RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 14 of 61
- YASHWANT HEIGHTS7.9 yr overdueMANGALMURTI DEVELOPERS · Vasai, PalgharP99000004110· 90.9% built
- Delta Avenue7.9 yr overdueDELTA REALTORS · Thane, ThaneP51700011834· 74.1% built
- KUSHAL SAGAR GALAXY7.9 yr overdueKUSHAL SAGAR BUILDERS · Shewalewadi, PuneP52100004886· 90.9% built
- AISHWARYA RESIDENCY7.9 yr overdueVYAS BUILDCON PVT. LTD. · Baner, PuneP52100002455· filed Mar 2018 → now Dec 2018· 72.4% built
- TANUSHREE PLAZA7.9 yr overdueSameer Ramesh Sawant · Shri ram nager, RatnagiriP52800000185· 90.9% built
- PALAVA REGALIA A to F7.9 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000390· 78.2% built
- RAI S HERITAGE D Wing7.9 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700009044· 54.5% built
- Golden Trellis A Building7.9 yr overdueGolden Trellis Developments · Baner, PuneP52100007351· 77.7% built· 2 complaints
- Panvelkar Crown7.9 yr overdueRahul Vijay Panvelkar · Ambarnath, ThaneP51700000598· 90.9% built
- SHREE TIRUMALA SWASTIK APARTMENT7.9 yr overdueROONGTA HOMES LLP · Indiranagar, NashikP51600005646· 90.9% built
- Advitiya-A7.9 yr overdueSilver Landmarks · Ambai Tank Area, KolhapurP53000001556· filed Jun 2018 → now Dec 2018· 90.9% built
- Sai Prasad7.9 yr overdueSoham Properties · Rui, AhmednagarP52200010919· 90.9% built
- TULJA ELITE7.9 yr overdueM/S IMAGINE CONSTRO ARTS PRIVATE LIMITED · NERAL, RaigarhP52000015338· 90.9% built
- Skyi Songbirds Phase A7.9 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000769· 98% built· 6 complaints
- NEWA BUSINESS PARK BUILDING A PHASE 17.9 yr overdueNEWA REALITY INFRASTRUCTURE · Thane, ThaneP51700008497· 90.9% built
- Tara City7.9 yr overdueNilesh Shivjee Singh · Haveli, PuneP52100009317· 62.4% built
- OM KRISHNA HEIGHTS7.9 yr overdueOM KRISHNA INFRA · Ambarnath, ThaneP51700004255· 81.8% built
- AVANEESH RESIDENCY7.9 yr overdueSHREE NATH CONSTRUCTION · SATARA, SataraP52700003834· 90.9% built
- Shankeshwar Dang Ikon Phase 17.9 yr overdueShree Shankeshwar Atharva Properties · Pimpri Chinchawad (M Corp.), PuneP52100000780· 72.7% built· 1 complaint
- Santacruz Prakash CHS Ltd Redevelopment7.9 yr overduePTR Corporations · Andheri, Mumbai SuburbanP51800003452· 90.9% built
- Ambrosia building 27.9 yr overduePawan Abhimanyu Singh · Palghar, PalgharP99000006358· 40.5% built
- GEETA HEIGHTS7.9 yr overdueGEETA DEVELOPERS · Nashik (M Corp.), NashikP51600011008· 73.6% built
- AZALEA B7.9 yr overdueACME SAWANT VENTURES · BHILAREWADI, PuneP52100014721· 33.7% built
- Kondilkar Residency7.9 yr overdueAditi Construction · Ambarnath, ThaneP51700000782· 90.9% built
- Atmaram Park7.9 yr overdueSuyash Developers · Vasai, PalgharP99000002606· 81.8% built
- PANDURANG PRESTIGE POINT PHASE 17.9 yr overdueSUKHSHANTI DEVELOPERS · Baramati (M Cl), PuneP52100005862· 90.9% built
- Arvind Vaastu7.9 yr overdueNilesh Arvind Manjarekar · Ashiye, SindhudurgP52900007739· 90.9% built
- TAMHANE TERRACE7.9 yr overdueSAMEER SHANTARAM TAMHANE · Chiplun (M Cl), RatnagiriP52800001025· 58.2% built
- Poonam Prime7.9 yr overduePrime Developers · Vasai, PalgharP99000006206· 81.8% built
- AKSHAY ARCADE7.9 yr overdueAKSHAY CONSTRUCTIONS & BUILDERS · Godhani (Railway), NagpurP50500009703· 90.9% built
- RADHAKUNJ CHS7.9 yr overdueAUM DEVELOPERS · Andheri, Mumbai SuburbanP51800007609· 90.9% built
- Moraya Construction7.9 yr overdueMoraya Construction · WAGHOLI, PuneP52100012562· 41.8% built
- LAMOUR7.9 yr overdueSPARK LINK VENTURE · Pimpri Chinchawad (M Corp.), PuneP52100009669· filed Jan 2018 → now Jan 2019· 62.7% built
- OMKAR APARTMENT7.8 yr overdueOmkar Developers · Nashik (M Corp.), NashikP51600012527· 65% built
- APEX STEP7.8 yr overdueAPEX REALTORS · Karanjade, RaigarhP52000007778· 90.9% built
- PARIJAT7.8 yr overdueAjitkumar Ramchandra Mahadik ·P52100004833· filed Dec 2018 → now Jan 2019· 90.9% built
- BOKAN HERITAGE7.8 yr overdueSWAPANIL CHANDRAKANT BOKAN · PARBHANI, ParbhaniP51300013752· 76.4% built
- MAA RESIDENCY7.8 yr overdueJJ BUILDERS · Sangli Miraj Kupwad (M Corp.), SangliP53100007081· 81.8% built· 2 complaints
- HAKIMI BAUG II7.8 yr overduePYRAMID INFRASTRUCTURE · Pune (M Corp.), PuneP52100009002· 81.8% built
- JOSA RESIDENCY II7.8 yr overdueJOSA INFRA · Chandrapur (M Cl), ChandrapurP50900005299· 24.1% built
- Moraya palace7.8 yr overdueSagar Mahadev Kate · Baramati Rural, PuneP52100013003· 80% built
- Vrundavan Gardan7.8 yr overdueSUMAN CONSTRUCTION COMPANY · Karanje Tarf Satara (CT), SataraP52700013071· 90.9% built
- SAI SWAMI7.8 yr overdueNandadeep Builders & Developers · Daund (CT), PuneP52100012146· 90.9% built
- Oracle Residency7.8 yr overdueNURUDDIN ABDULREHMAN TANDEL · Nachane (CT), RatnagiriP52800007479· 44.1% built
- SEAWOOD Phase I7.8 yr overdueShreeram Builders & Developers · Vengurla (M Cl), SindhudurgP52900010496· 81.8% built
- MADHUPRABHA HEIGHTS7.8 yr overduePRIME DEVELOPERS · Jalgaon (M Corp.), JalgaonP49900008336· 55.3% built
- DHANRAJ PARK7.8 yr overdueDANRAJ VENKATRAO BARURE · Latur (M Cl), LaturP52400012886· 9.5% built
- HAREKRISHNA RESIDENCY7.8 yr overdueRAMESH SHANKARLAL MOR · Pungaon, JalgaonP49900010955· 34.4% built
- RUDRA PHASE II7.8 yr overdueAandDConstructions · Pune (M Corp.), PuneP52100013267· 81.8% built
- Lakshmi Plaza Building D7.8 yr overdueIndus Realty · Haveli, PuneP52100002883· 58.2% built
- Royal Court - Commercial7.8 yr overduePSC PROPERTIES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002784· filed Jul 2018 → now Jan 2019· 81.8% built
- SHIVAM PARK7.8 yr overdueSAMBHAV INFRA · Shankarpur, NagpurP50500002280· 86.4% built
- SHRI KRISHNA OASIS7.8 yr overdueSHRI BUILDCON · Pune (M Corp.), PuneP52100011176· 33.3% built
- AMAR JYOT7.8 yr overdueAMARDEEP DEVELOPERS · Mamdapur, RaigarhP52000010025· 59.2% built
- Pratham residency7.8 yr overdueCreative Constructions · Tembhode, PalgharP99000009497· filed Sept 2018 → now Jan 2019· 81.8% built
- NEW CUFFE PARADE - LODHA ESTRELLA7.8 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000521· 81.8% built· 6 complaints
- Malati Heritage7.8 yr overdueMalati Enterprises · Khalapur, RaigarhP52000004604· 90.9% built
- UNIQUE7.8 yr overdueVS DEVELOPERS · THANE, ThaneP51700005344· 53.6% built
- PARIJAT-A7.8 yr overdueDEVEN DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500008142· 81.8% built
- SAPTARANG HEIGHT7.8 yr overdueSAPTASHRUNGI REALTORS · Haveli, PuneP52100004786· 50.9% built
- RUSHIKESH7.8 yr overdueRUSHI DEVELOPERS · Karanjade, RaigarhP52000005675· 45.9% built
- NAJMUN RESIDENCY7.8 yr overdueALNASEER MOHAMMED SHAFI MIRZA · KHANBHAG, SangliP53100016154· 90.9% built
- Shri Govinda Imperial7.8 yr overdueSHREE GOVINDA CONSTRUCTIONS · Amravati (M Corp.), AmravatiP50300002973· 72.3% built
- SONAL CO-OP HOUSING SOCIETY7.8 yr overdueSOHAM DEVELOPERS · Badlapur (M Cl), ThaneP51700005982· 54.5% built
- VICTORIA HOUSE PHASE I7.8 yr overdueLIFESPACE REALTY · Ambarnath, ThaneP51700008522· filed Jun 2018 → now Jan 2019· 78.6% built
- NEELKANTH RESIDENCY7.8 yr overdueNEELKANTH ENTERPRISES · Panvel, RaigarhP52000009397· 90.9% built
- NYATI ELAN COMMERCIAL7.8 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100001374· 73.6% built· 1 complaint
- RUSHI CELEBRATION7.8 yr overdueMEGHASHAM MALLIKARJUN YEMUL · Solapur (M Corp.), SolapurP52600010113· 90.9% built
- Jay Ganesh Apartment7.8 yr overdueHemant Arun Upare · CHARHOLI, PuneP52100007865· filed Jan 2018 → now Jan 2019· 90.9% built
- VARUN FLORA TOWNSHIP7.8 yr overdueVertex Developers · Ujalaiwadi, KolhapurP53000000346· 90.9% built
- SURYA TOWER 17.8 yr overdueBALAJI BUILDERS AND DEVELOPERS · Bela (CT), BhandaraP50600009251· 66.4% built
- Shelter Avenue7.8 yr overdueAbu Zaid Khan · ULWE, RaigarhP52000008295· 54.1% built
- Param Heights7.7 yr overdueBharat Lalji Mawani · Vrindawan Nagar, NashikP51600007240· 65.5% built
- Kate pride7.7 yr overdueSagar Mahadev Kate · Jalochi, PuneP52100013121· 81.8% built
- PRAYAG YASH PHASE I7.7 yr overduePRAYAG PROPERTIES · ADAI NR GAON DEVI MANDIR, RaigarhP52000011038· filed Dec 2018 → now Feb 2019· 90.9% built
- BARSANA RESIDENCY7.7 yr overdueAKSHADA YOGESH CHAVAN · Savarkar Nagar, SangliP53100000238· filed Feb 2018 → now Feb 2019· 72.7% built
- ATLANTIC ORRA7.7 yr overdueATLANTIC WINDS INFRASTRUCTURE PVT.LTD. · Kalyan, ThaneP51700005954· 45.5% built
- Golden Eye Phase III7.7 yr overdueKotak Sons · Palghar, PalgharP99000014416· 12.9% built
- MAITRI APARTMENT7.7 yr overduePinki Mahavir Jain · Kuwarbav (CT), RatnagiriP52800009037· 90.9% built
- COSMOS BUILDING C7.7 yr overdueBENJAMIN MANWEL DSOUZA · VENGURLA, SindhudurgP52900014898· 90.9% built
- MAITRI PARK7.7 yr overdueSWANAND SHANTARAM BAMBADE · Savarde Kh., RatnagiriP52800009711· 49.4% built· 1 complaint
- BALAJI AANGAN SHIVAM-B WING7.7 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700012104· 78.2% built
- SIDDHIVINAYAK RESIDENCY7.7 yr overdueSUNIL RAGHUNATH VIDHATE · Pen (M Cl), RaigarhP52000013005· filed May 2018 → now Feb 2019· 62.3% built
- AVADHUT RESIDENCY7.7 yr overdueYOGESH BALASAHEB TAWARE · Malegaon Bk, PuneP52100012487· 72.7% built
- SHUBAN Society7.7 yr overdueShrikrishna Marathe · Kalyan, ThaneP51700003453· 58.2% built
- PALAVA PRIMIA E to J7.7 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000391· 78.2% built
- Desai Oceanic 11th and 12th Floor7.7 yr overdueDESAI RESIDENCY PVT.LTD · Mumbai City, Mumbai CityP51900005231· filed Jun 2018 → now Feb 2019· 90% built· 1 complaint
- Indiabulls Savroli - 17.7 yr overdueSylvanus Properties Limited · Khalapur, RaigarhP52000001481· 78.2% built· 19 complaints
- The Turf7.7 yr overdueAMA Properties · Ghorpadi, PuneP52100000632· 90.9% built· 1 complaint
- TRIMURTI CLASSIC D7.7 yr overdueCHANDRAKANT SADHU PAKHALE · Kolki (CT), SataraP52700008735· 74.1% built
- Shivam appartment7.7 yr overdueRavindra Maind · Nashik (M Corp.), NashikP51600010850· filed Mar 2018 → now Mar 2019· 69.1% built
- AADINATH PARK7.7 yr overdueSUJATA PRITESH CHHAJED · BEHED, NashikP51600015818· 81.8% built
- New Veerdhaval CHS. Ltd.7.7 yr overdueShree Durga Vastu Makers Private Limited · Babhai Naka, Mumbai CityP51900006532· filed Mar 2018 → now Mar 2019· 85.5% built
- Cluster F7.7 yr overdueShibam Associates · Neral, RaigarhP52000008779· 90.9% built
- Pranav Paradise7.7 yr overduePranav Builders · Sangli, SangliP53100009663· 81.8% built
- CASA ROW HOUSES7.6 yr overdueCasa Builders · Nagapur (CT), AhmednagarP52200013067· 81.8% built
- NANDAN SRUSHTI7.6 yr overdueHITESH RAMANBHAI PATEL · SAGAR VILLAGE, NashikP51600006992· 81.8% built
- Seven Green Phase 17.6 yr overdueDinesh Buildcon · Rui, PuneP52100011773· 81.8% built
- Hayaat Green7.6 yr overdueM M Enterprises · Vasai, PalgharP99000003365· filed Mar 2018 → now Mar 2019· 90.9% built
- SANDEEP HEIGHTS7.6 yr overdueSB LIFESPACES PVT LTD · Vasai, PalgharP99000010491· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- SONCHAFA7.6 yr overdueGreenmark Engicon builder and developers ·P52100008475· filed Aug 2018 → now Mar 2019· 72.7% built
- RISHIK APPT7.6 yr overdueDARSHIT PURUSHOTTAM PATEL · Nashik, NashikP51600011144· 63.6% built
- SANIKA VIHAR7.6 yr overdueANIL RAMDAS UKEY · Bhilgaon, NagpurP50500002354· 44.1% built
- Tathastu Paradise7.6 yr overdueROYAL DEVELOPERS · Haveli, PuneP52100003490· 69.3% built
- Kakade Township7.6 yr overdueSuryakant Kakade · Pimpri Chinchawad (M Corp.), PuneP52100011673· 90.9% built
- RAJ COMMERCIAL CUM RESIDENTAIL BUILDING G -F7.6 yr overdueMR SANJAY BALAPRASAD BIYANI · Nanded Waghala (M Corp.), NandedP51100012323· 53.2% built
- HARI KRISHNA PHASE III7.6 yr overdueNARESH JAGUMAL KARDA · Deolaligaon, NashikP51600000375· filed Mar 2018 → now Mar 2019· 90.9% built
- AKSHAY AANGAN7.6 yr overdueAkshay Properties · Wadgaon, PuneP52100014607· 68.6% built
- TIRUPATI RESIDENCY7.6 yr overdueDATTA PROJECTS PVT LTD · BALAJI MANDIR, Dadra & Nagar HaveliP49600000007· 90.9% built
- VISHWA KUNJ PHASE 17.6 yr overdueArchway Realltors · Pune City, PuneP52100012495· filed Mar 2018 → now Mar 2019· 78.7% built
- VARAD VINAYAK APARTMENTS7.6 yr overdueHARISHCHANDRA REALTY SOLUTIONS LLP · behind Gogate high school, SindhudurgP52900001578· 49.1% built
- SELENA B7.6 yr overdueKumar Construction and Properties Pvt Ltd · Pashan, PuneP52100000252· 69.7% built
- SHREE RIDDHIE SIDDHIE APARTMENT7.6 yr overdueSWATI ASHUTOSH NAIK · Nagpur (M Corp.), NagpurP50500014260· 74.1% built
- NIVARA ENCLAVE7.6 yr overdueNIVARA BUILDCON ·P52100013120· filed Mar 2018 → now Mar 2019· 68.6% built
- DHARMAPRATAP CHS LTD7.6 yr overdueSAI LIFE REALTORS · Kurla, Mumbai SuburbanP51800006987· 90.9% built
- KHAR YAMUNA BHUVAN CO.OP.HSG. SOC. LTD.7.6 yr overdueAUM ASSOCIATES · Andheri, Mumbai SuburbanP51800006884· 90.9% built
- OLIVE SILLARI7.6 yr overdueCHANDRAPAL NATHUSAO CHOUKASEY · Nagpur (M Corp.), NagpurP50500012737· 72.1% built
- SAGAR SAHAJIVAN SANKUL7.6 yr overdueROZY REALTORS · Chiplun (M Cl), RatnagiriP52800011881· 72.7% built
- K-SQUARE APARTMENTS7.6 yr overdueANKIT CONSTRUCTION · Nagpur (M Corp.), NagpurP50500003259· 90.9% built· 36 complaints
- SARA GREEN7.6 yr overdueTRINETRESHWARI BUILDCON · WALUJ, AurangabadP51500013552· 90.9% built
- VAKRATUNDA7.6 yr overdueAMIT HARSHAVADAN AGASKAR · Palghar, PalgharP99000008078· 90.9% built
- NANDADEEP APARTMENT7.6 yr overdueSHREE YASH DEVELOPERS · kondhwa BK, PuneP52100012358· filed Apr 2018 → now Mar 2019· 79.2% built
- SHRINIWAS Q HOMES7.6 yr overdueCUPID CONSTRUCTION LLP · Pune (M Corp.), PuneP52100011776· 81.8% built· 15 complaints
- PUJARI NAGAR7.6 yr overdueSHIVTEJ BUILDERS AND DEVELOPERS · Plot No.61 to 69, OsmanabadP52500015220· 60% built
- KRISHNA GANGA RESIDENCY7.6 yr overdueNIRMAL DEVELOPERS AND BUILDERS · Nagpur (M Corp.), NagpurP50500013591· 86.8% built
- S.N.PLAZA7.6 yr overdueSHAHNAWAZ SULTAN SHAIKH · Mamdapur, RaigarhP52000013851· 72.7% built
- KANTI NX7.6 yr overdueMAHAVIR REALTORS · Vasai, PalgharP99000005321· filed Mar 2018 → now Mar 2019· 90.9% built
- KRISHNA DHAM7.6 yr overdueLANDMARK CONSTRUCTION · Panvel, RaigarhP52000009937· filed Mar 2018 → now Mar 2019· 58.5% built
- Sai Anand7.6 yr overdueSairam Corporation · Vasai, PalgharP99000005553· filed Mar 2018 → now Mar 2019· 90.9% built
- YASHLAXMI COMPLEX7.6 yr overdueAMODH ASSOCIATES · Daund, PuneP52100013503· 45.5% built
- KAPALESHWAR CO. - OP. HSG. SOC.7.6 yr overdueABHAY CHANDMAL JAIN · NASIK ROAD, NashikP51600016108· 37.3% built
- RMKNATURESCLASSIC7.6 yr overdueRANJEET RAMDAS KAKADE · Talegaon Dabhade (M Cl), PuneP52100001545· 61.6% built
- ADORA7.6 yr overdueNEST KRISALA ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100003141· 81.8% built
- THE PALMS7.6 yr overdueMETRO DEVELOPMENT · Thane, ThaneP51700000006· 91.5% built
- NANDAN SMRUTI7.6 yr overduePRAKASHKUMAR CHHAGANBHAI PATEL · UNTVADI, NashikP51600011972· 81.8% built
- MANGESHI FLORA7.6 yr overdueOM REALTY · Kalyan, ThaneP51700005811· 62.7% built
- GAJANAN NANA HEIGHTS7.6 yr overdueVASTU GANESH BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010902· 46.4% built
- Yogi Milan Phase 27.6 yr overdueShiv Builders · NR. BALAJI TEMPLE, Dadra & Nagar HaveliP49600000006· 90.9% built
- Aarti Empire7.6 yr overdueG N CONSTRUCTION · Nagpur (M Corp.), NagpurP50500006514· 41.8% built
- SHARVARI HEIGHTS7.6 yr overdueATHARVA VISHWA BUILDCON · Nashik (M Corp.), NashikP51600008067· 90.9% built
- SKY CANARY7.6 yr overdueAADHAR INFRA PROJECT · Uran, RaigarhP52000004704· 72.7% built
- NL ARYAVARTA7.6 yr overdueNAHALCHAND LALOOCHAND PVT. LTD. · Borivali, Mumbai SuburbanP51800004816· 90.9% built· 11 complaints
- ROONGTA ARCADE APARTMENT7.6 yr overdueSHREE TIRUMALA DEVELOPERS · Nashik, NashikP51600006600· 81.8% built
- ASHUTOSH RESIDENCY7.6 yr overdueASHUTOSH ASSOCIATES · Mulshi, PuneP52100008229· filed Mar 2018 → now Mar 2019· 81.8% built· 3 complaints
- FAVOLOSA7.6 yr overdueABHILASHA DEVELOPERS · Pune (M Corp.), PuneP52100002469· 66.6% built
- SHREEJI AMREET7.6 yr overdueSHREEJI LIFESPACES BUILDERS & DEVELOPERS · Ulawe, RaigarhP52000009597· 31.2% built
- Dreamzland Business Park Phase II7.6 yr overdueM/S DREAMZ INFRASTRUCTURE · Borgaon, AmravatiP50300004985· 64.1% built
- Rustomjee Azziano Wing G7.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001060· 90.9% built· 4 complaints
- Happy Home7.6 yr overdueFour Square Properties · Talegaon Dabhade (R), PuneP52100010203· filed Jul 2018 → now Mar 2019· 28.6% built
- Elanza7.6 yr overduePRAVIN Viram SATRA · Andheri, Mumbai SuburbanP51800007425· filed Dec 2017 → now Mar 2019· 90.9% built· 1 complaint
- Swagat Heights7.6 yr overdueSwagat Property Developers · Thane, ThaneP51700008280· 68.9% built
- KALYANI SAI SWAROOP7.6 yr overdueJ K BUILDERS AND DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500006684· 75% built
- Sagarninad7.6 yr overdueSaurabh Realtors & Developers · Zadgaon CT, RatnagiriP52800006415· 90.9% built
- S S PARK PHASE 27.6 yr overdueS S DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500008157· 72.7% built
- Meher Shelter7.6 yr overdueRajvaibhav Infra · Nagpur (M Corp.), NagpurP50500008418· 90.9% built· 1 complaint
- NEEL RIDDHI EMERALD7.6 yr overdueNEEL RIDDHI EMERALD · Panvel, RaigarhP52000000999· 90.9% built
- Royal Crest7.6 yr overdueNavabharat Infraventures Ltd. · Nagpur (M Corp.), NagpurP50500001369· 93.8% built· 1 complaint
- SAPTASHRUNGI TARA7.6 yr overdueTRIMURTI GROUP · Nashik (M Corp.), NashikP51600011060· 90.9% built
- Amrit Kalash7.6 yr overdueRaghukul Constructions Private Limited · Nagpur (M Corp.), NagpurP50500001929· 90.9% built
- SAI RESIDENCY7.6 yr overdueSHREE VENKATESH INFRA · Aurangabad (M Corp.), AurangabadP51500003184· 62.7% built
- RANA BUSINESS COMPLEX7.6 yr overdueRANA INFRA · Nagpur (M Corp.), NagpurP50500007730· 27.7% built
- THE BLUE MAJESTIC7.6 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100012704· 90.9% built
- N B Square7.6 yr overdueGanesh Developers & Company · AMBEGAON Bk, PuneP52100013282· 59.1% built
- GAJSHEELA7.6 yr overdueSHASHIKANT LAXMAN BHAGAT · Talegaon Dabhade (M Cl), PuneP52100002285· 38.6% built
- Apex Wildernest7.6 yr overdueApex Creators · Vasai, PalgharP99000005939· filed Mar 2018 → now Mar 2019· 53.9% built
- Mohan Ritteka7.6 yr overdueSHREE KRISHNA ENTERPRISES · Ulhasnagar, ThaneP51700004103· filed Mar 2018 → now Mar 2019· 90.9% built
- JANARDAN CHSL7.6 yr overdueMahesh Laxman Thakkar · Borivali, Mumbai SuburbanP51800009412· 90.9% built
- Mauli Residency7.6 yr overdueVraj Ratan Home Makers (I) Pvt Ltd · Wakad, PuneP52100010200· filed Mar 2018 → now Mar 2019· 88.6% built
- SHYAM SQUIRE7.6 yr overdueNILAM JAGDISH VAGHELA · Nashik (M Corp.), NashikP51600009778· 90.9% built
- Dreamzland Business Park Phase I7.6 yr overdueM/S DREAMZ INFRASTRUCTURE · Borgaon, AmravatiP50300004385· 67.3% built
- Mannat Tower7.6 yr overdueShri Sati Builders and Developers Private Limited · Kurla, Mumbai SuburbanP51800009212· filed Dec 2017 → now Mar 2019· 54.5% built· 66 complaints
- HIGHLAND HAVEN BUILDING 4D CORAL-A PHASE 47.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006815· 83.9% built
- SAI ESHANYA7.6 yr overdueMANIKCHAND VASUDHA DEVELOPERS · BANER, PuneP52100002815· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- MAHALAXMI PALACE-27.6 yr overdueVIJAYA VIJAY INGLE · Nagpur (M Corp.), NagpurP50500010562· 38.2% built
- Piyusha7.6 yr overdueAmol Ajit Ravetkar · Pune (M Corp.), PuneP52100002284· 60% built
- JP NAKSHTRA 1B7.6 yr overdueJAGDISHPRASAD HANUMNMAL SHARMA · Hingna, NagpurP50500002283· filed Mar 2018 → now Mar 2019· 72.7% built
- SHIREEN PLAZA7.6 yr overdueS V ENTERPRISES · MAMDAPUR, RaigarhP52000016254· 90.9% built
- VELKAR RESIDENCY7.6 yr overdueK L HOUSING LLP · Andheri, Mumbai SuburbanP51800008739· filed Mar 2018 → now Mar 2019· 49.1% built
- Park Marina Building B and C7.6 yr overdueSUJAY ASSOCIATES · Baner, PuneP52100004085· filed Mar 2018 → now Mar 2019· 40.9% built
- LA CABANA7.6 yr overdueSigma one shilp ventures · Sus Gaon, PuneP52100009637· filed Mar 2018 → now Mar 2019· 77.3% built· 7 complaints
- SHAKUNTALA SILVER BLISS7.6 yr overdueOSWAL REALTORS · Kurla, Mumbai SuburbanP51800013474· 90.9% built
- ANIRUDDHA LANDMARK7.6 yr overdueVASUDEV VISHWANATH PATIL · Navi Mumbai (M Corp.), ThaneP51700011992· 55.5% built
- AGARWAL SOLITAIRE7.6 yr overdueAGARWAL BUILDERS · Vasai, PalgharP99000003833· 90.5% built· 1 complaint
- DISHA PARADISE7.6 yr overdueJAY GANESH EMPIRE · Shirur, PuneP52100003596· 42.7% built
- The Courtyard Phase-I Building E and C7.6 yr overdueMarc Developers · Tarakpur, AhmednagarP52200000247· 90.9% built· 1 complaint
- PRAMUKH SADAN7.6 yr overdueSAHAJANAND DEVELOPERS · Ambarnath, ThaneP51700000743· 41.8% built
- SAI SARANG7.6 yr overdueV B REALITIES · PANVEL, RaigarhP52000006506· 72.7% built
- HIBISCUS GARDEN7.6 yr overdueURICH GRACE INFRASTRUCTURE PVT LTD · Gawasi Manapur, NagpurP50500012509· 39.5% built
- ANANDI PRIDE PHASE III7.6 yr overdueANANDI ENTERPRISES · Alibag, RaigarhP52000007845· filed Mar 2018 → now Mar 2019· 66.4% built
- Tulip7.6 yr overdueLEVERAGE INFRASTRUCTURES PRIVATE LIMITED · Nagpur (M Corp.), NagpurP50500001330· 90.6% built· 1 complaint
- BALAJI APARTMENTS7.6 yr overdueSMITA MUKUND VAIDYA · Nagpur (M Corp.), NagpurP50500002892· 47.7% built
- Aditya Aryan / Ejaj7.6 yr overdueDinesh C Agarwal · Borivali, Mumbai SuburbanP51800011231· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- RIDDHESH HEIGHTS7.6 yr overdueSAMRUDDHI DEVELOPERS · Nashik, NashikP51600012650· filed Mar 2018 → now Mar 2019· 63.6% built
- West Square7.6 yr overdueSiddharth Properties · Pune City, PuneP52100016161· 67.3% built
- HORIZON SAMYAK7.6 yr overdueHORIZON PROMOTERS INDIA LTD · Kurla, Mumbai SuburbanP51800005791· 90.9% built
- VIVA KINGSTON CROWN7.6 yr overdueViva Mahalaxmi Associates · Vasai-Virar City (M Corp), PalgharP99000008460· 90.9% built
- ISHAN HEIGHTS7.6 yr overdueRACHANACONSTRUCTION · NASHIK, NashikP51600015977· 85% built· 2 complaints
- ZIGGURAT H Building7.6 yr overdueM/S BUILT UP · Ambegaon, PuneP52100002178· 86.6% built
- SWAPNAPURTI7.6 yr overdueAshwamegh Developers · Kolki (CT), SataraP52700002699· 81.8% built
- Sky Avenue7.6 yr overdueShreeji Corporation · Vasai, PalgharP99000003755· filed Mar 2018 → now Mar 2019· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.