RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 24 of 61
- Tulip C Eco6.9 yr overdueAshoka Township (AOP) · Kajikhore, NashikP51600015179· 27.3% built
- Eco Greens Phase II6.9 yr overdueEcopark Developers LLP · Karjat, RaigarhP52000000268· 87.9% built· 2 complaints
- Mallhar Terraces6.9 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001244· filed Dec 2018 → now Dec 2019· 77.7% built
- Raza Imperial6.9 yr overdueShakeel Ahmad Abdul Gafoor Quazi · Raza Colony, NashikP51600009442· 90.9% built
- MARATHON NEXZONE ZODIAC -26.9 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000661· 72.7% built· 2 complaints
- GANESH GUNJAN6.9 yr overdueNERKAR PROPERTIES LLP · Nashik (M Corp.), NashikP51600006346· filed Dec 2018 → now Dec 2019· 65% built
- Aayushi Apartment6.9 yr overduePRIYANSHI ENTERPRISES · Karanjade, RaigarhP52000005046· 27.3% built
- GOLDEN WINDS Building E Phase 26.9 yr overdueGOLDEN BRICKS DEVELOPERS · Pune City, PuneP52100005025· 90.9% built
- ASHARA6.9 yr overdueDevleela Developers · Borivali, Mumbai SuburbanP51800005938· 98.2% built
- Shree Shakun Greens6.9 yr overdueShree Shakun Realty Pvt Ltd · Vasai, PalgharP99000001708· 98.6% built· 5 complaints
- ASMI6.9 yr overdueSia Developers LLP · Borivali, Mumbai SuburbanP51800002325· 82.5% built· 1 complaint
- Celestine6.9 yr overdueLotus Construction · Pune City, PuneP52100002736· 39.4% built
- Bhosales Mallhar Heritage6.9 yr overdueShendre and Associates · Kolhapur (M Corp.), KolhapurP53000001531· filed Dec 2018 → now Dec 2019· 90.9% built
- Teerth Technospace 26.9 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100012046· filed Dec 2018 → now Dec 2019· 90.9% built
- COURTYARD6.9 yr overdueYOGESH & YOGESH DEVELOPERS · PASHAN, PuneP52100007218· filed Dec 2018 → now Dec 2019· 51.8% built
- ABHIMAAN HOMES PHASE I6.9 yr overdueRISING PROPCON LLP · Shirgaon, PuneP52100000339· 83% built· 1 complaint
- KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSL6.9 yr overdueKABRA AND ASSOCIATES · Andheri, Mumbai SuburbanP51800005550· 81.8% built· 1 complaint
- Flying Colors6.9 yr overdueNEPTUNE CONSTRUCTIONS · Kurla, Mumbai SuburbanP51800008417· filed Dec 2018 → now Dec 2019· 74.5% built
- SHUBH AASHISH6.9 yr overdueA B BUILDER & DEVELOPERS PVT LTD · Mumbai, Mumbai SuburbanP51800009692· filed Dec 2018 → now Dec 2019· 90.9% built
- TULIP N6.9 yr overdueROYALE URBANSPACE · SHAHAPUR, ThaneP51700011791· 53.2% built
- SANA ARCADE6.9 yr overdueKADRI CONSTRUCTION CO. · Kurla, Mumbai SuburbanP51800012722· filed Jan 2019 → now Dec 2019· 72.7% built
- Samarth Siddhi6.9 yr overdueShree Samarth Developers · Haveli, PuneP52100000711· 81.8% built
- LAABH NEELKANTH6.9 yr overdueLAABH BUILDTECH · Thane, ThaneP51700010195· 83.9% built
- BHIMASHANKAR6.9 yr overdueMADHHU DAULATRAO PATIL · Panvel, RaigarhP52000011874· 74.5% built
- Venus Heights6.9 yr overdueRupal Enterprises · Panvel, RaigarhP52000004341· filed Dec 2018 → now Dec 2019· 72.5% built
- ATULYA RACHANA6.9 yr overdueRAJNANDINI DEVELOPERS · KRANTINAGAR, PuneP52100002404· 90.9% built
- KRISH AVENUE6.9 yr overdueM AND K DEVELOPERS · kala khadak, PuneP52100012641· filed Dec 2018 → now Dec 2019· 63.6% built
- Flora6.9 yr overdueSiddhidata Construction and Siddhesh Landge Developers · Pimple Nilakh, PuneP52100016341· 81.8% built
- ROSWALT HEIGHTS6.9 yr overdueURBAN HEIGHTS REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800003019· 74.6% built· 1 complaint
- THE SPIRES6.9 yr overdueNAIKNAVARE PRIDE AOP · Pune City, PuneP52100000485· filed Dec 2018 → now Dec 2019· 87.9% built
- Shaankeshwar Pride6.9 yr overdueSri Shaankeshwar Developers · Pimpri Chinchawad (M Corp.), PuneP52100013140· 81.8% built
- NEELAYA6.9 yr overdueNAIKNAVARE BUILDCON PVT LTD · TALEGAON, PuneP52100000013· 95.5% built
- MADHUKRISHNA CHS LTD6.9 yr overdueBUILT TECH BUILDERS & DEVELOPERS PVT. LTD. · Rahataghar, RatnagiriP52800008814· 66.4% built
- SHAAD RESIDENCY6.9 yr overdueSHADAB ISLAM QURESHI · Ward E, Mumbai CityP51900009967· 95.7% built· 2 complaints
- TRIANGLE TOWER6.9 yr overdueSURESH SHIVRAM KASHID · Solapur (M Corp.), SolapurP52600006568· 81.8% built
- NEELKANTH AURA6.9 yr overdueNEELKANTH LIFESPACE LLP · NAVI MUMBAI, RaigarhP52000007335· 88% built
- Dahisar Sunderbaug co-op housing society ltd.6.9 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800002464· filed Dec 2018 → now Dec 2019· 81.1% built
- SOLITAIRE6.9 yr overdueVarsha Ritu Constructions Pvt Ltd · Hadapsar, PuneP52100004759· filed Dec 2018 → now Dec 2019· 90.9% built
- Sai Saroj6.9 yr overdueM/S Vighnaharta Developers · Ravet, PuneP52100000008· filed Mar 2019 → now Dec 2019· 58.8% built
- Optimus6.9 yr overdueSiddhesh properties · Lahagaon, PuneP52100000803· filed Dec 2018 → now Dec 2019· 38.2% built
- G M HEIGHT6.9 yr overdueGARODIA & MAKWANA DEVELOPERS · Vasai, PalgharP99000005833· filed Mar 2018 → now Dec 2019· 70% built
- Shree Sai Pooja6.9 yr overdueM/s Mahalaxmi Construction Co. · Ambarnath, ThaneP51700002237· 90.9% built
- Galaxy Orchid6.9 yr overdueGalaxy Constructions · Pune City, PuneP52100008975· 10.8% built
- SWEET HOME BUILDING 16.9 yr overdueIPSIT ENTERPRISE · Shirgaon, PalgharP99000009859· 18.2% built
- SPARSH6.9 yr overdueVALUABLE DREAMSCAPE LLP · Andheri, Mumbai SuburbanP51800002394· filed Dec 2018 → now Dec 2019· 50.7% built
- JYOTI POOJA APARTMENT6.9 yr overdueJYOTI BUILDCON · Nashik, NashikP51600009580· 90.9% built
- Omkar Residency6.9 yr overdueM/s Pavan and JM Construction co · Nachane (CT), RatnagiriP52800001744· 90.9% built
- Shhraddha Vishwa6.9 yr overdueShhraddha Enterprises · Bhavani Peth, SolapurP52600000065· 90.9% built
- NEPTUNE SWARAJYA SECTOR 2 - B56.9 yr overdueNEPTUNE DEVELOPERS LTD · Kalyan-Dombivali (M Corp.), ThaneP51700011913· filed Dec 2018 → now Dec 2019· 49% built
- IMPRESSA SKY HOMES6.9 yr overdueIMPRESSA REALTORS · MANKAPUR, NagpurP50500010028· 90.9% built
- Teerth Technospace 76.9 yr overdueTEERTH DEVELOPERS AND TEERTH REALTIES JV · Baner, PuneP52100006190· filed Dec 2018 → now Dec 2019· 90.9% built
- Anmol Nayantara Empire6.9 yr overdueBafna Builders and Land Developers · Nashik, NashikP51600001304· filed Dec 2018 → now Dec 2019· 72.7% built
- VARDHAMAN DREAMS PHASE II6.9 yr overdueVARDHMAN PROPERTISE · Wakad, PuneP52100001649· 90.2% built
- Shree Gajanan Estate6.9 yr overdueShree Buildcon realty · CHEHEDI BK, NashikP51600001483· 66.5% built
- MANGALYA6.9 yr overdueINTEGRATE INFRASPACES · Karjat, RaigarhP52000001461· 69.5% built
- MUGDHALI APARTMENT CONDOMINIUM6.9 yr overdueKotibhaskar Infrastructures &Developers Pvt.Ltd. · Erandwana, PuneP52100015051· 90.9% built
- Kohinoor waves6.9 yr overdueKohinoor Realties (J.V) · Ulhasnagar, ThaneP51700009303· filed Jan 2019 → now Jan 2020· 90.9% built
- LAXMI PUJAN RESIDENCY6.8 yr overdueLAXMI PUJAN DEVELOPERS · Ambegaon, PuneP52100006418· filed Dec 2018 → now Jan 2020· 90.9% built
- Parnika Residency6.8 yr overdueIra Developers · GAONBHAG, SangliP53100008648· filed Dec 2019 → now Jan 2020· 81.8% built
- PRABHAT6.8 yr overdueM/s PANCHARATNAA · Ward GNorth, Mumbai CityP51900008699· 99.5% built
- SRUSHTI APARTMENT6.8 yr overdueRACHANA CREATERS · -, PuneP52100014366· filed Oct 2019 → now Jan 2020· 61.8% built
- MITTAL APPARTMENT6.8 yr overdueMOHAMMAD ILIYAS ABDUL SATTAR GORI · NEW TIDKE COLONOY, NashikP51600010217· filed Jan 2019 → now Jan 2020· 90.9% built
- PENTAGON SHARADA6.8 yr overduePENTAGON INFRASTRUCTURE · GOVERNMENT COLONY, SangliP53100015195· 90.9% built
- RAVIRAJ GARDEN PHASE I6.8 yr overdueRAJU WHABI · Rees, RaigarhP52000006834· 89.3% built
- JAYHIND ICON6.8 yr overdueJAYHIND BUILDERS AND DEVELOPERS · Haveli, PuneP52100003193· 89.3% built
- VISION 16.8 yr overdueVISION PROPERTIES · CHIKHALI, PuneP52100014791· 81.8% built
- Acropolis6.8 yr overdueMillennium Developers · NEAR BHUMKAR CHOWK, PuneP52100000088· 75.8% built
- Krupasindhu Corner6.8 yr overdueDhanlaxmi Builders And Developers · Haveli, PuneP52100011889· filed Jan 2019 → now Jan 2020· 90.9% built
- Shriram Vihar6.8 yr overdueShau Associates · Pimpri Chinchawad (M Corp.), PuneP52100002393· 79.5% built
- URJA ANEX6.8 yr overdueHARESH SHANTILAL RAMANI · Nashik, NashikP51600003034· 40% built
- Bloomdale Building 10 A6.8 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500007997· filed Jan 2019 → now Jan 2020· 90.9% built
- SHRI HARI BUILDING6.8 yr overdueSHRI NEELKANTH DEVELOPERS · Borivali, Mumbai SuburbanP51800010627· filed Jan 2019 → now Jan 2020· 90.9% built
- SAI SANGAAM6.8 yr overdueHITESH RAJARAM SAWANT · Ulawe, RaigarhP52000003120· 90.9% built
- SUN SHADE6.8 yr overdueSHUBHAM ENTERPRISE · Borivali, Mumbai SuburbanP51800002607· 47.2% built
- CRYSTAL APARTMENT6.8 yr overdueCRYSTAL CONSTRUCTION CO · Thane, ThaneP51700004766· 50.9% built· 1 complaint
- Mahavir Kunj C Wing A6.8 yr overdueRajesh Realtors · Mahavir Kunj, PalgharP99000017961· 90.9% built
- SAHAYOG NIWAS6.8 yr overdueSHREE DEVELOPERS · Thane, ThaneP51700013083· 81.8% built
- SOHAM RESIDENCY6.8 yr overdueKHUSHBU REALTIES PVT. LTD · Haveli, PuneP52100007025· 81.8% built
- VEDANGI DEVELOPERS6.8 yr overdueVEDANGI DEVELOPERS · Vasai, PalgharP99000005089· filed Jan 2019 → now Jan 2020· 90.9% built
- YASHWANT HEIGHTS C Wing6.8 yr overdueRAI RESIDENCY Private Limited · Kalyan, ThaneP51700008574· filed Mar 2018 → now Jan 2020· 86.2% built
- Ganeshree6.8 yr overdueGokhale Homes LLP · Pune (M Corp.), PuneP52100004527· filed Dec 2017 → now Jan 2020· 90.5% built
- Dosti Desire-Dosti Joy6.8 yr overdueD. D. ASSOCIATES · brahmand, ThaneP51700008886· 90.9% built
- Govind Plaza6.8 yr overdueShrinivas Ramchandra Gaikwad · Vengurla (M Cl), SindhudurgP52900004773· 90.9% built
- Shree Sadan6.8 yr overdueSHRINIVAS DATTATRAY KALE · Thane, ThaneP51700005889· 82.5% built
- SURYA TOWER-III6.8 yr overdueBIRENDRA KAMDEO SINGH · Bhandara (M Cl), BhandaraP50600011213· filed Jan 2019 → now Jan 2020· 61.8% built
- ASHISH AASHIYANA6.8 yr overdueMALLESH SUNDARAIH MATLA · Panvel, RaigarhP52000021038· 66.8% built· 2 complaints
- V M HERITAGE 26.8 yr overdueDILAWAR SUJATKHAN PATHAN · Khopoli, RaigarhP52000011478· filed Jul 2019 → now Jan 2020· 33.6% built· 1 complaint
- WHITE CASTLE6.8 yr overdueJAGO DEVELOPERS · Karjat, RaigarhP52000012822· filed Jun 2018 → now Jan 2020· 53.2% built
- KRUSHNAI IMPIRIO6.8 yr overdueKRUSHNAI BUILDCON · Pimpri Chinchawad (M Corp.), PuneP52100004229· 43% built
- Samartha Residency6.8 yr overdueM/s Samruddhi Realty · PANDHARPUR, SolapurP52600005499· 51.4% built
- LAXMINARAYAN APARTMENT6.8 yr overdueKAPIL VILASRAO BARGE · MALEGAON B.K. TAL BARAMATI, PuneP52100017726· 10.9% built
- GREEN VIEW RESIDENCY6.8 yr overdueN K ASSOCIATES · BORGAON, NagpurP50500015333· 38.6% built
- HIGHLAND TOWER6.8 yr overdueALI JANAMUDDIN SIDDIQUI · AADGON SHIVAR, NashikP51600017325· 90.9% built
- GOKULDHAM RESIDENCY6.8 yr overdueS K BUILDERS AND DEVELOPERS · CHARHOLI, PuneP52100014496· 89.1% built
- BHASKAR PLANET APARTMENT6.8 yr overdueCHANDUBHAI LAXMANBHAI PATEL · Nashik (M Corp.), NashikP51600006743· filed Dec 2018 → now Jan 2020· 78.2% built
- DISHA CO OPERATIVE HOUSING SOCIETY LTD6.8 yr overdueGAGAN DEVELOPERS AND ENGINEERS · KALYAN WEST, ThaneP51700015245· 90.9% built
- OSCAR PLAZZA6.8 yr overdueSHUBHAM DEVELOPERS · Nashik (M Corp.), NashikP51600011286· 81.8% built
- Anoushka Gardens6.8 yr overdueRaghav Construction · Nagpur (M Corp.), NagpurP50500001804· 36.9% built
- Rajasi hotel restaurant and shoppvenue6.8 yr overdueGharge-Salunkhe Associates · Sadarbazar (CT), SataraP52700001245· 65.5% built
- Shree Heritage6.7 yr overdueHemant Damu Pingale · Solapur (M Corp.), SolapurP52600012051· filed Dec 2018 → now Feb 2020· 76.8% built
- PRIVIA SQUARE6.7 yr overdueELLORA ASIAN REALTY PRIVATE LIMITED · MOSHI, PuneP52100009271· 81.8% built· 1 complaint
- WAGHU RESIDENCY6.7 yr overdueNEELKANTH PROSPERITY · Rahataghar, RatnagiriP52800005534· filed Jun 2019 → now Feb 2020· 90.9% built
- Basileo Phase 26.7 yr overdueKate Jagtap Associates · Haveli, PuneP52100005652· 82.8% built
- Shree Niwas Sankul6.7 yr overdueAnand Jagdish Dhale · NEAR SWARAJ SANSKRUTIK BHAVAN, SataraP52700002900· filed Feb 2019 → now Feb 2020· 90.9% built
- VIJAYRAJ MANOR6.7 yr overdueAMAR KALYANI BIRAJDAR · GEETA NAGAR, SolapurP52600015136· 90.9% built
- MANTRI ETERNITY PLUS6.7 yr overdueOMEGA PREMISES PVT LTD · Haveli, PuneP52100007791· filed Feb 2019 → now Feb 2020· 54.5% built
- THE WORLD TOWERS - WORLD ONE - TIER II6.7 yr overdueMACROTECH DEVELOPERS LIMITED · Ward GSouth, Mumbai CityP51900008345· filed Sept 2018 → now Feb 2020· 90.9% built· 15 complaints
- Celina B2 Wing6.7 yr overdueWelworth Associates · NA, PuneP52100015172· 81.8% built· 1 complaint
- Atlas6.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000262· 54.5% built· 1 complaint
- Hermes6.7 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000267· 54.5% built· 2 complaints
- BALKRISHNA APARTMENT6.7 yr overdueVENKAT BALKRISHNARAO BHATGARE · Nagpur (M Corp.), NagpurP50500010628· filed Feb 2019 → now Feb 2020· 55.1% built
- TULIP HEIGHTS6.7 yr overdueASK VENTURES PVT LTD · ITKHEDA, AurangabadP51500018605· 81.8% built
- HERAMBKRUPA C H S LTD6.7 yr overdueSHREE SAI BUILDERS & DEVELOPERS · BHIDEWADI KANSAI SECTION, ThaneP51700016175· 81.8% built
- SILVER ICON6.7 yr overdueSILVER GLADES PROJECTS PRIVATE LIMITED · KONKAN, ThaneP52000001364· 90.9% built
- PRISTINE CITY BEF6.7 yr overduePRISTINE DEVELOPERS · Adjucent to Bakori Village, PuneP52100000913· filed Aug 2019 → now Feb 2020· 90.9% built· 2 complaints
- ZENIYA ARCADE6.7 yr overdueRAJESH DHANJI ZALTE · Jalgaon, JalgaonP49900003376· 70% built
- Govind Enclave6.7 yr overdueArun Wamanrao Khadgi · ., NagpurP50500013663· filed Feb 2018 → now Feb 2020· 80% built
- Mansing Residency6.7 yr overdueShilpaja Pramod Kangutkar · Kolhapur (M Corp.), KolhapurP53000001602· 72.3% built
- MALHAR COMPLEX6.7 yr overdueVINAYAK MHALSAKNT KHADE · TAL PURANDAR, PuneP52100015650· 19.1% built
- Megapolis Mystic Phase 26.7 yr overduePegasus Properties Pvt. Ltd. · Hinjewadi, PuneP52100001391· 90.9% built
- MANGALMURTI APARTMENT6.7 yr overdueOM ASSOCIATES · Sangli Miraj Kupwad (M Corp.), SangliP53100013089· 90.9% built
- Swami Samarth6.7 yr overduePRIDE PROPERTIES & INFRASTRUCTURE · Erandwana, PuneP52100015849· 81.8% built
- SIDDHIVINAYAK HEIGHT6.7 yr overdueSIDDHIVINAYAK DEVELOPERS · Thane (M Corp.), ThaneP51700012778· 54.5% built
- Simar elegance6.7 yr overdueManmohan Singh Alagh · Pimpri Chinchawad (M Corp.), PuneP52100004329· 52.7% built
- Shantiniketan Phase II A36.7 yr overdueKumar Builders Consortium · Pune, PuneP52100005467· filed Mar 2019 → now Mar 2020· 90.9% built· 2 complaints
- Indrayani Towers6.7 yr overdueGRAND BUILDERS AND DEVELOPERS · Satara, AurangabadP51500015879· 90.9% built
- Anushree6.7 yr overduePrasad Rajan Sable · Pimpri Chinchawad (M Corp.), PuneP52100013940· 15.1% built
- RENUKA HEIGHTS6.7 yr overdueR. H. ASSOCIATES · Baramati, PuneP52100011243· 20.5% built
- Vaidyas Shakuntal Heights6.7 yr overdueDigvijay Vaidya Builders and Developers through proprietor Shri Digvijay Dattatrya Vaidya · Satara, SataraP52700011216· 50.9% built
- SAGAR DARSHAN CHS LTD6.6 yr overdueNIRMITEE DEVELOPERS · Borivali, Mumbai SuburbanP51800014616· 27.3% built
- ASHTAVINAYAK NX6.6 yr overdueASHTAVINAYAK INFRASTRUCTURE · AMBARNATH EAST, ThaneP51700015495· filed Mar 2019 → now Mar 2020· 27.7% built
- SAI SANKALP6.6 yr overdueJAI AMBE CONSTRUCTIONS · SAMBHAJI CHOWK, ThaneP51700016052· filed Mar 2019 → now Mar 2020· 34.1% built
- SARA SAMRUDDHI - PHASE 16.6 yr overdueSARA PROPERTIES · MIT COLLEGE, AurangabadP51500013783· filed Mar 2019 → now Mar 2020· 81.8% built
- Gajanan Annex6.6 yr overdueLaxmi Associates · Makhmalabad, NashikP51600005393· 90.9% built
- SHREE TIRUMALA BHUMIKA APARTMENT- B WING6.6 yr overdueROONGTA BUILDERS AND DEVELOPERS · Nashik, NashikP51600002388· 81.8% built
- AASHIRWAD ROW HOUSE6.6 yr overdueVISHWAKARMA BUILDWELL CONSTRUCTION · Nashik (M Corp.), NashikP51600009685· 81.8% built
- DREAMZ SIGNATURE6.6 yr overdueDREAMZ INFRASPACE · Amravati (M Corp.), AmravatiP50300013798· 72.7% built
- INDRAPRASTHA 46.6 yr overduePREM CONSTRUCTIONS · Palghar, PalgharP99000017898· 90.9% built
- Shanta Bhuvan CHS Ltd.6.6 yr overdueLabh Homes Creations And Holdings Pvt. Ltd. · Andheri, Mumbai SuburbanP51800005306· 90.9% built· 1 complaint
- TRINITY - RUDRA6.6 yr overdueRATTANRAJ LIFESPACES · AMABARNATH, ThaneP51700015840· 72.7% built
- LANDSCAPE HERITAGE BUILDING NO 16.6 yr overdueLANDSCAPE INFRASTRUCTURE · AMBARNATH EAST, ThaneP51700015151· 63.6% built
- Chintamani6.6 yr overdueShree Sadguru Builders · Pen, RaigarhP52000016118· 90.9% built
- Naman Vihar6.6 yr overdueNAMAN VENTURES PRIVATE LIMITED · Nandgaon peth, AmravatiP50300003113· 57.3% built
- Girivan Shivkunj6.6 yr overdueShri Sati Builders and Developers Private Limited · Chembur, Mumbai SuburbanP51800011754· 79.1% built
- SHIVOM REGENCY6.6 yr overdueSPACE BUILDERS & DEVELOPERS · Baner Village, PuneP52100014878· 78.6% built
- Prabhu Fort6.6 yr overduePacific Builders · DGP NAGAR, NashikP51600007154· 72.7% built
- SWARAJ SPANDAN6.6 yr overdueHARAK PATIL REALTORS · Bhagur Rural, NashikP51600012984· 72.7% built
- SHREE TIRUMALA AASHIYANA APARTMENT6.6 yr overdueSHREE CHAWO SATI BUILDERS PRIVATE LIMITED · NASHIK, NashikP51600001825· 90.9% built
- Vishwa Nest Apartments6.6 yr overduePatki-Joshi Engineers and Contractors Pvt. Ltd. · Nimbalkar Colony Kolhapur, KolhapurP53000015053· 90.9% built
- PRAYAG GREENS6.6 yr overduePRAYAG DEVELOPER · Nashik (M Corp.), NashikP51600008173· 60% built
- Times Square- C WIng6.6 yr overdueNTPL DEVELOPERS,LLP · Andheri, Mumbai SuburbanP51800018273· 28.2% built
- SHIVPADMA RESIDENCY6.6 yr overdueN B PROPERTIES · CHARHOLI, PuneP52100015571· 9.1% built
- SILVER ROCKS6.5 yr overdueSILVER DEVELOPERS · Haveli, PuneP52100013495· filed Dec 2018 → now Apr 2020· 19.5% built
- Anshul Aarush A building and B building6.5 yr overdueM/s Mithila Realty · Dattanagar, AhmednagarP52200000814· 80% built
- Sheela Smruti CHSL6.5 yr overdueBlack Gold Developers Pvt Ltd · Andheri, Mumbai SuburbanP51800004201· 90.9% built
- SHREE GANESH RESIDENCY6.5 yr overdueRAVINDRA PUNDLIKRAO MAHALLE · AMRAVATI, AmravatiP50300008561· 72.7% built
- ANURON SEVEN6.4 yr overdueANURON INFRASTRUCTURES · Ahmadnagar (M Corp.), AhmednagarP52200000566· 52.7% built
- Salasar Aarpan A Wing6.4 yr overdueSalangpur Gruh Nirman · Mira-Bhayandar (M Corp.), ThaneP51700010292· filed Jun 2019 → now Jun 2020· 90.9% built· 1 complaint
- LITTLE EARTH MASULKAR CITY PHASE 36.4 yr overdueKolte-Patil Developers Limited · KIWALE, PuneP52100014875· 88.6% built· 5 complaints
- NIRMAN DWARKAPURAM6.4 yr overdueNIRMAN ESTATE DEVELOPERS PVT LTD · DWARKA ANNEX, NashikP51600001184· 90.9% built
- LAXMI RESIDENCY6.4 yr overdueARUN PUNDLIK NIKAM · Nashik, NashikP51600010591· 50% built
- SAPTSHRUNGI ROW HOUSE6.4 yr overdueBHAVANI CONSTRUCTION · Nashik, NashikP51600010741· 72.7% built
- Pankaj Residency6.4 yr overduePankaj Borole · Chopda (M Cl), JalgaonP49900007463· 41.8% built
- Pandurang smruti6.4 yr overdueLote Constructions · Kalyan, ThaneP51700013381· filed Jul 2019 → now Jun 2020· 82.5% built
- Rishika Park6.4 yr overduePankaj Borole · Chopda (M Cl), JalgaonP49900001384· 50% built
- LILLIAN6.4 yr overdueKALCON INFRASTRUCTURE · WAKAD, PuneP52100015032· 90.9% built
- AKSHAR DEEP6.4 yr overdueAkshar Enterprises · Nashik (M Corp.), NashikP51600008239· 72.7% built
- SAPPHIRE6.3 yr overdueVARDHAMAN DEVELOPERS · Shirur, PuneP52100000277· 90.9% built
- Rajmudra Pride6.3 yr overdueAnurag Rohidas Aher · Nashik (M Corp.), NashikP51600006713· 72.5% built
- OM SAI6.3 yr overdueMAYFAIR ENTERPRISES · khairepada, PalgharP99000013687· filed Jul 2019 → now Jul 2020· 90.9% built
- SAHARA COMPLEX6.3 yr overdueGULAM HUSAIN YUSUF CHOUGLE · KHED DAPOLI ROAD, RatnagiriP52800015442· filed Dec 2022 → now Jul 2020· 81.8% built
- PAVILION REGENCY6.3 yr overdueAVISHKAR DEVELOPERS AND BUILDERS · PUNE, PuneP52100014474· filed Jul 2019 → now Jul 2020· 71.8% built
- AVNI SPARSH6.3 yr overdueNISARGA DEVELOPERS · Nashik (M Corp.), NashikP51600012356· 41.4% built
- OMKAR HEIGHTS CO-OP HOUSING SOCIETY LTD6.3 yr overdueOMKAR HEIGHTS CO-OP HOUSING SOCIETY LTD. · Jail Road, NashikP51600007817· 81.8% built
- JOG CHARITABLE MEDICAL RELIF FUND HOSPITAL AND RACHANASHRI COMMERCIALS6.3 yr overdueM/S RACHANA BUILDERS AND DEVELOPERS · Amravati City., AmravatiP50300004928· 81.8% built
- ROONGTA HORIZON APARTMENT6.3 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600001399· 81.8% built
- ROONGTA IMPERIA APARTMENT6.3 yr overdueROONGTA HOMES LLP · NASHIK, NashikP51600001327· 81.8% built
- MAHADEV TOWER6.3 yr overdueMAHADEV MARKEING COMPANY · Nagpur (M Corp.), NagpurP50500013512· filed Jul 2018 → now Jul 2020· 90.9% built· 1 complaint
- Vande Residency6.3 yr overdueVANDE DEVELOPERS · Nashik, NashikP51600009139· 49.1% built
- SAI SHOPPING COMPLEX6.3 yr overdueSAI DEVELOPERS · Ghatanji, YavatmalP51000013171· 81.8% built
- ROYAL GARDEN6.2 yr overdueYSSF ENTERPRISES · MALYAN, PalgharP99000025831· 90.9% built
- SHRADDHA INFINITY6.2 yr overdueSHRADDHA LANDMARK PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010938· filed Dec 2018 → now Aug 2020· 43.5% built
- Gajanan smruti6.2 yr overdueBALASAHEB SHANKAR SUTAR · VITA, SangliP53100025414· 81.8% built
- JOHN RESIDENCY6.2 yr overdueJAMES JOHN DSOUZA · MASOLI, PalgharP99000025496· 90.9% built
- Sanskruti6.2 yr overdueSugee Three Developers LLP · Ward GNorth, Mumbai CityP51900001098· 81.8% built
- ROYAL RESIDENCY6.2 yr overdueHIMANSHU SHAM TENDULKAR · opp .filteration plant, PalgharP99000014529· 90.9% built
- SHRI KRISHNA APARTMENT6.2 yr overduePRASHANT DEVELOPERS · Dhule, DhuleP49800010300· 90.9% built
- NIDHI SHELTER6.2 yr overdueBMH PROPERTIES PVT LTD · GOPIPURA-E, PalgharP99000025815· 78.6% built
- MAHAVIR AVENUE6.2 yr overdueAbhishek Builders · Nashik (M Corp.), NashikP51600009340· 81.8% built
- NA6.2 yr overdueSanghi Builders and Developers · Nashik, NashikP51600008840· 96.4% built
- LEELA PRIDE6.1 yr overdueSURESH JAMATRAJ OSWAL · VITA, SangliP53100024296· 81.8% built
- VASANT NIRVANA PHASE 26.1 yr overdueM/S SHREE SAI DEVELOPERS · Karjat, RaigarhP52000005693· filed Sept 2019 → now Sept 2020· 68.2% built
- SIDDHATEKPRIDE6.1 yr overdueSiddhatek Builders and Developers · VISHRAMBAG, SangliP53100015642· 90.9% built
- Parvati Emperia6.1 yr overdueR.D Builders · Panvel, RaigarhP52000003221· filed Mar 2019 → now Sept 2020· 65.9% built
- Sapphire Park6.1 yr overdueS.S.Builders and Developers · Kolhapur (M Corp.), KolhapurP53000000649· filed Sept 2019 → now Sept 2020· 90.9% built
- SIGNATURE RESIDENCY6.1 yr overdueDIVINE GANESHA DEVELOPERS · Uran, RaigarhP52000008593· filed Mar 2019 → now Sept 2020· 90.9% built
- SWAGAT SYMPHONY6.1 yr overdueMODERNGROUP · Nashik (M Corp.), NashikP51600003257· 57.3% built
- SWAGAT PARK6.1 yr overdueSHRI SANDERI GROUP · DHRUV NAGAR, OFF GANGAPUR ROAD, NashikP51600006695· 79.1% built
- SWAGAT VILLA6.1 yr overdueSHRI SANDERI GROUP · DHRUV NAGAR, OFF GANGAPUR ROAD, NashikP51600007624· 31.8% built
- Minerva6.1 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000284· 54.5% built· 1 complaint
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.