RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 16 of 61
- MAHARUDRA RESIEDENCY7.6 yr overdueARVIND MAHADEV PATIL · Sangli Miraj Kupwad (M Corp.), SangliP53100010240· 81.8% built
- GRUKRUPA7.6 yr overdueGURUKRUPA ASSOCIATES · Wadagaon (CT), PuneP52100013430· 48.2% built
- SINDHURWARNA7.6 yr overdueDEEPAK VASANTRAO SURYAWANSHI · Sangli Miraj Kupwad (M Corp.), SangliP53100003272· 90.9% built
- Jaymala Business Court7.6 yr overdueSatyam Constructions · mANJRI, PuneP52100002339· 81.8% built
- Bhagyam Residency7.6 yr overdueZende Reality · kondhwa BK, PuneP52100003512· 52.7% built
- Sukhwani Gracia Phase-2 B Wing7.6 yr overduePrime properties · Sus Pune, PuneP52100007297· 90.9% built
- SHUBHARAMBHA SKY7.6 yr overdueSHUBHARAMBHA DEVELOPERS · NARHE, PuneP52100013417· 90.9% built· 1 complaint
- Manjri Green Annexe - B1, B2, B37.6 yr overdueY Associates · Gopalpatti, PuneP52100000538· 90.9% built
- ANAND TOWER7.6 yr overdueSUMITKUMAR SAHEBRAO SARDAR · Collector Banglow, BuldanaP50000010006· 16.8% built
- Raigad7.6 yr overdueShanikrupa Construction · Ahmadnagar (M Corp.), AhmednagarP52200008256· 90.9% built
- RAJ ANGAN7.6 yr overdueBATHUWEL UTTAMRAO BALID · Pimpri Chinchawad (M Corp.), PuneP52100012828· 72.7% built· 1 complaint
- Jai Residency7.6 yr overdueSandeep Shivajirao Jadhav · Ramnagar, SataraP52700015594· 31.8% built
- NISHIGANDH7.6 yr overduePRASHANT CHANDRAKANT KHEDEKAR ·P52100004986· filed Jan 2018 → now Apr 2019· 90.9% built
- Desai Panaromic7.6 yr overdueDesai Buildwell Pvt. Ltd. · Chiplun (M Cl), RatnagiriP52800002759· 36.8% built
- DEVGHAR7.6 yr overdueBagwan Infratech · ADARSHNAGAR, PuneP52100014545· 9.1% built
- Saket Iris7.6 yr overdueANIL SHILPAYATAN PRIVATE LIMITED · Kalyan, ThaneP51700001875· 90.9% built
- HARSHMADHURAJ SANKUL7.6 yr overdueHARSH INFRA · SURVADI, SataraP52700008601· filed Apr 2018 → now Apr 2019· 31.8% built
- CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABAD7.6 yr overdueCHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) · NAKSHATRAWADI, AurangabadP51500013212· 78.2% built
- SAI SANKUL7.5 yr overdueADITYA DEVELOPERS · MAUZA BORGAON, NagpurP50500020622· 90.9% built
- Viraj Shopping Mall7.5 yr overdueViraj Shopping Mall · Digras, YavatmalP51000001945· 96.4% built
- SILVER CREST7.5 yr overduePRIDE HOMES · Wakad, PuneP52100007038· 63.6% built
- SKY HILL7.5 yr overdueSEVEN HILL BUILDCON · Ambarnath, ThaneP51700002510· 81.8% built· 2 complaints
- SARA A BUILDING7.5 yr overdueAnshul Megaprojects LLP · Baner, PuneP52100002199· 90.9% built· 1 complaint
- PANVELKAR DAFFODIL7.5 yr overdueAMEYA DEVELOPERS · AMBERNATH, ThaneP51700019159· 90.9% built
- Aditya Pristine7.5 yr overdueATUL ARVIND BHOSLE · Mohannagar baner, PuneP52100001573· filed May 2018 → now Apr 2019· 80.2% built
- GLOBE ESTATE PHASE 27.5 yr overdueGLOBE ENTERPRISES · MIDC PHASE 1,, ThaneP51700015240· 81.8% built
- Sumit Greendale NX7.5 yr overdueSumit Pragati Shelters LLP · Palghar, PalgharP99000004678· filed Oct 2018 → now Apr 2019· 83.4% built
- KRISHNA ENCLAVE7.5 yr overdueOM SAI DEVELOPERS · jarimari mata mandir, ThaneP51700007291· 40.5% built
- SAARVI NISARG7.5 yr overdueSAARVI HOME MAKERS · Alefata (N.V.), PuneP52100004502· 60.5% built
- Regency Orion7.5 yr overdueREGENCY HOUSING · Baner, PuneP52100020102· 81.8% built
- 41 ESTERA7.5 yr overdueSAMARTTHA TRIMURTI PROPERTIES · PUNAWALE, PuneP52100003574· filed Jul 2018 → now Apr 2019· 81.8% built· 2 complaints
- PARSHVADHARA7.5 yr overduePARSHVANATH DEVELOPERS · Badlapur (M Cl), ThaneP51700010323· 70.2% built
- BELLAVISTA G BUILDING7.5 yr overdueAVNEE AND CONCORD ASSOCIATES · Pune City, PuneP52100001389· filed Apr 2018 → now Apr 2019· 60.3% built
- DHARMAVIHAR7.5 yr overdueMKY Infrastructure · Bhiwandi, ThaneP51700010249· filed Jul 2018 → now Apr 2019· 90.9% built· 1 complaint
- VARAD SUKRITI7.5 yr overdueNEHA DREAM HOMES LLP · Mukund Nagar, PuneP52100003495· 58.2% built
- TULSI SONATA7.5 yr overdueTULSI CONSTRUCTIONS · SAI NAGAR OLD PANVEL, RaigarhP52000001762· filed Jul 2018 → now Apr 2019· 64.5% built
- Heritage7.5 yr overdueGalaxy Realty · Wakad, PuneP52100001845· filed Jun 2018 → now Apr 2019· 51.5% built· 1 complaint
- Durvankur7.5 yr overdueDarpan Construction · Sawantwadi (M Cl), SindhudurgP52900007625· 90.9% built
- SHIV AASTHA7.5 yr overdueRUPALI SUDHIR GULATI · SECTOR 21, RaigarhP52000000960· 89.5% built
- VIVANTA LIFE VISHAKHA PHASE I7.5 yr overdueVIVANTA REALTY ·P52100004348· 90.9% built
- Hayaat Tower7.5 yr overdueSky Developers · Vasai, PalgharP99000003783· filed Mar 2018 → now Apr 2019· 81.8% built
- Namo Panchratna Residency7.5 yr overdueShital Samir Oswal · Wadagaon (CT), PuneP52100013359· 51.4% built
- AISHWARYAM HAMARA MHADA7.5 yr overdueSAI ESSEN DEVELOPERS · CHIKHALI, PuneP52100016065· 36.8% built
- SHRI RAM KUNJ7.5 yr overdueRAI UDYOG LIMITED · LAKADGANJ, NagpurP50500016003· 95.5% built· 2 complaints
- TULSI SHAKUNTALA KANADE NAGAR7.5 yr overdueM/s. TULSI DEVELOPERS · KANADE NAGAR, PuneP52100008932· filed Apr 2018 → now Apr 2019· 68.6% built· 1 complaint
- NAVALAI HEIGHTS7.5 yr overdueVIVEK VIJAY SAWANT · Pune City, PuneP52100010137· 46.4% built
- Anand Shree Society7.5 yr overdueNS Landmarks · Parvati, PuneP52100005478· filed Apr 2018 → now Apr 2019· 90.9% built
- MALTI HEIGHTS7.5 yr overdueVashudev Developers · Nashik, NashikP51600008940· 70% built
- Erande Hills7.5 yr overdueSairam Associates ·P52100003271· 46.5% built
- DEVRATNA7.5 yr overdueK PATEL AND CO PVT LTD · Ward FNorth, Mumbai CityP51900002091· filed Oct 2018 → now Apr 2019· 63.6% built
- VICTORIAN7.5 yr overdueFaithfull Developers · Mumbai City, Mumbai CityP51900003161· filed Apr 2018 → now Apr 2019· 90.9% built· 2 complaints
- VIRAJ PEARL7.5 yr overdueM/S. R.P. PATEL & SONS. · Aurangabad (M Corp.), AurangabadP51500013087· 48.2% built
- Hayaat Hill7.5 yr overdueM M Developers · Vasai-Virar City (M Corp), PalgharP99000012187· filed Mar 2018 → now Apr 2019· 81.8% built
- AARADHYA RESIDENCY7.5 yr overdueMAN AARADHYA INFRACONSTRUCTION LLP · Kurla, Mumbai SuburbanP51800000362· filed Apr 2018 → now Apr 2019· 90.9% built
- AXIOM INIZIA7.5 yr overdueAxiom Real Estate Developers Pvt Ltd · Mumbai, Mumbai SuburbanP51800001683· filed Sept 2018 → now Apr 2019· 90.9% built
- TRUSPACE PALOMA7.5 yr overdueTruSpace · VIJAYANAGAR COLONY, PuneP52100001474· 65.5% built
- PETALS7.5 yr overdueJD BUILDCON PVT LTD & SHRIKA DEVELOPERS PVT LTD · SHIVAJI NAGAR, NagpurP50500001914· 62.3% built
- AKSHAT ELITE7.5 yr overdueYOGESH CONSTRUCTION · Uran, RaigarhP52000004614· 90.9% built
- QUALITY PLANET7.5 yr overdueQUALITY DEVELOPERS · Panvel, RaigarhP52000007975· filed Apr 2018 → now Apr 2019· 93% built
- SAMBHAJI RESIDENCY7.5 yr overdueBABURAO PUNJARAM THANGE · Bidkin, AurangabadP51500011831· 81.8% built
- SWAMIRAJ ERANDE COMPLEX7.5 yr overdueSWAMIRAJ DEVELOPERS ·P52100001855· 90.9% built
- SAMRUDDHI BUILDERS7.5 yr overdueSANJAY VINAYAK KOLTE · BULDANA, BuldanaP50000017281· 77.3% built
- REKHA SKY GARDEN7.5 yr overdueBhima builders & developers · NEAR RAM MANGAL KARYALAYA, KolhapurP53000000341· 81.8% built
- Madhuwanti7.5 yr overdueSharmila Raj Thackeray · Ward GNorth, Mumbai CityP51900003098· 68.3% built
- Godavari Heights7.5 yr overdueBHARAT JETHLAL THAKKAR · Nashik (M Corp.), NashikP51600005790· filed Mar 2018 → now May 2019· 75.5% built
- NIDHIKRUPA RESIDENCY7.5 yr overdueSUMTILAL MANGILAL KATARIYA · PLOT NO 19B, AurangabadP51500014861· 21.8% built
- Harsh Bakul7.5 yr overdueSRS HABITAT LLP · Ward FNorth, Mumbai CityP51900008961· 97.3% built
- Nandini Orchid Phase 17.5 yr overdueNandini Group Promoters And Builders · Wadki, PuneP52100014245· 81.8% built· 7 complaints
- Madhuvan Residency7.5 yr overdueSri Sri Radha Madan Gopal Construction and developers · Nashik, NashikP51600004865· 38.4% built
- Satguru Sankul7.5 yr overdueSatguru Builders and Developers · Vidhate Nagar, NashikP51600013560· 86.4% built
- ELEGANT OLYMPIA7.5 yr overdueELEGANT HOMES · Panvel, RaigarhP51700010687· filed May 2018 → now May 2019· 90.9% built
- PAWAR RESIDENCY7.5 yr overduePAWAR BUILDERS AND DEVELOPERS · NEAR DATTA MANDIR, RatnagiriP52800012573· filed May 2018 → now May 2019· 90.9% built· 1 complaint
- Ketan Residancy7.5 yr overdueS Kumar Constructions · Sangli Miraj Kupwad (M Corp.), SangliP53100001502· 90.9% built
- SHIVNERI APPARTMENT7.5 yr overdueSHIVNERI DEVELOPERS ASHTI · Ashti, BeedP52300000176· 55.5% built
- Aeropolis Phase II7.5 yr overdueKrishna developers · LOHGAON, PuneP52100003798· 90.9% built
- SAMARTH VIHAR7.5 yr overdueSANGRAM NANDKUMAR KOTMIRE · Kolhapur (M Corp.), KolhapurP53000009225· 76.4% built
- DREAM HEIGHTS7.5 yr overdueH M BUILDERS · Nashik (M Corp.), NashikP51600004361· 65.5% built
- NIkunj7.5 yr overdueJ.R.P. Constructions · Swami Samarath Colony, SangliP53100004210· 43.2% built
- HILLVIEW RESIDENCY PHASE I7.5 yr overdueKUMAR BEHARAY PROPERTIES LLP · KOTHRUD, PuneP52100001962· 93.2% built· 1 complaint
- M R COMPLEX7.5 yr overdueM R CONSTRUCTION · Karad (M Cl), SataraP52700011129· 18.2% built
- Goodwill Nirmiti B Building7.4 yr overdueUnique Choice Ventures · LOHGAON, PuneP52100003051· 58.2% built
- STAR SHERATON7.4 yr overdueSTAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012499· filed May 2018 → now May 2019· 90.9% built
- RAJ VASTU7.4 yr overdueRAJ BUILDCON · SATARA, SataraP52700000910· 90.9% built
- JAITAPKARWADI PHASE II7.4 yr overduePRAKASH RAJARAM JAITAPKAR · Oros, SindhudurgP52900003896· 43.2% built
- Vastu Nirvana7.4 yr overdueNirvana Builders · Pune City, PuneP52100002857· 65.5% built
- Parshuram Residency7.4 yr overdueShree Radha Developers · Ambarnath(M Cl), ThaneP51700013256· 39.6% built
- Park Infinia Phase III7.4 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Haveli, PuneP52100000084· 89.1% built
- Omkara Prathmesh7.4 yr overdueOmkara Builders & Developers · KARANJADE, RaigarhP52000000628· 82.7% built
- Gundecha Woods Phase 17.4 yr overdueGundechaConstructionPvtLtd · Palghar, PalgharP99000003314· filed May 2018 → now May 2019· 89.1% built· 1 complaint
- Antariksha Apartment7.4 yr overdueRavi Mahajan Builders & Developers Pvt.Ltd. · Nashik, NashikP51600009960· 90.9% built
- Mahavir Universe - Phoenix7.4 yr overdueUniverse Developers · Kurla, Mumbai SuburbanP51800002709· 79.1% built· 1 complaint
- NOBLE ORCHID7.4 yr overdueAMITKUMAR ZAVERCHAND SHETH · Mahad (M Cl), RaigarhP52000002417· 90.9% built
- PAWAN RESIDENCY7.4 yr overduePAWAN ENTERPRISE · Uran, RaigarhP52000011799· 90.9% built
- ARIHANT RESIDENCY7.4 yr overdueAtul Vijaykant Moog · Kolhapur (M Corp.), KolhapurP53000011755· 90.9% built
- GIRIVIHAR7.4 yr overdueABHINANDAN ENTERPRISE · Thane, ThaneP51700009018· 48.2% built
- GULMOHAR HERITAGE BUILDING NO 3 WING C AND D7.4 yr overdueVIVA SWASTIK HOMES · Vasai, PalgharP99000002070· filed Jun 2018 → now May 2019· 90.9% built
- PLATINUM HERITAGE7.4 yr overdueDARSHAN SAGAR DEVELOPERS · patlipada, ThaneP51700005172· filed May 2018 → now May 2019· 78.2% built· 12 complaints
- RUNWAL SERENE7.4 yr overdueRunwal Construction Private Limited · Kurla, Mumbai SuburbanP51800000347· filed May 2018 → now May 2019· 90.9% built· 1 complaint
- GURU PRAJAKTA7.4 yr overduePRAJ DEVELOPERS · Lohgaon, PuneP52100001792· 81.4% built
- Amrutvilla7.4 yr overdueM/s Abhiraj Builders · Chakankar mala, PuneP52100005156· 81.8% built
- CHAURANG SUNSHINE7.4 yr overdueCHAURANG BUILDERS · Mumbai, Mumbai SuburbanP51800008938· filed May 2018 → now May 2019· 90.9% built
- Rustomjee Azziano Wing H7.4 yr overdueKapstone Constructions Private Limited · Thane, ThaneP51700001453· 89.1% built
- Sarovar Residency7.4 yr overdueChandrakant Shankar Bhide · Talegaon Dabhade (M Cl), PuneP52100008917· 82.7% built
- ANIKA ARCADE7.4 yr overdueArun Pitamber Sheth · PISOLI, PuneP52100018361· 55.5% built
- PANVELKAR SANKALP WING B7.4 yr overdueGEETAI ENTERPRISES · Ambarnath, ThaneP51700011019· 90.9% built
- G N HEIGHTS7.4 yr overdueG N DEVELOPERS · Solapur (M Corp.), SolapurP52600007456· 40.9% built
- Rucha Phase II7.4 yr overdueKEDAR RANADE · Punawale, PuneP52100001692· 81.8% built
- HINGLAJ7.4 yr overdueBHARAT JETHLAL THAKKAR · HIRAWADI, PANCHAVATI NASIK, NashikP51600014802· 90.9% built
- NAKSHATRA RESIDENCY7.4 yr overdueCHETAN RANGNATHRAO WATHWADE · OSMANABAD, OsmanabadP52500011272· 50.9% built
- Prime Group Project Satyaniwas7.4 yr overdueNITIN VASUDEV BHANDARKAR · Borivali, Mumbai SuburbanP51800001445· 90.9% built· 1 complaint
- NAMAN VIHAR7.4 yr overdueSANJAY SHYAMLAL VYAS · Tisgaon, AurangabadP51500005043· 50% built
- AVISHKAR RESIDENCY7.4 yr overdueSHREE DYC REALITIES PVT. LTD. · Nagpur (M Corp.), NagpurP50500001173· 47.5% built
- PARIJAT C7.4 yr overdueDEVEN DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500007708· 58.6% built
- NAVASHISH7.4 yr overdueKEDAR RANADE · TULSHIBAUGWALE COLONY, PuneP52100001911· 90.9% built
- Damji Shamji Corporate Square - A Wing7.4 yr overdueCoronate Constructions · Kurla, Mumbai SuburbanP51800001495· 80.9% built
- SAIPRASAD APPARTMENT7.4 yr overdueSAIKRUPA DEVELOPERS · WARDHA, WardhaP50400013320· 81.8% built
- SIDDHGANESH RESIDENCY7.4 yr overdueMeenakshi Shankarrao Mali · Godoli (CT), SataraP52700008072· 69.1% built
- Silver Leaf Residency7.4 yr overdueM/s Inspire Group · PANZARWADA, SindhudurgP52900005266· filed May 2018 → now May 2019· 87.1% built
- WISTERIA C BUILDING PHASE 17.4 yr overdueMR DILIP KANAIYALAL TILWANI · chikhali Bk, PuneP52100007292· 90.9% built
- LA RIVERIA7.4 yr overdueLAKHANI BUILDERS PVT LTD · Panvel, RaigarhP52000001858· 80.7% built
- Rucha Phase I7.4 yr overdueKEDAR RANADE · NEAR BLUE WATER HOTEL, PuneP52100001941· 81.8% built
- CLEMENT REGENCY7.4 yr overdueCLEMENT REGENCY · Vasai, PalgharP99000009464· 54.5% built
- SAMARTH DHANVATIKA7.4 yr overdueSWAMI SAMARTH DEVELOPERS · Wadagaon (CT), PuneP52100005854· 39.1% built
- MADHUMITA7.4 yr overdueKEDAR RANADE · MAHAGANESH COLONY, PuneP52100001656· 90.9% built
- THE HOUSE OF LORDS7.4 yr overdueTHE HOUSE OF LORDS · Pune (M Corp.), PuneP52100006066· filed Jun 2018 → now May 2019· 68.2% built
- GURUMAULI RESIDENCY7.4 yr overdueSUVARNA SANJAY SAYANKAR · Nashik (M Corp.), NashikP51600006854· 81.8% built
- SAMRUDDHI7.4 yr overdueKishor Ramchandra Kulkarni · DOMBIVLI, ThaneP51700013478· 74.5% built
- GRAND ICON7.4 yr overdueTRIMURTI DEVELOPERS · NEAR TRIMURTI CHOWK, PuneP52100006202· 56.4% built
- MAHALAXMI APPARTMENT7.4 yr overdueSHALIK MAHADEORAO URKUDE · NEAR DR MUNJE, YavatmalP51000015251· 9.2% built
- SABARI HILLGRANGE7.4 yr overdueSabari Developers LLP · chembur, Mumbai SuburbanP51800007070· 92.3% built
- LAXMIPATI TOWER7.4 yr overdueSBM DEVELOPERS · MOUDA, NagpurP50500015456· 72.3% built
- ADITYASAI LANDMARK7.4 yr overdueADITYASAI BUIDERS · Sangli Miraj Kupwad (M Corp.), SangliP53100000833· 81.8% built
- GULMOHAR7.4 yr overdueM/S SERENE LIFESPACES · ULWE, RaigarhP52000000719· 65.5% built
- KAKADE PROPERTIES7.4 yr overdueKUNAL PRAKASH KAKADE · Pimpri Chinchawad (M Corp.), PuneP52100010667· 11.8% built
- PRERNA7.4 yr overdueLAGOO BUILDERS AND CONSULTANTS PVT LTD · Sangli Miraj Kupwad (M Corp.), SangliP53100000286· 76.8% built
- Sopan Residency7.4 yr overdueMauli Enterprises · Haveli, PuneP52100007906· 72.7% built
- Green Republic7.4 yr overdueSamrat Buildcon · Wagholi, PuneP52100009638· 90.9% built· 2 complaints
- Anand Gold Coin7.4 yr overdueAnand Infra · Baramati (M Cl), PuneP52100007171· 74.5% built
- HARIKRIPA SRA CO OP HGS7.4 yr overdueSAI BHAGYAWAN ENTERPRISES · Kurla, Mumbai SuburbanP51800007469· 90.9% built
- RACHANA HEIGHTS7.4 yr overdueRESHMA VIKAS BAMBULKAR · Badlapur (M Cl), ThaneP51700014144· 74.1% built
- Rutuja Heights7.4 yr overdueOm Developers · Pimpri Chinchawad (M Corp.), PuneP52100009892· 63.6% built
- DWARKA RESIDENCY WING-A7.4 yr overdueSHRI PANDURANG MARUTI KACHARE · JALOCHI TALUKA BARAMATI, PuneP52100015319· 54.5% built
- Sapphire Greens7.4 yr overdueShreem Corporation · Waksai, PuneP52100002171· filed Jun 2018 → now Jun 2019· 78.2% built
- UTSAV RESIDENCY7.4 yr overdueROYAL DEVELOPERS · WAGHOLI, PuneP52100006886· 81.8% built
- YASH HEIGHTS7.4 yr overdueYash Developers · Navi Mumbai, RaigarhP52000007304· 73.2% built
- NEELKANTH VANDAN7.4 yr overdueROOPA ASSOCIATES · NEAR SAI MANDIR, RaigarhP52000001990· 62.9% built
- Classic Samarth Villa7.4 yr overdueShree Rajrajeshwar Builders & Developers · Aurangabad (M Corp.), AurangabadP51500007813· 90.9% built
- Sugam Cooperative Housing Society Limited7.4 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Erandwane, PuneP52100012123· 90.9% built
- SUWARNA KALASH7.4 yr overdueMAHESH VASUDEV KANDALGAONKAR · Oras Bk., SindhudurgP52900013174· 36.8% built
- LEAF VILLA7.4 yr overdueSHREE KHODIYAR DEVELOPERS · Uran, RaigarhP52000004152· 63.6% built
- Jai Ganesh7.4 yr overdueVastushri construction · Vadgaon Mawal, PuneP52100011271· filed Jun 2018 → now Jun 2019· 81.8% built
- Mahabhadra Residency7.4 yr overdueSHRIGANESH DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000003371· 90.9% built
- Areej Park7.4 yr overdueS. B. Homes Builders and Developers · Uktad, RatnagiriP52800001783· 76.4% built
- METRO HIGHLAND PHASE I7.4 yr overdueMETRO DEVELOPERS · Ambarnath, ThaneP51700005374· filed Jun 2018 → now Jun 2019· 90.5% built
- ADVITIYA - B7.4 yr overdueSILVER LANDMARKS · AMBAI TANK AREA, KolhapurP53000015013· 90.9% built
- SHREE GOHIL MANSION CO OP HOUSING SOCIETY LTD7.4 yr overdueVIDISHA REAL ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800009541· filed Jun 2018 → now Jun 2019· 90.9% built
- LODHA SPLENDORA PLATINO E TO G , VIVANT A TO D7.4 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000199· 78.2% built· 14 complaints
- SHREE SIDDHI RESIDENCY7.4 yr overdueGANGADHAR RAMESH BHALEKAR · Pimpri Chinchawad (M Corp.), PuneP52100012836· 76.8% built
- NAMDEV PLAZA7.4 yr overdueMETRO INFRA · Ambarnath, ThaneP51700003887· 58.2% built
- SAMARTH ANGAN7.4 yr overdueSAMARTH KRUPA DEVELOPERS · Malwan (M Cl), SindhudurgP52900010854· 90.9% built
- VBHC Greenwoods7.4 yr overdueVBHDC Bangalore Value Homes Private Limited · Palghar, PalgharP99000001539· filed Jun 2018 → now Jun 2019· 81.8% built· 3 complaints
- SIROCCO GRANDE7.4 yr overdueBENCHMARK TOWN PLANNING LLP · Punavale, PuneP52100000326· 75.3% built· 11 complaints
- FLORIDA RIVER BANK7.4 yr overdueONE EARTH · Mundhawa, PuneP52100000236· 90.9% built
- POONAM ESTATE CL 2 BLG NO 7 8 97.4 yr overdueRavi Developments · Thane, ThaneP51700008166· 68.2% built
- Konark Orchid I and J7.4 yr overdueKaria Realty · Wagholi, PuneP52100016266· 90.9% built
- SHREE SHIVNATH DEVELOPERS7.4 yr overdueSHREE SHIVNATH DEVELOPERS · Kubhephal, AurangabadP51500011333· 24.6% built
- Apple Tree Cottage7.4 yr overdueSaraswati Constructions · pune, PuneP52100003385· 72.6% built
- SAIRAJ SKY COURT APARTMENTS7.4 yr overdueSAIRAJ BUILDERS AND DEVELOPERS · Karmayogi Nagar, NashikP51600007109· filed Jun 2018 → now Jun 2019· 90.9% built
- ANAND TARANG B1 AND B27.4 yr overdueR K LUNKAD BUILDERS AND PROMOTERS · Charoli Phata, PuneP52100000126· 90.9% built
- GALAXEE APARTMENT7.4 yr overdueHASMUKH INDRADEV GUPTA · LONAVALA, PuneP52100014995· 90.9% built
- ELLANZA PHASE-A7.4 yr overdueMAHESH VITTHAL · WADGAON BUDRUK, PuneP52100003171· 74.4% built
- SHREE DATTA NIWARA7.4 yr overdueTHE HOME MAKERS · Nagpur (M Corp.), NagpurP50500008983· filed Jun 2018 → now Jun 2019· 90.9% built
- August Homes Phase II7.4 yr overdueChampalal Kanhaiyalal Khinvasara · Khinvasara Park, AurangabadP51500003877· 81.8% built
- SAHIL HEIGHTS7.4 yr overdueVAISHNAVI PROMOTERS AND DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100010663· 56.1% built· 2 complaints
- VASUDEV SKY HIGH7.4 yr overdueSHREE PRATHAMESH DEVELOPER · Thane, ThaneP51700003503· 59% built
- NEW CUFFE PARADE - LODHA ENCHANTE7.4 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000367· filed Jun 2018 → now Jun 2019· 81.8% built· 16 complaints
- Nakshatra Greens7.4 yr overdueJSB Buildcon LLP · Vasai, PalgharP99000005051· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- VIMAL KASTURI7.4 yr overdueAISHWARYA VIMAL BUILDERS · Haveli, PuneP52100009078· 90.9% built
- Vibha7.4 yr overdueBKP Infraa · NARHE, PuneP52100005970· filed Jun 2018 → now Jun 2019· 42% built
- Alankapuram ph 2 D building7.4 yr overdueR K Lunkad Housing corporation · CHARHOLI, PuneP52100000334· 81.8% built
- SUVIRA NEST7.4 yr overdueSUVIRA GROUP ·P52100011278· 72.1% built
- SARASWATI APARTMENT7.4 yr overdueGANESH SAKHARAM KANDEKAR · Bharana Naka, RatnagiriP52800010417· 63.6% built
- MANOHAR SHRUSTI7.4 yr overdueSAI VIDYA CONSTRUCTIONS · Kolhapur (M Corp.), KolhapurP53000007220· 92.7% built
- ARTEMIS7.4 yr overdueCALYX ESTATES · Wadgaon Bk, PuneP52100002256· filed Jun 2018 → now Jun 2019· 90.9% built
- MEENAKSHI HEIGHTS PHASE 17.4 yr overdueVIVA MEENAKSHI REALTY · Vasai, PalgharP99000007255· 32.5% built
- Vertical Oriana Phase II7.4 yr overdueVertical Infra · Mundhwa, PuneP52100003699· 33.9% built
- SHREE GURUDEV RESIDENCY7.4 yr overdueNITIN SAHEBRAO UMAP · Amravati (M Corp.), AmravatiP50300013548· 30% built
- Uma Vatika7.4 yr overdueUma Creative · Ambarnath, ThaneP51700003281· 66.8% built
- Sai Darshan7.4 yr overdueZenith Enterprises · Tembhode, PalgharP99000014724· 90.9% built
- Samarth Nilaya7.4 yr overdueShree Samarthkrupa Associates · Haveli, PuneP52100001584· 72.7% built
- The Empire State7.4 yr overdueShivdatta Associates · Sangli Miraj Kupwad (M Corp.), SangliP53100000993· 81.8% built
- OPAL SQUARE7.4 yr overdueShuban Buildpro LLP · Thane, ThaneP51700005705· 63.6% built
- SHIVGANGA DUPLEX ROW HOUSE7.4 yr overdueC S BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600008595· 36.8% built
- Greens Centre7.4 yr overdueAMJ Land Developers · Chinchwad, PuneP52100013159· 81.8% built
- Blue Bell7.4 yr overdueAbhaysinh Dhadve Patil Constructions Private Limited · Baner, PuneP52100008278· 88.2% built· 9 complaints
- Highrise Galaxy7.4 yr overdueHIGHRISE BUILDCON · AMBEGAON Bk, PuneP52100012996· 72.7% built
- BHAKTI SAPPHIRE7.4 yr overdueDHAVAL BUILDERS · Pune City, PuneP52100000646· 58.3% built
- 1 Hallmark Avenue Phase I7.4 yr overdueRajHeramb Properties · Ravet, PuneP52100002760· filed Jun 2018 → now Jun 2019· 89.1% built
- NEW CUFFE PARADE - LODHA DIORO AND ELISIUM7.4 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000314· filed Jun 2018 → now Jun 2019· 81.8% built· 38 complaints
- OZONE7.4 yr overdueAMMA BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600011883· filed Jun 2018 → now Jun 2019· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.