All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 12 of 48.
Thane
- Rose Tower · SHANTI GARDENAKSHAR SHANTI REALTORS PRIVATE LIMITED · P51700024772 · possession Dec 2030 · 47.6% built
- Amber Galaxy C Wing · VITAWAPANDHARINATH SITARAM PATIL · P51700024773 · possession Mar 2026 · 26.8% built · 1 complaint
- DEEP LAXMI HEIGHT · BHIWANDIDEEPLAXMI HEIGHTS · P51700024784 · possession Dec 2027 · 80.9% built
- SAKET WORLD · Near Chetana SchoolAnand Associates · P51700024797 · possession Jun 2026 · 11.3% built
- AMAR VIJAY CHS LTD · STATION ROADJ.V. ENTERPRISES · P51700024853 · possession Sept 2024 · 82.5% built
- VALENCIA · MAHATMA PHULE ROADIMPRESSIONS · P51700024879 · possession Mar 2027 · 80% built
- CHINTAMANI MEADOWS · SHAHAPURJASHNANI CONSTRUCTION PRIVATE LIMITED · P51700024889 · possession Dec 2026 · 75.2% built
- Gayatri Elegance · ThaneGayatrikripa Developers Private Limited · P51700024926 · possession Dec 2026 · 61.1% built
- MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 · KATRAP LAKEDEEPLAXMI DEVELOPERS · P51700024942 · possession Mar 2029 · 87.3% built
- SAI WORLD LEGEND · UlhasnagarParadise Lifestyles Private Limited · P51700025002 · possession May 2026 · 45.8% built
- 24 HIGH · OPP DY PATIL STADIUMDREAM APEX REALTIES LIMITED · P51700025150 · possession Apr 2026 · 60.9% built · 1 complaint
- Mahavir Sarvoday Plaza · Dombivli WestVIRA THEATRES PVT LTD · P51700025161 · possession Mar 2026 · 100% built
- Kamdhenu23-west · ThaneAccura Developers LLP · P51700025164 · possession May 2025 · 75.5% built
- ARYA ARIANA · DOMBIVLIASHAPURA CORPORATION · P51700025165 · possession Sept 2026 · 68.2% built
- PADMADISHA PARADISE - BUILDING 2 · TemgharPADMADISHA PARADISE · P51700025271 · possession Dec 2026 · 77.1% built
- KASTURI VAN · ThaneGUJARAT ESTATE · P51700025276 · possession Dec 2029 · 9.1% built
- GAMI ASTERS A WING · ThaneTHALIA AND GAMI ENTERPRISES · P51700025311 · possession Dec 2026 · 98.6% built
- PARSHURAM TOWER · TALUKA KALAYNMORESHWAR CONSTRUCTIONS · P51700025480 · possession Sept 2026 · 70.4% built
- SAI VAIBHAV PARADISE · SHRIDHAR MHATRE CHOWKSHREE SAI DEVELOPERS · P51700025525 · possession Jun 2022 · 39.1% built
- SALASAR EXOTICA - I · MIRA ROAD EASTSalasar Associates · P51700025546 · possession Jun 2025 · 100% built
- PLUTONIUM BUSINESS PARK · ThanePLUTONIUM BUSINESS SOLLUTION PRIVATE LIMITED · P51700025606 · possession Jun 2026 · 74.1% built
- PUSHKAR CO OP HSG SOCIETY PRAPOSED · OPP DNC HIGH SCHOOLAMEYA DEVELOPERS · P51700025616 · possession Feb 2024 · 28% built
- CENTRUM BUSINESS SQUARE PHASE 1 · ThaneSQUAREFEET CONSTRUCTION · P51700025651 · possession Jun 2027 · 100% built
- vraj vatika · Thanevraj vatika · P51700025676 · possession Jun 2026 · 27.8% built
- Prapti Heritage · Manjarli Badlapur WestTridev Enterprises · P51700025683 · possession Jun 2025 · 90.9% built
- SHRUTI APARTMENT · ThaneVIKRANT V RAIKAR HUF - - · P51700025732 · possession Nov 2023 · 39.2% built
- udaynagar chs · PanchpakhadiNatu Paranjape Realty · P51700025743 · possession Mar 2028 · 37% built
- Provident Palmvista B1 · -Provident Housing Limited · P51700025841 · possession Jun 2028 · 38.5% built
- Provident Palmvista D4 · -Provident Housing Limited · P51700025842 · possession Jun 2028 · 43.7% built
- Provident Palmvista D3 · -Provident Housing Limited · P51700025849 · possession Jun 2028 · 41% built
- Provident Palmvista D2 · -Provident Housing Limited · P51700025854 · possession Jun 2028 · 22.7% built
- Superio Grand Central · ThaneFortune Infracreators Private Limited · P51700025980 · possession Sept 2030 · 42.7% built · 14 complaints
- MALI PINNACLE · HAJIMALANG ROADMALI INFRA · P51700026067 · possession Jan 2027 · 72.7% built · 1 complaint
- AASHRAY AANAND PHASE-II · GAIKWADPADADREAM CORPRATION · P51700026268 · possession Nov 2022 · 86.4% built
- Maatr Waters · Village BaraveMaatr Enterprises · P51700026313 · possession Sept 2023 · 90.5% built
- BHOOMI ICON · ThaneFORNAX REALTY · P51700026412 · possession Jun 2026 · 68.4% built
- A H Sapphire · MahajanwadiA.H. Constructions · P51700026430 · possession Dec 2027 · 74.9% built · 1 complaint
- Runwal Shopping Arcade · DombivliRunwal Residency Private Limited · P51700026438 · possession Apr 2025 · 90.9% built · 1 complaint
- Paramount E · ThaneKalpataru Homes Private Limited · P51700026608 · possession Jun 2025 · 100% built
- L AND T SEAWOODS RESIDENCES - NORTH TOWERS · L&T SeawoodsL&T SEAWOODS LIMITED · P51700026653 · possession Dec 2024 · 71.8% built · 2 complaints
- BALAJI EXOTICA BUILDING TYPE D PHASE III · CHIKANGHARBALAJI WORLD · P51700026674 · possession Dec 2025 · 90.9% built · 1 complaint
- Sudama Vallabh wing A,B,C · ThanePravin Vandravandas Vora · P51700026698 · possession Jun 2027 · 71.5% built
- OM SAMAPRIYA COMPLEX BLDG.NO-1 · KALYANOMKAR GRUH NIRMAN LLP · P51700026753 · possession Dec 2026 · 70.5% built
- JAGDALE AASTHA · ThaneJAGDALE INFRASTRUCTURE PVT. LTD. · P51700026770 · possession Dec 2026 · 38.5% built
- IMPERIAL RESIDENCY · ThaneLeena Construction Co. · P51700026852 · possession Jun 2027 · 87.3% built
- SUNRAJ SUPREME · DOMBIVILI EASTVASHDEV BACHOMAL KHUSHALANI · P51700026868 · possession Jun 2026 · 90.9% built
- The Willows Phase 1 · GAURAV VALLEYORIGIN REALTORS LLP · P51700027028 · possession Dec 2027 · 47.6% built
- SHREE MANGALMURTI BUILDERS AND DEVELOPERS · MURBADVASANTI KASHINATH CHAUDHARI · P51700027105 · possession Sept 2022 · 82.2% built
- LARKINS 315 FIO-A · PANCH PAKHADIM/S PUSHPAK DEVELOPERS · P51700027115 · possession Dec 2026 · 85.9% built · 1 complaint
- SIDDHAKALA HEIGHTS · ThaneRushabh Developers · P51700027126 · possession Jun 2024 · 90.9% built
- Samruddhi Residency · DawleSHREE SAI GANESH DEVELOPERS · P51700027136 · possession Jun 2028 · 66.7% built
- Shapoorji Pallonji The Impulse- Phase 1 · ThaneJaykali Developers Private Limited · P51700027176 · possession Jun 2028 · 1.4% built
- MATOSHREE RESIDENCY · NEAR PATIL BHAVANM/S MATOSHREE DEVELOPERS · P51700027225 · possession Aug 2027 · 67.3% built
- SATYAM SEVEN SKIES · ThaneJai Jalaram Enterprises · P51700027232 · possession Jun 2024 · 100% built
- AMBER ONE · kanchangoanAMBER BUILDCON · P51700027251 · possession Jun 2028 · 92.3% built
- MAHAAVIR PRIDE · DOMBIVALI EASTMAHAAVIR BUILDCON LLP · P51700027307 · possession Jun 2027 · 83.9% built
- SAVALIYA RESIDENCY · Mira Road EastShree Savaliya Housing LLP · P51700027312 · possession Jul 2026 · 75.9% built
- ASHLAR TATTVA · MANDAAKSHAR ENTERPRISES · P51700027399 · possession Jun 2027 · 32.7% built
- GODREJ UPAVAN · BHADVAD & TEMGHARPRAKHHYAT DWELLINGS LLP · P51700027436 · possession Jun 2028 · 30.2% built · 7 complaints
- GAMI INDUSTRIAL PARK-B BUILDING · PAWANE MIDCGolden Falcon Pacific Ltd · P51700027441 · possession Jun 2023 · 100% built
- NEXUS PARK · Village DawaleNEXUS GROUP · P51700027450 · possession Jun 2027 · 73% built
- SPACE RESIDENCE - II - BUILDING NO. 4 B · OPP. PLEASANT PARKSPACE REALTY · P51700027464 · possession Jan 2027 · 67.3% built
- INDRA NEEL · ThaneSONAM SPARK INFRA LIMITED · P51700027465 · possession May 2027 · 97.7% built · 1 complaint
- SARVODAY SQUARE PHASE 3 BLDG NO 1 · AmbarnathSHREE SQUAREFEET ENTERPRISES LLP · P51700027546 · possession Jun 2026 · 81.8% built
- Riverview Classic Building no. 3 Phase III · KalyanRUTU BUILDERS · P51700027621 · possession Jun 2024 · 100% built
- HYDE PARK RESIDENCY F5 BUILDING PHASE · ThaneNEXUS BUILDERS AND DEVELOPERS PVT LTD · P51700027694 · possession Sept 2023 · 86.8% built
- SILVER LINE PHASE - 1 · VASUNDRIHOME CONSULTANCY · P51700027713 · possession Mar 2031 · 13.4% built
- ANWAR ARCADE · GAURI PADAFARHAT FAROOQUE AHMED MOMIN · P51700027730 · possession Jun 2027 · 75% built
- Chandanbala · ThaneHemant Sagarmal Jain · P51700027814 · possession Dec 2026 · 160.9% built
- ZIPRYA GOVIND TOWER · Near Kopar Railway StationShivshkati Builders and Developers · P51700027822 · possession Jun 2024 · 63.6% built
- SAI DATTA KRIPA · SHASTRI NAGARBhalchandra Vinayak Wadnerkar · P51700027824 · possession Dec 2027 · 90.9% built · 1 complaint
- SHALIMAR CO.OP HSG SOC LTD · ThaneNEENA SHAILESH PARANJAPE · P51700027861 · possession Jun 2027 · 37.4% built
- ARIHANT CITY PHASE-II - N BUILDING · BHADWADARIHANT ENTERPRISES · P51700027862 · possession Dec 2028 · 20.9% built
- L M TOWER · BHADWADL M REALTY · P51700027947 · possession Mar 2027 · 76.8% built
- BALAJI ESTATE · UmbroliM/s. Sai Balaji Buildcon · P51700027980 · possession Jul 2026 · 83.6% built
- NANDANVAN HOMES-BUILDING B · PARSIK NAGAR NEAR RELIANCE MARKETSHREE KRUPA BUILDERS · P51700028028 · possession Mar 2027 · 54.5% built · 3 complaints
- DHAVAL · VILLAGE BELVALI ,BACK SIDE OF RIDDHI SIDDHI BUILDINGSHREEJI AND INNOVATIVE DEVELOPERS · P51700028136 · possession Dec 2022 · 81.8% built
- WISTERIA SQUARE 1 · VINAY NAGARRAJDEEP REALTORS & DEVELOPERS PVT LTD · P51700028141 · possession Dec 2028 · 33.7% built · 8 complaints
- SRUSHTI RESIDENCY BUILDING E · KANCHANGAON THAKURLIPappu Developers & Group · P51700028176 · possession Jun 2024 · 90.9% built
- ENVIRO AFFINITY · GAURAV CITYAristone Developers · P51700028265 · possession Dec 2028 · 39.4% built
- The Landmark · BadlapurR PLUS INFRA · P51700028309 · possession Feb 2028 · 37.7% built
- Royal Palm · WashindBuildcon Enterprises · P51700028329 · possession Jun 2025 · 78.5% built
- ARIHANT CITY PHASE-II - M BUILDING · BHADWADARIHANT ENTERPRISES · P51700028430 · possession Dec 2028 · 20.9% built
- RAUNAK 108 · OWALE VILLAGEUNNATHI ASSOCIATES · P51700028435 · possession Jun 2027 · 66.8% built · 8 complaints
- 27 East · SagaonRashi Developers · P51700028466 · possession Jun 2025 · 65.3% built
- KINGS COURT · SURYODAYA SOCEITYAMI SAI CONSTRUCTION · P51700028580 · possession Jun 2023 · 100% built
- LAXMI SHANKAR COMPLEX · BADLAPUR GAONADITI BUILDWELL · P51700028607 · possession Jun 2028 · 44.3% built
- Sector 2A - Wing B · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700028685 · possession Dec 2027 · 97.7% built · 1 complaint
- Bhairav Enclave · ThaneLeena Estate Venture · P51700028700 · possession Aug 2026 · 90.9% built
- AL AMIN TOWER · BHIWANDIS V BUILDERS · P51700028707 · possession Dec 2026 · 70.5% built · 1 complaint
- 10 Marina Bay · ThaneEV HOMES CONSTRUCTIONS PVT. LTD. · P51700028722 · possession Jun 2028 · 77.3% built
- Kashish Park Tower C-1 · ThaneKashish Park Realtors · P51700028738 · possession Jun 2030 · 34.5% built · 1 complaint
- HEMA KUNJ · ThaneBHADRANKAR ENTERPRISES LLP · P51700028739 · possession Aug 2023 · 41.8% built · 1 complaint
- Maatr Skye · KhadakpadaMaatr Ventures · P51700028786 · possession Sept 2025 · 90.9% built
- SAI VATIKA RESIDENCY · KAMATGHARMOHD HASIM ABDUL SATTAR KHAN · P51700028797 · possession Dec 2027 · 47.3% built
- CHADHA RESIDENCY · SHIL AND KARAVCHADHA DEVELOPERS AND PROMOTERS · P51700028831 · possession Sept 2026 · 25.1% built · 1 complaint
- OM SAI CLASSIC · AMBERNATH VILLAGED A CONSTRUCTION · P51700028873 · possession Jun 2025 · 100% built
- USHAKIRAN ENCLAVE · KalyanJAYANT ENTERPRISES · P51700028914 · possession Dec 2028 · 74.8% built
- THE ICON PHASE 3 · DhokaliLeading Frontier Private Limited · P51700029059 · possession Dec 2026 · 84.6% built · 3 complaints
- The Icon Phase 4 · DhokaliLeading Frontier Private Limited · P51700029062 · possession Dec 2026 · 75.2% built · 1 complaint
- BHOOMI AVENUE · AMBERNATH (E)BHOOMI ENTERPRISES · P51700029068 · possession Aug 2023 · 90.9% built
- SHWETA HEIGHTS · MIRA ROAD EASTSHREE SAI ASSOCIATES · P51700029110 · possession Mar 2027 · 90.9% built
- ISHWAR SHUBHLAXMI · AMBARNATHISHWAR REALITY · P51700029135 · possession Dec 2021 · 90.9% built
- GOPAL SMRUTI · AMBERNATHDATTA BABURAO GHAVAT · P51700029145 · possession Mar 2024 · 90.7% built
- JADHAV GADH · Godrej HillShree Samarth Developers · P51700029156 · possession Dec 2022 · 100% built
- KARTIK HOMES · SHIRGAON BADLAPUR EASTKARTIK ENTERPRISES · P51700029229 · possession Dec 2026 · 77.1% built
- Bhumi Height · ThaneBhumi Homes · P51700029282 · possession Dec 2031 · 2.3% built
- OMKAR RESIDENCY · mandaM/s OMKAR ASSOCIATES · P51700029285 · possession Dec 2025 · 81.8% built
- LAXMI CASTLE · KalyanLAXMI CASTLE · P51700029322 · possession Dec 2028 · 36.4% built
- Geeta Heights · RambaughMAYUR GROUP (RD) · P51700029333 · possession Dec 2024 · 90.9% built
- INFINITY IKON · ThaneEMPERIA PROJECTS · P51700029339 · possession Dec 2026 · 54.1% built
- Sector 2A - Wing A · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700029367 · possession Jun 2027 · 97.9% built
- Sadguru Symphony - Wing - A, D, E, F and G of Phase-II · Badlapur WestSADGURU INFRA · P51700029442 · possession Dec 2026 · 53.8% built
- SHREEJI SQUARE PHASE I · BADLAPURSHREEJI DEVELOPERS · P51700029512 · possession Jun 2026 · 103.6% built
- Constrcution of 2557 EWS tenements at S.No.157/1,village Gotheghar,Tal . Dist.-Thane PMAY Project · NEAR MSETCL RECIEVING STATION,UTTARSHIV VILLAGE ROADMaharashtra Housing and Area Development Board Konkan · P51700029534 · possession Jun 2028 · 14.7% built
- SATVIK WING B · AmbarnathM/s. JIGAR ENTERPRISE · P51700029587 · possession Dec 2023 · 45.5% built
- DAMODAR TOWER · KHARI VILLAGE, BHAYANDAR EASTJAANVI DEVELOPERS · P51700029603 · possession Mar 2027 · 90.9% built
- KRISHNA HEIGHTS · ThaneKRISHNA ASSOCIATE · P51700029686 · possession Dec 2026 · 9.5% built
- Birla Vanya Phase 2 · ShahadAditya Birla Real Estate Limited · P51700029755 · possession Jun 2025 · 100% built
- GAYATRI NIWAS · CHIKANGHARGayatri Builders · P51700029816 · possession Dec 2025 · 90.9% built
- SHANKESHWAR DARSHAN · ThaneKALPVRIKSH HOMES LLP · P51700030025 · possession Dec 2029 · 50.1% built
- Lucas Residency · Ambernath WestSunita Developers · P51700030052 · possession Dec 2023 · 90.9% built
- VIDHI PREM · KalyanLOTUS CONSTRUCTION · P51700030057 · possession Dec 2023 · 86.8% built
- LA LUXURIA · SHAHAPURRJ ENTERPRISES · P51700030059 · possession Mar 2027 · 135.5% built
- Navare Residency and Library · AmbernathShree Ganesh Developers · P51700030076 · possession Dec 2022 · 100% built
- SUNDAR RESIDENCY F WING · GAURIPADANAVADITYA DEVELOPERS · P51700030083 · possession Dec 2024 · 12.5% built
- Plot No -1A,Sector -19, Vashi Truck Terminal · ThaneCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED · P51700030100 · possession Dec 2028 · 44.4% built
- ESQUIRE · ThaneJP INFRA&SALASAR BUILDCON LLP · P51700030151 · possession Dec 2027 · 80.2% built · 1 complaint
- AVESA · Pokhran Road 2JAGDALE INFRASTRUCTURE PVT. LTD. · P51700030171 · possession Oct 2026 · 47.3% built
- THARWANI SOLITAIRE PHASE IV · SHAHADANIL HARDASMAL THARWANI · P51700030172 · possession Jul 2026 · 73.2% built
- Riverwood Park Building No -3 · Sagarli, Dombivili EastShree Khidkaleshwar Property Developers Pvt. Ltd. · P51700030195 · possession Jun 2027 · 82.7% built
- SAKET WORLD · Near Chetana SchoolAnand Associates · P51700030224 · possession Dec 2026 · 29.5% built
- SURVAL HEIGHTS · BADLAPUR EASTGAYATRI DEVELOPERS · P51700030228 · possession Dec 2023 · 74.1% built
- Tisai Heights · Katemanevali, KalyanTisai Construction · P51700030323 · possession Dec 2023 · 60% built
- AVIGHNA KARAN WING C · Kalyan eastAVIGHNA KARAN · P51700030327 · possession Aug 2026 · 72.7% built
- Sai Pearl · KatrapM/S MITRA REALITY · P51700030340 · possession Dec 2025 · 86.4% built · 1 complaint
- SATISH OAK HEIGHT · BADLAPUR WESTSHREE SAI PRATHAMESH DEVELOPERS · P51700030403 · possession Mar 2026 · 36.4% built
- SUYASH CO.OP. HOUSING SOCIETY LTD · ThaneSNA Build-Tech · P51700030476 · possession Jan 2025 · 87.3% built
- TWIN TOWERS · MILLAT NAGARMARJAAN DEVELOPERS LLP · P51700030487 · possession Dec 2027 · 70.4% built
- Runwal Gardens Phase 4 Bldg No. 33-34 · DombivaliRunwal Residency Private Limited · P51700030533 · possession Sept 2026 · 59.4% built · 3 complaints
- SAI BALAJI COMPLEX · TONDLIKAR NAGARSAI BALAJI COMPLEX · P51700030544 · possession Jul 2024 · 90.9% built
- HILTRON LIFE STYLE · UlhasnagarHILTON HEIGHTS LLP. · P51700030558 · possession Dec 2027 · 76.4% built
- RAHUL CO.OP. HOUSING SOCIETY LTD · PANCHPAKHADISNA Build-Tech · P51700030595 · possession Feb 2025 · 80% built
- AARADHYA HIGHPARK PROJECT III of PHASE 1 · NEAR SINGAPORE INTERNATIONAL SCHOOLMAN VASTUCON LLP · P51700030611 · possession Dec 2025 · 95% built · 2 complaints
- SARVESH DREAM CITY WING D · JOVELISAI SHRADHA DEVELOPERS · P51700030642 · possession Dec 2025 · 61.8% built
- NAVKAR BAHAR · DOMBIVLI WESTAMI ENTERPRISES · P51700030709 · possession Dec 2026 · 37.4% built
- NIRMALA PARADISE · BADLAPUR WESTPokhriyal And Associates · P51700030774 · possession Sept 2024 · 81.8% built
- NICE WORLD 1 · MUMBRANICE BUILDERS · P51700030809 · possession Dec 2031 · 45% built
- SAI VIDHATA · UlhasnagarSAI SHRADDHA ASSOCIATES · P51700030832 · possession Jun 2023 · 81.8% built
- Chintamani Heights (Building No 1) & Chintamani Kuber (Building No 2) · DevichapadaChintamani Developers · P51700030843 · possession Dec 2026 · 80.3% built
- DZ CITY - BUILDING NO 1 · MUMBRAMAASH CONSTRUCTION · P51700030861 · possession Jun 2030 · 49.4% built
- Kohinoor Eden · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700030888 · possession Sept 2026 · 90.9% built · 3 complaints
- SHATRUNJAY HEIGHTS · KAMATGHARONYX BUILDCON LLP · P51700030901 · possession Dec 2028 · 36.2% built
- SUVIAM PEARL PHASE I · SAI CHOWK, KHADAKPADALAXMI CONSTRUCTION CO · P51700030925 · possession Dec 2026 · 81.1% built · 1 complaint
- YASHWANT HEIGHTS PHASE II · KALYAN ERAI RESIDENCY Private Limited · P51700030946 · possession May 2023 · 82.5% built
- HILL CREST · ULHASNAGARUNIVERSAL INFRA · P51700030982 · possession Sept 2024 · 59.5% built
- KANHA RESIDENCY · BELAVALI GAONKULKARNII BUILDER · P51700030985 · possession May 2025 · 90.9% built
- DZ CITY - BUILDING NO 3 · MUMBRAAL BARI'S CONSTRUCTION · P51700031021 · possession Jun 2030 · 40.3% built
- SAROJINI · NEAR RAM MANDIRJAY SERVICE AND CONSULTANT · P51700031047 · possession Dec 2025 · 100% built
- ANANT PRABHA · SURYODAY SOCIETY KANSAIRUSHIKESH ENTERPRISES · P51700031051 · possession Apr 2023 · 90.9% built
- N G AVENUE · ThaneRNA Builders (NG) · P51700031064 · possession Dec 2027 · 33.6% built
- KRISHNA VANSH · KALYAN ECHAITANYA DEVELOPERS · P51700031076 · possession Dec 2028 · 36.5% built
- VAISHNAVI DHAM COMPLEX · NEW STANDARD SCHOOLVAISHNAVI BUILDERS AND DEVELOPERS · P51700031112 · possession Jul 2026 · 54.7% built
- OPULENCE · ThaneSONAM SPARK INFRA LIMITED · P51700031137 · possession Dec 2028 · 32.4% built
- SIDDHESHWAR HEIGHTS A WING FROM 2nd TO 14th FLOOR · KalyanSHREE JAI MALHAR ENTERPRISES · P51700031142 · possession Jan 2025 · 37.5% built
- Mohan Tribeca · KhadakpadaMOHAN LIFESPACES LLP · P51700031172 · possession Dec 2026 · 84.5% built
- GAMI EVA · ThaneThalia And Gami Enterprises · P51700031192 · possession Jun 2023 · 100% built
- SARVESHWAR CO-OP HSG SOC · TALUKA AMBERNATHDALAL BUILDSCAPE · P51700031253 · possession Jun 2024 · 71.8% built · 1 complaint
- TRINITY MOKSH · PALEGAONRATTANRAJ LIFESPACES · P51700031260 · possession Mar 2027 · 89.5% built
- KHUSHI AXIS WORLD · BHIWANDIKHUSHI AXIS INFRATECH LLP · P51700031265 · possession Dec 2026 · 54% built
- SHIVALAYA HEIGHTS · KALYAN EASTS R REALTORS · P51700031306 · possession Sept 2027 · 37.5% built
- Suman Arcade · SagaonShreekrupa Construction · P51700031345 · possession Dec 2026 · 9.1% built
- N G GRAND EMPIRE PHASE II · ThaneRNA Builders (NG) · P51700031379 · possession Dec 2028 · 43.3% built
- MADHUBAN PARK · B CABINRAJNB HOUSING LLP · P51700031395 · possession Mar 2023 · 72.3% built
- IRA INSIGNIA · Dombivli EastIRA HOMES · P51700031409 · possession Dec 2026 · 22.9% built · 3 complaints
- AMAR ELEGANCE · Ganesh Nagar, Dombivli WestAMAR REALTY · P51700031419 · possession Sept 2026 · 81.8% built
- SHREEJI MEADOWS · BELAVLIDEEPLAXMI DEVELOPERS · P51700031453 · possession Jul 2026 · 81.8% built
- AVASAR PRIDE · Mouje VillageD P REALTY · P51700031454 · possession Dec 2026 · 10.9% built
- VIVANTA MARVEL · MIRA ROAD - EASTTECHNO VISION REALTORS LLP · P51700031458 · possession Sept 2025 · 90% built · 1 complaint
- SPRINGS · ThaneQUEENSTOWN CONSTRUCTIONS PRIVATE LIMITED · P51700031471 · possession Mar 2024 · 100% built
- Niraj Exotica Wing B C D · AdharwadiK D Construction Co · P51700031494 · possession Mar 2030 · 57% built
- Ahmahf Empire · Kalyan EastEmpire Residency · P51700031570 · possession Dec 2027 · 72.7% built
- Goodwill Bizhub · ThaneM/s. Goodwill Dwellings LLP · P51700031628 · possession Sept 2026 · 35% built · 1 complaint
- ADISHAKTI · DOMBIVLI EASTADIMAYA ENTERPRISE · P51700031649 · possession Jan 2027 · 81.8% built
- Godrej Bayview · ThaneSuncity Infrastructures (Mumbai) LLP · P51700031726 · possession Dec 2028 · 35.4% built · 2 complaints
- Swaminarayan City Phase 1B · Mothagaon, Mauje ThakurliSwaminarayan Life Space LLP · P51700031749 · possession Dec 2028 · 44.4% built
- NISARG GREENS Phase - 2 F · Ambernath EastNND Ambernath LLP · P51700031797 · possession Jun 2025 · 72.7% built
- NISARG GREENS Phase - 2 D · Amberntah EastNND Ambernath LLP · P51700031807 · possession Jun 2025 · 63.6% built
- SHRESHTHA SWAPNA CO-OP HOUSING SOCIETY LTD · Taluka AmbarnathOM SHREE SAI BUILDERS AND DEVELOPERS · P51700031812 · possession Dec 2024 · 46.8% built
- N G GRAND EMPIRE PHASE I · NAVGHARRNA Builders (NG) · P51700031846 · possession Dec 2026 · 82.3% built
- Panvelkar Estate - Stanford - Phase II - R1 - B · MankivaliPanvelkar Infrastructures Private Limited · P51700031879 · possession Dec 2024 · 90.9% built
- N G SILVER SPRING PHASE III · ThaneRNA Builders (NG) · P51700031911 · possession Dec 2026 · 45.4% built
- MIDTOWN TWIN TOWERS · NEAR WADHWA'S SHIV MANDIRSHIRDI SAI SHELTORS LLP · P51700031951 · possession Nov 2026 · 71.6% built
- Anantsavitri Ratna Heights · Near Maxus MallKrisha Realty · P51700032014 · possession Aug 2026 · 90.9% built
- Satyabhama CHS LTD · GHANTALIMahesh Shriram Borkar · P51700032055 · possession Jun 2024 · 90.9% built
- SPM DREAM CITY PHASE 1 · VILLAGE PALID K BUILDCON · P51700032070 · possession Dec 2028 · 38.4% built
- Paramount C · ThaneKalpataru Homes Private Limited · P51700032095 · possession Jun 2025 · 2 complaints
- S. A. Patil Nagar Garden View CHS · AmbarnathShree Khodiyar Builders and Developers · P51700032102 · possession Sept 2023 · 70.4% built
- SILVER LIFESTYLE · KAUSASILVERLINE BUILDHEIGHT LLP · P51700032131 · possession Dec 2026 · 45.4% built
- MY CITY PHASE II CLUSTER 5 PART II · Usarghar DombivaliHORIZON PROJECTS PVT LTD · P51700032157 · possession Dec 2027 · 71.4% built
- SAKET WORLD BUILDING TYPE C · Near Chetana SchoolAnand Associates · P51700032180 · possession Jun 2027 · 53.2% built
- RUSTOMJEE LA FAMILIA - WING B · MAJIWADEKapstone Constructions Private Limited · P51700032205 · possession Dec 2026 · 46.4% built · 2 complaints
- SEVEN ELEVEN COURTYARD · GoddevS.S.S ASSOICATES · P51700032221 · possession Mar 2029 · 25.5% built
- PRISM INDUSTRIAL ESTATE · NEAR PENDHARKAR COLLEGESPLENDOR SHELTERS PVT LTD · P51700032231 · possession Oct 2025 · 90.9% built
- RUSTOMJEE LA FAMILIA - WING A · MAJIWADEKapstone Constructions Private Limited · P51700032262 · possession Dec 2026 · 47% built
- Puraniks Unicorn Phase 1 · MogharpadaPuranik Builders Limited · P51700032292 · possession Dec 2028 · 51.5% built · 2 complaints
- N G AROMA PHASE I · NAVGHARRNA Builders (NG) · P51700032309 · possession Dec 2026 · 45.5% built · 1 complaint
- S K VALLEY · SHILLITTEHAD BUILDCON · P51700032338 · possession Apr 2028 · 55.8% built
- HIGHLAND SKY TOWERS A BUILDING · NAUPADAPROVIDENCE REALTY LLP · P51700032367 · possession Dec 2027 · 39.2% built
- OM MAITRI ICON · DOMBIVLI (E)VISHNU BUILDWELL · P51700032392 · possession Jun 2027 · 76.4% built
- AMBER BLISS · DOMBIVLI WESTM/S. AMBER COMBINES · P51700032492 · possession Dec 2025 · 79.1% built
- Laaman Industrial Park · ThaneLaaman Developers · P51700032501 · possession Jan 2025 · 100% built
- GEETAI SMRUTI · Near DNC SchoolNEELPADMA DEVELOPERS · P51700032519 · possession Dec 2026 · 43.4% built
- PATELS FALCON · KHER SECTIONPRAMUKH DEVELOPERS · P51700032547 · possession Dec 2026 · 90.9% built
- Riverwood Park Building No -1 · Sagarli , Dombivali EastShree Khidkaleshwar Property Developers Pvt. Ltd. · P51700032548 · possession Mar 2027 · 41.1% built · 1 complaint
- Godrej Riviera Phase 1 · KalyanGODREJ PROPERTIES LIMITED · P51700032552 · possession Dec 2026 · 60.6% built · 1 complaint
- SHARMILA RESIDENCY · AMBERNATHANNAPURNA ENTERPRISES · P51700032556 · possession Mar 2025 · 61.8% built
- SHIVANJALI HEIGHTS · BADLAPUR WESTSHIVANJALI CONSTRUCTION · P51700032585 · possession Jun 2023 · 50% built
- Shubhanand NX And Greenland NX · AmbarnathMarathe Enterprises · P51700032625 · possession Dec 2026 · 90% built
- Gayatri CHS LTD · ThaneShree Angarak Enterprises Builders and Developers · P51700032690 · possession Mar 2026 · 81.8% built
- Sky Heights Tower No. 4 · Kausa VillageVIRANI CONSTRUCTION COMPANY · P51700032730 · possession Dec 2028 · 50.5% built
- KAPIL BLING · BHIWANDITRIDENT BUILDERS AND DEVELOPERS · P51700032751 · possession Mar 2026 · 27.3% built
- OM SAI HOME-D · KAMATGHARM/S. INFINI DEVELOPERS · P51700032786 · possession Dec 2024 · 90.9% built
- Tulsi Aanand · Badlapur eastRAJ GROUP · P51700032811 · possession Dec 2025 · 100% built
- 9PBR TOWER B1 · ThaneMISTRY CONSTRUCTION CO. PVT. LTD. · P51700032812 · possession Dec 2028 · 56% built
- HIGHLAND SKY TOWER DAMANI B BUILDING · NAUPADAPROVIDENCE REALTY LLP · P51700032859 · possession Jun 2027 · 52.2% built
- Sai Heights Building No.1 B Wing · Vithalwadi,Sai Siddhi Developers · P51700032918 · possession Dec 2025 · 90.9% built
- SWAMI NARENDRA RESIDENCY · MURBADRAJ RATNESHWARI DEVELOPERS · P51700032919 · possession Dec 2026 · 44% built
- Shreeram Vaishali · Dombivali EastADITYA REALTORS · P51700032988 · possession Dec 2024 · 60% built
- MARATHE SAPPHIRE · TITWALASAIJI DEVELOPERS · P51700032995 · possession Dec 2031 · 43.6% built
- SAI PALACE · SHAHAPURVARDHAMAN DEVELOPERS · P51700033001 · possession Oct 2026 · 90.9% built
- UMA KUNJ COOPERATIVE HOUSING SOCIETY LIMITED · BadlapurPravin Arvind Apte · P51700033015 · possession May 2026 · 90.9% built
- SIDDHIVINAYAK RESIDENCY · BADLAPURSAIRAJ DEVELOPERS · P51700033059 · possession Dec 2024 · 72.7% built
- PRECIOUS MEADOWS · MharalVINAYAK ASSOCIATES · P51700033139 · possession Nov 2026 · 90.9% built · 1 complaint
- RAJ HERITAGE 2 · MIRA BHAYANDER ROAD MIRA ROAD EASTRAJ REALTY BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700033231 · possession Mar 2026 · 100% built
- Shapoorji Pallonji Skyraa at Northern Lights · ThaneJaykali Developers Private Limited · P51700033243 · possession Dec 2031 · 0% built · 2 complaints
- GLOBE BUSINESS AVENUE · MIDC PHASE IIGlobe Solitaire LLP · P51700033290 · possession Dec 2026 · 72.7% built
- SHIV HEIGHTS · THANE WESTSARWANGKRIPA DEVELOPERS LLP · P51700033313 · possession Dec 2026 · 69.1% built
- AMBIKA HEIGHTS · AMRAI CHOWKRAJESH MAVJI CHHEDA · P51700033336 · possession Jun 2024 · 90.9% built · 1 complaint
- Panvelkar Greens - Phase I · JoveliESHAN DEVELOPERS · P51700033348 · possession Dec 2026 · 71.8% built
- OM BHAGWATI · KDMCOM BHAGWATI BUILDERS AND DEVELOPERS · P51700033354 · possession Dec 2026 · 67.3% built
- The Palace Tower B · Vinay NagarJP Infra Realty Private Limited · P51700033430 · possession Dec 2028 · 43.6% built · 1 complaint
- The Palace Tower C · Vinay NagarJP Infra Realty Private Limited · P51700033431 · possession Dec 2028 · 43.8% built · 1 complaint
- AUDUMBAR DARSHAN · BADLAPUR EASTAUDUMBAR ENTERPRISES · P51700033432 · possession Oct 2024 · 44.5% built
- ASMITA GRAND MAISON · MIRA ROAD EASTASMITA INDIA LIMITED · P51700033489 · possession Dec 2027 · 73.5% built
- PINE VIEW · BADLAPURSATYA DEVELOPERS · P51700033505 · possession Mar 2028 · 36.8% built
- Mai Kripa Co. Op. Hsg. Soc. · ThaneOJASS CONSTRUCTIONS · P51700033561 · possession Mar 2024 · 90.9% built
- KMC SKYLINE · KANCHANGAON THAKURLIPRIME PROPERTIES · P51700033584 · possession Jun 2028 · 22.3% built · 1 complaint
- PEARL HEIGHTS · BADLAPUR GAONZAHID IQBAL KOHARI · P51700033623 · possession Dec 2026 · 74.7% built
- REGAL SQUARE PH 4 TOWER 6 AND 8 · Near Chattrapati Shivaji Maharaj StadiumDEV DRASHTI REALTY PRIVATE LIMITED · P51700033625 · possession Dec 2026 · 45.5% built
- Dosti West County - Dosti Nest - Phase 2 · ThaneDOSTI ENTERPRISES · P51700033663 · possession Jun 2027 · 92.6% built · 1 complaint
- SAPTASHRUNGI · TUKARAM NAGARPADMAVATI BUILDERS · P51700033668 · possession Dec 2026 · 81.8% built
- UMIYA NAKSHATRA HEIGHTS · KATRAP BADLAPUR EM/S. JIGAR ENTERPRISE · P51700033734 · possession Dec 2027 · 51.1% built
- Cascade Avenue Bellagio · MogharpadaAarsh Construction · P51700033736 · possession Dec 2026 · 62.2% built
- MAATR INFINITY · NEXT TO RATAN RIVERIA NEAR GODREJ RIVERSIDE BUILDING, KALYAN WMaatr Infra · P51700033746 · possession Mar 2027 · 88.2% built
- RAUNAK CITY SECTOR VI - F2 · KALYANRAUNAK CORPORATION · P51700033757 · possession Dec 2028 · 75.9% built · 3 complaints
- RAUNAK CITY SECTOR VI - F1 · KALYAN WRAUNAK CORPORATION · P51700033762 · possession Dec 2028 · 79.1% built
- Code Name-Enchanted · KolshetRunwal Construction Private Limited · P51700033799 · possession Jun 2028 · 54.8% built · 8 complaints
- AYESHA GARDEN B WING · KALYANAZKA BUILDERS AND DEVELOPERS · P51700033810 · possession Sept 2025 · 82.3% built
- Ace Courtyard · MogharpadaAce Signature Homes LLP · P51700033813 · possession Mar 2024 · 90.9% built
- MODEL TOWN · SHAHAPURQAVI CONSTRUCTION PVT. LTD. · P51700033833 · possession Dec 2026 · 90.9% built
- Sector 2A - Wing C · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700033851 · possession Jun 2027 · 66.2% built
- Mahavir Bliss · ThaneM/s. Shivshakti Engineers · P51700033859 · possession Dec 2026 · 71.7% built
- BHAKTI WINDSOR · KALYAN WESTBHAKTI REALTORS · P51700033913 · possession Oct 2026 · 90.9% built
- Dashmesh Crystal phase 2 · kharvai chowkDashmesh Infrastructure · P51700033926 · possession Jun 2024 · 100% built
- VITTHAI ANANT PLAZA · BADLAPURSHARAD NAMDEO GAIKWAD · P51700033932 · possession Dec 2026 · 61.4% built
- WALCHAND PARADISE · MIRA ROAD EASTPRAMANIK HOUSING PRIVATE LIMITED · P51700033946 · possession Dec 2025 · 100% built · 1 complaint
- RAUNAK CITY SECTOR VI - F3 · KALYANRAUNAK CORPORATION · P51700033972 · possession Dec 2028 · 75.9% built
- Rex Residency · ThaneEKDANTA DEVELOPERS PRIVATE LIMITED · P51700033974 · possession Dec 2028 · 45.9% built
- SACHINAM CO OP HSG SOCIETY · KULGAONSHREEKANTH DEVELOPERS · P51700033985 · possession Mar 2024 · 63.6% built
- RUSTTAGI AARAMBHA PHASE-III · TITWALARUSTAGI ESTATES PRIVATE LIMITED · P51700033998 · possession Feb 2027 · 90.9% built
- SHIV SONAL PALACE CHS LTD · AMBERNATH EASTSAI PRASAD BUILDERS AND DEVELOPERS · P51700034047 · possession Jan 2024 · 27.3% built
- SHREE CHARAN APARTMENT · MURBADSHREE MANGALMURTI ENTERPRISES · P51700034064 · possession Apr 2024 · 52.8% built
- Shree Datta Samartha CHSL · Near Railway StationShree Sai Swami Enterprises · P51700034066 · possession Jun 2023 · 90.9% built
- Mark 1 · ThaneM/S IJB Realty · P51700034134 · possession Dec 2027 · 50.7% built
- EVANA D-2 · THANEVIHANG INFRASTRUCTURE PVT LTD · P51700034145 · possession Dec 2029 · 45.9% built
- SAI WORLD · BORADPADA ROADPINNACLE CORPORATION · P51700034155 · possession Mar 2026 · 90.9% built
- DEVI HEIGHTS · UlhasnagarLUXUR AND LAVISH HOMES · P51700034179 · possession Jun 2026 · 77.3% built
- Sai Altezza · KatemanevaliSAI SHRADDHA CONSTRUCTIONS · P51700034218 · possession Dec 2026 · 53.6% built
- SAMRUDDHI HEIGHTS · BhiwandiShree Samruddhi Corporation · P51700034220 · possession Dec 2026 · 63.6% built
- CENTRAL PARK · ThaneHARMAIN ENTERPRISES · P51700034243 · possession Dec 2027 · 34.5% built
- RAJ INAAYA · PALEGAONMAHALAXMI CONSTRUCTION · P51700034259 · possession Dec 2023 · 90.9% built
- N G BLISS · GODDEVRNA Builders (NG) · P51700034305 · possession Dec 2026 · 55% built
- ORCHID TOWER · KALYANSKYVIEW BUILDERS & DEVELOPERS · P51700034353 · possession Jan 2027 · 38.5% built
- RAJ REGALIA PHASE-2 · NXT TO RELIANCE RESIDENCYAMRUT LAXMI DEVELOPERS · P51700034369 · possession Jun 2027 · 90.6% built
- CENTER ONE · MILLAT NAGARMURA REALTY LLP · P51700034376 · possession Dec 2026 · 122% built
- Tricity Montview · ThaneTRICITY REALTY LLP · P51700034413 · possession Dec 2026 · 100% built
- SEASONS ONE · KALYAN WESTUNIQUE ENTERPRISES · P51700034455 · possession Dec 2028 · 77.1% built
- Bhagwati Celeste · Bhaji Market DombivliSagar Homes · P51700034475 · possession Mar 2027 · 55.7% built
- SAI VIJAY HERITAGE · UlhasnagarVIJAY LALSINGH THAKUR · P51700034485 · possession Mar 2026 · 51.8% built
- LA GRANDEURE TOWER 1 · KalyanLA HOMES · P51700034532 · possession May 2027 · 84.5% built
- CRYSTAL CORNER · THANEADISHWAR ENTERPRISES · P51700034562 · possession Dec 2024 · 100% built
- SAI TIRTH PHASE II · JOVELIPINNACLE CORPORATION · P51700034566 · possession Mar 2025 · 90.9% built
- SAGAR KUNJ HIGHLAND · PATHARLI, DOMBIVLI EASTBSR Homes · P51700034568 · possession Dec 2027 · 61.4% built
- VARHAALA HEIGHTS · BhiwandiSARVASHIVA ENTERPRISES · P51700034584 · possession Mar 2028 · 88.2% built
- BLOSSOM HEIGHT · BADLAPUR EASTShiv Sai Constructions · P51700034602 · possession Dec 2028 · 45.5% built
- Pankaj Co-Op Housing Society Ltd. · Sahakar Colony, Brahmin Society, Thane (W)Aditya Associates · P51700034605 · possession Sept 2023 · 90.9% built
- Godrej Ascend Phase 1 · Dhokali NakaGodrej Properties Limited · P51700034608 · possession Apr 2028 · 39.6% built · 5 complaints
- Charms City A12 · TitwalaCharms Developers · P51700034654 · possession Jul 2024 · 2.3% built
- GAMI JADE · ThaneLAL GEBI INFRA PRIVATE LIMITED · P51700034661 · possession Dec 2025 · 100% built
- Kohinoor Eden Ph 2 · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700034683 · possession Sept 2026 · 77.7% built
- JAYRAM HEIGHTS · JAYRAM HEIGHTS STAR COLONY NEAR SAI BABA MANDIR P AND T COLONY SERVICE ROAD DOMBIVLI EAST 421201ASHAPURA ENTERPRISES · P51700034741 · possession Jul 2026 · 65.9% built
- VIHANG MARINA · BHAYENDERPADABALAJI ENTERPRISES · P51700034747 · possession Dec 2029 · 26.1% built
- ELITA D3 · OWALEVIHANG INFRASTRUCTURE PVT LTD · P51700034754 · possession Dec 2030 · 7.7% built
- 127 RAJ HOMES A WING · Penkar Pada ( Mahajanwadi)RAJ HOMES · P51700034776 · possession Aug 2026 · 90.9% built
- Madhu Milind Co-Op Housing Society Ltd · NaupadaAditya Associates · P51700034830 · possession Mar 2025 · 87.7% built
- ELITE RESIDENCE - A · MUMBRAELITE REALTY · P51700034881 · possession Dec 2026 · 81.8% built
- CHINTAMANI HABITAT JASMINE TYPE A-B-J · SHAHAPURJASHNANI CONSTRUCTION PRIVATE LIMITED · P51700034891 · possession Dec 2025 · 81.8% built
- ELITE RESIDENCE - B · MUMBRAELITE REALTY · P51700034893 · possession Dec 2026 · 81.8% built
- GAYATRI COMPLEX D WING · SHIRGAONOM SAI DEVELOPERS · P51700034938 · possession Dec 2027 · 72.7% built
- S3 Skyrise · Near Dahisar Checkpost, Mira Road (East) Taluka and District ThameS3 Smart Spaces Private Limited · P51700034944 · possession Dec 2027 · 8.6% built · 1 complaint
- Sai Narayana Residency · Bhiwandi ThaneMM Landmark Realty LLP · P51700034963 · possession Dec 2026 · 51.8% built
- DOSTI PLANET NORTH - SECTOR 3 · NEAR SHILPHATACHALAMA INFRAPROPERTIES PRIVATE LIMITED · P51700034985 · possession Dec 2028 · 40.9% built
- MADHUSUDAN BUILDING · KANSAI SECTIONMADHUSUDAN BUILDCON · P51700035033 · possession Dec 2026 · 17% built
- Aastha Omkar · BalyaniAastha Realtors · P51700035044 · possession Dec 2028 · 17% built
- OSIANS GARDEN - PHASE-II · NAGAONGLACIER DWELLINGS LLP · P51700035070 · possession Dec 2028 · 28.6% built
- SAVALIYA HEIGHTS · BHAYANDERSHREE SAVALIYA HOMES LLP · P51700035088 · possession Dec 2026 · 90.9% built
- BUDDHA HEIGHTS · NAVGHAR VILLAGEBuddha Enterprises · P51700035107 · possession Dec 2027 · 27.3% built
- Tycoons Square Avenue III Tower D · Konkan VasahatTycoons Avanti Projects Pvt. Ltd. · P51700035166 · possession Dec 2026 · 8.2% built · 3 complaints
- Datta Dham Apartment CHS · VADAVALITELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700035172 · possession Feb 2025 · 100% built
- Salasar Courtyard · Mira Road EastSalasar Maxus Builders LLP · P51700035177 · possession Dec 2027 · 65.2% built
- SAI WORLD DREAMS PHASE 1 · KalyanOut N Out Infotech India LLP · P51700035191 · possession Dec 2028 · 84.1% built
- RAUNAK SERENE · ThaneRAUNAK CORPORATION · P51700045210 · possession Dec 2028 · 35.9% built · 2 complaints
- APNA GHAR PHASE III NX · VILLAGE GHODBUNDERSeven Eleven Construction Pvt Ltd · P51700045229 · possession Mar 2027 · 0% built · 1 complaint
- KURM CASA · CHINCHPADARAJESH GANPATI JADHAV · P51700045240 · possession Dec 2026 · 72.7% built
- GAMI ASTERS B WING · ThaneTHALIA AND GAMI ENTERPRISES · P51700045247 · possession Dec 2026 · 98.6% built
- KEYUR CO-OPERATIVE HOUSING SOCIETY LTD · AMBERNATHDHANASHREE DEVELOPERS · P51700045253 · possession Dec 2029 · 9.1% built
- SUYOG APARTMENT · SAI SECTIONTELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700045255 · possession Mar 2025 · 49.1% built
- MIDTOWN W90 · OPP KAILASH GARDENMIDTOWN SHELTORS LLP · P51700045256 · possession Dec 2026 · 83.3% built
- Charms Padamavati Royal Phase 2 · S No 89 1A, 95 1A 95 2 and 95 10Charms Developers · P51700045389 · possession Apr 2027 · 33.9% built
- ALISHAN ARCADE - BUILDING NO. B1 · THANEPATANGWALA ASSOCIATES · P51700045401 · possession Mar 2027 · 51.8% built
- Charms Padamavati Royal Phase 1 · Survey No 89/1A, 95/1A, 95/2 and 95/10Charms Developers · P51700045436 · possession Apr 2027 · 41.9% built
- Magus City Tower 1 Selene · Additional Kalyan Bhiwandi Industrial AreaMAGUS INFRATECH PRIVATE LIMITED · P51700045444 · possession Apr 2027 · 81.1% built
- LAXMI AANGAN - MAHANADI, KRISHNA AND GANGA · DAWALEKanji Murji Mange · P51700045456 · possession Mar 2027 · 46.5% built
- Mahavir Spring -Daffodils-P3 · ThaneVinayak Developers · P51700045504 · possession Dec 2027 · 65% built
- VIRAJ ICONIC · BadlapurBONZER ORBIT · P51700045521 · possession Dec 2026 · 80% built
- NIDHI RESIDENCY · CHIKHLOLIADITYA YASH BUILDERS · P51700045522 · possession Mar 2027 · 35.4% built
- SAI PRAJAKTA · ThaneSUNIL MANGILAL JAIN · P51700045523 · possession Dec 2027 · 52.7% built
- ROHIT CO-OP HOUSING SOCIETY LTD · PanchpakhadiVEDANT CONSTRUCTION · P51700045536 · possession Dec 2024 · 89.1% built
- SILVER SQUARE · BHAYADNERRAMDEV VENKATESH HOUSING · P51700045618 · possession Dec 2026 · 32.7% built
- MARINE HEIGHTS · MILLAT NAGARQUBA REALTY LLP · P51700045622 · possession Jun 2028 · 50.5% built
- Sunrise Parkview Phase II · Padle VillageSukham Corporation Proprietor Sunrise Lifespaces LLP · P51700045660 · possession Dec 2029 · 13.6% built · 1 complaint
- SHREE SHANKHESHWAR ASHISH · UTHALSARRAJARAM CONSTRUCTION · P51700045694 · possession Dec 2026 · 90.9% built
- BSC IT PARK · Thanebansal steel corporation · P51700045736 · possession Jun 2026 · 90.9% built
- SAI POOJA · BADLAPURSAIRAJ ENTERPRISES · P51700045755 · possession Dec 2024 · 72.7% built
- SAGAR ENCLAVE · DAWALEKANCHAN BUILDERS & DEVELOPERS · P51700045775 · possession Dec 2026 · 51.8% built
- SHRADDHA PENINSULA · ThanePADMAGRIHA HEIGHTS · P51700045788 · possession Dec 2026 · 54.1% built
- L AND T SEAWOODS-JASPER AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045793 · possession Dec 2027 · 100% built · 1 complaint
- L AND T SEAWOODS - OPAL AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045794 · possession Jan 2027 · 100% built
- L AND T SEAWOODS - AMBER AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045795 · possession Dec 2027 · 100% built
- L AND T SEAWOODS - CORAL AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045802 · possession Jan 2027 · 65.7% built · 1 complaint
- Vasudev Laxmi Park · VARAP GAONTHANMAHESH MANOHAR SALPHALE · P51700045821 · possession Jan 2027 · 24.2% built
- SAMRUDDHI HEIGHTS · BADLAPURSAMRUDDHI ENTERPRISES · P51700045866 · possession Dec 2027 · 81.8% built
- ROSE RESIDENCY · KAMATGHARKUNAL RAMESH KARANIYA · P51700045898 · possession Sept 2026 · 38.4% built
- GAMI SOLITAIRE · KOPARKHAIRANEANIL LAXMAN GAMI · P51700045909 · possession Dec 2024 · 9.1% built
- AMBER ELLANCE A-2 · DAWLEAAKASH CORPORATION · P51700045936 · possession Dec 2027 · 90.9% built
- KOHINOOR RESIDENCY · BHIWANDIABRAR HAROON KHAN · P51700045947 · possession Dec 2026 · 90.9% built
- Radhe Govind Commercial Complex · Morivali AmbarnathShree Radha Construction · P51700045967 · possession Dec 2026 · 28.2% built
- AYKON · ThaneMETRO LIFESCAPES INDIA LLP · P51700046010 · possession Dec 2027 · 100% built · 2 complaints
- VASUNDHARA · MOUJE BELAVALI BADLAPUR WESTRUDRA DEVELOPERS · P51700046028 · possession Dec 2026 · 55.5% built
- AHMAHF EMPIRE - WING A · KALYAN EASTAHMAHF REALTY & DEVELOPERS · P51700046092 · possession Jun 2028 · 79.1% built
- RUSTOMJEE LA FAMILIA- WING C · RUSTOMJEE URBANIAKapstone Constructions Private Limited · P51700046128 · possession Jun 2027 · 43.8% built
- Alishan Park 3 · Near Chhatri BunglowAliakbar Yusuf Zojwalla · P51700046147 · possession May 2027 · 81.8% built
- Olivia Bliss · KalherJai Bhawani Orchid Infra LLP · P51700046158 · possession Dec 2026 · 72.7% built
- ALLIAANCE ICON · ThaneSATYAM INFRA · P51700046173 · possession Dec 2026 · 100% built
- ASHTAVINAYAK · SAI BABA MANDIRPARISPARSH · P51700046185 · possession Apr 2025 · 10% built
- Omkar Residency A-Wing · BhiwandiK K GROUP · P51700046189 · possession Dec 2026 · 44.1% built
- Sai Siddhi Residency · DOMBIVALIDEVENDRA DAMODAR PATIL · P51700046244 · possession Sept 2026 · 51.8% built
- ALPHA RESIDENCY · BhiwandiAGNETA CONSTRUCTIONS · P51700046254 · possession May 2027 · 90.9% built
- MEGA PEARL · Manda TitwalaMega Creative LLP · P51700046279 · possession Dec 2026 · 51.3% built
- CENTONIC · ThaneMETRO LIFESCAPES INDIA LLP · P51700046286 · possession Jun 2027 · 90.9% built
- Hundiwale · ThaneAditya Associates · P51700046290 · possession Sept 2023 · 90.9% built
- SHREEJI GREENS · BADLAPURDEEP LAXMI ASSOCIATES · P51700046293 · possession Jul 2026 · 81.8% built
- RUNWAL LANDS END · KolshetRunwal Construction Private Limited · P51700046298 · possession Jun 2029 · 36.4% built
- AMEYA GARDEN PHASE II · TISGAONAMEYA ENTERPRISES · P51700046302 · possession Jun 2027 · 81.8% built
- Elanor - Tower 2 · DhokaliLODHA DEVELOPERS LIMITED · P51700046313 · possession Dec 2031 · 7.7% built · 1 complaint
- TISAI SRUSHTI PHASE 1 · KALYANVVKS DEVELOPERS PRIVATE LIMITED · P51700046320 · possession Dec 2027 · 56.4% built
- SILVER RESIDENCE · KALYAN WESTHARIS BUILDERS AND DEVELOPERS · P51700046336 · possession Dec 2027 · 27.3% built
- ELITE RESIDENCE - C · MUMBRAELITE REALTY · P51700046346 · possession Dec 2026 · 81.8% built
- VAISHNAVI PRIDE · CHINCHPADAVAISHNAVI DEVELOPERS · P51700046405 · possession Dec 2026 · 55.2% built
- RAUNAK BLISS B1 · ThaneUNNATHI ASSOCIATES · P51700046534 · possession Dec 2029 · 62.3% built · 1 complaint
- Ace Enclave · MogharpadaAce Signature Homes LLP · P51700046536 · possession Dec 2026 · 81.8% built · 1 complaint
- Godrej Ascend Phase 2 · Dhokali NakaGodrej Properties Limited · P51700046541 · possession Dec 2028 · 36.4% built · 1 complaint
- RAUNAK BLISS B3 · Vadavali & OwaleUNNATHI ASSOCIATES · P51700046564 · possession Dec 2029 · 74.5% built · 8 complaints
- RAUNAK BLISS B2 · Vadavali & OwaleUNNATHI ASSOCIATES · P51700046565 · possession Dec 2029 · 61.8% built
- Shiv Paradise · ShirgaonShiv Corporation · P51700046607 · possession Dec 2025 · 90.9% built
- Bungalow K 53 · ThaneRekha Mohanlal Nensi Tanna Bhimjyani · P51700046611 · possession Jan 2023 · 100% built
- EMPIRE HERITAGE · PANCHPAKADILAKHANI BUILDERS PVT LTD · P51700046624 · possession Jul 2027 · 56.5% built
- Senwin Residency · WaldhuniSenwin Divine Ventures · P51700046632 · possession Mar 2025 · 79.5% built
- Antalya · ThaneM/S Sara Realty · P51700046637 · possession Jun 2027 · 81.8% built
- Dashmesh Empire · Next to Godrej VihaDashmesh Infrastructure · P51700046663 · possession Jun 2027 · 80.9% built
- RAUNAK BLISS A4 · Vadawali & OwaleUNNATHI ASSOCIATES · P51700046674 · possession Dec 2029 · 70% built · 4 complaints
- THE HARMONY · VISHUNAGAR DOMBILVI WESTTHE IMPRESSIONS · P51700046683 · possession Dec 2027 · 32.7% built
- Morivali Richmand Park · Mauje MorivaliSHREE KHODIYAR BUILDCON · P51700046687 · possession Nov 2025 · 52.7% built
- Globe Estate - Next · KalyanVijay Paper Product · P51700046696 · possession Dec 2026 · 71.4% built
- URBAN GRANDEUR BLDG-2 · MIRAROAD ECLLARO ENTERPRISES LLP · P51700046697 · possession Jun 2027 · 100% built · 4 complaints
- CHAVAN ADVAITAM · Near Sandip HotelSAIDEEP CONSTRUCTIONS · P51700046731 · possession Dec 2026 · 21.1% built
- ZENITH · ThaneRUNWAL DEVELOPERS LIMITED · P51700046734 · possession Sept 2028 · 48.5% built
- URBAN NEST BLDG - 1 · BEVERLY PARK MIRA ROAD EASTCLLARO ENTERPRISES LLP · P51700046736 · possession Dec 2024 · 90.9% built
- EMPIRE PRESIDENCY · PANCHPAKHADILAKHANI BUILDERS PVT LTD · P51700046747 · possession Jul 2027 · 50% built
- Ananta Residency · ThaneSuresh Lacchiram Agarwal · P51700046757 · possession Jun 2027 · 77.3% built
- AARADHYA PARKWOOD 1 · NEAR SINGAPORE INTERNATION SCHOOLMAN VASTUCON LLP · P51700046758 · possession Dec 2028 · 100% built · 3 complaints
- SAI WORLD LEGEND PHASE II · UlhasnagarParadise Lifestyles Private Limited · P51700046767 · possession Dec 2029 · 59.4% built
- SHIVSHAKTI OASIS · SHIRGAONSHIVSHAKTI GENESIS · P51700046768 · possession Dec 2026 · 72.7% built
- Rumah Bali Phase 4 · BhainderpadaPuranik Builders Limited · P51700046777 · possession Dec 2028 · 35.4% built · 1 complaint
- GREEN SQUARE · KAVESAR GHODBUNDER ROAD BEHIND D MARTSQUAREFEET ENTERPRISES · P51700046932 · possession Dec 2027 · 88.2% built
- WINSTONE BUILDING TYPE - E · BEVERLY PARKPNK Construction · P51700046957 · possession Dec 2026 · 31.9% built
- FULORA CO-OP HOUSING SOCIETY LTD · BADLAPUR EASTPINNACLE CREATORS · P51700046975 · possession Jul 2025 · 90.9% built
- SATYAM SHEELA WING F · AmbarnathSHREEJI DEVELOPERS · P51700046976 · possession Jul 2026 · 90.5% built
- Empire Industrial Centrum Phase 5 · AmbarnathEMPIRE INDUSTRIES LTD · P51700047011 · possession Jun 2027 · 33.9% built
- Morivali Prarambh · MaujeSHREE KHODIYAR BUILDCON · P51700047016 · possession Nov 2024 · 86.4% built
- Shanti Legacy · ThaneAnmol Infra · P51700047026 · possession Mar 2025 · 29.1% built
- Shree Kacharnath CHS Ltd · Chole VillageAMOGH ASSOCIATES · P51700047049 · possession Dec 2024 · 85.5% built
- SHIVAM RESIDENCY PHASE II · BhiwandiSHIVAM DEVELOPERS · P51700047055 · possession Dec 2026 · 40% built
- AUROVILLE A AND B WING · SANDAPARYA CONSTRUCTION · P51700047056 · possession Dec 2025 · 81.8% built
- SUDAMA ELEVATE · AmbarnathSUDAM ZIPA RASAL · P51700047064 · possession Dec 2026 · 47.3% built
- AVIGHNA BUILDING NO 3 · CHHEDA GREENSCHHEDA DEVELOPMENTS · P51700047096 · possession Dec 2026 · 90.9% built
- S3 Skygreens · Near Dahisar Checkpost Mira Road East Taluka and District ThaneS3 Smart Spaces Private Limited · P51700047108 · possession Jun 2028 · 2.3% built
- Mangalmurti Heights · Opposite Bank of India, ShahadRamesh Nanalal Jain · P51700047233 · possession Mar 2027 · 80.9% built
- RUKMANI RESIDENCY · Kasar AliCLAY NEST DEVELOPERS · P51700047237 · possession Dec 2027 · 49.5% built
- SARAS RESIDENCY · NEAR MODEL COLLEGEBALAJI GROUP BUILDERS & DEVELOPERS · P51700047251 · possession Dec 2027 · 61.7% built
- Aaraadhy Imperial · Tilak NagarNirmaan Realty · P51700047256 · possession Aug 2024 · 41.8% built
- RAJ SILVERSTONE PHASE-2 · BELAVALI BADLAPUR WESTSKYSPACE BUILTEK · P51700047261 · possession Jul 2026 · 71.4% built
- EKATVA ONYX · ThaneVERTICAL REALTORS PRIVATE LIMITED · P51700047272 · possession Jun 2026 · 62.3% built
- GANESH DARSHAN · PENKARPADA MAHAJANWADIJ.V. REALTY · P51700047281 · possession Jul 2026 · 27.3% built
- GALAXY HERITAGE · UlhasnagarGRAND GALAXY SUPERSTRUCTURES PRIVATE LIMITED · P51700047350 · possession Dec 2023 · 100% built
- RITZ TOWER B · SHREE COMPLEX PHASE IIIVIKAS HARAKCHAND JAIN · P51700047353 · possession Sept 2026 · 42.7% built
- VISION SRUSHTI 1 · ASANGAONM/S MANGALDEEP ENTERPRISES · P51700047364 · possession Dec 2026 · 77.3% built
- ASHAR PULSE · MAJIWADAMs ASHAR VENTURES · P51700047432 · possession Dec 2028 · 5.9% built
- Gajanan Superbia · Dombivli EastRiddhi Siddhi Developers · P51700047450 · possession Dec 2026 · 50.7% built
- PARK ONE, PHASE I · BADLAPUR EASTSHREE LAXMI ENTERPRISES · P51700047479 · possession Aug 2026 · 68.9% built
- THARWANI ARIANA PHASE IV · CHIKLOLIANIL HARDASMAL THARWANI · P51700047534 · possession Jun 2026 · 36.6% built
- Puraniks Unicorn Phase 2 · Near Puranik City ReservaPuranik Builders Limited · P51700047561 · possession Dec 2029 · 50.4% built
- Vedant Millenia Happiness Phase II Wing E · TITWALA (EAST)MOHAN HARDASMAL THARWANI · P51700047571 · possession Dec 2029 · 0% built · 1 complaint
- TOWER INDUSTRIAL PARK · ThaneTOWER ENGINEERING PRIVATE LIMITED · P51700047580 · possession Sept 2027 · 81.8% built
- AADI ARAMBH SHIVKANTA · AmbernathD A CONSTRUCTION · P51700047627 · possession Dec 2025 · 100% built
- Courtyard - Asteria A · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700047633 · possession Dec 2027 · 90% built
- PREMSADAN CHS · G B PATHARLINAMRATA REALTORS · P51700047653 · possession Jul 2026 · 67.3% built
- Courtyard - Asteria B · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700047655 · possession Dec 2027 · 84% built
- WAGLE TRADE SQUARE · ThaneSQUAREFEET REAL ESTATE · P51700047689 · possession Aug 2027 · 86.6% built
- NEELKANTH SADAN · THANESHREEJI ENTERPRISES · P51700047708 · possession Jul 2026 · 70.5% built
- RITZ TOWER C · SHREE COMPLEX PHASE IIIVIKAS HARAKCHAND JAIN · P51700047718 · possession Sept 2026 · 61.8% built
- SHARDA EMPORIO · NEAR AMAN TALKIESSHARDA INFRA · P51700047731 · possession Dec 2025 · 23.6% built
- LAXMI ARCADE · NEAR POST OFFICE SHAHAPURSATISH KASHINATH GUJARATHI · P51700047732 · possession Dec 2024 · 40% built
- Raghunath Heights · S No 105 H No 04Khrushna Infrastructure Builders & Developers · P51700047773 · possession Dec 2028 · 15.2% built
- Gami Terra · ThaneLAL GEBI INFRA PRIVATE LIMITED · P51700047776 · possession Dec 2026 · 100% built
- Harikunj Enclave · Brahman Society, NaupadaSamir Shrinivas Kale · P51700047799 · possession Aug 2025 · 80.9% built
- SANGLES TRINITY · GAURIPADASANGLE ENTERPRISES PRIVATE LIMITED · P51700047810 · possession Jul 2028 · 50.5% built · 1 complaint
- KRISHNAPINGAKSHA · APTEWADIPRASHANT TUKARAM BAEET · P51700047833 · possession Dec 2026 · 73.6% built
- The Pentagon · ThaneANJANI KUMAR COMPANY PRIVATE LIMITED · P51700047942 · possession Dec 2026 · 55% built
- MILLANO HEIGHTS · UlhasnagarCHIMNANI CONSTRUCTIONS · P51700047948 · possession Dec 2025 · 86.8% built
- DINKAR ELITE · Opp Don Bosco SchoolEKDANT ENTERPRISES · P51700047950 · possession Dec 2028 · 72.7% built
- Baliram Tare Residency · CHINCHPADA GAONTARE GROUP BUILDERS AND DEVELOPERS · P51700047951 · possession Dec 2028 · 45.5% built
- OM ASHISH CHS · GANESH NAGARGREEN HEIGHTS INFRA · P51700047977 · possession Dec 2026 · 48.9% built
- Shiv ganga Apartment · UlhasnagarSHREE SWAMI SAMARTH CONSTRUCTION · P51700047981 · possession Dec 2024 · 45.5% built
- Mangeshi Arcade II · KolivaliMangesh Dashrath Gaikar · P51700047988 · possession Feb 2027 · 81.8% built
- SONAL RESIDENCY · VILLAGE KANSAIRAJNB HOUSING LLP · P51700047994 · possession Mar 2025 · 67.7% built
- Sukh Ganga Residency · ShirgoanM/s Neev Infinity · P51700047995 · possession Dec 2026 · 81.8% built
- Shivam Homes Wing A and B · Badlapur EastShivam Homes · P51700048026 · possession Dec 2025 · 81.8% built
- LAXMAN RESIDENCY · BHIWANDICrystal Krishraj · P51700048029 · possession Dec 2026 · 43.2% built
- Thanekar Civic Phase II · Chikhloli BadlapurThanekar Construction LLP · P51700048038 · possession Dec 2024 · 51.1% built
- OSTWAL PARADISE BUILDING NO.9 WING A - B - C · MIRA ROAD EASTSHREE OSTWAL BUILDERS LTD · P51700048041 · possession Dec 2028 · 47.8% built
- OM DATTATRAY CHS LTD · SHIV GANGA NAGARSHIV SHAKTI DEVELOPERS · P51700048053 · possession Dec 2024 · 72.7% built
- HEERA KRUSHNA · CHARAIA AND J CONSTRUCTIONS · P51700048066 · possession Jan 2028 · 39.5% built
- Balaji Heritage · BelavaliBalaji Developers · P51700048085 · possession Dec 2025 · 79.5% built
- Sai Flora · KatrapM/S MITRA REALITY · P51700048154 · possession Dec 2026 · 89.1% built
- SALASAR AAVATAR · MIRA ROAD EASTSalangpur Gruh Nirman · P51700048170 · possession Dec 2027 · 43.4% built
- KULSWAMINI · BADLAPUR EASTSHREE SAI BUILDERS · P51700048200 · possession Dec 2026 · 100% built
- Thane Shivam Chs Ltd · PachpakhadiMahesh Shriram Borkar · P51700048226 · possession Dec 2026 · 67.3% built
- MANOHAR MAHAL · PANCHPAKHADISHARDA VASTU NIRMITEE PVT. LTD. · P51700048230 · possession Dec 2025 · 81.8% built
- ADITYA HEIGHTS · MANDARATNAKAR DHARMA PATIL · P51700048244 · possession Jun 2025 · 90.9% built
- JHALAK ELENZA · AmbernathSHIVAM CONSTRUCTION CO · P51700048248 · possession Dec 2026 · 81.8% built
- 25HOURLIFE - Tower B1 · PunchpakhadiRUNWAL DEVELOPERS LIMITED · P51700048270 · possession Dec 2029 · 70.5% built · 3 complaints
- 25HOURLIFE - Tower C1 · PanchpakhadiRUNWAL DEVELOPERS LIMITED · P51700048278 · possession Dec 2029 · 57.8% built · 2 complaints
- Deep Dhara · At Village - Kharvai, BadlapurM/s. Deepali Infracon LLP · P51700048280 · possession Dec 2026 · 80.9% built
- Patel Mount · Chikanghar, Kalyan WestPatel Group & Co · P51700048299 · possession Dec 2026 · 49% built · 1 complaint
- Raunak White House · KolsetRAUNAK AVENUE REALTY · P51700048307 · possession Dec 2028 · 33.5% built
- VEDANT D5 · ThaneSAHEBRAO VITHAL SATRE · P51700048308 · possession Dec 2023 · 60.9% built
- DGT - Sector 3A - Cluster 2 - Phase 1 · Kalher JunctionADRIKA DEVELOPERS PRIVATE LIMITED · P51700048334 · possession Dec 2027 · 53.3% built · 1 complaint
- Deep Nirvana · KolsewaddiDeepali Infraprojects · P51700048358 · possession Dec 2026 · 35.9% built
- Courtyard - Asteria C · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700048420 · possession Dec 2027 · 62.7% built
- VISHWA SKY HIGH · BELAVALI BADLAPUR WESTVINEET INFRASTRUCTURE · P51700048435 · possession Nov 2027 · 48.4% built
- Vishnu Altezza · Belavali BadlapurVISHNU INFRA · P51700048439 · possession Dec 2027 · 41.1% built
- Q Islands R6 · ThaneAurum RealEstate Developers Limited · P51700048523 · possession Dec 2027 · 42.7% built
- Chandraprabhakar Co-operative Housing Society Limited · Garibcha wada Dombivli westMellennium Homes · P51700048538 · possession Apr 2025 · 87.3% built
- Shree Siddhivinayak · Near Ashok TalkiesShree Siddhivinayak Developers · P51700048570 · possession Jun 2025 · 100% built
- SHREE ANANDI IMPERIAL · Dombivli EastJAI MALHAR BUILDERS & DEVELOPERS · P51700048585 · possession Dec 2026 · 85.3% built
- Stellar · Thane westTrimity Realty LLP · P51700048590 · possession Jun 2029 · 37.4% built
- SAI HANUMAN TOWER B WING · RAIOM SAI BABA BUILDERS · P51700048598 · possession May 2025 · 89.1% built
- VIGHNAHAR APARTMENT · CHERPOLIROHIL ENTERPRISES · P51700048613 · possession Nov 2024 · 100% built
- Dipti Skycity Bldg No. 7 · Ambernath East District thaneDipti Home Makers Pvt Ltd · P51700048627 · possession Dec 2026 · 47.6% built
- Q Islands R7 · ThaneAurum RealEstate Developers Limited · P51700048656 · possession Dec 2027 · 51.7% built
- Shree Ganesh Apartment · UlhasnagarSHRI GANESH BUILDER AND DEVELOPERS · P51700048692 · possession Dec 2024 · 72.7% built
- PRADHAN MANTRI AWAS YOJANA - URBAN · BADLAPUR EASTKULGAON BADLAPUR MUNICIPAL COUNCIL · P51700048693 · possession Dec 2027 · 25.8% built
- SWEET DREAM HEIGHTS · DREAMLAND PARKSWAMINI BUILDERS AND DEVELOPERS · P51700048696 · possession Dec 2029 · 55.2% built
- ASHTAVINAYAK RESIDENCY · THANEASHVATTHA REALTY LLP · P51700048703 · possession Sept 2026 · 51.8% built
- SUMEET ELITE · ThaneVEDANT CONSTRUCTION · P51700048753 · possession May 2027 · 77.3% built