RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 21 of 59
- JIN YASH6.6 yr overdueContendre Infratech Pvt. Ltd. · SHILPHATA, RaigarhP52000017145· 90.9% built
- GANESH AURA6.6 yr overdueVEDDANT REALTY · Haveli, PuneP52100005169· 72.7% built
- AMIT DEVELOPERS AND BUILDER6.6 yr overdueAMIT DEVELOPERS & BUILDER · Pune City, PuneP52100014355· 86.4% built
- PAVILION 796.6 yr overdueWAKADKAR ASSOCIATE · Wakad, PuneP52100004489· 23.6% built
- GANDHARV SERENITY6.6 yr overdueGandharv Developers · HADAPSAR, PuneP52100005405· filed Jun 2019 → now Dec 2019· 35% built
- NEMINATH APARTMENT SRA CHS AND SHREE SIDDHAGIRI SRA CHS6.6 yr overdueSUBHASH VELJI CHAWDA · Borivali, Mumbai SuburbanP51800011251· 41.9% built
- AFFAN PLAZA6.6 yr overdueTAJ BUILDERS AND DEVELOPERS · GANDHARPALE, RaigarhP52000013713· 81.8% built
- Elite Abodeh6.6 yr overdueGanesh Dashrath Dale · LOHGAON, PuneP52100009181· filed Dec 2018 → now Dec 2019· 97.3% built
- NEPTUNE SWARAJYA SECTOR 2 - B126.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008852· filed Dec 2018 → now Dec 2019· 60.2% built
- DEV RATNA6.6 yr overdueSDC DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700007785· 90.9% built
- SHREEJI VANDAN6.6 yr overdueSHREE LAND DEVELOPERS AND BUILDERS · Indira Nagar, NashikP51600011735· 90.9% built
- Raza Imperial6.6 yr overdueShakeel Ahmad Abdul Gafoor Quazi · Raza Colony, NashikP51600009442· 90.9% built
- PRASHANT UDYAN CHS LTD6.6 yr overdueSHREE CHAMUNDA REALTORS · Mumbai City, Mumbai CityP51900009273· 43.2% built
- Rachayati Enclave6.6 yr overdueRachayati Realtors and Developers pvt ltd · Amravati (M Corp.), AmravatiP50300013564· 90.9% built
- AND SUNFLOWER6.6 yr overdueANANTNATH DEVELOPERS · Thane, ThaneP51700002966· 90.9% built· 1 complaint
- Sun Planet Phase III6.6 yr overdueJindal Mittal Graha Nirman Pvt. Ltd. · Haveli, PuneP52100018258· 81.8% built
- N.M.Joshi Building No.4 Annex6.6 yr overdueSHREE DEVELOPERS · Kurla, Mumbai SuburbanP51800006487· 80.6% built
- Construction of 406 TR TS 442 EWS 258 MIG TS at Gavanpada Mulund east Mumbai6.6 yr overdueMHADA · Kurla, Mumbai SuburbanP51800000024· filed Dec 2018 → now Dec 2019· 90.8% built
- TULIP CLASSIC6.6 yr overdueTushar Mohanrao Khatavkar · Rajarampuri 12th lane, KolhapurP53000015468· 72.5% built
- Clover Casablanca Phase II6.6 yr overdueWorthwhile Properties Pvt. Ltd. · Mawal, PuneP52100002277· filed Dec 2018 → now Dec 2019· 90.9% built
- Promenade - The Address6.6 yr overdueWadhwa Residency Pvt Ltd · Kurla, Mumbai SuburbanP51800000201· 90.9% built· 21 complaints
- CHIRAG CITY6.6 yr overdueCHIRAG CONSTRUCTIONS · Amravati (M Corp.), AmravatiP50300010045· 73% built
- DATTA VIHAR6.6 yr overdueSHREE UMIYA BUILDCON · Ambegaon, PuneP52100016362· 90.9% built
- Om Heights6.6 yr overdueOM BUILDERS AND DEVELOPERS · Near Global School, JalgaonP49900015232· 81.8% built
- GRAPE CITY PHASE I6.6 yr overdueMs AMBER ESTATE · ANANDVALLI BEHIND SHRI GURUJI HOSPITAL, ThaneP51700001499· filed Dec 2018 → now Dec 2019· 90.9% built
- JADHAV RESIDENCY6.6 yr overduePALAK BUILDERS · Vasai, PalgharP99000011045· 90.9% built
- LEGRANZ6.6 yr overdueEKTA SHUBHAM VENTURE · Kurla, Mumbai SuburbanP51800000141· filed Dec 2018 → now Dec 2019· 90.9% built· 2 complaints
- NIRMAL DHARA6.6 yr overdueSIDDHIVINAYAK ENTERPRISES · Badlapur (M Cl), ThaneP51700012325· 90.9% built
- KABRA PRARTHNA6.6 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · Andheri, Mumbai SuburbanP51800000499· filed Dec 2018 → now Dec 2019· 99.5% built
- Engracia6.6 yr overdueJagtap Patil Promoters & Builders · Haveli, PuneP52100002471· 81.8% built
- Arihant Enclave6.6 yr overdueKDS Developers Pvt. Ltd. · Borivali, Mumbai SuburbanP51800010229· filed Dec 2018 → now Dec 2019· 95.9% built
- Shree Apartment Phase16.6 yr overdueNandini Mangaldeep Vishnu Associates · Rahatani, PuneP52100014877· 81.8% built
- RANWARA APPARTMENT6.6 yr overduePURI ENGINNEING MARVELS · Shankar Nagar, YavatmalP51000005291· 63.6% built
- SHARNAM HEIGHTS6.6 yr overdueSHYAM BIHARILAL GEHANI · Borivali, Mumbai SuburbanP51800012351· 90.9% built
- LODHA FRESHIA WING D, E6.6 yr overdueLodha Developers Limited · Kalyan, ThaneP51700006149· 90.9% built
- VST3- AAKASJ GANGA 16.6 yr overdueVIDARBHA TOWN DEVELOPERS · BRAMHAPURI, ChandrapurP50900011774· 27.3% built
- NAKSHATRA PLAZA6.6 yr overdueV S KHOT REAL ESTATE DEVELOPERS · Gadhinglaj, KolhapurP53000012651· 90.9% built
- Kisna6.6 yr overdueShreeji Realties Private Limited · Andheri, Mumbai SuburbanP51800003802· 90.9% built
- YASH LAXMI6.6 yr overdueAkshay Developers · Karjat, RaigarhP52000009103· 60% built
- MILLENIUM EMPIRE6.6 yr overdueBHARAT CONSTRUCTION · Panvel, RaigarhP52000001042· 75.2% built
- KIMAYA MAYURSHRI6.6 yr overdueSAMIR AMRUT GANDHI · GANDHI NAGAR, SolapurP52600000788· 26.8% built
- SHEETAL AIRWING6.6 yr overdueTOUGHCONS REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001146· filed Dec 2018 → now Dec 2019· 75.5% built
- Saideep Apartment6.6 yr overdueTithi Enterprises · Nashik (M Corp.), NashikP51600010856· 90.9% built
- VINAY UNIQUE HEIGHTS6.6 yr overdueSUV DEVELOPERS · Vasai, PalgharP99000002691· 83.6% built
- Geetanjali6.6 yr overdueHonest Homes · Chikanghar, ThaneP51700009495· 90.9% built
- SHREE SADGURU COMPLEX PHASE I6.6 yr overdueEARTH HOME · Khalapur, RaigarhP52000011306· 90.9% built
- AAIJI BLISS6.6 yr overdueSHRI GANESH DEVELOPERS · Karanjade, RaigarhP52000011848· 29.5% built
- GAGAN AKANKSHA PHASE 16.6 yr overdueGAGAN HORIZON VENTURES · Koregaon mul, PuneP52100001285· filed Dec 2018 → now Dec 2019· 90.3% built· 26 complaints
- URBAN BRICKS6.6 yr overdueRATAN CIVIL ASSOCIATES PVT LTD · Nashik, NashikP51600013094· 59.1% built
- MARATHON NEXZONE ZODIAC -26.6 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000661· 72.7% built· 2 complaints
- LODHA ETERNIS SERENA A6.6 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800000294· 90.9% built· 1 complaint
- PRIME ROASE6.6 yr overduePRIMEROSE ·P52100002180· 9.1% built
- LABDHI GARDENS PHASE 56.6 yr overdueLabdhi Lifestyle Limited · Neral, Mumbai CityP51900003524· 74.2% built
- MAJESTIQUE CITY6.6 yr overdueMANISH DWARKADAS MAHESHWARI · Wagholi, PuneP52100000113· 90.9% built
- BEAUPRIDE6.6 yr overdueSHETH REALTORS · Andheri, Mumbai SuburbanP51800000418· 87.7% built· 1 complaint
- Ronch Viveza6.6 yr overdueRonch Realty Pvt. Ltd · Valvan, PuneP52100010441· 43.6% built
- Legacy Aura6.6 yr overdueLegacy Lifespaces LLP · Haveli, PuneP52100000710· 90.9% built
- CITY VISTA6.6 yr overdueKOLTE-PATIL REAL ESTATE PRIVATE LIMITED · KharadiP52100007612· 63.6% built· 3 complaints
- SOLITAIRE SEVEN6.6 yr overdueAtul Builders · BANER, PuneP52100006186· filed Dec 2018 → now Dec 2019· 90.9% built
- THE VIDARBHA PREMIER SAHANIWAS CHIKHALI KHURD NAGPUR6.6 yr overduePRAKASH NARAYANRAO RAOLE · VITTHAL NAGAR, NagpurP50500012223· filed Dec 2018 → now Dec 2019· 72.7% built
- THE SPIRES6.6 yr overdueNAIKNAVARE PRIDE AOP · Pune City, PuneP52100000485· filed Dec 2018 → now Dec 2019· 87.9% built
- Uttam Townscapes6.6 yr overdueFORTUNE DEVELOPERS AND INFRASTRUCTURES · Vishrantwadi, PuneP52100014002· 90.9% built
- Sai Saroj6.6 yr overdueM/S Vighnaharta Developers · Ravet, PuneP52100000008· filed Mar 2019 → now Dec 2019· 58.8% built
- KAJAL PRIDE6.6 yr overdueDEEPAK BHAICHAND SHAH · KARJAT, RaigarhP52000014535· 90.9% built
- CRESCENT APARTMENT6.6 yr overdueJHALA INFRATECH · Gangapur Road, NashikP51600001071· 68.2% built
- ANANDTARAS HARITARA6.6 yr overdueANANDTARA PROPERTIES · Haveli, PuneP52100004122· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- SHRI SAHYOG6.6 yr overdueRAMDAS RAOSAHEB JAGTAP · Karanje Peth Satara (CT), SataraP52700006267· filed Dec 2018 → now Dec 2019· 90.9% built
- Venkateshwara Heights B6.6 yr overdueOhana Builders& Developers · Baner, PuneP52100010633· 90.9% built
- Teerth Technospace 126.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006740· filed Dec 2018 → now Dec 2019· 90.9% built
- Varun Buildcon6.6 yr overdueDeepak Bhupatrai Vora · Village Sativali, PalgharP99000015763· 28.6% built
- Vedaarya Homes6.6 yr overdueAdditya Infrastructure · Borkhedi, NagpurP50500003103· filed Dec 2018 → now Dec 2019· 90.9% built
- Pristine Greens Phase 16.6 yr overduePRISTINE PROPERTIES · BORHADEWADI, PuneP52100009406· 90.9% built· 9 complaints
- SHALIMAR SHELTERS6.6 yr overdueSADGURU ENTERPRISES · Borivali, Mumbai SuburbanP51800004740· 90.9% built
- NIVASA UDAAN - PHASE II6.6 yr overdueNIVASA REALTY · LOHEGAON, PuneP52100017799· 37.7% built
- ROSWALT HEIGHTS6.6 yr overdueURBAN HEIGHTS REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800003019· 74.6% built· 1 complaint
- SAPTASUR6.6 yr overdueBHAGIRATHI GROUP · Kothrud, PuneP52100003100· 90.9% built
- AARAMBH6.6 yr overdueSAPTARSHI DEVELOPERS · Shirur, PuneP52100004850· 60.6% built
- Sangam Solitaire A wing6.6 yr overdueSangam Press Pvt Ltd · Pune (M Corp.), PuneP52100000438· 82.5% built
- AG ICON6.6 yr overdueAJIT SUBHASH GAIKWAD · Haveli, PuneP52100005698· filed Dec 2018 → now Dec 2019· 45.5% built
- Sairaj Heights6.6 yr overdueSAIBABA SALES PRIVATE LIMITED · Pimpri Chinchawad (M Corp.), PuneP52100001542· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- QUALITY HEIGHTS I6.6 yr overdueQUALITY CONSTRUCTION CO · Thane, ThaneP51700010184· filed Dec 2018 → now Dec 2019· 90.9% built
- SANKALPA RESIDENCY6.6 yr overdueMAHESH KISAN JADHAV · Kodoli (CT), SataraP52700012239· 90.9% built
- ANA Avant Garde Phase 16.6 yr overdueSTEELFAB ENGINEERING CORPORATION · Thane, ThaneP51700001388· filed Dec 2018 → now Dec 2019· 97.4% built· 25 complaints
- VIMAL RAJ WING A-1, MEDITYARAVIRAJ COMPLEX6.6 yr overdueRITESH RAMESH JAIN · Thane, ThaneP51700007634· 84.5% built
- Mohan Willows II6.6 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700003971· filed Dec 2018 → now Dec 2019· 90.9% built
- NOBEL SAGAR RESIDENCY6.6 yr overdueNOBLE SAGAR CONSTRUCTION · NEAR SHRI NAGARI, SataraP52700010865· 90.9% built
- DANVIJAY C.H.S. LTD6.6 yr overdueANKURDEV BUILDCON · Borivali, Mumbai SuburbanP51800005272· 49.1% built
- SAMUDRIKA6.6 yr overdueESS GEE TRADEFIN PVT LTD · Uran, RaigarhP52000003694· 81.4% built
- PRAMUKH GARDENS PHASE 26.6 yr overduePRASHANT DEVELOPERS PVT LTD · OPP. YOGI HOSPITAL, Dadra & Nagar HaveliP49600000004· 90.9% built
- Shankeshwar Crimson6.6 yr overdueNitin Chhaganlal Jain · Haveli, PuneP52100000087· 90.9% built
- Sai Tirupati Greens Phase- I6.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- BALAJI DARPAN6.6 yr overdueBALAJI INFRA · Panvel, RaigarhP52000005816· 49.4% built
- ASHIRWAD GLORY6.6 yr overdueYUG BUILDERS · Nasik Shivar, NashikP51600012250· 90.9% built
- Choice Ambe Smruti6.6 yr overdueCHOICE BUILDCON LLP · Khalapur, RaigarhP52000000824· 64.3% built
- EKTA GREENVILLE PHASE 36.6 yr overdueEKTA HOUSING PRIVATE LIMITED · Nashik, NashikP51600001510· filed Dec 2018 → now Dec 2019· 71.7% built· 3 complaints
- Sai Hills6.6 yr overdueVighnaharta Promoters · Sai Hills, PuneP52100000061· filed Dec 2018 → now Dec 2019· 77.3% built
- Renuka Tulsi Phase II6.6 yr overdueRenuka Constructions · CHINCHWAD, PuneP52100002644· 90.9% built
- PANOM PARK PHASE 1 WING A B C AND C EXTENSION6.6 yr overduePANOM DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800005027· 90.9% built
- VENKATESH JOYNEST PHASE 46.6 yr overdueSHREE VENKATESH GROUP · Haveli, PuneP52100017998· 90.9% built
- Shantiniketan Wing B46.6 yr overdueAnmol Associates · Kalyan, ThaneP51700011429· 75% built
- HIGHWAY HEIGHTS6.6 yr overdueBHELKE AND DHONE PROMOTERS AND BUILDERS · Haveli, PuneP52100010723· 43.2% built
- SPACE PALACE6.6 yr overdueSPACE ASSOCIATE · Ulawe, RaigarhP52000003658· 90.9% built
- ROYAL PEARL / ROYAL SANKALP6.6 yr overdueROYAL REALTORS · Borivali, Mumbai SuburbanP51800001607· 90.9% built
- ND Enclave6.6 yr overdueN & D Constructions LLP · Andheri, Mumbai SuburbanP51800010411· filed Dec 2018 → now Dec 2019· 90.5% built
- Stella Sapphire A Wing6.6 yr overdueVaibhavLaxmi Builders and Developers · Kurla, Mumbai SuburbanP51800007545· 64.3% built
- USHAPRABHA CHS6.6 yr overdueSHASHIKANT GAJANAN POTE · Panvel, RaigarhP52000007082· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B 146.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700003706· filed Dec 2018 → now Dec 2019· 65.8% built· 1 complaint
- RAMESHWAR PARK (ORCHID, IRIS & ROSE)6.6 yr overdueRAMESHAWAR BUILDERS & DEVELOPERS · Thane, ThaneP51700008168· 90.9% built
- SAIVIJAY6.6 yr overdueJAY DEVELOPERS · NASHIK, NashikP51600006235· 90.9% built
- LAXMI AND SHAKUNTALA HEIGHTS6.6 yr overdueJ K ASSOCIATES · Nashik, NashikP51600012259· 82.5% built
- RAJ HEIGHT A WING6.6 yr overdueBhavani Enterprises · SHIRGOAN, ThaneP51700020263· 81.8% built
- SIRVI Heights6.6 yr overduePYRAMID ENTERPRISES · KAMOTHE, RaigarhP52000012162· 59.1% built
- DURVA RESIDENCE6.6 yr overduePRADEEP MANIK BHISE · Thergaon, PuneP52100008001· 9.1% built
- PUNYODAYA BHAVAN6.6 yr overdueHARAKCHAND NENMAL JAIN · Kalyan, ThaneP51700005373· 81.8% built
- PARK PLAZA WING A6.6 yr overduePPR CONSTRUCTION LLP · HOHGAON, PuneP52100002914· 55.7% built
- Xrbia Hinjewadi Road / Riverfront - Ph - 26.6 yr overdueXrbia North Hinjewadi Developers Private Limited · Bebad Ohol, PuneP52100000379· filed Dec 2018 → now Dec 2019· 90.9% built· 7 complaints
- RADHA RESIDENCY6.6 yr overdueGOVINDA CONSTRUCTION · Nashik (M Corp.), NashikP51600012697· 90.9% built
- BALAJI ARCADE WING B6.6 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700010369· 78.2% built
- ANAND AASHRAY6.6 yr overdueANAND ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100002204· filed Dec 2018 → now Dec 2019· 90.9% built· 3 complaints
- Marvel Ganga Sangria A,B,C Building6.6 yr overdueMARVEL LANDMARKS PVT LTD · MOHAMMADWADI, PuneP52100001815· 76.8% built· 5 complaints
- Indraprastha Paradise6.6 yr overdueS. S. Developers · Borhadewadi, PuneP52100014739· 81.8% built· 1 complaint
- Ratnesh Plaza6.6 yr overdueBabasaheb Pandurang Patil · Sawantwadi (M Cl), SindhudurgP52900011813· 90.9% built
- SAKET PLAZA6.6 yr overdueS S BUILDERS AND DEVELOPERS · AYODYA NAGARI NASHIK, NashikP51600016202· 40.9% built
- Rassaz Greens6.6 yr overdueRais Ahmad · Thane, ThaneP51700008730· 50% built
- SAI SAMARTH SANKUL6.6 yr overdueSAI SAMARTH ENTERPRISES · Kudal (CT), SindhudurgP52900008286· 45.5% built
- TULIP N6.6 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011791· 53.2% built
- Arihant Heights6.6 yr overdueSamruddhi Developers · Haveli, PuneP52100015353· 77.3% built
- AARAMBH6.6 yr overduePANDHARINATH VITTHAL JAMBHALKAR · Haveli, PuneP52100002457· filed Dec 2018 → now Dec 2019· 76.4% built
- SHRI BALAJI NIWAS6.6 yr overdueBHOOMI ENTERPRISES · PALGHAR, PalgharP99000015857· 72.7% built
- SHUBH AASHISH6.6 yr overdueA B BUILDER & DEVELOPERS PVT LTD · Mumbai, Mumbai SuburbanP51800009692· filed Dec 2018 → now Dec 2019· 90.9% built
- SAMARTH ARCADE PH 26.6 yr overdueSHRINIWAS VASTUNIRMAN PVT LTD · Aurangabad (M Corp.), AurangabadP51500002392· 81.8% built
- Samarth Siddhi6.6 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- CENTRAL PLAZA6.6 yr overdueAMITKUMAR ZAVERCHAND SHETH · Mahad (M Cl), RaigarhP52000002418· 90.9% built
- AMANN MARINA6.6 yr overdueMS RELLIANCE CONSTRUCTION CO · Ward GSouth, Mumbai CityP51900010428· filed Dec 2018 → now Dec 2019· 81.8% built· 3 complaints
- Neptune Flying Kites A Wing - Right Wing6.6 yr overdueNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800007428· filed Dec 2018 → now Dec 2019· 90.9% built· 8 complaints
- ZIGGURAT G Building6.6 yr overdueM/S BUILT UP · Ambegaon, PuneP52100003097· 77.6% built
- SHIVPURAM A PLOT A6.6 yr overdueLUNKAD VISHWA DEVELOPERS · Haveli, PuneP52100002861· 81.8% built
- SHREE CHAMUNDA HEIGHTS6.6 yr overdueSHREE CHAMUNDA REALTORS · Mumbai City, Mumbai CityP51900009861· 58.6% built
- SM Chandrabhaga6.6 yr overdueSM DEVELOPERS · Ulawe, RaigarhP52000002561· 90.9% built
- AJIT HEIGHTS6.6 yr overdueSHRINIWAS CONSTRUCTION · Aurangabad (M Corp.), AurangabadP51500002177· 81.8% built
- Shravan Dhara6.6 yr overdueM/s Suyog Nirman · Chiplun (M Cl), RatnagiriP52800001197· 39.1% built
- ROYAL OASIS PHASE 16.6 yr overdueRIKKI RONIE DEVELOPERS · Borivali, Mumbai SuburbanP51800002382· filed Dec 2018 → now Dec 2019· 94.5% built· 2 complaints
- MSPACE6.6 yr overdueMahindra Lifespace Developers limited · Haveli, PuneP52100015480· 81.8% built
- MANI BHAVAN6.6 yr overdueCHHADVA ASSOCIATES · Kurla, Mumbai SuburbanP51800008429· 90.9% built
- Atmaram Plaza6.6 yr overdueShreeyan Developers · Vasai, PalgharP99000003881· 45.5% built
- TRANQUIL BAY6.6 yr overdueSURAJ ESTATE DEVELOPERS LTD · Ward GNorth, Mumbai CityP51900003689· filed Dec 2018 → now Dec 2019· 88.2% built· 1 complaint
- LAXMI EMERALD PHASE-I6.6 yr overdueLAXMI DEVELOPMENTS · LOHGAON, PuneP52100004583· 77.4% built
- PRATHAM RESIDENCY6.6 yr overdueADARSH ENTERPRISES · Uran, RaigarhP52000005240· 90.9% built
- AVNI LANDMARK6.6 yr overdueNISARG ENTERPRISES · Nashik (M Corp.), NashikP51600009262· 63.6% built
- Stadium View6.6 yr overdueAcme Avenue Infrastructure Pvt. Ltd. · Andheri, Mumbai SuburbanP51800000777· 52.7% built· 2 complaints
- SAI RESIDENCY6.6 yr overdueRAMANAND KISAN KACHARE · Wai (M Cl), SataraP52700003633· 11.4% built
- Teerth Technospace 26.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100012046· filed Dec 2018 → now Dec 2019· 90.9% built
- SUNCITY ORION6.6 yr overdueNESTOR SAI DEVELOPERS PVT LTD · Bhiwandi, ThaneP51700008247· filed Dec 2018 → now Dec 2019· 90.9% built
- Goolden Woods6.6 yr overdueKirti Construction · Nideban (CT), LaturP52400010216· 78.2% built· 1 complaint
- HERAMB SANKUL6.6 yr overdueM/S HERAMB CONSTRUCTIONS · Vengurla (M Cl), SindhudurgP52900011588· 90.9% built
- NeaPlus6.6 yr overdueSkylark Promoters Pvt. Ltd. · Baner Annexure, PuneP52100000823· filed Dec 2018 → now Dec 2019· 74.5% built
- SHAAD RESIDENCY6.6 yr overdueSHADAB ISLAM QURESHI · Ward E, Mumbai CityP51900009967· 95.7% built· 2 complaints
- Sukhwani Scarlet6.6 yr overdueRavi Ghanshyam Sukhwani · WAGHOLI, PuneP52100000894· 90.2% built
- PARK SOLITAIRE6.6 yr overdueAMAZON MANA & ASSOCIATES AOP · Andheri, Mumbai SuburbanP51800006074· filed Dec 2018 → now Dec 2019· 87.7% built· 4 complaints
- GAURISHANKAR BUNGALOW REDEVELOPMENT6.6 yr overdueS S REALITY · Shreekrishna Nagar, Mumbai SuburbanP51800015462· 90.9% built
- SHELTER HEIGHTS6.6 yr overdueSHREE VIMALNATH REALITY · Vasai, PalgharP99000013845· 60.9% built
- TRIANGLE TOWER6.6 yr overdueSURESH SHIVRAM KASHID · Solapur (M Corp.), SolapurP52600006568· 81.8% built
- GANESH GUNJAN6.6 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600006346· filed Dec 2018 → now Dec 2019· 65% built
- ICCHAPURTI SAI PRESTIGE6.6 yr overdueMAHAVIR VENTURES · Vasai, PalgharP99000009115· 87.9% built
- EKA PHASE II - E BUILDING6.6 yr overdueAmit Builders · Pathardi, NashikP51600006366· 88.6% built· 2 complaints
- Asmeeta Infratech Limited - Asmeeta Texpa6.6 yr overdueAsmeeta Infratech Limited · kon (CT), ThaneP51700009154· 81.8% built
- Sundaram residency6.6 yr overdueJadhav Enterprises · Tathwade, PuneP52100000907· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- PAHHAL AVENUE6.6 yr overdueUmmang Realtors LLP · Borivali, Mumbai SuburbanP51800015919· 45.5% built
- Dahisar Sunderbaug co-op housing society ltd.6.6 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800002464· filed Dec 2018 → now Dec 2019· 81.1% built
- Mohan Areca II6.6 yr overdueMOHAN LIFESPACES LLP · Shirgaon, ThaneP51700017925· 90.9% built
- Modispaces Amazon6.6 yr overdueModispaces Real Estate Pvt Ltd · Borivali, Mumbai SuburbanP51800004328· 45.5% built
- Teerth Technospace 66.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004940· filed Dec 2018 → now Dec 2019· 90.9% built
- DREAMS ROYALE6.6 yr overdueDREAM HOMES · pimpri, PuneP52100002470· 81.8% built
- ELITE DREAMS6.6 yr overdueAJINKYA DEVELOPERS · Haveli, PuneP52100007217· 44.1% built
- RUNWAL GREENS Wings 5 - 86.6 yr overdueRunwal Apartments Private Limited · Kurla, Mumbai SuburbanP51800000271· 72.7% built· 44 complaints
- GOKULDHAM APARTMENT6.6 yr overdueRAJESH BHAGULAL DHAMONE · NEAR KINGS COLLEGE, JalnaP51400015664· 27.3% built
- ANAND VIEW6.6 yr overdueSHREE ADESHWAR BUILDER AND DEVELOPER · Vasai, PalgharP99000003252· filed Dec 2018 → now Dec 2019· 72% built
- Rajshree Orchid6.6 yr overdueLAXMIECHAND DEVJI DEDHIA · Kurla, Mumbai SuburbanP51800001097· 90.9% built
- Vanashree Apartment6.6 yr overdueGoldCoast Infra · Bhatwadi, SindhudurgP52900010169· 90.9% built
- PRINCE TOWER6.6 yr overdueADITYA BUILDCON · Aurangabad (M Corp.), AurangabadP51500007890· 90.9% built
- SAIVIJAYTRADECENTER6.6 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600006432· 90.9% built
- RAVI RENAISSANCE6.6 yr overdueRAVINDRA DEVELOPERS PVT LTD · Parthardi, NashikP51600012691· 90.9% built
- Aayush Aura6.6 yr overdueAayush & Arrtha Realtors LLP · Kurla, Mumbai SuburbanP51800000622· filed Dec 2018 → now Dec 2019· 90.9% built
- omkar residency6.6 yr overdueM/s Pavan and JM Construction co · Nachane (CT), RatnagiriP52800001744· 90.9% built
- POPULAR COLONY6.6 yr overdueBALAJI CONSTRUCTION COMPANY · Haveli, PuneP52100015233· 72.7% built
- Parshwa Chintamani6.6 yr overdueVeetarag Builders & Developers · Parshwanath Nagar, SangliP53100015249· 81.8% built
- SAI RACHANA APARTMENT6.6 yr overdueSHRI SAI BHOO RACHANA · Kurla, Mumbai SuburbanP51800012011· filed Dec 2018 → now Dec 2019· 65.9% built· 1 complaint
- Gundecha Desire6.6 yr overdueRockline Developers Pvt. Ltd. · Andheri, Mumbai SuburbanP51800001166· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- ELITE GREEN ACRES - I AND J6.6 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100003819· 81.8% built
- SORRENTO6.6 yr overdueSAHAJ ANKUR DEVELOPERS · Andheri, Mumbai SuburbanP51800003022· filed Dec 2018 → now Dec 2019· 95% built· 2 complaints
- NILOY6.6 yr overdueSHREE SAI BUILDERS & DEVELOPERS · Ambarnath, ThaneP51700000166· 81.8% built
- VIRALI APARTMENT6.6 yr overdueCHANDRASHEKHAR TUKARAM JADHAV · Chiplun (M Cl), RatnagiriP52800010221· 90.9% built
- SAI SHRADDHA6.6 yr overdueBALAJI ENTERPRISES · BOPELE, RaigarhP52000015196· 40.9% built
- SHAJANAND PARK6.6 yr overdueSHREE HARIKRUSHNA DEVELOPERS · Nashik, NashikP51600009666· 27.3% built
- Briza Anchor Park6.6 yr overdueLakozy Builders LLp · Vasai, PalgharP99000010053· filed Dec 2018 → now Dec 2019· 90.9% built· 4 complaints
- Flora6.6 yr overdueSiddhidata Construction and Siddhesh Landge Developers · Pimple Nilakh, PuneP52100016341· 81.8% built
- Universal Cubical6.6 yr overduePAGARANI UNIVERSAL INFRASTRUCTURE PVT. LTD. · Andheri, Mumbai SuburbanP51800002157· filed Dec 2018 → now Dec 2019· 48.4% built· 4 complaints
- RIVERSIDE GREENS6.6 yr overdueGROW PLUS INFRA · Umroli, RaigarhP52000005275· filed Dec 2018 → now Dec 2019· 87.6% built· 2 complaints
- Grow More Bliss B Wing6.6 yr overdueGrowmore Space Solutions Pvt. Ltd. · Borivali, Mumbai SuburbanP51800005958· 81.8% built
- VIJAY RESIDENCY6.6 yr overdueVEDANT PROPERTIES · Pune (M Corp.), PuneP52100013999· 78.2% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.