTY A1-B1 PHASE 17.9 yr overdueLARKINS REALTORS · Thane, ThaneP51700006280· 98.6% built
- Sai Kunj Phase 27.9 yr overdueShree Saidatta Associates · Chikhali, PuneP52100011033· 90.9% built
- KONARK RESIDENCY7.9 yr overdueUNIVERSAL REALTORS · Vasai, PalgharP99000003440· 83% built
- The Residences7.9 yr overdueVaijanath Realtors LLP · Kalyan, ThaneP51700010368· 72.7% built
- Siyona Phase - I7.9 yr overduePETHKAR PROJECTS · Punawale, PuneP52100000155· 89.1% built· 1 complaint
- FIA CONSTRUCTION COMPANY - FIA PRIDE7.9 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000000701· 90.9% built
- ARPAN COMPLEX7.9 yr overdueShashikant Balkrushna Patil · Miraj, SangliP53100006018· 29.1% built
- CHAITANYA PRIDE7.9 yr overdueCHAITANYA DEVELOPERS · Daund (M Cl), PuneP52100004999· 38.2% built
- ELEMENTA7.9 yr overdueAKSHAR LAND DEVELOPERS PRIVATE LIMITED · Tathwade, PuneP52100002903· 89.1% built
- TULJA ELITE7.9 yr overdueM/S IMAGINE CONSTRO ARTS PRIVATE LIMITED · NERAL, RaigarhP52000015338· 90.9% built
- NINE STAR RESIDENCY KRITIKA7.9 yr overdueYOGESH BIDYE · MAKANE, PalgharP99000009956· 50.5% built
- Indira Niwas Annex7.9 yr overdueShree Swami Krupa Builders and Developers · Thane, ThaneP51700010108· 90.9% built
- AARAMBH7.9 yr overdueG K GROUP VENTURES ·P52100012934· 75.9% built