RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 10 of 59
- OM SHRI SHANTIKUNJ7.6 yr overdueADITYA ENTERPRISES · Kurla, Mumbai SuburbanP51800009006· 73.9% built· 4 complaints
- Shankar Heights, Phase 37.6 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010807· 90% built
- HORIZON RESIDENCY B BUILDING7.6 yr overdueARHAM DEVELOPER · Silvassa, Dadra & Nagar HaveliP49600000036· 66.4% built
- DWARKA7.6 yr overdueCUBIX DEVELOPERS · Pune (M Corp.), PuneP52100007405· 79.1% built
- KALA RESIDENCY7.6 yr overdueVIJAY BHASKAR AHIRRAO · Nashik, NashikP51600007667· 90% built
- SAI AANGAN7.6 yr overdueRAJESH MAHADEO MANE · Satara, SataraP52700010269· 50% built
- SHIROMANI HEIGHTS7.6 yr overdueSudarshan Construction · Haveli, PuneP52100007178· 67.3% built· 1 complaint
- sai avishkar7.6 yr overdueSUYOG ANJANI AVISHKAR ASSOCIATES · Haveli, PuneP52100004067· 80.9% built
- Saivilla Appartment7.6 yr overdueNIRAJ PRALHADRAO PADGILWAR · Chandrapur (M Cl), ChandrapurP50900005775· 90% built
- Jijaushrrusti7.6 yr overdueJijaushrusti · Rui, PuneP52100012782· 81.8% built
- APEKSHA SHOPPING CENTRE7.6 yr overdueKOTHARI CONSTRUCTION CO · Vasai-Virar City (M Corp), PalgharP99000010073· filed Dec 2017 → now Dec 2018· 78.2% built
- Shankar Heights Phase 2 Krishna Wing7.6 yr overdueLaxmi Kamal Associates · Ambarnath, ThaneP51700010806· 90.5% built
- ARIHANT AMISHA PHASE I7.6 yr overdueARIHANT AASHIYANA PRIVATE LIMITED · Panvel, RaigarhP52000008203· 89.1% built
- Disha Heights7.6 yr overdueDinesh Prabhakar Baravkar · Daund, PuneP52100009125· 84.1% built
- Welhome Galaxy Phase 17.6 yr overdueWelhome Properties · WAGHOLI, PuneP52100013204· 72.7% built
- Sun Orchid7.6 yr overdueMOHAMMED SIRAJ BASHEER · Thane, ThaneP51700013513· 90.9% built
- TRADEMARK LIFE7.6 yr overdueNEW FRONT PRABHAVEE VENTURES · Mulshi, PuneP52100008152· filed Mar 2018 → now Dec 2018· 90% built
- GOLDEN BELLS PHASE II7.6 yr overduePIONEER CONSTRUCTIONS · Haveli, PuneP52100003229· 90.9% built
- VIHANG APPARTMENT7.6 yr overdueSUDHAKAR DEVELOPERS PVT. LTD. · Kolhapur (M Corp.), KolhapurP53000000963· 81.8% built
- ASHAR 16 WING D PHASE II7.6 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001926· 90.9% built· 1 complaint
- SHREERAM LOTUS7.6 yr overdueR G Developers · LOHGAON, PuneP52100008339· 18.2% built
- Payal Palace7.6 yr overdueNanji Murji Dama · near ramseth thakur stadium, RaigarhP52000009512· 90.9% built
- MY SKY RESIDENCY PHASE I7.6 yr overdueASHAPURA ABODE · Dhamote, RaigarhP52000001455· 61.4% built
- Marvel Fuego7.6 yr overdueMARVEL REALTORS AND DEVELOPERS LTD · Hadapsar, PuneP52100006192· 86.4% built· 5 complaints
- Atria Business Center7.6 yr overdueAtria Developers · Baramati (M Cl), PuneP52100001547· 81.8% built
- ASMANT7.6 yr overdueKULKARNI SCHEME · Sus, PuneP52100006724· 90.9% built
- PRAGATI NIVAS7.6 yr overduePRAGATI DEVELOPERS · Ulawe, RaigarhP52000007296· 74.9% built
- Palladium Exotica Phase- II- D7.6 yr overduePalladium Developers ·P52100004221· 81.8% built
- MANGAL VATIKA7.6 yr overdueUMA CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100005578· 90.9% built
- PATIL REGENCYS AVDHOOT7.6 yr overdueHEMANT ARVIND MAHAJAN · YEWLEWADI, PuneP52100015276· 57.7% built
- LAXMI NAGAR PHASE I7.6 yr overdueVijayalaxmi Developers · Shendraban, AurangabadP51500003708· 90.9% built
- SHIVGIRI CO OP HSG SOC LTD7.6 yr overdueHEALTH COLONIES & CONSTRUCTION PVT.LTD. · Kurla, Mumbai SuburbanP51800002023· 90.9% built
- MARVEL ARCO B BUILDING7.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100008708· 75.9% built· 4 complaints
- Vasukamal Samruddhi7.6 yr overdueVasukamal & Associates · Jalgaon, JalgaonP49900000069· 87.3% built· 1 complaint
- Shri Sai Palace7.6 yr overdueAbhijit Madhukar Jagtap · Saswad Rural, PuneP52100005801· 16.7% built
- BALAJI INFINITY7.6 yr overdueBalaji Infinity · Baner, PuneP52100004356· 90.9% built· 1 complaint
- MONTECITO PHASE I - D BUILDING PART 27.6 yr overdueAmit Vastu Ventures LLP · Parvati, PuneP52100008717· 86.9% built· 16 complaints
- Riddhi Siddhi Greens7.6 yr overdueRiddhi Siddhi Realtors · Palghar, PalgharP99000003664· 81.8% built
- DHARMANATH KRUPA7.6 yr overdueBALI LANDMARKS LLP · Borivali, Mumbai SuburbanP51800007747· 90.9% built
- Dattnath Aangan7.6 yr overdueSheetal Prabhakar Sonawane · Sai Vikaswadi, RaigarhP52000014461· 90.9% built
- RISHITA APARTMENT7.6 yr overdueSHANTI ENTERPRISE · Mira-Bhayandar (M Corp.), ThaneP51700005397· 90.9% built
- NANDVIHAR7.6 yr overdueBhagwati Developers · Khalapur, RaigarhP52000009560· 74.5% built
- Vrindavan Garden - Tulip7.6 yr overdueSairaj Enterprises · Karjat, RaigarhP52000004716· 90.9% built
- SHREE HARI NISARG RESIDENCY7.6 yr overdueSHREE HARI REALTORS · Bopele, RaigarhP52000001148· 90.9% built
- DREAM CITY PROJECT- PHASE I7.6 yr overdueDarshan Erectors Private Limited · Khokurla, BhandaraP50600010003· 44.9% built
- VIHANG HILLS7.6 yr overdueVIHANG ENTERPRISES · Thane (M Corp.), ThaneP51700007590· 95.5% built· 5 complaints
- Paradise7.6 yr overdueOm Sai Riddhi Siddhi Developers · Thane, ThaneP51700008580· 84.5% built
- SAMRUDDHI APARTMENT7.6 yr overdueAMOL ABHIJEET KAMBLE · Nagpur (M Corp.), NagpurP50500011027· 70.5% built
- PINNACOLO7.6 yr overdueSKD REALTY LLP · Thane, ThaneP51700008205· filed Jun 2018 → now Dec 2018· 78.4% built· 1 complaint
- PRABHAT URBANE7.6 yr overdueH.M. ENTERPRISE · Andheri, Mumbai SuburbanP51800002059· 90.9% built
- KALPATARU APARTMENT7.6 yr overdueS.G.CONSTRUCTION · Roha Ashtami (M Cl), RaigarhP52000014265· 39.1% built
- SUKHKARTA 27.6 yr overdueIMAGE BUILDERS · Khopoli, RaigarhP52000010927· 75.5% built
- SIMRAN COMPLEX7.6 yr overdueF & R DEVELOPERS · MAHAD, RaigarhP52000012954· 66.4% built· 1 complaint
- HONEY KARTIK TOWER7.6 yr overdueT KHANDWANI BUILDERS AND DEVELOPERS · lakadganj, NagpurP50500015286· 90.5% built
- TULIP RESIDENCY7.6 yr overdueSWAROOP DEVELOPERS · Mawal, PuneP52100004920· 57.3% built
- Golden Trellis F and G7.6 yr overdueGolden Trellis Developments · Baner, PuneP52100006717· 85.2% built
- RICH WOODS7.6 yr overdueJAGRUTI PROMOTORS · Bhosari, PuneP52100004375· 81.8% built
- SHIV GAURI7.6 yr overdueBHOOMI REALTORS · Greater Mumbai (M Corp.) (Part) (802794), Mumbai SuburbanP51800010081· 52.3% built· 1 complaint
- SADGURU KRIPA APARTMENT7.6 yr overdueSADGURU DEVELOPER · Ambarnath, ThaneP51700009917· 40.9% built
- BAYVIEW HEIGHTS7.6 yr overdueHIND CONSTRUCTION · Ward GNorth, Mumbai CityP51900012124· 90.9% built
- DHUNDIRAJ7.6 yr overdueHERAMB CONSTRUCTION · Parnaka, ThaneP51700007802· 90.9% built
- VRINDAVAN7.6 yr overdueNIRMITI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600004972· filed Dec 2017 → now Dec 2018· 89.5% built· 1 complaint
- JYOTI CHSL7.6 yr overdueOssia developers · Borivali -W, Mumbai SuburbanP51800008566· filed Jun 2018 → now Dec 2018· 90.9% built
- CLASSIC BURJ7.6 yr overdueYUNUS ISMAIL UMRETIYA · Ward ABCD, Mumbai CityP51900004100· 68.8% built
- SHEVANTA ENCLAVES7.6 yr overdueP.S.PROMOTERS AND DEVELOPERS · Haveli, PuneP52100008941· 84.1% built
- PARK EXPRESS PHASE II7.6 yr overduePARK EXPRESS JOINT VENTURE · BALEWADI, PuneP52100000939· 68.8% built· 4 complaints
- SAI LEELA7.6 yr overdueJADHAV DEVELOPERS · Pune City, PuneP52100004397· 81.4% built
- FUTURE GOLD7.6 yr overdueFUTURE HOMES DEVELOPERS · Thane, ThaneP51700007006· 90.9% built
- Anika Mangalam7.6 yr overdueArun Sheth Properties · Pune City, PuneP52100002636· 90.9% built
- Joy Alka7.6 yr overdueJoy Realty Limited · Andheri, Mumbai SuburbanP51800000728· 90.9% built
- DNV ARCELIA PH 27.6 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100003478· 67.4% built
- THE RENAISSANCE7.6 yr overdueVAKRATUNDA PROPERTIES · GOVIND NAGAR, NashikP51600006900· 90.9% built
- MAHALAXMI PRASAD BUILDING7.6 yr overdueSUDHEER DADARKAR · Borivali, Mumbai SuburbanP51800002525· 95.5% built
- DNV ARCELIA PH 37.6 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100013972· 79.6% built
- GOKUL HEIGHTS7.6 yr overdueTHAKKAR BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800007528· filed Mar 2018 → now Dec 2018· 81.8% built· 1 complaint
- SHILOH7.6 yr overdueVIRAJ PROPERTIES · Pune City, PuneP52100002763· 55.8% built
- SHAILJEET HEIGHTS7.6 yr overdueMANDAKINI KESHAV TOKRE · Kalyan, ThaneP51700008334· 60.9% built
- saiprakash appartment7.6 yr overdueshweta prakash ambhore · Sundar khed (CT), BuldanaP50000001993· 90.9% built
- Shatavari Apartments7.6 yr overdueWAGHOLIKAR ASSOCIATES · Jalochi, PuneP52100001138· 69.1% built
- Gokul 17.6 yr overdueGokul Infrastructure · Satpur, NashikP51600007108· 71.5% built
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED7.6 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002752· 83.6% built
- SIDDH DARSHAN7.6 yr overdueDEEP ASSOCIATES · Kurla, Mumbai SuburbanP51800006988· 56.4% built
- Ayush Park7.6 yr overdueShubhankar Developers · Talegaon Dabhade (M Cl), PuneP52100012062· 90.9% built
- TULJA ELITE7.6 yr overdueM/S IMAGINE CONSTRO ARTS PRIVATE LIMITED · NERAL, RaigarhP52000015338· 90.9% built
- PLATINUM7.6 yr overdueRohit Infra · KALA KADAK, PuneP52100016424· 90.9% built
- Jadhav Complex7.6 yr overdueDisha Constructions · Wadagaon (CT), PuneP52100010809· 69.1% built
- PPRL Mera Ghar - Building L17.6 yr overdueParakh Plexus Realty Ltd. · Jalgaon (M Corp.), JalgaonP49900001386· 90.9% built
- Sai Pearl Phase 17.6 yr overdueSSD PROMOTERS AND BUILDERS · Pimpale Saudagar, PuneP52100001207· 89.2% built
- Shriniwas Aangan7.6 yr overduePoonam Nilesh Shedge · Haveli, PuneP52100007136· 81.8% built
- SAMRUDHIPALACE7.6 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600010696· 90.9% built
- ELEMENTA7.6 yr overdueAKSHAR LAND DEVELOPERS PRIVATE LIMITED · Tathwade, PuneP52100002903· 89.1% built
- Rite Divine7.6 yr overdueRite Developers Pvt. Ltd. · Borivali, Mumbai SuburbanP51800006927· filed Dec 2017 → now Dec 2018· 97.4% built
- Anmol Nayantara City One Phase 17.6 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000539· 79.6% built· 1 complaint
- NEETA NIWAS CHSL7.6 yr overdueC H PATIL AND SONS LLP · Borivali, Mumbai SuburbanP51800006436· 90.9% built
- GULMOHAR PLAZA7.6 yr overdueSUNIL UTTAMRAO FURDE · Residential, SolapurP52600007621· 90.9% built
- ADITYA APARTMENTS7.6 yr overdueNAVIN NARANJI JAIN · Bapsai, ThaneP51700010512· 90.9% built
- SHARAYU CLASSIC7.6 yr overdueANIL GULABRAO PAWAR · Pune City, PuneP52100001503· 63.6% built
- AMI CHSL7.6 yr overdueMEHTA GROUP · Borivali, Mumbai SuburbanP51800008106· 72.7% built
- Basil Park A and B Wing7.6 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100002663· 81.8% built
- VIRANGULA CHS LTD7.6 yr overdueRISHABRAJ HOUSING · Borivali, Mumbai SuburbanP51800004450· 85.9% built
- SABARI SHAAN7.6 yr overdueShankheshwar Properties Pvt Ltd · Kurla, Mumbai SuburbanP51800010056· 93.2% built· 1 complaint
- WHITE WOODS7.6 yr overdueShagun Realty · ULWE, RaigarhP52000001185· 90.9% built
- Shri Krishna Kunj CHS Ltd7.6 yr overdueEllora Developers · Andheri, Mumbai SuburbanP51800001311· 90.9% built
- SPRINGS PLAZA7.6 yr overdueSHAKTI CORPORATION · NIBM, PuneP52100012202· 66.4% built
- Shubharambh7.6 yr overdueFive Elements Erectors and landmarks LLP · Pimpri Chinchawad (M Corp.), PuneP52100003800· 90.9% built
- BHAKTI GULMOHAR7.6 yr overdueMEGHASWANA INFRA · Talegaon Dabhade (M Cl), PuneP52100002983· 45.5% built
- DIVYA SHANTI7.6 yr overdueAnand Properties · Sus, PuneP52100006485· 90.9% built
- ARUN APARTMENT7.6 yr overdueZINNIA SPACES PVT LTD · Pune (M Corp.), PuneP52100002034· 65.6% built· 2 complaints
- SAI AANGAN - C WING7.6 yr overdueSHREE SAI CHATRA DEVELOPERS · Badlapur (M Cl), ThaneP51700014326· 36.4% built
- Shree Madhusudan CHSL7.6 yr overdueSpark Builders & Infra Projects Pvt Ltd · Andheri, Mumbai SuburbanP51800005040· filed Dec 2017 → now Dec 2018· 90.9% built
- ICON PRIDE7.6 yr overdueICON INFRA · Khed (CT), SataraP52700002609· 81.8% built
- The Big World7.6 yr overdueSOMAN SUN CITI · Kalyan-Dombivali (M Corp.), ThaneP51700014517· 62.7% built
- DHIREN CO OPERATIVE HOUSING SOCIETY7.6 yr overdueUTKARSH CONSTRUCTION · Kurla, Mumbai SuburbanP51800006902· filed Dec 2017 → now Dec 2018· 90.9% built
- Waheguru Dreams7.6 yr overdueWaheguru Developers · Pimpri Chinchawad (M Corp.), PuneP52100013093· filed Dec 2017 → now Dec 2018· 61.1% built
- Green County Phase II Wing-C7.6 yr overdueAnand Developers · Fursungi, PuneP52100011772· 82.7% built
- Amar CHSL7.6 yr overdueShiva Shakti Enclaves Private Limited · Andheri, Mumbai SuburbanP51800003597· 53.9% built· 2 complaints
- SARA SWAPNANGAN - A4, A5, A6 BUILDINGS7.6 yr overdueSara Infrastructures · MIDC, AurangabadP51500001363· 81.8% built
- SPRING HEIGHTS7.6 yr overdueSHRI GANESH DEVELOPERS · AMBEGAON Bk, PuneP52100003315· 75% built
- Santacruz Prakash CHS Ltd Redevelopment7.6 yr overduePTR Corporations · Andheri, Mumbai SuburbanP51800003452· 90.9% built
- ORCHID RESIDENCES7.6 yr overdueH.K.PUJARA BUILDERS · Andheri, Mumbai SuburbanP51800004540· 90.9% built
- MARSHAL SRISHTI7.6 yr overdueMARSHAL CORPORATION · Kurla, Mumbai SuburbanP51800000296· 90.9% built· 2 complaints
- Kush Sapphire7.6 yr overdueKush Buildcon LLP · Andheri, Mumbai SuburbanP51800007193· 90.9% built
- VISHWESHWAR NAGAR PHASE - 17.6 yr overdueM/S. VISION GROUP · ALANDI, PuneP52100006647· 81.8% built
- SAUBHAGYA DARSHAN7.6 yr overdueSAUBHAGYA BUILDERS · Karanjade, RaigarhP52000003233· 63.6% built
- VRUNDAVAN7.6 yr overdueSHRI LAXMI BALAJI DEVELOPERS · charholi kh, PuneP52100008543· 90.9% built
- GANESHYOG CHS7.6 yr overdueAARUNI HARISHCHANDRA PATIL · Borivali, Mumbai SuburbanP51800006281· 55.5% built
- TREASURE PARK PHRASE -17.6 yr overdueKANAKLAXMI DEVELOPERS · Nashik, NashikP51600006300· filed Dec 2017 → now Dec 2018· 72.7% built
- Runwal Elina7.6 yr overdueRUNWAL DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800000072· filed Dec 2017 → now Dec 2018· 70.3% built· 2 complaints
- KRISHNA HARMONY7.6 yr overdueRADHE KRISHNA BUILDERS · Karanjade, RaigarhP52000003078· 81.8% built
- DISHA CO-OP HOUSING SOCIETY LTD7.6 yr overduePRITESH SANGHVI · Andheri, Mumbai SuburbanP51800000806· 90.9% built
- BALAJI AANGAN SHIVAM-A WING7.6 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700011189· 78.6% built
- HEERA MANEK PRAGATEE ENCLAVE7.6 yr overdueVIKRAM JAYANTILAL BRAHMABHATT · Mumbai City, Mumbai CityP51900012389· 64.5% built
- PATEL ASSOCIATES7.6 yr overduePURSHOTTAM KALUBHAI PATEL · Borivali, Mumbai SuburbanP51800013348· 89.2% built
- SHREE SAMARTH DARSHAN7.6 yr overdueSHREE SAMARTH RESIDENCY · Dhamote, RaigarhP52000001859· 90.9% built
- SONTERRA RESIDENCES7.6 yr overdueJAISONS PROPERTIES LLP · Mulshi, PuneP52100004313· filed Dec 2017 → now Dec 2018· 55% built
- SOLITAIRE INDUSTRIAL ESTATE7.6 yr overdueShelter Construction · Kalyan, ThaneP51700007963· 81.8% built
- Pratham7.6 yr overduePrimary Housing Corporation LLP · Shirur, PuneP52100008426· filed Dec 2017 → now Dec 2018· 89.1% built
- ERASALI DIVINE7.6 yr overdueA A THAIUP ALI ABDUL MADINA · Uran, RaigarhP52000005380· 72.7% built
- LAXMI ICON7.6 yr overdueANIRUDDHA BUILDERS AND DEVELOPERS · Navi Mumbai (M Corp.), ThaneP51700005005· 97.3% built
- GOOD RELATION -WING B7.6 yr overdueSkyrise Enterpirses · Kurla, Mumbai SuburbanP51800000112· 95.5% built
- VEDA PRIVE II7.6 yr overdueVEDA VENTURES · Ahmadnagar (M Corp.), AhmednagarP52200000360· 90.9% built
- PRASANNA SUYASH7.6 yr overduePRASANA SUYASH BUILDERS AND DEVELOPERS · Sundarwadi, AurangabadP51500007449· 36.5% built
- T13 - PHASE OF THE PROJECT COMPRISING BUILDING T12 AND T137.6 yr overdueCavalcade Properties Private Limited · Mohammadwadi, PuneP52100000707· 72.7% built
- SABARI SANGAM WING A7.6 yr overdueMeraki Habitats LLP · Kurla, Mumbai SuburbanP51800001271· 71.8% built
- HERAMB RESIDENCY7.6 yr overdueSHRI SAI DEVELOPERS · Malkapur (NP), SataraP52700012960· 38.2% built
- SHIVSHAKTI7.6 yr overdueSAMARTH ERECTORS & DEVELOPERS · Borivali, Mumbai SuburbanP51800006063· 88.5% built
- RAMKRISHNA NAGARI7.6 yr overdueRAMKRISHNA DEVELOPERS · Narsala, NagpurP50500006674· filed Dec 2017 → now Dec 2018· 79.1% built
- STAR HOMES7.6 yr overdueSTAR HEIGHT BUILDERS LLP · Bokadvira, RaigarhP52000013196· 66.4% built· 2 complaints
- FORTUNE MIGNAS7.6 yr overdueNamla Developers Private Limited · Ward E, Mumbai CityP51900009466· 81.8% built
- SHARDA HEIGHTS7.6 yr overdueNARENDRA JAGDISHPRASAD AGARWAL · Andheri, Mumbai SuburbanP51800006585· 90.9% built
- SHREE HEIGHTS7.6 yr overdueAnuj Vasantrao Mendhule · Brahmapuri (M Cl), ChandrapurP50900012482· 90.5% built
- PARADISE7.6 yr overdueSAFFRON DEVELOPERS · Vevoor, PalgharP99000010941· 90.9% built
- FORTUNE HEIGHTS7.6 yr overdueSONY NOORIE REALITY · Thane, ThaneP51700009190· 87.7% built
- Rajendra Jhaveri Residence7.6 yr overdueUsha Developers · Borivali, Mumbai SuburbanP51800005957· 54.1% built
- Vrindavan Arcade7.6 yr overdueSHREEJI ENTERPRISES · Bopele, RaigarhP52000013103· 90.9% built
- MANDLIK NAGAR CHS LTD PHASE II REHAB WING E PT AND F7.6 yr overdueTRIUMPH BUILDERS LLP · Borivali, Mumbai SuburbanP51800004077· 46.8% built
- Bindu / Vidyavihar7.6 yr overdueKurla, Mumbai SuburbanP51800002800· 90.9% built
- NINE STAR RESIDENCY PURVA7.6 yr overdueSai Mudraa Construction · Palghar, PalgharP99000007206· 50% built
- SHAKTI UNICUS7.6 yr overdueRAHEJA & CO · Mumbai, Mumbai SuburbanP51800004839· 90.9% built
- SATYAM APARTMENT7.6 yr overdueSHANTI DEVELOPERS · Taloje Panchnad, RaigarhP52000012326· 45% built
- RIDDHI SIDDHI COMPLEX7.6 yr overdueRIDDHI SIDDHI COMPLEX · Vadgaon Kasaba, KolhapurP53000013964· 90.9% built
- CHAITANYA PRIDE7.6 yr overdueCHAITANYA DEVELOPERS · Daund (M Cl), PuneP52100004999· 38.2% built
- SHREEMAN RESIDENCY7.6 yr overdueOM ENTERPRISES · MANDA, ThaneP51700011833· 90.9% built
- Green Acre- Phase II7.6 yr overdueDharti Developers · Vakadi, RaigarhP52000000697· 67.3% built
- LOTUS7.6 yr overdueCREATIONPROPERTIES · Sangli Miraj Kupwad (M Corp.), SangliP53100003144· 38.2% built
- PRIDE RESIDENCY DAFFODIL7.6 yr overdueSAHIL DEVELOPERS · Thane, ThaneP51700004934· 90.9% built
- Antheia C27.6 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000249· 60.7% built
- 5P ARIA7.6 yr overdue5P Developers · Neral, RaigarhP52000013706· 73.3% built· 1 complaint
- IMPERIAL HEIGHTS7.6 yr overdueSHYAM BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000009768· 67.3% built
- Halai Constructions7.6 yr overdueHalai Constructions · Andheri, Mumbai SuburbanP51800010271· 89.5% built
- RAI S HERITAGE D Wing7.6 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700009044· 54.5% built
- Kingston Serene B1 Building Phase 17.6 yr overdueVedant Realtors · Handewadi, PuneP52100006952· 90.9% built· 1 complaint
- VIGHNAHARTA DEVELOPER7.6 yr overdueVIGHNAHARTA DEVELOPER · Mauje Dapoli, RatnagiriP52800011598· 62.3% built
- BELLEZZA7.6 yr overdueSIDDHISHREE BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100002229· 81.8% built
- SAI SHRADDHA RESIDENCY7.6 yr overdueSANCHIT BUILDERS AND INFRASTRUCTURE DEVELOPERS · Amravati, AmravatiP50300010853· 67.3% built
- SHREE TIRUMALA SWASTIK APARTMENT7.6 yr overdueROONGTA HOMES LLP · Indiranagar, NashikP51600005646· 90.9% built
- REDWOOD ICON7.6 yr overdueREDWOOD BUILDCON · Pen (M Cl), RaigarhP52000009374· 54.5% built
- Kunal Aspiree Phase II7.6 yr overdueKunal Spaces Pvt Ltd · Balewadi, PuneP52100001814· 90.9% built
- Zafeera Estates7.6 yr overdueZafeera Estates · Chiplun (M Cl), RatnagiriP52800004349· 83.6% built
- EVERSHINE MADHUVAN7.6 yr overdueEVERSHINE BUILDERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000687· 90.9% built
- Tembhurni Prime City Mall - Wing - A - GF And FF - Phase - A17.6 yr overdueDhariwal And Chhoriya Buildcon Pvt Ltd · Tembhurni, SolapurP52600006058· filed Jun 2018 → now Dec 2018· 90.9% built
- PEARL BELLEZA7.6 yr overdueCHEMBUR HOTELS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800001897· 77.7% built
- Saarvi Corner7.6 yr overdueSaarvi Infratech · Thane, ThaneP51700002720· 9.6% built
- Kohinoor Shangrila Phase I7.6 yr overdueKOHINOOR PROPERTIES · PIMPRI, PuneP52100011483· filed Dec 2017 → now Dec 2018· 90.9% built· 1 complaint
- Durvankur Srushti7.6 yr overdueDurvankur Vastunirmiti Private Limited · NARHE, PuneP52100010911· 89.5% built
- Anmol Nayantara City One Phase 37.6 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000354· 69.8% built
- ARADHYA RESIDENCY7.6 yr overdueMEERA DEVELOPERS · KARANJADE, RaigarhP52000006254· 81.8% built
- SAIRAJ COMPLEX7.6 yr overdueSHOBHA ATUL BALGUDE · Baramati (M Cl), PuneP52100003625· 33.3% built
- BALAJI RESIDENCY COMPLEX7.6 yr overdueDev Builders and Developers · Hedutane, RaigarhP52000003419· 90.6% built
- Oasis Insignia Phase-27.6 yr overdueOasis Landmarks · Aurangabad (M Corp.), AurangabadP51500012426· 81.8% built
- Sai Prasad7.6 yr overdueSoham Properties · Rui, AhmednagarP52200010919· 90.9% built
- INFINITI INDUSTRIAL ESTATE I7.6 yr overdueACETRON CONSTRUCTION LLP · Vasai-Virar City (M Corp), PalgharP99000002356· 32.1% built
- SHREE GANESH APARTMENT7.6 yr overdueSAFFRON DEVELOPERS · Ulawe, RaigarhP52000006424· 36.4% built
- BLUE MOON7.6 yr overduePRECISION REALTY · SHINDE CHOWK, SolapurP52600000497· 26.4% built
- LODHA VENEZIA - 49TH TO 65TH FLOOR7.6 yr overdueLodha Developers Limited · Ward FSouth, Mumbai CityP51900005378· 90.9% built· 8 complaints
- VENKATESH GRAFFITI PHASE 27.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100001007· 90.9% built
- SWAMI CHINTAMANI7.6 yr overdueMEENA SADASHIV AGALAVE · GANDHI CHOWK KALYAN WEST, ThaneP51700010673· 40.9% built
- LAXMI HEIGHTS7.6 yr overdueLAXMIDEVI DEVELOPERS · Borivali, Mumbai SuburbanP51800006754· 82.7% built
- Mittal Enclave Mittal Centre Shopping B-37.6 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai, PalgharP99000005104· 72.7% built
- MARVEL ARCO E BUILDING7.6 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100007022· 96.8% built· 3 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.