RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 13 of 61
- Nakshatra7.9 yr overdueKrishnaraj Developers · Kasar Amboli, PuneP52100006627· 88.2% built
- REDEVELOPMENT OF SHALAKA CHS LTD7.9 yr overdueDINACO RESORTS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009201· 80% built
- Anand Baug Building D7.9 yr overdueSankalp Developers · Sasvad (M Cl), PuneP52100010296· 53.6% built
- RAJVEE PARK7.9 yr overdueVitthal Purushottam Sarap · Malkapur (CT), AkolaP50100013464· 38.5% built· 1 complaint
- PRIDE PALMS MAJESTY A1-B1 PHASE 17.9 yr overdueLARKINS REALTORS · Thane, ThaneP51700006280· 98.6% built
- FIA CONSTRUCTION COMPANY - FIA PRIDE7.9 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000000701· 90.9% built
- VIRAJBLISS7.9 yr overdueVIJAY RAJ ESTATES · Andheri, Mumbai SuburbanP51800001355· 81.8% built
- SHREE SARASWATI CHSL PLOT 8 A7.9 yr overdueNav Durga Construction Company · Kurla, Mumbai SuburbanP51800001302· 50.9% built
- AVIGHNA VIHAR 27.9 yr overdueConcept Builders · Godhani (Railway), NagpurP50500012585· 52.7% built
- KOTESHWARI HERITAGE7.9 yr overduePDDEVELOPERS · Murud Janjira (M Cl), RaigarhP52000008481· 67.7% built
- ASMANT7.9 yr overdueKULKARNI SCHEME · Sus, PuneP52100006724· 90.9% built
- VIJAY SONNET7.9 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011372· 90.9% built
- Yashada Residency7.9 yr overdueAgresar Construction · Daund, PuneP52100002610· 37.2% built
- ORCHID SQUARE PHASE 27.9 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Thane, ThaneP51700006658· 81.8% built
- QUEENSLAND7.9 yr overdueMOTI UDHARAM PANJABI · Moshi-Boradewadi, PuneP52100001606· 86.5% built
- SHIVALAY RESIDENCY7.9 yr overdueRAJU GHANSHYAM PURSWANI · Varasoli, RaigarhP52000006833· 46.4% built
- SHAHS GOVIND APARTMENT PHASE I7.9 yr overdueSHAH BUILDERS AND DEVELOPERS · NEAR RENUKA MATA MANDIR, NashikP51600007197· 72.7% built
- VEDANT PINAKIN7.9 yr overdueVEDANT BUILDERS · MANJARI Bk, PuneP52100009780· 65.5% built
- AARADHYA SIGNATURE7.9 yr overdueMANMANTRA INFRACON LLP · Ward FNorth, Mumbai CityP51900000049· 78.6% built
- Shhraddha Ellegance Building C7.9 yr overdueShhraddha Properties · Bale, SolapurP52600000708· 90.9% built
- SPOT 97.9 yr overdueRAMNIKLAL GOPAL GANGANI · Wadagaon (CT), PuneP52100006534· 90.9% built
- VENU ENCLAVE7.9 yr overdueOM SAI BUILDER & DEVELOPERS · Nagpur (M Corp.), NagpurP50500010162· 81.8% built
- HILLMIST RESIDENCY7.9 yr overdueABBAS AHMED DALVI · Dapoli Camp, RatnagiriP52800012644· 50% built
- PARADISE HEIGHT7.9 yr overdueFRIENDS GROUP · Thane, ThaneP51700009471· 90.9% built
- WHITE CARNATION7.9 yr overdueSPS CONSTRUCTION · ULWE, RaigarhP52000001088· 90.9% built
- THE RENAISSANCE7.9 yr overdueVAKRATUNDA PROPERTIES · GOVIND NAGAR, NashikP51600006900· 90.9% built
- INSIGNIA7.9 yr overdueShagun Realty · Ulawe, RaigarhP52000005695· 48.6% built
- NEETA NIWAS CHSL7.9 yr overdueC H PATIL AND SONS LLP · Borivali, Mumbai SuburbanP51800006436· 90.9% built
- Jadhav Complex7.9 yr overdueDisha Constructions · Wadagaon (CT), PuneP52100010809· 69.1% built
- ORION SQUARE TYPE C7.9 yr overdueSQUARE FEET REAL ESTATE · Ambarnath, ThaneP51700009388· 81.8% built
- DIVYA SHANTI7.9 yr overdueAnand Properties · Sus, PuneP52100006485· 90.9% built
- VINAYAK SAI RESIDENCY47.9 yr overdueSAI BUILT CON · Pen (M Cl), RaigarhP52000001360· 80% built
- Palladium Exotica Phase- II- D7.9 yr overduePalladium Developers ·P52100004221· 81.8% built
- AASTHA7.9 yr overdueRADHE DEVELOPERS · Haveli, PuneP52100014227· 55.1% built
- SHREE SAMARTH DARSHAN7.9 yr overdueSHREE SAMARTH RESIDENCY · Dhamote, RaigarhP52000001859· 90.9% built
- Whitespring7.9 yr overdueCCI PROJECTS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800002287· 99.2% built· 10 complaints
- SHREE GANESH APARTMENT7.9 yr overdueSAFFRON DEVELOPERS · Ulawe, RaigarhP52000006424· 36.4% built
- MARVEL ARCO B BUILDING7.9 yr overdueMARVEL SIGMA HOMES PRIVATE LIMITED · Hadapsar, PuneP52100008708· 75.9% built· 4 complaints
- SIDDHIVINAYK TOWER7.9 yr overdueROYAL FANTASY BUILDERS AND DEVELOPERS · SATARA, SataraP52700004438· 90.9% built
- Sai Aanand Plaza7.9 yr overdueVishwas Builders & Developers · Nashik (M Corp.), NashikP51600008613· 80.5% built
- Palazzio7.9 yr overdueSpenta Builders Private Limited · Kurla, Mumbai SuburbanP51800002414· filed Dec 2017 → now Dec 2018· 90.9% built· 15 complaints
- AISHWARYA LAXMI7.9 yr overdueOM SIDDHAKALA ASSOCIATES · WAGHOLI, PuneP52100005746· filed Dec 2017 → now Dec 2018· 90.9% built
- Venkatesh Paradise A Wing7.9 yr overdueSANJAY DNYANOBA JAGTAP · Pisoli, PuneP52100001162· 89.1% built· 3 complaints
- SHIVANK7.9 yr overdueNABAR ASSOCIATES · Pune City, PuneP52100009452· filed Dec 2017 → now Dec 2018· 90.9% built
- MANAS VASUDHA7.9 yr overdueM/S SHREE MANAS DEVELOPRS · Thane, ThaneP51700003568· 82.7% built
- Mittal Enclave Mittal Centre Shopping B-17.9 yr overdueSealink Construction Co. Pvt. Ltd. · Vasai-Virar City (M Corp), PalgharP99000008632· 72.7% built
- Swapnalok Nagari Building no. 34,35,36,377.9 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100001827· 90.9% built
- RAAJ SWAPNAPURTI7.9 yr overdueS RAAJ ASSOCIATES · Tisgaon, AurangabadP51500000594· 89.1% built
- Shree Siddhi Properties7.9 yr overdueShree SiddhProperties · Kolhapur (M Corp.), KolhapurP53000006146· 74.1% built
- Aum Apartment7.9 yr overdueDRS Constructions LLP · WAGHOLI, PuneP52100011615· filed Dec 2017 → now Dec 2018· 90.7% built
- Aayush Park II7.9 yr overdueEarnest and Shah Ventures · Varale, PuneP52100000222· 81.8% built
- GANRAYA PLAZA7.9 yr overdueVASANT VISHNU BANKHELE WITH ATUL BALIRAM THORAT ASSOCIATION OF PERSONS · Ambegaon, PuneP52100009301· 64.5% built
- Zion7.9 yr overdueSai Mahaavir Developers · Panvel, RaigarhP52000001426· 90.9% built
- AMBER ARCADE7.9 yr overdueMAITRI DEVELOPERS · Badlapur (M Cl), ThaneP51700010130· 81.8% built
- PROBO PROLIX PRIDE7.9 yr overduePRADNYESH DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100004907· 76.7% built
- Unnatti Anmol7.9 yr overdueUnnatti Infra · Palghar, PalgharP99000004567· 72.7% built
- KOHINOOR7.9 yr overdueSALEJI CONSTRUCTION PRIVATE LIMITED · Khalapur, RaigarhP52000009096· 89.1% built
- JYOTI MONTERIO PHASE 17.9 yr overdueJeevan Jyoti Builders and Developers · Japhale, KolhapurP53000001496· 53.6% built
- Ekaaksh7.9 yr overdueNaman Associates · Pune City, PuneP52100005372· filed Mar 2018 → now Dec 2018· 90.9% built
- YASH COMPLEX7.9 yr overdueYASH DEVELOPERS · Pen (M Cl), RaigarhP52000010152· 62.7% built
- MRUNALI PARADISE7.9 yr overdueTUKARAM BARKU MHATRE · Badlapur (M Cl), ThaneP51700007167· 53.2% built
- Durvankur Srushti7.9 yr overdueDurvankur Vastunirmiti Private Limited · NARHE, PuneP52100010911· 89.5% built
- Durvankur Apartment7.9 yr overdueVinayak Developers · Haveli, PuneP52100000784· 81.8% built
- Malav Vallencia7.9 yr overdueMALAV PROMOTERS & DEVELOPERS · Khalapur, RaigarhP52000000076· filed Jun 2018 → now Dec 2018· 72.7% built
- MAA VAISHNAVI RESIDENCY - FLATS7.9 yr overdueMAA VAISHNAVI REAL ESTATE · Umred (M Cl), NagpurP50400002587· 90.9% built
- MAAN PAPPILON7.9 yr overdueMAAN REALTY · Borivali, Mumbai SuburbanP51800003769· 67.7% built· 1 complaint
- DWARKA PROJECT 17.9 yr overdueNAIKNAVAREHOUSINGDEVELOPEMENTSPVTLTD · CHAKAN, PuneP52100000164· 76% built
- Anmol Nayantara City One Phase 17.9 yr overdueBafna Realtors Pvt Ltd · Nashik, NashikP51600000539· 79.6% built· 1 complaint
- HERAMB RESIDENCY7.9 yr overdueSHRI SAI DEVELOPERS · Malkapur (NP), SataraP52700012960· 38.2% built
- BHOSALE MARIGOLD7.9 yr overdueLEENA ARJUN GARAD · Ulawe, RaigarhP52000012668· 90.9% built
- RIVER BREEZE7.9 yr overduePUSHPA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100013499· filed Dec 2017 → now Dec 2018· 80.9% built
- SHIVDARSHAN SRA CHS LTD7.9 yr overdueSHREE SWAMI SAMARTH BUILDERS · Kurla, Mumbai SuburbanP51800011946· 95.3% built
- JAY SHRI KRISHNA SANKUL7.9 yr overdueHariomconstruction · Aurangabad (M Corp.), AurangabadP51500007901· 44.5% built
- NIRMANA ENCLAVE7.9 yr overdueNIRMANA DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100001680· 90.9% built
- Xenia7.9 yr overdueKOLTE-PATIL REAL ESTATE PRIVATE LIMITED ·P52100000575· 90.9% built
- Shantiniketan Wing B7.9 yr overdueAnmol Associates · Kalyan, ThaneP51700010349· 87.2% built
- SKY VIEW PH 17.9 yr overdueM D CONSTRUCTIONS · Pune (M Corp.), PuneP52100010942· filed Dec 2017 → now Dec 2018· 90.9% built
- VIJAY RESIDENCY7.9 yr overdueJAY DEVELOPERS · Aanandwali, NashikP51600007898· 72.7% built
- ANANDVAN DABHOLKAR SANKUL PHASE 27.9 yr overdueCONSORTEXE PROPERTIES PVT LTD · Pinguli, SindhudurgP52900001575· 72.7% built
- Windermere Phase 17.9 yr overdueVascon Engineers Ltd · Koregaon ParkP52100003865· 89.5% built
- LAXMI ICON7.9 yr overdueANIRUDDHA BUILDERS AND DEVELOPERS · Navi Mumbai (M Corp.), ThaneP51700005005· 97.3% built
- SHREE SIDDHI VINAYAK APPARTMENT7.9 yr overdueRIDDHI SIDDI DEVELOPERS · Nashik (M Corp.), NashikP51600004980· 90.9% built
- VAIBHAVLAXMI APPARTMENT7.9 yr overduePETHE BUILDERS AND DEVELOPERS PVT LTD · Nagpur (M Corp.), NagpurP50500012874· 81.8% built
- SADGURU KRIPA APARTMENT7.9 yr overdueSADGURU DEVELOPER · Ambarnath, ThaneP51700009917· 40.9% built
- Ayush Park7.9 yr overdueShubhankar Developers · Talegaon Dabhade (M Cl), PuneP52100012062· 90.9% built
- VASUDEV APARTMENT7.9 yr overdueJAY BALAJI BUILDCON · Nashik (M Corp.), NashikP51600010213· 86.8% built
- Constructing 45 T/s EWS on S.No.42-B at Ujalaiwadi, Kolhapur7.9 yr overduePune Housing and Area Development Board Pune · Ujalaiwadi (CT), KolhapurP53000005353· 6.1% built
- SHAMA NISARG RESIDENCY7.9 yr overdueAPPLE BUILDERS AND DEVELOPERS · Talegaon Dabhade (R), PuneP52100001415· 68.2% built
- SAI BAN7.9 yr overdueKAILASH NAMDEO KABADE · Wadgaon Kolhati (CT), AurangabadP51500001609· 78.2% built
- PANCHRATNA PARK7.9 yr overdueHINDUSTAN CONSTRUCTION BUILDERS & DEVELOPERS · Panvel, RaigarhP52000008794· 81.3% built
- Yashodhan Apartment7.9 yr overdueShri Siddhivinayak Constructions · Ratnagiri (M Cl), RatnagiriP52800002367· 62% built
- SAI VISHWA7.9 yr overdueHARIVISHWA BUILDER · Chiplun (M Cl), RatnagiriP52800013629· 35.5% built
- Basil Park A and B Wing7.9 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100002663· 81.8% built
- Madhukunj CHS Ltd7.9 yr overdueKurla, Mumbai SuburbanP51800005882· 81.6% built
- GOKUL HEIGHTS7.9 yr overdueTHAKKAR BUILDERS & DEVELOPERS · Borivali, Mumbai SuburbanP51800007528· filed Mar 2018 → now Dec 2018· 81.8% built· 1 complaint
- MY SKY RESIDENCY PHASE I7.9 yr overdueASHAPURA ABODE · Dhamote, RaigarhP52000001455· 61.4% built
- MAHESH APARTMENT7.9 yr overdueSATYENDRAKUMAR SHANTISWAROOP MAHESH · Mumbai City, Mumbai CityP51900008085· 82.5% built
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED7.9 yr overdueFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002752· 83.6% built
- DNV ARCELIA PH 37.9 yr overdueDNV REALTY · Pimpri Chinchawad (M Corp.), PuneP52100013972· 79.6% built
- OM RESIDENCY APPARTMENT7.9 yr overdueSIDDHIVINAYAK BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012992· 90.9% built
- AMOGH RESIDENCY7.9 yr overdueKPL ASSOCIATES · Pasarni, SataraP52700011502· filed Dec 2017 → now Dec 2018· 87.9% built
- AMAR WESTVIEW7.9 yr overdueINC DEVELOPERS · Pune City, PuneP52100000170· 90.9% built
- SADGURU TOWER7.9 yr overdueROHIT BHIMRAO PAWAR · Ahmadnagar (M Corp.), AhmednagarP52200007246· 55.5% built
- INSIGNIA - PHASE II7.9 yr overdueM/s. K N ASSOCIATES · Baner, PuneP52100011802· 64.8% built
- HORIZON VIEW VI VII7.9 yr overdueNasir Abdul Rahiman Khot · Uktad, RatnagiriP52800009576· 60.9% built
- TULIP TOWER7.9 yr overdueCLASSIC BUILDERS AND DEVELOPERS · NASHIK, NashikP51600015100· 85% built
- KASHIDHAM7.9 yr overdueSHAH AND DASWANI · Thane, ThaneP51700011016· filed Dec 2017 → now Dec 2018· 45% built
- OCEAN PEARL7.9 yr overdueOCEAN DEVELOPERS · Palghar, PalgharP99000004132· 37.3% built
- YASHWANT HEIGHTS7.9 yr overdueMANGALMURTI DEVELOPERS · Vasai, PalgharP99000004110· 90.9% built
- Ambrosia building 27.9 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000006358· 40.5% built
- Surval Heights7.9 yr overdueGayatri Developers · Ambarnath, ThaneP51700004370· 57.3% built
- ESSENTIA7.9 yr overdueShagun Realty · Ulawe, RaigarhP52000001961· 55% built
- SB Paradise7.9 yr overdueS B GROUP · Sangli Miraj Kupwad (M Corp.), SangliP53100013929· 61.8% built
- PRIDE PHOENIX BUILDING B1-B27.9 yr overdueABAD ESTATE AOP · Chikalthana, AurangabadP51500000331· 90.9% built
- Quadream Residences Phase 1 Bldg C D and Common Amenities7.9 yr overdueGAGAN SHARDA DEVELOPERS · Undri, PuneP52100001996· 81.8% built
- PARIJAT CO OPERATIVE HOUSING SOCIETY LIMITED PHASE II7.9 yr overdueROHRA CONSTRUCTIONS · AMBERNATH, ThaneP51700016225· 38.6% built
- KOOL HOMES SIGNATURE7.9 yr overdueMADISON HOLDINGS · Nyati County, PuneP52100005690· 87.9% built
- Dattnath Aangan7.9 yr overdueSheetal Prabhakar Sonawane · Sai Vikaswadi, RaigarhP52000014461· 90.9% built
- THARWANI MIRACLE7.9 yr overdueANIL HARDASMAL THARWANI · BARAVE VILLAGE, ThaneP51700007310· 39% built
- ASHAR 16 WING C PHASE III7.9 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700000972· 90.9% built
- TULJA ELITE7.9 yr overdueM/S IMAGINE CONSTRO ARTS PRIVATE LIMITED · NERAL, RaigarhP52000015338· 90.9% built
- DHRUV RESIDENCY PHASE EXCELLENCY KWING7.9 yr overdueDHRUV ASSOCIATES · Pashane, RaigarhP52000007640· 81.8% built
- SAINATH MADHUBAN7.9 yr overdueSAINATH LAND DEVELOPERS PVT. LTD. · Kurla, Mumbai SuburbanP51800000752· 90.9% built
- Dattawad Renaissance7.9 yr overdueKarnasingh Daulatrao Ghorpade · Kolhapur (M Corp.), KolhapurP53000000560· filed Dec 2017 → now Dec 2018· 79.5% built
- NIRMAN BHARATI CITY CENTRE7.9 yr overdueCITY BHARATI TECHNO HEROTAGE LLP · Aurangabad (M Corp.), AurangabadP51500012003· 90.9% built
- Shree Madhusudan CHSL7.9 yr overdueSpark Builders & Infra Projects Pvt Ltd · Andheri, Mumbai SuburbanP51800005040· filed Dec 2017 → now Dec 2018· 90.9% built
- TERRAZA7.9 yr overdueSanskruti City Space · Baner, PuneP52100006921· filed Dec 2017 → now Dec 2018· 90.9% built· 1 complaint
- VIHANG HILLS7.9 yr overdueVIHANG ENTERPRISES · Thane (M Corp.), ThaneP51700007590· 95.5% built· 5 complaints
- Happinest Boisar Phase III7.9 yr overdueMahindra Lifespace Developers limited · Palghar, PalgharP99000000106· 81.8% built· 1 complaint
- HONEY KARTIK TOWER7.9 yr overdueT KHANDWANI BUILDERS AND DEVELOPERS · lakadganj, NagpurP50500015286· 90.5% built
- AMAAN7.9 yr overdueKALBAY ABBAS SAYED RIZVI · Vasai, PalgharP99000014133· 76.4% built
- Marvel Selva Ridge Villa Phase 017.9 yr overdueMARVEL OMEGA BUILDERS PVT LTD · Bavdhan Kh., PuneP52100011640· 85.2% built
- Zenia7.9 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700002912· 72.7% built
- Pratham7.9 yr overduePrimary Housing Corporation LLP · Shirur, PuneP52100008426· filed Dec 2017 → now Dec 2018· 89.1% built
- Krishnakripa Lake View7.9 yr overdueKrishnakripa Buildcon LLP · Balinge, KolhapurP53000010555· 88.6% built
- SHREE HARI RESIDENCY7.9 yr overdueM/s SHREE ODHAV DEVELOPERS · Kalyan, ThaneP51700004461· filed Jun 2018 → now Dec 2018· 90.9% built
- TIMES CHAMBER7.9 yr overdueADITI CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800006100· 90.9% built
- Riddhi Siddhi Greens7.9 yr overdueRiddhi Siddhi Realtors · Palghar, PalgharP99000003664· 81.8% built
- RADHESHYAM REGENCY7.9 yr overdueSHRI SATIMA ENTERPRISE · Thane, ThaneP51700009169· 90% built
- LA REGALIA7.9 yr overdueRAGHAV LIFESPACES · Ramdaspeth, NagpurP50500004826· 75% built
- AARAMBH7.9 yr overdueG K GROUP VENTURES ·P52100012934· 75.9% built
- OM KRISHNA HEIGHTS7.9 yr overdueOM KRISHNA INFRA · Ambarnath, ThaneP51700004255· 81.8% built
- PANCHRATNA PARK7.9 yr overdueHINDUSTAN CONSTRUCTION BUILDERS & DEVELOPERS · AGOSHIVNAGAR, SataraP52700014829· 81.3% built
- RAHUL EASTVIEW I7.9 yr overdueRAHUL CONSTRUCTIONS · HANDEWADI ROAD, PuneP52100000845· 56.4% built· 1 complaint
- JIJABAI PARK7.9 yr overdueDNYANESHWAR MAULI BUILDER & DEVELOPERS · Badlapur (M Cl), ThaneP51700006524· 54.5% built
- PRAGATI AVENUE7.9 yr overduePRAGATI REALTY · -, RaigarhP52000012345· 68.1% built
- Gandhaar7.9 yr overdueAlliance Properties · Pune (M Corp.), PuneP52100011029· 79.1% built
- APTE HOMES7.9 yr overdueSHREE SIDDHI DEVELOPERS · Badlapur (M Cl), ThaneP51700005931· 70% built
- KABRA PARADISE7.9 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · Andheri, Mumbai SuburbanP51800000684· 90.9% built
- UNIQUE GREEN - MHADA7.9 yr overdueMADHU HARSHAD DOSHI · Thane (M Corp.), ThaneP51700007437· filed Jun 2018 → now Dec 2018· 80.9% built
- HEERA MANEK PRAGATEE ENCLAVE7.9 yr overdueVIKRAM JAYANTILAL BRAHMABHATT · Mumbai City, Mumbai CityP51900012389· 64.5% built
- Saiprakash Appartment7.9 yr overdueShweta Prakash Ambhore · Sundar khed (CT), BuldanaP50000001993· 90.9% built
- STAR CITY B WING7.9 yr overdueAmar Builder and Promoters · Khed, PuneP52100013488· 81.8% built· 1 complaint
- ORBIT CASA7.9 yr overdueB-ORBIT VENTURES · Nashik, NashikP51600009915· 59.1% built
- NAVALAKHA RITZ7.9 yr overdueNAVALAKHA CHORADIYA ASSOCIATES ·P52100002664· filed May 2018 → now Dec 2018· 95.5% built
- PLATINUM7.9 yr overdueRohit Infra · KALA KADAK, PuneP52100016424· 90.9% built
- ATMARAM KENE RESIDENCY7.9 yr overdueMEGA DEVELOPERS · Kalyan, ThaneP51700004471· 42.7% built
- ICON PRIDE7.9 yr overdueICON INFRA · Khed (CT), SataraP52700002609· 81.8% built
- 7 Avenues7.9 yr overdueSai Innovision Associates · Baner, PuneP52100004977· 56.2% built
- MUNOTH EMPRESS7.9 yr overdueARHAM DEVELOPERS · Panvel, RaigarhP52000002872· 79.1% built
- GANESHYOG CHS7.9 yr overdueAARUNI HARISHCHANDRA PATIL · Borivali, Mumbai SuburbanP51800006281· 55.5% built
- ASHAR 16 WING E PHASE I7.9 yr overdueMs ASHAR REALTORS · Thane, ThaneP51700001081· 90.9% built
- ARUN APARTMENT7.9 yr overdueZINNIA SPACES PVT LTD · Pune (M Corp.), PuneP52100002034· 65.6% built
- SHREE VILLA7.9 yr overdueSHREE BUILD CRAFTS · Nashik (M Corp.), NashikP51600009776· 47.7% built
- PAVILLION RESIDENCY7.9 yr overdueAPEX DEVELOPERS · Mahalunge, PuneP52100006615· 63.6% built
- NEW ERA BUSINESS PARK7.9 yr overdueNEW ERA VENTURES · Thane, ThaneP51700005182· 56.4% built
- Aadinath Complex Bldg No 1 and 27.9 yr overdueChamunda Developers · Palghar East, PalgharP99000012472· 90.9% built
- Shantiniketan Wing B17.9 yr overdueAnmol Associates · Kalyan, ThaneP51700004738· 87.2% built
- SOLITAIRE7.9 yr overdueKAPIL NANDKISHOR NATHANI · Nagpur (M Corp.), NagpurP50500012837· 81.8% built
- INFINITE GALAXY7.9 yr overdueINFINITE STAR REALTY PVT LTD · Kasarsai, PuneP52100010340· 49% built
- MSR REGENCY7.9 yr overdueBhandari Infrastructure & Construction Development Pvt. Ltd. · Pune (M Corp.), PuneP52100004593· filed Jul 2018 → now Dec 2018· 90.9% built
- ADINATH ENCLAVE7.9 yr overdueADINATH CONSTRUCTION · Kopargaon (M Cl), AhmednagarP52200013374· 33.6% built
- DISHA CO-OP HOUSING SOCIETY LTD7.9 yr overduePRITESH SANGHVI · Andheri, Mumbai SuburbanP51800000806· 90.9% built
- Sai Pearl Phase 17.9 yr overdueSSD PROMOTERS AND BUILDERS · Pimpale Saudagar, PuneP52100001207· 89.2% built
- Mahavir Estella - Wing A and B7.9 yr overdueCityscape Construction Co · Thane, ThaneP51700003600· 85.5% built
- SONTERRA RESIDENCES7.9 yr overdueJAISONS PROPERTIES LLP · Mulshi, PuneP52100004313· filed Dec 2017 → now Dec 2018· 55% built
- KALYAN SAMRUDDHI7.9 yr overdueKALYAN TOLL INFRASTRUCTURE LTD · DHRUVA NAGAR, NashikP51600011079· 90.9% built
- SIMRAN MAJESTIC7.9 yr overdueVIKRANT VIKAS RAIKAR · Panvel, RaigarhP52000002117· filed Jun 2018 → now Dec 2018· 82% built
- TANISHQ HOLLYHOCK7.9 yr overdueTANISHQ CONSTRUCTION · Mumbai City, Mumbai CityP51900008628· filed Dec 2017 → now Dec 2018· 90% built
- CHAURANG SHRADDHA7.9 yr overdueM/s. CHAURANG DEVELOPERS · Kurla, Mumbai SuburbanP51800002864· filed Dec 2017 → now Dec 2018· 81.8% built
- Siyona Phase - I7.9 yr overduePETHKAR PROJECTS · Punawale, PuneP52100000155· 89.1% built· 1 complaint
- Sai Kunj Phase 27.9 yr overdueShree Saidatta Associates · Chikhali, PuneP52100011033· 90.9% built
- SHRIHARI RESIDENCY7.9 yr overdueVIJAYA INFRAVENTURES · NEAR LIONS CONVENT, YavatmalP51000014550· 73.1% built
- THE BLUE PLAQUES7.9 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100000688· 90.9% built
- VASANT VIHAR7.9 yr overdueSULEKH BUILDCON LLP · Kalambe T. Thane (CT), KolhapurP53000010322· filed Dec 2017 → now Dec 2018· 53.6% built
- Sai Nisarg7.9 yr overdueHemant Audumber Padule · Haveli, PuneP52100003763· 34.1% built
- Salvia7.9 yr overdueGurudevelopers · Bhosari, PuneP52100007723· 90.9% built
- Delta Avenue7.9 yr overdueDELTA REALTORS · Thane, ThaneP51700011834· 74.1% built
- ANANDI NIWAS7.9 yr overdueSuniti Developers · Kolhapur (M Corp.), KolhapurP53000012050· filed Dec 2017 → now Dec 2018· 81.8% built
- KUSHAL SAGAR GALAXY7.9 yr overdueKUSHAL SAGAR BUILDERS · Shewalewadi, PuneP52100004886· 90.9% built
- AISHWARYA RESIDENCY7.9 yr overdueVYAS BUILDCON PVT. LTD. · Baner, PuneP52100002455· filed Mar 2018 → now Dec 2018· 72.4% built
- TANUSHREE PLAZA7.9 yr overdueSameer Ramesh Sawant · Shri ram nager, RatnagiriP52800000185· 90.9% built
- CERATEC CITY PHASE I PART 27.9 yr overdueCERATEC CONSTRUCTION · YAWALEWADI, PuneP52100001332· 90.9% built
- Shri Sai Palace7.9 yr overdueAbhijit Madhukar Jagtap · Saswad Rural, PuneP52100005801· 16.7% built
- Vrindavan Garden - Tulip7.9 yr overdueSairaj Enterprises · Karjat, RaigarhP52000004716· 90.9% built
- Sai Prasad7.9 yr overdueSoham Properties · Rui, AhmednagarP52200010919· 90.9% built
- TARIQUE SAPPHIRE7.9 yr overdueKOHINOOR DEVELOOPERS AND REALTORS · Panvel, RaigarhP52000010945· 61.8% built
- Skyi Songbirds Phase A7.9 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000769· 98% built· 6 complaints
- ROHAN ABHILASHA BUILDING E7.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000832· 90.7% built· 3 complaints
- SANTAN ARCADE7.9 yr overdueMANUEL DIAGO ALPHUNSO · Vasai, PalgharP99000010892· filed Dec 2017 → now Dec 2018· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.