RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 17 of 59
- Om Ganesh Krupa7.1 yr overdueDharma Construction · Borivali, Mumbai SuburbanP51800004592· 90.9% built
- OZONE7.1 yr overdueAMMA BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600011883· filed Jun 2018 → now Jun 2019· 90.9% built
- ARMAAN RESIDENCY7.1 yr overdueRAIS AMIR PATEL · Panvel, RaigarhP52000005926· 50% built
- KONARK SOLITAIRE - PHASE 17.1 yr overdueKONARK REALTIES J.V. · NEXT TO KDMC "A" WARD, ThaneP51700009356· 90.9% built
- shree balaji nagar7.1 yr overduepradip badrinarayan mundada · Kopargaon (M Cl), AhmednagarP52200013077· 78.2% built
- Vrindavan Park7.1 yr overdueMohammed Salim Yusuf · Kalyan, ThaneP51700003010· 88.5% built
- Star City7.1 yr overdueYasmeen Gulaam Tandel · Shringartali, RatnagiriP52800008558· 51.8% built
- ARTEMIS7.1 yr overdueCALYX ESTATES · Wadgaon Bk, PuneP52100002256· filed Jun 2018 → now Jun 2019· 90.9% built· 3 complaints
- SAIRAJ SKY COURT APARTMENTS7.1 yr overdueSAIRAJ BUILDERS AND DEVELOPERS · Karmayogi Nagar, NashikP51600007109· filed Jun 2018 → now Jun 2019· 90.9% built
- TULSA NAMDEO RESIDENCY7.1 yr overdueRAM VASDEV BATHIJA · Ulawe, RaigarhP52000005472· 56.8% built· 1 complaint
- Rachana Madhukosh Wing C7.1 yr overdueRachana construction Co. (Nagpur) Pvt. Ltd. · Bhamti, NagpurP50500015593· 90.9% built
- SINDHU SRUSHTI7.1 yr overdueSHREE VIGHNAHAR PROMOTERS AND BUILDERS PVT LTD · Junnar, PuneP52100005663· 78% built
- AMITs COLORI Phase-II H and I Building7.1 yr overdueAMIT ENTERPRISES HOUSING LIMITED · Undri, PuneP52100001940· 95.5% built· 2 complaints
- EMERALD PH-IV7.1 yr overdueGAWADE CONSTRUCTION COMPANY · Wakad, PuneP52100001028· 76.4% built
- BHOOMI NIWAS7.1 yr overdueBHOOMI CORPARATION · PALGHAR, PalgharP99000015823· 0.5% built
- NEELKANTH JYOT7.1 yr overduePRAPTI ENTERPRISES · Sape, ThaneP51700010769· 90.9% built
- Tirumala Habitats7.1 yr overdueAAP Realtors Ltd. · Kurla, Mumbai SuburbanP51800004278· 96.1% built· 17 complaints
- VALLABH C H S LTD PROPOSED7.1 yr overdueSpendor Shelters Private Limited · Kalyan, ThaneP51700001106· 31.8% built
- TATER FLORENCE DAISY-C WING7.1 yr overdueTATER REALTY · Karjat, RaigarhP52000010005· 88.6% built
- SIDDHICITY7.1 yr overdueSiddhitech Homes Private Limited · Ambarnath, ThaneP51700001597· filed Jun 2018 → now Jun 2019· 85.2% built· 24 complaints
- Rathod Niwas7.1 yr overdueAiM Construction Co. · Andheri, Mumbai SuburbanP51800006556· 28.2% built
- MAITRI SIYA APARTMENT7.1 yr overdueMAITRI AND PP REALTORS · Borivali, Mumbai SuburbanP51800012159· 35.4% built
- POONAM ESTATE CL 2 BLG NO 7 8 97.1 yr overdueRavi Developments · Thane, ThaneP51700008166· 68.2% built
- MITHA NAGAR ARCHANA CHS LTD7.1 yr overdueDHANSHREE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800013116· 67.5% built· 3 complaints
- SIROCCO GRANDE7.1 yr overdueBENCHMARK TOWN PLANNING LLP · Punavale, PuneP52100000326· 75.3% built· 11 complaints
- Lotus Laxmi 27.1 yr overdueSURYA PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100001075· 90.9% built
- Nakshatra Primus7.1 yr overdueJSB Dream Homes Private Limited · Vasai, PalgharP99000006041· filed Jun 2018 → now Jun 2019· 87.3% built· 1 complaint
- August Homes Phase II7.1 yr overdueChampalal Kanhaiyalal Khinvasara · Khinvasara Park, AurangabadP51500003877· 81.8% built
- NAVKAR - B building7.1 yr overdueMAJESTIQUE LIFESPACES LLP · Kondhwa BK, PuneP52100001335· 99.5% built
- VIVAAN7.1 yr overduePADALE CONSTRUCTIONS PVT LTD · Mahalunge, PuneP52100007627· 18.9% built
- Ceratec Greens7.1 yr overdueanand dayanand agarwal · Pune (M Corp.), PuneP52100000432· 90.9% built
- AMAN7.1 yr overdueKANDUR CORPORATION · Borivali, Mumbai SuburbanP51800006880· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- SAIKRUPA CHS7.1 yr overdueHASMUKH R HIRANI · Borivali, Mumbai SuburbanP51800008274· 29.5% built
- 36 AB - Anand Bhavan7.1 yr overdueVaswani 108 Lifespaces LLP · Andheri, Mumbai SuburbanP51800001726· 69.1% built
- Highrise Galaxy7.1 yr overdueHIGHRISE BUILDCON · AMBEGAON Bk, PuneP52100012996· 72.7% built
- COSMOS ENCLAVE7.1 yr overdueASHIRWAD DEVELOPERS · Thane, ThaneP51700001476· 33.9% built· 1 complaint
- Riverview Classic Building No.2,Phase II7.1 yr overdueRUTU BUILDERS · Kalyan, ThaneP51700001351· 98.6% built· 1 complaint
- Greens Centre7.1 yr overdueAMJ Land Developers · Chinchwad, PuneP52100013159· 81.8% built
- AARAMBH7.1 yr overdueCHANDHERE KARPE BUILDERS ·P52100004875· 81.8% built
- Alankapuram ph 2 D building7.1 yr overdueR K Lunkad Housing corporation · CHARHOLI, PuneP52100000334· 81.8% built
- Girnar Tirth7.1 yr overdueParshwa Associates · Kalyan, ThaneP51700007746· 45.5% built· 2 complaints
- Mohan Willows I7.1 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700002731· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- Navkar A building7.1 yr overdueMAJESTIQUE LIFESPACES LLP · Kondhwa BK, PuneP52100001901· 99.5% built
- Yashwin Anand7.1 yr overdueVilas Javdekar & Sanjeevani Developers LLP · Sus, PuneP52100000012· 90.9% built
- Swastik7.1 yr overdueAditya Infrastructure · Karjat, RaigarhP52000009322· filed Jul 2018 → now Jun 2019· 47.3% built
- UNIQUE GREEN7.1 yr overdueMADHU HARSHAD DOSHI · Thane (M Corp.), ThaneP51700009563· filed Jun 2018 → now Jun 2019· 90.9% built· 11 complaints
- GREEN PARK PHASE 37.1 yr overdueRAJENDRA VASANTRAO INGOLE · Rui, PuneP52100008361· 81.8% built
- RHYTHM PARK7.1 yr overdueOM VENTURES · -, PuneP52100016489· 83.6% built
- DURGA HEIGHTS7.1 yr overdueSANDIP PIRAJI KOTKAR · Ahmadnagar (M Corp.), AhmednagarP52200012827· 81.8% built
- SHREE DATTA NIWARA7.1 yr overdueTHE HOME MAKERS · Nagpur (M Corp.), NagpurP50500008983· filed Jun 2018 → now Jun 2019· 90.9% built
- S3 PRIME7.1 yr overdueS-3 PROPERTIES · Sus, PuneP52100002314· 60% built
- ABHINANDAN HEIGHTS7.1 yr overdueABHAY CHANDMAL JAIN · MAKHAMALABAD, NashikP51600015311· 73.2% built
- SHREE GURUDEV RESIDENCY7.1 yr overdueNITIN SAHEBRAO UMAP · Amravati (M Corp.), AmravatiP50300013548· 30% built
- VASANT ELITE7.1 yr overdueM/S VASANT BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700003400· filed Jun 2018 → now Jun 2019· 90.9% built
- GALAXEE APARTMENT7.1 yr overdueHASMUKH INDRADEV GUPTA · LONAVALA, PuneP52100014995· 90.9% built
- HARI SPARSH PHASE III7.1 yr overdueDHARAN INFRA-EPC LIMITED · Bhagur Rural, NashikP51600000225· 90.5% built
- MAITRI HILLS7.1 yr overdueESHWAR ENTERPRISES · Badlapur (M Cl), ThaneP51700011254· 54.5% built
- SHAHS KAMAL SANKUL7.1 yr overdueSHAH BUILDERS AND DEVELOPERS · NASHIK, NashikP51600014862· 72.7% built
- METRO HIGHLAND PHASE I7.1 yr overdueMETRO DEVELOPERS · Ambarnath, ThaneP51700005374· filed Jun 2018 → now Jun 2019· 90.5% built
- Nakshatra Greens7.1 yr overdueJSB Buildcon LLP · Vasai, PalgharP99000005051· filed Jun 2018 → now Jun 2019· 90.9% built· 1 complaint
- OPAL SQUARE7.1 yr overdueShuban Buildpro LLP · Thane, ThaneP51700005705· 63.6% built
- Eves Garden Phase V7.1 yr overdueSancheti Properties · Mundhwa, PuneP52100004610· 50% built
- MAYFAIR AASAAN7.1 yr overdueMAYFAIR HOUSING PRIVATE LIMITED · VALSHET, ThaneP51700013741· 83.7% built
- SHIVGANGA DUPLEX ROW HOUSE7.1 yr overdueC S BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600008595· 36.8% built
- SHIVSHAKTI COMPLEX7.1 yr overdueSHIV SHAKTI CORPORATION · Ambarnath, ThaneP51700006887· 51.9% built
- Alankar E building7.1 yr overdueR K Lunkad Housing Company · charoli, PuneP52100000231· 81.8% built
- VIMAL KASTURI7.1 yr overdueAISHWARYA VIMAL BUILDERS · Haveli, PuneP52100009078· 90.9% built
- SUNRISE HEIGHTS7.1 yr overdueUNITED DEVELOPER · Solapur (M Corp.), SolapurP52600000338· 82.5% built
- Dreamcastle7.1 yr overdueSancheti Space · Wakad, PuneP52100002264· 84.8% built
- LODHA BELMONDO AUGUSTA B7.1 yr overdueLodha Developers Limited · Gahunje, PuneP52100000406· 90.9% built· 2 complaints
- KRISHNA PARADISE7.1 yr overdueGOPAL KRISHNA DEVELOPERS · Kalyan-Dombivali (M Corp.), ThaneP51700012318· 90.9% built
- SHREE SHIVNATH DEVELOPERS7.1 yr overdueSHREE SHIVNATH DEVELOPERS · Kubhephal, AurangabadP51500011333· 24.6% built
- SARASWATI APARTMENT7.1 yr overdueGANESH SAKHARAM KANDEKAR · Bharana Naka, RatnagiriP52800010417· 63.6% built
- Regalia Residency7.1 yr overdueRajHeramb Properties · Bavdhan, PuneP52100001872· filed Jun 2018 → now Jun 2019· 90.9% built
- MEENAKSHI HEIGHTS PHASE 17.1 yr overdueVIVA MEENAKSHI REALTY · Vasai, PalgharP99000007255· 32.5% built
- Apple Tree Cottage7.1 yr overdueSaraswati Constructions · pune, PuneP52100003385· 72.6% built
- RUSHI HEIGHTS7.1 yr overdueMEGHASHAM MALLIKARJUN YEMUL · .., SolapurP52600009148· 90.9% built
- Regency Homes7.1 yr overdueWILSON V MANUEL GONSALVES · Vasai, PalgharP99000006502· 34.5% built
- TANVI RESIDENCY7.1 yr overdueARM ENGINEERS · Shirur, PuneP52100003796· 90.9% built
- COSMOS ORCHID7.1 yr overdueMONARCH DEVELOPERS · Thane (M Corp.), ThaneP51700011044· 87.3% built
- SAI RACHANA7.1 yr overdueSAI ASSOCIATES · Panvel, RaigarhP52000001349· 72.7% built
- DEEP ENCLAVE7.1 yr overdueDATTAGURU ENTERPRISES · BADLAPUR, ThaneP51700014690· 20.5% built
- MORYA PARK PHASE II7.1 yr overdueHARSIDDHI BUILDERS · HARSUL, AurangabadP51500015005· 22.7% built
- HEAVEN HILLS7.1 yr overdueXL REALTORZ · Palghar, PalgharP99000002974· filed Jun 2018 → now Jun 2019· 81.8% built· 2 complaints
- PAPA MAMTA RESIDENCY7.1 yr overdueANUP indrapal BASHANI · Wadagaon (CT), PuneP52100005206· 30.5% built
- GOVINDA HEIGHTS7.1 yr overdueRADHE DEVELOPERS · Nashik, NashikP51600004718· 52.7% built
- BHAKTI SAPPHIRE7.1 yr overdueDHAVAL BUILDERS · Pune City, PuneP52100000646· 58.3% built
- FLORA PHASE I7.1 yr overdueTAPADIA CONSTRUCTIONS LIMITED · TISGAON, AurangabadP51500011591· filed Jun 2018 → now Jun 2019· 79.7% built
- PRISTINE VILLAS PHASE II7.1 yr overdueATHARV DEVELOPERS · Karla, PuneP52100004703· 23.6% built
- ADCON IRIS7.1 yr overdueADCON INFRAPROJECTS PVT.LTD. · Andheri, Mumbai SuburbanP51800012207· filed Jun 2018 → now Jun 2019· 72.7% built
- RKL Complex B Building7.1 yr overdueRKL Complex · CHARHOLI, PuneP52100000266· 90.9% built
- Avenue D - Phase III7.1 yr overdueVenus Developers · Vasai, PalgharP99000002430· 34.1% built· 1 complaint
- Blue Bell7.1 yr overdueAbhaysinh Dhadve Patil Constructions Private Limited · Baner, PuneP52100008278· 88.2% built· 9 complaints
- KK SHRIRAM7.1 yr overdueKOKANE BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100011061· 90.9% built
- VASANT SPRINGWOODS PHASE 27.1 yr overdueM/S SHREE CONSTRUCTIONS · Badlapur (M Cl), ThaneP51700008622· 90.9% built
- INFINITY TOWER - B WING7.1 yr overdueTULIP DEVELOPERS · Punawale, PuneP52100004824· 77.7% built
- DEVALAYA PHASE 17.1 yr overduePRASHANT SUDHAKARRAO KASHETTIWAR · BHADRAWATI, ChandrapurP50900011153· 35.4% built
- GILT RESIDENCES7.1 yr overdueSAMRAT SPACES · Pune (M Corp.), PuneP52100001614· filed Jun 2018 → now Jun 2019· 18.2% built
- SHREEJI DREAMS7.1 yr overdueSHREEJI DEVELOPERS · Bhosari, PuneP52100003437· 43.6% built
- Chhoriya - Regency7.1 yr overduePragati Infra Services Pvt. Ltd. · Kurdu, SolapurP52600001775· 81.8% built
- LALI RESIDENCY7.1 yr overdueARCHANA DEVELOPERS · GULTEKADI PUNE, PuneP52100008977· 81.8% built
- Nishant iken Phase 17.1 yr overdueGanesh kashiram ahire · Nashik (M Corp.), NashikP51600004851· 76.1% built
- Sai Pradnya7.1 yr overdueDrushti Realtors · Kurla, Mumbai SuburbanP51800007499· filed Jun 2018 → now Jun 2019· 74.1% built· 12 complaints
- NEW CUFFE PARADE - LODHA DIORO AND ELISIUM7.1 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000314· filed Jun 2018 → now Jun 2019· 81.8% built· 38 complaints
- Konark Orchid I and J7.1 yr overdueKaria Realty · Wagholi, PuneP52100016266· 90.9% built
- Riddhi Siddhi Enclave7.1 yr overdueSNEHA CONSTRUCTIONS · Pune City, PuneP52100004206· filed Jun 2018 → now Jun 2019· 67.7% built· 1 complaint
- SHREE SIDDHI RESIDENCY7.1 yr overdueGANGADHAR RAMESH BHALEKAR · Pimpri Chinchawad (M Corp.), PuneP52100012836· 76.8% built
- LODHA SPLENDORA PLATINO E TO G , VIVANT A TO D7.1 yr overdueLODHA DEVELOPERS LIMITED · Thane, ThaneP51700000199· 78.2% built· 14 complaints
- HUM SUB CHSL7.1 yr overdueSHRADDHARPAN DEVELOPERS · Borivali, Mumbai SuburbanP51800004487· filed Jun 2018 → now Jun 2019· 90.9% built· 3 complaints
- MOTIRAM DARSHAN NX7.1 yr overdueMOTIRAM DARSHAN NX · Ambarnath, ThaneP51700006708· 38.6% built
- SAHAKAR DWARKA I7.1 yr overdueSANKET HOMES · PANVEL, RaigarhP52000002292· filed Jun 2018 → now Jun 2019· 81.2% built
- AMBE KRUPA7.1 yr overdueGUDDI ENTERPRISES · Kurla, Mumbai SuburbanP51800002344· 56.6% built
- SAI SADAN RESIDENCY 17.1 yr overdueSACHIN GANPATRAO TAWARE · Baramati (M Cl), PuneP52100008043· 90.9% built
- Eastwoods7.1 yr overdueSRS PROJECTS JV · kondhwa khurd, PuneP52100001430· filed Jun 2018 → now Jun 2019· 90.9% built
- SUVIRA NEST7.1 yr overdueSUVIRA GROUP ·P52100011278· 72.1% built
- PATEL ESTATES7.1 yr overdueVINOD GORDHANBHAI PATEL · GANDHI CHOWK, ThaneP51700010036· 72.7% built
- 1 Hallmark Avenue Phase I7.1 yr overdueRajHeramb Properties · Ravet, PuneP52100002760· filed Jun 2018 → now Jun 2019· 89.1% built
- Vertical Oriana Phase II7.1 yr overdueVertical Infra · Mundhwa, PuneP52100003699· 33.9% built
- Samarth Nilaya7.1 yr overdueShree Samarthkrupa Associates · Haveli, PuneP52100001584· 72.7% built
- Sari Oshiya Park7.1 yr overdueVijaykumar Fulchand Bafna · kondhwa BK, PuneP52100011977· 78.2% built
- UMIYA DARSHAN7.1 yr overdueSHREE UMIYA GROUP · Badlapur (M Cl), ThaneP51700008860· filed Jun 2018 → now Jun 2019· 70.5% built· 2 complaints
- NEELKANTH RESIDENCY7.1 yr overdueSHIVSHAKTI ASSOCIATES · Chikhali Bk., PuneP52100011342· filed Jun 2018 → now Jun 2019· 56.4% built
- Spectra7.1 yr overdueSaarrthi Blue Ventures Limited Liability Partnership · Kothrud, PuneP52100014363· 90.9% built· 1 complaint
- ORCHID CITY BUILDING A7.1 yr overdueS S ASSOCIATES · Baramati (M Cl), PuneP52100004953· filed Jun 2018 → now Jun 2019· 63.2% built
- ANAND TARANG B1 AND B27.1 yr overdueR K LUNKAD BUILDERS AND PROMOTERS · Charoli Phata, PuneP52100000126· 90.9% built
- BON VIVANT7.1 yr overdueMALKANI PROPERTIES · Mundhawa-Keshavnagar, PuneP52100000944· 63.3% built
- SHIVRAI APARTMENT7.1 yr overdueCHANDRIKA SHIVPRASAD ROY · NASHIK, NashikP51600015341· 27.7% built
- SAHIL HEIGHTS7.1 yr overdueVAISHNAVI PROMOTERS AND DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100010663· 56.1% built· 2 complaints
- PRERANA7.1 yr overdueBPN ASSOCIATES · Pune (M Corp.), PuneP52100004966· 52.7% built· 1 complaint
- YOGRAJ SRUSHTI7.1 yr overdueYOGRAJ GROUP · AURANGABAD, AurangabadP51500015073· 42.7% built
- ADVITIYA - B7.1 yr overdueSILVER LANDMARKS · AMBAI TANK AREA, KolhapurP53000015013· 90.9% built
- BHAIRAAV SIGNATURE7.1 yr overdueSHARPMIND INFRASTRUCTURE PRIVATE LIMITED · Thane, ThaneP51700003768· filed Jun 2018 → now Jun 2019· 98.2% built
- DEZINER ASTER7.1 yr overdueDEZINERS HOMES PVT. LTD. · Ulawe, RaigarhP52000006304· 90.8% built
- NYATI EVARA I7.1 yr overdueNYATI BUILDERS PRIVATE LIMITED · UNDRI, PuneP52100000455· 89.2% built· 2 complaints
- PANCHARATNA COMPLEX7.1 yr overdueHONESTY BULDER AND DEVELOPERS · Lodhivali, RaigarhP52000008880· filed Jul 2018 → now Jun 2019· 90.9% built
- Avnish Residency7.1 yr overduePrathamesh Buildwell · Collage Road, NashikP51600014671· 90.9% built
- DREAMZ PARK WING B7.1 yr overdueDREAMZ INFRASPACE · Amravati (M Corp.), AmravatiP50300005712· 63.6% built
- Rolling Hills7.1 yr overdueSHIVNERI ASSOCIATES · Haveli, PuneP52100001755· 81.8% built
- OAKWOOD HILLS7.1 yr overdueSHARAD SOPAN SHENDE · Baner, PuneP52100001235· 39.5% built
- SHREE RADHE COMPLEX7.1 yr overdueSHRIKRUSHNA DEVELOPERS · Nagpur (M Corp.), NagpurP50500006951· filed Jun 2018 → now Jun 2019· 81.8% built
- VBHC Greenwoods7.1 yr overdueVBHDC Bangalore Value Homes Private Limited · Palghar, PalgharP99000001539· filed Jun 2018 → now Jun 2019· 81.8% built· 3 complaints
- PLATINUM PRIDE B WING7.1 yr overdueSHREE ASHTAVINAYAK DEVELOPERS · NEAR GOKUL DAIRY, RaigarhP52000004013· 67.7% built
- SAMARTH ANGAN7.1 yr overdueSAMARTH KRUPA DEVELOPERS · Malwan (M Cl), SindhudurgP52900010854· 90.9% built
- DAYALHEIGHTS7.1 yr overdueVINOD PREMCHAND CHANDWANI · Haveli, PuneP52100000191· 90.9% built
- The Empire State7.1 yr overdueShivdatta Associates · Sangli Miraj Kupwad (M Corp.), SangliP53100000993· 81.8% built
- ELLANZA PHASE-A7.1 yr overdueMAHESH VITTHAL · WADGAON BUDRUK, PuneP52100003171· 74.4% built
- NEW CUFFE PARADE - LODHA ENCHANTE7.1 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000367· filed Jun 2018 → now Jun 2019· 81.8% built· 16 complaints
- Prudentia - Phase 17.1 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100000114· 66.7% built
- MARATHON EMBLEM-17.1 yr overdueUNITED ENTERPRISES · Kurla, Mumbai SuburbanP51800000645· 63.3% built
- Abhimanyu Nagari7.1 yr overdueAbhimanyu Group · Baramati (M Cl), PuneP52100010222· 77.3% built
- JOANITA VILLA7.1 yr overdueWESTIN DEVELOPERS PVT. LTD · Mumbai City, Mumbai CityP51900005532· filed Jun 2018 → now Jun 2019· 71.4% built· 3 complaints
- The Address - 17.1 yr overdueSOL Developers · MOSHI, PuneP52100007674· 90.9% built
- Prozone Trade Centre7.1 yr overdueEmpire Mall Private Limited · Aurangabad, AurangabadP51500003693· filed Jun 2018 → now Jun 2019· 54.5% built· 5 complaints
- TANISHQ CASITA7.1 yr overdueNAVKAAR ASSOCIATES · AMBEGAON Bk, PuneP52100013979· 93.9% built
- Vibha7.1 yr overdueBKP Infraa · NARHE, PuneP52100005970· filed Jun 2018 → now Jun 2019· 42% built
- SRISHTI ELEGANCE7.1 yr overdueSWASTIK REALTORS · Kurla, Mumbai SuburbanP51800000568· 90.9% built
- PEBBLES 57.1 yr overdueSPACE INFRASTRUCTURE · Nagpur (M Corp.), NagpurP50500012361· 85.9% built
- Krishna Kunj7.1 yr overdueRajendra Dinkar Phatarpekar · Kasai, SindhudurgP52900004075· 24.5% built
- MAJESTIC PARADISE7.1 yr overdueBURHANI BUILDER AND LAND DEVELOPERS · Palakwadi (Wardha), WardhaP50400002111· 47.3% built
- SHREE GANESH IMPERIAL7.1 yr overduePRAKASH RAMAN CHAUDHARI · Shahade (r), NandurbarP49700008973· 77.3% built
- KARMAA PINNACLE7.1 yr overdueKARMAA BUILDERS · Nashik Road, NashikP51600001393· 90.9% built· 2 complaints
- SHOPPERS SQUARE7.1 yr overdueYUSUF JAMAL SHAIKH · Solapur (M Corp.), SolapurP52600004287· 68.2% built
- SHUBH NAKASHTRA7.1 yr overdueSHUBH DEVELOPERS · RAHU HOTEL, NashikP51600010875· 63.6% built
- Venkatesh Galaxy7.1 yr overdueVenkatesh Associates · Tilekar Nagar, PuneP52100006088· 51.1% built
- IMPERIAL MEADOWS PHASE 17.1 yr overdueTALWARE BUILDERS PRIVATE LIMITED · Nashik, NashikP51600014067· 38.5% built
- HOLLYHOCK CITY7.1 yr overdueKate Moze Associates · LOHGAON, PuneP52100013107· 70.2% built
- AMBAI RESIDENCY7.1 yr overdueVASANT MUKUNDAS SHEDJI · Sangli Miraj Kupwad (M Corp.), SangliP53100000353· 58.6% built
- CRYSTAL TOWER7.1 yr overdueASIF SATTAR PATHAN · Solapur (M Corp.), SolapurP52600010080· 49.1% built
- SAI GANESH APARTMENT7.1 yr overdueSHRI DATTAKRUPA DEVLOPERS · Lanja (CT), RatnagiriP52800004959· filed Jun 2018 → now Jul 2019· 72.7% built
- PUSHPVIHAR7.1 yr overdueA K ENTERPRISES · Aurangabad (CB), AurangabadP51500006569· 68.4% built
- NAVNATH APARTMENT7.1 yr overdueAARTI ESTATES · Ward FSouth, Mumbai CityP51900012813· filed Jul 2018 → now Jul 2019· 90.9% built
- SHIVNERI7.1 yr overdueAAVISHKAR ASSOCIATES · Kalyan, ThaneP51700008705· filed Dec 2018 → now Jul 2019· 90.9% built
- SHIV OM PLAZA7.1 yr overdueSHIVSHAKTI ENTERPRISES · Khedshi, RatnagiriP52800001921· 44.5% built
- VISHWA LAXMI7.1 yr overdueSANTOSH RAMCHANDRA JAGTAP · Trishul Housing Society, PuneP52100010518· 90.9% built
- CENTURY PLAZA7.1 yr overdueSURABHI DEVELOPERS · Ichalkaranji (M Cl), KolhapurP53000002854· 90.9% built
- SHANTI VIJAY7.1 yr overdueNavkar Infra Projects · Borivali, Mumbai SuburbanP51800000790· 90.3% built
- GOVIND PLAZA7.1 yr overdueG P DEVELOPERS · NEAR COURT BUILDING WANLESWADI, SangliP53100008021· 59.1% built
- SHIVSAMBO NILAYAN7.1 yr overdueSHUBHANGI PRAMOD RISAWADE · Sangli Miraj Kupwad (M Corp.), SangliP53100007152· 81.8% built
- ADIRAJ RESIDENCY7.1 yr overdueKHORJUVEKAR BUILDERS & DEVELOPERS · Sawantwadi (M Cl), SindhudurgP52900007870· 77.3% built
- THE CROWN7.1 yr overdueABC DEVELOPERS · Hingoli, HingoliP51200012404· 53% built
- WATER EDGE7.1 yr overdueRAYKAR MARATHE DEVELOPERS · PUNE, PuneP52100008074· 11.8% built
- SAI SIDDHI7.1 yr overdueDHARMENDRA SINGH PARIHAR · SAPHALE, PalgharP99000014781· 52.7% built
- MAHALAXMI SANYOG PARK7.0 yr overdueMAHALAXMI BUILDERS AND DEVELOPERS · Besa, NagpurP50500006225· 71.7% built
- MAHADKAR RESIDENCY7.0 yr overdueP.V,Mahadkar and Associates · Kothrud, PuneP52100006972· 99.9% built
- MARUTI DARSHAN7.0 yr overdueKOMAL DREAM BUILDERS PRIVATE LIMITED · Thane, ThaneP51700002727· 73.4% built
- ARIHANT VILLA7.0 yr overdueDEEPA MAHAVEER KABADGE · Sangli Miraj Kupwad (M Corp.), SangliP53100006413· 78.2% built
- PEARL RESIDENCY - WING-A, RESIDENTIAL PHASE - I7.0 yr overdueGIRIRAJ ENTERPRISES · Andheri, Mumbai SuburbanP51800009344· 94.1% built· 2 complaints
- GOVIND SMRUTI7.0 yr overdueB.Kalyanji Realty · Khalapur, RaigarhP52000002247· 82.3% built
- PEARL RESIDENCY - WING-A, COMMERCIAL PHASE-II7.0 yr overdueGIRIRAJ ENTERPRISES · Andheri, Mumbai SuburbanP51800004037· 69.5% built
- Shiv Elite Phase III7.0 yr overdueOm Shivam Buildcon Private Limited · Shankarpur, NagpurP50500005732· 89.1% built
- Guru Villa7.0 yr overdueAllwin Infrastructure · Nashik (M Corp.), NashikP51600011745· 81.8% built
- SHAH ARCADE III7.0 yr overdueSHAH HOUSECON PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800003642· filed Jul 2018 → now Jul 2019· 95.9% built· 3 complaints
- KARMAA PINNACLE7.0 yr overduePINNACLE HABITATS LLP · Nashik, NashikP51600009298· 73.6% built
- SAI VISHWANGAN7.0 yr overdueAB Reality · Shirwal, SataraP52100006939· 90.9% built
- Nakshatra I-Land - 27.0 yr overdueEllora Homemakers Pvt. Ltd. · Moshi, PuneP52100007078· 90.9% built
- Shivmudra Darshan Appartment7.0 yr overdueShivmudra Builders and Developers · Nashik, NashikP51600012624· filed Jul 2018 → now Jul 2019· 65.5% built
- DESHPANDE HEIGHTS7.0 yr overdueH M BUILDERS · Nashik (M Corp.), NashikP51600004222· 51.8% built
- SHREE SAVALI WING B7.0 yr overdueUMESH RAOSAHEB PAWAR PATIL HUF · Thane, ThaneP51700005638· 90.9% built
- CANAL HEIGHTS7.0 yr overdueNAVNIT STAR REALTY LLP · Nagpur (M Corp.), NagpurP50500006199· 69.5% built
- SHREE PRATHAMESH PARK7.0 yr overdueSHREE CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100001644· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.