RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 11 of 61
- Kingston Serene B1 Building Phase 17.9 yr overdueVedant Realtors · Handewadi, PuneP52100006952· 90.9% built· 1 complaint
- OM RESIDENCY APPARTMENT7.9 yr overdueSIDDHIVINAYAK BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012992· 90.9% built
- Windermere Phase 17.9 yr overdueVascon Engineers Ltd · Koregaon ParkP52100003865· 89.5% built
- REDEVELOPMENT OF SHALAKA CHS LTD7.9 yr overdueDINACO RESORTS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009201· 80% built
- Kush Sapphire7.9 yr overdueKush Buildcon LLP · Andheri, Mumbai SuburbanP51800007193· 90.9% built
- ARKADE ART PHASE 17.9 yr overdueARKADE REALTY · Thane, ThaneP51700004429· 72% built· 12 complaints
- DIVYA HEIGHTS7.9 yr overdueSAI HOMES DEVELOPERS · Karanjade, RaigarhP52000013582· filed Dec 2017 → now Dec 2018· 90.9% built· 2 complaints
- ISHANA ASSOCIATES7.9 yr overdueISHANA ASSOCIATES · Ambegaon, PuneP52100011826· filed Dec 2017 → now Dec 2018· 72.7% built
- SIDDHIVINAYAK GARIMA7.9 yr overdueSIDDHIVINAYAK HOMES · Panvel, RaigarhP52000001125· 89.1% built
- Sanwariya Darshan7.9 yr overdueShyam Sunder Satyanarayan Dad · Kharkopar, RaigarhP52000006340· 90.9% built
- SIMRAN COMPLEX7.9 yr overdueF & R DEVELOPERS · MAHAD, RaigarhP52000012954· 66.4% built· 1 complaint
- Dattnath Aangan7.9 yr overdueSheetal Prabhakar Sonawane · Sai Vikaswadi, RaigarhP52000014461· 90.9% built
- RAJHANS KSHITIJ, ASPEN, WING C7.9 yr overdueAJMERA DEVELOPERS · Vasai, PalgharP99000006700· 90.9% built
- RAI PARADISE7.9 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700012449· 80% built
- Times Square7.9 yr overdueSheth Developers · Hinjavadi (CT), PuneP52100009391· filed Dec 2017 → now Dec 2018· 69.1% built
- MSR SQUARE7.9 yr overdueMind Space Realty Pvt. Ltd. · Pimpri Chinchawad (M Corp.), PuneP52100004881· 90.9% built
- DISHA CO-OP HOUSING SOCIETY LTD7.9 yr overduePRITESH SANGHVI · Andheri, Mumbai SuburbanP51800000806· 90.9% built
- HERAMB RESIDENCY7.9 yr overdueSHRI SAI DEVELOPERS · Malkapur (NP), SataraP52700012960· 38.2% built
- M/s. Shubham Karoti Complex Phase - II7.9 yr overdueM/s. Shubham Karoti Enterprises · Badlapur (M Cl), ThaneP51700012010· 36.4% built
- MUNOTH EMPRESS7.9 yr overdueARHAM DEVELOPERS · Panvel, RaigarhP52000002872· 79.1% built
- Malav Vallencia7.9 yr overdueMALAV PROMOTERS & DEVELOPERS · Khalapur, RaigarhP52000000076· filed Jun 2018 → now Dec 2018· 72.7% built
- AVIGHNA VIHAR 27.9 yr overdueConcept Builders · Godhani (Railway), NagpurP50500012585· 52.7% built
- AMRUT PEARL BUILDING NO. 5 AND 67.9 yr overdueAMRUT BUILDERS · Gauripada, ThaneP51700008092· 90.9% built
- Capital City7.9 yr overdueGDS Buildcon Private Limited · Nighoje, PuneP52100004342· 70.8% built· 1 complaint
- AUDUMBER7.9 yr overdueAADYASHAKTI ENTERPRISES · Thane, ThaneP51700012435· 89.5% built
- TARIQUE SAPPHIRE7.9 yr overdueKOHINOOR DEVELOOPERS AND REALTORS · Panvel, RaigarhP52000010945· 61.8% built
- LOTUS7.9 yr overdueCREATIONPROPERTIES · Sangli Miraj Kupwad (M Corp.), SangliP53100003144· 38.2% built
- GANGADHAR NAGAR A WING7.9 yr overdueONKAR NIVRUTTI MAHALE HUF · Nashik, NashikP51600013925· 55.5% built
- SWAMI CHINTAMANI7.9 yr overdueMEENA SADASHIV AGALAVE · GANDHI CHOWK KALYAN WEST, ThaneP51700010673· 40.9% built
- BAYVIEW HEIGHTS7.9 yr overdueHIND CONSTRUCTION · Ward GNorth, Mumbai CityP51900012124· 90.9% built
- SAI BAN7.9 yr overdueKAILASH NAMDEO KABADE · Wadgaon Kolhati (CT), AurangabadP51500001609· 78.2% built
- VRINDAVAN NIKETAN7.9 yr overduePRAKASH BHOJRAJ SHEWANI · Badlapur (M Cl), ThaneP51700010990· 78.2% built
- OJAS DREAM HOME7.9 yr overdueOJAS BUILD TECH · Nashik, NashikP51600010730· 36.4% built
- DEVAKI COMPLEX7.9 yr overdueDILIP DHARMAJI WAVHAL · Alefata (N.V.), PuneP52100009441· 23.6% built· 1 complaint
- GOKUL HEIGHTS7.9 yr overdueTHAKKAR BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800007528· filed Mar 2018 → now Dec 2018· 81.8% built· 1 complaint
- Ekdant Srushti Phase-17.9 yr overdueSanjeevkumar Harakchand Kankariya · Aurangabad (CB), AurangabadP51500001817· 72.7% built
- M M VALLEY C17.9 yr overdueALFA ENTERPRISES · Thane, ThaneP51700009447· 90.9% built· 5 complaints
- OM YASHWANT PLAZA7.9 yr overdueOMPRAKASH RAMCHANDRA PANDEY · BADLAPUR, ThaneP51700015200· 87.3% built
- THE WOODS7.9 yr overdueVILEENA ALLEN GONSALVES · Vasai, PalgharP99000007560· 90.9% built
- Panvelkar Crown7.9 yr overdueRahul Vijay Panvelkar · Ambarnath, ThaneP51700000598· 90.9% built
- PRAGATI AVENUE7.9 yr overduePRAGATI REALTY · -, RaigarhP52000012345· 68.1% built
- OM KRISHNA HEIGHTS7.9 yr overdueOM KRISHNA INFRA · Ambarnath, ThaneP51700004255· 81.8% built
- OCEAN PEARL7.9 yr overdueOCEAN DEVELOPERS · Palghar, PalgharP99000004132· 37.3% built
- LAXMI HEIGHTS7.9 yr overdueLAXMIDEVI DEVELOPERS · Borivali, Mumbai SuburbanP51800006754· 82.7% built
- MANAS RESIDENCY7.9 yr overdueMANAS ENTERPRISES · Ambarnath, ThaneP51700004698· 65% built
- Dandelia7.9 yr overdueAcme Housing India Private Limited · Thane, ThaneP51700001032· 82.3% built
- MANAV MANDIR7.9 yr overdueTARUN CONSTRUCTION COMPANY · Amravati (M Corp.), AmravatiP50300007094· 60% built
- Indira Niwas Annex7.9 yr overdueShree Swami Krupa Builders and Developers · Thane, ThaneP51700010108· 90.9% built
- DNV ARCELIA PH 37.9 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100013972· 79.6% built
- VIJAY RESIDENCY7.9 yr overdueJAY DEVELOPERS · Aanandwali, NashikP51600007898· 72.7% built
- SHILP KALA7.9 yr overdueSHILP KALA CO-OPERATIVE HOUSING SOCIETY LIMITED · Adarsh Nagar, NashikP51600009737· 81.8% built
- MORAYA APARTMENT7.9 yr overdueSIDDHARTH RAMESH SHAH · Makhmalabad, NashikP51600006906· 81.8% built
- NEW ERA BUSINESS PARK7.9 yr overdueNEW ERA VENTURES · Thane, ThaneP51700005182· 56.4% built
- JAI SHREE SWAMI SAMARTH7.9 yr overdueBhalchandra Vinayak Wadnerkar · Kalyan, ThaneP51700007190· 90.9% built
- NANDAN SHILP7.9 yr overdueNARESHKUMAR JAYANTIBHAI PATEL · PRABHAT NAGAR, NashikP51600009425· 81.8% built
- Matoshree Nandadeep7.9 yr overdueMatoshree Infrastructure Private Limited · Mumbai City, Mumbai CityP51900004442· 65% built
- VAIJNATH7.9 yr overduePRAKASH LELE CONSTRUCTION · Kalyan, ThaneP51700005444· 40.5% built
- Prathamesh Apartment7.9 yr overdueDisha Constructions · Wadagaon (CT), PuneP52100011069· 61.8% built
- VISHWASHANTI7.9 yr overdueVISHWATAMAK ASSOCIATES · DIGHIP52100004268· 81.8% built
- Pratham7.9 yr overduePrimary Housing Corporation LLP · Shirur, PuneP52100008426· filed Dec 2017 → now Dec 2018· 89.1% built
- IMPERIAL HEIGHTS7.9 yr overdueSHYAM BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000009768· 67.3% built
- Shree Ganesh Residency7.9 yr overdueAV Associates · TALEGAON, PuneP52100005787· 90.9% built
- Pankaj Height7.9 yr overdueM/S Volition Investments Private Limited · Ward ABCD, Mumbai CityP51900003718· 85.5% built
- Riddhi Siddhi Greens7.9 yr overdueRiddhi Siddhi Realtors · Palghar, PalgharP99000003664· 81.8% built
- Legacy Urbania7.9 yr overdueLegacy Homes · near Pune Ville, PuneP52100000804· 90.9% built
- AARADHYA SIGNATURE7.9 yr overdueMANMANTRA INFRACON LLP · Ward FNorth, Mumbai CityP51900000049· 78.6% built
- PRAKRUTI TOWERS7.9 yr overdueVISHWAKARMA DEVLOPERS · Shirwal, SataraP52700003997· 81.8% built· 1 complaint
- Saarvi Corner7.9 yr overdueSaarvi Infratech · Thane, ThaneP51700002720· 9.6% built
- Pride Phoenix Building - A7.9 yr overdueABAD ESTATE AOP · Chikalthana, AurangabadP51500000376· 90.9% built· 1 complaint
- REDEVELOPMENT OF GOREGAON PRAKASH C.H.S.LTD.7.9 yr overdueM/S. MADHAV ENTERPRISES · Borivali, Mumbai SuburbanP51800007965· 57.3% built
- AMBER ARCADE7.9 yr overdueMAITRI DEVELOPERS · Badlapur (M Cl), ThaneP51700010130· 81.8% built
- RAUNAK DELIGHT7.9 yr overdueUNNATHI ASSOCIATES · Thane, ThaneP51700002037· 90.9% built
- Grace Luxuria7.9 yr overdueNew India Construction Co · Borivali, Mumbai SuburbanP51800004501· 90.9% built· 3 complaints
- Vasundhara7.9 yr overdueInfinity Construction Co. · Kurla, Mumbai SuburbanP51800000451· 74.5% built
- Sai Pearl Phase 17.9 yr overdueSSD PROMOTERS AND BUILDERS · Pimpale Saudagar, PuneP52100001207· 89.2% built
- PRIDE PALMS MAJESTY A1-B1 PHASE 17.9 yr overdueLARKINS REALTORS · Thane, ThaneP51700006280· 98.6% built
- Gokul 17.9 yr overdueGokul Infrastructure · Satpur, NashikP51600007108· 71.5% built
- SHREESAMARTH APARTMENT7.9 yr overdueSHREEYOG PROPERTIES · WADALA SHIWAR, NashikP51600000748· 90.9% built
- Runwal Elina7.9 yr overdueRUNWAL DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800000072· filed Dec 2017 → now Dec 2018· 70.3% built· 2 complaints
- EVERSHINE MADHUVAN7.9 yr overdueEVERSHINE BUILDERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000687· 90.9% built
- Ambrosia building 37.9 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000006660· 37.3% built· 1 complaint
- The Big World7.9 yr overdueSOMAN SUN CITI · Kalyan-Dombivali (M Corp.), ThaneP51700014517· 62.7% built
- JAY GANESH7.9 yr overdueK.V.CORPORATION · Uran, RaigarhP52000002853· 90.9% built
- Tirupati Garden Phase III7.9 yr overdueRIDDHI SIDDHI CONSTRUCTIONS · Bhagur (M Cl), NashikP51600008472· 90.9% built
- SAMRUDHIPALACE7.9 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600010696· 90.9% built
- VASTUSRUSHTI7.9 yr overdueVASTUSRUSHTI REALTORS LLP · Palghar, PalgharP99000005981· 8.4% built
- NEHRU NAGAR AMRAPALI CHS LTD7.9 yr overdueSAMRUDDHI DEVELOPERS · Kurla, Mumbai SuburbanP51800012607· 85% built
- SUNWINDS COMMERCIAL7.9 yr overdueSANIKET INFRASTRUCTURES · Bavdhan Kh., PuneP52100002154· filed Feb 2018 → now Dec 2018· 90.9% built
- Palaash Icon Phase 17.9 yr overdueG S PROMOTERS · Chinchwad, PuneP52100001017· 90.9% built
- Shatavari Apartments7.9 yr overdueWAGHOLIKAR ASSOCIATES · Jalochi, PuneP52100001138· 69.1% built
- VIJAY SONNET7.9 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011372· 90.9% built
- RAAJ SWAPNAPURTI7.9 yr overdueS RAAJ ASSOCIATES · Tisgaon, AurangabadP51500000594· 89.1% built
- Sahakar Residency7.9 yr overdueSahakar Infracon Projects Private Limited · Vasai, PalgharP51700009131· filed Dec 2017 → now Dec 2018· 90.9% built
- Modispaces Doyle7.9 yr overdueModispaces Real Estate Pvt Ltd · Borivali, Mumbai SuburbanP51800006618· 90.9% built
- SHRIHARI RESIDENCY7.9 yr overdueVIJAYA INFRAVENTURES · NEAR LIONS CONVENT, YavatmalP51000014550· 73.1% built
- FIA CONSTRUCTION COMPANY - FIA PRIDE7.9 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000000701· 90.9% built
- AAIJI HILLS7.9 yr overdueOM SAI DEVELOPERS · KARANJADE, RaigarhP52000010921· 65.6% built
- ASTRIA RESIDENCY7.9 yr overdueANIL BALKRUSHNA KATE · Wakad, PuneP52100007808· 63.6% built
- UNIVERSAL PARADISE A AND B7.9 yr overduePAGARANI UNIVERSAL INFRASTRUCTURE PVT LTD · Andheri, Mumbai SuburbanP51800003121· 88% built
- Vrundavan Homes Wing A7.9 yr overduePrapti Spaces · Alandi Rural, PuneP52100005873· 81.4% built
- Gandhaar7.9 yr overdueAlliance Properties · Pune (M Corp.), PuneP52100011029· 79.1% built
- ORCHID SQUARE PHASE 27.9 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Thane, ThaneP51700006658· 81.8% built
- Shree Sai Jalaram Builders and Developers7.9 yr overdueShree Sai Jalaram Builders & Developers · Thane, ThaneP51700016463· 70.9% built
- Mauli Residency7.9 yr overdueMauli Enterprises · Panvel, RaigarhP52000007675· 90.9% built
- SAUBHAGYA DARSHAN7.9 yr overdueSAUBHAGYA BUILDERS · Karanjade, RaigarhP52000003233· 63.6% built
- Adhya Rohan7.9 yr overdueADHYA PROPERTIES · Ambegaon, PuneP52100001122· 60.6% built· 1 complaint
- INSIGNIA7.9 yr overdueShagun Realty · Ulawe, RaigarhP52000005695· 48.6% built
- NINE STAR RESIDENCY PHALGUNI7.9 yr overdueKRISHA CONSTRUCTIONS · Palghar, PalgharP99000007286· 81.8% built
- Gurudev Heights7.9 yr overdueAmit Gangadhar Jadhav · Indiranagar, NashikP51600003352· 90.9% built
- SHILOH7.9 yr overdueVIRAJ PROPERTIES · Pune City, PuneP52100002763· 55.8% built
- LIGHTHALL D WING7.9 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800002737· 90.9% built
- DHARIYA CORNER7.9 yr overdueANKIT ARVIND DHARIYA · Mahad (M Cl), RaigarhP52000013074· 64.5% built· 2 complaints
- 21 HILLS7.9 yr overdueAMAR DEVELOPERS · Borivali, Mumbai SuburbanP51800006364· filed Jun 2018 → now Dec 2018· 93.2% built
- JASWANT HEIGHTS7.9 yr overdueL NAGPAL DEVELOPERS · Andheri, Mumbai SuburbanP51800006497· 72.7% built
- NANDANVAN GARDEN APARTMENT7.9 yr overdueSHREE ASSOCIATES · Nashik (M Corp.), NashikP51600011042· 81.8% built
- NANDVIHAR7.9 yr overdueBhagwati Developers · Khalapur, RaigarhP52000009560· 74.5% built
- VRUNDAVAN7.9 yr overdueBHAISHREE VENTURES · NEAR ZP SCHOOL, AurangabadP51500003771· 78.2% built
- Pushkar Govind and Narayan Apartment7.9 yr overduePushkar Homes Private Limited · Zinga Bai Takli, NagpurP50500005009· filed Dec 2017 → now Dec 2018· 72% built
- MULTAN HEIGHTS7.9 yr overdueS D BHALERAO CONSTRUCTIONS PVT LTD · Andheri, Mumbai SuburbanP51800012470· 90.9% built
- SILVER HEIGHTS7.9 yr overdueTITANIC PROMOTERS AND DEVELOPERS · Mawal, PuneP52100002577· 36.4% built· 1 complaint
- VASUDEV APARTMENT7.9 yr overdueJAY BALAJI BUILDCON · Nashik (M Corp.), NashikP51600010213· 86.8% built
- SUBHADRA APARTMENT7.9 yr overdueSPM UNIQUE CONSTRUCTION · Dhamandivi, RatnagiriP52800005997· 37.5% built
- Laxmi Dhule Complex7.9 yr overdueDhule Construction Co · Vasai, PalgharP99000012699· 82% built
- SHREE SIDDHI VINAYAK APPARTMENT7.9 yr overdueRIDDHI SIDDI DEVELOPERS · Nashik (M Corp.), NashikP51600004980· 90.9% built
- SB Paradise7.9 yr overdueS B GROUP · Sangli Miraj Kupwad (M Corp.), SangliP53100013929· 61.8% built
- HONEY KARTIK TOWER7.9 yr overdueT KHANDWANI BUILDERS AND DEVELOPERS · lakadganj, NagpurP50500015286· 90.5% built
- ASHAR 16 WING D PHASE II7.9 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001926· 90.9% built· 1 complaint
- NIRMANA ENCLAVE7.9 yr overdueNIRMANA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100001680· 90.9% built
- MY SKY RESIDENCY PHASE I7.9 yr overdueASHAPURA ABODE · Dhamote, RaigarhP52000001455· 61.4% built
- AMI CHSL7.9 yr overdueMEHTA GROUP · Borivali, Mumbai SuburbanP51800008106· 72.7% built
- LOTUS COURT7.9 yr overdueBORA HOSPITALITY LLP · panchwati, NashikP51600002017· 70.9% built
- Vastu shilp7.9 yr overdueShilp Buildcon · Nashik (M Corp.), NashikP51600007256· 45.5% built· 1 complaint
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED7.9 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002752· 83.6% built
- Zafeera Estates7.9 yr overdueZafeera Estates · Chiplun (M Cl), RatnagiriP52800004349· 83.6% built
- SADGURU KRIPA APARTMENT7.9 yr overdueSADGURU DEVELOPER · Ambarnath, ThaneP51700009917· 40.9% built
- 40 Hyde Park7.9 yr overdueViraj Properties · Pune (M Corp.), PuneP52100003914· 90.9% built
- Trimurti Residency7.9 yr overdueTrimurti Construction Co · Thane, ThaneP51700005837· 62.7% built
- Anika Mangalam7.9 yr overdueArun Sheth Properties · Pune City, PuneP52100002636· 90.9% built
- VIJAY ROYAL7.9 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011816· 81.8% built
- VAIBHAVLAXMI APPARTMENT7.9 yr overduePETHE BUILDERS AND DEVELOPERS PVT LTD · Nagpur (M Corp.), NagpurP50500012874· 81.8% built
- SOLITAIRE7.9 yr overdueKAPIL NANDKISHOR NATHANI · Nagpur (M Corp.), NagpurP50500012837· 81.8% built
- Venkatesh Paradise A Wing7.9 yr overdueSANJAY DNYANOBA JAGTAP · Pisoli, PuneP52100001162· 89.1% built· 3 complaints
- Chembur Shri Sai Shraddha CHS7.9 yr overdueUnity Land Consultancy · Opp. Kurla ST Depot, Mumbai SuburbanP51800009369· 81.4% built
- MANGALMURTI DARSHAN7.9 yr overdueMANGALMURTI ASSOCIATES · Karjat, RaigarhP52000005588· 81.8% built
- Palace Orchids Phase-I7.9 yr overdueSiddhant Infrastructure · Raman Mala,, KolhapurP53000000108· 90.9% built
- Zion7.9 yr overdueSai Mahaavir Developers · Panvel, RaigarhP52000001426· 90.9% built
- GURUKUL RESIDENCY7.9 yr overdueSHREE BRAMHA ENTERPRISES · Mamdapur, RaigarhP52000011499· 21.8% built
- MYRIAX TOWER7.9 yr overdueMYRIAX INFRATECH PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800007754· 72.7% built
- ANANDI NIWAS7.9 yr overdueSuniti Developers · Kolhapur (M Corp.), KolhapurP53000012050· filed Dec 2017 → now Dec 2018· 81.8% built
- CITY LAKE VIEW7.9 yr overdueRAJESH GAJANAN DESHMANE · Sangli Miraj Kupwad (M Corp.), SangliP53100011413· 33.6% built
- Madhukunj CHS Ltd7.9 yr overdueKurla, Mumbai SuburbanP51800005882· 81.6% built
- ESSENTIA7.9 yr overdueShagun Realty · Ulawe, RaigarhP52000001961· 55% built
- Dattakrupa Apartment7.9 yr overdueVaibhav Vijay Naik HUF · Kankavali, SindhudurgP52900011920· 90.9% built
- HILLMIST RESIDENCY7.9 yr overdueABBAS AHMED DALVI · Dapoli Camp, RatnagiriP52800012644· 50% built
- Riddhi Siddhi7.9 yr overdueSHREEJI & INNOVATIVE DEVELOPERS · Badlapur (M Cl), ThaneP51700012445· 81.8% built
- MAHALAXMI PRASAD BUILDING7.9 yr overdueSUDHEER DADARKAR · Borivali, Mumbai SuburbanP51800002525· 95.5% built
- Vighnaraj Apartment7.9 yr overdueShri Samarth Builders & Developers · Ratnagiri (M Cl), RatnagiriP52800002303· 90.9% built
- Ozarde Complex7.9 yr overdueOnkar Developers · Baramati (M Cl), PuneP52100009428· 80% built
- Mittal Enclave Mittal Centre Shopping B-17.9 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai-Virar City (M Corp), PalgharP99000008632· 72.7% built
- Subham Bileshwar7.9 yr overdueSubham Developers · Ghatkopar (East), Mumbai SuburbanP51800013930· 90.9% built
- Skyways Sereno7.9 yr overduePranam Associates · LOHGAON, PuneP52100002552· 85.8% built
- BHAMA PEARL7.9 yr overdueAASTHA INFRA BUILDCON · Pune (M Corp.), PuneP52100007480· 42.3% built· 3 complaints
- Payal Palace7.9 yr overdueNanji Murji Dama · near ramseth thakur stadium, RaigarhP52000009512· 90.9% built
- RAUNAK CITY SECTOR II - B77.9 yr overdueRAUNAK CORPORATION · Kalyan, ThaneP51700006182· 90.9% built
- SANSKAR SAMRUDDHI7.9 yr overdueSANSKAR SAMRUDDHI · Haveli, PuneP52100005048· 90.9% built
- SPRINGS PLAZA7.9 yr overdueSHAKTI CORPORATION · NIBM, PuneP52100012202· 66.4% built
- MSR REGENCY7.9 yr overdueBhandari Infrastructure & Construction Development Pvt. Ltd. · Pune (M Corp.), PuneP52100004593· filed Jul 2018 → now Dec 2018· 90.9% built
- GREEN PARADISE7.9 yr overdueCREATIONPROPERTIES · Sangli Miraj Kupwad (M Corp.), SangliP53100003467· 38.2% built
- RIVER BREEZE7.9 yr overduePUSHPA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013499· filed Dec 2017 → now Dec 2018· 80.9% built
- Antheia C27.9 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100000249· 60.7% built
- TULJA ELITE7.9 yr overdueM/S IMAGINE CONSTRO ARTS PRIVATE LIMITED · NERAL, RaigarhP52000015338· 90.9% built
- BELLEZZA7.9 yr overdueSIDDHISHREE BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100002229· 81.8% built
- OM SIDDHI7.9 yr overdueRamesh Baliba Karanjawane · Haveli, PuneP52100012876· 70.9% built
- WHITE CARNATION7.9 yr overdueSPS CONSTRUCTION · ULWE, RaigarhP52000001088· 90.9% built
- LABH SHRIVALLI7.9 yr overdueLABHARTI INFRASTRUCTURE · Andheri, Mumbai SuburbanP51800012182· 84.5% built
- Gurnani Palms Wing A7.9 yr overdueInterintel Constructions · Andheri, Mumbai SuburbanP51800005611· 90.8% built
- SHREE KRUPA HEIGHTS7.9 yr overdueShree Krupa Builders & Developers · Kalyan, ThaneP51700004754· 81.8% built· 1 complaint
- THE BLUE PLAQUES7.9 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100000688· 90.9% built
- AARADHYA ONE7.9 yr overdueAM DEVELOPERS · Kurla, Mumbai SuburbanP51800000333· 89.4% built
- 7 Avenues7.9 yr overdueSai Innovision Associates · Baner, PuneP52100004977· 56.2% built
- PRAYOG7.9 yr overduePSC PROPERTIES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001932· filed Dec 2017 → now Dec 2018· 86.4% built· 2 complaints
- Stella Sapphire B WIng7.9 yr overdueVaibhavLaxmi Builders and Developers · Kurla, Mumbai SuburbanP51800003333· 89.1% built
- SAI VISHWA7.9 yr overdueHARIVISHWA BUILDER · Chiplun (M Cl), RatnagiriP52800013629· 35.5% built
- RAJHANS KSHITIJ IRIS WING E F G7.9 yr overduePRAGATI INFRASTRUCTURES · Vasai, PalgharP99000003532· 86.4% built
- BHAIRAAV MILESTONE7.9 yr overdueSharpmind Consultancy Services Private Limited · Thane, ThaneP51700015119· 55% built
- Grace Heritage7.9 yr overdueGrace Gharunda · Andheri, Mumbai SuburbanP51800008493· 90.9% built
- Jadhav Complex7.9 yr overdueDisha Constructions · Wadagaon (CT), PuneP52100010809· 69.1% built
- SIDDHIVINAYAK HERITAGE7.9 yr overdueSIDDHIVINAYAK DEVELOPERS · Panvel, RaigarhP52000002557· 90.9% built
- Bindu / Vidyavihar7.9 yr overdueKurla, Mumbai SuburbanP51800002800· 90.9% built
- JIJABAI PARK7.9 yr overdueDNYANESHWAR MAULI BUILDER & DEVELOPERS · Badlapur (M Cl), ThaneP51700006524· 54.5% built
- Gajanan Plaza Apartment7.9 yr overdueMahesh Joshi & Narendra Kulkarni Associates · Indira Nagar, NashikP51600004168· 90.9% built
- Sunshine Phase II7.9 yr overdueSTAR DEVELOPERS · Vasai, PalgharP99000003797· filed Dec 2017 → now Dec 2018· 63.6% built
- SHREE SAMARTH DARSHAN7.9 yr overdueSHREE SAMARTH RESIDENCY · Dhamote, RaigarhP52000001859· 90.9% built
- Shantiniketan Wing A7.9 yr overdueAnmol Associates · Kalyan, ThaneP51700010899· 87.2% built
- SHAHS GOVIND APARTMENT PHASE I7.9 yr overdueSHAH BUILDERS AND DEVELOPERS · NEAR RENUKA MATA MANDIR, NashikP51600007197· 72.7% built
- Atria Business Center7.9 yr overdueAtria Developers · Baramati (M Cl), PuneP52100001547· 81.8% built
- Nirman Ajinkyatara7.9 yr overdueNIRMAN DEVELOPERS · Ambegaon Budruk, PuneP52100002423· 72% built· 1 complaint
- SAI NIWAS7.9 yr overdueMEDAPARAMPIL GANGADHARAN SADASHIVAN · Bamandongri, RaigarhP52000011554· 9.1% built
- BLUE MOON7.9 yr overduePRECISION REALTY · SHINDE CHOWK, SolapurP52600000497· 26.4% built
- ROHAN ABHILASHA BUILDING A7.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000471· 88.8% built· 3 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.