- Mahadev Enclaves · Opp Regency AntiliaMahadev Enclaves · P51700054527 · possession Jul 2028 · 38.2% built
- VASUDEV RATNA · BHAYANDARKRISHA BUILDERS · P51700054530 · possession Apr 2028 · 30% built
- NAKSHATRA · GANESH NAGAR, DOMBIVLI EASTURBAN LIFESPACE · P51700054533 · possession Nov 2026 · 70.9% built
- OM SAI AVENUE · Ambernath EastD A CONSTRUCTION · P51700054556 · possession Dec 2025 · 100% built
- HILTRON HILLS · UlhasnagarHILLVIEW REALTY · P51700054570 · possession Apr 2028 · 43.6% built
- AMAR PUSHPAKUNJ · ThaneAMAR PUSHPAKUNJ · P51700054590 · possession Apr 2028 · 50.6% built
- SAWAN SERENITY · NerulShree Sawan Buildcon · P51700054606 · possession Dec 2026 · 81.8% built
- Manas Heights · Titwala EastK V M and Morya Group · P51700054620 · possession Apr 2028 · 57.3% built
- Bhoomi Castle, Phase I · DaigharGajra Ventures Private Limited · P51700054644 · possession Apr 2031 · 29% built
- Shanu Majestic · G B PatharliFortune Group of Construction · P51700054649 · possession Apr 2027 · 78.2% built
- BILESHWAR · Wadeghar- Kalyan WestASHAPURA COMBINES · P51700054702 · possession Apr 2029 · 65% built
- ANIRUDDHA POOJA · ThaneANIRUDDHA POOJA · P51700054763 · possession Apr 2027 · 89.1% built · 1 complaint
- JVM's CYNERGY · Khidkali, ThaneZenith Home Maker · P51700054766 · possession Apr 2029 · 40.3% built
- Urban Heritage · ThaneUrban Space Buildcon Private Limited · P51700054780 · possession Apr 2027 · 44.1% built
- PATELS ZENITH · AMBERNATHPRAMUKH DEVELOPERS · P51700054783 · possession Apr 2028 · 81.8% built
- MARKANDEY SQUARE · ThaneMARKANDEY SQUARE · P51700054803 · possession Apr 2029 · 38.6% built
- Mandarmala Co-Operative Housing Society Limited · Dombivli City WestRachana Empire · P51700054811 · possession Apr 2028 · 62.7% built
- Progressive Era · ThaneProgressive Era · P51700054819 · possession Dec 2028 · 53.5% built
- RHUTU HEIGHTS · VILLAGE NAVAGAONVIKAS WAMAN MHATRE · P51700054822 · possession Apr 2029 · 65.5% built
- NORTH IMPERIAL GREENS -TOWER 2 · GHODBUNDER ROADSkylark Buildspace Private Limited · P51700054824 · possession Dec 2031 · 48.8% built
- RAVICHANDRA CHS PROPOSED · GOPAL NAGARSPLENDOR SHELTERS PRIVATE LIMITED · P51700054858 · possession Sept 2027 · 81.8% built
- RAJESHWARI COMPLEX · KOLEGAONManohar Vithu Chaudhari · P51700054859 · possession Dec 2027 · 55.4% built
- Shree Ganraj Residency · Village KulgaonOM SAI CONSTRUCTION · P51700054872 · possession Apr 2027 · 61.4% built
- SHREEJI NX · At Village - Valivali, Taluka Ambernath, BadlapurSHUBH BUILDERS · P51700054882 · possession Apr 2027 · 81.8% built · 1 complaint
- SHREE BALAJI EMPIRE · BHAYANDER EASTSHUBHAM HOUSING · P51700054916 · possession Dec 2030 · 66.6% built
- Pragati Om Gulmohar · Dombivli EastPRAGATI HOMES · P51700054917 · possession Jan 2028 · 90.5% built
- Masaakin Hatimiyah · BHAYANDARINDUS INFRATECH · P51700054926 · possession Jul 2029 · 29.1% built
- JNP RESIDENCY · SHILAL-SIRAJ BUILDERS & DEVELOPERS · P51700054939 · possession Nov 2027 · 77.3% built
- Shivnath Skycity · KhidkaliSHIVNATH DEVELOPER · P51700054944 · possession Apr 2029 · 38.2% built
- SHIVOM LAKESIDE · KALYANSHIVOM BUILDERS AND DEVELOPERS · P51700054952 · possession Apr 2029 · 33.8% built
- OM SHREE SAI VILLA · TONDLIKAR NAGAROM SHREE SAI CONSTRUCTION · P51700054953 · possession Apr 2027 · 65% built
- N.A. PARADISE · VASUNDARIN.A.BUILDERS · P51700054954 · possession Apr 2027 · 12.9% built
- RIDDHI SIDDHI CHS · BADLAPURVADNERE BUILDER & DEVELOPERS · P51700054957 · possession Dec 2026 · 77.3% built
- Deepjyoti Chs Ltd · ThaneBorkar Realty · P51700054974 · possession Oct 2028 · 47.7% built
- NANO CITY · JOVELI BADLAPUR EASTPINNACLE SPM GROUP · P51700055001 · possession Apr 2028 · 40% built
- Sky Heights · NavgharBALAJI REALTY LLP · P51700055003 · possession Apr 2030 · 50.9% built
- NOBLE SKY · MUMBRAPARADISE MKH BUILDERS & DEVELOPERS · P51700055022 · possession Apr 2034 · 32.5% built
- DIGVIJAY C.H.S. LTD. · ThaneDIGVIJAY C.H.S. LTD. · P51700055039 · possession Jul 2027 · 45.5% built
- SANJEEVANI CO-OP HOUSING SOCIETY LTD · AMBARNATH (EAST)SIDDHARTHA CONSTRUCTIONS · P51700055050 · possession Dec 2026 · 81.8% built
- Grace Square D1 and D2 · MUMBRASKYLINE INFRA · P51700055059 · possession Apr 2030 · 38.2% built
- Mangalmurti Paradise · AyreShubham Construction · P51700055074 · possession Apr 2027 · 67.7% built
- SAPTASHREE GLOBAL TECH CENTER · ThaneSAPTASHREE GLOBAL TECH CENTER · P51700055086 · possession Dec 2028 · 36.7% built
- Shree Sai Aangan · Near Ramchndra TalkiesMahesh Enterprises · P51700055090 · possession Oct 2026 · 90% built
- Mali Avenue · KALYANMALI INFRA · P51700055096 · possession Apr 2027 · 79.5% built · 1 complaint
- AVIGHNA COMPLEX PHASE II · AVIGHNA COMPOUNDAVIGHNAA INFRA BUILDCON LLP · P51700055107 · possession Apr 2030 · 27.5% built · 1 complaint
- Swaraswati Heights · BelavliShree Samarth Enterprises · P51700055115 · possession Jan 2029 · 43.2% built · 1 complaint
- Mantra · Taluka - Kalyan, TitwalaVAIDIKH NIRMAAN LLP · P51700055124 · possession Mar 2027 · 65.3% built
- Radhe Govind Plaza · MorivaliShree Radha Construction · P51700055151 · possession Apr 2027 · 42.7% built
- SUN PRIDE · Tal KalyanC K Developers · P51700055206 · possession Apr 2027 · 46.4% built
- SAI KRISHNA HEIGHTS · BAJARPETH MURBADOM SAI DEVELOPERS · P51700055211 · possession Apr 2027 · 49.5% built
- MANOVI UPTOWN · GANPATI CHOWK, KALYAN WESTMANOVI UPTOWN · P51700055249 · possession Aug 2027 · 35.9% built
- ASMA GARDEN · NagaonQUBA SQUARE LLP · P51700055252 · possession Oct 2028 · 23.3% built
- RAGHUKUNJ CHS LTD · DOMBIVLI EASTJ B CONSTRUCTIONS · P51700055259 · possession May 2027 · 75% built
- Trinity - Shashank Saptshrung · dombivli westRADHIKA CONSTRUCTION COMPANY · P51700055300 · possession Dec 2028 · 44.5% built
- GOLDEN CITY · UlhasnagarGOLDEN CITY · P51700055313 · possession Dec 2026 · 30.9% built
- Shiv Paradise Wing C · ShirgaonShiv Corporation · P51700055322 · possession Apr 2027 · 90.9% built
- KRISHNA DHAM - 2 · YERANJADATREE REALTORS · P51700055326 · possession Dec 2026 · 50.9% built
- JOGANI PRIDE · BhiwandiBLISSFUL BUILDCON LLP · P51700055327 · possession Apr 2028 · 30.6% built
- Royal heights · BhalSiddhi Vinayak Builders & Developers · P51700055339 · possession May 2027 · 44.1% built
- Vedant Millenia Happiness Phase II Wing D · KalyanMOHAN HARDASMAL THARWANI · P51700055377 · possession Jul 2028 · 33.6% built · 1 complaint
- Sarvoday Marvel · Wadeghar, Kalyan (W)Sarvoday Group · P51700055414 · possession Nov 2027 · 84.1% built
- SHREE SHASHWAT BUILDING NO. 22 · SHREE SHASHWAT COMPLEX, PLEASANT PARK, MIRA ROAD EASTRaj InfraEmpire Private Limited · P51700055427 · possession May 2027 · 76.4% built
- SATYAM ANANTAM · BADLAPURSHIVANSH INFRA · P51700055439 · possession Dec 2026 · 70.9% built
- MAHADEV HEIGHTS · KALYAN EASTSONALI HOMES LLP · P51700055444 · possession Apr 2030 · 47.5% built
- ZUBAIR ENCLAVE · MUMBRAROYAL BUILDERS AND DEVELOPERS · P51700055458 · possession Apr 2029 · 44.1% built
- THARWANIS MEGHNA MONTANA PHASE - 3 · AmbarnathTHARWANIS MEGHNA MONTANA PHASE - 3 · P51700055468 · possession Apr 2029 · 2.7% built
- DEVI HILLS · UlhasnagarDEVI HILLS · P51700055474 · possession Apr 2027 · 45.5% built
- SKY MARINA · DombivliSwaminarayan Developers · P51700055494 · possession Apr 2030 · 38.9% built
- Kamdhenu 23 West Grande · ThaneKamdhenu 23 West Grande · P51700055502 · possession Apr 2029 · 56.8% built
- VIMAL RESIDENCY · At Post VasindNIRMITI INFRA · P51700055523 · possession Apr 2028 · 68.6% built
- MASTER BUSINESS CENTRE · AmbarnathMASTER BUSINESS CENTRE · P51700055525 · possession Dec 2024 · 68.2% built
- SEA GREEN PALACIA · UlhasnagarSEA GREEN PALACIA · P51700055526 · possession Oct 2027 · 54.5% built
- YASH MIDTOWN · WALDHUNIYASH REALTY · P51700055547 · possession Apr 2029 · 17.5% built
- OM SHIV GANESH CO OPERATIVE HOUSING SOCIETY LTD · DNC ROAD DOMBIVLI EASTIMPRESSIONS NXT · P51700055555 · possession Mar 2027 · 48.2% built
- ARIHANT TOWER · BHAYANDARARIHANT REALTY · P51700055564 · possession Dec 2028 · 13.6% built · 1 complaint
- MIRAYA DIVINE · MAJIWADEMEXTECH PROPERTY DEVELOPERS LLP · P51700055585 · possession Apr 2030 · 43.2% built · 1 complaint
- SHREE SAMARTH DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · DOMBIVLI EASTNAVKAR ENGINEERS · P51700055588 · possession Oct 2029 · 42.3% built
- SHREEJI DIOS · THANE BELAPUR ROAD, NAVI MUMBAISHREEJI VENTURES NIRMAAN PRIVATE LIMITED · P51700055622 · possession Apr 2027 · 90.9% built
- VISHNU BLISS · .LEGACY BUILDERS & INNOVATORS · P51700055630 · possession Jun 2026 · 79.6% built · 1 complaint
- SHREE SHASHWAT BUILDING NO. 21 · MIRA ROAD EASTG N DEVELOPERS · P51700055631 · possession May 2027 · 71.3% built
- THE NILAYA · TitwalaABHIDARSHAN CORPORATION LLP · P51700055643 · possession Apr 2028 · 29.1% built
- Swaminarayan City Phase 1D · Mothagon, Mauje, ThakurliSwaminarayan Life Space LLP · P51700055644 · possession Apr 2031 · 38.3% built · 1 complaint
- EV 9 Square · ThaneEV 9 Square · P51700055650 · possession Apr 2029 · 57.8% built
- Kamdhenu Grandeur · ThaneKamdhenu Grandeur · P51700055665 · possession Apr 2028 · 70.6% built
- Trident Avalon · BadlapurShri Krishna Realty · P51700055667 · possession Apr 2027 · 75.6% built · 1 complaint
- CROSSTOWN II C WING · UlhasnagarCROSSTOWN II C WING · P51700055668 · possession Jun 2029 · 29% built
- BHAGWATI HEIGHTS · SHAHAPURPERFECT REALITY · P51700055682 · possession Apr 2028 · 72.7% built
- Sunteck Sky Park 3 · Village NavgharSunteck Lifespace Private Limited · P51700055703 · possession Apr 2031 · 40.9% built
- Ammu Co-Op Housing Society Ltd · Chikanghar, Kalyan WestStonecrafters · P51700055717 · possession Jul 2027 · 58.6% built
- AURA BUSINESS CENTER · ThaneAURA BUSINESS CENTER · P51700055734 · possession Apr 2027 · 31.5% built
- PRECIOUS MEADOWS NX · KalyanRadhe Krishna Developers · P51700055752 · possession Oct 2027 · 71.8% built · 1 complaint
- Swarajya · CHARAISAILAVKIK REALTY PRIVATE LIMITED · P51700055753 · possession Jul 2027 · 30% built
- Mangalmurti Garden · Chole-Dombivali EastShivam Universal · P51700055757 · possession Apr 2027 · 81.8% built
- RAJ EMPIRES BUILDING NO.2 · KALYANRAJ PRITAM CHATURVEDI · P51700055768 · possession Jul 2027 · 40.7% built
- ART SHREE · KalyanART ENTERPRISES · P51700055811 · possession Apr 2027 · 79.1% built
- PRAMUKH PARADISE · NEAR VANGANI RAILWAY STATION EAST FOOTOVER BRIDGEAASHAPURA ASSOCIATE · P51700055845 · possession Apr 2030 · 22.6% built
- REGENCY ANANTAM NXT PHASE I · DombivliREGENCY NIRMAN LTD · P51700055848 · possession Apr 2029 · 22.9% built
- SHIVANAND SUDAMA CO. OP. HSG. SOCIETY. LTD. · DOMBIVLINARENDRA KALYANJI PATEL · P51700055865 · possession Jul 2027 · 66.4% built
- MIRAYA BUSINESS HUB · MAJIWADEMEXTECH PROPERTY DEVELOPERS LLP · P51700055878 · possession Apr 2029 · 42.7% built
- GAJANAN PRIDE · SANGEETAWADIBALAJI INFRA · P51700055892 · possession Apr 2028 · 35.5% built
- RANUJA RAMDEV C TYPE · BHAYANDAR EASTRANUJA RAMDEV C TYPE · P51700055896 · possession Apr 2027 · 55.5% built
- SHREE VIGHNAHARTA · NASHREE SAI ENTERPRISES · P51700055907 · possession Apr 2028 · 27.3% built
- SHREE HILL RESIDENCY · AMBERNATHSADGURU CORPORATION · P51700055920 · possession Jul 2027 · 43.6% built
- ONE SILVER AVENUE · BhiwandiONE SILVER AVENUE · P51700055921 · possession Apr 2030 · 30% built
- JAY RAMDARSHAN CHS LTD · Badlapur WestMITRA BUILDCON · P51700055924 · possession Mar 2027 · 48.2% built
- MAHAVIR VISTA AND VISTA POINT · ThaneMAHAVIR VISTA AND VISTA POINT · P51700055928 · possession Apr 2029 · 35.7% built
- SHIVALAYA HEIGHTS · KHIDKALIRUDIS INFRA · P51700055940 · possession Oct 2028 · 61% built
- THE MILLENIA · KatemanevaliMILAN CONSTRUCTIONS · P51700055944 · possession Dec 2028 · 37.8% built
- MAHALAXMI APARTMENT · KONMANVI CONSTRUCTION · P51700055962 · possession Apr 2028 · 62.7% built
- PATELS ASPIRE · AMBERNATH EASTPRAMUKH DEVELOPERS · P51700055979 · possession Apr 2027 · 32.5% built · 1 complaint
- Shree Prasad CHSL · NaupadaLcon Infra LLP · P51700055985 · possession Jun 2026 · 63.8% built
- Leena Oasis · Naya NagarLeena Constructions Private Limited · P51700055999 · possession Apr 2030 · 29.5% built
- CROSSTOWN II B WING · UlhasnagarCROSSTOWN II B WING · P51700056000 · possession Jun 2029 · 29% built
- PRECIOUS EMPIRE WING A, B AND C · PaleRKR REALITY · P51700056016 · possession Dec 2026 · 81.4% built · 1 complaint
- Navkamal Pushpa CHS · Naupada, Thane WestDream Realtors · P51700056041 · possession May 2026 · 27.3% built
- AL BALAD RESIDENCY II · SECTOR 9 THANEUnity Realty · P51700056042 · possession Oct 2029 · 18.8% built
- Shubharambh Residency · ThaneAarambh Developers · P51700056055 · possession Mar 2028 · 27% built
- Haware Paramount Kalyan Phase 1 · Muthaval VillageHaware Properties LLP · P51700056061 · possession Apr 2029 · 36.2% built · 1 complaint
- ANSAL SUVARNA VILLAS · SenwaTilak construction co · P51700056071 · possession Dec 2030 · 18.2% built · 1 complaint
- Sanveg Residency · BadlapurOm Vastu Homes NX · P51700056072 · possession Apr 2029 · 72.4% built
- Amakin Mohammadiyah Complex · Dombivli EastRAJ CORPORATION · P51700056078 · possession Apr 2031 · 49.5% built
- SATYAM CHOPRA ENCLAVE · CHOTA MHASOBA MAIDANSAI SATYAM PROPERTIES LLP · P51700056086 · possession Jul 2027 · 34.5% built
- RIDDHI SIDDHI PARVATI · ThaneRIDDHI SIDDHI PARVATI · P51700056091 · possession Sept 2027 · 38.2% built
- TULSI VATIKA · VADAVALISHRI KALKI ENTERPRISES · P51700056104 · possession Jul 2030 · 43.2% built
- AMALTAS · DOMBIVLIAARYA DEVELOPERS · P51700056146 · possession Dec 2027 · 47.7% built
- SAHYADRI ELITE · PISAVALISIKERIA SHELTER PRIVATE LIMITED · P51700056156 · possession Jul 2028 · 33.4% built
- Precious Villas by RM | Parijas · KALYANRM Buildcon · P51700056173 · possession Apr 2031 · 28.6% built
- JARIMARI HOMES · KALYANJARIMARI HOMES · P51700056174 · possession Apr 2028 · 0.9% built
- Haware Palms Kalyan Phase 1 · Muthaval VillageHaware Properties LLP · P51700056190 · possession Apr 2029 · 41.4% built · 1 complaint
- SHRI KRISHNA GOVIND PRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED · NAUPADAGOVIND OJASS EDIFICE PVT. LTD. · P51700056222 · possession Dec 2026 · 61.8% built
- Shri Jiveshwar Apartment · KulgaonOMKAR ENTERPRISES · P51700056234 · possession Apr 2029 · 30.9% built
- SHUBHANKAR · Pendse NagarITCON BUILDERS AND DEVELOPERS · P51700056238 · possession Oct 2026 · 58.6% built
- Anand Upvan NX · Village -MorivaliAmeya Developers · P51700056251 · possession Apr 2030 · 35.9% built
- Urban Hills Phase 1 · Kalyan Phata, ThaneLotus Group · P51700056256 · possession Aug 2028 · 52% built
- MARUTI HOMES · ThaneJay Shree Krishna Enterprises · P51700056264 · possession Jan 2029 · 37.7% built
- DOSTI WEST COUNTY - PHASE 7 - DOSTI WILLOW · ThaneDOSTI WEST COUNTY - PHASE 7 - DOSTI WILLOW · P51700056278 · possession Jul 2028 · 58.4% built
- Yesu Anand Residency · Behind Old Guardian High School, Near Avdhuth Buiding,Vijay Ananta Patil · P51700056279 · possession Dec 2026 · 81.8% built
- KRISHNA NAYAN COMPLEX PHASE I · Village - Shirgaon, Taluka Ambernath, BadlapurSHREEJI BUILDERS AND DEVELOPERS · P51700056288 · possession Dec 2027 · 42.2% built
- Palm Riveria · ThanePalm Riveria · P51700056303 · possession Apr 2034 · 9.6% built
- Sai Vedant · SHIRGAONSai Aangan Residency · P51700056315 · possession Mar 2027 · 83.5% built
- WALCHAND AVENUE · MIRA ROAD EASTPRAMANIK HOMES LLP · P51700056323 · possession Apr 2029 · 50.9% built
- Aarambha Luxor · Ramachandra NagarAARAMBHA VISION HOMES · P51700056333 · possession Sept 2027 · 35% built
- OM GURU KRUPA CO-OP. HOUSING SOCIETY LTD · BADLAPURSAIRAJ CONSTRUCTION · P51700056339 · possession Jul 2027 · 68.2% built
- NAKSHATRA RESIDENCY · AMBARNATH WESTNAKSHATRA LIFESPACES · P51700056351 · possession Apr 2027 · 81.4% built · 1 complaint
- Nature Vista Building - 2 · Near Dwarli Post OfficeOyster Saket Infrastructure · P51700056365 · possession Dec 2029 · 19.2% built
- Swastik Paradise · ChikhaloliGHUDE ENTERPRISES · P51700056372 · possession Jul 2026 · 81.5% built
- PG VRUNDAVAN · S NO 62, H NO 6AMARUTI CORPORATION · P51700056377 · possession Apr 2028 · 69.1% built
- CHANDRANGAN RESIDENCY PHASE-V · DIVAEKVEERA ENTERPRISES · P51700056410 · possession Apr 2028 · 20.6% built
- PRABHU DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · BADLAPURNYP DEVELOPERS · P51700056412 · possession Apr 2027 · 41.8% built
- GOLDEN HEIGHTS · AMBERNATHJAINAM REALTY · P51700056413 · possession Dec 2027 · 63.2% built
- SUJAN CO-OP. HSG. SOC. LTD. · ThaneSUJAN CO-OP. HSG. SOC. LTD. · P51700056415 · possession Dec 2026 · 43.6% built
- SHUBHVASTU · KHATIVALISAVJIBHAI BAVJIBHAI KODINARIYA · P51700056449 · possession Apr 2029 · 19.2% built
- ASHOK SMRUTI · VadavaliAsha Construction · P51700066502 · possession Jan 2027 · 90.3% built
- SHIV PRARAMBH · DombivliShivaditya Realty Llp · P51700066515 · possession Oct 2027 · 44.5% built
- BALKRUSHNA CO-OP HOUSING SOCIETY LTD · Village - Katrap, Taluka - Ambernath, BadlapurSAI HOMES · P51700066544 · possession Apr 2027 · 62.7% built
- DEVRAJ REGENCY 3 · VASHINDSHRIVIGHANHARTA REALTY (OPC) PRIVATE LIMITED · P51700066550 · possession Mar 2027 · 28.8% built
- RONAK SOLITAIRE /WING A · KALYAN WESTGAYATRI ASSOCIATES · P51700066555 · possession Jul 2029 · 35.5% built
- NARMADESHWAR · Wadeghar-Kalyan WestASHAPURA COMBINES · P51700066563 · possession Apr 2031 · 29.4% built
- Royal Meadows · Bail Bazaar CircleSiddh Enterprises · P51700066576 · possession Sept 2026 · 172.8% built
- CRESCENT WTC - WESTERN TRADE CENTER - PHASE - II, BUILDING A 1 - 2 · NEAR DAHISAR CHECK NAKA MIRA ROAD EASTCRESCENT SHELTERS · P51700076585 · possession Oct 2028 · 25.9% built
- SHREE SIDDHIVINAYAK PARK B TYPE BUILDING · VANGANISATYASHIV BUILDERS AND DEVELOPERS NX · P51700076614 · possession Apr 2029 · 40.9% built
- DESAI CELESTE · Adharwadi Jail Road, Opp. Royal ResidencyKIRTI ENTERPRISES · P51700076618 · possession Mar 2028 · 41.4% built
- Soman Shrishti Villa · AmbernathSoman Sons Nirmaan LLP · P51700076619 · possession Apr 2030 · 39.1% built
- Solanki Co-op. Hsg. Soc. Ltd. · ThaneSolanki Co-op. Hsg. Soc. Ltd. · P51700076642 · possession Jul 2027 · 46.4% built
- Sai Mauli Phase - II · TitwalaSai Ganesh Enterprises · P51700076648 · possession Apr 2027 · 74.1% built
- MULTANI RESIDENCY · ChavindreM R Developers · P51700076655 · possession Mar 2027 · 43.5% built
- Veer Heights · ThaneVeer Heights · P51700076668 · possession Aug 2028 · 30.6% built
- AL MAWADAH RESIDENCY · MUMBRASEHER REALTY · P51700076683 · possession Apr 2031 · 32.6% built
- Juhi Empressa · ThaneJuhi Empressa · P51700076712 · possession Aug 2030 · 18.9% built
- ANAND IMPERIAL · KONGAONM/S Anand Developers · P51700076717 · possession Mar 2028 · 17% built
- PRECIOUS ICON · Mouje - Pale, Rangoli HotelRKR Construction · P51700076725 · possession Dec 2026 · 65.5% built
- NETRA GAJANAND BUILDING NO. THREE TYPE A · ThaneNETRA GAJANAND BUILDING NO. THREE TYPE A · P51700076744 · possession Apr 2027 · 9.1% built
- BALAJI INOX · MAHAJANWADIBALAJI VENTURES · P51700076777 · possession Apr 2028 · 36.5% built
- ELANZA WING B · NAVGHARSTONEWALL BUILDCON LLP · P51700076791 · possession Jul 2027 · 18.2% built
- VIGHNAHARTA CO. OP. HOUSING SOCIETY LTD · OPP. TALATHI OFFICE, NEAR SHREE COMPLEXSHREE KRUSHNA ASSOCIATES · P51700076802 · possession Apr 2030 · 23.5% built
- KT SKYLIGHT · TEMGHARK T CONSTRUCTION COMPANY · P51700076822 · possession Apr 2031 · 19.1% built
- Soman Shrishti A · AmbernathSoman Sons Nirmaan LLP · P51700076825 · possession Dec 2029 · 18.2% built
- Kohinoor Gardens · UlhasnagarKohinoor Gardens · P51700076841 · possession Mar 2028 · 0.9% built
- Nirvana Gardens Phase 1 Wing A Ivana · KalyanSqylines Builders LLP · P51700076843 · possession Nov 2028 · 34.8% built
- Swarg · NerulM/S. V.R. BUILDERS · P51700076846 · possession Oct 2027 · 43.2% built
- Ram Devi Tower · UlhasnagarRam Devi Tower · P51700076849 · possession Jul 2027 · 37.5% built
- SIYARA SIGNATURE · KAMATGHARSHAKTI REALTY · P51700076857 · possession Jul 2029 · 35% built
- ELANZA WING A · NAVGHARSTONEWALL BUILDCON LLP · P51700076871 · possession Mar 2028 · 56.6% built · 1 complaint
- SAI RAM HEIGHTS · DEVRUNDSAI RAM BUILDERS AND DEVELOPERS · P51700076874 · possession Apr 2027 · 83% built
- YASHWANT HEIGHTS · CHIKHALE BAUGM/S SHREE RAM INFRASTRUCTURES · P51700076884 · possession Apr 2029 · 37.1% built
- SHREE NANDKUMAR MAHADEV ASHIRWAD · NAVGHAR VILLAGE BHAYANDER EASTMANISH NANDKUMAR PATIL · P51700076895 · possession Apr 2030 · 53.6% built
- SRINIVASA NILAYAM · Dombivali EastNilaya Enterprises · P51700076900 · possession Apr 2028 · 51.8% built
- Amber Elegance · Kanchangaon- Dombivali (E)Amber Enterprises · P51700076905 · possession Apr 2029 · 59.5% built
- UNITY TOWERS · KamatgharQUBA TRADELINKS LLP · P51700076917 · possession Oct 2029 · 29.2% built
- Shiv Shambho Heights · At Post Vasind EShiv Shambho Construction · P51700076924 · possession Jul 2028 · 12.7% built
- Rusttagi Aarambha 2.0 · Near Shree Mahaganpati MandirRUSTAGI ESTATES PRIVATE LIMITED · P51700076932 · possession Mar 2027 · 61.4% built
- PATELS PEARL · DOMBIVLIPRAMUKH DEVELOPERS · P51700076936 · possession Oct 2026 · 71.4% built
- Sheetal Dhara · Mira Road (East)M/s. J. K. Associates · P51700076937 · possession Apr 2027 · 64.4% built
- Soman Shrishti B · AmbernathSoman Sons Nirmaan LLP · P51700076942 · possession Apr 2029 · 41.8% built
- THE PALLAZO · BhiwandiSHETRUNJAY REALTY LLP · P51700076959 · possession Sept 2029 · 42.9% built
- Mahindra Happinest Kalyan - 2 Project B · RanjnoliMahindra Lifespace Developers limited · P51700076963 · possession Apr 2029 · 20.5% built
- YASHODA VRUNDAVAN COMPLEX - C WING · POST VANGANIVardhman Realty · P51700076964 · possession Nov 2027 · 55.5% built
- DEVANSH HEIGHTS · Dombivali EastNilaya Enterprises · P51700076977 · possession Apr 2028 · 51.8% built
- ADIYOGI AURA · CHIKLOLI VILLAGEADIYOGI INFRA · P51700076979 · possession Dec 2029 · 48.2% built
- MILAN HEIGHTS · DOMBIVLIMILAN ASSOCIATES · P51700076985 · possession Aug 2029 · 33.2% built
- Vivanta Bliss Phase II · Jai Mata Di Compound KalherJAI BHAWANI ORCHID INFRA LLP · P51700076999 · possession Apr 2029 · 64.5% built
- Kohinoor Eden B5 · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700077032 · possession Jun 2027 · 32.5% built
- Elite Galaxy · NandivaliSai Imperial · P51700077038 · possession Apr 2028 · 43.6% built
- SHREE PRATIMA · Mauje NavagaonRJPV & SONS · P51700077066 · possession Apr 2028 · 55.9% built
- Shagun Residency · Revenue VillageShagun Enterprises · P51700077081 · possession Oct 2027 · 45.6% built
- MEERA NANDA BLISS · AMBERNATHMEERA HOMES LLP · P51700077102 · possession Mar 2027 · 47.3% built
- INDIRA GALAXY · BHAGSHALASHREE DEVELOPERS · P51700077105 · possession Apr 2027 · 54.1% built
- PG SWARA · KULGAON BADLAPURYOGESH SHANKAR PAWAR · P51700077113 · possession Apr 2029 · 68.2% built
- RUSTOMJEE VERDANT VISTAS WING B · Majiwade, Thane WestKapstone Constructions Private Limited · P51700077134 · possession Jun 2030 · 0% built · 2 complaints
- RUSTOMJEE VERDANT VISTAS WING A · Majiwade Thane WestKapstone Constructions Private Limited · P51700077136 · possession Jan 2030 · 10.3% built
- Kasturi Vandana Empire · Narmada NagarTirupati Estate Developers LLP · P51700077143 · possession Apr 2030 · 7% built
- The Nature · TitawalaUma Infratech · P51700077155 · possession Oct 2030 · 42.2% built · 1 complaint
- SHREE APARTMENT · AMBERNATHCRYSTAL INFRA · P51700077157 · possession Apr 2027 · 45% built
- VINAYAK PLATINA · VILL MANGAONVINAYAK CONSTRUCTION · P51700077189 · possession Apr 2027 · 53.6% built
- AMBER ELITE · KHARDIGAON, DIVA EASTAMBER REALTY · P51700077223 · possession Apr 2029 · 75.2% built
- Hiranandani Westgate Phase 1 · KavesarSHODEN DEVELOPERS PRIVATE LIMITED · P51700077268 · possession Feb 2032 · 8.2% built
- GOLDEN PALACE · THANEMANIBHADRA ENTERPRISES · P51700077297 · possession Dec 2027 · 59.1% built
- PEARL GALAXY · BalyaniPearlCorporates · P51700077302 · possession Apr 2027 · 54.5% built
- MANGALMURTI HEIGHTS · TITWALAPRASAD SUBHASH KATHORE · P51700077306 · possession Apr 2029 · 27.7% built
- OM SUMUKH DARSHAN CHSL · BADLAP[UR WESTM/S PNR GROUP DEVELOPERS · P51700077321 · possession Apr 2027 · 81.6% built
- YASHWANT NIWAS · NAUPADAVIJAYRAJ DEVELOPERS LLP · P51700077327 · possession Mar 2027 · 90.9% built
- THE HYDE PARK · MIRAROADARISTONE BUILDERS · P51700077328 · possession Apr 2030 · 10% built · 1 complaint
- VERMA HERITAGE · AMBERNATH EASTGRRS NIRMAN PRIVATE LIMITED · P51700077335 · possession Jul 2027 · 74.4% built
- SWANAND VEDIKA · BADLAPUR WESTATHARV INFRASTRUCTURES · P51700077350 · possession Oct 2029 · 25.7% built
- Swami Datta Krupa · KalyanDinesh Laxman Sonawane · P51700077368 · possession Sept 2026 · 27.3% built · 4 complaints
- DRISHTANT CO-OPERATIVE HOUSING SOCIETY LIMITED · NERULDRISHTANT CO-OPERATIVE HOUSING SOCIETY LIMITED · P51700077391 · possession Dec 2027 · 68.6% built
- ANANT SAGAR BUILDING - E · Bhagat Singh Marg, KolivaliSAGAR ENTERPRISES · P51700077392 · possession Apr 2027 · 78.6% built
- AAKAR CELESTIAL · ThaneAAKAR CELESTIAL · P51700077393 · possession Apr 2029 · 27.3% built
- Panvelkar Evoke Co-op Housing Society Ltd · KatrapPanvelkar Group Infrastructure · P51700077394 · possession Apr 2029 · 43.3% built
- Amara · Tilak NagarPlanacres Properties · P51700077405 · possession Apr 2027 · 47.3% built
- OM MAHESH CO-OPERATIVE HOUSING SOCIETY LIMITED · VitthalwadiRAMUGRAH LALBIHARI SINGH · P51700077415 · possession Jul 2029 · 0% built · 1 complaint
- Roshan Co-op Housing Society · ShirgaonSURESH KESHAVRAO YASHVANTRAO · P51700077419 · possession Jul 2028 · 71% built
- Om Pushpanjali · chikangharR B CONSTRUCTION · P51700077423 · possession Apr 2027 · 52.3% built
- AARADHYA PARKWOOD 2 · NEAR SINGAPORE INTERNATIONAL SCHOOLMAN VASTUCON LLP · P51700077424 · possession Apr 2029 · 61.8% built
- NICE WORLD 2 · ThaneNICE WORLD 2 · P51700077433 · possession Apr 2035 · 29.5% built
- DAMJI SHAMJI GALLERIA · THANE WESTVINAYAK DEVELOPERS · P51700077473 · possession Apr 2029 · 25.5% built
- SUN VIEW HEIGHTS · ThaneSUN VIEW HEIGHTS · P51700077509 · possession Jan 2029 · 39.2% built
- SANKALP SIDDHI · ChikhloliM/S BHOIR BUILDCON · P51700077526 · possession Apr 2029 · 65.3% built
- RIVIERA TOWER · ,BLISSFUL TOWERS LLP · P51700077539 · possession Jul 2028 · 36.1% built
- SMIT VISTA · MIRA - BHAYANDERSMIT MEGASTRUCTURES · P51700077561 · possession Dec 2029 · 44.1% built
- DAVAKHAR SERENO PHASE I · KALYANDAVAKHAR INFRASTRUCTURE PRIVATE LIMITED · P51700077564 · possession Apr 2030 · 0% built · 1 complaint
- Mauli Pride · ChikangharMauli Krupa Developers · P51700077591 · possession Apr 2028 · 4.5% built
- EOS IT PARK · ThaneEOS IT PARK · P51700077595 · possession Dec 2027 · 68.2% built
- Om Yashodhan CHSL · Thane WestSILVER STONE REALTY · P51700077611 · possession Mar 2027 · 69.1% built
- Satyam Stella · ThaneSatyam Stella · P51700077621 · possession Apr 2028 · 60% built
- AMBAR VAASTU PHASE-II, C-WING · At Village - Kharvai, Taluka - Ambernath, Badlapur, Dist. Thane, MaharashtraBALAJI HOMES · P51700077627 · possession Jul 2027 · 80% built
- SPLENDOR LUXOR · GANDHI NAGARSPLENDOR SHELTERS PVT LTD · P51700077631 · possession Dec 2029 · 51.1% built
- SKY VIEW · ChikhloliSHREEJI ICON · P51700077646 · possession Mar 2029 · 43.2% built
- L and T Realty Evara Heights T1 · Village PanchpakhadiELANTE PROPERTIES PRIVATE LIMITED · P51700077650 · possession Dec 2030 · 36.4% built
- BUL BUL CO-OPERATIVE HOUSING SOCIETY LIMITED · ThaneBUL BUL CO-OPERATIVE HOUSING SOCIETY LIMITED · P51700077654 · possession Apr 2027 · 36.6% built
- L and T Realty Evara Heights T2 · Village PanchpakhadiELANTE PROPERTIES PRIVATE LIMITED · P51700077678 · possession Dec 2030 · 30.9% built
- ONENESS · ThaneONENESS · P51700077679 · possession Oct 2028 · 42.7% built
- Mauli Nidhi · VILLAGE PATHARLIMAULI ENTERPRISES · P51700077685 · possession Apr 2027 · 39.5% built
- TRIVIDH · NEAR NAUPADA POLICE STATIONCosmos Skyline Green View LLP · P51700077697 · possession Jun 2029 · 38.9% built
- The Heavens Palace Phase II · ThaneGAYASUDDIN RIYAZUDDIN KHAN · P51700077717 · possession Apr 2028 · 59.5% built
- Shivam Enclave · ThaneShivam Enclave · P51700077726 · possession Jan 2028 · 61.1% built
- The Royal Palms · ThaneThe Royal Palms · P51700077727 · possession Apr 2029 · 0% built
- VITTHAL HEIGHTS · MiraBHOIR DEVELOPERS · P51700077730 · possession Apr 2028 · 39.1% built
- Embassy One Thane · PanchpakhadiTapir Constructions Limited · P51700077743 · possession Oct 2029 · 31.6% built · 1 complaint
- SHRIPAT GALAXY · SHILSHREE SHRIPAT BUILDERS & DEVELOPERS · P51700077748 · possession Apr 2030 · 24.8% built
- Chavan Star · Next to MSEB officeOM SHREE SAIKRUPA CONSTRUCTION · P51700077757 · possession Oct 2027 · 43.2% built
- JVMs Hive · THANEMehta Realtors · P51700077770 · possession Apr 2028 · 46.7% built
- Kamdhenu Pinnacle · Nerul, Navi MumbaiKamdhenu Green · P51700077771 · possession Apr 2030 · 56.6% built
- GREEN SQUARE- PHASE II TOWER 1 AND 3 · KAVESAR, GHODBUNDER ROAD, BEHIND D MARTSQUAREFEET ENTERPRISES · P51700077787 · possession Apr 2031 · 0% built
- ATLANTAA ENCLAVE - II · SHILPHATA, THANEATLANTAA LIMITED · P51700077788 · possession Dec 2028 · 40.6% built
- RAJ ULTIMATE E-WING · Penker PadaS D U TRADELINK PVT LTD. · P51700077797 · possession Apr 2027 · 77.7% built
- Magus City Tower 2 Lunar · ADDL, Kalyan Bhiwandi Industrial Area, KoneMagus Infra Tech Private Limited · P51700077802 · possession Apr 2029 · 38% built
- Saras Icon · NerulSaras Infra · P51700077818 · possession Jul 2028 · 13.6% built
- PRECIOUS EMPIRE WING D, E AND F · PaleRKR REALITY · P51700077849 · possession Jul 2027 · 81.8% built
- TIMES SQUARE · WAGLE ESTATE THANESUPPER SQUAREFEET INFRAVENTURES LLP · P51700077852 · possession Apr 2030 · 18.5% built
- SHIRISH RESIDENCY · KALYANRL CONSTRUCTIONS · P51700077853 · possession Apr 2027 · 34.9% built
- Davakhar Sereno Phase III · Adivali DhokaliDAVAKHAR INFRASTRUCTURE PRIVATE LIMITED · P51700077873 · possession Apr 2030 · 0% built · 1 complaint
- MAHALAXMI · ShirgaonNAYNA MUKESH SAPRA · P51700077883 · possession Apr 2029 · 38.5% built
- Gokuldham · DwaraliMAANIT INFRA · P51700077905 · possession Dec 2028 · 22.7% built
- EMPERIA I PARK · WAGLE ESTATEMANOMETER (INDIA) LLP · P51700077912 · possession Apr 2031 · 11.8% built
- SEASONS SAHARA BUILDING NO. 1 · KALYAN EASTSAMARTH SAI BUILDERS & DEVELOPERS · P51700077940 · possession Apr 2029 · 28.2% built
- Narang Privado A · Off Pokran Road 1NARANG REALTY PRIVATE LIMITED · P51700077946 · possession Mar 2029 · 41.8% built
- MAHEK MEADOWS · Gau. No.46M/s Riddhi Siddhi Infraprojects · P51700077954 · possession Apr 2027 · 80.9% built
- SUNRAJ SOLITAIRE · Golivali-Dombivali EastSunraj Construction · P51700077991 · possession Apr 2032 · 10.7% built
- DEBONAIR CLASSIC · PANCHPAKHADIANANT SQUARE DEVELOPERS · P51700078007 · possession Aug 2029 · 35.7% built
- AHS TOWER · KAUSASAHYADRI INFRA STRUCTURES · P51700078016 · possession Aug 2031 · 18.2% built
- EV 23 MALIBU WEST · ThaneEV 23 MALIBU WEST · P51700078094 · possession Apr 2030 · 27% built
- Fiora I · HedutaneLODHA DEVELOPERS LIMITED · P51700078112 · possession Jun 2030 · 17.3% built
- Haware Paramount Kalyan Phase- III · MuthavalHaware Properties LLP · P51700078127 · possession Apr 2029 · 0% built
- NIYATI LAKE CROWN · SECTOR 6 GHODBUNDERSHREE SWAMI SAMARTH ENTERPRISES · P51700078241 · possession Dec 2027 · 35.5% built · 1 complaint
- Dalal Kalash · AmbernathAdvance Buildcon · P51700078313 · possession Apr 2028 · 14.5% built · 1 complaint
- JAY GANESH DARSHAN CHSL · AMBERNATH EASTYADAV BROS CONSTRUCTION · P51700078315 · possession Dec 2026 · 9.1% built
- LJTANNA PANORAMA A WING · Shankar NagarLJTANNA REALTY LLP · P51700078323 · possession Dec 2029 · 66.1% built
- Hanuman Kutir · Saraswat Colony, Dombivli EastTHE IMPRESSIONS · P51700078332 · possession Aug 2027 · 43.6% built
- Harishree Celestial-1 · AmbarnathHarishree Celestial-1 · P51700078356 · possession Apr 2029 · 51.8% built
- L and T Realty Evara Heights T5 · Village PanchpakhadiELANTE PROPERTIES PRIVATE LIMITED · P51700078362 · possession Aug 2030 · 13.6% built
- SAVA ARCADE · At Post AsangaonSAVA DEVELOPERS · P51700078381 · possession Oct 2026 · 50.9% built
- Omkar Regency · Nerul, Navi MumbaiAarav Realtors · P51700078385 · possession Mar 2029 · 25.1% built
- Satyam Sicilia · ThaneSatyam Sicilia · P51700078388 · possession Apr 2029 · 58.7% built
- The Royal Bay · Nerul Navi MumbaiTPV Vishwakarma Venture LLP · P51700078391 · possession Apr 2029 · 0% built
- Komal Palace CHS LTD · Ayodhya Nagri, GB PatharliAmeya Enterprises · P51700078402 · possession Jan 2030 · 34.4% built
- Hira-Krishna · Dombivli EastShree Kesarinandan Developers · P51700078405 · possession Nov 2027 · 77.3% built
- KINGSMAN RESIDENCY · Kalyan WestSHREE SWASTIK CONSTRUCTIONS · P51700078440 · possession Oct 2028 · 52.5% built
- ASHWATHI HEIGHTS · KALYANPRACHITI CONSTRUCTIONS · P51700078444 · possession Dec 2026 · 47.7% built
- ALLIAANCE THE VIEW · GHANSOLIALLIAANCE REALTY · P51700078452 · possession Dec 2030 · 24.4% built
- ELITE CRYSTAL · UlhasnagarELITE CRYSTAL · P51700078478 · possession Oct 2027 · 69.1% built
- SHRI LAXMI NIVAS CO OP HSG SOC LTD · NAUPADA THANEOJASS GOVIND INFRA LLP · P51700078481 · possession Apr 2028 · 43.6% built · 1 complaint
- The Palace Tower A · VINAY NAGARJP Infra Realty Private Limited · P51700078483 · possession Dec 2031 · 37.3% built
- Jalaram Jyot Co-op Housing Society Ltd. · KatrapSHIV ASSOCIATES · P51700078509 · possession Dec 2027 · 38.2% built
- EMPIRE TOWER · S NO 110/1A/1B/8 PLOT NO 9,10 AT BETURKARPADA SECTOR 1EKADANTA DEVELOPERS · P51700078534 · possession Apr 2027 · 0.7% built
- SILVER CREST · Sector 19A, Nerul EastAKHITECH REALTY · P51700078561 · possession Apr 2029 · 39.1% built
- Dream Paradise · Kolbad, Thane WestPridedream Realtors · P51700078571 · possession Dec 2027 · 19.9% built
- HUMSAAZ HOMES · Mauje ChavindraHumsaaz Homes LLP · P51700078599 · possession Oct 2027 · 34.2% built
- Sarthi Serenity · DombivliSarthi Developers · P51700078601 · possession Apr 2028 · 50.6% built
- Savaliya Sky · BhayandarShree Giriraj Infra Developers · P51700078611 · possession Apr 2030 · 23.8% built
- DASHMESH HEIGHTS · VILLAGE JOVELIDashmesh Infrastructure · P51700078670 · possession Apr 2030 · 20% built · 1 complaint
- SIYARA VIVA · KAMATGHARSHAKTI REALTY · P51700078690 · possession Nov 2029 · 42.2% built
- Parivartan Tower · KulgaonParivartan Builders & Developers · P51700078723 · possession Apr 2029 · 32.7% built
- AUROVILLE WING C AND D · BHOPARARYA CONSTRUCTION · P51700078750 · possession Apr 2027 · 37.5% built
- HKs SILVER PALACE · Thane WestHK Realtors · P51700078765 · possession Apr 2028 · 43.2% built
- SHREEJI OASIS · NEAR SHIV MANDIRSHREEJI REALTORS · P51700078790 · possession Oct 2028 · 46.8% built
- OM VARDHASTA · KALYAN WESTZK REALTY · P51700078820 · possession Apr 2028 · 4.5% built
- DELTA GREENVILLE - ASTER · THANEDELTA SYNERGY LLP · P51700078827 · possession May 2031 · 9.1% built
- DELTA GREENVILLE - CEDAR · OWALEDELTA SYNERGY LLP · P51700078829 · possession Dec 2030 · 9.1% built
- ADITYA HEIGHTS · PANDURANG WADIASHAPURA DEVELOPERS · P51700078831 · possession Apr 2027 · 70.9% built
- BRAMHANDNAYAK · SHIRGAONSWAMINI INFRA PRIVATE LIMITED · P51700078848 · possession Apr 2029 · 58.2% built
- Veer Enclave · charaiVEER LIFE SPACES LLP · P51700078859 · possession Oct 2028 · 38.2% built
- Benevolent MB Heights · MIRA ROAD EASTBENEVOLENT M.B CONSTRUCTIONS PVT LTD · P51700078879 · possession Apr 2028 · 31.5% built · 1 complaint
- Janki Signature · ThaneJanki Signature · P51700078883 · possession Apr 2030 · 4.5% built
- ISHWAR GAJANAN · B CABIN ROAD VADAVALIISHWAR REALITY · P51700078889 · possession Apr 2028 · 68.2% built
- Hiya Avenue · Sai Baba NagarVinod Lalchandji Mehta · P51700078895 · possession Jul 2029 · 51.8% built
- Shree Ram Kutir · AmbarnathShree Ram Kutir · P51700078902 · possession Sept 2027 · 21.2% built
- JVMs Emerald · ThaneJVM LIFESPACES · P51700078908 · possession Dec 2027 · 65.5% built
- Maitreya Mandai Legacy · Dombivli EastM/S SAISH GROUP · P51700078914 · possession Dec 2028 · 23.6% built
- PARIVAR SADAN CHS LTD · BADLAPURKAIVALYA AND ASSOCIATES · P51700078920 · possession Jul 2027 · 45.9% built
- MADHUKAR HERITAGE BUILDING A-1 · AmbarnathMADHUKAR HERITAGE BUILDING A-1 · P51700078921 · possession Apr 2028 · 30.9% built
- AL-JANNAH MANZIL · SALAMATPURAMOHD AZAM MOHD ASLAM ANSARI · P51700078940 · possession Apr 2029 · 20% built
- The Heavens Palace Phase III · ThaneGAYASUDDIN RIYAZUDDIN KHAN · P51700078962 · possession Apr 2028 · 65% built
- SWASTICK MANGALAM · GODDEV, BHAYANDER EAST, THANESHREE SWASTICK BUILDINFRA LLP · P51700078964 · possession Apr 2030 · 37% built
- MAA BHAVANI KRUPA · BADLAPUR EASTVIJAY TUKARAM PATIL · P51700078990 · possession Apr 2028 · 25.6% built
- Regency Luxuria Phase III · DombivliREGENCY NIRMAN LTD · P51700078991 · possession Oct 2028 · 46.5% built
- MANGALMURTI HEIGHTS · TemgharROSHNI BUILDERS AND DEVELOPERS · P51700079016 · possession Sept 2028 · 12.7% built
- HARIHAR DARSHAN · KhadakpadaBorgaonkar Realty · P51700079018 · possession Apr 2027 · 65.5% built
- OPULIS C · KoleLODHA DEVELOPERS LIMITED · P51700079032 · possession Mar 2031 · 29.4% built
- JUHI ELEGANCE · GHANSOLI, NAVI MUMBAIJuhi Habitat Pvt. Ltd. · P51700079049 · possession Apr 2031 · 48.4% built
- VIHANG ATHARVA · GHODBUNDERREYANSHP REALTY LLP · P51700079063 · possession Apr 2030 · 38.5% built
- PINNACLE VATIKA · NR SAI AANGAN BADLAPUR VILLAGEMM PINNACLE BUILDCON LLP · P51700079070 · possession Apr 2030 · 31.4% built
- Ramatai Heights · At GothegharAshtavinayak Builders and Developers · P51700079072 · possession Apr 2027 · 45.5% built
- ASHIRWAD · NaupadaGAUTAM SHANTI ENTERPRISES · P51700079073 · possession Nov 2027 · 39.3% built
- SHANKHESHWAR PUSHP · KhambalpadaSHREE SHANKHESHWAR ENTERPRISES · P51700079074 · possession Jul 2027 · 62.7% built
- Shreeji Landmark NX · At Village - Shirgaon, BadlapurSHUBH INFRA · P51700079080 · possession Apr 2027 · 22.9% built
- Rustomjee Urban Woods - Palm · Kalyan EastKEYBLUE REALTORS PRIVATE LIMITED · P51700079096 · possession Sept 2029 · 20% built
- ROSHAN GALAXY · AmbarnathROSHAN GALAXY · P51700079122 · possession Dec 2026 · 77.8% built
- OSTWAL AKAASHA · BHAYANDER (EAST)SHREE OSTWAL BUILDERS LTD · P51700079129 · possession Dec 2029 · 28.5% built
- EMERALD HORIZONS · ThaneEMERALD HORIZONS · P51700079160 · possession Apr 2028 · 48.7% built
- SAI HILLCREST WING A & B · BELAVALISAIRAJ ENTERPRISES · P51700079190 · possession Jan 2030 · 70.5% built
- Rustomjee Urban Woods - Maple · Kalyan EastKEYBLUE REALTORS PRIVATE LIMITED · P51700079209 · possession Sept 2029 · 35.5% built
- SEA GREEN · NavgharSIERRA INFRAPROJECT LLP · P51700079252 · possession Mar 2029 · 26.4% built · 1 complaint
- Seabreeze at Godrej Bayview · ThaneSeabreeze at Godrej Bayview · P51700079255 · possession Apr 2031 · 49.5% built
- Manav Sangeet CHS · AmbernathCONCEPT DEVELOPERS · P51700079281 · possession Apr 2028 · 58.6% built
- Prakash Palace · ThaneR K Builders and Developers · P51700079283 · possession Apr 2027 · 45.5% built
- Platinum Oakwoods · Nerul, Navi MumbaiEscaso Ventures · P51700079286 · possession Apr 2030 · 53% built
- Tropical Bliss · Sector no-6, Kavesar villageAMAATRA TROPICAL BUILDWELL PVT. LTD. · P51700079373 · possession Jan 2029 · 30.3% built
- KULSWAMINI BRAHMAND WING B JANAI SHANKAR · 80 FEET ROADKULSWAMINI BUILDERS & DEVELOPERS · P51700079375 · possession Dec 2030 · 24.4% built
- Platinum Sicily · Nerul, Navi MumbaiEscaso Ventures · P51700079378 · possession Apr 2030 · 24.1% built
- Om Chandraprakash Co. Op. Housing Society Ltd. · Near Masaheb Jijau MaidanMega Arcade Developers · P51700079388 · possession Sept 2027 · 27.3% built
- NEMMI PANCHGANGA · 2 RABODINemmi Realty · P51700079393 · possession Jul 2029 · 42.3% built
- JAK NAMAHA · BHAYANDAR EASTJAK INFRATECH · P51700079398 · possession Apr 2029 · 28.3% built · 1 complaint
- Saburi CHS · Mouje Kohoj KhuntavaliMarathe Enterprises · P51700079418 · possession Apr 2028 · 37.3% built
- DATTA VAIBHAV CHSL · NAVI DOMBIVLISHREE SIDDHI ENTERPRISES · P51700079419 · possession Jul 2027 · 52.3% built
- Opal Annex · KalherBuildcon Infra · P51700079425 · possession Oct 2028 · 26.1% built
- Gurudeo Co Operative Housing Society Limited · ThaneGurudeo Co Operative Housing Society Limited · P51700079460 · possession Jan 2028 · 55% built · 4 complaints
- Rustomjee Urban Woods - Walnut · Kalyan EastKEYBLUE REALTORS PRIVATE LIMITED · P51700079483 · possession Aug 2029 · 109.1% built
- Rustomjee Urban Woods - Oak · Kalyan EastKEYBLUE REALTORS PRIVATE LIMITED · P51700079484 · possession Aug 2029 · 35.5% built
- SUASHA CO.OPERATIVE HOUSING SOCIETY LIMITED · THANE WESTANANTNATH ENTERPRISES · P51700079489 · possession Apr 2028 · 59.1% built
- KARTIK ENCLAVE · KALHERSHIVAAY DEVELOPERS · P51700079492 · possession Dec 2029 · 34.5% built
- Dream Nityanand · NaupadaDream Constructions · P51700079497 · possession Dec 2028 · 33.8% built · 1 complaint
- Hitech Park · AmbarnathSilverleaf Buildcon · P51700079506 · possession Apr 2030 · 28% built
- JIGNESH CO. OP. HSG. SOCIETY. LTD. · DOMBIVLISHREE ATHARVA APEX · P51700079512 · possession Aug 2028 · 54.5% built
- Swami · KALYANSwapn Vastu Builders And Developers · P51700079542 · possession Jan 2029 · 27.3% built
- Shatataraka Dilip Kunj · ThaneSMARTS · P51700079557 · possession Apr 2028 · 54.5% built
- PRECIOUS ICON PHASE II · AmbernathRKR Construction · P51700079563 · possession Jul 2028 · 39.8% built
- RAMASHRAY · RAMASHRAY DR R P ROAD RAMNAGAR DOMBIVLI EASTKSR SHELTERS · P51700079584 · possession Dec 2028 · 27.7% built
- BALARAM HEIGHTS · KALYANSHREE SAMARTH KRUPA ENTERPRISES · P51700079589 · possession Jan 2028 · 35.2% built · 1 complaint
- Sunrise Corporate Park Phase II · Wagle EstateSunrise Lifespaces LLP · P51700079592 · possession Apr 2030 · 39.1% built
- MEENAKSHI PLAZA CO-OPERATIVE HOUSING SOCIETY LTD · AMBERNATHLAXMI KAMAL DEVELOPER · P51700079599 · possession Jul 2028 · 13.6% built
- The Elements · GhansoliTPV Ventures LLP · P51700079613 · possession Dec 2031 · 22.1% built · 1 complaint
- Shivansh Enclave · KatrapShivansh Buildcon · P51700079620 · possession Apr 2028 · 41.8% built
- BAKUL CO-OPERATIVE HOUSING SOCIETY LIMITED · NaupadaADHIRAAJ DEVELOPERS · P51700079621 · possession Nov 2027 · 35.9% built
- Niharika Heights · Cherpoli, ShahapurDwarkamai Developers · P51700079641 · possession Apr 2030 · 18.2% built
- Narsinha Co-Op. Hsg. Soc. Ltd. · Ganeshwadi, PanchpakhadiREAL HOMES DEVELOPERS · P51700079643 · possession Apr 2028 · 27.3% built
- Elements Phase 2 · DiagharUMA REALTY · P51700079654 · possession Jul 2029 · 33.5% built
- Matrix Aspire · Nerul Navi MumbaiMatrix Lifestyle · P51700079675 · possession Oct 2031 · 10.6% built
- Amar Galaxy Bldg No. 2 Wing B and C · Cholegaon, Near Raj Vaibhav ComplexAMAR REALTY · P51700079679 · possession Apr 2030 · 11.4% built
- NEW AAKASH CO. OP. HSG. SOC. LTD. · Badlapur (East)JK Developers · P51700079686 · possession Jul 2029 · 34.5% built
- Amogh Ratan · ThaneAmogh Ratan · P51700079697 · possession Apr 2027 · 28.6% built
- YASHAL TOWER · ChavindraAMIRSONS REALTY LLP · P51700079709 · possession Oct 2028 · 31.2% built
- RAMESHWAR PARK - DAFFODIL C · DAWALERAMESHAWAR BUILDERS & DEVELOPERS · P51700079711 · possession Apr 2027 · 72.3% built
- ELITE TOWER · MUMBRAELITE BUILDERS · P51700079719 · possession Apr 2032 · 20.6% built
- Shreeji Darshan · NerulSHREEJI VENTURES SUPERSTRUCTURES LLP · P51700079728 · possession Dec 2028 · 1.9% built
- Kamini A Wing Co-operative Housing Society Ltd · Vadivali, AmbernathShreeyansh Builders and Developers · P51700079737 · possession Apr 2028 · 39.5% built
- Gami Avant · ThaneGami Avant · P51700079740 · possession Dec 2029 · 33.9% built · 1 complaint
- SAI GIRNAR CHS LTD · D.P. Road, Katrap, BadlapurMITRA REALITY · P51700079744 · possession Apr 2029 · 26.5% built
- Horizon Pearl II · ThaneKM Developers · P51700079782 · possession Apr 2029 · 21.9% built
- INFINITY ONE · WAGLE ESTATEVEEDHAN BUILDTECH · P51700079787 · possession Feb 2028 · 18.2% built
- Purva Panorama Tower C · ThanePurva Oak Private Limited · P51700079811 · possession Jul 2031 · 29.5% built
- ANNAPURNA ARIES · MIRAROAD EASTM/s. DWIVEDI CONSTRUCTION · P51700079820 · possession Aug 2031 · 35.5% built · 1 complaint
- Harisha · Kalyan, ThaneOmkar Manik Mhatre · P51700079852 · possession Oct 2028 · 43.2% built
- VEER YASHODEEP · Naupada Thane westYash Infra · P51700079872 · possession May 2028 · 16.6% built
- VANYA ARCADE · KATRAP, BADLAPUR EASTR A INFRASTRUCTURE · P51700079888 · possession Oct 2027 · 45.5% built
- Codename LIT Tower A · ThaneCamrose Realtors Private Limited · P51700079896 · possession Apr 2030 · 10.5% built · 1 complaint
- EMAAR HEIGHT · MIRAROAD EASTM/S KANAKBHUMI BUIDCOM LLP · P51700079900 · possession Apr 2030 · 22.7% built
- Windsor · Near New Girls English SchoolBorkar Realty · P51700079914 · possession Apr 2029 · 35.5% built
- ADITYARAJ SAHYADRI · THANEADITYARAJ BUILDERS AND DEVELOPERS · P51700079928 · possession May 2029 · 32.7% built
- Sasvat Enclave · Hissa No. 1Sasvat Enterprises · P51700079933 · possession Jul 2027 · 9.1% built
- PATELS ASTRUM · AMBERNATH EASTNEXA CONSTRUCTION LLP · P51700079953 · possession Aug 2027 · 25% built
- SHREE AYYAPPA CO-OPERATIVE HOUSING SOCIETY LIMITED · VILLAGE SHIRGAONG. K. BUILDERS · P51700079960 · possession Jan 2027 · 72.7% built
- SAI RATANLAXMI CO. OP. HSG. SOC. LTD. · KALYAN (EAST)LAXMI ENTERPRISES · P51700080007 · possession Apr 2027 · 42.7% built
- KHER ENCLAVE · AMBERNATH EASTAMI PROPERTIES · P51700080015 · possession Apr 2027 · 39.1% built
- VAVIYA SEVENTY 7 · ThaneVAVIYA SEVENTY 7 · P51700080021 · possession Apr 2028 · 7.3% built
- RAM EMPIRE · BADLAPURPATKAR REALTY LLP · P51700080024 · possession Nov 2028 · 42.8% built
- Veer Hills · ThaneVeer Hills · P51700080034 · possession Apr 2031 · 16.4% built
- Gami Telon · GhansoliLAL GEBI INFRA PRIVATE LIMITED · P51700080035 · possession Apr 2030 · 28.2% built
- VIHAAN ELEGANZA · NERUL EASTVIHAAN DEVELOPERS · P51700080062 · possession Apr 2030 · 41.5% built
- SHREE SAMARTH PARADISE · KALYAN (EAST)SHREE MANGALMURTI DEVELOPERS · P51700080081 · possession Dec 2028 · 21.6% built
- Shree Darshan Heights · MurbadShree Darshan Construction · P51700080082 · possession Apr 2030 · 47.7% built
- Parshuram Heights · Near Dwarli Bus stopShree Chintamani Developers · P51700080100 · possession Apr 2028 · 26.1% built
- ELYSIA D-4 · VILLAGE OVALEVIHANG INFRASTRUCTURE PVT LTD · P51700080101 · possession Apr 2032 · 0% built
- Jewel Crest · NerulShree Gowardhan Co-Operative Housing Society Limited · P51700080103 · possession Oct 2028 · 43.3% built
- Shree Datta Imperial · Ganesh nagarNirmaan Realty · P51700080107 · possession Sept 2027 · 59.1% built
- Sai Baliram · AmbarnathAnnapurna Infra · P51700080120 · possession Dec 2027 · 25.5% built
- Sarvesh CHS Ltd · ThaneSarvesh CHS Ltd · P51700080137 · possession Jul 2029 · 25.5% built
- AMBER SPACES · Thakurli EastAMBER BUILDCON · P51700080151 · possession Apr 2028 · 87.3% built
- ESTRELLA VILLAS · ThaneESTRELLA VILLAS · P51700080164 · possession May 2027 · 25.5% built
- Shanti Galaxy · NaupadaShree Mahavir Urban Developers LLP · P51700080190 · possession May 2028 · 50% built
- Haware Paramount Kalyan Phase IV · Muthaval, BhiwandiHaware Properties LLP · P51700080192 · possession Apr 2029 · 10% built
- ROSE PALACE · KAUSA MUMBRAIBAD DEVELOPERS · P51700080210 · possession Apr 2029 · 34.6% built
- Maplewood Phase III · ThaneMaplewood Phase III · P51700080212 · possession Apr 2031 · 0% built
- AAWAS DARSHAN CO-OPERATIVE HOUSING SOCIETY LTD · MoujeVIBRANT DEVELOPERS · P51700080231 · possession Feb 2028 · 18.2% built
- Mangeshi heights · ThaneMangeshi heights · P51700080264 · possession Mar 2031 · 14.5% built
- Arunoday Heights · BapgaonSankalp Builders and Developers · P51700080271 · possession Apr 2027 · 39.1% built
- TRIBECA · DOMBIVLI EASTSERENITYSPACES · P51700080273 · possession Apr 2028 · 31.8% built
- SEASONS PEARL · KALYAN WESTMAHADEV SAI HOMES LLP · P51700080291 · possession Apr 2030 · 28.2% built
- MEERA VISTARA · AMBERNATH EASTSARASWATI INFRA · P51700080328 · possession Apr 2029 · 31.6% built
- MEGA 75 WEST · ThaneMEGA 75 WEST · P51700080395 · possession Dec 2028 · 29.5% built
- Shiv-Vista Homes · VasindPrakash Bhimrao Baviskar · P51700080407 · possession Apr 2030 · 8.8% built
- The Identity - Indira · Near Gaondevi MandirSaish Intech · P51700080411 · possession Feb 2028 · 15.9% built
- SIYARA BUSINESS PARK · KaneriSIYARA REALTY PRIVATE LIMITED · P51700080413 · possession Dec 2029 · 11.8% built
- Anand Homes - Phase 3 · Behind Ganesh Vidya MandirM/s. MORYA GROUP · P51700080465 · possession Apr 2028 · 45.5% built
- LA VESTA · NERULSeavista Infrastructure LLP · P51700080489 · possession Apr 2029 · 39.5% built
- VIVANTA · ThaneVIVANTA · P51700080519 · possession Apr 2028 · 0.9% built
- SHREE VIRAJ RESIDENCY, WING-D, PHASE-3 · SHIRGAON MIDCSHREE VIRAJ ENTERPRISES · P51700080527 · possession Apr 2028 · 36.4% built
- OAK LEAF TOWERS · BHAYANDARAXIS HOUSING PRIVATE LIMITED · P51700080534 · possession Apr 2031 · 31.8% built
- VIJAYSHREE CHSL · THANE WESTVARAD RAJA REALTY · P51700080537 · possession Jan 2028 · 70.5% built
- PURANJAY HEIGHTS · KalherRiddhi Siddhi Luxuria · P51700080561 · possession Apr 2030 · 18.2% built
- SHREEYUG RESIDENCY · kansai sectionSHREE MANGAL MAHAL · P51700080569 · possession Oct 2027 · 22.7% built
- KALYAN ELITE · KON GRAMPANCHAYATKALYAN BUILDCON · P51700080574 · possession Feb 2028 · 37.3% built
- OM CHAITANYA CO-OPERATIVE HOUSING SOCIETY LIMITED · BADLAPUR EASTG.K.BUILDERS · P51700080609 · possession Apr 2027 · 54.5% built
- Yuvan Prime · BhiwandiRanjana Enterprises · P51700080620 · possession Sept 2028 · 6.1% built
- VASTUDEEP CHS · NEAR BANK OF INDIA, KATRAP, BADLAPUR EASTVASTU NIRMAN · P51700080669 · possession Jun 2029 · 44.5% built
- SHREE AMAR CHS · DOMBIVLI EASTOBELISK SPACE · P51700080672 · possession Mar 2028 · 37.7% built
- SOLITAIRE HEIGHTS · Dawale, DivaKanji Murji Mange · P51700080691 · possession Jul 2029 · 15.9% built
- RAMESHWAR PARK - A1 AND A2 · Sector-11, Mouje-Dawale,RAMESHAWAR BUILDERS & DEVELOPERS · P51700080694 · possession Apr 2028 · 53.6% built
- PATELS AVENUE · AMBERNATH EASTPRAMUKH DEVELOPERS · P51700080725 · possession Jul 2028 · 43.2% built
- MIRAYA TRINITY - ETERNITY · MajiwadeMEXTECH PROPERTY DEVELOPERS LLP · P51700080732 · possession Apr 2030 · 38.6% built
- Tirupati Ritu Empire · bhayandar westRitu Corp · P51700080735 · possession Apr 2030 · 30.9% built
- PRECIOUS GREENWOODS PHASE I · varapPrecious Group LLP · P51700080748 · possession Sept 2029 · 15.2% built
- GLORIA GREENS · ThaneGLORIA GREENS · P51700080790 · possession Apr 2029 · 50.6% built
- PRECIOUS AVALON PHASE-1 · KalyanVINAYAK ASSOCIATES · P51700080811 · possession Apr 2030 · 30% built
- PANCHRATNA SAPPHIRE · KalyanPANCHRATNA SAPPHIRE · P51700080824 · possession Apr 2029 · 33.9% built
- PATELS ORION · KALYAN WESTDESIRE REALTY · P51700080843 · possession Jul 2030 · 30.7% built
- Vihaara Business Bay · Dombivli EastRainbow Paints · P51700080851 · possession Sept 2027 · 16.4% built
- Millat Arcade · BhiwandiR K Buildcon · P51700080861 · possession Oct 2026 · 79.1% built
- MIRAYA TRINITY - SERENITY · MAJIWADAMEXTECH PROPERTY DEVELOPERS LLP · P51700080866 · possession Apr 2030 · 38.6% built
- A N EMPIRE · AmbarnathA N EMPIRE · P51700080869 · possession Apr 2030 · 16.5% built
- PRECIOUS ORCHID · KalyanPrecious Keystone LLP · P51700080873 · possession Sept 2029 · 32.3% built · 1 complaint
- Sai Complex · NiljeSHIV SAI CONSTRUCTION · P51700080880 · possession Apr 2029 · 23.9% built
- HILL GALAXY PHASE II · MIRA BHAYANDARGULAMRASUL MOHAMMED ALI SHAIKH · P51700080892 · possession Oct 2030 · 9.1% built
- Dipti Business Center · Ambernath EastDipti Builders Universal Pvt Ltd · P51700080925 · possession Apr 2030 · 25.5% built
- PARVATI PARK CO OP HSG SOC LTD · AMBERNATH ESHREYAS ENTERPRISES AND CONSTRUCTION · P51700080953 · possession Dec 2027 · 53.6% built
- RAMDEV KHODIYAR · BHAYANDAR EASTRAMDEV KHODIYAR · P51700080976 · possession Jul 2029 · 60.9% built
- SHREE GANESH APARTMENT · MURBADVANDANA DINESH KANTE · P51700080980 · possession Jul 2028 · 36.4% built
- ROSA SEPHORA · KAVESARAAKASH DARSHAN BUILDCORP LLP · P51700080991 · possession Apr 2030 · 7.3% built
- SHRIPAD RESIDENCY · TITWALASAI MAULI ENTERPRISES · P51700080994 · possession Mar 2029 · 58.6% built
- Atlas Sky View · CHERPOLIK.P. & SONS · P51700081005 · possession Jan 2030 · 6.8% built
- Adwait · Naupada Thane WestShree Swami Samartha Associates · P51700081006 · possession Apr 2029 · 30.9% built
- Prime Heights · KulgaonPRIME ENTERPRISES · P51700081030 · possession Jun 2029 · 18.2% built
- Leela Prasad · ThanePataskar Developers Private Limited · P51700081033 · possession Apr 2027 · 54.5% built
- SNEH SHILP · VILLAGE AYRESNEH SHELTERS · P51700081034 · possession Sept 2028 · 34.5% built
- WINDSOR TOWER A · ThaneWINDSOR TOWER A · P51700081037 · possession Jul 2032 · 15.9% built
- IMPERIAL HEIGHTS PHASE III - E WING · MIRA ROAD EASTAkshar Shanti Realtors Private Limited · P51700081041 · possession Apr 2031 · 4.5% built
- WINDSOR TOWER B · ThaneWINDSOR TOWER B · P51700081067 · possession Jul 2032 · 11.4% built
- WINDSOR TOWER C · ThaneWINDSOR TOWER C · P51700081077 · possession Jul 2032 · 9.5% built
- HKS Solace · Mira RoadM/s. HKS Realty · P51700081118 · possession Apr 2027 · 43.9% built
DOMBIVLI EAST
Mumbai Suburban
- Haware Sky · KurlaHaware Sky · P51700066480 · possession Jun 2029 · 50.7% built
- KRISHNA ENCLAVE · AndheriASHA DEVELOPERS · P51800000004 · possession Aug 2023 · 66.7% built
- SAANVI HEIGHTS · BorivaliADINATH ENTERPRISE · P51800000010 · possession Dec 2018 · 88.6% built · 1 complaint
- Jeevan Kanchan Co-Operative Housing Society Ltd. · AndheriShri Krishna Chaitanya Enterprises · P51800000014 · possession Mar 2018 · 90.9% built
- Veena Serenity · KurlaVEENA REALCON PRIVATE LIMITED · P51800000016 · possession Dec 2021 · 76.8% built
- PLOT NO 3 CHARKOP SECTOR 8 · BorivaliMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · P51800000017 · possession Oct 2020 · 88.2% built
- PLOT NO.2 · BorivaliMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · P51800000019 · possession Dec 2018 · 100% built
- Construction of 83 LIG Ts on Guest plot CTS no 43 Pt of Unnatagar, Village Pahadi goregaon · AndheriMUMBAI HOUSING AND AREA DEVELOPMENT BOARD · P51800000023 · possession Oct 2020 · 90.9% built