RERA projects past their possession deadline
11,767 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 23 of 59
- SIRVI AVENUE6.6 yr overduePYRAMID ENTERPRISES · Karanjade, RaigarhP52000004615· 68.2% built
- KalpaVruksha B6.6 yr overdueVaichal Constructions Pvt Ltd · Mulshi, PuneP52100004001· filed Dec 2018 → now Dec 2019· 90.9% built
- shree aditya residency6.6 yr overdueshree aditya associates · Sangli Miraj Kupwad (M Corp.), SangliP53100009014· 81.8% built
- Tiara6.6 yr overdueSHETH AND POPAT ENTERPRISE · Wakad, PuneP52100007260· 26.8% built· 1 complaint
- Balaji Arcade Wing C6.6 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700005709· 61.4% built
- TUKAI 106.6 yr overdueTukai developers · Pune, PuneP52100015033· 44.5% built
- VINAY UNIQUE HOMES6.6 yr overdueVINAYUNIQUE REALTORS · Vasai-Virar City (M Corp), PalgharP99000007717· 88.2% built· 2 complaints
- BALAJI AANGAN SHIVAM - C WING6.6 yr overdueSHREE SAI BALAJI ENTERPRISES · Kalyan, ThaneP51700007601· 75.9% built
- SETPAL PALAZZO6.6 yr overdueSETPAL PROPERTIES PVT. LTD. · Mawal, PuneP52100001337· 88.6% built
- Sunshine Joy Phase 26.6 yr overdueGreenlife Associates · Mulshi, PuneP52100004441· filed Dec 2018 → now Dec 2019· 86.4% built
- CRESCENT IMPERIA6.6 yr overdueCRESCENT ARK LIFESTYLES PVT LTD · Andheri, Mumbai SuburbanP51800002184· 90.9% built
- RUDRAKSH RESIDENCY6.6 yr overdueMUGDHA SANDEEP BODKE · satpur, NashikP51600012753· 90.9% built
- GURU ATMAN6.6 yr overdueGURUKRUPA BUILDCON · NAVI MUMBAI, RaigarhP52000002703· 90.9% built
- NEELREKHA6.6 yr overdueTASMAI SPACES · Borivali, Mumbai SuburbanP51800008659· filed Dec 2018 → now Dec 2019· 36.4% built· 1 complaint
- SHAMBHURAJ GARDEN WING-A AND WING-B6.6 yr overdueSHAMBHURAJ DEVELOPERS · PHALTAN, SataraP52700014866· 16.4% built
- SHREE RASRAJ TOWER6.6 yr overdueK MEHTA AND COMPANY · Borivali, Mumbai SuburbanP51800000873· 90.9% built
- ANAND VIEW A WING6.6 yr overdueSHREE ARIHANT DEVELOPERS · Vasai, PalgharP99000005956· filed Dec 2018 → now Dec 2019· 72.5% built
- AARAMBH6.6 yr overdueSAPTARSHI DEVELOPERS · Shirur, PuneP52100004850· 60.6% built
- Teerth Technospace 76.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006190· filed Dec 2018 → now Dec 2019· 90.9% built
- RIVERSIDE GREENS6.6 yr overdueGROW PLUS INFRA · Umroli, RaigarhP52000005275· filed Dec 2018 → now Dec 2019· 87.6% built· 2 complaints
- SS Builders Building No.76.6 yr overdueS S BUILDERS · Vasai, PalgharP99000004734· 81.8% built
- 117 RESIDENCY6.6 yr overdueV3 PARTNERS · chembur, Mumbai SuburbanP51800012457· 50% built
- Saheels Fortune Park II6.6 yr overdueNeev Sai Associates · PUNE, PuneP52100002349· 90.9% built
- LAXMI EMERALD PHASE-I6.6 yr overdueLAXMI DEVELOPMENTS · LOHGAON, PuneP52100004583· 77.4% built
- Mallhar Terraces6.6 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001244· filed Dec 2018 → now Dec 2019· 77.7% built
- PRAMAN SPLENDOUR6.6 yr overdueShreepati Splendour · Ward FNorth, Mumbai CityP51900004811· 90.9% built
- Shine Square6.6 yr overdueNamoh Builders & Developers · Pimpri Chinchawad (M Corp.), PuneP52100003130· filed Dec 2018 → now Dec 2019· 75.9% built· 1 complaint
- GANESH SPARSH6.6 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600008749· filed Dec 2018 → now Dec 2019· 22.4% built
- SHEETAL AIRWING6.6 yr overdueTOUGHCONS REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001146· filed Dec 2018 → now Dec 2019· 75.5% built
- Giri Darshan Apartment6.6 yr overdueConcept Townships & Estate Developers Pvt Ltd · Talegaon Dabhade (M Cl), PuneP52100011639· 54.5% built
- NEPTUNE SWARAJYA SECTOR 2 - B36.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700009783· filed Dec 2018 → now Dec 2019· 60.2% built· 1 complaint
- SAIS LEELA6.6 yr overdueSAIBABA SALES PRIVATE LIMITED · Haveli, PuneP52100001705· filed Dec 2018 → now Dec 2019· 81.8% built
- Spring Dale6.6 yr overdueAmbrosial Developers Private Limited · Andheri, Mumbai SuburbanP51800002536· 90.9% built
- KANAKIA WALLSTREET WING A6.6 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000121· 90.7% built· 2 complaints
- RAJ HEIGHT A WING6.6 yr overdueBhavani Enterprises · SHIRGOAN, ThaneP51700020263· 81.8% built
- REDEVELOPMENT OF ULKA CHSL6.6 yr overduePRANAV CONSTRUCTIONS LIMITED · Borivali, Mumbai SuburbanP51800004627· 90.9% built
- SAVITRI COMPLEX6.6 yr overdueM/S TRIMURTI DEVELOPERS · Otur, PuneP52100012055· 90.9% built
- SHRIRANG RESIDENCY6.6 yr overdueS M CONSTRUCTIONS · Nashik (M Corp.), NashikP51600012796· 72.7% built
- Venkateshwara Heights B6.6 yr overdueOhana Builders& Developers · Baner, PuneP52100010633· 90.9% built
- UNIQUE ELITA6.6 yr overdueANKUR SHUBHAM DEVELOPERS · Andheri, Mumbai SuburbanP51800006885· filed Dec 2018 → now Dec 2019· 45.9% built· 1 complaint
- Unnati6.6 yr overdueSigma Realty · Mulshi, PuneP52100000976· filed Dec 2018 → now Dec 2019· 90.9% built
- AMEY RESIDENCY6.6 yr overdueMANOJ SHAM GHUDE · Nachane (CT), RatnagiriP52800009400· 33.6% built
- PPRL Mera Ghar - Building E26.6 yr overdueParakh Plexus Realty Ltd. · Jalgaon (M Corp.), JalgaonP49900001778· 50.9% built
- SHILP SIDDHI6.6 yr overdueHemant Dattatraya Gaikwad · Shivram Nagar, NashikP51600011679· 81.8% built
- kamal enclave6.6 yr overdueprafulla prakash nagapurkar & others · JALAN NAGAR, AurangabadP51500015262· 90.9% built
- QUALITY HEIGHTS I6.6 yr overdueQUALITY CONSTRUCTION CO · Thane, ThaneP51700010184· filed Dec 2018 → now Dec 2019· 90.9% built
- VIJAY RESIDENCY6.6 yr overdueVEDANT PROPERTIES · Pune (M Corp.), PuneP52100013999· 78.2% built
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT6.6 yr overduePrarthana Constructions · Borivali, Mumbai SuburbanP51800008405· filed Dec 2018 → now Dec 2019· 84.5% built· 1 complaint
- VIMAL RAJ WING A-1, MEDITYARAVIRAJ COMPLEX6.6 yr overdueRITESH RAMESH JAIN · Thane, ThaneP51700007634· 84.5% built
- BHARGAV6.6 yr overdueR N ENTERPRISES · Thane, ThaneP51700009004· 90.9% built
- ASHTAVINAYAK CITY PHASE 16.6 yr overdueASHTAVINAYAK CITY PUNE LLP · Fursungi, PuneP52100003514· filed Dec 2018 → now Dec 2019· 90.9% built
- Sunrise Enclave6.6 yr overdueSunrise Realtors · Pimpri Chinchawad (M Corp.), PuneP52100002153· 65.9% built
- Akashvedh Phase 16.6 yr overdueRaghvendra Buildcon · Pimpri Chinchawad (M Corp.), PuneP52100006065· filed Dec 2018 → now Dec 2019· 90.9% built
- Sai Hira6.6 yr overdueMRUNALI REALTY LLP · MOSHI, PuneP52100000634· 90.9% built
- 81 AUREATE6.6 yr overduePYRAMID DEVELOPERS · Andheri, Mumbai SuburbanP51800010171· filed Dec 2018 → now Dec 2019· 98% built· 25 complaints
- PRISTINE PARK6.6 yr overdueVASTUSHILPA INFRA PRIVATE LIMITED · Near Reliance Petrolium, SangliP53100003369· filed Dec 2018 → now Dec 2019· 81.8% built
- SHUBHASHREE APARTMENT6.6 yr overdueRAMESH GULAB TUPE · PANVEL, RaigarhP52000016100· 90.9% built
- Sai Tirupati Greens Phase- I6.6 yr overdueSai Tirupati Properties · Wadmukhwadi, PuneP52100010061· 81.8% built· 1 complaint
- SILVANA COUNTY6.6 yr overdueDIAMOND PROPERTIES · CHAROLI PHATA, PuneP52100018403· 90.9% built
- Skylight6.6 yr overdueKrushnarang Associates · Haveli, PuneP52100014803· 35.9% built
- KRISHNA AAKAR6.6 yr overdueKRISHNA AAKAR · Talegaon Dabhade (M Cl), PuneP52100000621· filed Dec 2018 → now Dec 2019· 86.4% built
- Shree Vishwa Residency6.6 yr overdueKishor Rajendra Sanjekar · Jule Solapur, SolapurP52600013153· 82.5% built
- ASHOKHEIGHTS6.6 yr overdueNEW INDIA CONSTRUCTION COMPANY · Andheri, Mumbai SuburbanP51800001158· 90.8% built
- BALAJI CORPORATE PARK6.6 yr overdueBALAJI BUILDCRAFT INFRA PRIVATE LIMITED · PRATAP NAGAR, NagpurP50500016644· 81.8% built
- KASTURI EXOTICA6.6 yr overdueACORN REALITIES · Ambarnath (R), ThaneP51700008788· 57% built
- SADGURU PLANET6.6 yr overdueSADGURU INFRAPROJECTS I PVT LTD · Kalamboli, RaigarhP52000013809· 90.9% built
- IMPERIA HOMES6.6 yr overdueGPRS REALTY · Vakola, Mumbai CityP51900010379· 58.6% built
- SUNRISE HOMES6.6 yr overdueKHALIF SIRAJ SHAIKH · Damat, RaigarhP52000010277· 61.8% built
- Mallhar Enclave6.6 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001423· filed Dec 2018 → now Dec 2019· 88.6% built
- NAMAN RESIDENCY6.6 yr overdueKIRANBHAI VITTHALBHAI PATEL · Nashik, NashikP51600011915· 43.6% built
- construction of 24 flats and 12 shops on plot bearing R.S. No. 599-4 part, Balajipark, Kolhapur6.6 yr overduePune Housing and Area Development Board Pune · Near Hocky Stadium, KolhapurP53000019417· 55.5% built
- SIGNATURE AQUA6.6 yr overdueTULSI INFRA · Karjat, RaigarhP52000001652· filed Dec 2018 → now Dec 2019· 90.9% built
- KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSL6.6 yr overdueKABRA AND ASSOCIATES · Andheri, Mumbai SuburbanP51800005550· 81.8% built· 1 complaint
- SANSKRUTI HOMES6.6 yr overduePAVAN BUILDER · LOHEGAON, PuneP52100012935· 81.8% built
- NIVASA UDAAN - PHASE II6.6 yr overdueNIVASA REALTY · LOHEGAON, PuneP52100017799· 37.7% built
- AUM HEIGHTS6.6 yr overdueAbhismit Enterprises · Borivali, Mumbai SuburbanP51800009081· filed Dec 2018 → now Dec 2019· 90.9% built
- DNS TOWER6.6 yr overdueRajendra Dattatray Sawant · Kurla, Mumbai SuburbanP51800009731· filed Dec 2018 → now Dec 2019· 90.9% built· 2 complaints
- SHUBHAM APARTMENT6.6 yr overdueRAMESH GULAB TUPE · VILLAGE PUSHPAK NODE , TALUKA PANVEL, RaigarhP52000015885· 90.9% built
- 11 West6.6 yr overduePARINEE REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800003709· 90.9% built· 2 complaints
- MANEESHA CHSL6.6 yr overdueSHAH DEVELOPERS · Kurla, Mumbai SuburbanP51800004616· filed Dec 2018 → now Dec 2019· 90.9% built
- ARAMUS COMPLEX6.6 yr overdueGURUKRUPA GROUP BUILDERS AND DEVELOPERS · Panvel, RaigarhP52000007602· filed Dec 2018 → now Dec 2019· 74.7% built
- BALAJI DARPAN6.6 yr overdueBALAJI INFRA · Panvel, RaigarhP52000005816· 49.4% built
- Shree Sai Pooja6.6 yr overdueM/s Mahalaxmi Construction Co. · Ambarnath, ThaneP51700002237· 90.9% built
- Rosa Oasis Phase 26.6 yr overdueUma Enterprises · Thane, ThaneP51700005311· filed Dec 2018 → now Dec 2019· 99% built
- AKHAND ANAND6.6 yr overdueSIV REALITY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800009094· filed Dec 2018 → now Dec 2019· 45% built
- SHRINATHJI HEIGHTS6.6 yr overdueSHRINATHJI BUILDER AND DEVELOPERS · Nanivali, PalgharP99000012732· 90.9% built· 2 complaints
- Anmol Nayantara Empire6.6 yr overdueBafna Builders and Land Developers · Nashik, NashikP51600001304· filed Dec 2018 → now Dec 2019· 72.7% built
- CRESENZO RESIDENCES6.6 yr overduePARESH PUJARA AND ABHIRAJ PUJARA (AOP) · Andheri, Mumbai SuburbanP51800005898· 90.9% built· 1 complaint
- SANKALP HERITAGE6.6 yr overdueSHYAM BIHARILAL GEHANI · Borivali, Mumbai SuburbanP51800003309· 90.9% built
- KUBER GANRAJ6.6 yr overdueKUBER ABHIRAJ INFRA · GANESH NAGAR, ThaneP51700008998· 81.7% built· 57 complaints
- PHASE III VISION SHREE6.6 yr overdueSHUBBAN PROPERTIES VISION SHREE · jambhul, PuneP52100011706· filed Dec 2018 → now Dec 2019· 78.2% built
- Sunrise Orlem Building 46.6 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800007714· filed Dec 2018 → now Dec 2019· 81.8% built
- N.M.Joshi Building No.4 Annex6.6 yr overdueSHREE DEVELOPERS · Kurla, Mumbai SuburbanP51800006487· 80.6% built
- Central Park6.6 yr overdueOpulent Properties · Manjari Bk, PuneP52100000909· 90.9% built
- Ganesh Heights6.6 yr overdueShiv Builders and Developers · Badlapur (M Cl), ThaneP51700006830· 90.9% built
- TARAMATI TOWER WING A B C D6.6 yr overdueVAST CONSTRUCTION · Pen (M Cl), RaigarhP52000002960· 59.1% built
- SHREY APARTMENT6.6 yr overdueADITI CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800003528· 43.2% built
- Modispaces Amazon6.6 yr overdueModispaces Real Estate Pvt Ltd · Borivali, Mumbai SuburbanP51800004328· 45.5% built
- NEMINATH APARTMENT SRA CHS AND SHREE SIDDHAGIRI SRA CHS6.6 yr overdueSUBHASH VELJI CHAWDA · Borivali, Mumbai SuburbanP51800011251· 41.9% built
- Universal Cubical6.6 yr overduePAGARANI UNIVERSAL INFRASTRUCTURE PVT. LTD. · Andheri, Mumbai SuburbanP51800002157· filed Dec 2018 → now Dec 2019· 48.4% built· 4 complaints
- REDEVLOPMENT OF RAJENDRA NAGAR - SHREE GANESH CHS LTD.6.6 yr overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800006765· filed Dec 2018 → now Dec 2019· 81.8% built
- SUNSHINE INFINITY6.6 yr overdueSQ INFRASTRUCTURE PRIVATE LIMITED · Ward FNorth, Mumbai CityP51900003947· filed Dec 2018 → now Dec 2019· 83.6% built· 4 complaints
- Sai Krupa Residency Wing B6.6 yr overdueSai Krupa Ventures · LOHGAON, PuneP52100007343· 90.9% built
- SANJAR DEVELOPERS AND BUILDERS6.6 yr overdueSANJAR DEVELOPERS & BUILDERS · Borivali, Mumbai SuburbanP51800003814· 88.2% built
- VARDHAMAN DREAMS PHASE II6.6 yr overdueVARDHMAN PROPERTISE · Wakad, PuneP52100001649· 90.2% built
- AMANN MARINA6.6 yr overdueMS RELLIANCE CONSTRUCTION CO · Ward GSouth, Mumbai CityP51900010428· filed Dec 2018 → now Dec 2019· 81.8% built· 3 complaints
- Hubtown Sunmist A 6th to Above Floor6.6 yr overdueHubtown Limited · Andheri, Mumbai SuburbanP51800001202· 81.2% built· 8 complaints
- MAULI HIGHTS6.6 yr overdueVIJAYANAND BUILDERS AND DEVELOPERS · Karanje Tarf Satara (CT), SataraP52700008248· 90.9% built
- WHITE PEARL6.6 yr overdueS S SHRIYA INFRASTRUCTURES · Nagpur (M Corp.), NagpurP50500010689· 11.6% built
- EDEN GARDEN APARTMENT6.6 yr overdueSHRI CONSTRUCTIONS · Kolhapur (M Corp.), KolhapurP53000010370· 84.8% built· 1 complaint
- SAPPHIRE6.6 yr overdueJANGID BUILDERS PRIVATE LIMITED · Mira Road East, ThaneP51700020060· 28.4% built
- Resham6.6 yr overdueManoj Vasudev Wadhwa · Andheri, Mumbai SuburbanP51800009249· filed Dec 2018 → now Dec 2019· 56.4% built
- Flora6.6 yr overdueSiddhidata Construction and Siddhesh Landge Developers · Pimple Nilakh, PuneP52100016341· 81.8% built
- SHREE POOJA6.6 yr overdueMANGALAM BUILDCON · NERAL, RaigarhP52000001841· 81.8% built
- Akshar Jyot6.6 yr overdueAkshar Enterprises · Near rau hotel, Peth road, NashikP51600018428· 43.6% built
- Chintamani Heights6.6 yr overdueYASH ENTERPRISES · Kulgaon, ThaneP51700014730· 90.9% built
- MON DESIR6.6 yr overdueSURAJ ESTATE DEVELOPERS LTD · Ward GNorth, Mumbai CityP51900004549· filed Dec 2018 → now Dec 2019· 82.7% built· 1 complaint
- CRESCENT APARTMENT6.6 yr overdueJHALA INFRATECH · Gangapur Road, NashikP51600001071· 68.2% built
- Om Sat6.6 yr overdueShree Siddhi Developers · Ward FNorth, Mumbai CityP51900007293· filed Dec 2018 → now Dec 2019· 90.9% built
- ASHIRWAD6.6 yr overdueVASTAV HOMES · Kurla, Mumbai SuburbanP51800003492· 90.9% built
- SHASHWAT PARK6.6 yr overdueMODERN CONSTRUCTION · Badlapur (M Cl), ThaneP51700004817· filed Dec 2018 → now Dec 2019· 17.3% built
- DHARTI VIEW6.6 yr overdueDHARTI ENTERPRISES · ULWE, RaigarhP52000014220· 9.1% built
- ASHARA6.6 yr overdueDevleela Developers · Borivali, Mumbai SuburbanP51800005938· 98.2% built
- Park Royale AB Wing6.6 yr overdueSHIVRANJANI PROPERTIES LLP · Andheri, Mumbai SuburbanP51800001315· 96.4% built
- KAJAL PRIDE6.6 yr overdueDEEPAK BHAICHAND SHAH · KARJAT, RaigarhP52000014535· 90.9% built
- VARAD VIHAR6.6 yr overdueSHREE DEVELOPERS · Haveli, PuneP52100012703· filed Aug 2018 → now Dec 2019· 52.7% built
- Swastik Sapphire6.6 yr overdueSwastik Realtors · Kurla, Mumbai SuburbanP51800000239· 63.6% built
- SHWETA CHS6.6 yr overdueATHARVA DEVELOPERS · Kurla, Mumbai SuburbanP51800001142· filed Dec 2018 → now Dec 2019· 90.9% built
- PHASE III VISION WOODS6.6 yr overdueSHUBBAN PROPERTIES VISION WOODS · pune, PuneP52100004840· filed Dec 2018 → now Dec 2019· 78.2% built
- Ratnesh Plaza6.6 yr overdueBabasaheb Pandurang Patil · Sawantwadi (M Cl), SindhudurgP52900011813· 90.9% built
- PANDAV CASITA6.6 yr overdueS R BUILDWELL · Nashik (M Corp.), NashikP51600011954· 90.9% built
- NISARG VISHWA6.6 yr overdueNISARG BUILDCON · Wakad, PuneP52100005116· 72.7% built
- BROOKEFIELD WILLOWS6.6 yr overdueNirman Trimurti Developers · Pisoli, PuneP52100002035· 90.9% built· 1 complaint
- CENTRAL PLAZA6.6 yr overdueAMITKUMAR ZAVERCHAND SHETH · Mahad (M Cl), RaigarhP52000002418· 90.9% built
- Mayur Majesty6.6 yr overdueKirtikumar Jadhavji Pokar · Nashik (M Corp.), NashikP51600008879· filed Dec 2018 → now Dec 2019· 90.9% built
- CRYSTAL PARK PHASE III6.6 yr overdueK K BUILDERS & DEVELOPERS · Palghar, PalgharP99000005782· 34.8% built
- Balaji Arcade Wing A6.6 yr overdueSHIKHAR DEVELOPERS · Kalyan, ThaneP51700012219· 90.9% built
- SHREEHARI APPARTMENT6.6 yr overdueSUNIL BHAUSING PAWAR · KAMATWADE, NashikP51600015983· 90.9% built
- SHANKAR COMPLEX II6.6 yr overdueJARIMARI RESIDENCY · Kalyan, ThaneP51700010530· 44.5% built
- Leisure town6.6 yr overdueBhansali Infotech LLP · hadpsar, PuneP52100001401· filed Dec 2018 → now Dec 2019· 90.9% built· 13 complaints
- BHUVI MADHURBAN6.6 yr overdueBhuvi Landmarks LLP · Balapur, AurangabadP51500002962· filed Dec 2018 → now Dec 2019· 78.2% built
- DNYANESHWARI COMPLEX6.6 yr overdueShree Raghunath Maharaj Developers · CHOVISWADI, PuneP52100016255· 47.7% built
- MUTUAL BENEFIT CO OP HSG SOC LTD6.6 yr overdueSUNRISE HOUSING · Kurla, Mumbai SuburbanP51800002333· 81.8% built
- Gala Amora6.6 yr overdueKarishma Realty · Andheri, Mumbai SuburbanP51800006181· 23.6% built
- SERENE HOMES6.6 yr overdueMANAS PROMOTERS & DEVELOPERS · Bhosari, PuneP52100012409· 73.1% built
- TULIP N6.6 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011791· 53.2% built
- SURAJ SURABHI6.6 yr overdueSURAJ BUILDERS · KONDHWA KHURD, PuneP52100014807· 71.8% built
- PRAYAG CITY Phase I6.6 yr overduePRAYAG BUILDERS AND DEVELOPERS · VIHIGHAR, RaigarhP52000004381· 89.1% built· 3 complaints
- ABHIMAAN HOMES PHASE I6.6 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000339· 83% built· 1 complaint
- GRACE HEIGHTS6.6 yr overdueGRACE VENTURES · Pune City, PuneP52100009946· 68.6% built
- HARIGANGA HEIGHTS6.6 yr overdueKALASH LANDMARKS · Amravati (M Corp.), AmravatiP50300011446· 32.7% built
- KRISHNA BHUVAN C.H.S.6.6 yr overdueSHAUNAK DILIP KIRKIRE · Ward FNorth, Mumbai CityP51900007903· 90.9% built· 5 complaints
- RAJYOG RESIDENCY6.6 yr overdueNISARG DEVELOPERS · Rajuri, PuneP52100011521· filed Dec 2018 → now Dec 2019· 48.5% built· 1 complaint
- Sundaram residency6.6 yr overdueJadhav Enterprises · Tathwade, PuneP52100000907· filed Dec 2018 → now Dec 2019· 81.8% built· 2 complaints
- Hubtown Countrywoods Building 36.6 yr overdueHubtown Limited · Tilekar Nagar Kondhwa Budruk, PuneP52100002733· 82% built
- JYOTI POOJA APARTMENT6.6 yr overdueJYOTI BUILDCON · Nashik, NashikP51600009580· 90.9% built
- Teerth Technospace 146.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100007620· filed Dec 2018 → now Dec 2019· 90.9% built
- Tejas Emerald6.6 yr overdueTejas Enterprises · Panvel, RaigarhP52000009591· 90.9% built
- Welkin Moon6.6 yr overdueWELKIN DEVELOPERS · Ulawe, RaigarhP52000001832· 0.2% built
- ORION6.6 yr overdueSUDARSHAN DEVELOPERS · Haveli, PuneP52100007244· 42.4% built
- Sangam Solitaire A wing6.6 yr overdueSangam Press Pvt Ltd · Pune (M Corp.), PuneP52100000438· 82.5% built
- STKANWARRAMPALACIOPHASE16.6 yr overdueVINOD PREMCHAND CHANDWANI · Chikhali Bk., PuneP52100000276· 90.9% built
- Chetna Kunj CHS6.6 yr overdueK Merchant Construction Ltd · Borivali, Mumbai SuburbanP51800010821· 69.1% built
- FENNEL D6.6 yr overdueROYALE URBANSPACE LLP · SHAHAPUR, ThaneP51700005481· 73.5% built
- Time Blossom6.6 yr overdueSudeep Rajendra Chhajed · Sadashiv Nagar, NashikP51600017542· 90.9% built
- ARMADAPHASEI6.6 yr overdueG K WONDERS · WAKAD, PuneP52100001684· 59.1% built
- AARSH AVENUE - SAAL WOOD AND SILVER WOOD6.6 yr overdueSATYAM CONSTRUCTION · BEHIND BHARAT COLLEGE, ThaneP51700013399· 90.9% built
- SHEETAL ANJALI6.6 yr overdueD.G.LAND DEVELOPERS PRIVATE LIMITED · Vasai-Virar City (M Corp), PalgharP99000005155· filed Dec 2018 → now Dec 2019· 48.9% built
- AAIJI BLISS6.6 yr overdueSHRI GANESH DEVELOPERS · Karanjade, RaigarhP52000011848· 29.5% built
- SIRVI Heights6.6 yr overduePYRAMID ENTERPRISES · KAMOTHE, RaigarhP52000012162· 59.1% built
- DEV RATNA6.6 yr overdueSDC DEVELOPERS PRIVATE LIMITED · Thane, ThaneP51700007785· 90.9% built
- SILVER PARK6.6 yr overduePRASHANT MAHABALESHWAR RAIKAR · Near sai mandir, AurangabadP51500005919· 86.4% built
- Grow More Bliss B Wing6.6 yr overdueGrowmore Space Solutions Pvt. Ltd. · Borivali, Mumbai SuburbanP51800005958· 81.8% built
- NEPTUNE SWARAJYA SECTOR 2 - B106.6 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700005300· filed Dec 2018 → now Dec 2019· 56.3% built
- ROYAL RESIDENCY6.6 yr overdueSANJAY HARISCHANDRA MORE · Mahad (M Cl), RaigarhP52000010729· 40% built
- NIRMAL RESIDENCY6.6 yr overduePRITAM SURESH PACHARE · MORWA, ChandrapurP50900015827· 61.3% built
- ORCHID6.6 yr overdueVISION VENTURES · Aurangabad (M Corp.), AurangabadP51500001044· 70.5% built
- NEELKANTH AURA6.6 yr overdueNEELKANTH LIFESPACE LLP · NAVI MUMBAI, RaigarhP52000007335· 88% built
- Chishti Apartment6.6 yr overdueDolphin Developers · Khopoli, RaigarhP52000013808· 90.9% built
- SAIVIJAY6.6 yr overdueJAY DEVELOPERS · NASHIK, NashikP51600006235· 90.9% built
- Raza Imperial6.6 yr overdueShakeel Ahmad Abdul Gafoor Quazi · Raza Colony, NashikP51600009442· 90.9% built
- Teerth Technospace 96.6 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100004297· filed Dec 2018 → now Dec 2019· 90.9% built
- VEENA SANTOOR PHASE II6.6 yr overdueVeena Developers · Borivali, Mumbai SuburbanP51800001482· 86.8% built
- Adityasagar Complex6.6 yr overdueSiddhesh Mahadeo Kanade · Vabhave, SindhudurgP52900012910· filed Dec 2018 → now Dec 2019· 69.5% built
- KAILASH HEIGHTS6.6 yr overdueRANJANA CONSTRUCTION PVT LTD · Borivali, Mumbai SuburbanP51800011192· 72.7% built
- BHIMASHANKAR6.6 yr overdueMADHHU DAULATRAO PATIL · Panvel, RaigarhP52000011874· 74.5% built
- RENTAL BUILDING A-1 R26.6 yr overdueSONAM SPARK INFRA LIMITED · Thane, ThaneP51700004747· filed Sept 2020 → now Dec 2019· 56.6% built
- IMPRESSA SKY HOMES6.6 yr overdueIMPRESSA REALTORS · MANKAPUR, NagpurP50500010028· 90.9% built
- SHIVAM APARTMENT6.6 yr overdueGOPIKRISHNA PRABHAKARAN NAIR · Neral, RaigarhP52000008618· 73.2% built
- Padmanabh Pride6.6 yr overduePadmanabh Properties · Nashik, NashikP51600005546· 90.5% built
- parijat6.6 yr overdueKHERADE BUILDER & DEVELOPER · Chiplun (M Cl), RatnagiriP52800002905· 63.6% built
- JMDVARDHAM6.6 yr overdueCOSTAL VINCOM PVT LTD · Borivali, Mumbai SuburbanP51800005339· 86.4% built
- SHRIRAM TOWER6.6 yr overdueSUDHASHRI INFRACON · Nagpur (M Corp.), NagpurP50500012525· 90.9% built
- DHAIRYASHEEL PRIDE6.6 yr overduePANDURANG VINAYAK KANDALGAONKAR · padatewadi, SindhudurgP52900004575· 81.8% built
- RAVI KARAN HEIGHTS6.6 yr overdueRAMKRISHNA DEVELOPERS · Haveli, PuneP52100013812· 22.7% built
- Shree Apartment Phase 26.6 yr overdueNandini Mangaldeep Vishnu Associates · Rahatani, PuneP52100017227· 81.8% built
- Mohan Greenwoods Building 16.6 yr overdueMOHAN LIFESPACES LLP · Manjarli, ThaneP51700015601· 90.9% built
- SDPL Aashray Wanjara6.6 yr overdueSANDEEP DWELLERS PVT. LTD. · Wanjara, NagpurP50500013707· 90.9% built
- BAITUS SALEHEEN6.6 yr overdueRainbow Constructions · SHANTINAGAR, NagpurP50500016107· 53.2% built
- SWARA RESIDENCY6.6 yr overdueYOGESH ENTERPRISES · Panvel, RaigarhP52000006983· 79.4% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.