27,983 registered projects with disclosed construction progress or complaint records. Page 12 of 56.
Thane
- Metropolis - Aquaris Phase 2 · KasarvadavliANANT SQUARE · P51700022959 · possession Sept 2025 · 90.9% built
- Metropolis - Aquaris Phase 1 · KasarvadavliANANT SQUARE · P51700022961 · possession Sept 2024 · 90.9% built
- Mahindra Happinest Kalyan Project A · Bhiwandi Kalyan JunctionMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P51700022981 · possession Dec 2024 · 81.8% built · 4 complaints
- Mahavir Spring - Daffodils - Phase 2 · Pokhran Road No. 2Vinayak developers · P51700022995 · possession Dec 2025 · 79.5% built
- Prakash Pratima · GARIBACHA WADAAnant Developers · P51700022999 · possession Dec 2023 · 43.6% built
- SHETH CNERGY PH 1 - UPTO 11TH FLOOR · PANCH PAKHADISheth Developers Private Limited · P51700023047 · possession Apr 2028 · 41.5% built · 6 complaints
- PATELS RESIDENCY - E WING · AMBARNATHPARAM BUILDERS AND DEVELOPERS · P51700023093 · possession Dec 2023 · 9.1% built
- STANBERTH ANNEX · UthalsarShivam Developers · P51700023104 · possession Dec 2026 · 67.3% built · 2 complaints
- Plan M Business PArk · ThaneVishwagreen Plus LLP · P51700023125 · possession Feb 2028 · 51.7% built · 2 complaints
- KONARK SOLITAIRE - PHASE II · AmbivaliKONARK REALTIES J.V. · P51700023163 · possession Dec 2022 · 90.9% built
- PODDAR RIVIERA PHASE - II · MHARALPoddar Housing and Development Limited · P51700023181 · possession Dec 2026 · 0% built · 1 complaint
- LJTANNA PANORAMA C WING · KalyanLJTANNA REALTY LLP · P51700023193 · possession Dec 2021 · 90.9% built
- RAMASHANKAR CHS LTD · KHARKAR ALISAI PRASAD BUILDERS AND DEVELOPERS · P51700023241 · possession Oct 2026 · 72.3% built
- SHRI VENKATESH KRUPA · BADLAPURMODI DEVELOPERS · P51700023261 · possession Dec 2023 · 46% built
- PODDAR RIVIERA PHASE - III · MHARALPoddar Housing and Development Limited · P51700023296 · possession Dec 2026 · 0% built · 2 complaints
- SHIVAM RESIDENCY-PHASE 1 · TEMGHARSHIVAM DEVELOPERS · P51700023348 · possession Apr 2027 · 90% built
- POKHRIYAL PARADISE · CHINTAMANI CHOWK, BADLAPUR (W)POKHRIYAL AND ASSOCIATES · P51700023364 · possession Oct 2022 · 27.3% built
- Anand Bhavan Co op Hsg. · BHAKTI MANDIR ROADShri Swami Samarth Developers · P51700023371 · possession Jun 2027 · 55.9% built
- NICE GARDEN 2 · SHILABHA BUILDERS · P51700023376 · possession Oct 2026 · 90.9% built
- VARDHAMAN VATIKA · KAMATGHARVARDHAMAN ENTERPRISES · P51700023391 · possession Jul 2027 · 90.9% built
- IMPERIAL GREENS · GARIBACHA WADASHREE DHANLAXMI PROPERTIES AND DEVELOPERS · P51700023481 · possession Mar 2027 · 63.6% built
- Regency Plaza · BadlapurSHREE SAI VENTURES · P51700023483 · possession Dec 2026 · 72.7% built
- GANRAJ ARCADE · BADLAPUR VILLAGEG G DEVELOPERS · P51700023490 · possession Mar 2022 · 63.6% built
- Padamavati Royal Phase 2 · TITWALASujeet Kumar Jeetpratap Singh · P51700023536 · possession Apr 2030 · 61.4% built
- RADHA KRISHNA PARK · ThaneSPACE DEVELOPERS · P51700023545 · possession Jun 2027 · 163.6% built
- LJTANNA PANORAMA B WING · KalyanLJTANNA REALTY LLP · P51700023550 · possession Jan 2025 · 100% built · 1 complaint
- Anmol Oasis · Bhaskar colonyM/s Ekdant Housing · P51700023557 · possession Jul 2024 · 90.9% built
- TRUSHNA CHS LTD · PANCHPAKHADIMahesh Shriram Borkar · P51700023568 · possession Jun 2024 · 77.5% built
- JEEVAN CHS LTD · PANCHPAKHADISHARDA VASTU NIRMITEE PVT. LTD. · P51700023605 · possession Oct 2023 · 90.9% built
- JAYRAM MALI COMPLEX · GANESH TEMPLEM/S EKVEERA CONSTRUCTIONS · P51700023739 · possession Dec 2026 · 81.8% built
- Q Islands R4 · GhansoliAurum RealEstate Developers Limited · P51700023775 · possession Dec 2024 · 100% built · 4 complaints
- THARWANI MILLENNIUM CITY PHASE III · BADLAPURTHARWANI REALTORS · P51700023784 · possession Apr 2027 · 0% built · 2 complaints
- AARADHYA PRIMUS · NEAR SINGAPORE INTERNATIONAL SCHOOLMAN VASTUCON LLP · P51700023844 · possession Mar 2023 · 81.8% built
- REGENCY ANTILIA PHASE IV · UlhasnagarREGENCY NIRMAN LTD · P51700023854 · possession Jun 2022 · 81.8% built
- THARWANI MAJESTIC TOWERS PHASE II · KALYANANIL HARDASMAL THARWANI · P51700023872 · possession Apr 2027 · 34.5% built · 1 complaint
- Sagar Apt · ThaneSilver & Rashi Constructions · P51700023901 · possession Nov 2027 · 65.5% built
- JP North Aviva · Vinay NagarJP Infra Realty Private Limited · P51700023940 · possession Dec 2026 · 90.9% built · 3 complaints
- SADGURU KRUPA II PHASE · VARAPCHIRAG ENTERPRISES · P51700023944 · possession Oct 2026 · 90.9% built
- THARWANI MILLENNIUM CITY PHASE I · BADLAPURTHARWANI REALTORS · P51700023974 · possession Jul 2023 · 95.9% built
- PAULOMI CHSL · NEAR TEEN PETROL PUMPOJASS GOVIND INFRA LLP · P51700023999 · possession Dec 2022 · 100% built
- Vaikunth Cluster 3 T1 · ThanePEPL Developers Pvt Ltd · P51700024023 · possession Jun 2027 · 90.9% built · 10 complaints
- Mohan Willows Commercial · SHIRGAONMOHAN LIFESPACES LLP · P51700024089 · possession Mar 2022 · 90.9% built
- Saayam Visava · Middle class Soc.Shrikrishna Ramchandra Marathe · P51700024133 · possession May 2023 · 73.6% built
- YASHRAJ PARADISE · SHREE MALANG ROAD RELAX GARDEN NEAR NANDIVALI BUS STOP KALYANYASH INFRA · P51700024174 · possession Apr 2028 · 64.6% built
- Shashwat Aangan Building / Wing B · WalivaliSamarth Construction · P51700024178 · possession Dec 2027 · 20.6% built
- SHRI SHIVANAND CHS · BHASKAR COLONYTrimity Constructions · P51700024183 · possession Aug 2024 · 81.4% built · 1 complaint
- ATMIYA RESIDENCY · AMBERNATHAKSHAR INFRA · P51700024195 · possession Apr 2028 · 67.4% built
- SHREE RAM HEIGHTS · MIRA ROAD EASTVAVYA ENTERPRISES · P51700024218 · possession Apr 2027 · 64% built
- MM VALLEY A-1 · KAUSA-MUMBRA-THANEALFA ENTERPRISES · P51700024240 · possession Dec 2025 · 79.8% built · 1 complaint
- Anjani Pride · Mira Road (East)Geeta Developers · P51700024335 · possession Dec 2025 · 88.6% built
- SKY CITY · BhiwandiSUNRISE REALTORS · P51700024337 · possession Oct 2028 · 31.6% built
- MAYUR CHS LTD · NAUPADAMahesh Shriram Borkar · P51700024371 · possession Dec 2023 · 90.9% built
- Qualcon Business Park · KalyanSharp Textile Mills Pvt Ltd · P51700024425 · possession Dec 2026 · 56.4% built
- HORIZON EXOTICA · BorivadeK M REALTY · P51700024438 · possession Dec 2026 · 90.9% built
- ARZOO GREENS · BhadvadSKYBOUND HEIGHTS INDIA PRIVATE LIMITED · P51700024463 · possession Mar 2030 · 20.1% built
- OSTWAL HORIZON · NAVGHAR MIRA ROAD EASTSHREE OSTWAL BUILDERS LTD · P51700024492 · possession Apr 2029 · 89.5% built
- Godrej Exquisite · KavesarGodrej Macbricks Private Limited · P51700024496 · possession Apr 2028 · 56.7% built · 7 complaints
- MANGESHI DAZZLE II · THAKURLI EKALYAN DEVELOPMENT CORPORATION · P51700024511 · possession Apr 2029 · 44.8% built
- Mangeshi Jupiter · AmbivaliMangesh Dashrath Gaikar · P51700024517 · possession Dec 2024 · 23.2% built
- SHREERAM CO OP SOCIETY · KPARKHAIRANERAHUL ENTERPRISES · P51700024549 · possession Dec 2023 · 90.9% built · 1 complaint
- MAHAVIR SQUARE · MANPADATHANE SQUAREFEET LIFESTYLES LLP · P51700024701 · possession Dec 2027 · 86.4% built
- GURUPRERNA · NAIK WADIAMARSINGH NARAYANSINGH THAKUR · P51700024709 · possession Oct 2024 · 100% built
- YESU ANAND HEIGHTS · NANDIVALI GAONYESU ANAND ENTERPRISES · P51700024758 · possession Nov 2026 · 81.8% built
- Rose Tower · SHANTI GARDENAKSHAR SHANTI REALTORS PRIVATE LIMITED · P51700024772 · possession Apr 2031 · 47.6% built
- Amber Galaxy C Wing · VITAWAPANDHARINATH SITARAM PATIL · P51700024773 · possession Mar 2026 · 26.8% built · 1 complaint
- DEEP LAXMI HEIGHT · BHIWANDIDEEPLAXMI HEIGHTS · P51700024784 · possession Apr 2028 · 80.9% built
- SAKET WORLD · Near Chetana SchoolAnand Associates · P51700024797 · possession Jun 2026 · 11.3% built
- Lodha Bellavista - Wing B1 · Off. Ghodbunder Road, ThaneLODHA DEVELOPERS LIMITED · P51700024815 · possession Jul 2028 · 1 complaint
- AMAR VIJAY CHS LTD · STATION ROADJ.V. ENTERPRISES · P51700024853 · possession Sept 2024 · 82.5% built
- VALENCIA · MAHATMA PHULE ROADIMPRESSIONS · P51700024879 · possession Jul 2027 · 70.9% built
- CHINTAMANI MEADOWS · SHAHAPURJASHNANI CONSTRUCTION PRIVATE LIMITED · P51700024889 · possession Dec 2026 · 75.5% built
- Gayatri Elegance · ThaneGayatrikripa Developers Private Limited · P51700024926 · possession Dec 2026 · 61.1% built
- MANOHAR VIKAS SHREEJI PARAISO PHASE - 2 · KATRAP LAKEDEEPLAXMI DEVELOPERS · P51700024942 · possession Mar 2029 · 87.3% built
- SAI WORLD LEGEND · UlhasnagarParadise Lifestyles Private Limited · P51700025002 · possession May 2026 · 45.8% built
- Fennelia Commercial · Off Ghodbunder RoadAcme Housing India Private Limited · P51700025082 · possession Jul 2027 · 0% built
- M Square IT Park · Wagle Industrial EstatePaper Flutings · P51700025102 · possession Jan 2027 · 70.5% built
- 24 HIGH · OPP DY PATIL STADIUMDREAM APEX REALTIES LIMITED · P51700025150 · possession Apr 2026 · 60.9% built · 1 complaint
- Mahavir Sarvoday Plaza · Dombivli WestVIRA THEATRES PVT LTD · P51700025161 · possession Mar 2026 · 100% built
- Kamdhenu23-west · ThaneAccura Developers LLP · P51700025164 · possession May 2025 · 75.5% built
- ARYA ARIANA · DOMBIVLIASHAPURA CORPORATION · P51700025165 · possession Jan 2027 · 68.2% built
- PADMADISHA PARADISE - BUILDING 2 · TemgharPADMADISHA PARADISE · P51700025271 · possession Apr 2027 · 90.9% built
- KASTURI VAN · ThaneGUJARAT ESTATE · P51700025276 · possession Dec 2029 · 18.2% built
- GAMI ASTERS A WING · ThaneTHALIA AND GAMI ENTERPRISES · P51700025311 · possession Apr 2027 · 98.6% built
- PARSHURAM TOWER · TALUKA KALAYNMORESHWAR CONSTRUCTIONS · P51700025480 · possession Sept 2026 · 71.5% built
- Olive - Phase III - Pranjee Garden City · KatrapPranjee Properties Pvt. Ltd · P51700025487 · possession Oct 2026 · 79.6% built
- SAI VAIBHAV PARADISE · SHRIDHAR MHATRE CHOWKSHREE SAI DEVELOPERS · P51700025525 · possession Jun 2022 · 39.1% built
- SALASAR EXOTICA - I · MIRA ROAD EASTSalasar Associates · P51700025546 · possession Jun 2025 · 100% built
- PLUTONIUM BUSINESS PARK · ThanePLUTONIUM BUSINESS SOLLUTION PRIVATE LIMITED · P51700025606 · possession Oct 2026 · 74.1% built
- PUSHKAR CO OP HSG SOCIETY PRAPOSED · OPP DNC HIGH SCHOOLAMEYA DEVELOPERS · P51700025616 · possession Feb 2024 · 28% built
- CENTRUM BUSINESS SQUARE PHASE 1 · ThaneSQUAREFEET CONSTRUCTION · P51700025651 · possession Jun 2027 · 100% built
- Vraj Vatika · ThaneVraj Vatika · P51700025676 · possession Jun 2026 · 36.4% built
- Prapti Heritage · Manjarli Badlapur WestTridev Enterprises · P51700025683 · possession Jun 2025 · 90.9% built
- BUILDING A1-SHREE KRUPA HEIGHTS · TISGAONSHREE KRUPA BUILDERS AND DEVELOPERS · P51700025692 · possession Jun 2026 · 90.9% built
- SHRUTI APARTMENT · ThaneVIKRANT V RAIKAR HUF - - · P51700025732 · possession Nov 2023 · 39.2% built
- Udaynagar Chs · PanchpakhadiNatu Paranjape Realty · P51700025743 · possession Jul 2028 · 37% built
- Provident Palmvista B1 · -Provident Housing Limited · P51700025841 · possession Oct 2028 · 38.5% built
- Provident Palmvista D4 · -Provident Housing Limited · P51700025842 · possession Oct 2028 · 43.7% built
- Provident Palmvista D3 · -Provident Housing Limited · P51700025849 · possession Oct 2028 · 41% built
- Provident Palmvista D2 · -Provident Housing Limited · P51700025854 · possession Oct 2028 · 22.7% built
- Superio Grand Central · ThaneFortune Infracreators Private Limited · P51700025980 · possession Jan 2031 · 42.7% built · 16 complaints
- NICE GARDEN 1 · SHILLABHA CONSTRUCTIONS · P51700026058 · possession Jun 2026 · 81.8% built
- MALI PINNACLE · HAJIMALANG ROADMALI INFRA · P51700026067 · possession Jan 2027 · 74.5% built · 2 complaints
- SAI AASHIYANA - II · TISGAONSai Sakshi Developers · P51700026248 · possession Oct 2026 · 90.9% built
- AASHRAY AANAND PHASE-II · GAIKWADPADADREAM CORPRATION · P51700026268 · possession Nov 2022 · 86.4% built
- Maatr Waters · Village BaraveMaatr Enterprises · P51700026313 · possession Sept 2023 · 90.5% built
- BHOOMI ICON · ThaneFORNAX REALTY · P51700026412 · possession Oct 2026 · 81.8% built
- A H Sapphire · MahajanwadiA.H. Constructions · P51700026430 · possession Apr 2028 · 74.9% built · 1 complaint
- Runwal Shopping Arcade · DombivliRunwal Residency Private Limited · P51700026438 · possession Apr 2025 · 90.9% built · 1 complaint
- Codename One and Only · .LODHA DEVELOPERS LIMITED · P51700026503 · possession Jun 2026 · 2 complaints
- Paramount E · ThaneKalpataru Homes Private Limited · P51700026608 · possession Jun 2025 · 100% built · 1 complaint
- The Anantaa Phase I · UttanAshtha Vinayak Developers LLP · P51700026651 · possession May 2030 · 5.8% built
- L AND T SEAWOODS RESIDENCES - NORTH TOWERS · L&T SeawoodsL&T SEAWOODS LIMITED · P51700026653 · possession Dec 2024 · 71.8% built · 2 complaints
- BALAJI EXOTICA BUILDING TYPE D PHASE III · CHIKANGHARBALAJI WORLD · P51700026674 · possession Dec 2025 · 90.9% built · 1 complaint
- Sudama Vallabh wing A,B,C · ThanePravin Vandravandas Vora · P51700026698 · possession Oct 2027 · 74.9% built
- RUDRAKSH TOWER · VILLAGE SHIVAJI NAGARSHIVSHAKTI BUILDERS AND DEVELOPERS · P51700026748 · possession Dec 2026 · 77.3% built
- OM SAMAPRIYA COMPLEX BLDG.NO-1 · KALYANOMKAR GRUH NIRMAN LLP · P51700026753 · possession Dec 2026 · 70.5% built
- JAGDALE AASTHA · ThaneJAGDALE INFRASTRUCTURE PVT. LTD. · P51700026770 · possession Dec 2026 · 38.5% built
- OM ENCLAVE · KALYANOM SHIV ENGINEERING AND CONSTRUCTION OPERATIONS PRIVATE LIMITED · P51700026804 · possession Dec 2027 · 80% built · 1 complaint
- IMPERIAL RESIDENCY · ThaneLeena Construction Co. · P51700026852 · possession Jun 2027 · 87.3% built
- SUNRAJ SUPREME · DOMBIVILI EASTVASHDEV BACHOMAL KHUSHALANI · P51700026868 · possession Jun 2026 · 90.9% built
- The Willows Phase 1 · GAURAV VALLEYORIGIN REALTORS LLP · P51700027028 · possession Dec 2027 · 47.6% built
- SHREE MANGALMURTI BUILDERS AND DEVELOPERS · MURBADVASANTI KASHINATH CHAUDHARI · P51700027105 · possession Sept 2022 · 82.2% built
- LARKINS 315 FIO-A · PANCH PAKHADIM/S PUSHPAK DEVELOPERS · P51700027115 · possession Apr 2027 · 85.9% built · 1 complaint
- SIDDHAKALA HEIGHTS · ThaneRushabh Developers · P51700027126 · possession Jun 2024 · 90.9% built
- Samruddhi Residency · DawleSHREE SAI GANESH DEVELOPERS · P51700027136 · possession Oct 2028 · 67.2% built
- Shapoorji Pallonji The Impulse- Phase 1 · ThaneJaykali Developers Private Limited · P51700027176 · possession Oct 2028 · 1.4% built
- MATOSHREE RESIDENCY · NEAR PATIL BHAVANM/S MATOSHREE DEVELOPERS · P51700027225 · possession Dec 2027 · 67.3% built
- SATYAM SEVEN SKIES · ThaneJai Jalaram Enterprises · P51700027232 · possession Jun 2024 · 100% built
- AMBER ONE · kanchangoanAMBER BUILDCON · P51700027251 · possession Oct 2028 · 96.4% built
- AVIGHNA COMPLEX PHASE I · MIRA ROAD EASTAVIGHNAA INFRA BUILDCON LLP · P51700027284 · possession Oct 2026 · 90.5% built · 1 complaint
- MAHAAVIR PRIDE · DOMBIVALI EASTMAHAAVIR BUILDCON LLP · P51700027307 · possession Jun 2027 · 83.9% built
- SAVALIYA RESIDENCY · Mira Road EastShree Savaliya Housing LLP · P51700027312 · possession Jul 2026 · 75.9% built
- ASHLAR TATTVA · MANDAAKSHAR ENTERPRISES · P51700027399 · possession Oct 2027 · 32.7% built
- GODREJ UPAVAN · BHADVAD & TEMGHARPRAKHHYAT DWELLINGS LLP · P51700027436 · possession Oct 2028 · 30.2% built · 17 complaints
- GAMI INDUSTRIAL PARK-B BUILDING · PAWANE MIDCGolden Falcon Pacific Ltd · P51700027441 · possession Jun 2023 · 100% built
- NEXUS PARK · Village DawaleNEXUS GROUP · P51700027450 · possession Jun 2027 · 73% built
- SPACE RESIDENCE - II - BUILDING NO. 4 B · OPP. PLEASANT PARKSPACE REALTY · P51700027464 · possession May 2027 · 67.3% built
- INDRA NEEL · ThaneSONAM SPARK INFRA LIMITED · P51700027465 · possession Sept 2027 · 98.6% built · 1 complaint
- SARVODAY SQUARE PHASE 3 BLDG NO 1 · AmbarnathSHREE SQUAREFEET ENTERPRISES LLP · P51700027546 · possession Jun 2026 · 81.8% built
- Riverview Classic Building no. 3 Phase III · KalyanRUTU BUILDERS · P51700027621 · possession Jun 2024 · 100% built
- HYDE PARK RESIDENCY F5 BUILDING PHASE · ThaneNEXUS BUILDERS AND DEVELOPERS PVT LTD · P51700027694 · possession Sept 2023 · 86.8% built
- SILVER LINE PHASE - 1 · VASUNDRIHOME CONSULTANCY · P51700027713 · possession Jul 2031 · 13.4% built
- ANWAR ARCADE · GAURI PADAFARHAT FAROOQUE AHMED MOMIN · P51700027730 · possession Oct 2027 · 75% built
- Chandanbala · ThaneHemant Sagarmal Jain · P51700027814 · possession Dec 2026 · 160.9% built
- ZIPRYA GOVIND TOWER · Near Kopar Railway StationShivshkati Builders and Developers · P51700027822 · possession Jun 2024 · 63.6% built
- SAI DATTA KRIPA · SHASTRI NAGARBhalchandra Vinayak Wadnerkar · P51700027824 · possession Apr 2028 · 90.9% built · 1 complaint
- SHALIMAR CO.OP HSG SOC LTD · ThaneNEENA SHAILESH PARANJAPE · P51700027861 · possession Oct 2027 · 37.4% built
- ARIHANT CITY PHASE-II - N BUILDING · BHADWADARIHANT ENTERPRISES · P51700027862 · possession Dec 2028 · 20.9% built
- AMBRIN · NEAR SHIVAM HOSPITAL,GHARDA CIRCLEIMPRESSIONS · P51700027906 · possession Jan 2023 · 65.9% built
- L M TOWER · BHADWADL M REALTY · P51700027947 · possession Jul 2027 · 78.6% built
- BALAJI ESTATE · UmbroliM/s. Sai Balaji Buildcon · P51700027980 · possession Dec 2026 · 85.8% built · 10 complaints
- NANDANVAN HOMES-BUILDING B · PARSIK NAGAR NEAR RELIANCE MARKETSHREE KRUPA BUILDERS · P51700028028 · possession Jul 2027 · 54.5% built · 3 complaints
- DHAVAL · VILLAGE BELVALI ,BACK SIDE OF RIDDHI SIDDHI BUILDINGSHREEJI AND INNOVATIVE DEVELOPERS · P51700028136 · possession Dec 2022 · 81.8% built
- WISTERIA SQUARE 1 · VINAY NAGARRAJDEEP REALTORS & DEVELOPERS PVT LTD · P51700028141 · possession Apr 2029 · 33.7% built · 9 complaints
- SRUSHTI RESIDENCY BUILDING E · KANCHANGAON THAKURLIPappu Developers & Group · P51700028176 · possession Jun 2024 · 90.9% built
- ENVIRO AFFINITY · GAURAV CITYAristone Developers · P51700028265 · possession Dec 2028 · 39.4% built
- The Landmark · BadlapurR PLUS INFRA · P51700028309 · possession Feb 2028 · 56.8% built
- Royal Palm · WashindBuildcon Enterprises · P51700028329 · possession Jun 2025 · 78.5% built
- NEELKANTH PALMS · BHIWANDINEELKANTH DEVELOPERS · P51700028339 · possession Dec 2028 · 37.3% built
- AROMA · KAVESARSagar Enterprise · P51700028361 · possession Nov 2026 · 90.9% built
- ARIHANT CITY PHASE-II - K BUILDING · BHADWAD BHIWANDIARIHANT ENTERPRISES · P51700028429 · possession Dec 2028 · 23.2% built
- ARIHANT CITY PHASE-II - M BUILDING · BHADWADARIHANT ENTERPRISES · P51700028430 · possession Dec 2028 · 20.9% built
- RAUNAK 108 · OWALE VILLAGEUNNATHI ASSOCIATES · P51700028435 · possession Oct 2027 · 74.5% built · 9 complaints
- 27 East · SagaonRashi Developers · P51700028466 · possession Jun 2025 · 65.3% built
- HORIZON PALMS - III · OwaleKM DEVELOPERS · P51700028504 · possession Dec 2026 · 79.5% built
- The Icon Phase 2 · DhokaliLeading Frontier Private Limited · P51700028535 · possession Jun 2026 · 88.1% built · 1 complaint
- KINGS COURT · SURYODAYA SOCEITYAMI SAI CONSTRUCTION · P51700028580 · possession Jun 2023 · 100% built
- LAXMI SHANKAR COMPLEX · BADLAPUR GAONADITI BUILDWELL · P51700028607 · possession Oct 2028 · 46.1% built
- Sector 2A - Wing B · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700028685 · possession Dec 2027 · 97.7% built · 1 complaint
- Bhairav Enclave · ThaneLeena Estate Venture · P51700028700 · possession Aug 2026 · 90.9% built
- AL AMIN TOWER · BHIWANDIS V BUILDERS · P51700028707 · possession Apr 2027 · 70.5% built · 1 complaint
- 10 Marina Bay · ThaneEV HOMES CONSTRUCTIONS PVT. LTD. · P51700028722 · possession Jun 2028 · 73.8% built
- Kashish Park Tower C-1 · ThaneKashish Park Realtors · P51700028738 · possession Oct 2030 · 34.5% built · 1 complaint
- HEMA KUNJ · ThaneBHADRANKAR ENTERPRISES LLP · P51700028739 · possession Aug 2023 · 41.8% built · 1 complaint
- Maatr Skye · KhadakpadaMaatr Ventures · P51700028786 · possession Sept 2025 · 90.9% built
- SAI VATIKA RESIDENCY · KAMATGHARMOHD HASIM ABDUL SATTAR KHAN · P51700028797 · possession Apr 2028 · 47.3% built
- CHADHA RESIDENCY · SHIL AND KARAVCHADHA DEVELOPERS AND PROMOTERS · P51700028831 · possession Sept 2027 · 25.1% built · 1 complaint
- OM SAI CLASSIC · AMBERNATH VILLAGED A CONSTRUCTION · P51700028873 · possession Jun 2025 · 100% built
- USHAKIRAN ENCLAVE · KalyanJAYANT ENTERPRISES · P51700028914 · possession Dec 2028 · 49.3% built
- GEETA PLAZA · MAHAGIRI THANEROYAL DEVELOPERS · P51700028915 · possession Oct 2026 · 68.2% built
- THE ICON PHASE 3 · DhokaliLeading Frontier Private Limited · P51700029059 · possession Apr 2027 · 84.6% built · 3 complaints
- The Icon Phase 4 · DhokaliLeading Frontier Private Limited · P51700029062 · possession Apr 2027 · 75.2% built · 1 complaint
- BHOOMI AVENUE · AMBERNATH (E)BHOOMI ENTERPRISES · P51700029068 · possession Aug 2023 · 90.9% built
- SHWETA HEIGHTS · MIRA ROAD EASTSHREE SAI ASSOCIATES · P51700029110 · possession Mar 2027 · 81.6% built
- ISHWAR SHUBHLAXMI · AMBARNATHISHWAR REALITY · P51700029135 · possession Dec 2021 · 90.9% built
- GOPAL SMRUTI · AMBERNATHDATTA BABURAO GHAVAT · P51700029145 · possession Mar 2024 · 90.7% built
- JADHAV GADH · Godrej HillShree Samarth Developers · P51700029156 · possession Dec 2022 · 100% built
- KARTIK HOMES · SHIRGAON BADLAPUR EASTKARTIK ENTERPRISES · P51700029229 · possession Apr 2027 · 77.1% built
- Bhumi Height · ThaneBhumi Homes · P51700029282 · possession Apr 2032 · 2.3% built
- OMKAR RESIDENCY · mandaM/s OMKAR ASSOCIATES · P51700029285 · possession Dec 2025 · 81.8% built
- LAXMI CASTLE · KalyanLAXMI CASTLE · P51700029322 · possession Dec 2028 · 41.5% built
- Geeta Heights · RambaughMAYUR GROUP (RD) · P51700029333 · possession Dec 2024 · 90.9% built
- INFINITY IKON · ThaneEMPERIA PROJECTS · P51700029339 · possession Dec 2026 · 55.4% built
- Sector 2A - Wing A · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700029367 · possession Jun 2027 · 97.9% built
- Sadguru Symphony - Wing - A, D, E, F and G of Phase-II · Badlapur WestSADGURU INFRA · P51700029442 · possession Apr 2027 · 53.8% built · 1 complaint
- SHREEJI SQUARE PHASE I · BADLAPURSHREEJI DEVELOPERS · P51700029512 · possession Jun 2026 · 103.6% built
- Constrcution of 2557 EWS tenements at S.No.157/1,village Gotheghar,Tal . Dist.-Thane PMAY Project · NEAR MSETCL RECIEVING STATION,UTTARSHIV VILLAGE ROADMaharashtra Housing and Area Development Board Konkan · P51700029534 · possession Oct 2028 · 14.7% built
- METRO MAJESTIC · ThaneNAKSHATRA BUILDERS · P51700029554 · possession Mar 2027 · 90.1% built
- SATVIK WING B · AmbarnathM/s. JIGAR ENTERPRISE · P51700029587 · possession Dec 2023 · 45.5% built
- DAMODAR TOWER · KHARI VILLAGE, BHAYANDAR EASTJAANVI DEVELOPERS · P51700029603 · possession Jul 2027 · 90.9% built
- KRISHNA HEIGHTS · ThaneKRISHNA ASSOCIATE · P51700029686 · possession Apr 2027 · 9.5% built
- Birla Vanya Phase 2 · ShahadAditya Birla Real Estate Limited · P51700029755 · possession Jun 2025 · 100% built · 2 complaints
- GAYATRI NIWAS · CHIKANGHARGayatri Builders · P51700029816 · possession Dec 2025 · 90.9% built
- SHANKESHWAR DARSHAN · ThaneKALPVRIKSH HOMES LLP · P51700030025 · possession Apr 2030 · 50.1% built
- Lucas Residency · Ambernath WestSunita Developers · P51700030052 · possession Dec 2023 · 90.9% built
- VIDHI PREM · KalyanLOTUS CONSTRUCTION · P51700030057 · possession Dec 2023 · 86.8% built
- LA LUXURIA · SHAHAPURRJ ENTERPRISES · P51700030059 · possession Mar 2027 · 90.9% built
- Navare Residency and Library · AmbernathShree Ganesh Developers · P51700030076 · possession Dec 2022 · 100% built
- SUNDAR RESIDENCY F WING · GAURIPADANAVADITYA DEVELOPERS · P51700030083 · possession Dec 2024 · 12.5% built
- Plot No -1A,Sector -19, Vashi Truck Terminal · ThaneCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED · P51700030100 · possession Apr 2029 · 44.4% built
- ESQUIRE · ThaneJP INFRA&SALASAR BUILDCON LLP · P51700030151 · possession Apr 2028 · 80.2% built · 1 complaint
- AVESA · Pokhran Road 2JAGDALE INFRASTRUCTURE PVT. LTD. · P51700030171 · possession Feb 2027 · 47.3% built
- THARWANI SOLITAIRE PHASE IV · SHAHADANIL HARDASMAL THARWANI · P51700030172 · possession Nov 2026 · 73.2% built
- Riverwood Park Building No -3 · Sagarli, Dombivili EastShree Khidkaleshwar Property Developers Pvt. Ltd. · P51700030195 · possession Oct 2027 · 83.2% built · 1 complaint
- SAKET WORLD · Near Chetana SchoolAnand Associates · P51700030224 · possession Apr 2027 · 29.5% built
- SURVAL HEIGHTS · BADLAPUR EASTGAYATRI DEVELOPERS · P51700030228 · possession Dec 2023 · 74.1% built
- Tisai Heights · Katemanevali, KalyanTisai Construction · P51700030323 · possession Dec 2023 · 60% built
- AVIGHNA KARAN WING C · Kalyan eastAVIGHNA KARAN · P51700030327 · possession Aug 2026 · 72.7% built
- Sai Pearl · KatrapM/S MITRA REALITY · P51700030340 · possession Dec 2025 · 86.4% built · 1 complaint
- SATISH OAK HEIGHT · BADLAPUR WESTSHREE SAI PRATHAMESH DEVELOPERS · P51700030403 · possession Mar 2026 · 36.4% built
- SUYASH CO.OP. HOUSING SOCIETY LTD · ThaneSNA Build-Tech · P51700030476 · possession Jan 2025 · 87.3% built
- TWIN TOWERS · MILLAT NAGARMARJAAN DEVELOPERS LLP · P51700030487 · possession Apr 2028 · 79.5% built
- Runwal Gardens Phase 4 Bldg No. 33-34 · DombivaliRunwal Residency Private Limited · P51700030533 · possession May 2027 · 59.4% built · 8 complaints
- SAI BALAJI COMPLEX · TONDLIKAR NAGARSAI BALAJI COMPLEX · P51700030544 · possession Jul 2024 · 90.9% built
- HILTRON LIFE STYLE · UlhasnagarHILTON HEIGHTS LLP. · P51700030558 · possession Apr 2028 · 76.4% built
- RAHUL CO.OP. HOUSING SOCIETY LTD · PANCHPAKHADISNA Build-Tech · P51700030595 · possession Feb 2025 · 80% built
- AARADHYA HIGHPARK PROJECT III of PHASE 1 · NEAR SINGAPORE INTERNATIONAL SCHOOLMAN VASTUCON LLP · P51700030611 · possession Dec 2025 · 95% built · 2 complaints
- SARVESH DREAM CITY WING D · JOVELISAI SHRADHA DEVELOPERS · P51700030642 · possession Dec 2025 · 61.8% built
- NAVKAR BAHAR · DOMBIVLI WESTAMI ENTERPRISES · P51700030709 · possession Dec 2026 · 37.4% built
- Om Maitri · Ram NagarOscar Infrastructure Pvt Ltd · P51700030770 · possession Dec 2026 · 88.6% built · 6 complaints
- NIRMALA PARADISE · BADLAPUR WESTPokhriyal And Associates · P51700030774 · possession Sept 2024 · 81.8% built
- NICE WORLD 1 · MUMBRANICE BUILDERS · P51700030809 · possession Apr 2032 · 45% built
- SAI VIDHATA · UlhasnagarSAI SHRADDHA ASSOCIATES · P51700030832 · possession Jun 2023 · 81.8% built
- Chintamani Heights (Building No 1) & Chintamani Kuber (Building No 2) · DevichapadaChintamani Developers · P51700030843 · possession Apr 2027 · 80.3% built
- DZ CITY - BUILDING NO 1 · MUMBRAMAASH CONSTRUCTION · P51700030861 · possession Jun 2030 · 49.4% built
- DZ CITY - BUILDING NO 2 · MUMBRAAL AMEEN BUILDERS AND DEVELOPERS · P51700030874 · possession Jun 2030 · 40.3% built
- Kohinoor Eden · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700030888 · possession Sept 2026 · 90.9% built · 3 complaints
- Trinity · Davadi GaothanJD Builders and Developers · P51700030893 · possession Jun 2027 · 68.6% built
- SHATRUNJAY HEIGHTS · KAMATGHARONYX BUILDCON LLP · P51700030901 · possession Apr 2029 · 40.8% built
- Mahavir Breeze Phase 1 · ThaneDamji Shamji Realty Pvt. Ltd. · P51700030915 · possession Apr 2032 · 0% built
- SUVIAM PEARL PHASE I · SAI CHOWK, KHADAKPADALAXMI CONSTRUCTION CO · P51700030925 · possession Dec 2026 · 81.6% built · 1 complaint
- YASHWANT HEIGHTS PHASE II · KALYAN ERAI RESIDENCY Private Limited · P51700030946 · possession May 2023 · 82.5% built
- SNEH SERENE · SHIVAJI NAGAR & GAONDEVI VILLAGE, DOMBIVLI WESTSNEH BUILDCON · P51700030955 · possession Oct 2026 · 87.5% built
- HILL CREST · ULHASNAGARUNIVERSAL INFRA · P51700030982 · possession Sept 2024 · 59.5% built
- KANHA RESIDENCY · BELAVALI GAONKULKARNII BUILDER · P51700030985 · possession May 2025 · 90.9% built
- Krishna Anand · Kalyan EastGopal Krishna Developers · P51700031006 · possession Apr 2027 · 90.9% built
- DZ CITY - BUILDING NO 3 · MUMBRAAL BARI'S CONSTRUCTION · P51700031021 · possession Jun 2030 · 40.3% built
- SAROJINI · NEAR RAM MANDIRJAY SERVICE AND CONSULTANT · P51700031047 · possession Dec 2025 · 100% built
- ANANT PRABHA · SURYODAY SOCIETY KANSAIRUSHIKESH ENTERPRISES · P51700031051 · possession Apr 2023 · 90.9% built
- N G AVENUE · ThaneRNA Builders (NG) · P51700031064 · possession Apr 2028 · 33.6% built
- KRISHNA VANSH · KALYAN ECHAITANYA DEVELOPERS · P51700031076 · possession Apr 2029 · 36.5% built
- VAISHNAVI DHAM COMPLEX · NEW STANDARD SCHOOLVAISHNAVI BUILDERS AND DEVELOPERS · P51700031112 · possession Nov 2026 · 54.7% built
- OPULENCE · ThaneSONAM SPARK INFRA LIMITED · P51700031137 · possession Apr 2029 · 46.4% built
- SIDDHESHWAR HEIGHTS A WING FROM 2nd TO 14th FLOOR · KalyanSHREE JAI MALHAR ENTERPRISES · P51700031142 · possession Jan 2025 · 37.5% built
- Mohan Tribeca · KhadakpadaMOHAN LIFESPACES LLP · P51700031172 · possession Apr 2027 · 84.5% built
- GAMI EVA · ThaneThalia And Gami Enterprises · P51700031192 · possession Jun 2023 · 100% built
- SARVESHWAR CO-OP HSG SOC · TALUKA AMBERNATHDALAL BUILDSCAPE · P51700031253 · possession Jun 2024 · 71.8% built · 1 complaint
- TRINITY MOKSH · PALEGAONRATTANRAJ LIFESPACES · P51700031260 · possession Jul 2027 · 90.5% built
- KHUSHI AXIS WORLD · BHIWANDIKHUSHI AXIS INFRATECH LLP · P51700031265 · possession Apr 2027 · 54% built
- SHIVALAYA HEIGHTS · KALYAN EASTS R REALTORS · P51700031306 · possession Jan 2028 · 40.4% built
- Suman Arcade · SagaonShreekrupa Construction · P51700031345 · possession Apr 2027 · 9.1% built
- N G GRAND EMPIRE PHASE II · ThaneRNA Builders (NG) · P51700031379 · possession Apr 2029 · 43.3% built
- MADHUBAN PARK · B CABINRAJNB HOUSING LLP · P51700031395 · possession Mar 2023 · 72.3% built
- IRA INSIGNIA · Dombivli EastIRA HOMES · P51700031409 · possession Apr 2027 · 22.9% built · 3 complaints
- AMAR ELEGANCE · Ganesh Nagar, Dombivli WestAMAR REALTY · P51700031419 · possession Jan 2027 · 81.8% built
- DZ CITY BLDG No. 4 and 5 · MUMBRASKYLINE ENTERPRISES · P51700031434 · possession Dec 2030 · 45.9% built
- SHREEJI MEADOWS · BELAVLIDEEPLAXMI DEVELOPERS · P51700031453 · possession Jul 2026 · 81.8% built
- AVASAR PRIDE · Mouje VillageD P REALTY · P51700031454 · possession Dec 2026 · 10.9% built
- VIVANTA MARVEL · MIRA ROAD - EASTTECHNO VISION REALTORS LLP · P51700031458 · possession Sept 2025 · 90% built · 1 complaint
- SPRINGS · ThaneQUEENSTOWN CONSTRUCTIONS PRIVATE LIMITED · P51700031471 · possession Mar 2024 · 100% built
- Niraj Exotica Wing B C D · AdharwadiK D Construction Co · P51700031494 · possession Jul 2030 · 57% built
- Ahmahf Empire · Kalyan EastEmpire Residency · P51700031570 · possession Apr 2028 · 72.7% built
- ASHOKA COMPLEX · SHELARA. K. BUILDERS · P51700031596 · possession Oct 2028 · 47.3% built
- Goodwill Bizhub · ThaneM/s. Goodwill Dwellings LLP · P51700031628 · possession Jan 2027 · 35% built · 1 complaint
- ADISHAKTI · DOMBIVLI EASTADIMAYA ENTERPRISE · P51700031649 · possession May 2027 · 81.8% built
- PATELS VENUS · AMBERNATHBECHAR RAGHAVJI PATEL · P51700031663 · possession Oct 2028 · 0% built
- Godrej Bayview · ThaneSuncity Infrastructures (Mumbai) LLP · P51700031726 · possession Apr 2029 · 35.4% built · 2 complaints
- Swaminarayan City Phase 1B · Mothagaon, Mauje ThakurliSwaminarayan Life Space LLP · P51700031749 · possession Apr 2029 · 44.4% built
- NISARG GREENS Phase - 2 F · Ambernath EastNND Ambernath LLP · P51700031797 · possession Jun 2025 · 72.7% built
- NISARG GREENS Phase - 2 D · Amberntah EastNND Ambernath LLP · P51700031807 · possession Jun 2025 · 63.6% built
- SHRESHTHA SWAPNA CO-OP HOUSING SOCIETY LTD · Taluka AmbarnathOM SHREE SAI BUILDERS AND DEVELOPERS · P51700031812 · possession Dec 2024 · 46.8% built
- N G GRAND EMPIRE PHASE I · NAVGHARRNA Builders (NG) · P51700031846 · possession Apr 2027 · 84.5% built
- Panvelkar Estate - Stanford - Phase II - R1 - B · MankivaliPanvelkar Infrastructures Private Limited · P51700031879 · possession Dec 2024 · 90.9% built
- N G SILVER SPRING PHASE III · ThaneRNA Builders (NG) · P51700031911 · possession Apr 2027 · 45.4% built
- MIDTOWN TWIN TOWERS · NEAR WADHWA'S SHIV MANDIRSHIRDI SAI SHELTORS LLP · P51700031951 · possession Mar 2027 · 73.2% built
- Anantsavitri Ratna Heights · Near Maxus MallKrisha Realty · P51700032014 · possession Aug 2026 · 90.9% built
- AUDUMBER FLOWER VALLEY · JUVELIAUDUMBER SUPERSTRUCTURES · P51700032044 · possession Oct 2026 · 89% built
- Satyabhama CHS LTD · GHANTALIMahesh Shriram Borkar · P51700032055 · possession Jun 2024 · 90.9% built
- SPM DREAM CITY PHASE 1 · VILLAGE PALID K BUILDCON · P51700032070 · possession Apr 2029 · 38.4% built
- Paramount C · ThaneKalpataru Homes Private Limited · P51700032095 · possession Jun 2025 · 2 complaints
- S. A. Patil Nagar Garden View CHS · AmbarnathShree Khodiyar Builders and Developers · P51700032102 · possession Sept 2023 · 70.4% built
- SILVER LIFESTYLE · KAUSASILVERLINE BUILDHEIGHT LLP · P51700032131 · possession Apr 2027 · 49.7% built
- MY CITY PHASE II CLUSTER 5 PART II · Usarghar DombivaliHORIZON PROJECTS PVT LTD · P51700032157 · possession Apr 2028 · 71.4% built
- SAKET WORLD BUILDING TYPE C · Near Chetana SchoolAnand Associates · P51700032180 · possession Oct 2027 · 53.2% built
- RUSTOMJEE LA FAMILIA - WING B · MAJIWADEKapstone Constructions Private Limited · P51700032205 · possession Apr 2027 · 46.4% built · 2 complaints
- SEVEN ELEVEN COURTYARD · GoddevS.S.S ASSOICATES · P51700032221 · possession Mar 2029 · 54.6% built
- PRISM INDUSTRIAL ESTATE · NEAR PENDHARKAR COLLEGESPLENDOR SHELTERS PVT LTD · P51700032231 · possession Oct 2025 · 90.9% built
- RUSTOMJEE LA FAMILIA - WING A · MAJIWADEKapstone Constructions Private Limited · P51700032262 · possession Apr 2027 · 47% built
- Puraniks Unicorn Phase 1 · MogharpadaPuranik Builders Limited · P51700032292 · possession Apr 2029 · 51.5% built · 2 complaints
- N G AROMA PHASE I · NAVGHARRNA Builders (NG) · P51700032309 · possession Dec 2026 · 49.1% built · 1 complaint
- S K VALLEY · SHILLITTEHAD BUILDCON · P51700032338 · possession Apr 2028 · 58.9% built
- HIGHLAND SKY TOWERS A BUILDING · NAUPADAPROVIDENCE REALTY LLP · P51700032367 · possession Dec 2027 · 39.2% built
- OM MAITRI ICON · DOMBIVLI (E)VISHNU BUILDWELL · P51700032392 · possession Jun 2027 · 161.8% built
- AMBER BLISS · DOMBIVLI WESTM/S. AMBER COMBINES · P51700032492 · possession Dec 2025 · 79.1% built
- Laaman Industrial Park · ThaneLaaman Developers · P51700032501 · possession Jan 2025 · 100% built
- GEETAI SMRUTI · Near DNC SchoolNEELPADMA DEVELOPERS · P51700032519 · possession Dec 2026 · 43.4% built
- PATELS FALCON · KHER SECTIONPRAMUKH DEVELOPERS · P51700032547 · possession Dec 2026 · 90.9% built
- Riverwood Park Building No -1 · Sagarli , Dombivali EastShree Khidkaleshwar Property Developers Pvt. Ltd. · P51700032548 · possession Jul 2027 · 59.7% built · 1 complaint
- Godrej Riviera Phase 1 · KalyanGODREJ PROPERTIES LIMITED · P51700032552 · possession Dec 2027 · 68.3% built · 1 complaint
- SHARMILA RESIDENCY · AMBERNATHANNAPURNA ENTERPRISES · P51700032556 · possession Mar 2025 · 61.8% built
- SHIVANJALI HEIGHTS · BADLAPUR WESTSHIVANJALI CONSTRUCTION · P51700032585 · possession Jun 2023 · 50% built
- Shubhanand NX And Greenland NX · AmbarnathMarathe Enterprises · P51700032625 · possession Apr 2027 · 90% built
- MARATHON NEXWORLD NOVA · BetawadeSunset Spaces Pvt. Ltd. · P51700032675 · possession Apr 2027 · 0% built
- Gayatri CHS LTD · ThaneShree Angarak Enterprises Builders and Developers · P51700032690 · possession Mar 2026 · 81.8% built
- SHREE SAMARTH KRUPA PRASAD CO OPERATIVE HOUSING SOCIETY LIMITED · AMBERNATHRAJLAXMI SAMARTH DEVELOPERS · P51700032714 · possession Jun 2026 · 90.9% built
- Sky Heights Tower No. 4 · Kausa VillageVIRANI CONSTRUCTION COMPANY · P51700032730 · possession Apr 2029 · 50.5% built
- KAPIL BLING · BHIWANDITRIDENT BUILDERS AND DEVELOPERS · P51700032751 · possession Mar 2026 · 27.3% built
- OM SAI HOME-D · KAMATGHARM/S. INFINI DEVELOPERS · P51700032786 · possession Dec 2024 · 90.9% built
- Tulsi Aanand · Badlapur eastRAJ GROUP · P51700032811 · possession Dec 2025 · 100% built
- 9PBR TOWER B1 · ThaneMISTRY CONSTRUCTION CO. PVT. LTD. · P51700032812 · possession Apr 2029 · 56% built
- HIGHLAND SKY TOWER DAMANI B BUILDING · NAUPADAPROVIDENCE REALTY LLP · P51700032859 · possession Oct 2027 · 52.2% built
- Sai Heights Building No.1 B Wing · Vithalwadi,Sai Siddhi Developers · P51700032918 · possession Dec 2025 · 90.9% built
- SWAMI NARENDRA RESIDENCY · MURBADRAJ RATNESHWARI DEVELOPERS · P51700032919 · possession Apr 2027 · 44% built
- Mahindra Happinest Kalyan-2 Project A · RanjnoliMahindra Lifespace Developers limited · P51700032925 · possession Dec 2028 · 0% built
- Shreeram Vaishali · Dombivali EastADITYA REALTORS · P51700032988 · possession Dec 2024 · 60% built
- MARATHE SAPPHIRE · TITWALASAIJI DEVELOPERS · P51700032995 · possession Apr 2032 · 43.6% built
- SAI PALACE · SHAHAPURVARDHAMAN DEVELOPERS · P51700033001 · possession Oct 2026 · 90.9% built
- UMA KUNJ COOPERATIVE HOUSING SOCIETY LIMITED · BadlapurPravin Arvind Apte · P51700033015 · possession May 2026 · 90.9% built
- SIDDHIVINAYAK RESIDENCY · BADLAPURSAIRAJ DEVELOPERS · P51700033059 · possession Dec 2024 · 72.7% built
- PRECIOUS MEADOWS · MharalVINAYAK ASSOCIATES · P51700033139 · possession Nov 2026 · 90.9% built · 1 complaint
- RAJ HERITAGE 2 · MIRA BHAYANDER ROAD MIRA ROAD EASTRAJ REALTY BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700033231 · possession Mar 2026 · 100% built
- Shapoorji Pallonji Skyraa at Northern Lights · ThaneJaykali Developers Private Limited · P51700033243 · possession Apr 2032 · 0% built · 2 complaints
- GLOBE BUSINESS AVENUE · MIDC PHASE IIGlobe Solitaire LLP · P51700033290 · possession Dec 2026 · 72.7% built
- SHIV HEIGHTS · THANE WESTSARWANGKRIPA DEVELOPERS LLP · P51700033313 · possession Apr 2027 · 69.1% built
- AMBIKA HEIGHTS · AMRAI CHOWKRAJESH MAVJI CHHEDA · P51700033336 · possession Jun 2024 · 90.9% built · 1 complaint
- Panvelkar Greens - Phase I · JoveliESHAN DEVELOPERS · P51700033348 · possession Dec 2026 · 73.4% built
- OM BHAGWATI · KDMCOM BHAGWATI BUILDERS AND DEVELOPERS · P51700033354 · possession Apr 2027 · 70% built
- The Palace Tower B · Vinay NagarJP Infra Realty Private Limited · P51700033430 · possession Apr 2029 · 52.7% built · 1 complaint
- The Palace Tower C · Vinay NagarJP Infra Realty Private Limited · P51700033431 · possession Dec 2028 · 52.9% built · 1 complaint
- AUDUMBAR DARSHAN · BADLAPUR EASTAUDUMBAR ENTERPRISES · P51700033432 · possession Oct 2024 · 44.5% built
- ASMITA GRAND MAISON · MIRA ROAD EASTASMITA INDIA LIMITED · P51700033489 · possession Apr 2028 · 73.5% built
- PINE VIEW · BADLAPURSATYA DEVELOPERS · P51700033505 · possession Jul 2028 · 36.8% built
- Mai Kripa Co. Op. Hsg. Soc. · ThaneOJASS CONSTRUCTIONS · P51700033561 · possession Mar 2024 · 90.9% built
- KMC SKYLINE · KANCHANGAON THAKURLIPRIME PROPERTIES · P51700033584 · possession Oct 2028 · 43.6% built · 1 complaint
- PEARL HEIGHTS · BADLAPUR GAONZAHID IQBAL KOHARI · P51700033623 · possession Apr 2027 · 91.2% built
- REGAL SQUARE PH 4 TOWER 6 AND 8 · Near Chattrapati Shivaji Maharaj StadiumDEV DRASHTI REALTY PRIVATE LIMITED · P51700033625 · possession Dec 2027 · 45.5% built
- Dosti West County - Dosti Nest - Phase 2 · ThaneDOSTI ENTERPRISES · P51700033663 · possession Oct 2027 · 94.5% built · 1 complaint
- SAPTASHRUNGI · TUKARAM NAGARPADMAVATI BUILDERS · P51700033668 · possession Dec 2026 · 81.8% built
- UMIYA NAKSHATRA HEIGHTS · KATRAP BADLAPUR EM/S. JIGAR ENTERPRISE · P51700033734 · possession Apr 2028 · 51.1% built
- Cascade Avenue Bellagio · MogharpadaAarsh Construction · P51700033736 · possession Apr 2027 · 62.2% built
- MAATR INFINITY · NEXT TO RATAN RIVERIA NEAR GODREJ RIVERSIDE BUILDING, KALYAN WMaatr Infra · P51700033746 · possession Jul 2027 · 59.1% built
- RAUNAK CITY SECTOR VI - F2 · KALYANRAUNAK CORPORATION · P51700033757 · possession Apr 2029 · 76.4% built · 4 complaints
- RAUNAK CITY SECTOR VI - F1 · KALYAN WRAUNAK CORPORATION · P51700033762 · possession Apr 2029 · 84.1% built
- Code Name-Enchanted · KolshetRunwal Construction Private Limited · P51700033799 · possession Oct 2028 · 54.8% built · 8 complaints
- AYESHA GARDEN B WING · KALYANAZKA BUILDERS AND DEVELOPERS · P51700033810 · possession Sept 2025 · 82.3% built
- Ace Courtyard · MogharpadaAce Signature Homes LLP · P51700033813 · possession Mar 2024 · 90.9% built
- MODEL TOWN · SHAHAPURQAVI CONSTRUCTION PVT. LTD. · P51700033833 · possession Dec 2026 · 80.9% built
- Sector 2A - Wing C · Shrushti Chowk, Mira RoadEversmile Properties Private Limited · P51700033851 · possession Jun 2027 · 66.2% built
- Mahavir Bliss · ThaneM/s. Shivshakti Engineers · P51700033859 · possession Apr 2027 · 78.2% built
- VRINDAVAN RESIDENCY · PADMANAGARAKASH DEVELOPERS · P51700033877 · possession Nov 2026 · 81.8% built
- BHAKTI WINDSOR · KALYAN WESTBHAKTI REALTORS · P51700033913 · possession Oct 2026 · 90.9% built
- Dashmesh Crystal phase 2 · kharvai chowkDashmesh Infrastructure · P51700033926 · possession Jun 2024 · 100% built
- VITTHAI ANANT PLAZA · BADLAPURSHARAD NAMDEO GAIKWAD · P51700033932 · possession Apr 2027 · 71.8% built
- WALCHAND PARADISE · MIRA ROAD EASTPRAMANIK HOUSING PRIVATE LIMITED · P51700033946 · possession Dec 2025 · 100% built · 1 complaint
- RAUNAK CITY SECTOR VI - F3 · KALYANRAUNAK CORPORATION · P51700033972 · possession Apr 2029 · 76.4% built
- Rex Residency · ThaneEKDANTA DEVELOPERS PRIVATE LIMITED · P51700033974 · possession Apr 2029 · 45.9% built
- SACHINAM CO OP HSG SOCIETY · KULGAONSHREEKANTH DEVELOPERS · P51700033985 · possession Mar 2024 · 63.6% built
- RUSTTAGI AARAMBHA PHASE-III · TITWALARUSTAGI ESTATES PRIVATE LIMITED · P51700033998 · possession Feb 2027 · 90.9% built
- SHIV SONAL PALACE CHS LTD · AMBERNATH EASTSAI PRASAD BUILDERS AND DEVELOPERS · P51700034047 · possession Jan 2024 · 27.3% built
- SHREE CHARAN APARTMENT · MURBADSHREE MANGALMURTI ENTERPRISES · P51700034064 · possession Apr 2024 · 52.8% built
- Shree Datta Samartha CHSL · Near Railway StationShree Sai Swami Enterprises · P51700034066 · possession Jun 2023 · 90.9% built
- Mark 1 · ThaneM/S IJB Realty · P51700034134 · possession Apr 2028 · 49.5% built
- EVANA D-2 · THANEVIHANG INFRASTRUCTURE PVT LTD · P51700034145 · possession Apr 2030 · 47.7% built
- SAI WORLD · BORADPADA ROADPINNACLE CORPORATION · P51700034155 · possession Mar 2026 · 90.9% built
- DEVI HEIGHTS · UlhasnagarLUXUR AND LAVISH HOMES · P51700034179 · possession Oct 2027 · 91.4% built
- Sai Altezza · KatemanevaliSAI SHRADDHA CONSTRUCTIONS · P51700034218 · possession Apr 2027 · 53.6% built
- SAMRUDDHI HEIGHTS · BhiwandiShree Samruddhi Corporation · P51700034220 · possession Dec 2026 · 63.6% built
- CENTRAL PARK · ThaneHARMAIN ENTERPRISES · P51700034243 · possession Apr 2028 · 34.5% built
- RAJ INAAYA · PALEGAONMAHALAXMI CONSTRUCTION · P51700034259 · possession Dec 2023 · 90.9% built
- N G BLISS · GODDEVRNA Builders (NG) · P51700034305 · possession Apr 2027 · 55.5% built
- Mangeshi Marvel · Kalyan WestMangesh Dashrath Gaikar · P51700034332 · possession May 2026 · 63.2% built
- ORCHID TOWER · KALYANSKYVIEW BUILDERS & DEVELOPERS · P51700034353 · possession Jan 2027 · 38.5% built
- RAJ REGALIA PHASE-2 · NXT TO RELIANCE RESIDENCYAMRUT LAXMI DEVELOPERS · P51700034369 · possession Jun 2027 · 90.6% built
- CENTER ONE · MILLAT NAGARMURA REALTY LLP · P51700034376 · possession Apr 2027 · 40.8% built
- Tricity Montview · ThaneTRICITY REALTY LLP · P51700034413 · possession Dec 2026 · 100% built
- Mangeshi Royale · Kalyan WestMangesh Dashrath Gaikar · P51700034444 · possession May 2026 · 0% built
- SEASONS ONE · KALYAN WESTUNIQUE ENTERPRISES · P51700034455 · possession Apr 2029 · 86.4% built
- SADGURU HARMONY PHASE - 3 WING C · BadlapurSADGURU ASSOCIATE · P51700034459 · possession Oct 2026 · 81.9% built
- Bhagwati Celeste · Bhaji Market DombivliSagar Homes · P51700034475 · possession Jul 2027 · 55.7% built
- SAI VIJAY HERITAGE · UlhasnagarVIJAY LALSINGH THAKUR · P51700034485 · possession Mar 2026 · 51.8% built
- LA GRANDEURE TOWER 1 · KalyanLA HOMES · P51700034532 · possession Sept 2027 · 84.5% built
- CRYSTAL CORNER · THANEADISHWAR ENTERPRISES · P51700034562 · possession Dec 2024 · 100% built
- SAI TIRTH PHASE II · JOVELIPINNACLE CORPORATION · P51700034566 · possession Mar 2025 · 90.9% built
- SAGAR KUNJ HIGHLAND · PATHARLI, DOMBIVLI EASTBSR Homes · P51700034568 · possession Apr 2028 · 75.4% built
- VARHAALA HEIGHTS · BhiwandiSARVASHIVA ENTERPRISES · P51700034584 · possession Jul 2028 · 89.1% built
- BLOSSOM HEIGHT · BADLAPUR EASTShiv Sai Constructions · P51700034602 · possession Apr 2029 · 45.5% built
- Pankaj Co-Op Housing Society Ltd. · Sahakar Colony, Brahmin Society, Thane (W)Aditya Associates · P51700034605 · possession Sept 2023 · 90.9% built
- Godrej Ascend Phase 1 · Dhokali NakaGodrej Properties Limited · P51700034608 · possession Aug 2028 · 39.6% built · 5 complaints
- Charms City A12 · TitwalaCharms Developers · P51700034654 · possession Jul 2024 · 2.3% built
- GAMI JADE · ThaneLAL GEBI INFRA PRIVATE LIMITED · P51700034661 · possession Dec 2025 · 100% built · 1 complaint
- Kohinoor Eden Ph 2 · Kalyan EastKGI REALTY PRIVATE LIMITED · P51700034683 · possession Sept 2026 · 79.1% built
- SADGURU HARMONY PHASE 4 WING D · BadlapurSADGURU ASSOCIATE · P51700034703 · possession Oct 2026 · 76.4% built
- JAYRAM HEIGHTS · JAYRAM HEIGHTS STAR COLONY NEAR SAI BABA MANDIR P AND T COLONY SERVICE ROAD DOMBIVLI EAST 421201ASHAPURA ENTERPRISES · P51700034741 · possession Nov 2026 · 67.3% built
- VIHANG MARINA · BHAYENDERPADABALAJI ENTERPRISES · P51700034747 · possession Apr 2030 · 14.8% built
- ELITA D3 · OWALEVIHANG INFRASTRUCTURE PVT LTD · P51700034754 · possession Apr 2031 · 7.7% built
- 127 RAJ HOMES A WING · Penkar Pada ( Mahajanwadi)RAJ HOMES · P51700034776 · possession Aug 2026 · 90.9% built · 1 complaint
- Madhu Milind Co-Op Housing Society Ltd · NaupadaAditya Associates · P51700034830 · possession Mar 2025 · 87.7% built
- ELITE RESIDENCE - A · MUMBRAELITE REALTY · P51700034881 · possession Dec 2026 · 81.8% built
- CHINTAMANI HABITAT JASMINE TYPE A-B-J · SHAHAPURJASHNANI CONSTRUCTION PRIVATE LIMITED · P51700034891 · possession Dec 2025 · 81.8% built
- ELITE RESIDENCE - B · MUMBRAELITE REALTY · P51700034893 · possession Dec 2026 · 81.8% built
- GAYATRI COMPLEX D WING · SHIRGAONOM SAI DEVELOPERS · P51700034938 · possession Dec 2027 · 81.8% built
- S3 Skyrise · Near Dahisar Checkpost, Mira Road (East) Taluka and District ThameS3 Smart Spaces Private Limited · P51700034944 · possession Apr 2028 · 8.6% built · 1 complaint
- KASTURI PALAZA · TITWALAARFA CONSTRUCTION · P51700034954 · possession Oct 2026 · 57.3% built
- Sai Narayana Residency · Bhiwandi ThaneMM Landmark Realty LLP · P51700034963 · possession Apr 2027 · 56.6% built
- DOSTI PLANET NORTH - SECTOR 3 · NEAR SHILPHATACHALAMA INFRAPROPERTIES PRIVATE LIMITED · P51700034985 · possession Apr 2029 · 41.4% built
- MADHUSUDAN BUILDING · KANSAI SECTIONMADHUSUDAN BUILDCON · P51700035033 · possession Apr 2027 · 17% built
- Aastha Omkar · BalyaniAastha Realtors · P51700035044 · possession Apr 2029 · 17% built
- OSIANS GARDEN - PHASE-II · NAGAONGLACIER DWELLINGS LLP · P51700035070 · possession Dec 2028 · 35% built
- SAVALIYA HEIGHTS · BHAYANDERSHREE SAVALIYA HOMES LLP · P51700035088 · possession Dec 2026 · 90.9% built
- BUDDHA HEIGHTS · NAVGHAR VILLAGEBuddha Enterprises · P51700035107 · possession Apr 2028 · 27.3% built
- Tycoons Square Avenue III Tower D · Konkan VasahatTycoons Avanti Projects Pvt. Ltd. · P51700035166 · possession Apr 2027 · 8.2% built · 3 complaints
- Datta Dham Apartment CHS · VADAVALITELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700035172 · possession Feb 2025 · 100% built
- Salasar Courtyard · Mira Road EastSalasar Maxus Builders LLP · P51700035177 · possession Apr 2028 · 65.2% built
- SAI WORLD DREAMS PHASE 1 · KalyanOut N Out Infotech India LLP · P51700035191 · possession Apr 2029 · 84.1% built
- RAUNAK SERENE · ThaneRAUNAK CORPORATION · P51700045210 · possession Apr 2029 · 31% built · 2 complaints
- APNA GHAR PHASE III NX · VILLAGE GHODBUNDERSeven Eleven Construction Pvt Ltd · P51700045229 · possession Jul 2027 · 0% built · 1 complaint
- Seva Smruti · AyreNeelpadma Associates · P51700045235 · possession Sept 2026 · 72.7% built
- KURM CASA · CHINCHPADARAJESH GANPATI JADHAV · P51700045240 · possession Apr 2027 · 72.7% built
- GAMI ASTERS B WING · ThaneTHALIA AND GAMI ENTERPRISES · P51700045247 · possession Apr 2027 · 98.6% built
- KEYUR CO-OPERATIVE HOUSING SOCIETY LTD · AMBERNATHDHANASHREE DEVELOPERS · P51700045253 · possession Dec 2029 · 9.1% built
- SUYOG APARTMENT · SAI SECTIONTELANGE BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700045255 · possession Mar 2025 · 49.1% built
- MIDTOWN W90 · OPP KAILASH GARDENMIDTOWN SHELTORS LLP · P51700045256 · possession Apr 2027 · 83.3% built
- Charms Padamavati Royal Phase 2 · S No 89 1A, 95 1A 95 2 and 95 10Charms Developers · P51700045389 · possession Aug 2027 · 33.9% built
- ALISHAN ARCADE - BUILDING NO. B1 · THANEPATANGWALA ASSOCIATES · P51700045401 · possession Jul 2027 · 51.8% built
- Charms Padamavati Royal Phase 1 · Survey No 89/1A, 95/1A, 95/2 and 95/10Charms Developers · P51700045436 · possession Aug 2027 · 41.9% built
- Magus City Tower 1 Selene · Additional Kalyan Bhiwandi Industrial AreaMAGUS INFRATECH PRIVATE LIMITED · P51700045444 · possession Apr 2027 · 81.1% built
- LAXMI AANGAN - MAHANADI, KRISHNA AND GANGA · DAWALEKanji Murji Mange · P51700045456 · possession Jul 2027 · 46.5% built
- Mahavir Spring -Daffodils-P3 · ThaneVinayak Developers · P51700045504 · possession Apr 2028 · 65% built
- VIRAJ ICONIC · BadlapurBONZER ORBIT · P51700045521 · possession Apr 2027 · 80% built
- NIDHI RESIDENCY · CHIKHLOLIADITYA YASH BUILDERS · P51700045522 · possession Jul 2027 · 35.4% built
- SAI PRAJAKTA · ThaneSUNIL MANGILAL JAIN · P51700045523 · possession Apr 2028 · 52.7% built
- ROHIT CO-OP HOUSING SOCIETY LTD · PanchpakhadiVEDANT CONSTRUCTION · P51700045536 · possession Dec 2024 · 89.1% built
- SILVER SQUARE · BHAYADNERRAMDEV VENKATESH HOUSING · P51700045618 · possession Apr 2027 · 32.7% built
- MARINE HEIGHTS · MILLAT NAGARQUBA REALTY LLP · P51700045622 · possession Jun 2028 · 50.5% built
- Sunrise Parkview Phase II · Padle VillageSukham Corporation Proprietor Sunrise Lifespaces LLP · P51700045660 · possession Dec 2029 · 13.6% built · 1 complaint
- SHREE SHANKHESHWAR ASHISH · UTHALSARRAJARAM CONSTRUCTION · P51700045694 · possession Apr 2027 · 90.9% built
- KAPIL CONTINENTAL · NEAR SHETH ZURI, LAXMI NAGARSACVIR REALTORS LLP · P51700045703 · possession Dec 2029 · 22.3% built
- BSC IT PARK · ThaneBansal Steel Corporation · P51700045736 · possession Jun 2026 · 90.9% built
- SAI POOJA · BADLAPURSAIRAJ ENTERPRISES · P51700045755 · possession Dec 2024 · 72.7% built
- SAGAR ENCLAVE · DAWALEKANCHAN BUILDERS & DEVELOPERS · P51700045775 · possession Apr 2027 · 54.1% built
- SHRADDHA PENINSULA · ThanePADMAGRIHA HEIGHTS · P51700045788 · possession Apr 2027 · 54.1% built
- L AND T SEAWOODS-JASPER AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045793 · possession Dec 2027 · 100% built · 1 complaint
- L AND T SEAWOODS - OPAL AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045794 · possession Jan 2027 · 100% built
- L AND T SEAWOODS - AMBER AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045795 · possession Dec 2027 · 100% built
- L AND T SEAWOODS - CORAL AT WEST SQUARE · ThaneL&T REALTY PROPERTIES LIMITED · P51700045802 · possession May 2027 · 53.5% built · 2 complaints
- ASAVARI CO OP HSG SOC LTD · NAUPADATrimity Constructions · P51700045809 · possession Oct 2026 · 90.9% built
- MAXIMUS · BHAYANDARGURUVIDHA ENTERPRISES · P51700045811 · possession Dec 2025 · 0.9% built
- Vasudev Laxmi Park · VARAP GAONTHANMAHESH MANOHAR SALPHALE · P51700045821 · possession May 2027 · 24.2% built
- SKY HEIGHT · Valivali VillageMango Enterprises · P51700045826 · possession Sept 2026 · 83.6% built
- SAMRUDDHI HEIGHTS · BADLAPURSAMRUDDHI ENTERPRISES · P51700045866 · possession Dec 2027 · 81.8% built
- Maruti Greens · Village KharvaiMARUTI BUILDCON · P51700045873 · possession Oct 2026 · 77.3% built
- ROSE RESIDENCY · KAMATGHARKUNAL RAMESH KARANIYA · P51700045898 · possession Jan 2027 · 38.4% built
- GAMI SOLITAIRE · KOPARKHAIRANEANIL LAXMAN GAMI · P51700045909 · possession Dec 2024 · 9.1% built
- AMBER ELLANCE A-2 · DAWLEAAKASH CORPORATION · P51700045936 · possession Apr 2028 · 90.9% built
- KOHINOOR RESIDENCY · BHIWANDIABRAR HAROON KHAN · P51700045947 · possession Apr 2027 · 90.9% built
- Radhe Govind Commercial Complex · Morivali AmbarnathShree Radha Construction · P51700045967 · possession Apr 2027 · 34.1% built
- AYKON · ThaneMETRO LIFESCAPES INDIA LLP · P51700046010 · possession Dec 2027 · 100% built · 2 complaints
- VASUNDHARA · MOUJE BELAVALI BADLAPUR WESTRUDRA DEVELOPERS · P51700046028 · possession Apr 2027 · 55.5% built
- AHMAHF EMPIRE - WING A · KALYAN EASTAHMAHF REALTY & DEVELOPERS · P51700046092 · possession Oct 2028 · 80.5% built
- RUSTOMJEE LA FAMILIA- WING C · RUSTOMJEE URBANIAKapstone Constructions Private Limited · P51700046128 · possession Oct 2027 · 43.8% built
- Alishan Park 3 · Near Chhatri BunglowAliakbar Yusuf Zojwalla · P51700046147 · possession Sept 2027 · 81.8% built
- Olivia Bliss · KalherJai Bhawani Orchid Infra LLP · P51700046158 · possession Apr 2027 · 72.7% built
- ALLIAANCE ICON · ThaneSATYAM INFRA · P51700046173 · possession Dec 2026 · 100% built
- ASHTAVINAYAK · SAI BABA MANDIRPARISPARSH · P51700046185 · possession Apr 2025 · 10% built
- Omkar Residency A-Wing · BhiwandiK K GROUP · P51700046189 · possession Dec 2026 · 44.1% built
- Sai Siddhi Residency · DOMBIVALIDEVENDRA DAMODAR PATIL · P51700046244 · possession Jan 2027 · 51.8% built
- ALPHA RESIDENCY · BhiwandiAGNETA CONSTRUCTIONS · P51700046254 · possession May 2027 · 90.9% built
- MEGA PEARL · Manda TitwalaMega Creative LLP · P51700046279 · possession Apr 2027 · 51.3% built
- CENTONIC · ThaneMETRO LIFESCAPES INDIA LLP · P51700046286 · possession Jun 2027 · 90.9% built
- Hundiwale · ThaneAditya Associates · P51700046290 · possession Sept 2023 · 90.9% built
- SHREEJI GREENS · BADLAPURDEEP LAXMI ASSOCIATES · P51700046293 · possession Jul 2026 · 81.8% built
- RUNWAL LANDS END · KolshetRunwal Construction Private Limited · P51700046298 · possession Oct 2029 · 36.4% built
- AMEYA GARDEN PHASE II · TISGAONAMEYA ENTERPRISES · P51700046302 · possession Oct 2027 · 81.8% built
- Elanor - Tower 2 · DhokaliLODHA DEVELOPERS LIMITED · P51700046313 · possession Dec 2031 · 7.7% built · 1 complaint
- TISAI SRUSHTI PHASE 1 · KALYANVVKS DEVELOPERS PRIVATE LIMITED · P51700046320 · possession Apr 2028 · 56.4% built
- SILVER RESIDENCE · KALYAN WESTHARIS BUILDERS AND DEVELOPERS · P51700046336 · possession Apr 2028 · 27.3% built
- ELITE RESIDENCE - C · MUMBRAELITE REALTY · P51700046346 · possession Apr 2027 · 81.8% built
- VAISHNAVI PRIDE · CHINCHPADAVAISHNAVI DEVELOPERS · P51700046405 · possession Apr 2027 · 55.2% built
- SHREE GAJANAN PLAZA · TITWALA, TALUKA KALYANSHREE GANADHISH INFRASTRUCTURE · P51700046406 · possession Jun 2027 · 56.4% built
- KATARIAS SHIV SHRISHTI · MORIVALISHIV SAGAR DEVELOPERS AND BUILDERS · P51700046409 · possession Dec 2025 · 72.3% built
- RAUNAK BLISS B1 · ThaneUNNATHI ASSOCIATES · P51700046534 · possession Apr 2030 · 64.5% built · 1 complaint
- Ace Enclave · MogharpadaAce Signature Homes LLP · P51700046536 · possession Dec 2026 · 81.8% built · 1 complaint
- Godrej Ascend Phase 2 · Dhokali NakaGodrej Properties Limited · P51700046541 · possession Apr 2029 · 36.4% built · 1 complaint
- RAUNAK BLISS B3 · Vadavali & OwaleUNNATHI ASSOCIATES · P51700046564 · possession Apr 2030 · 74.5% built · 10 complaints
- RAUNAK BLISS B2 · Vadavali & OwaleUNNATHI ASSOCIATES · P51700046565 · possession Apr 2030 · 64.5% built
- Shiv Paradise · ShirgaonShiv Corporation · P51700046607 · possession Dec 2025 · 90.9% built
- Bungalow K 53 · ThaneRekha Mohanlal Nensi Tanna Bhimjyani · P51700046611 · possession Jan 2023 · 100% built
- EMPIRE HERITAGE · PANCHPAKADILAKHANI BUILDERS PVT LTD · P51700046624 · possession Nov 2027 · 56.5% built