RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 15 of 61
- BHAGIRATH RESIDENCY7.6 yr overdueBHAGIRATH CORPORATION · Panvel, RaigarhP52000004859· 45.4% built
- Rustomjee Azziano Wing J7.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700000950· 87% built· 1 complaint
- GANARAYA HEIGHTS-3 CONDOMINIUM7.6 yr overduePINNACLE BUILDCON · Nagpur (M Corp.), NagpurP50500013852· 11.6% built
- AGARWAL SOLITAIRE7.6 yr overdueAGARWAL BUILDERS · Vasai, PalgharP99000003833· 90.5% built· 1 complaint
- ALCON STYLUS7.6 yr overdueALCON LANDMRKS · kondhwa BK, PuneP52100001398· 76.8% built
- LEELA TARA7.6 yr overdueSAKAAR DEVELOPERS · Ward ABCD, Mumbai CityP51900008194· 81.8% built
- RADHA RAMAN APARTMENT7.6 yr overdueSARVESHWAR ASSOCIATES · Jalgaon (M Corp.), JalgaonP49900000128· 90.9% built
- SHREE GANESH VYAPARI SANKUL7.6 yr overdueRAJDEEP BUILDERS AND DEVELOPERS · Badlapur (M Cl), ThaneP51700007269· 74.5% built
- Bhalchandra Apartment7.6 yr overdueSiddhivinayak Properties · Nagpur (M Corp.), NagpurP50500014197· 90.9% built
- SUMATISPARSH7.6 yr overdueSACHIN SUMATILAL BEDMUTHA · Sangli Miraj Kupwad (M Corp.), SangliP53100007871· 80.9% built
- SAI ICONIC7.6 yr overdueSHREE KRISHNA SAI DEVELOPMENT CORPORATION · Andheri, Mumbai SuburbanP51800002150· 90.9% built
- SARA GREEN7.6 yr overdueTRINETRESHWARI BUILDCON · WALUJ, AurangabadP51500013552· 90.9% built
- EKDANT ENCLAVE7.6 yr overdueSiddhivinayak Properties · Nagpur (M Corp.), NagpurP50500014264· 60% built
- SAI REGENCY7.6 yr overdueSHREE GURUDATTA ENTERPRISES · Vasai, PalgharP99000014353· 56.4% built
- ATLANTA RESIDENCY PHASE I7.6 yr overdueSRI BALAJI DEVELOPER · Bhiwandi, ThaneP51700007107· filed Mar 2018 → now Mar 2019· 89.4% built
- KONARK RESIDENCY7.6 yr overdueKonark NIrman Pvt. Ltd. · Ulhasnagar, ThaneP51700008502· 86.1% built· 1 complaint
- OLIVE SILLARI7.6 yr overdueCHANDRAPAL NATHUSAO CHOUKASEY · Nagpur (M Corp.), NagpurP50500012737· 72.1% built
- RUBY CHS7.6 yr overdueHASMUKH R HIRANI · Borivali, Mumbai SuburbanP51800009070· 98.2% built
- AERO NEST7.6 yr overdueGURUKRUPA BUILDCON · UNDRI, PuneP52100001596· 90.9% built
- Solitaire II7.6 yr overdueShree Satya Sai Developers · Vasai, PalgharP99000003564· filed Mar 2018 → now Mar 2019· 95.5% built
- SAI SAAKSHAAT - WING E7.6 yr overdueSAI SHIRDI CONSTRUCTIONS · Panvel, RaigarhP52000000509· 90% built
- SAGAR SAHAJIVAN SANKUL7.6 yr overdueROZY REALTORS · Chiplun (M Cl), RatnagiriP52800011881· 72.7% built
- Amodini Apartment7.6 yr overdueRavi Mahajan Builders & Developers Pvt.Ltd. · Nashik, NashikP51600012217· 90.9% built
- PUJARI NAGAR7.6 yr overdueSHIVTEJ BUILDERS AND DEVELOPERS · Plot No.61 to 69, OsmanabadP52500015220· 60% built
- Happy Home7.6 yr overdueFour Square Properties · Talegaon Dabhade (R), PuneP52100010203· filed Jul 2018 → now Mar 2019· 28.6% built
- MEERA HEIGHTS7.6 yr overdueAKHILESH SHESHNARAYAN GUPTA · GUPTA COLONY, BhandaraP50600014887· 63.6% built
- KANTI NX7.6 yr overdueMAHAVIR REALTORS · Vasai, PalgharP99000005321· filed Mar 2018 → now Mar 2019· 90.9% built
- SHIV PARVATI RESIDENCY7.6 yr overdueSHRIKRISHNA DEVELOPERS · Ambarnath, ThaneP51700005502· 43.6% built
- Shree Yash Varad7.6 yr overduePowar Associates · Kolhapur (M Corp.), KolhapurP53000001365· 90.9% built
- PEACE HEIGHTS7.6 yr overdueS M PROPERTIES · Solapur (M Corp.), SolapurP52600001571· 90.9% built
- KARMAYOGI APARTMENT7.6 yr overdueKARMAYOGI BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600006353· 71.4% built
- RAJ HOME7.6 yr overdueHOME TOWN ENTERPRISES · Panvel, RaigarhP52000004421· 72.1% built
- Ganga Sagar - Phase II7.6 yr overdueCHAITALI BUILDERS AND DEVELOPERS · Daund, PuneP52100001623· 36.4% built
- LA CABANA7.6 yr overdueSigma one shilp ventures · Sus Gaon, PuneP52100009637· filed Mar 2018 → now Mar 2019· 77.3% built· 7 complaints
- JP NAKSHTRA 3B7.6 yr overdueJAGDISHPRASAD HANUMNMAL SHARMA · Hingna, NagpurP50500001703· filed Mar 2018 → now Mar 2019· 72.7% built
- Samruddhi Heights7.6 yr overdueSamrudhi Housing and Infrastructures · Mangaldham Area, AmravatiP50300018049· 90.9% built
- Pure Gold7.6 yr overdueSUDHIR VASU SHETTY · Chembur Mumbai, Mumbai SuburbanP51800006305· filed Mar 2018 → now Mar 2019· 81.8% built
- NANDAN SMRUTI7.6 yr overduePRAKASHKUMAR CHHAGANBHAI PATEL · UNTVADI, NashikP51600011972· 81.8% built
- MARATHE FORTUNE7.6 yr overdueSAIJI DEVELOPERS · Titwala, ThaneP51700008862· 4.2% built
- S S PARK PHASE 27.6 yr overdueS S DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500008157· 72.7% built
- MANOMAY RESIDENCY7.6 yr overdueMAHALAXMI PROMOTERS · KALASP52100004537· 90.9% built· 1 complaint
- SKY CANARY7.6 yr overdueAADHAR INFRA PROJECT · Uran, RaigarhP52000004704· 72.7% built
- SAI MALHAR7.6 yr overdueSai Associates · Pimpri Chinchawad (M Corp.), PuneP52100013695· 80.9% built
- NEEL SAI GANGA7.6 yr overdueVilas Madanlal Kothari · OPP SAI BABA TEMPLE, RaigarhP52000000904· 86.4% built
- KRISHNA GANGA RESIDENCY7.6 yr overdueNIRMAL DEVELOPERS AND BUILDERS · Nagpur (M Corp.), NagpurP50500013591· 86.8% built
- APEX VILLA7.6 yr overdueAPEX BUILDERS & DEVELOPERS · Karanjade, RaigarhP52000006690· 90.9% built
- LODHA SPLENDORA - PLATINO - B7.6 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000258· 81.8% built
- VELKAR RESIDENCY7.6 yr overdueK L HOUSING LLP · Andheri, Mumbai SuburbanP51800008739· filed Mar 2018 → now Mar 2019· 49.1% built
- ARYAN ONE WING E AND F7.6 yr overdueKonark Lifespaces · Shirgaon, ThaneP51700009247· filed Apr 2018 → now Mar 2019· 90.9% built
- STELLA7.6 yr overdueSANT SAGAR BUILDERS AND DEVELOPERS PRIVATE LIMITED ·P51900014065· filed Mar 2018 → now Mar 2019· 81.8% built· 1 complaint
- MAHALAXMI PALACE-27.6 yr overdueVIJAYA VIJAY INGLE · Nagpur (M Corp.), NagpurP50500010562· 38.2% built
- RUSHI PRIDE7.6 yr overdueMEGHASHAM MALLIKARJUN YEMUL · NEAR WIT COLLEGE, SolapurP52600006430· 77.3% built
- Sabari Palm View7.6 yr overdueSabari Developers LLP · Kurla, Mumbai SuburbanP51800001155· 92.7% built
- YASHASVI-37.6 yr overdueMAHARUDRA INFRACOMBINES PRIVATE LIMITED · Amravati (M Corp.), AmravatiP50300013750· 49.5% built
- Mohan Ritteka7.6 yr overdueSHREE KRISHNA ENTERPRISES · Ulhasnagar, ThaneP51700004103· filed Mar 2018 → now Mar 2019· 90.9% built
- 93 AVENUE PHASE- 17.6 yr overdueRAVIRAJ BOKADIA CREATIVE · Pune City, PuneP52100015538· 81.8% built
- PRAMOD SMRUTI7.6 yr overdueMATOSHREE CONSTRUCTION · Kalyan, ThaneP51700009396· 80% built
- BLISS AVENUE BUILDING B7.6 yr overdueLUNAWAT ASSOCIATES · Balewadi, PuneP52100001094· 90.9% built
- JANARDAN CHSL7.6 yr overdueMahesh Laxman Thakkar · Borivali, Mumbai SuburbanP51800009412· 90.9% built
- KRISHNA DHAM7.6 yr overdueLANDMARK CONSTRUCTION · Panvel, RaigarhP52000009937· filed Mar 2018 → now Mar 2019· 58.5% built
- AMALTAS7.6 yr overdueNOVELLUS INFRASTRUCTURE · Nagpur (M Corp.), NagpurP50500005633· filed Mar 2018 → now Mar 2019· 90.9% built· 2 complaints
- SPANDAN RESIDENCY7.6 yr overduePopat Nivrutti Kasar · NEAR KINETIC COMPANY, AhmednagarP52200014327· 90.9% built
- Maithili7.6 yr overdueSHARDA VASTU NIRMITEE PVT. LTD. · Thane, ThaneP51700002777· 78.4% built
- Rustomjee Azziano Wing F7.6 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001021· 90.9% built· 8 complaints
- SPAN EXOTICA-WING B7.6 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane, ThaneP51700001353· 89.1% built
- Sagarninad7.6 yr overdueSaurabh Realtors & Developers · Zadgaon CT, RatnagiriP52800006415· 90.9% built
- 33 MILESTONE PHASE III7.6 yr overdueLABH PROMOTERS AND DEVELOPERS · TATHAWADE, PuneP52100013749· 52.7% built
- Deccan Residency7.6 yr overduePRAVEEN PREMKUMAR NAIR · Khalapur, RaigarhP52000006375· 85.5% built· 1 complaint
- Apex Wildernest7.6 yr overdueApex Creators · Vasai, PalgharP99000005939· filed Mar 2018 → now Mar 2019· 53.9% built
- HIGHLAND HAVEN BUILDING 4D CORAL-A PHASE 47.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006815· 83.9% built
- RAJ CONSTRUCTIONS7.6 yr overdueSHAKEEL AHMED MOHAMMED YUNUS · Mumbai City, Mumbai CityP51900005282· filed Mar 2018 → now Mar 2019· 98.2% built· 1 complaint
- SHREE TIRUMALA RIVIERA PHASE II7.6 yr overdueSHREE SHYAM BUILDERS · Aanandwali, NashikP51600007719· 81.8% built
- DWARKESH HEIGHT7.6 yr overdueUMA BUILDERS & DEVLOPERS · M, NashikP51600012534· 90.9% built
- SHAKUNTALA SILVER BLISS7.6 yr overdueOSWAL REALTORS · Kurla, Mumbai SuburbanP51800013474· 90.9% built
- JAI MATADEE7.6 yr overdueAARADHANA DEVELOPERS · Thane, ThaneP51700000884· filed Mar 2018 → now Mar 2019· 50% built
- GAGAN CEFIRO PHASE 27.6 yr overdueGAGAN UNNATI PROMOTERS · Undri, PuneP52100002365· 90.9% built
- Green Groves - Cilantro7.6 yr overdueKP-Rachana Real Estate LLP · WAGHOLI, PuneP52100012330· 86.8% built
- ELITE GRANDEUR7.6 yr overdueNATHDWARA LIFESPACE PVT LTD · Panvel, RaigarhP52000012375· filed Mar 2018 → now Mar 2019· 96.8% built· 1 complaint
- Purva Apartment7.6 yr overdueDEEPAK MOTIRAM DALAL · AMBERNATH, ThaneP51700014812· 18.2% built
- RAZA ASHIYANA7.6 yr overdueNAZRULLAH NAIMUDDIN ANSARI · CHUNCHALE, NashikP51600012889· 90.9% built
- RAMJI RESIDENCY7.6 yr overdueVITTHAL RAMJI MORE · Khalapur, RaigarhP52000006271· 68.5% built
- Pramukh Sangam Phase 27.6 yr overduePramukh Devcon Pvt. Ltd · NEAR BYOUR LADY OF HELP ENGLISH SCOOL, Dadra & Nagar HaveliP49600000008· 90.9% built
- RIDDHESH HEIGHTS7.6 yr overdueSAMRUDDHI DEVELOPERS · Nashik, NashikP51600012650· filed Mar 2018 → now Mar 2019· 63.6% built
- West Square7.6 yr overdueSiddharth Properties · Pune City, PuneP52100016161· 67.3% built
- KAMAL RESIDENCY7.6 yr overdueADITYA ASSOCIATES · Talegaon Dabhade (R), PuneP52100002337· 60.9% built
- SAI KIRAN APPARTMENT7.6 yr overdueSAI DEVELOPERS · Dwarka, NashikP51600011947· 90.9% built
- NAZARETH NIKETAN7.6 yr overdueMILAN INTERBUILT PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800008647· filed Mar 2018 → now Mar 2019· 64.1% built
- SAMRUDDHI EVERGREEN-PHASE-4B7.6 yr overduePoddar Housing and Development Limited · Badlapur (M Cl), ThaneP51700009016· 70.6% built
- The Courtyard Phase-I Building E and C7.6 yr overdueMarc Developers · Tarakpur, AhmednagarP52200000247· 90.9% built· 1 complaint
- ASHTHAVINAYAK7.6 yr overdueUNITY GROUP BUILDERS AND DEVELOPERS · Tandulwadi, PuneP52100010511· 13.8% built
- SANKALP ENCLAVE7.6 yr overdueM/S. N.K. ASSOCIATES · Wadi, NagpurP50500012658· 50% built
- NYATI KALEIDOSCOPE II7.6 yr overdueNITIN DWARKADAS NYATI · KHARADIP52100018178· 65.5% built
- Madan Vilas7.6 yr overdueIshaan Enterprise · Thane, ThaneP51700001871· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- Ram Ranjan Apartments7.6 yr overdueRavindra Ramchandra Sangitrao · Nagpur (M Corp.), NagpurP50500012701· 54.3% built
- SHIV KRUPA7.6 yr overdueSHIV KRUPA DEVELOPERS · Kurla, Mumbai SuburbanP51800008179· filed Mar 2018 → now Mar 2019· 81.8% built
- FERRO GARDENS7.6 yr overdueFERRO ASSOCIATES ·P52100001919· 70.9% built
- SHASHI ANAND ENCLAVE7.6 yr overdueANAND PREM ASSOCIATES · Nashik, NashikP51600003498· 68.2% built
- Windermere Phase 27.6 yr overdueVascon Engineers Ltd · Haveli, PuneP52100002368· 80% built· 2 complaints
- DREAM CITY7.6 yr overdueTANAJI SADASHIV PANSARE · Jalochi, PuneP52100005463· 90.9% built· 1 complaint
- Hubtown Vedant Ground to 2nd Floor7.6 yr overdueCitywood Builders Pvt.Ltd. · Mumbai City, Mumbai CityP51900000839· 65.9% built· 1 complaint
- FORTUNE WORLD ONE7.6 yr overdueFORTUNE DEVELOPERS · 6 TH LANE, KolhapurP53000004848· filed Mar 2018 → now Mar 2019· 47.7% built
- GOKUL APARTMENT7.6 yr overduePUNDLIK GOKUL SUTAR · Dhule (M Corp.), DhuleP49800011969· filed Mar 2018 → now Mar 2019· 81.8% built
- THE PALMS7.6 yr overdueMETRO DEVELOPMENT · Thane, ThaneP51700000006· 91.5% built
- LIFE VILLE7.6 yr overdueBHARAT SITARAM KATE · Pimpale Saudagar, PuneP52100003879· 30.2% built
- MEGA NEXUS7.6 yr overdueMohammed Yusuf Salim Chaudhary · Ulawe, RaigarhP52000006659· 90.9% built
- United Galaxy Phase 47.6 yr overdueThe United Group Of Builders And Developers · Pen (M Cl), RaigarhP52000001710· 65% built
- VARDHAMAN RESIDENCY7.6 yr overdueINTELLA HOMES · MASCARNES COLONY, PuneP52100012091· 90.9% built
- SHAHS PARASHRAM APARTMENT7.6 yr overdueSHAH BUILDERS AND DEVELOPERS · SANSARI, NashikP51600001937· 69.1% built
- ASTON PLAZA PHASE I7.6 yr overdueSKP Corp Private Limited · Ambegaon, PuneP52100013383· 49.1% built
- ZIGGURAT H Building7.6 yr overdueM/S BUILT UP · Ambegaon, PuneP52100002178· 86.6% built
- INDRA HEIGHTS7.6 yr overdueBHOIR AND SONS · Kalyan, ThaneP51700010267· 54.5% built
- Crescent Bay - T27.6 yr overdueL&T Parel Project LLP (JV with ORDPL) · Ward FSouth, Mumbai CityP51900010178· 89.6% built· 12 complaints
- Munisuvrat Arc - Building 1 Plot 1 and Munisuvrat Royal - Building 2 on Plot 27.6 yr overdueShree Munisuvrat Realty · Bhiwandi, ThaneP51700004825· 57.3% built
- NANDADEEP APARTMENT7.6 yr overdueSHREE YASH DEVELOPERS · kondhwa BK, PuneP52100012358· filed Apr 2018 → now Mar 2019· 79.2% built
- TIRUPATI TOWER7.6 yr overduePRADEEP SURYAKANT BAPTE · Aurangabad (M Corp.), AurangabadP51500008273· 59.1% built
- Kingston Atlantis B1 and B2 Building7.6 yr overdueVedant Landmarks · MOHAMMADWADI, PuneP52100011904· 99.5% built· 1 complaint
- Sai Anand7.6 yr overdueSairam Corporation · Vasai, PalgharP99000005553· filed Mar 2018 → now Mar 2019· 90.9% built
- VEDANT RESIDENCY7.6 yr overdueJALARAM DEVELOPERS · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000024· 90.9% built
- 33 MILESTONE PHASE IV7.6 yr overdueLABH PROMOTERS AND DEVELOPERS · Tathwade, PuneP52100013679· 52.7% built
- PRATIBHA SADAN CO. OP. HSG. SOC.7.6 yr overdueVYAS BUILDCON PVT. LTD. · Kothrud, PuneP52100002624· filed Mar 2018 → now Mar 2019· 85.5% built
- SAMARTH CARINA7.6 yr overdueMAHESH ZUMBARLAL KHINVASARA · Thergaon, PuneP52100009646· 19.1% built
- BHAGYASHRI7.6 yr overdueBHAGYASHRI DIPAK PAWAR · Karanje Peth Satara (CT), SataraP52700005166· filed Mar 2018 → now Mar 2019· 90.9% built
- GAJANAN NANA HEIGHTS7.6 yr overdueVASTU GANESH BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010902· 46.4% built
- Techno IT Park7.6 yr overdueSureshwari Enterprises · Eksar Borivali, Mumbai SuburbanP51800015974· 90.9% built
- Park Marina Building B and C7.6 yr overdueSUJAY ASSOCIATES · Baner, PuneP52100004085· filed Mar 2018 → now Mar 2019· 40.9% built
- NITYA DARSHAN7.6 yr overdueNemi Buildcon · PALGHAR, PalgharP99000014653· 36.4% built
- SHREE APPARTMENT7.6 yr overdueSHARDUL ASSOCIATES · AMRAVATI, AmravatiP50300015867· 45.5% built
- MANGESHI FLORA7.6 yr overdueOM REALTY · Kalyan, ThaneP51700005811· 62.7% built
- BLUE BELLS AURA7.6 yr overdueRainbow Construction · PASHAN, PuneP52100009029· 90.9% built
- DISHA VINAYAK PHASE 17.6 yr overdueDNK COMBINES · Satara (CT), AurangabadP51500002345· 90.9% built
- TULIP RESIDENCY7.6 yr overdueRAHUL DILIP PATIL · Thane, ThaneP51700008759· 68.2% built
- ORCHID7.6 yr overdueSHRI HARI DINESHCHANDRA CORPORATION · Panvel, RaigarhP51700006223· 49% built
- HARSHAS K K ANGELS BUILDING NO 17.6 yr overdueHARSHA PROPERTIES · Haveli, PuneP52100000484· 55.5% built
- SAI SANKUL PHASE-II7.6 yr overdueSHREE VENKATESH DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500004795· 22.7% built
- YASHRAJ CORNER7.6 yr overdueYASHRAJ ENTERPRISES · NAVI MUMBAI, RaigarhP52000007567· 90.9% built
- SENTOSA PALM7.6 yr overdueSRI SAINATH INFRA · Wakad, PuneP52100013778· 90.9% built
- SAI VRUNDAVAN7.6 yr overduePRABHAKAR BABURAO THORAT · Ambegaon, PuneP52100007037· 84.8% built
- Varsha Olive CHSL7.6 yr overdueNitesh J Jain · Andheri, Mumbai SuburbanP51800001733· 90.9% built
- SUNSHINE PHASE II7.6 yr overdueMUBIN MOHAMMED IQBAL JUMANI · Dahiwali T. Waredi, RaigarhP52000012800· 49.1% built
- JAIRATNA CO-OP SOCIETY7.6 yr overdueSHREE ASTAVINAYAK DEVELOPERS · Nashik, NashikP51600012430· 90.9% built
- ORCHID7.6 yr overdueMEHTA REALTORS · Thane, ThaneP51700001234· 72.7% built
- SHRADHHA RESIDENCY7.6 yr overdueM/S VIJAYRAJ ASSOCIATES · Haveli, PuneP52100001915· 60.9% built
- Shree Sai Villas7.6 yr overdueShree Buildcon realty ·P51600011733· 59.3% built
- Yogi Milan Phase 27.6 yr overdueShiv Builders · NR. BALAJI TEMPLE, Dadra & Nagar HaveliP49600000006· 90.9% built
- CHITRALEKHA HERRITAGE7.6 yr overdueH.K.PUJARA BUILDERS · Andheri, Mumbai SuburbanP51800004317· 90.9% built
- ANUJAI RESIDENCY7.6 yr overdueYashwant Kaluram Kumbhar · Pimple nilakh, PuneP52100016816· 63.6% built
- SURYASHRUSHTI7.6 yr overdueSURYAPUTRA DEVELOPERS · Junnar, PuneP52100003450· 90.9% built
- MANTRI ALPINE C PART7.6 yr overdueOMEGA PREMISES PVT LTD · BAVDHAN BK, PuneP52100011683· filed Mar 2018 → now Mar 2019· 81.4% built
- Mohan Suburbia IIB7.6 yr overdueMOHAN LIFESPACES LLP · Ambernath, ThaneP51700010658· filed Mar 2018 → now Mar 2019· 89.1% built· 1 complaint
- Suncity Complex7.6 yr overdueSWASTIK BUILDER AND DEVELOPERS · Palghar, PalgharP99000009723· 90.9% built
- KRISHNA DARSHAN7.6 yr overdueS.K. DEVELOPERS · Kalyan, ThaneP51700007961· 43.6% built
- RMKNATURESCLASSIC7.6 yr overdueRANJEET RAMDAS KAKADE · Talegaon Dabhade (M Cl), PuneP52100001545· 61.6% built
- LAXMI NARAYAN RESIDENCY7.6 yr overdueSUDARSHAN LAND AND DEVELOPERS · Nagpur (M Corp.), NagpurP50500001582· 75% built
- Suyog Nisarg Phase III7.6 yr overdueSuyog Nisarg JV · WAGHOLI, PuneP52100003483· 84.5% built· 4 complaints
- METRO APARTMENT7.6 yr overdueMETRO ENTERPRISES · Panvel, RaigarhP52000003818· 18.2% built
- Grande Ventila Phase 1 Wing B7.6 yr overdueSATAVDEVELOPERSANDBUILDERS · Wagholi, PuneP52100007686· 90.9% built
- MOHAN HEIGHTS -PHASE 17.6 yr overdueBHAVANI ENTERPRISES · Kalyan, ThaneP51700004730· filed Mar 2018 → now Mar 2019· 90.9% built· 1 complaint
- SWISS PLAZA7.6 yr overdueMOTI UDHARAM PANJABI · THERGAON, PuneP52100016426· 61.6% built
- Athashri Xion7.6 yr overduePSC Pacific · Hinjavadi (CT), PuneP52100000051· 88.6% built
- Anand Enclave7.6 yr overdueMakarand Madhav Kulkarni · Sawedi, AhmednagarP52200000178· 90.9% built
- Amrit Kalash7.6 yr overdueRaghukul Constructions Private Limited · Nagpur (M Corp.), NagpurP50500001929· 90.9% built
- SAI NAGAR PHASE 2 K WING7.6 yr overdueDATTAINFINITY · MASAT, Dadra & Nagar HaveliP49600000019· 90.9% built
- Marvel Brisa7.6 yr overdueMARVEL REALTORS AND DEVELOPERS LTD · Pune (M Corp.), PuneP52100001627· 91.2% built· 22 complaints
- MIDAS GLORY7.6 yr overdueDHMP INFRA · Vasai, PalgharP99000006814· filed Mar 2018 → now Mar 2019· 54.5% built
- HIGHLAND HAVEN BUILDING 2B DEW-A PHASE 27.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700005689· 83.9% built· 1 complaint
- THE BLUE MAJESTIC7.6 yr overdueBLUEBERRY DEVELOPERS · Somatane, PuneP52100012704· 90.9% built
- CHINTAMANI HEIGHTS TYPE E WING Q R S7.6 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Cherpoli, ThaneP51700004624· 81.8% built
- EMPPIRE ETERNITY7.6 yr overdueEMPPIRE PROPERTIES · Pune (M Corp.), PuneP52100003185· 41.8% built
- HIGHLAND HAVEN BUILDING 3C CORAL-B PHASE 37.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700007196· 83.9% built
- PATELS RESIDENCY7.6 yr overduePARAM BUILDERS AND DEVELOPERS · Ambarnath, ThaneP51700000865· filed Mar 2018 → now Mar 2019· 56.4% built
- Shiv Amrut7.6 yr overdueJagdish Petha Patel · Nashik (M Corp.), NashikP51600012447· 90.9% built
- HORIZON SAMYAK7.6 yr overdueHORIZON PROMOTERS INDIA LTD · Kurla, Mumbai SuburbanP51800005791· 90.9% built
- BRAMHA VALLEY7.6 yr overdueSHREE BRAMHA ENTERPRISES · Mamdapur, RaigarhP52000008559· 21.8% built
- AVIGHNA KARAN WING A7.6 yr overdueAVIGHNA KARAN · Kalyan, ThaneP51700010306· 90.9% built
- Meher Shelter7.6 yr overdueRajvaibhav Infra · Nagpur (M Corp.), NagpurP50500008418· 90.9% built· 1 complaint
- 93 Avenue Phase-II7.6 yr overdueRAVIRAJ BOKADIA CREATIVE · Pune City, PuneP52100017392· 63.6% built
- KALYANI SAI SWAROOP7.6 yr overdueJ K BUILDERS AND DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500006684· 75% built
- PUSHKAR APARTMENT7.6 yr overdueSAYALEE SANJESH PATKAR · Badlapur (M Cl), ThaneP51700010103· 41.8% built
- Mauli Residency7.6 yr overdueVraj Ratan Home Makers (I) Pvt Ltd · Wakad, PuneP52100010200· filed Mar 2018 → now Mar 2019· 88.6% built
- Riddhi Siddhi Park7.6 yr overdueRiddhi Siddhi Builders · Palghar, PalgharP99000012373· 90.9% built
- SHREE TIRUMALA HARINIWAS APARTMENT7.6 yr overdueROONGTA HOMES LLP · Satpur, NashikP51600001282· 90.9% built
- Jeevan Lifestyles7.6 yr overdueJEEVAN ENTERPRISES · Badlapur (M Cl), ThaneP51700004929· 72.7% built
- ALFA LIFESCAPES PHASE 17.6 yr overdueTRINITY LANDMARKS · WAGHOLI, PuneP52100000749· 85.2% built
- PRISTINE VIVA7.6 yr overdueSACHIN ISHWARCHAND GOYAL · MOHAMMADWADI, PuneP52100002319· 90.9% built
- GEMINI HEIGHTS II7.6 yr overdueVIKAS GEMINI · Nashik (M Corp.), NashikP51600010513· 90.9% built
- PRIME 97.6 yr overdueM/S. IMPRESSA CENTRAL · Dharampeth, NagpurP50500015201· 63.2% built
- Tulip7.6 yr overdueLEVERAGE INFRASTRUCTURES PRIVATE LIMITED · Nagpur (M Corp.), NagpurP50500001330· 90.6% built· 1 complaint
- Sarth7.6 yr overduePRASANNA PRAKASH KULKARNI · Talegaon Dabhade (M Cl), PuneP52100013882· 90.9% built
- ISHAN HEIGHTS7.6 yr overdueRACHANACONSTRUCTION · NASHIK, NashikP51600015977· 85% built· 2 complaints
- PLANET97.6 yr overdueShree Sai Developers · Hinjavadi (CT), PuneP52100001880· 90.9% built
- VIVA KINGSTON CROWN7.6 yr overdueViva Mahalaxmi Associates · Vasai-Virar City (M Corp), PalgharP99000008460· 90.9% built
- SHRINIWAS Q HOMES7.6 yr overdueCUPID CONSTRUCTION LLP · Pune (M Corp.), PuneP52100011776· 81.8% built· 15 complaints
- MODY KUNJ7.6 yr overdueMEHTA ENTERPRISES · Mumbai City, Mumbai CityP51900007488· 90.5% built
- HIGHLAND HAVEN BUILDING 1A DEW-B PHASE 17.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700006850· 83.9% built· 1 complaint
- ARCHANA KOHINOOR GLORY7.6 yr overdueKOHINOOR GLORY · MOHAMMADWADI, PuneP52100003656· 76.8% built
- Golden Castle7.6 yr overdueFelix Associates · Pune, PuneP52100013780· 72.7% built
- Shivangan7.6 yr overdueJK2 Associates · Wakad, PuneP52100008075· 71.4% built
- DNV ELVIRA A7.6 yr overdueDNV REALTY · NEAR AKSHARA SCHOOL, PuneP52100001240· 72.7% built
- TROPICAL SQUARE7.6 yr overdueOm Developers Project Green · Wakad, PuneP52100014854· 9.1% built· 1 complaint
- Manhattan7.6 yr overdueMajestique Housing LLP · WAGHOLI, PuneP52100000291· 93.2% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.