23,645 registered projects with disclosed construction progress or complaint records. Page 13 of 48.
Thane
- Siddhivinayak Prasad CO-OP.Housing Soc.Ltd · BadlapurShaurya Developers · P51700048754 · possession Dec 2026 · 72.7% built
- V-10 LAKE VIEW · KALYANV TEN REALTY PRIVATE LIMITED · P51700048764 · possession Dec 2027 · 66.4% built
- SHRI HARI VITTHAL VIHAR · SHAHAPURAJ HOMES · P51700048796 · possession Aug 2027 · 78.6% built
- ROYAL PARK · TEMGHARPENS BUILDERS & DEVELOPERS LLP · P51700048809 · possession Dec 2029 · 19.4% built
- 9 SQUARE · SAI CHOWK, KHADAKPADASHIVSAI HOMES BUILDERS AND DEVELOPERS LLP · P51700048819 · possession Dec 2026 · 98.7% built
- PAWAN HEIGHTS · KALYANPAWAN ENTERPRISES · P51700048857 · possession Mar 2027 · 56.8% built
- Tulsi Aananta · BadlapurShree Developers · P51700048896 · possession Dec 2028 · 69.3% built
- Konark · Ambarnath EastNYP DEVELOPERS · P51700048903 · possession Mar 2027 · 85% built
- KUSUM RESIDENCY · ThaneSURESH PADMAN PATIL · P51700048955 · possession Dec 2026 · 80.9% built
- Arfa Garden · ChavindraQuba Homes LLP · P51700048960 · possession Dec 2026 · 51.9% built
- Gaurang Apartment · Opp to State Bank of IndiaGanesha Developers · P51700048961 · possession Dec 2025 · 90.9% built
- RBI Employees Awantika Co Op Hsg Soc Ltd · NaupadaGOVIND OJASS EDIFICE PVT. LTD. · P51700048962 · possession Dec 2024 · 72.7% built
- SALASAR EXOTICA II · GHODBUNDERNORTH SOUTH ESTATE BUILDERS · P51700048972 · possession Dec 2027 · 79.5% built
- NILYOG APARTMENT · SURYODAYA CHSRAJNB HOUSING LLP · P51700048983 · possession Mar 2025 · 34.1% built
- Amara Business Park · ThaneAmara Crest LLP · P51700049039 · possession Dec 2028 · 37.4% built
- Ekatva Coral · PancpakhadiSynergy Developers · P51700049059 · possession Dec 2025 · 66.8% built
- MIDTOWN EVE · WADEGHARMOON STAR DEVELOPERS LLP · P51700049094 · possession Jun 2027 · 67.3% built
- SAIRAJ EMERALD · BADLAPUR WESTSAIRAJ ENTERPRISES · P51700049097 · possession Sept 2023 · 71.8% built
- DALALS SQUARE · Khoj Khuntavali, Kher Section, AmbernathDalal Realty · P51700049109 · possession Sept 2026 · 47.5% built
- LAXMI MAJESTIC · THANEKanji Murji Mange · P51700049111 · possession Mar 2027 · 38.4% built
- THE DOMUS PRIVE · ThaneARAMUS VENTURES LLP · P51700049114 · possession Dec 2026 · 63.8% built
- SHIVA AMRUT ESTATE D WING · SABA DIVASHIVA AMRUT ENTERPERISES · P51700049115 · possession Dec 2026 · 26.4% built
- VIHANG LUXURIA · ThaneREYANSHP REALTY LLP · P51700049126 · possession Dec 2027 · 54.4% built
- LAXMI NARAYAN CO OP HOUSING SOCIETY LTD · NAUPADAOJASS GOVIND INFRA LLP · P51700049169 · possession Dec 2025 · 74.3% built
- 24 EAST · ThaneMALHAR DEVELOPERS · P51700049178 · possession Jun 2026 · 96.4% built
- HARSHAL CO-OP HOUSING SOCIETY LTD · Hari NiwasVEENA DEVELOPERS · P51700049194 · possession Sept 2024 · 100% built
- YES CENTRAL GALLERIA · SONKHAR MUMBRANOBLE ENTERPRISES · P51700049210 · possession Oct 2026 · 54.5% built
- ASHTAMI · KALYAN ERAI RESIDENCY Private Limited · P51700049225 · possession Dec 2027 · 85% built
- SANTOSH APARTMENT · SHAHAPURGAJANAN KATHOD SHELAVALE · P51700049247 · possession Dec 2027 · 75.5% built
- F Neelkanth Greens · ThaneNeelkanth Mansions and Infrastructure Pvt. Ltd.d · P51700049248 · possession Mar 2028 · 45.5% built
- Precious Harmony NX · Belawali, AmbernathP.G. CONSTRUCTIONS · P51700049260 · possession Dec 2026 · 85.2% built
- R K APARTMENT · BHIWANDIFAIZ ANIS AHMED KHAN · P51700049305 · possession Dec 2027 · 35.5% built
- VRUNDAVAN PARK · DEVRUNGSHREE VASTUNIRMAN DEVELOPERS · P51700049309 · possession Dec 2027 · 38.6% built
- ISHWAR BLOSSOM · KANSAI SECTIONISHWAR LIFESPACE · P51700049361 · possession Jun 2026 · 72.3% built
- NANDIGRAM · Mahagiri Kharkar Ali, ThaneYOGESH KISHOR MAHAJAN · P51700049363 · possession Jul 2026 · 84.1% built
- Magic Meera Heights · MiraMagic Star Developers · P51700049394 · possession Dec 2026 · 50.9% built
- Dosti Desire - Phase 2 · brahmandD.D. Associates · P51700049421 · possession Aug 2027 · 66.7% built
- WINDERMERE BUILDING NO 1 TO 6 · BHAYANDER WESTA G SUPERSTRUCTURES PVT LTD · P51700049440 · possession Dec 2027 · 71% built
- BEAUMONDE · KANUNGO GARDEN CITY, MIRA ROAD EASTKANUNGO PROPERTY · P51700049442 · possession Sept 2026 · 90.9% built
- Mangeshi Gemini · KalyanMangesh Dashrath Gaikar · P51700049445 · possession Dec 2027 · 37.7% built
- TULSI ARIANA · KALYAN WESTTULSI REALTY · P51700049486 · possession Dec 2027 · 96.8% built
- TEN X ERA Raymond Realty Tower C · ThaneRaymond Limited · P51700049520 · possession Jan 2029 · 52% built · 4 complaints
- Neelkrishna amalgamated project of Neelam CHS Ltd and Krishna Milan CHS Ltd · KOHOJ KHUNTAVALIOM SAI INFRA · P51700049553 · possession Mar 2027 · 71.4% built
- CHARMS CITY B AND C WING · KALYAN WESTCharms Developers · P51700049561 · possession Dec 2028 · 46.4% built
- Guru Ganesh CHS · Badlapur EastVADNERE BUILDER & DEVELOPERS · P51700049564 · possession Dec 2025 · 81.8% built
- Swaminarayan City Phase 1C · Mothagon, Mauje, ThakurliSwaminarayan Life Space LLP · P51700049570 · possession Dec 2029 · 41.5% built · 3 complaints
- Amrut Manjil · AMBERNATHSAI SHRADHA DEVELOPERS · P51700049585 · possession Jan 2028 · 57% built
- VED HEIGHTS · SHIRGAON, BADLAPUR-EASTOM REALITY · P51700049586 · possession Dec 2026 · 76.4% built
- TEN X ERA Raymond Realty Tower B · ThaneRaymond Limited · P51700049592 · possession Jan 2029 · 49.2% built · 5 complaints
- YES CENTRAL GALLERIA 1 · SONKHAR MUMBRAYES ENTERPRISES · P51700049599 · possession Oct 2026 · 52.4% built
- Mangeshi Star · KalyanMangesh Dashrath Gaikar · P51700049605 · possession Dec 2027 · 47.8% built
- Lakeview Co Operative Housing Limited · Neelkanthnagar, KalyanGP Infra · P51700049612 · possession Jan 2026 · 81.8% built
- ARIN · PENDSE NAGARGORAKSH BUILDERS · P51700049613 · possession Apr 2025 · 100% built
- M/S V.K.CONSTRUCTIONS · VASINDVIKRAM RAMESH KATHOLE · P51700049629 · possession Dec 2026 · 43.6% built
- Mangeshi Heaven · KalyanMangesh Dashrath Gaikar · P51700049701 · possession Dec 2027 · 32.2% built
- PEARL COMPLEX · KalyanM/S Sai Developers · P51700049703 · possession Dec 2026 · 65.9% built
- RAM RIVERA · KULGAON BADLAPURP51700049706 · possession Sept 2025 · 39% built
- BAGH-E-FIRDOUS TOWER · Revenue VillageCaption Real Estate · P51700049729 · possession Dec 2027 · 28.4% built
- SWAMI CHETANA · VISHNU NAGAR, DOMBIVLI WESTOM SAI BUILDERS AND DEVELOPERS · P51700049740 · possession Dec 2026 · 77.3% built
- Creek Edge · Kanchangaon, Dombivli EastVinayak Deoram Patil · P51700049777 · possession Dec 2027 · 70.9% built
- SAIRAJ AVENUE WING B · BEHIND SHREE COMPLEX BADLAPUR WESTVIRENDRA ATMARAM SALUNKHE · P51700049787 · possession Jul 2026 · 90.9% built
- KASHI DARSHAN B WING · Saparde RoadVARAD RAJ CONSTRUCTION · P51700049803 · possession Dec 2026 · 51.4% built
- NASCON MATOSHREE · Navagaon Dombivli EastOMKAR DEVELOPERS · P51700049858 · possession Dec 2026 · 41.4% built
- BARKU HEIGHT · KALYAN EASTSHREE DATTA DEVELOPERS · P51700049873 · possession Dec 2026 · 79.1% built
- Vedant Connect · KalyaMOHAN HARDASMAL THARWANI · P51700049879 · possession Dec 2026 · 60.6% built
- DIVINE SHLOKA · THANEOM DIVINE BUILDCON LLP · P51700049887 · possession Dec 2029 · 53% built
- GNP LANDMARK · KhadakpadaGNP LANDMARK · P51700049895 · possession Jan 2027 · 74.5% built
- Vedant Empire Phase II Wing B-Hampton · KalyanMOHAN HARDASMAL THARWANI · P51700049934 · possession Dec 2027 · 51.1% built
- SAI DARSHAN · AMBERNATHSAI KRUPA BUILDERS · P51700049948 · possession Nov 2026 · 59.5% built
- VASANT COMPLEX · NANDIVLI PANCHANANDSHREE SAI MALHAR CONSTRUCTION · P51700049953 · possession Dec 2026 · 28% built
- DATTATRAY RESIDENCY · BADLAPURSHRI KRISHNA VASTU · P51700049960 · possession Dec 2027 · 16.4% built
- SAMARTH PARADISE · BADLAPUR EASTS P DEVELOPERS · P51700049961 · possession Dec 2026 · 63.6% built
- Kohinoor Eden B4 · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700050022 · possession Dec 2026 · 74.5% built · 2 complaints
- Vastu Rachana · ShirgaonGAGANGIRI INFRA · P51700050034 · possession Dec 2026 · 33.8% built
- PANVELKAR BHOOMI BUILDING NO 5,6,7,8,9 · TALUKA AMBERNATHPANVELKAR BHOOMI · P51700050061 · possession Dec 2027 · 20.2% built
- Narang Privado - B · ThaneNARANG REALTY PRIVATE LIMITED · P51700050065 · possession Mar 2028 · 95.3% built · 1 complaint
- SHREE SIDDHIVINAYAK PARK B1 AND B2 · MURBADSATYASHIV DEVELOPERS · P51700050066 · possession Dec 2030 · 70.5% built
- 127 RAJ HOMES B AND C WING · Penkar Pada (Mahajanwadi)RAJ HOMES · P51700050118 · possession Dec 2026 · 87.3% built
- Sunita Palace · VanganiShree Ganesh Buildcon · P51700050154 · possession Dec 2026 · 90.9% built
- PRECIOUS SOLITAIRE · AmbernathSHUBH LIFESPACES · P51700050164 · possession Aug 2028 · 45% built
- Sunteck Sky Park 2 · Village NavgharSunteck Lifespace Private Limited · P51700050166 · possession Dec 2029 · 45.7% built
- Jeevan Lifespaces · WasindMs Jeevan Enterprises · P51700050185 · possession Dec 2027 · 6.7% built
- Vedant Empire Phase I Wing A-Eagleton · KALYANMOHAN HARDASMAL THARWANI · P51700050201 · possession Dec 2027 · 49.5% built
- Vedant Millenia happiness Phase II Wing C · KalyanMOHAN HARDASMAL THARWANI · P51700050205 · possession Dec 2027 · 45.5% built · 1 complaint
- SAI MAJESTIC PARK · ROOM NO 362 SHEET NO 42MARUTI DEVELOPERS · P51700050235 · possession Jan 2026 · 43.6% built
- Sai Vikrant Heights · KatemanevaliVikrant Construction · P51700050236 · possession Dec 2026 · 46.8% built
- SHASHWAT PARK Z-5 A and B WING APARTMENT · BADLAPUR WESTSHASHWAT HOMES · P51700050263 · possession Jun 2026 · 90.9% built
- Shivshakti Manokamana · WADEGHARSHUBH VASTU CONSTRUCTION · P51700050309 · possession Dec 2029 · 35.9% built
- Forestville - Phase 1 · KolshetOberoi Realty Limited · P51700050312 · possession Dec 2029 · 45.9% built
- SHREEJI MILESTONE · BELVALI, BADLAPURDEEP LAXMI ASSOCIATES · P51700050320 · possession Jun 2029 · 47.5% built
- DATTA SAMARTH · ThanePANDURANG ARJUN CHAWAN · P51700050343 · possession Jun 2026 · 77% built
- PINNACLE ADARSH · BELAVLI BADLAPUR WESTPINNACLE ENTERPRISES · P51700050363 · possession Jun 2025 · 90.9% built
- PUSHPANJALI RESIDENCY PHASE III · OWALE THANESHRIRAAM PIONEER DEVELOPERS PRIVATE LIMITED · P51700050376 · possession Dec 2028 · 0% built · 1 complaint
- Sunrise Corporate Park- Phase I · ThaneSunrise Lifespaces LLP · P51700050406 · possession Dec 2028 · 76.8% built
- 127 RAJ HOMES D WING · PENKAR PADA (MAHAJANWADI)RAJ HOMES · P51700050415 · possession Dec 2026 · 60.9% built
- MANGALAM ARCADE · BADLAPUR EASTMANGALAM ENTERPRISES · P51700050434 · possession Oct 2024 · 72.7% built
- Bank of Maharashtra Employees Manisha Co-Operative Housing Society Limited · Tilak nagarJ B Constructions · P51700050442 · possession Jan 2025 · 90.9% built
- The Gateway · ThaneMetricon Realty LLP · P51700050451 · possession Mar 2029 · 46.2% built
- BELICIA · PanchpakhadiRajshila Construction LLP · P51700050457 · possession Jun 2028 · 46.9% built
- M/S. SADGURU NARAYAN MAHARAJ SHREE GONDEKAR CHS LTD-NAMASHREE · DR. RAJENDRA PRASAD ROAD TILAK NAGAR DOMBIVLI EASTNILPADMA DEVELOPERS · P51700050476 · possession Mar 2027 · 40.9% built
- Platinum Westwoods · Nerul, Navi MumbaiExperio Ventures · P51700050489 · possession Dec 2027 · 87.8% built
- Siddhivinayak Aura Building - 1 · Mira Road EastVaradvinayak Developers · P51700050502 · possession May 2029 · 46.2% built
- Shri Sai Mangal Co-Op Housing Society Ltd A Building · Village Chole , ThakurliAMOGH ASSOCIATES · P51700050524 · possession Dec 2025 · 84.1% built
- MARUTI SQUARE BUILDING NO 7 · MIRA ROAD EASTMARUTI DWELLERS PRIVATE LIMITED · P51700050526 · possession Dec 2027 · 85.9% built
- RAMDARSHAN RESIDENCY · TITWALASHREE SAI GAJANAN DEVELOPERS · P51700050529 · possession Feb 2027 · 83.2% built
- Odysseus · KolshetSagar Enterprise · P51700050539 · possession Sept 2026 · 57.3% built
- SKYLINE WING - C · BHAYANDAR WESTSHRI RATNARAJ INFRA LLP · P51700050558 · possession Dec 2029 · 50.5% built
- The Address Wing C Phase III · Badlapur WestSADGURU ASSOCIATE · P51700050566 · possession Dec 2026 · 43.4% built
- Aditya Laxmi Icon · DahisarGROWLD REALTORS LLP · P51700050575 · possession Mar 2028 · 30% built · 3 complaints
- Soham Neel · KatrapM/s Neel Siddhi Enterprises · P51700050596 · possession Mar 2027 · 90.9% built
- RENUKA CHS · DOMBIVLINEELPADMA CONSTRUCTIONS · P51700050607 · possession Dec 2026 · 56.8% built
- ANJANI ONE · ThaneANJANI KUMAR COMPANY PRIVATE LIMITED · P51700050620 · possession Mar 2027 · 56.8% built
- Paramount F · ThaneKalpataru Homes Private Limited · P51700050624 · possession Sept 2024 · 72.5% built
- Shree Ram Radha Damodar · Near Aditya Mangal KaryalayaADITYA BUILDCON · P51700050634 · possession Mar 2026 · 72.7% built
- NIRMAN SIGNATURE · Badlapur (W)SHREE SHA DEVELOPERS · P51700050640 · possession Mar 2026 · 81.8% built
- JVMs Spectrum · Dhokali- ThaneJVM Spectrum LLP · P51700050671 · possession Dec 2025 · 72.7% built
- PANCHRATNA SAPPHIRE · KALYANPANCHARATNA DEVELOPERS · P51700050689 · possession Mar 2027 · 63.6% built
- PLATINUM ELYSIUM · NERULExperio Ventures · P51700050735 · possession Dec 2027 · 87.8% built
- WINDERMERE TOWER B · BHAYANDER WESTA G SUPERSTRUCTURES PVT LTD · P51700050737 · possession Dec 2028 · 31.1% built
- PUSHPAK HEIGHTS · VISHNUNAGAR, NAUPADAJ K ASSOCIATES · P51700050747 · possession Dec 2024 · 46.8% built
- RASHMI PRIYA CO-OP HSG SOC LTD · NEAR MODEL SCHOOLSHREE RIDDHI SIDDHI INFRAPROJECT · P51700050768 · possession Aug 2026 · 81.8% built
- Hiranandani Woodspring Bldg A-Oakwood Bldg B-Bridgewood Bldg C-Greenwood · Near Kon Toll NakaGolden Mile Builders LLP · P51700050785 · possession Jan 2028 · 56.1% built
- NAKSHATRA DEVELOPERS · GANDHINAGARNAKSHATRA DEVELOPERS · P51700050786 · possession Dec 2028 · 83.4% built
- PRADEEP CO-OPERATIVE HOUSING SOCIETY LTD. · PANCHPAKHADISQUAREFEET REAL ESTATE · P51700050794 · possession Sept 2027 · 90.9% built
- HORIZON PEARL · OWALEKM DEVELOPERS · P51700050797 · possession Apr 2027 · 60.9% built
- VASTU LUXURIA · PNT ColonyLAUKIK DEVELOPMENT CORPORATION · P51700050802 · possession Dec 2028 · 53.5% built
- RUSTOMJEE LA VIE WING A · Majiwade Thane WestKapstone Constructions Private Limited · P51700050803 · possession Dec 2028 · 25.1% built
- Mohan Altezza III · KhadakpadaMOHAN LIFESPACES LLP · P51700050807 · possession Dec 2027 · 66.4% built
- Raunak Bliss B6 · ThaneUNNATHI ASSOCIATES · P51700050827 · possession Dec 2030 · 52.5% built
- Raunak Bliss B5 · ThaneUNNATHI ASSOCIATES · P51700050828 · possession Dec 2030 · 56.8% built · 3 complaints
- Raunak Bliss B4 · ThaneUNNATHI ASSOCIATES · P51700050829 · possession Dec 2030 · 56.8% built · 8 complaints
- OMKAR HEIGHTS · NEAR GADGE MAHARAJ HOSPITAL, SAINATH NAGAROMKAR ENTERPRISES · P51700050864 · possession Mar 2027 · 46.5% built
- SHREYAS RESIDENCY · SAROVAR NAGARKASHINATH KALU BHOIR · P51700050871 · possession Jun 2027 · 87.9% built
- ISHWAR NEW AMIT · VADAVALIISHWAR DEVELOPERS · P51700050877 · possession May 2026 · 81.4% built
- HCS HORIZON · MIRA ROAD EASTHCS REALTORS LLP · P51700050894 · possession Dec 2026 · 49.5% built
- MAPLEWOODS PHASE 1 · ThaneM/S BKS Galaxy Realtors LLP · P51700050973 · possession Dec 2028 · 35.3% built
- THE TRELLIS · ThaneMAITHILI BUILDERS PRIVATE LIMITED · P51700050980 · possession Mar 2029 · 62.4% built
- WINDERMERE TOWER C · BHAYANDER WESTA G SUPERSTRCUTURES PVT LTD · P51700050981 · possession Dec 2028 · 19.1% built
- Shree Sadan Complex · Mankoli VillageShree Buildcon · P51700051017 · possession Dec 2026 · 70% built
- Kohinoor Highland · Usarghar, DombiviliKGI REALTY PRIVATE LIMITED · P51700051023 · possession Dec 2026 · 77.3% built
- AUDUMBER CHSL · TALUKA AMBERNATH BADLAPUR WESTBHAVANI ENTERPRISES · P51700051065 · possession Mar 2027 · 51.4% built
- SHREE UMA HEIGHTS · KalyanJALARAM DEVELOPERS · P51700051066 · possession Jan 2028 · 76.4% built
- Rajesh Co. Op. Hsg. Society · Ramchandra nagarNEELPADMA ENCLAVE · P51700051067 · possession Dec 2026 · 43.6% built
- RITZ Tower D Residential · KalyanVikas Harakchand Jain · P51700051081 · possession Dec 2026 · 60.5% built
- RITZ Tower F · KalyanVikas Harakchand Jain · P51700051084 · possession Dec 2026 · 37.2% built
- MOHAN SUBURBIA IV NX · AmbernathMOHAN LIFESPACES LLP · P51700051088 · possession Dec 2027 · 43.1% built
- ATHARVA HEIGHTS · MHASOBA MAIDANJAI SHREEGURUTATVAM ENGINEERS AND DEVELOPERS · P51700051104 · possession Dec 2026 · 75.5% built
- MAHAVEER HORIZON WING A AND WING B · KOLIVALI KALYANMAHAVEER INFRASTRUCTURE PVT LTD · P51700051107 · possession Dec 2028 · 72.3% built
- Falcon Building No 58 · Hiranandani EstateROMA BUILDERS PRIVATE LIMITED · P51700051114 · possession Apr 2028 · 78.4% built
- RITZ Tower E · KalyanVikas Harakchand Jain · P51700051119 · possession Dec 2026 · 65% built
- SUKH SAGAR CO-OP HSG SOCIETY · KATRAPNOBLE INFRASTRUCTURE BUILDER AND DEVELOPERS · P51700051135 · possession Dec 2025 · 72.7% built
- SAI SAMRUDDHI · DOMBIVLISAMRUDDHI BUILDCON · P51700051140 · possession Dec 2026 · 90.8% built
- NEWA BHAKTI PARK B WING · ThaneNEWA TECHNOCITY (I) PRIVATE LIMITED · P51700051141 · possession Dec 2027 · 78.9% built
- Bayview Signature · ThaneSAMP CONSTRUCTIONS LLP · P51700051142 · possession Mar 2027 · 9.1% built
- SAI AMRUT · VANGANIPRAVIN SURESH BAMNE · P51700051157 · possession Oct 2027 · 46.8% built
- ISKCON RESIDENCY PHASE 1 · AMBERNATHIskcon Realtors · P51700051160 · possession Dec 2025 · 59.1% built
- SHREEJI LANDMARK PHASE 1 · AmbarnathDEEP LAXMI ASSOCIATES · P51700051162 · possession Mar 2027 · 81.8% built
- Tulsi Vrundavan · Near Vangani Railway StationTulsi Builders and Developers · P51700051177 · possession Sept 2026 · 61% built
- SILVER OAK APARTMENT · SHAHAPURASHOKKUMAR TOPANLAL DEWANI · P51700051210 · possession Mar 2025 · 62.6% built
- PATELS INFINIA · AMBERNATH EASTR CITY DEVELOPERS · P51700051222 · possession May 2027 · 74.3% built
- REGENCY PRIME · UlhasnagarREGENCY PRIME · P51700051258 · possession Dec 2027 · 54.5% built
- ANIRUDDHA ICON · NERUL EASTHARIOM DEVELOPERS · P51700051262 · possession Dec 2027 · 93.2% built
- VAISHNAVI HEIGHTS · THANGEWADIVAISHNAVI CONSTRUCTION · P51700051267 · possession Dec 2026 · 75% built
- Plan I · Trans Thane CreekM/S. Tescon Plan-I LLP · P51700051273 · possession Dec 2026 · 7.3% built · 2 complaints
- Dnyaneshwar Mauli Nirwana · Dwarli GaonDwarli Construction · P51700051281 · possession Dec 2028 · 36.8% built
- DREAMS ENCLAVE · BADLAPURDREAMLAND DEVELOPERS · P51700051292 · possession Dec 2026 · 90.9% built
- SPACE RESIDENCE - II BUILDING NO. 4 A · OPP. PLEASANT PARKSPACE REALTY · P51700051349 · possession Dec 2027 · 55.9% built
- PRIYANKA PARADISE · ThanePRIYANKA REGENCY LLP · P51700051357 · possession Dec 2024 · 90.9% built
- Imperial Garden · MiraroadS. K. Heights Builders & Developers LLP · P51700051365 · possession Mar 2031 · 42.5% built
- Thanekar Palacio Phase II · Badlapur EastThanekar Construction LLP · P51700051381 · possession Dec 2026 · 43% built
- Proposed Residential,Commercial Bldgs on Plot bearing OLD 96 C 2-pt - Mayur Mahal · RambaughMAYUR GROUP (RD) · P51700051402 · possession Jun 2027 · 47% built
- Sai Ganesh Co-Operative Housing Society Ltd · Dombivli WestShree Vyankatesh Enterprises · P51700051405 · possession May 2026 · 59.1% built
- KANAKIA BEVERLY HEIGHTS · ThanePERIWINKLE CONSTRUCTIONS PRIVATE LIMITED · P51700051409 · possession Dec 2027 · 45.7% built
- Veer Galaxy · near vandana depoYash Infra · P51700051438 · possession Jul 2026 · 66.8% built
- PRIYANKA AVENUE · ThanePRIYANKA REGENCY LLP · P51700051443 · possession Mar 2028 · 52.7% built
- PUSHKARAJ CHS PROPOSED · BEHIND DNC HIGHSCHOOLSPLENDOR SHELTERS PVT LTD · P51700051480 · possession Mar 2025 · 90.9% built
- Intelligentia Business Park Vashi Phase 2 · Vashi Navi MumbaiHaware Finance Pvt Ltd · P51700051494 · possession Dec 2024 · 100% built
- SAURABH HEIGHTS · BadlapurS K DEVELOPERS · P51700051500 · possession Mar 2026 · 90.9% built
- ISHWAR SARASWATI PALACE · KANSAIISHWAR REALITY · P51700051501 · possession May 2026 · 72.3% built
- Kerala Village Phase-2 · Near Shenwa NakaJOHN MATHEW · P51700051512 · possession Mar 2027 · 70.5% built
- Gami Ved · NerulAMBALAL BHANJI GAMI · P51700051520 · possession Jun 2027 · 53.6% built
- RUGI COLONIA · CHIKHLOLIP P CORPORATION · P51700051526 · possession Dec 2026 · 43.6% built
- AUDUMBER CROWN · BADLAPURAUDUMBER BUILDERS & DEVELOPERS · P51700051534 · possession Dec 2026 · 76.8% built
- NMS MIDAS · ThaneDHARTI DHAN REALTY · P51700051539 · possession Dec 2028 · 50.9% built
- Bhumi Imperial · Kalher Village , Before Kasheli Toll NakaBhumi Urban Lifespaces LLP · P51700051555 · possession May 2027 · 32.7% built
- AKSHAR PANCHRATNA · ThaneAKSHAR DREAM HOMES · P51700051580 · possession Jun 2027 · 66.4% built
- GARDEN COURT-D WING · NARITU DEVELOPERS · P51700051586 · possession Mar 2028 · 39.9% built
- Al- Maqaam · KausaEminent Constructions · P51700051594 · possession Dec 2028 · 32.4% built
- GANGA RESIDENCY · ULHASNAGAR-04MR RAVI YALLAPPA VHATKAR · P51700051627 · possession Sept 2026 · 83.7% built
- 36 Mansions A wing · KhadakpadaSri Lifespace · P51700051652 · possession Dec 2027 · 41.2% built
- SRI PARKVIEW · khadakpadaSri Lifespace · P51700051657 · possession Dec 2027 · 42.3% built
- ROYAL PALM · WashindBuildcon Enterprises · P51700051703 · possession Dec 2027 · 32.5% built
- SHREE GANESH RESIDENCY · LODHA HEAVEN NILJESHRI GANESH ENTERPRISES · P51700051704 · possession Dec 2026 · 86.7% built
- SAINATH · Thane city, Shivaji NagarShreekrishna Enterprises · P51700051714 · possession Jun 2027 · 52.7% built
- SHREE KRUPA CO OP HOUSING SOCIETY · PANCHPAKHADISHARDA VASTU NIRMITEE PVT. LTD. · P51700051756 · possession Sept 2026 · 66.4% built
- Thakker Shraddha Kunj · Kulgaon BadlapurM/s THAKKER WORLD CONSTRUCTIONS LLP · P51700051804 · possession Dec 2026 · 37.5% built
- SAI ENCLAVE · KALYAN EASTSAI SAMARTH CONSTRUCTION · P51700051807 · possession Jun 2028 · 51.8% built
- ROSE VILLA · PALE, AMBERNATHKEYSTONE CREATION · P51700051844 · possession Dec 2027 · 9.8% built
- BayLeaf Residences by Mayuresh · ThaneBayLeaf Residences by Mayuresh · P51700051857 · possession Dec 2029 · 64.9% built
- NIRJA HEIGHTS · CHAKKI NAKA TISGAON KALYAN EASTNIRJA BUILDERS AND DEVELOPERS · P51700051866 · possession Mar 2025 · 90% built
- MEDHEKAR HEIGHTS · WaldhuniSOMESHWARNATH DEVELOPERS · P51700051875 · possession Dec 2027 · 45.9% built
- Pitruchhaya Apartment · Tulsi ViharThe Finest Housing Company · P51700051889 · possession Jun 2027 · 57.3% built
- SONAL PARADISE · Valivali, Taluka Ambernath, Badlapur (West)SHUBH GROUP · P51700051894 · possession Dec 2026 · 41.8% built
- SURYA HERITAGE A · MIRA ROADARUN CONSTRUCTION CO · P51700051908 · possession Dec 2026 · 83.6% built
- NAV SAMIDHA CO-OP HSG SOC LTD · NEAR PARAG BANGALOWSAIGAN INTERNATIONAL BUILDERS & DEVELOPERS · P51700051933 · possession Dec 2028 · 48.2% built
- GLOBAL HEIGHTS · UlhasnagarGLOBAL BUILDERS AND DEVELOPERS · P51700051937 · possession Dec 2027 · 37.7% built
- KASTURI HOME TOWER · TITWALASHREE MORYA ASSOCIATES · P51700051947 · possession Dec 2026 · 54.5% built
- GLOBE COMPASS · KalyanGLOBE COMPASS · P51700051985 · possession Dec 2028 · 33.2% built
- SAGAR HEIGHTS · KHADAKPADAAADINATH DEVELOPERS · P51700051990 · possession Jun 2026 · 90.5% built
- SHIVNERI PARK CO OP HSG SOC LTD · KALYANSHREE SWASTIK CONSTRUCTIONS · P51700051991 · possession Mar 2027 · 36.4% built · 1 complaint
- SAI PARK · BIRLA COLLEGESAI SATYAM REALTY LLP · P51700052002 · possession Dec 2027 · 77.7% built
- THE ADDRESS BY GS TOWER C · ChavindraTHE ADDRESS BY GS TOWER C · P51700052008 · possession Dec 2028 · 58.6% built · 1 complaint
- WHITE SQUARE · KALYANSHRI RAGHUVEER STHAPATYA · P51700052011 · possession Dec 2027 · 57.8% built
- NARMADA MOHAN ATLANTIS · RAIK.M.DEVELOPERS · P51700052021 · possession Dec 2028 · 28.2% built
- SIDDHIVINAYAK ENCLAVE · BHAYANDER EASTSIDDHI DEVELOPERS · P51700052057 · possession Dec 2028 · 47.7% built · 1 complaint
- K. E. Zojwalla Commercial Center · KALYANJOHAR HASAN ZOJWALLA · P51700052075 · possession Dec 2026 · 90.9% built
- WINDERMERE TOWER A · BHAYANDER WESTA G SUPERSTRUCTURES PRIVATE LIMITED · P51700052078 · possession Dec 2028 · 34.1% built
- Krishna Empire · KatemanevaliTirumala Developers · P51700052085 · possession Jun 2027 · 81.8% built
- ALIMKAR HEIGHTS · OLD MUMBRA PANVEL ROAD, SHILPHATAALIMKAR & SONS · P51700052095 · possession Oct 2026 · 33.8% built
- DATTA KUTIR · AMBERNATH EASTSPARSH BUILDCON · P51700052141 · possession May 2027 · 54.5% built
- SAI ARCADE · KALYAN EGANESH DEVELOPERS · P51700052148 · possession Dec 2027 · 23.6% built
- ROYAL PALM PHASE - 1 · WASHINDSIDDHI DEVELOPERS · P51700052162 · possession Jun 2027 · 38.8% built
- Sky Heights Tower No. 3 · KausaVIRANI CONSTRUCTION COMPANY · P51700052167 · possession Dec 2030 · 27.3% built
- Kohinoor Eden B6 · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700052179 · possession Jun 2026 · 57.3% built
- GAYATRI SANKUL NX · Oak BaugGayatri Builders · P51700052224 · possession Dec 2027 · 7.3% built · 1 complaint
- Serein Phase II · ThaneARDENT PROPERTIES PRIVATE LIMITED · P51700052235 · possession May 2027 · 67.1% built
- K D HERMITAGE BUILDING NO 1 · MIRA BHAYANDERKOTHARI CREATION · P51700052294 · possession Dec 2026 · 68.6% built
- COSMOS ENCLAVE BLDG-JASMINE · KASARVADAVLI, THANE WESTMONARCH DEVELOPERS · P51700052301 · possession Dec 2026 · 85.5% built
- GAYATRI ANAND · Kalyan WGayatri Builders · P51700052310 · possession Dec 2028 · 0.5% built
- ROYAL PLAZA · Kalyan WROYAL REALTY · P51700052331 · possession Dec 2027 · 60% built
- TULSI PALACE · GANDHAREV V CONSTRUCTION CO · P51700052343 · possession Dec 2027 · 65% built
- AVENUE · Kausa, MumbraBUILDBRICK BUILDERS AND DEVELOPERS · P51700052369 · possession Dec 2028 · 51.8% built
- NMS Gami Palm Amore · NERUL NAVI MUMBAIVISION INFRA LLP · P51700052377 · possession Mar 2031 · 54.7% built · 1 complaint
- Munisuvrat Textile Park · Rahanal VillageMunisuvrat Commercial Parks LLP · P51700052393 · possession Mar 2027 · 81.8% built
- WAMAN HEIGHTS C WING · SHIVAJI NAGAR DOMBIVLI WESTR V ENTERPRISE · P51700052396 · possession Mar 2027 · 90.9% built
- jewel vistaz · adivali villageJewel Builders and Infraprojects Ltd · P51700052410 · possession Mar 2028 · 50% built · 2 complaints
- SAI TULIP · KALYANSAI SPACE CORPORATION · P51700052412 · possession Dec 2026 · 64.1% built
- JVMs Magnum · Dhokali- ThaneJVM Spectrum LLP · P51700052431 · possession Dec 2025 · 78.2% built
- Ten X Vibes · ThaneTen X Vibes · P51700052442 · possession May 2024 · 90.9% built
- RAUNAK FORTUNA · PADLE VILLAGERDP REALTORS PRIVATE LIMITED · P51700052460 · possession Dec 2030 · 22.7% built · 2 complaints
- MARATHON NEXWORLD FLORA · BetawadeSunset Spaces Pvt. Ltd. · P51700052461 · possession Dec 2027 · 6.8% built
- SAI PARADISE · Kalyan ESAI ENTERPRISES · P51700052473 · possession Dec 2028 · 15.1% built
- Om Moreshwar · KatrapM/s Samruddhi Builders & Developers · P51700052478 · possession Dec 2026 · 88.1% built
- Regency Antilia Phase VIII Avana · UlhasnagarRegency Antilia Phase VIII Avana · P51700052485 · possession Dec 2026 · 84.8% built
- SARNOBAT RESIDENCY · MANDABUDHARAM GANPAT SARNOBAT · P51700052514 · possession May 2028 · 25.5% built
- EMPIRE DYNASTY · THANELAKHANI BUILDERS PVT LTD · P51700052523 · possession Dec 2030 · 39.1% built
- Nature Vista Building - 1 · Near Dwarli Post OfficeOyster Saket Infrastructure · P51700052551 · possession Dec 2028 · 18.2% built
- SALASAR SHEETAL SANGEET · MIRA ROAD EASTSALASAR LIFESPACES · P51700052552 · possession Dec 2027 · 50% built
- Vastu Imperia · Village Katrap, BadlapurVastu Builders and Developers · P51700052579 · possession Dec 2029 · 43% built
- JAI GANESH CO-OPERATIVE HOUSING SOCIETY LTD · Kulgaon, Badlapur (East)DEEPALI LANDSCAPE · P51700052606 · possession Dec 2026 · 55.9% built
- New Suyash CHS · NaupadaGanesh Chandrakant Malvankar · P51700052617 · possession Jun 2027 · 70% built
- RAUNAK IMPERIAL · ThaneRAUNAK AVENUE REALTY · P51700052635 · possession Dec 2026 · 36.4% built
- SUMATI SKYLINE · VILLAGE AYRE,TALUKA KALYANSUBHASH SKYLINE INFRA · P51700052640 · possession Sept 2026 · 81.8% built
- SHREEJI LANDMARK PHASE II · Village Shirgaon, Taluka Ambernath, BadlapurShubh Housing · P51700052645 · possession Dec 2026 · 42% built
- JANKI DHAM · WALDHUNIRAKESH TAPESHWAR SINGH · P51700052670 · possession Dec 2027 · 40.9% built
- COLOSSAL · KALYAN EWASTGANESH HARISHCHANDRA DHONE · P51700052696 · possession Jun 2027 · 55.1% built
- SHARDA ROYCE · UlhasnagarSHARDA ROYCE · P51700052697 · possession Dec 2028 · 62.7% built
- SAI HEAVEN · DOMBIVILI EMORYA ENTERPRISES · P51700052714 · possession Dec 2027 · 36.9% built
- PRATHMESH VRINDAVAN F WING · BADLAPURS. P. GROUP · P51700052743 · possession Dec 2026 · 69.5% built
- Om Square · Near Kasheli Toll PlazaBuildtech Ventures Realty · P51700052745 · possession Dec 2026 · 43.6% built
- SILVER BLISS · ThaneSILVER BLISS · P51700052749 · possession Jun 2027 · 27.3% built
- Shubh Vastu Phase III · Shirgaon, BadlapurSHUBH HOMES · P51700052762 · possession Dec 2026 · 80.9% built
- Padmavati Blue Sapphire · Behind Swagat Sweets, KolivaliPadmavati Residency · P51700052776 · possession Dec 2026 · 48.4% built
- SUMITRA HEIGHTS · KALYAN DOMBIVLI M CORPSWAMI NARAYAN ENTERPRISES · P51700052785 · possession Mar 2026 · 90.9% built
- KASTURI BLOSSOM · KASHIMIRA, MIRA ROAD EASTSIDDHIVINAYAK ENTERPRISE · P51700052787 · possession Dec 2027 · 45.5% built
- Haware My First Home Shil Phata Phase 1 Bldg 1 · ThaneHaware Properties LLP · P51700052794 · possession Dec 2030 · 32.5% built · 1 complaint
- Tulip Heights · TisgaonOM SAI DEVELOPERS · P51700052798 · possession Jun 2027 · 70.9% built
- PG VATIKA · Gadge NagarGURUKRUPA ENTERPRISES · P51700052819 · possession Dec 2026 · 81.8% built
- METRO PRIDE · KALYANGauri Vinayak Builder and Developers Pvt Ltd · P51700052871 · possession Dec 2027 · 20.1% built
- Ace Parkside · KasarvadavaliAARTI ESTATES · P51700052890 · possession Dec 2029 · 62.3% built
- Rajeshwari Plaza · KatrapSheela Ravindra Ghormode · P51700052909 · possession Mar 2027 · 81.8% built
- Gami Erica · ThaneGami Erica · P51700052930 · possession Dec 2026 · 85.5% built
- GAMI SATYAM BUSINESS AVENUE · ThaneGAMI SATYAM BUSINESS AVENUE · P51700052956 · possession Dec 2027 · 22.7% built
- Sai Chandra Pride · umbarde goanMAULI KRUPA DEVELOPERS PRIVATE LIMITED · P51700052973 · possession Dec 2027 · 27.3% built
- SHREEJI ICONIC · SHIRGAONRAJ LAXMI DEVELOPERS · P51700052990 · possession Dec 2028 · 62.3% built
- Samarth Shivani Co-Operative Housing Society Limited · ShirgaonGURURAJ ENTERPRISES BUILDERS AND DEVELOPERS · P51700052991 · possession Aug 2026 · 64.1% built
- Alankapuri · KulgaonAshish Waman Gole · P51700053040 · possession May 2027 · 50% built
- SAI DWARKA RESIDENCY · GauripadaHARI OM CONSTRUCTION · P51700053053 · possession Jun 2028 · 54% built
- Sai Heritage · AmbernathShashank Enterprises · P51700053065 · possession Dec 2025 · 80.5% built
- Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 2 · Kalher Junction, BhiwandiADRIKA DEVELOPERS PRIVATE LIMITED · P51700053096 · possession Oct 2028 · 36.9% built · 1 complaint
- SHREESHA HEIGHTS · VILLEGE CHIKANGHARVASTUNIRMAN DEVELOPERS · P51700053108 · possession Aug 2028 · 10.5% built
- RUSTOMJEE LA VIE WING C · Majiwade Thane WestKapstone Constructions Private Limited · P51700053109 · possession Feb 2029 · 11.4% built · 1 complaint
- RUSTOMJEE LA VIE WING B · Majiwade Thane WestKapstone Constructions Private Limited · P51700053110 · possession Feb 2029 · 20.5% built · 1 complaint
- ARENA SQUARE · MUMBRAEMPIRE ARENA · P51700053120 · possession Jun 2030 · 50.1% built · 1 complaint
- OM TRIMURTI DARSHAN · DOMBIVLI EASTPRACHI GROUP · P51700053133 · possession Aug 2026 · 69.1% built
- CENTRAL MEADOWS · MUMBRAHONOUR REALTY · P51700053134 · possession Dec 2027 · 37.1% built
- 24 High BIZBAY · Ambernath(West)Apex Infra · P51700053135 · possession Mar 2027 · 56.2% built
- Parkwoods D6 · KavesarAniline Construction Company Private Limited · P51700053143 · possession Dec 2028 · 8.2% built
- Shrihari Chandan Apartment · Badlapur KulgoanABHISHEK SHELTERS LIMITED · P51700053154 · possession Mar 2028 · 54.5% built
- JAI MALHAR PLAZA · DOMBIVALI WESTSWAMINARAYAN RESIDENCY · P51700053192 · possession Aug 2026 · 73.6% built
- Avighna Building No 4 · Chheda GreensChheda Developments · P51700053193 · possession Dec 2027 · 50.9% built
- Ace Signature IT Park · ThaneAce Signature IT Park · P51700053213 · possession Dec 2027 · 62.7% built
- AL BALAD RESIDENCY · SONKHARUNITY INFRA · P51700053215 · possession Dec 2028 · 13.6% built
- Dosti Greater Thane - Sector 3A - Cluster 1B - Phase 3 · BhiwandiDosti Greater Thane - Sector 3A - Cluster 1B - Phase 3 · P51700053217 · possession Oct 2030 · 19.2% built · 1 complaint
- VENUS SKKY CITY VIVANTA BLDG F AND BLDG G · NEAR LODHA PANACEAVENUS NIRVANA LLP · P51700053219 · possession Dec 2027 · 36.8% built · 1 complaint
- CRESCENT WTC (WESTERN TRADE CENTER) · NEAR DAHISAR CHECK NAKA MIRA ROAD EASTCRESCENT SHELTERS · P51700053224 · possession Jun 2027 · 70% built
- Down Town Avenue · ThaneDown Town Avenue · P51700053275 · possession Mar 2028 · 41.1% built · 1 complaint
- Daffodil Co- Op Housing Society Ltd · Chikanghar, Kalyan (West)Stonecrafters · P51700053309 · possession Dec 2026 · 50.5% built
- Sunteck Crescent Park -2 · Village ShahadSUNTECK PROPERTY HOLDINGS PRIVATE LIMITED · P51700053312 · possession Dec 2031 · 1 complaint
- UMA ANANTA · ThaneUMA ANANTA · P51700053344 · possession Mar 2029 · 57.3% built
- SHIVSHAKTI PRIME · KulgaonSHIVSHAKTI BUILDCON · P51700053379 · possession Sept 2027 · 45.9% built
- KESHAR AAGAN COOPERATIVE HOUSING SOCIETY · CHIKANGHARGAGAN HOMES · P51700053386 · possession Sept 2026 · 60% built
- Horizon Bhumi · Ghodbunder RoadMajestic Horizon Bhumi Developers · P51700053412 · possession Mar 2028 · 27.9% built
- Sunteck Crescent Park -1 · Village ShahadSUNTECK PROPERTY HOLDINGS PRIVATE LIMITED · P51700053439 · possession Dec 2029 · 36.4% built · 3 complaints
- SARASWATI DEVI KRUPA · RAM MANDIR ROAD NO 5YOGIRAJ HERITAGE · P51700053444 · possession Jul 2026 · 90.9% built
- SUPERIOR EXOTICA · ThaneSUPERIOR EXOTICA · P51700053448 · possession Dec 2027 · 55.9% built
- NEST PARADISE · KAMBA VILLAGENEST DEVELOPERS · P51700053453 · possession Aug 2028 · 23.6% built
- Rameshwar Co-Op Housing Society Ltd. · Panchpakhadi, Thane WestAditya Associates · P51700053476 · possession Mar 2027 · 40.3% built
- North Westend Tower 1 · BhayanderJP Infra Realty Private Limited · P51700053522 · possession Dec 2029 · 27.3% built
- Empire City Building No. 1 · PisavliEmpire Developers · P51700053544 · possession Dec 2026 · 80.9% built
- ACE ARISTO · THANE WESTGAURAV LAND CORPORATION · P51700053626 · possession Oct 2026 · 81.8% built
- VINAYAK PRERANA · KANCHANGAONNAKSHATRA GROUP · P51700053644 · possession Sept 2026 · 66.8% built
- SWAYAMBHU CO.OP.HSG.SOC.LTD · SHIVAJI CHOWK BADLAPURMEGA SQUARE DEVELOPERS · P51700053659 · possession Dec 2026 · 36.4% built
- Godrej Ascend Phase 4 · Dhokali NakaGodrej Properties Limited · P51700053668 · possession Dec 2029 · 36.5% built · 2 complaints
- WHITE SQUARE NX Wing B · KALYANSHRI RAM STHAPATYA · P51700053671 · possession Dec 2028 · 18.2% built
- O22 Business Park · ThaneMIDAS TOUCH · P51700053701 · possession Dec 2026 · 155.4% built
- SAI KRUPA APARTMENT · DWARKADAS RISSE MILLBHIMRAJ GANPAT MORE · P51700053728 · possession Dec 2026 · 71.4% built
- BLUE BERRY · NAMDEVWADIASHWAMEDH CORPORATION · P51700053750 · possession Jun 2027 · 68% built
- LEVEL 23 · ThaneLEVEL 23 · P51700053764 · possession Dec 2029 · 73.8% built
- Intelligentia Segment by Haware Properties · Ghodbunder RoadSuresh Kashinath Haware · P51700053766 · possession Dec 2027 · 50% built · 1 complaint
- REGENCY BUSINESS PARK PHASE I · KolshetREGENCY SHELTERS LLP · P51700053811 · possession Dec 2026 · 74.5% built
- PLATINUM MANSIONZ · Nerul, Navi MumbaiExperio Ventures · P51700053815 · possession Dec 2029 · 63.8% built
- Haware My First Home Shil Phata Phase 1 Bldg 2 · ThaneHaware Properties LLP · P51700053825 · possession Dec 2030 · 33.3% built · 1 complaint
- Haware My First Home Shil Phata Phase 2 Bldg 1 · ThaneHaware My First Home Shil Phata Phase 2 Bldg 1 · P51700053826 · possession Dec 2030 · 41.4% built
- Balaji Aqua · Gandhare, Kalyan (West)BALAJI WORLD · P51700053830 · possession Nov 2029 · 30.5% built
- WHITE SQUARE NX Wing A,C,D · KalyanWHITE SQUARE NX Wing A,C,D · P51700053888 · possession Dec 2028 · 21% built
- HAROLD CO-OP HOUSING SOCIETY · KALYANSTONECRAFTERS · P51700053912 · possession Dec 2026 · 79.3% built
- Haware My First Home Shil Phata Phase 2 Bldg 2 · ThaneHaware My First Home Shil Phata Phase 2 Bldg 2 · P51700053915 · possession Dec 2030 · 48.6% built
- PATELS HORIZON · BADLAPURPARAMYOGI DEVELOPERS LLP · P51700053982 · possession Nov 2027 · 29.2% built
- Veer Vishwa · Naupada Thane westVEER LIFE SPACES LLP · P51700054017 · possession Feb 2027 · 45.2% built
- Mauli Park · ShirgaonM/s. Mauli Developers · P51700054021 · possession Mar 2028 · 37.6% built
- Panvelkar Nisarg Phase II Building A2 · JoveliPanvelkar Realty Pvt Ltd · P51700054034 · possession Dec 2026 · 18.2% built
- SARVODAY DATT · KALYAN WESTSARVODAY COMBINE · P51700054070 · possession Dec 2027 · 57.3% built
- PATELS EIRENE · AMBERNATH EASTPRAMUKH DEVELOPERS · P51700054106 · possession Aug 2026 · 46.8% built
- The Green Sapphirre · BapgaonGreen World Realtors · P51700054111 · possession Nov 2027 · 47% built
- UNIQUE ESTATE TYPE-C WING D · GODDEVSIDDHIVINAYAK DEVELOPERS · P51700054119 · possession Mar 2027 · 44.1% built
- VISHWANATH DARSHAN · Wadeghar-Kalyan WestASHAPURA COMBINES · P51700054131 · possession Dec 2029 · 48.2% built
- Sitabai Apartment · VasindDosti Construction · P51700054134 · possession Mar 2028 · 90.9% built
- MATRU MANDIR · Next to Naupada Police StationPARNAD ANIL GUPTE · P51700054138 · possession Dec 2026 · 72.7% built
- HERITAGE GARDEN · UlhasnagarHERITAGE GARDEN · P51700054143 · possession Jun 2025 · 53.6% built
- Imperial Heights · Tisgaon at Kalyan (East)GP Infra · P51700054187 · possession Dec 2026 · 41.8% built
- PARIJAS HORIZON · GANDHARE, KALYANOCTAVE INFRAVENTURES LLP · P51700054200 · possession Jun 2028 · 43.6% built
- SAPTASHREE GALICIA · KOLSHETSAPTASHREE REALITY PRIVATE LIMITED · P51700054273 · possession May 2028 · 49.2% built
- Codename StarLife · Bhayander EastJP Infra Realty Private Limited · P51700054275 · possession Dec 2031 · 15% built
- PROGRESSIVE ONE · ThanePROGRESSIVE ONE · P51700054296 · possession Dec 2028 · 43.2% built
- FATIMA SKY · KALYAN WESTLFKA BUILDERS AND DEVELOPERS · P51700054322 · possession Dec 2027 · 44.1% built
- Crystal Antras · Chitalsar ManpadaLuxora Realtors Private Limited · P51700054437 · possession Dec 2028 · 30.9% built
- ASHTAVINAYAK DARSHAN · DOMBIVALI EASTYASHASHREE CONSTRUCTION · P51700054438 · possession Aug 2028 · 42.3% built
- MATRIX IMPERIAL · NerulMATRIX LIFESTYLE · P51700054466 · possession Dec 2028 · 53.4% built
- DATTU ENCLAVE · KATEMANEVALIYASH ENTERPRISES · P51700054489 · possession Dec 2028 · 22.2% built
- Surbhi Sangeeta Co-Op. Housing Society Ltd. · ThaneSurbhi Sangeeta Co-Op. Housing Society Ltd. · P51700054506 · possession Dec 2026 · 27.3% built
- CENTRUM BUSINESS SQUARE PHASE 2 · ThaneCENTRUM BUSINESS SQUARE PHASE 2 · P51700054522 · possession Dec 2027 · 43.7% built
- Mahadev Enclaves · Opp Regency AntiliaMahadev Enclaves · P51700054527 · possession Mar 2028 · 25.7% built
- VASUDEV RATNA · BHAYANDARKRISHA BUILDERS · P51700054530 · possession Dec 2027 · 30% built
- OM SAI AVENUE · Ambernath EastD A CONSTRUCTION · P51700054556 · possession Dec 2025 · 100% built
- HILTRON HILLS · UlhasnagarHILLVIEW REALTY · P51700054570 · possession Dec 2027 · 43.6% built
- AMAR PUSHPAKUNJ · ThaneAMAR PUSHPAKUNJ · P51700054590 · possession Jul 2026 · 48.2% built
- SAWAN SERENITY · NerulShree Sawan Buildcon · P51700054606 · possession Dec 2026 · 81.8% built
- Manas Heights · Titwala EastK V M and Morya Group · P51700054620 · possession Dec 2027 · 57.3% built
- Bhoomi Castle, Phase I · DaigharGajra Ventures Private Limited · P51700054644 · possession Dec 2030 · 29% built
- BILESHWAR · Wadeghar- Kalyan WestASHAPURA COMBINES · P51700054702 · possession Dec 2028 · 65% built
- ANIRUDDHA POOJA · ThaneANIRUDDHA POOJA · P51700054763 · possession Dec 2026 · 89.1% built · 1 complaint
- JVM's CYNERGY · Khidkali, ThaneZenith Home Maker · P51700054766 · possession Dec 2028 · 35.9% built
- Urban Heritage · ThaneUrban Space Buildcon Private Limited · P51700054780 · possession Dec 2026 · 41.8% built
- PATELS ZENITH · AMBERNATHPRAMUKH DEVELOPERS · P51700054783 · possession Dec 2027 · 39.2% built
- MARKANDEY SQUARE · ThaneMARKANDEY SQUARE · P51700054803 · possession Dec 2028 · 42.4% built
- Mandarmala Co-Operative Housing Society Limited · Dombivli City WestRachana Empire · P51700054811 · possession Dec 2027 · 62.7% built
- Progressive Era · ThaneProgressive Era · P51700054819 · possession Dec 2028 · 53.5% built
- RHUTU HEIGHTS · VILLAGE NAVAGAONVIKAS WAMAN MHATRE · P51700054822 · possession Dec 2028 · 60.5% built
- NORTH IMPERIAL GREENS -TOWER 2 · GHODBUNDER ROADSkylark Buildspace Private Limited · P51700054824 · possession Dec 2031 · 21% built
- RAVICHANDRA CHS PROPOSED · GOPAL NAGARSPLENDOR SHELTERS PRIVATE LIMITED · P51700054858 · possession Sept 2027 · 81.8% built
- RAJESHWARI COMPLEX · KOLEGAONManohar Vithu Chaudhari · P51700054859 · possession Dec 2027 · 55.4% built
- Shree Ganraj Residency · Village KulgaonOM SAI CONSTRUCTION · P51700054872 · possession Dec 2026 · 61.4% built
- SHREEJI NX · At Village - Valivali, Taluka Ambernath, BadlapurSHUBH BUILDERS · P51700054882 · possession Dec 2026 · 81.8% built · 1 complaint
- SHREE BALAJI EMPIRE · BHAYANDER EASTSHUBHAM HOUSING · P51700054916 · possession Dec 2030 · 66.6% built
- Pragati Om Gulmohar · Dombivli EastPRAGATI HOMES · P51700054917 · possession Sept 2027 · 89.1% built
- Masaakin Hatimiyah · BHAYANDARINDUS INFRATECH · P51700054926 · possession Mar 2029 · 29.1% built
- JNP RESIDENCY · SHILAL-SIRAJ BUILDERS & DEVELOPERS · P51700054939 · possession Jul 2027 · 77.3% built
- Shivnath Skycity · KhidkaliSHIVNATH DEVELOPER · P51700054944 · possession Dec 2028 · 38.2% built
- SHIVOM LAKESIDE · KALYANSHIVOM BUILDERS AND DEVELOPERS · P51700054952 · possession Dec 2028 · 31.2% built
- OM SHREE SAI VILLA · TONDLIKAR NAGAROM SHREE SAI CONSTRUCTION · P51700054953 · possession Dec 2026 · 65% built
- N.A. PARADISE · VASUNDARIN.A.BUILDERS · P51700054954 · possession Dec 2026 · 12.1% built
- RIDDHI SIDDHI CHS · BADLAPURVADNERE BUILDER & DEVELOPERS · P51700054957 · possession Dec 2026 · 77.3% built
- Deepjyoti Chs Ltd · ThaneBorkar Realty · P51700054974 · possession Jun 2028 · 46.5% built
- NANO CITY · JOVELI BADLAPUR EASTPINNACLE SPM GROUP · P51700055001 · possession Dec 2027 · 40% built
- Sky Heights · NavgharBALAJI REALTY LLP · P51700055003 · possession Dec 2029 · 50.9% built
- NOBLE SKY · MUMBRAPARADISE MKH BUILDERS & DEVELOPERS · P51700055022 · possession Dec 2033 · 31.7% built
- DIGVIJAY C.H.S. LTD. · ThaneDIGVIJAY C.H.S. LTD. · P51700055039 · possession Jul 2027 · 45.5% built
- SANJEEVANI CO-OP HOUSING SOCIETY LTD · AMBARNATH (EAST)SIDDHARTHA CONSTRUCTIONS · P51700055050 · possession Dec 2026 · 81.8% built
- Grace Square D1 and D2 · MUMBRASKYLINE INFRA · P51700055059 · possession Dec 2029 · 38.2% built
- Mangalmurti Paradise · AyreShubham Construction · P51700055074 · possession Dec 2026 · 61.4% built
- SAPTASHREE GLOBAL TECH CENTER · ThaneSAPTASHREE GLOBAL TECH CENTER · P51700055086 · possession Dec 2028 · 34.2% built
- Mali Avenue · KALYANMALI INFRA · P51700055096 · possession Dec 2026 · 77.7% built · 1 complaint
- AVIGHNA COMPLEX PHASE II · AVIGHNA COMPOUNDAVIGHNAA INFRA BUILDCON LLP · P51700055107 · possession Dec 2029 · 25.8% built · 1 complaint
- Swaraswati Heights · BelavliShree Samarth Enterprises · P51700055115 · possession Sept 2028 · 43.2% built · 1 complaint
- Mantra · Taluka - Kalyan, TitwalaVAIDIKH NIRMAAN LLP · P51700055124 · possession Nov 2026 · 65.3% built
- Radhe Govind Plaza · MorivaliShree Radha Construction · P51700055151 · possession Dec 2026 · 42.7% built
- SUN PRIDE · Tal KalyanC K Developers · P51700055206 · possession Dec 2026 · 40% built
- SAI KRISHNA HEIGHTS · BAJARPETH MURBADOM SAI DEVELOPERS · P51700055211 · possession Dec 2026 · 49.5% built
- MANOVI UPTOWN · GANPATI CHOWK, KALYAN WESTMANOVI UPTOWN · P51700055249 · possession Apr 2027 · 31.4% built
- ASMA GARDEN · NagaonQUBA SQUARE LLP · P51700055252 · possession Jun 2028 · 20.8% built
- RAGHUKUNJ CHS LTD · DOMBIVLI EASTJ B CONSTRUCTIONS · P51700055259 · possession Jan 2027 · 62.7% built
- Trinity - Shashank Saptshrung · dombivli westRADHIKA CONSTRUCTION COMPANY · P51700055300 · possession Aug 2028 · 31.4% built
- GOLDEN CITY · UlhasnagarGOLDEN CITY · P51700055313 · possession Dec 2026 · 30% built
- Shiv Paradise Wing C · ShirgaonShiv Corporation · P51700055322 · possession Dec 2026 · 90.9% built
- KRISHNA DHAM - 2 · YERANJADATREE REALTORS · P51700055326 · possession Dec 2026 · 50.9% built
- JOGANI PRIDE · BhiwandiBLISSFUL BUILDCON LLP · P51700055327 · possession Dec 2027 · 48.5% built
- Royal heights · BhalSiddhi Vinayak Builders & Developers · P51700055339 · possession May 2027 · 44.1% built
- Vedant Millenia Happiness Phase II Wing D · KalyanMOHAN HARDASMAL THARWANI · P51700055377 · possession Jul 2028 · 31.8% built · 1 complaint
- Sarvoday Marvel · Wadeghar, Kalyan (W)Sarvoday Group · P51700055414 · possession Jul 2027 · 84.1% built
- SHREE SHASHWAT BUILDING NO. 22 · SHREE SHASHWAT COMPLEX, PLEASANT PARK, MIRA ROAD EASTRaj InfraEmpire Private Limited · P51700055427 · possession Jan 2027 · 57.9% built
- SATYAM ANANTAM · BADLAPURSHIVANSH INFRA · P51700055439 · possession Dec 2026 · 70.9% built
- MAHADEV HEIGHTS · KALYAN EASTSONALI HOMES LLP · P51700055444 · possession Dec 2029 · 39.1% built
- ZUBAIR ENCLAVE · MUMBRAROYAL BUILDERS AND DEVELOPERS · P51700055458 · possession Dec 2028 · 44.1% built
- THARWANIS MEGHNA MONTANA PHASE - 3 · AmbarnathTHARWANIS MEGHNA MONTANA PHASE - 3 · P51700055468 · possession Dec 2028 · 2.7% built
- DEVI HILLS · UlhasnagarDEVI HILLS · P51700055474 · possession Dec 2026 · 45.5% built
- SKY MARINA · DombivliSwaminarayan Developers · P51700055494 · possession Dec 2029 · 38.9% built
- Kamdhenu 23 West Grande · ThaneKamdhenu 23 West Grande · P51700055502 · possession Dec 2028 · 51.6% built
- VIMAL RESIDENCY · At Post VasindNIRMITI INFRA · P51700055523 · possession Dec 2027 · 68.6% built
- MASTER BUSINESS CENTRE · AmbarnathMASTER BUSINESS CENTRE · P51700055525 · possession Dec 2024 · 68.2% built
- SEA GREEN PALACIA · UlhasnagarSEA GREEN PALACIA · P51700055526 · possession Jun 2026 · 54.5% built
- YASH MIDTOWN · WALDHUNIYASH REALTY · P51700055547 · possession Dec 2028 · 17.5% built
- OM SHIV GANESH CO OPERATIVE HOUSING SOCIETY LTD · DNC ROAD DOMBIVLI EASTIMPRESSIONS NXT · P51700055555 · possession Mar 2027 · 48.2% built
- ARIHANT TOWER · BHAYANDARARIHANT REALTY · P51700055564 · possession Dec 2028 · 13.6% built · 1 complaint
- MIRAYA DIVINE · MAJIWADEMEXTECH PROPERTY DEVELOPERS LLP · P51700055585 · possession Dec 2029 · 43.2% built · 1 complaint
- SHREE SAMARTH DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · DOMBIVLI EASTNAVKAR ENGINEERS · P51700055588 · possession Jun 2029 · 42.3% built
- SHREEJI DIOS · THANE BELAPUR ROAD, NAVI MUMBAISHREEJI VENTURES NIRMAAN PRIVATE LIMITED · P51700055622 · possession Dec 2026 · 82.3% built
- VISHNU BLISS · .LEGACY BUILDERS & INNOVATORS · P51700055630 · possession Jun 2026 · 79.6% built · 1 complaint
- SHREE SHASHWAT BUILDING NO. 21 · MIRA ROAD EASTG N DEVELOPERS · P51700055631 · possession Jan 2027 · 66.1% built
- THE NILAYA · TitwalaABHIDARSHAN CORPORATION LLP · P51700055643 · possession Dec 2027 · 27.3% built
- Swaminarayan City Phase 1D · Mothagon, Mauje, ThakurliSwaminarayan Life Space LLP · P51700055644 · possession Dec 2030 · 38.3% built · 1 complaint
- EV 9 Square · ThaneEV 9 Square · P51700055650 · possession Dec 2028 · 52.1% built
- Kamdhenu Grandeur · ThaneKamdhenu Grandeur · P51700055665 · possession Dec 2027 · 68.6% built
- Trident Avalon · BadlapurShri Krishna Realty · P51700055667 · possession Dec 2026 · 72.6% built · 1 complaint
- CROSSTOWN II C WING · UlhasnagarCROSSTOWN II C WING · P51700055668 · possession Feb 2029 · 29% built
- BHAGWATI HEIGHTS · SHAHAPURPERFECT REALITY · P51700055682 · possession Dec 2027 · 70% built
- Sunteck Sky Park 3 · Village NavgharSunteck Lifespace Private Limited · P51700055703 · possession Dec 2030 · 36.4% built
- Ammu Co-Op Housing Society Ltd · Chikanghar, Kalyan WestStonecrafters · P51700055717 · possession Mar 2027 · 58.6% built
- AURA BUSINESS CENTER · ThaneAURA BUSINESS CENTER · P51700055734 · possession Dec 2026 · 29.7% built
- PRECIOUS MEADOWS NX · KalyanRadhe Krishna Developers · P51700055752 · possession Jun 2027 · 71.8% built · 1 complaint
- Swarajya · CHARAISAILAVKIK REALTY PRIVATE LIMITED · P51700055753 · possession Mar 2027 · 30% built
- Mangalmurti Garden · Chole-Dombivali EastShivam Universal · P51700055757 · possession Dec 2026 · 78.2% built
- RAJ EMPIRES BUILDING NO.2 · KALYANRAJ PRITAM CHATURVEDI · P51700055768 · possession Mar 2027 · 40.5% built
- PRAMUKH PARADISE · NEAR VANGANI RAILWAY STATION EAST FOOTOVER BRIDGEAASHAPURA ASSOCIATE · P51700055845 · possession Dec 2029 · 22.6% built
- REGENCY ANANTAM NXT PHASE I · DombivliREGENCY NIRMAN LTD · P51700055848 · possession Dec 2028 · 37.5% built
- SHIVANAND SUDAMA CO. OP. HSG. SOCIETY. LTD. · DOMBIVLINARENDRA KALYANJI PATEL · P51700055865 · possession Mar 2027 · 66.4% built
- MIRAYA BUSINESS HUB · MAJIWADEMEXTECH PROPERTY DEVELOPERS LLP · P51700055878 · possession Dec 2028 · 42.7% built
- GAJANAN PRIDE · SANGEETAWADIBALAJI INFRA · P51700055892 · possession Dec 2027 · 31% built
- RANUJA RAMDEV C TYPE · BHAYANDAR EASTRANUJA RAMDEV C TYPE · P51700055896 · possession Dec 2026 · 55.5% built
- SHREE VIGHNAHARTA · NASHREE SAI ENTERPRISES · P51700055907 · possession Dec 2027 · 27.3% built
- SHREE HILL RESIDENCY · AMBERNATHSADGURU CORPORATION · P51700055920 · possession Mar 2027 · 43.6% built
- ONE SILVER AVENUE · BhiwandiONE SILVER AVENUE · P51700055921 · possession Dec 2029 · 30% built
- JAY RAMDARSHAN CHS LTD · Badlapur WestMITRA BUILDCON · P51700055924 · possession Nov 2026 · 48.2% built
- MAHAVIR VISTA AND VISTA POINT · ThaneMAHAVIR VISTA AND VISTA POINT · P51700055928 · possession Dec 2028 · 35.7% built
- SHIVALAYA HEIGHTS · KHIDKALIRUDIS INFRA · P51700055940 · possession Jun 2028 · 64.5% built
- THE MILLENIA · KatemanevaliMILAN CONSTRUCTIONS · P51700055944 · possession Aug 2028 · 37.8% built
- MAHALAXMI APARTMENT · KONMANVI CONSTRUCTION · P51700055962 · possession Dec 2027 · 62.7% built
- PATELS ASPIRE · AMBERNATH EASTPRAMUKH DEVELOPERS · P51700055979 · possession Dec 2026 · 32.5% built · 1 complaint
- Leena Oasis · Naya NagarLeena Constructions Private Limited · P51700055999 · possession Dec 2029 · 28.1% built
- CROSSTOWN II B WING · UlhasnagarCROSSTOWN II B WING · P51700056000 · possession Feb 2029 · 29% built
- PRECIOUS EMPIRE WING A, B AND C · PaleRKR REALITY · P51700056016 · possession Dec 2026 · 81.4% built · 1 complaint
- Navkamal Pushpa CHS · Naupada, Thane WestDream Realtors · P51700056041 · possession May 2026 · 27.3% built
- AL BALAD RESIDENCY II · SECTOR 9 THANEunity realty · P51700056042 · possession Jun 2029 · 18.8% built
- Shubharambh Residency · ThaneAarambh Developers · P51700056055 · possession Nov 2027 · 27% built
- Haware Paramount Kalyan Phase 1 · Muthaval VillageHaware Properties LLP · P51700056061 · possession Dec 2028 · 39.2% built · 1 complaint
- ANSAL SUVARNA VILLAS · SenwaTilak construction co · P51700056071 · possession Dec 2030 · 18.2% built · 1 complaint
- Sanveg Residency · BadlapurOm Vastu Homes NX · P51700056072 · possession Dec 2028 · 72.4% built
- Amakin Mohammadiyah Complex · Dombivli EastRAJ CORPORATION · P51700056078 · possession Dec 2030 · 49.5% built
- SATYAM CHOPRA ENCLAVE · CHOTA MHASOBA MAIDANSAI SATYAM PROPERTIES LLP · P51700056086 · possession Mar 2027 · 34.5% built
- RIDDHI SIDDHI PARVATI · ThaneRIDDHI SIDDHI PARVATI · P51700056091 · possession May 2027 · 36.4% built
- TULSI VATIKA · VADAVALISHRI KALKI ENTERPRISES · P51700056104 · possession Mar 2030 · 38.5% built
- AMALTAS · DOMBIVLIAARYA DEVELOPERS · P51700056146 · possession Dec 2027 · 53.2% built
- SAHYADRI ELITE · PISAVALISIKERIA SHELTER PRIVATE LIMITED · P51700056156 · possession Mar 2028 · 27.1% built
- Precious Villas by RM | Parijas · KALYANRM Buildcon · P51700056173 · possession Dec 2030 · 28.6% built
- JARIMARI HOMES · KALYANJARIMARI HOMES · P51700056174 · possession Dec 2027 · 0.9% built
- Haware Palms Kalyan Phase 1 · Muthaval VillageHaware Properties LLP · P51700056190 · possession Dec 2028 · 41.4% built · 1 complaint
- SHRI KRISHNA GOVIND PRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED · NAUPADAGOVIND OJASS EDIFICE PVT. LTD. · P51700056222 · possession Dec 2026 · 61.8% built
- Shri Jiveshwar Apartment · KulgaonOMKAR ENTERPRISES · P51700056234 · possession Dec 2028 · 30% built
- Anand Upvan NX · Village -MorivaliAmeya Developers · P51700056251 · possession Dec 2029 · 35.9% built
- Urban Hills Phase 1 · Kalyan Phata, ThaneLotus Group · P51700056256 · possession Apr 2028 · 51.1% built
- MARUTI HOMES · ThaneJay Shree Krishna Enterprises · P51700056264 · possession Sept 2028 · 37.7% built
- DOSTI WEST COUNTY - PHASE 7 - DOSTI WILLOW · ThaneDOSTI WEST COUNTY - PHASE 7 - DOSTI WILLOW · P51700056278 · possession Mar 2028 · 54.4% built
- Yesu Anand Residency · Behind Old Guardian High School, Near Avdhuth Buiding,Vijay Ananta Patil · P51700056279 · possession Dec 2026 · 76.4% built
- KRISHNA NAYAN COMPLEX PHASE I · Village - Shirgaon, Taluka Ambernath, BadlapurSHREEJI BUILDERS AND DEVELOPERS · P51700056288 · possession Dec 2027 · 42.2% built
- Palm Riveria · ThanePalm Riveria · P51700056303 · possession Dec 2033 · 9.6% built
- Sai Vedant · SHIRGAONSai Aangan Residency · P51700056315 · possession Mar 2027 · 83.5% built
- WALCHAND AVENUE · MIRA ROAD EASTPRAMANIK HOMES LLP · P51700056323 · possession Dec 2028 · 50.9% built
- Aarambha Luxor · Ramachandra NagarAARAMBHA VISION HOMES · P51700056333 · possession May 2027 · 35% built
- OM GURU KRUPA CO-OP. HOUSING SOCIETY LTD · BADLAPURSAIRAJ CONSTRUCTION · P51700056339 · possession Mar 2027 · 68.2% built
- NAKSHATRA RESIDENCY · AMBARNATH WESTNAKSHATRA LIFESPACES · P51700056351 · possession Dec 2026 · 81.4% built
- Nature Vista Building - 2 · Near Dwarli Post OfficeOyster Saket Infrastructure · P51700056365 · possession Dec 2029 · 18.2% built
- Swastik Paradise · ChikhaloliGHUDE ENTERPRISES · P51700056372 · possession Jul 2026 · 81.5% built
- PG VRUNDAVAN · S NO 62, H NO 6AMARUTI CORPORATION · P51700056377 · possession Dec 2027 · 69.1% built
- CHANDRANGAN RESIDENCY PHASE-V · DIVAEKVEERA ENTERPRISES · P51700056410 · possession Dec 2027 · 20.6% built
- PRABHU DARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · BADLAPURNYP DEVELOPERS · P51700056412 · possession Dec 2026 · 40.9% built
- GOLDEN HEIGHTS · AMBERNATHJAINAM REALTY · P51700056413 · possession Dec 2027 · 63.2% built
- SUJAN CO-OP. HSG. SOC. LTD. · ThaneSUJAN CO-OP. HSG. SOC. LTD. · P51700056415 · possession Aug 2026 · 43.6% built
- SHUBHVASTU · KHATIVALISAVJIBHAI BAVJIBHAI KODINARIYA · P51700056449 · possession Dec 2028 · 18.7% built