RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 23 of 61
- AKSHAR EDEANIA6.9 yr overdueVAGAD CONSTRUCTIONS · Uran, RaigarhP52000006744· filed Dec 2018 → now Dec 2019· 85.9% built· 1 complaint
- Omega Paradise Wing L Phase 16.9 yr overdueOmega Promoters Private Ltd · wakad, PuneP52100011411· filed Dec 2018 → now Dec 2019· 58.5% built· 1 complaint
- SHRINATHJI HEIGHTS6.9 yr overdueSHRINATHJI BUILDER AND DEVELOPERS · Nanivali, PalgharP99000012732· 90.9% built· 2 complaints
- Asmeeta Infratech Limited - Asmeeta Texpa6.9 yr overdueAsmeeta Infratech Limited · kon (CT), ThaneP51700009154· 81.8% built
- SAMUDRIKA6.9 yr overdueESS GEE TRADEFIN PVT LTD · Uran, RaigarhP52000003694· 81.4% built
- SHAH GOVIND APARTMENT PHASE II6.9 yr overdueSHAH BUILDERS AND DEVELOPERS · Bhagur Rural, NashikP51600001700· 64.1% built
- Chintamani Heights6.9 yr overdueYASH ENTERPRISES · Kulgaon, ThaneP51700014730· 90.9% built
- Goolden Woods6.9 yr overdueKirti Construction · Nideban (CT), LaturP52400010216· 78.2% built· 1 complaint
- Mohan Willows II6.9 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700003971· filed Dec 2018 → now Dec 2019· 90.9% built
- URBAN BRICKS6.9 yr overdueRATAN CIVIL ASSOCIATES PVT LTD · Nashik, NashikP51600013094· 59.1% built
- Orbit Bonneville6.9 yr overdueB-Orbit Amparo Constructions PVT Ltd · MOSHI, PuneP52100003348· filed Dec 2018 → now Dec 2019· 90.9% built
- SILVANACOUNTY6.9 yr overdueDIAMOND PROPERTIES · CHARHOLI, PuneP52100002224· 85.9% built
- BORA VILLE PHASE - II6.9 yr overdueBORA REALTIES · PUNEP52100000757· 90.9% built
- PPRL Mera Ghar - Building E26.9 yr overdueParakh Plexus Realty Ltd. · Jalgaon (M Corp.), JalgaonP49900001778· 50.9% built
- OAK VIEW6.9 yr overduePM Construction · Thergaon Near PCMC Zonal Office, PuneP52100006090· 94.1% built· 4 complaints
- RAMESHWAR PARK (ORCHID, IRIS & ROSE)6.9 yr overdueRAMESHAWAR BUILDERS & DEVELOPERS · Thane, ThaneP51700008168· 90.9% built
- SHREEJI PALACE6.9 yr overdueRIMALKUMAR KISHORBHAI PATEL · Panchavati, NashikP51600005247· 81.8% built
- TRIBECA6.9 yr overdueNESTOR BUILDERS & DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009815· filed Dec 2018 → now Dec 2019· 90.9% built· 2 complaints
- Akshar Jyot6.9 yr overdueAkshar Enterprises · Near rau hotel, Peth road, NashikP51600018428· 43.6% built
- EKA PHASE II - E BUILDING6.9 yr overdueAmit Builders · Pathardi, NashikP51600006366· 88.6% built· 2 complaints
- PRABHUKUNJ APPARTMENT6.9 yr overdueTULJAI DEVELOPERS · Yavatmal (M Cl), YavatmalP51000007459· 50% built
- Renuka Tulsi Phase II6.9 yr overdueRenuka Constructions · CHINCHWAD, PuneP52100002644· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B66.9 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008931· filed Dec 2018 → now Dec 2019· 49% built· 3 complaints
- VST3- AAKASH GANGA 66.9 yr overdueVIDARBHA TOWN DEVELOPERS · MALDONGRI ROAD, ChandrapurP50900009769· 29.5% built
- KRISHNA AAKAR6.9 yr overdueKRISHNA AAKAR · Talegaon Dabhade (M Cl), PuneP52100000621· filed Dec 2018 → now Dec 2019· 86.4% built
- Vantagio6.9 yr overdueVyankatesh Infra · Osmanpura, AurangabadP51500013507· 59.1% built
- PARK SOLITAIRE6.9 yr overdueAMAZON MANA & ASSOCIATES AOP · Andheri, Mumbai SuburbanP51800006074· filed Dec 2018 → now Dec 2019· 87.7% built· 4 complaints
- Teerth Technospace 116.9 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100005717· filed Dec 2018 → now Dec 2019· 90.9% built
- LAABH NEELKANTH6.9 yr overdueLAABH BUILDTECH · Thane, ThaneP51700010195· 83.9% built
- Sundaram residency6.9 yr overdueJadhav Enterprises · Tathwade, PuneP52100000907· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- Indraprastha Paradise6.9 yr overdueS. S. Developers · Borhadewadi, PuneP52100014739· 81.8% built· 1 complaint
- NEPTUNE SWARAJYA SECTOR 2 - B136.9 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700012000· filed Dec 2018 → now Dec 2019· 62.7% built
- VINAY UNIQUE HOMES6.9 yr overdueVINAYUNIQUE REALTORS · Vasai-Virar City (M Corp), PalgharP99000007717· 88.2% built· 2 complaints
- Shantiniketan Wing B46.9 yr overdueAnmol Associates · Kalyan, ThaneP51700011429· 75% built
- VARDHMAN VATIKA6.9 yr overdueDIWALI DEVELOPERS · Thane, ThaneP51700018906· 90.9% built
- SHRIRANG RESIDENCY6.9 yr overdueS M CONSTRUCTIONS · Nashik (M Corp.), NashikP51600012796· 72.7% built
- LODHA ETERNIS SERENA A6.9 yr overdueLODHA DEVELOPERS LIMITED · Andheri, Mumbai SuburbanP51800000294· 90.9% built· 1 complaint
- Tulip Anchor Park6.9 yr overdueLakozy Buliders LLP · Vasai, PalgharP99000009059· filed Dec 2018 → now Dec 2019· 90.9% built· 1 complaint
- RIVERSIDE GREENS6.9 yr overdueGROW PLUS INFRA · Umroli, RaigarhP52000005275· filed Dec 2018 → now Dec 2019· 87.6% built· 2 complaints
- AFFORDABLE HOUSING PROPOSED ON KH.NO.54,CITY SURVEY NO.173 LAYOUT PLAN NEAR SHESHNAGAR.6.9 yr overdueNagpur Improvement Trust · SHESHNAGAR, NagpurP50500017530· 58.7% built
- KASTURI EXOTICA6.9 yr overdueACORN REALITIES · Ambarnath (R), ThaneP51700008788· 57% built
- QUALITY HEIGHTS I6.9 yr overdueQUALITY CONSTRUCTION CO · Thane, ThaneP51700010184· filed Dec 2018 → now Dec 2019· 90.9% built
- BALAJI AANGAN SHIVAM - C WING6.9 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700007601· 75.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B186.9 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700008868· filed Dec 2018 → now Dec 2019· 57.1% built
- SIMRAN HEIGHTS6.9 yr overdueNAVRANG HOME MAKERS · Panvel, RaigarhP52000002052· 73.2% built
- ROHAN ABHILASHA BUILDING F6.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100000490· 83% built
- WHITE PEARL6.9 yr overdueS S SHRIYA INFRASTRUCTURES · Nagpur (M Corp.), NagpurP50500010689· 11.6% built
- Kalp Residency C Wing6.9 yr overdueKalp Buildtech · Chakan, PuneP52100002332· filed Dec 2018 → now Dec 2019· 81.8% built
- ANAND AASHRAY6.9 yr overdueANAND ENTERPRISES · Pimpri Chinchawad (M Corp.), PuneP52100002204· filed Dec 2018 → now Dec 2019· 90.9% built· 3 complaints
- Sai Tirupati Greens Phase- I6.9 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- ASHIRWAD GLORY6.9 yr overdueYUG BUILDERS · Nasik Shivar, NashikP51600012250· 90.9% built
- FENNEL D6.9 yr overdueROYALE URBANSPACE LLP · SHAHAPUR, ThaneP51700005481· 73.5% built
- HIRAMAN6.9 yr overdueBASHIR MISKIN SHAH · PUSHPAK NEW VADGHAR, RaigarhP52000017621· 26.4% built
- SWEET HOME BUILDING 16.9 yr overdueIPSIT ENTERPRISE · Shirgaon, PalgharP99000009859· 18.2% built
- SHAAD RESIDENCY6.9 yr overdueSHADAB ISLAM QURESHI · Ward E, Mumbai CityP51900009967· 95.7% built· 2 complaints
- CONWOOD ASTORIA TOWER A6.9 yr overdueCONWOOD REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800008188· filed Dec 2018 → now Dec 2019· 82.3% built· 25 complaints
- BHARGAV6.9 yr overdueR N ENTERPRISES · Thane, ThaneP51700009004· 90.9% built
- PEACE VALLEY6.9 yr overdueR J DEVELOPERS · Ravet, PuneP52100012347· filed Dec 2018 → now Dec 2019· 81.4% built
- Sai Krupa Residency Wing B6.9 yr overdueSai Krupa Ventures · LOHGAON, PuneP52100007343· 90.9% built
- ARCH GARDENS I AND II6.9 yr overdueSAI PREM DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700002994· filed Dec 2018 → now Dec 2019· 87.9% built
- SHANKAR PARVATI PARK PHASE 16.9 yr overdueGANESH SHANKARRAO FULARI · Behind Essar Pump, AhmednagarP52200009734· 90.9% built
- GADIMA PARK PHASE 16.9 yr overdueAJIT BUILDERS AND DEVELOPERS · Atpadi, SangliP53100006274· 99.2% built
- YASH SARTHAK6.9 yr overdueAkshay Enterprises · Kalyan, ThaneP51700005645· 90.9% built
- MANORATH RESIDENCY PHASE - 26.9 yr overdueKrishnakumar Ramsinh Parmar · Near Lions School, Dadra & Nagar HaveliP49600000013· 84.5% built
- SAMARTH CARINA COMMERCIA6.9 yr overdueMAHESH ZUMBARLAL KHINVASARA · NEAR ADITYA BIRLA HOSPITAL, PuneP52100015662· 9.1% built
- RUDRA6.9 yr overdueShree DPS Project and Services Pvt. Ltd. · Borivali, Mumbai SuburbanP51800010461· 90.9% built· 1 complaint
- RAJSHREE CLOVER6.9 yr overdueRajshree Creations · Kurla, Mumbai SuburbanP51800004812· 90.9% built
- EDEN SOLITIARE6.9 yr overdueELEMENT INFRACON PVT LTD · Mulshi, PuneP52100005489· filed Dec 2018 → now Dec 2019· 87.7% built
- PRAYEJA CITY PHASE II6.9 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100011611· filed Dec 2018 → now Dec 2019· 90.5% built· 1 complaint
- SUNWINDS RESIDENTIAL6.9 yr overdueSANIKET INFRASTRUCTURES · BAVDHAN KHURD, PuneP52100002322· 81.8% built
- Sunrise Parkville Annex6.9 yr overdueUnnati Enterprises · Ramkrishana Nagar, RaigarhP52000008663· 68.2% built
- THANEKAR PARKLAND6.9 yr overdueAJAY MADHUKAR THANEKAR · Ambarnath, ThaneP51700000644· 43.9% built· 3 complaints
- ANAND VIEW6.9 yr overdueSHREE ADESHWAR BUILDER AND DEVELOPER · Vasai, PalgharP99000003252· filed Dec 2018 → now Dec 2019· 72% built
- CRESENZO RESIDENCES6.9 yr overduePARESH PUJARA AND ABHIRAJ PUJARA (AOP) · Andheri, Mumbai SuburbanP51800005898· 90.9% built· 1 complaint
- VST3-AAKASH GANGA 76.9 yr overdueVIDARBHA TOWN DEVELOPERS · MALDONGRI ROAD, ChandrapurP50900010888· 81.8% built
- Chetna Kunj CHS6.9 yr overdueK Merchant Construction Ltd · Borivali, Mumbai SuburbanP51800010821· 69.1% built
- AKSHAY RESIDENCY6.9 yr overdueRAJENDRA RAMANLAL LUNAKD · Wakad, PuneP52100005552· 40.9% built
- Bloomdale Duplex Home 46.9 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500007215· filed Dec 2018 → now Dec 2019· 81.8% built
- SHEETAL AIRWING6.9 yr overdueTOUGHCONS REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001146· filed Dec 2018 → now Dec 2019· 75.5% built
- ELITE GREEN ACRES - I AND J6.9 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100003819· 81.8% built
- Teerth Technospace 46.9 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100011403· filed Dec 2018 → now Dec 2019· 90.9% built
- DISHA KUNJABAN PHASE 26.9 yr overdueDEVANAND NARAYANRAO KOTGIRE (HUF) · Wadgaon Kolhati (CT), AurangabadP51500001997· filed Dec 2018 → now Dec 2019· 90.9% built
- THE VIDARBHA PREMIER SAHANIWAS CHIKHALI KHURD NAGPUR6.9 yr overduePRAKASH NARAYANRAO RAOLE · VITTHAL NAGAR, NagpurP50500012223· filed Dec 2018 → now Dec 2019· 72.7% built
- RAVI RENAISSANCE6.9 yr overdueRAVINDRA DEVELOPERS PVT LTD · Parthardi, NashikP51600012691· 90.9% built
- Evergreen Woods6.9 yr overdueANKUR MAYFLOWER ASSOCIATES · Andheri, Mumbai SuburbanP51800008167· filed Jun 2020 → now Dec 2019· 45.5% built
- GANESH ATRIA6.9 yr overdueZENITH DEVELOPERS · AMBAD, NashikP51600004173· filed Dec 2018 → now Dec 2019· 60.9% built
- GOKULDHAM APARTMENT6.9 yr overdueRAJESH BHAGULAL DHAMONE · NEAR KINGS COLLEGE, JalnaP51400015664· 27.3% built
- 117 RESIDENCY6.9 yr overdueV3 PARTNERS · chembur, Mumbai SuburbanP51800012457· 50% built
- Joy Square6.9 yr overdueANANT SQUARE · Thane, ThaneP51700003827· 90.9% built
- CRD Gardenia Apartments 16.9 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000009462· filed Dec 2018 → now Dec 2019· 81.8% built
- Tulsi Elanza6.9 yr overdueMETRO CAPITAL · Kurla, Mumbai SuburbanP51800006377· 27.3% built
- Padmanabh Pride6.9 yr overduePadmanabh Properties · Nashik, NashikP51600005546· 90.5% built
- SIGNATURE AQUA6.9 yr overdueTULSI INFRA · Karjat, RaigarhP52000001652· filed Dec 2018 → now Dec 2019· 90.9% built
- UNWIND6.9 yr overdueLIFESPACE REALTY · ULWE, RaigarhP52000000773· 42.7% built
- MAGNOVA MANOR PHASE 16.9 yr overdueMAGNOVA REALTY · WAKAD, PuneP52100004858· 81.8% built
- BHAVESHWAR CORNER6.9 yr overdueBHAVESHWAR CONSTRUCTION · Karanjade, RaigarhP52000006595· 39.9% built
- SHREE AMBA BUSINESS PARK WING A6.9 yr overdueSHREE AMBA BUSINESS PARK · RAHATGAON NEAR RING ROAD T-POINT, AmravatiP50300015750· 72.7% built
- DHAWAL RESIDENCY6.9 yr overdueDHAVAL CONSTRUCTION · MAKHAMALABAD, NashikP51600015450· 90.9% built
- Construction of 406 TR TS 442 EWS 258 MIG TS at Gavanpada Mulund east Mumbai6.9 yr overdueMHADA · Kurla, Mumbai SuburbanP51800000024· filed Dec 2018 → now Dec 2019· 90.8% built
- AKSHAT PRIME6.9 yr overdueYOGESH CONSTRUCTION · Uran, RaigarhP52000002802· 90.9% built
- Sai Hira6.9 yr overdueMRUNALI REALTY LLP · MOSHI, PuneP52100000634· 90.9% built
- Siddhivinayak Splendour6.9 yr overdueAshok Motiram Jaidhara · Ulwe, RaigarhP52000005567· 90.9% built
- WHITEFIELD PHASE 16.9 yr overdueBALAJI ALLIANCE DEVELOPERS LLP · Sus, PuneP52100002460· 61.2% built
- N.V. Deshmukh - NEPTUNE GULMOHAR6.9 yr overdueVEDANT REALTORS LLP · Kurla, Mumbai SuburbanP51800005834· filed Dec 2018 → now Dec 2019· 77.7% built
- Om Sat6.9 yr overdueShree Siddhi Developers · Ward FNorth, Mumbai CityP51900007293· filed Dec 2018 → now Dec 2019· 90.9% built
- JARDIN6.9 yr overdueSanskruti Life Spaces · Mahalunge, PuneP52100003366· 79% built
- RADHA RESIDENCY6.9 yr overdueGOVINDA CONSTRUCTION · Nashik (M Corp.), NashikP51600012697· 90.9% built
- SAPTARSHI RESIDENCY C WING6.9 yr overdueSUBHAGYA PROMOTERS & BUILDERS PRIVATE LIMITED · AHER NAGAR , NEAR AHER GARDEN, PuneP52100010341· filed Dec 2018 → now Dec 2019· 45.5% built
- LABDHI GARDENS PHASE 56.9 yr overdueLabdhi Lifestyle Limited · Neral, Mumbai CityP51900003524· 74.2% built
- VEDANT PERIDOT6.9 yr overdueNANIS BUILDCON PRIVATE LIMITED · Nagpur (M Corp.), NagpurP50500009166· 84.5% built
- KALYANI SAI ENCLAVE6.9 yr overdueJ K BUILDERS AND DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500012465· 59.1% built
- PAVILION 796.9 yr overdueWAKADKAR ASSOCIATE · Wakad, PuneP52100004489· 23.6% built
- TRISHABH SIGNET6.9 yr overdueDimension Housing Realty LLP · Kurla, Mumbai SuburbanP51800001222· 90% built· 1 complaint
- AMANN MARINA6.9 yr overdueMS RELLIANCE CONSTRUCTION CO · Ward GSouth, Mumbai CityP51900010428· filed Dec 2018 → now Dec 2019· 81.8% built· 3 complaints
- ORCHID6.9 yr overdueVISION VENTURES · Aurangabad (M Corp.), AurangabadP51500001044· 70.5% built
- KINGSTON COURT6.9 yr overdueMAHALAXMI ENTERPRISES · Vasai, PalgharP99000003618· 70.6% built
- SAI DHAM RESIDENCY6.9 yr overdueBUILDCON ENGINEERS · Bhiwandi, ThaneP51700009855· 81.8% built
- AMEY RESIDENCY6.9 yr overdueMANOJ SHAM GHUDE · Nachane (CT), RatnagiriP52800009400· 33.6% built
- Shanti Niwas6.9 yr overdueD.G. Patel & Co. · Kurla, Mumbai SuburbanP51800007402· filed Dec 2018 → now Dec 2019· 90.9% built
- IMPRESSA GLORY HOMES6.9 yr overdueIMPRESSA VENTURES · NAGPUR, NagpurP50500006214· 90.9% built
- MANEESHA CHSL6.9 yr overdueSHAH DEVELOPERS · Kurla, Mumbai SuburbanP51800004616· filed Dec 2018 → now Dec 2019· 90.9% built
- OM AADITYA APARTMENT6.9 yr overdueSUDHIR BABURAO KALE · GODHNI (RAILWAY), NagpurP50500015166· 90.9% built
- VEENA DYNASTY PH II6.9 yr overdueNIKUNJ DEVELOPERS · Vasai, PalgharP99000007769· 89.1% built
- SHUBH AASHISH6.9 yr overdueA B BUILDER & DEVELOPERS PVT LTD · Mumbai, Mumbai SuburbanP51800009692· filed Dec 2018 → now Dec 2019· 90.9% built
- ZIGGURAT G Building6.9 yr overdueM/S BUILT UP · Ambegaon, PuneP52100003097· 77.6% built
- Grow More Bliss B Wing6.9 yr overdueGrowmore Space Solutions Pvt. Ltd. · Borivali, Mumbai SuburbanP51800005958· 81.8% built
- Portia6.9 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Haveli, PuneP52100000301· filed Dec 2018 → now Dec 2019· 68.2% built
- AUDUMBAR6.9 yr overdueVAS BUILDER & DEVELOPERS · Borivali East, Mumbai SuburbanP51800011943· 41.5% built
- Radhe Govind Niwas6.9 yr overdueSHRIVARI PROPERTIES · Bajaj Nagar, NagpurP50500016170· 61.8% built
- ARMONIA RESIDENCY6.9 yr overdueM2 DEVELOPERS · Somatane, PuneP52100013738· 81.8% built
- KOHINOOR IRIS PARK6.9 yr overdueKohinoor Properties · kalepadal, PuneP52100001617· 81.8% built
- Mallhar Towers6.9 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001951· filed Dec 2018 → now Dec 2019· 81.4% built
- GANESH AURA6.9 yr overdueVEDDANT REALTY · Haveli, PuneP52100005169· 72.7% built
- The Sacred Basil Phase II6.9 yr overdueAshapuri Realtors · Pirangut, PuneP52100001486· 81.8% built
- DISHA KUNJBAN PHASE 16.9 yr overdueDEVANAND NARAYANRAO KOTGIRE (HUF) · Wadgaon Kolhati (CT), AurangabadP51500001108· filed Dec 2018 → now Dec 2019· 90.9% built
- ELITE GREEN ACRES - A6.9 yr overdueSUNITA GAJENDRA PATIL · Mawal, PuneP52100004215· 81.8% built· 1 complaint
- SADGURU PLANET6.9 yr overdueSADGURU INFRAPROJECTS I PVT LTD · Kalamboli, RaigarhP52000013809· 90.9% built
- TUKAI 106.9 yr overdueTukai developers · Pune, PuneP52100015033· 44.5% built
- ANANDI ARPAN PHASE II6.9 yr overdueANANDI CONSTRUCTIONS · Vengurla (M Cl), SindhudurgP52900007995· 81.8% built
- SAI KRUPA RESIDENCY6.9 yr overdueSAIRAJ DEVELOPERS · BADLAPUR, ThaneP51700015567· 90.9% built
- NAMAN RESIDENCY6.9 yr overdueKIRANBHAI VITTHALBHAI PATEL · Nashik, NashikP51600011915· 43.6% built
- Pristine Greens Phase 16.9 yr overduePRISTINE PROPERTIES · BORHADEWADI, PuneP52100009406· 90.9% built· 9 complaints
- Universal Cubical6.9 yr overduePAGARANI UNIVERSAL INFRASTRUCTURE PVT. LTD. · Andheri, Mumbai SuburbanP51800002157· filed Dec 2018 → now Dec 2019· 48.4% built· 4 complaints
- GURU BRAMHA APARTMENT6.9 yr overdueM/s MAHARANA'S BUILDERS,DEVELOPERS AND ENGINEERS · Telangkhedi, NagpurP50500005639· 81.8% built
- GREENFIELD 1 WING D6.9 yr overdueL G DEVELOPERS AND BUILDERS · Wanadongri, NagpurP50500009629· 90.9% built
- SUNRISE RESIDENCY6.9 yr overdueRAJNIR ENTERPRISES PRIVATE LIMITED · Damat, RaigarhP51800005060· filed Dec 2018 → now Dec 2019· 89.1% built
- LAKEVIEW APARTMENT6.9 yr overdueTRIMURTI BUILDERS AND DEVELOPERS · Vasai, PalgharP99000007342· 28.8% built· 1 complaint
- VENKATESH GRAFFITI PHASE 36.9 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100001000· 90.9% built· 1 complaint
- ASHOKHEIGHTS6.9 yr overdueNEW INDIA CONSTRUCTION COMPANY · Andheri, Mumbai SuburbanP51800001158· 90.8% built
- Aaradhyam6.9 yr overdueDHANESHWAR VISION DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100008419· 86.4% built
- Neptune Flying Kites A Wing - Right Wing6.9 yr overdueNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800007428· filed Dec 2018 → now Dec 2019· 90.9% built· 8 complaints
- Vikas Phase 16.9 yr overdueM/S CHORDIYA REALTY · ChoksiwadiP52100018881· 32.5% built
- NIRMAL DHARA6.9 yr overdueSIDDHIVINAYAK ENTERPRISES · Badlapur (M Cl), ThaneP51700012325· 90.9% built
- Varun Buildcon6.9 yr overdueDeepak Bhupatrai Vora · Village Sativali, PalgharP99000015763· 28.6% built
- Balaji Arcade Wing C6.9 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700005709· 61.4% built
- ARAMUS COMPLEX6.9 yr overdueGURUKRUPA GROUP BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000007602· filed Dec 2018 → now Dec 2019· 74.7% built
- ADCON MERIDIAN6.9 yr overdueHI SKY REALTY · Andheri, Mumbai SuburbanP51800010498· filed Dec 2018 → now Dec 2019· 90.9% built
- Shreedham Classic6.9 yr overdueShreedham Construction Private Limited · Andheri, Mumbai SuburbanP51800012234· filed Dec 2018 → now Dec 2019· 89.9% built· 1 complaint
- Rajshree Orchid6.9 yr overdueLAXMIECHAND DEVJI DEDHIA · Kurla, Mumbai SuburbanP51800001097· 90.9% built
- CITY VISTA6.9 yr overdueKOLTE-PATIL REAL ESTATE PRIVATE LIMITED · KharadiP52100007612· 63.6% built· 3 complaints
- Mallhar Terraces6.9 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001244· filed Dec 2018 → now Dec 2019· 77.7% built
- KRISH AVENUE6.9 yr overdueM AND K DEVELOPERS · kala khadak, PuneP52100012641· filed Dec 2018 → now Dec 2019· 63.6% built
- CHIRAG CITY6.9 yr overdueCHIRAG CONSTRUCTIONS · Amravati (M Corp.), AmravatiP50300010045· 73% built
- Welkin Moon6.9 yr overdueWELKIN DEVELOPERS · Ulawe, RaigarhP52000001832· 0.2% built
- NEELREKHA6.9 yr overdueTASMAI SPACES · Borivali, Mumbai SuburbanP51800008659· filed Dec 2018 → now Dec 2019· 36.4% built· 1 complaint
- Engracia6.9 yr overdueJagtap Patil Promoters & Builders · Haveli, PuneP52100002471· 81.8% built
- Chhoriya Residency Nandurbar Phase - 26.9 yr overdueChhoriya and Kela Developers · Nandurbar, NandurbarP49700009502· filed Dec 2018 → now Dec 2019· 50.6% built
- DWARKA PROJECT 46.9 yr overdueNAIKNAVAREHOUSINGDEVELOPERSPVTLTD · CHAKAN, PuneP52100000240· 0% built· 1 complaint
- ARPIT6.9 yr overdueTISTA IMPEX PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800004857· 56.8% built
- Galaxy Orchid6.9 yr overdueGalaxy Constructions · Pune City, PuneP52100008975· 10.8% built
- Sunrise Enclave6.9 yr overdueSunrise Realtors · Pimpri Chinchawad (M Corp.), PuneP52100002153· 65.9% built
- SHAJANAND PARK6.9 yr overdueSHREE HARIKRUSHNA DEVELOPERS · Nashik, NashikP51600009666· 27.3% built
- MUTUAL BENEFIT CO OP HSG SOC LTD6.9 yr overdueSUNRISE HOUSING · Kurla, Mumbai SuburbanP51800002333· 81.8% built
- Neptune Flying Kites B Wing- Left Wing6.9 yr overdueNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800009307· filed Dec 2018 → now Dec 2019· 90.9% built· 7 complaints
- UNITED ARISE6.9 yr overdueUNITED REALINFRA LLP · Pune (M Corp.), PuneP52100001312· filed Dec 2018 → now Dec 2019· 69.1% built
- NEPTUNE SWARAJYA SECTOR 2 - 2B6.9 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005899· filed Dec 2018 → now Dec 2019· 54.5% built
- KRISHNABAN Phase 16.9 yr overdueBhuvi Landmarks LLP · Jalna, JalnaP51400006388· filed Dec 2018 → now Dec 2019· 78.2% built
- Kamal Enclave6.9 yr overduePrafulla Prakash Nagapurkar & Others · JALAN NAGAR, AurangabadP51500015262· 90.9% built
- SHREE SADGURU COMPLEX PHASE I6.9 yr overdueEARTH HOME · Khalapur, RaigarhP52000011306· 90.9% built
- AVNI LANDMARK6.9 yr overdueNISARG ENTERPRISES · Nashik (M Corp.), NashikP51600009262· 63.6% built
- POONAM HEIGHTS6.9 yr overduePOONAM REALTY · Vasai, PalgharP99000002118· 90.9% built
- SHEETAL ANJALI6.9 yr overdueD.G.LAND DEVELOPERS PRIVATE LIMITED · Vasai-Virar City (M Corp), PalgharP99000005155· filed Dec 2018 → now Dec 2019· 48.9% built
- LOTUS PARK6.9 yr overdueMATRUKRUPA DEVELOPERS · Ambegaon Bk, PuneP52100016278· 62.7% built
- GAGAN AKANKSHA PHASE 16.9 yr overdueGAGAN HORIZON VENTURES · Koregaon mul, PuneP52100001285· filed Dec 2018 → now Dec 2019· 90.3% built· 26 complaints
- OM SHILP6.9 yr overdueOM SHILP · Haveli, PuneP52100013506· 81.8% built
- Mallhar Enclave6.9 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001423· filed Dec 2018 → now Dec 2019· 88.6% built
- SATYAM OLEANDER6.9 yr overdueSAHYOG GROUP · Ambarnath(M Cl), ThaneP51700010440· 74.2% built· 2 complaints
- SHREERAM MAREEGOLD6.9 yr overdueR.G.DEVELOPERS · LOHGAON, PuneP52100003038· 27.3% built
- AG ICON6.9 yr overdueAJIT SUBHASH GAIKWAD · Haveli, PuneP52100005698· filed Dec 2018 → now Dec 2019· 45.5% built
- 11 West6.9 yr overduePARINEE REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800003709· 90.9% built· 2 complaints
- PRITHVI RESIDENCY6.9 yr overduePRITHVI BUILD HOMES · Borivali, Mumbai SuburbanP51800009232· filed Dec 2018 → now Dec 2019· 90.9% built
- GANESH AVENUE6.9 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600007654· filed Dec 2018 → now Dec 2019· 69.5% built
- Ronch Viveza6.9 yr overdueRonch Realty Pvt. Ltd · Valvan, PuneP52100010441· 43.6% built
- Samarth Siddhi6.9 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- Eco Greens Phase II6.9 yr overdueEcopark Developers LLP · Karjat, RaigarhP52000000268· 87.9% built· 2 complaints
- PHASE III VISION SHREE6.9 yr overdueSHUBBAN PROPERTIES VISION SHREE · jambhul, PuneP52100011706· filed Dec 2018 → now Dec 2019· 78.2% built
- NIVASA UDAAN - PHASE II6.9 yr overdueNIVASA REALTY · LOHEGAON, PuneP52100017799· 37.7% built
- MARATHON NEXZONE ZODIAC -26.9 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000661· 72.7% built· 2 complaints
- MY RESIDENCY6.9 yr overdueHITESH INDRAVADAN PATEL · Andheri, Mumbai SuburbanP51800004728· 99.5% built
- SAI APARTMENTS6.9 yr overdueGAJANAN KOTKAR & NANDINI KOTKAR · Thane, ThaneP51700004665· filed Dec 2018 → now Dec 2019· 9.1% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.