All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 15 of 48.
Mumbai Suburban
- NAVKAR DEVDATT · BorivaliMUKTISTAR REALTORS · P51800001177 · possession Dec 2028 · 70.5% built · 3 complaints
- Kesarban · AndheriAmbrosial Developers Private Limited · P51800001181 · possession Mar 2018 · 90.9% built
- Xpoint Redevelopment of Prem Bhavna CHSL · BorivaliRodium Properties division of Rodium Realty Ltd. · P51800001187 · possession Dec 2021 · 50% built
- MILAP CO-OPERATIVE HOUSING SOCIETY · AndheriGOLDEN EYECON · P51800001191 · possession Mar 2018 · 90.9% built
- Peninsula Technopark Building D · KurlaSwan Energy Limited · P51800001195 · possession Sept 2018 · 81.8% built
- MAULI OMKAR · BorivaliMAULI SAI DEVELOPERS PVT LTD · P51800001198 · possession Jul 2027 · 75% built · 2 complaints
- MAULI PRIDE · BorivaliMAULI SAI DEVELOPERS PVT LTD · P51800001199 · possession Jul 2027 · 81.8% built · 1 complaint
- Hubtown Sunmist A 6th to Above Floor · AndheriHubtown Limited · P51800001202 · possession Dec 2019 · 81.2% built · 8 complaints
- Neelkanth Regent Building 3 - Wing A and Wing B · KurlaMukesh Patel & Others · P51800001215 · possession Nov 2018 · 100% built
- Aspen Park · BorivaliMessrs. Unique Real Estate Developers · P51800001218 · possession Dec 2020 · 97.5% built
- TRISHABH SIGNET · KurlaDimension Housing Realty LLP · P51800001222 · possession Dec 2019 · 90% built · 1 complaint
- SAJAG CHS · BorivaliNavkar Infra Projects · P51800001223 · possession Dec 2020 · 90.9% built
- NIRANT APARTMENT · AndheriADITI CONSTRUCTIONS · P51800001225 · possession Dec 2018 · 90.9% built
- SIGNATURE · MumbaiLAKHANI BUILDERS PVT LTD · P51800001227 · possession Jul 2018 · 90.5% built · 1 complaint
- MAPLE HEIGHTS · BorivaliBHOLASAI DEVELOPERS · P51800001232 · possession Dec 2019 · 100% built
- DATTA RAMANAND CHS LTD · AndheriDISHA CONSTRUCTION · P51800001236 · possession Dec 2021 · 89.1% built
- Oasis - Tower 2 · BorivaliAcme Housing India Private Limited · P51800001238 · possession Dec 2021 · 94.1% built · 22 complaints
- Atmosphere Phase 1 · KurlaAtmosphere Realty Pvt Ltd · P51800001243 · possession Oct 2019 · 100% built · 8 complaints
- Sai Leela · BorivaliLaxmi Associates · P51800001249 · possession Dec 2022 · 90.9% built
- SABARI SANGAM WING A · KurlaMeraki Habitats LLP · P51800001271 · possession Dec 2018 · 71.8% built
- YASHASWATI CHS LTD · KurlaLAKSHMI BUILDERS AND DEVELOPERS · P51800001279 · possession Jul 2023 · 90.9% built
- Sunteck City Avenue 1 · BorivaliSunteck Realty Limited · P51800001281 · possession Dec 2026 · 96.6% built · 57 complaints
- WESTERN HEIGHTS - PHASE 1 RESIDENTIAL · AndheriADANI ESTATES PRIVATE LIMITED · P51800001290 · possession Jun 2019 · 100% built · 23 complaints
- Runwal Bliss Wing - D · KurlaEvie Real Estate Private Limited · P51800001296 · possession Dec 2023 · 100% built · 9 complaints
- SHREE SARASWATI CHSL PLOT 8 A · KurlaNav Durga Construction Company · P51800001302 · possession Dec 2018 · 50.9% built
- VISHVAM · AndheriBHARAT PRANJIVAN VALIA · P51800001306 · possession Dec 2027 · 92.3% built · 5 complaints
- Shri Krishna Kunj CHS Ltd · AndheriEllora Developers · P51800001311 · possession Dec 2018 · 90.9% built
- Park Royale AB Wing · AndheriSHIVRANJANI PROPERTIES LLP · P51800001315 · possession Dec 2019 · 96.4% built
- Lifescapes Prithvii · MumbaiGirnar Builders & Developers · P51800001333 · possession Jun 2025 · 91.1% built
- VIRAJBLISS · AndheriVIJAY RAJ ESTATES · P51800001355 · possession Dec 2018 · 81.8% built
- India International Tower (A6) - 14th to 19th floor · KurlaRare Townships Private Limited · P51800001357 · possession Dec 2027 · 72.7% built · 1 complaint
- Rustomjee Elements - Wing SG · AndheriRustomjee Realty Private Limited · P51800001382 · possession Dec 2018 · 100% built · 2 complaints
- SRISHTI HARMONY III- PHASE 1 · KurlaNATHAN PROPERTIES PVT LTD · P51800001404 · possession Dec 2019 · 100% built · 1 complaint
- SHETH BLUE IVY · BorivaliSheth Developers Private Limited · P51800001407 · possession Nov 2027 · 26.6% built · 21 complaints
- AURIS SERENITY TOWER 2 · BorivaliTRANSCON-SHETH CREATORS PRIVATE LIMITED · P51800001413 · possession Dec 2023 · 72.7% built · 18 complaints
- ROMELL SHRADDHA · BorivaliSHRADDHA SHIVSHAKTI DEVELOPERS · P51800001420 · possession Dec 2018 · 90.9% built
- Rustomjee Seasons - Wing A · AndheriKEYSTONE REALTORS LIMITED · P51800001433 · possession Dec 2022 · 89.1% built · 4 complaints
- REGENT GALAXY · BorivaliREGENT CONSTRUCTIONS · P51800001438 · possession Dec 2021 · 99.1% built
- SHAPOORJI PALLONJI THE DESIGNATE · AndheriBEHOLD SPACE DEVELOPERS PRIVATE LIMITED · P51800001443 · possession Dec 2022 · 80% built · 4 complaints
- Prime Group Project Satyaniwas · BorivaliNITIN VASUDEV BHANDARKAR · P51800001445 · possession May 2019 · 90.9% built · 1 complaint
- PREM CHITRALEKHA · KurlaHITESH ENTERPRISES · P51800001449 · possession Sept 2018 · 100% built
- TRINITY CO OP HSG SOC LTD · KurlaPIONEER ENTERPRISES · P51800001462 · possession Dec 2019 · 99.9% built
- SHREE RAM · KurlaRACHANAA · P51800001464 · possession Mar 2018 · 90.9% built
- Hubtown Solaris · AndheriHubtown Limited · P51800001465 · possession Dec 2022 · 100% built · 187 complaints
- Runwal Bliss Wing - E · KurlaEvie Real Estate Private Limited · P51800001477 · possession Dec 2023 · 100% built · 2 complaints
- Elanza Commercial · KurlaAcme Complex Pvt Ltd · P51800001479 · possession Dec 2027 · 40% built
- VEENA SANTOOR PHASE II · BorivaliVeena Developers · P51800001482 · possession Dec 2019 · 86.8% built
- JP Decks · AndheriJ. P. INFRA (MUMBAI) PRIVATE LIMITED · P51800001488 · possession Dec 2019 · 100% built · 16 complaints
- RAVIRAJ ROYAL · BorivaliM/S RAVIRAJ DEVELOPERS · P51800001493 · possession May 2022 · 100% built · 1 complaint
- WESTBAY · AndheriShraddha Shelters Pvt. Ltd. · P51800001494 · possession Dec 2022 · 100% built · 2 complaints
- Damji Shamji Corporate Square - A Wing · KurlaCoronate Constructions · P51800001495 · possession May 2019 · 80.9% built
- SKYLINE SPARKLE WING C · KurlaSKYLINE GREATHILLS · P51800001500 · possession Dec 2021 · 100% built
- GUNDECHA ASTA PHASE I · AndheriAnaya Infrastructure Pvt. Ltd. · P51800001504 · possession May 2018 · 88.6% built · 1 complaint
- Kalpataru Woodsville · KurlaKalpataru Plus Sharyans · P51800001512 · possession Dec 2023 · 86.8% built · 1 complaint
- EKTA MAPLEWOOD · AndheriEKTA HOUSING PRIVATE LIMITED · P51800001523 · possession Jun 2019 · 100% built
- ASHTHA GOREGAON WEST · BorivaliTOWN DEVELOPERS · P51800001546 · possession Nov 2021 · 87.9% built
- YOGA YOG CHS - CREST · AndheriHariom Sayaji Properties LLP · P51800001550 · possession May 2022 · 72.7% built · 1 complaint
- Golden Heights · AndheriGold Coin Builders · P51800001552 · possession Dec 2023 · 90.9% built
- KARMAYOG · AndheriWESTIN DEVELOPERS PVT. LTD · P51800001588 · possession Mar 2027 · 80.7% built · 2 complaints
- AMRITA PRIVE · KurlaSKREE KRISHNA PROPERTIES · P51800001593 · possession Jun 2019 · 66.8% built
- Kuber Varshatai Tower · KurlaANAND DATTATRAYA PATIL · P51800001601 · possession Dec 2020 · 72.3% built
- ROYAL PEARL / ROYAL SANKALP · BorivaliROYAL REALTORS · P51800001607 · possession Dec 2019 · 90.9% built
- SANDHU PALACE A WING · AndheriSANDHU BUILDERS · P51800001610 · possession Dec 2021 · 90.9% built · 1 complaint
- Niramaya CHS Ltd · AndheriShamik Enterprises Pvt Ltd. · P51800001624 · possession Jun 2019 · 90.9% built
- STEVELAND · KurlaCALVIN PROPERTIES · P51800001625 · possession Dec 2021 · 90.9% built
- SUN-VISON SOLITAIRE · AndheriDHAN INTERNATIONAL PVT LTD · P51800001637 · possession Dec 2020 · 60% built · 2 complaints
- SAT ANUPA CHS PHASE 1 · AndheriDISHA CONSTRUCTION · P51800001640 · possession Mar 2022 · 81.1% built · 1 complaint
- Neelyog Veydaanta · KurlaRatan Builders · P51800001645 · possession Mar 2023 · 80.7% built · 1 complaint
- Redevelopment of GKW Sankey Employees chsl · KurlaHeritage Lifestyles & Developers Pvt. Ltd.e · P51800001655 · possession Nov 2020 · 85.2% built · 1 complaint
- Medinee CHS Ltd · AndheriShamik Enterprises Pvt Ltd. · P51800001664 · possession Sept 2018 · 90.9% built
- NAV-VISHWADHAM CHSL · AndheriWOLFPACK HOUSING CORPORATION · P51800001669 · possession Dec 2023 · 90.9% built
- Runwal Bliss Wing - A · KurlaEvie Real Estate Private Limited · P51800001670 · possession Dec 2023 · 98% built · 9 complaints
- Goldcrest Business Park · KurlaSwastik Associates · P51800001671 · possession Dec 2018 · 81.8% built
- Rajal - Frances CHS Ltd · BorivaliNisar Properties Private Limited · P51800001672 · possession Mar 2018 · 90.9% built
- AXIOM INIZIA · MumbaiAxiom Real Estate Developers Pvt Ltd · P51800001683 · possession Apr 2019 · 90.9% built
- CLARION · BorivaliSheth Developers Private Limited · P51800001685 · possession Nov 2021 · 100% built · 2 complaints
- SAi JHAROKHA · BorivaliSwastik Space · P51800001686 · possession Dec 2017 · 90.9% built
- Boulevard Tower 5 · AndheriAcme Realties Private Limited · P51800001690 · possession Jun 2027 · 79.1% built · 25 complaints
- Shubhada Co-operative Housing Society Ltd. · AndheriBHOOMIVIJAY PROPERTIES PRIVATE LIMITED · P51800001693 · possession Jun 2026 · 90.9% built · 1 complaint
- PALI HILL NAVROZE PREMISES CHS LIMITED · AndheriKRYSHNAJAY DEVELOPERS PRIVATE LIMITED · P51800001695 · possession Feb 2022 · 97.7% built
- SHEETAL ANIKET · BorivaliSHEETAL ANIKET · P51800001704 · possession Dec 2026 · 99.9% built · 1 complaint
- Primo · KurlaCeear Land Developers LLP · P51800001724 · possession Sept 2026 · 72.9% built · 41 complaints
- 36 AB - Anand Bhavan · AndheriVaswani 108 Lifespaces LLP · P51800001726 · possession Jun 2019 · 69.1% built
- Varsha Olive CHSL · AndheriNitesh J Jain · P51800001733 · possession Mar 2019 · 90.9% built
- Sanaya Elysium · KurlaM/s Sanaya Realties Pvt Ltd · P51800001739 · possession Dec 2022 · 85.7% built · 1 complaint
- Redevelopment of Apsara CHS Ltd. · KurlaHeritage Lifestyles & Developers Pvt.Ltd. · P51800001743 · possession Dec 2021 · 72.3% built
- Parmarth Niketan - Redevelopment of Mani Bhuvan · BorivaliJ V Constructions & Developers · P51800001745 · possession Jun 2023 · 90.9% built
- 9 Crystal · KurlaKeyland developers · P51800001748 · possession Dec 2025 · 100% built
- Redevelopment of Marhaba Co-operative Housing Society Limited · MumbaiShree Mahavir Estates · P51800001749 · possession Oct 2019 · 78.2% built
- SANDHU PALACE B WING · AndheriSANDHU BUILDERS · P51800001751 · possession Dec 2028 · 50.8% built
- Sandu Aarambh · KurlaSandu Developers · P51800001753 · possession Dec 2018 · 100% built
- PLATINUM TOWER - 31 · AndheriMANAS GRUHPRAVESH LLP · P51800001759 · possession Jun 2022 · 85.4% built
- Redevelopment of Chembur Sandhya CHSL · KurlaHeritage Lifestyles & Developers Pvt. Ltd. · P51800001760 · possession Nov 2021 · 90.9% built · 1 complaint
- CELESTIAL · KurlaSU SHARDA EDIFICE LLP · P51800001768 · possession Dec 2024 · 99.7% built · 3 complaints
- Redevelopment of Juhu Shantivan CHSL · MumbaiShree Mahavir Properties · P51800001772 · possession Sept 2020 · 90.9% built
- Simran · AndheriElite Corporation · P51800001782 · possession Dec 2018 · 83.6% built
- LIVA ROCA · AndheriParinee Shelters Pvt. Ltd. · P51800001785 · possession Dec 2020 · 43.6% built
- Redevelopment of Tirandaz Subha Niketan CHS Ltd. · Mumbaiheritage Lifestyles & Developers Pvt. Ltd. · P51800001807 · possession Feb 2021 · 90.9% built
- EKTA EROS · AndheriEKTA SHELTERS PRIVATE LIMITED · P51800001826 · possession Dec 2021 · 100% built
- Runwal Forests Tower 5-8 · KurlaWheelabrator Alloy Castings Limited · P51800001838 · possession Dec 2022 · 100% built · 27 complaints
- Parinee Adney · BorivaliPARINEE REALTY PRIVATE LIMITED · P51800001852 · possession Dec 2021 · 90.9% built · 31 complaints
- GUNDECHA GREENS PHASE 1 · BorivaliKASHTAMANDUP DEVELOPERS PVT LTD · P51800001863 · possession Dec 2022 · 100% built · 3 complaints
- RAIKAR CHAMBERS · KurlaDEV DUTTA APARTMENTS PVT LTD · P51800001874 · possession Dec 2018 · 81.8% built
- K RAHEJA PLATINUM · AndheriDIMPLE ENTERPRISES · P51800001882 · possession Dec 2018 · 81.8% built
- NEW PUSHPARAJ · KurlaYASH INFOMEDIA & ESTATE PRIVATE LIMITED · P51800001883 · possession May 2022 · 50.5% built
- Vile Parle Shiv Swami Kripa Cooperative Housing Society Limited · AndheriRelcon Infraprojects Ltd · P51800001893 · possession Dec 2027 · 90.9% built
- Aspen Garden · BorivaliMessrs. Unique Real Estate Developers · P51800001894 · possession Dec 2018 · 100% built
- PEARL BELLEZA · KurlaCHEMBUR HOTELS PRIVATE LIMITED · P51800001897 · possession Dec 2018 · 77.7% built
- Vaidya Cottage CHS Ltd · Vile Parle (east)Shamik Enterprises Pvt Ltd. · P51800001902 · possession Oct 2021 · 90.9% built · 2 complaints
- Runwal Bliss Wing - C · KurlaEvie Real Estate Private Limited · P51800001903 · possession Dec 2023 · 100% built · 6 complaints
- Anmol Fortune - III · BorivaliWadhwa Realty Pvt Ltd. · P51800001912 · possession Dec 2022 · 90% built · 4 complaints
- CHEMBUR HEIGHTS II · KurlaKUKREJA CONSTRUCTION CO · P51800001916 · possession Dec 2021 · 87.3% built
- PRAYOG · AndheriPSC PROPERTIES PRIVATE LIMITED · P51800001932 · possession Dec 2018 · 86.4% built · 2 complaints
- Mahavir Galaxy · KurlaNayan Builders · P51800001952 · possession Jun 2025 · 99.9% built · 1 complaint
- Redevelopment of New Monalisa CHSL · MumbaiShree Mahavir Estates · P51800001955 · possession Jun 2022 · 34.4% built
- BASERA CHS LTD · AndheriLAKSHMI BUILDERS AND DEVELOPERS · P51800001959 · possession Jul 2023 · 90.9% built
- VIKAS PALAZZO · KurlaDURATECH · P51800001960 · possession Nov 2027 · 100% built
- SAYLEE ENCLAVE · BorivaliFUNSIGN HOUSING PVT. LTD · P51800001965 · possession Oct 2021 · 90.9% built
- PARIJATAK CO OP HSG SOC LTD · KurlaSUNRISE HOUSING · P51800001974 · possession Dec 2021 · 80% built
- VKG ESTATES · AndheriGreenery Rock LLP · P51800001980 · possession Dec 2026 · 12.5% built · 10 complaints
- GLORIS · BorivaliSahakar Developers · P51800001984 · possession Dec 2019 · 80.5% built
- SAI SASTHA CRYSTAL · KurlaMS SAI SASTHA ENTERPRISES · P51800002006 · possession Dec 2021 · 90.9% built
- Rachanaa Solitaire · KurlaRACHANAA REALTORS PRIVATE LIMITED · P51800002008 · possession Mar 2018 · 90.9% built
- SWAPNAPOORTI · AndheriM/S SHIV SAMRUDDHI DEVELOPERS · P51800002012 · possession Dec 2021 · 63.6% built
- ATL Corporate Park · KurlaShreem Properties · P51800002013 · possession Dec 2017 · 100% built
- YAMUNA HEIGHTS · KurlaSAINATH ENTERPRISES · P51800002016 · possession Dec 2021 · 46.2% built
- NEHRU NAGAR NISHIGANDHA CHS LTD · KurlaAISHWARYA BUILDERS & DEVELOPERS · P51800002020 · possession Jun 2022 · 90.9% built
- SHIVGIRI CO OP HSG SOC LTD · KurlaHEALTH COLONIES & CONSTRUCTION PVT.LTD. · P51800002023 · possession Dec 2018 · 90.9% built
- AVENUE WING A · BorivaliDharmesh Constructions Private Limited · P51800002030 · possession Dec 2021 · 80.6% built · 21 complaints
- Velentine Apartment 1 Wing D · AndheriVelentine Properties Private Limited · P51800002036 · possession Jul 2023 · 7.3% built
- Lotus Niwas / Satya Niwas · BorivaliK L Ventures and Enterprises · P51800002047 · possession Sept 2020 · 81.8% built
- Aayush Poornima · KurlaAayush Developers · P51800002056 · possession Dec 2020 · 100% built · 1 complaint
- MANHAR RESIDENCY · Dahisar westSHLOK ENTERPRISES (MANHAR) · P51800002057 · possession Jun 2022 · 90.8% built
- PRABHAT URBANE · AndheriH.M. ENTERPRISE · P51800002059 · possession Dec 2018 · 90.9% built
- Rajshree Status · KurlaJetalaal Laxmiechand Dedhia · P51800002062 · possession Dec 2020 · 90.9% built
- OPULENCE · KurlaSIDHIVINAYAK CONSTRUCTIONS · P51800002068 · possession Dec 2020 · 100% built
- 64 Greens · AndheriMessrs Neuzen Realtors LLP · P51800002079 · possession Dec 2020 · 100% built
- SANKALP HEIGHTS 1-22 · BorivaliSTATUS CONSTRUCTION PVT LTD · P51800002085 · possession Dec 2027 · 78.4% built · 2 complaints
- ROYAL GREEN · AndheriAdmire Revive Builder & Developer · P51800002086 · possession Dec 2026 · 5 complaints
- SAGAR APARTMENT · KurlaVIKAS NARAYAN RAIKAR · P51800002093 · possession Dec 2020 · 62.7% built
- Eco Roshni - Redevelopment of Nai Roshni CHSL · AndheriEcohomes Constructions Pvt. Ltd. · P51800002116 · possession Jun 2019 · 80.9% built · 1 complaint
- Rajal - Om Jaishriram CHS Ltd · KurlaNisar Properties Private Limited · P51800002124 · possession Dec 2017 · 90.9% built · 12 complaints
- Boulevard Tower 4 · AndheriAcme Realties Private Limited · P51800002133 · possession Jun 2027 · 79.1% built · 18 complaints
- Sharda Sahaniwas · BorivaliSumit Chetna Ventures · P51800002134 · possession Jun 2018 · 98.6% built · 1 complaint
- Ashford Royale Tower D · KurlaAshford Infotech Private Limited · P51800002149 · possession Dec 2019 · 100% built
- SAI ICONIC · AndheriSHREE KRISHNA SAI DEVELOPMENT CORPORATION · P51800002150 · possession Mar 2019 · 90.9% built
- NS HEIGHTS · AndheriNS BUILDERS & DEVELOPERS · P51800002156 · possession Oct 2023 · 90.9% built · 1 complaint
- Universal Cubical · AndheriPAGARANI UNIVERSAL INFRASTRUCTURE PVT. LTD. · P51800002157 · possession Dec 2019 · 48.4% built · 4 complaints
- STERLING COURT WING D · AndheriAPRAULIC CONSTRUCTION INVESTMENT AND FINANCE PRIVATE LIMITED · P51800002160 · possession Dec 2023 · 90.9% built
- ANANDI HEIGHTS · KurlaSarvoday Enterprises · P51800002161 · possession Jun 2022 · 100% built
- CRESCENT IMPERIA · AndheriCRESCENT ARK LIFESTYLES PVT LTD · P51800002184 · possession Dec 2019 · 90.9% built
- SUDHA AVENUE · BorivaliM/S. CHAMUNDA ENTERPRISES · P51800002186 · possession Dec 2019 · 100% built
- NAVKAR PALAZZO · BorivaliNAVKAR PALAZZO · P51800002187 · possession Dec 2026 · 47.7% built · 8 complaints
- JASWANTI WOODS · KurlaASHRAY REALTORS · P51800002192 · possession Dec 2019 · 90.9% built
- REDEVELOPMENT OF MALAD RAJHANS CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800002196 · possession Mar 2019 · 90.9% built
- SWASTIK PHASE 1 · AndheriDISHA CONSTRUCTION · P51800002197 · possession Dec 2023 · 49.2% built · 1 complaint
- WESTERN HEIGHTS PHASE 2 COMMERCIAL 1ST AND 2ND FLOOR · AndheriADANI ESTATES PRIVATE LIMITED · P51800002219 · possession Jun 2019 · 100% built
- AMRUT ELLEGANCE · AndheriAMRUT ENTERPRISES · P51800002223 · possession Dec 2020 · 39.3% built
- ZEN APARTMENTS · KurlaBHOLENATH DEVELOPERS LTD. · P51800002227 · possession Mar 2018 · 90.9% built
- Emerald Isle - T8 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800002230 · possession Dec 2018 · 97.8% built · 21 complaints
- Mulund Mahavir Darshan · KurlaChheda Lifestyles · P51800002234 · possession Oct 2018 · 72.7% built
- Ventura at ONE4 · AndheriSun Star Spaces Pvt. Ltd. · P51800002236 · possession Mar 2018 · 100% built
- SHREYA · BorivaliBHARAT NAVINCHANDRA GALA · P51800002243 · possession Jun 2026 · 36.2% built · 1 complaint
- ANU-SMERA CELESTE · KurlaANUSMERA REALTY & INFRA PRIVATE LIMITED · P51800002260 · possession Dec 2021 · 100% built · 1 complaint
- SHASHWAT RESIDENCY · BorivaliRUSHI REALTY INDIA PVT LTD · P51800002265 · possession Dec 2027 · 26.3% built
- Whitespring · BorivaliCCI PROJECTS PRIVATE LIMITED · P51800002287 · possession Dec 2018 · 99.2% built · 10 complaints
- Diamond Residency · BorivaliP. H. REALTY · P51800002306 · possession Dec 2018 · 85.5% built
- SETHIA SEA VIEW C AND D WING · BorivaliPrathamesh Land Developers · P51800002308 · possession Mar 2022 · 90.9% built · 6 complaints
- DLH KESLEY · BorivaliDLH PANSN DEVELOPERS LLP · P51800002310 · possession Mar 2019 · 100% built
- INSIGNIA · KalinaULTRA SPACE DEVELOPERS PRIVATE LIMITED · P51800002313 · possession Jun 2022 · 96.1% built · 64 complaints
- Gomes Apartment CHS · BorivaliMetro Associates · P51800002316 · possession Dec 2021 · 50% built
- 64 LIG, 80 MIG, 16HIG and 20 Shops at Sr. No. 491, Res. No. 23 Part, Vengurla, Dist. Sindhudurg · AndheriMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · P51800002323 · possession May 2018 · 69.3% built
- ASMI · BorivaliSia Developers LLP · P51800002325 · possession Dec 2019 · 82.5% built · 1 complaint
- MUTUAL BENEFIT CO OP HSG SOC LTD · KurlaSUNRISE HOUSING · P51800002333 · possession Dec 2019 · 81.8% built
- Hubtown Viva · AndheriWellgroomed Venture · P51800002336 · possession Jul 2019 · 90.3% built · 16 complaints
- AMBE KRUPA · KurlaGUDDI ENTERPRISES · P51800002344 · possession Jun 2019 · 56.6% built
- ODHAV K K RESIDENCY · KurlaK. K. PATEL & SONS · P51800002362 · possession Mar 2028 · 84.2% built
- BLDG NO.1 DAHISAR SAI SADAN CHS LTD · BorivaliTRUMPH DEVELOPERS · P51800002369 · possession Dec 2026 · 81.8% built · 11 complaints
- Nakshatra · KurlaMETRO DEVELOPERS CO. · P51800002370 · possession Mar 2023 · 100% built
- Hubtown Seasons - Daintree · KurlaJoynest Premises Private Limited · P51800002373 · possession Dec 2024 · 81.8% built · 7 complaints
- REDEVELOPMENT OF RAJENDRA APARTMENTS CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800002378 · possession Jul 2018 · 90.9% built
- ROYAL OASIS PHASE 1 · BorivaliRIKKI RONIE DEVELOPERS · P51800002382 · possession Dec 2019 · 94.5% built · 2 complaints
- EAST EDEN · AndheriPRIMA TERRA LANDMARK PVT LTD · P51800002386 · possession Oct 2022 · 100% built · 1 complaint
- SPARSH · AndheriVALUABLE DREAMSCAPE LLP · P51800002394 · possession Dec 2019 · 50.7% built
- Palazzio · KurlaSpenta Builders Private Limited · P51800002414 · possession Dec 2018 · 90.9% built · 15 complaints
- Keshav Shiv Heights · BorivaliInventure Sejal Realtors Pvt. Ltd. · P51800002416 · possession Dec 2018 · 100% built
- NEPTUNE ELEVE WING C · KurlaNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · P51800002428 · possession Dec 2026 · 0.9% built · 11 complaints
- ECO HEIGHTS · NITYANAND NAGARETCO BUILDERS PRIVATE LIMITED · P51800002429 · possession Dec 2023 · 90.9% built · 9 complaints
- Integrated Kamal · KurlaIntegrated Spaces Limited · P51800002437 · possession Dec 2019 · 99.1% built
- PADMA CHS LTD · AndheriG.M.DEVELOPERS · P51800002441 · possession Dec 2017 · 90.9% built
- VIKI HEIGHTS · KurlaDivij Developers · P51800002451 · possession Nov 2019 · 100% built
- Redevelopment of Lamplight CHSL · MumbaiShree Mahavir Estates · P51800002461 · possession Dec 2021 · 76.8% built
- Om Shyam · KurlaP51800002462 · possession Jun 2022 · 90.9% built
- Dahisar Sunderbaug co-op housing society ltd. · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800002464 · possession Dec 2019 · 81.1% built
- SHANTIVILLA · Vile Parle(West)RIKHAV ASHIT SHAH · P51800002468 · possession Mar 2022 · 47.3% built
- KABRA AJANTA Redevelopment of Santacruz Ajanta Premises Co Operative Society Ltd · AndheriKABRA AND ASSOCIATES · P51800002483 · possession Dec 2021 · 100% built
- SARLA AVENUE · BorivaliSANDEEP MAHENDRA KANAKIA · P51800002489 · possession Oct 2018 · 90.9% built
- EXPRESS ZONE MALL · AndheriCELLO SONAL CONSTRUCTION · P51800002490 · possession Jun 2024 · 81.8% built · 3 complaints
- Serenity Heights · KurlaAristocrat Marketing Ltd · P51800002492 · possession Nov 2021 · 90.9% built
- Skyline viha Wing B · KurlaAnkit Overseas · P51800002495 · possession Jun 2024 · 82.6% built · 1 complaint
- Kalpawriksha Cooperative Housing Society Limited · AndheriRELCON REALTY PRIVATE LIMITED · P51800002502 · possession Dec 2018 · 90.9% built
- MAHALAXMI PRASAD BUILDING · BorivaliSUDHEER DADARKAR · P51800002525 · possession Dec 2018 · 95.5% built
- Neumec Srushti · KurlaNEUMEC ESTATE DEVELOPER LLP · P51800002532 · possession Dec 2027 · 73% built
- NOBLE HEIGHT · AndheriNOBLE CONSTRUCTION · P51800002534 · possession Mar 2021 · 100% built
- Spring Dale · AndheriAmbrosial Developers Private Limited · P51800002536 · possession Dec 2019 · 90.9% built
- Redevelopment of Silverlight CHSL · MumbaiShree Mahavir Estates · P51800002541 · possession Jun 2022 · 36.2% built
- NATEKAR HEIGHTS · KurlaSabari Developers LLP · P51800002547 · possession Oct 2020 · 82.7% built
- Hillcrest A Wing · AndheriHillcrest Joint Venture · P51800002556 · possession Mar 2018 · 97.6% built · 4 complaints
- Gorai Laxmi CHSL Casa Bellisimo B wing · BorivaliJaydev Realtors Private Limited · P51800002562 · possession Oct 2019 · 96.4% built
- VASANT KUNJ CHS LTD · AndheriCALVIN SHRESTH PROPERTIES LLP · P51800002566 · possession Oct 2021 · 80.5% built
- Gayatri CHSL · BorivaliKhushi Associates · P51800002567 · possession Sept 2019 · 90.9% built
- SBIEs Geetanjali CHSL · BorivaliB.CHOPDA CONSTRUCTION PVT LTD · P51800002588 · possession Jul 2019 · 69.1% built
- DEVI CLASSIC · KurlaD M REALITY · P51800002600 · possession Jun 2018 · 90.9% built
- AMAR GEEJAY CO OPERATIVE HOUSING SOCIETY LIMITED · BorivaliK T SONS · P51800002603 · possession Jul 2018 · 90.5% built · 2 complaints
- PURNIMA PRIDE · KurlaADITYA ENTERPRISES · P51800002605 · possession Feb 2021 · 100% built
- SUN SHADE · BorivaliSHUBHAM ENTERPRISE · P51800002607 · possession Jan 2020 · 47.2% built
- PRABHAT DARSHAN · AndheriSHIVALIK VENTURES PRIVATE LIMITED · P51800002608 · possession Jun 2023 · 89.5% built
- EKAM · AndheriA P PROPERTIES · P51800002628 · possession Mar 2026 · 72.6% built
- Sunteck City Avenue 2 · GoregaonSunteck Realty Limited · P51800002637 · possession Apr 2023 · 93.9% built · 34 complaints
- SAI GRANDEUR · KurlaSHREE SAI REALTORS · P51800002645 · possession Mar 2021 · 100% built
- ADVENT PALAZZO · BorivaliADVENT DEVELOPERS PRIVATE LIMITED · P51800002649 · possession Jun 2018 · 86.4% built · 1 complaint
- ALEXIO APARTMENT CHSL · BorivaliM. MAMTORA ASSOCIATES · P51800002650 · possession Sept 2019 · 90.9% built
- Enigma Towers A and B · KurlaOberoi Constructions Limited · P51800002656 · possession Aug 2024 · 100% built · 16 complaints
- Neelkanth Enclave C Wing Arihant · KurlaBhaveshwar Properties Pvt Ltd · P51800002669 · possession Nov 2019 · 89.7% built · 2 complaints
- Hubtown Premiere Residences - Beverly · AndheriHubtown Limited · P51800002671 · possession Jul 2029 · 96.4% built · 3 complaints
- LAXMI VILLA · BorivaliLAXMIDEVI DEVELOPERS · P51800002675 · possession Jun 2018 · 90.9% built
- Kashish Park Ghatkopar · KurlaLadam Homes Pvt Ltd. · P51800002692 · possession Dec 2022 · 90.8% built · 11 complaints
- Mahavir Universe - Phoenix · KurlaUniverse Developers · P51800002709 · possession May 2019 · 79.1% built · 1 complaint
- TERRAFORM DWARKA · KurlaMoney Magnum Nest Pvt Ltd · P51800002718 · possession Dec 2023 · 91.2% built · 2 complaints
- Arham Aum · KurlaMahavir Enterprises · P51800002719 · possession Dec 2017 · 75.9% built · 1 complaint
- Kush Prestige · AndheriKush Buildcon LLP · P51800002724 · possession Dec 2017 · 90.9% built
- A AND O PALAZZIO · AndheriASHAPURA OPTIONS PRIVATE LIMITED · P51800002732 · possession Jul 2019 · 90.9% built
- LIGHTHALL D WING · KurlaGamma Constructions Pvt Ltd · P51800002737 · possession Dec 2018 · 90.9% built
- DELHOUSE CO.OP. HSG. SOC.LTD. · AndheriAUM SHIV ENTERPRISES · P51800002780 · possession Sept 2018 · 90.9% built
- Royal Court - Commercial · AndheriPSC PROPERTIES PRIVATE LIMITED · P51800002784 · possession Jan 2019 · 81.8% built
- Srushti Raj Siddhi · Tilak NagarCHINNAIAH VENKATESH GOWDA · P51800002790 · possession Dec 2027 · 56.2% built · 19 complaints
- AADITYA PLAZA · BorivaliJET BUILD DEVELOPERS(MUMBAI) · P51800002793 · possession Dec 2026 · 99.5% built · 2 complaints
- Om Samarpan · BorivaliK MEHTA AND COMPANY · P51800002794 · possession Jul 2019 · 53.8% built
- CHITTARANJAN TOWER · KurlaNarrottam Chittaranjan Sharma · P51800002797 · possession Oct 2024 · 100% built
- SHELTON B · AndheriPatel Construction co · P51800002799 · possession Mar 2018 · 72.7% built
- Bindu / Vidyavihar · KurlaP51800002800 · possession Dec 2018 · 90.9% built
- VEENA SIGNATURE · BorivaliVeena Developers · P51800002804 · possession Dec 2019 · 64.1% built · 1 complaint
- Shah Business Centre · BorivaliSHAH HOUSECON PRIVATE LIMITED · P51800002825 · possession Dec 2021 · 60% built · 2 complaints
- Terraform Dwarka · KurlaMoney Magnum Nest Pvt Ltd · P51800002826 · possession Dec 2023 · 91.2% built · 1 complaint
- Construction of LIG and MIG Tenement at Virar Bolinj · AndheriKONKAN HOUSING AND AREA DEVELOPMENT BOARD · P51800002836 · possession Mar 2018 · 100% built
- VAIBHAV HEIGHTS · AndheriRSN BALAJI REALTORS P LTD · P51800002862 · possession Dec 2026 · 90.5% built · 2 complaints
- AZAD NAGAR KEDAR DARSHAN CHSL · AndheriPRATHAMESH KRUPA BUILDCON PRIVATE LIMITED · P51800002863 · possession Aug 2019 · 90.5% built
- CHAURANG SHRADDHA · KurlaM/s. CHAURANG DEVELOPERS · P51800002864 · possession Dec 2018 · 81.8% built
- HAPPY HOME C WING · KurlaENTEE DEVELOPERS · P51800002874 · possession Dec 2021 · 81.8% built · 3 complaints
- SHREE GANESH PRASAD · KurlaANON DEVELOPERS · P51800002888 · possession Dec 2021 · 82.5% built
- RADHAKRISHNA · BorivaliK.PATELAND CO · P51800002896 · possession Dec 2017 · 100% built
- Building on Sub Plot F of CTS No 283 A and 238 B of Kandivali West · KandivaliRNA Palazzo Residents Welfare Association · P51800002906 · possession Mar 2027 · 23% built · 3 complaints
- TILAK INDRAYANI CHS LTD · KurlaRELIANCE CORPORATION · P51800002913 · possession Sept 2020 · 90.9% built · 1 complaint
- The Gateway · AndheriConoor Builders Private Limited · P51800002922 · possession Sept 2020 · 100% built · 22 complaints
- AMAZON PARK BUILDING NO 2 - WING C · BORIVALI WESTR.J. CONSTRUCTIONS · P51800002956 · possession Mar 2025 · 53.6% built · 14 complaints
- Rigveda · BandraSupreme Ventures LLP · P51800002957 · possession May 2023 · 100% built
- Oshi · OshiwaraSahyog Homes Limited · P51800002965 · possession Jun 2024 · 92.7% built · 7 complaints
- Neev Amberwood · AndheriNeev Infrastructure Pvt Ltd · P51800002969 · possession Mar 2019 · 66.4% built · 9 complaints
- Mircale Heritage · AndheriMircale Heritage · P51800002996 · possession Jun 2031 · 0% built · 3 complaints
- MANJARI ARCADE · KurlaJYOTI HOMEMAKERS PVT. LTD. · P51800002997 · possession Dec 2021 · 100% built
- Hubtown Seasons Czarnowo · KurlaJoynest Premises Private Limited · P51800003012 · possession Jul 2025 · 70% built
- AAKRUTI AASHVI APARTMENT · KurlaAakruti Aashvi Developers · P51800003018 · possession Jun 2026 · 81.4% built
- ROSWALT HEIGHTS · KurlaURBAN HEIGHTS REALTORS PRIVATE LIMITED · P51800003019 · possession Dec 2019 · 74.6% built · 1 complaint
- SORRENTO · AndheriSAHAJ ANKUR DEVELOPERS · P51800003022 · possession Dec 2019 · 95% built · 2 complaints
- Verona · AndheriSahyog Homes Limited · P51800003040 · possession Dec 2027 · 78% built · 110 complaints
- HANSA · AndheriAMN Enterprises · P51800003042 · possession Dec 2023 · 100% built
- SHASHWAT PARK · KurlaATLANTA ASSOCIATES · P51800003044 · possession Dec 2022 · 71.5% built · 2 complaints
- SABARI ASHVILLE · KurlaSABARI JANI ASSOCIATES · P51800003066 · possession Dec 2018 · 99.9% built · 1 complaint
- Wintergreen · BorivaliCCI PROJECTS PRIVATE LIMITED · P51800003067 · possession Dec 2021 · 100% built · 444 complaints
- Nirman · BorivaliJPV Realtors Private Limited · P51800003080 · possession Dec 2017 · 90.9% built
- Ashford Royale Tower A · KurlaAshford Infotech Private Limited · P51800003093 · possession Dec 2023 · 92.5% built · 3 complaints
- KAHAN JASH RESIDENCY · KurlaMEHTA ASSOCIATES · P51800003109 · possession Dec 2027 · 81.8% built
- UNIVERSAL PARADISE A AND B · AndheriPAGARANI UNIVERSAL INFRASTRUCTURE PVT LTD · P51800003121 · possession Dec 2018 · 88% built
- A-14, A Wing Petunia Apts, Bindra Complex · AndheriAccord Land Developers Pvt Ltd · P51800003133 · possession Nov 2018 · 90.9% built
- SHUBH REGENCY · MULUNDSHUBH ENTERPRISE · P51800003145 · possession Feb 2025 · 90.9% built · 2 complaints
- APURVA · KurlaSIDHIVINAYAK CONSTRUCTIONS · P51800003149 · possession Dec 2020 · 100% built
- LANDMARK · AndheriCRESCENT REALTORS INDIA PVT LTD · P51800003163 · possession Dec 2019 · 90.9% built
- BURHANI BUILDING · BorivaliMS DEVELOPERS · P51800003165 · possession Dec 2020 · 90.9% built
- Aria · AndheriParinee Realtors Pvt. Ltd. · P51800003167 · possession Apr 2022 · 87.7% built
- OLIVIA · KurlaNAHAR BUILDERS LTD · P51800003168 · possession Dec 2022 · 100% built
- REDEVELOPMENT OF SBI EMPLOYEES KANCHAN MRIG CHS LTD. · AndheriR R CONSTRUCTIONS · P51800003186 · possession Apr 2018 · 90.9% built
- CENTRONA ZEST- B · KurlaELEVATED AVENUE REALTY LLP · P51800003201 · possession Dec 2026 · 79.5% built
- Avanya Tower A · BorivaliAniline Properties Private Limited · P51800003202 · possession Jun 2024 · 100% built · 5 complaints
- PARK REACH · AndheriPLATINUM HOMES PROPERTY · P51800003208 · possession Mar 2023 · 90.9% built
- Gaodevi Krupa Darshan SRA CHS Ltd · KurlaShivshankar Singh & Others · P51800003218 · possession Dec 2026 · 81.8% built · 5 complaints
- Tivon Park Wing E and F · KurlaD S Developers · P51800003235 · possession Dec 2026 · 90.6% built · 1 complaint
- Joy Legend Wing B · AndheriBhavin Jayant Soni · P51800003263 · possession Dec 2026 · 44.8% built
- Imperial Heights Wing C and D · BorivaliEPITOME RESIDENCY PRIVATE LIMITED · P51800003270 · possession Dec 2021 · 97.1% built · 34 complaints
- SHREE GANESH RACHANA · KurlaRAJAN CHANDRAKANT TIPNIS HUF · P51800003279 · possession Oct 2018 · 67.5% built
- SHARAD APARTMENTS CHS LTD · BorivaliAAKAR CONSTRUCTIONS · P51800003282 · possession Apr 2022 · 90.9% built · 1 complaint
- Mahavir Nagar Anshul Plaza Co-Operative Housing Society Limited · BorivaliNHP Developers LLP · P51800003285 · possession Jun 2019 · 100% built · 3 complaints
- KRISHVI RESIDENCY · KurlaSHAGUN CHEMBUR (AOP) · P51800003291 · possession Dec 2027 · 93.6% built · 2 complaints
- PLLATINUM AURA · AndheriG.S. DEVELOPERS · P51800003297 · possession Mar 2018 · 90.9% built · 1 complaint
- PEARL HAZELINE · AndheriCHANDIWALA ENTERPRISES · P51800003301 · possession May 2018 · 90.9% built
- SUDHANSHU IMPERIA · KurlaSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · P51800003303 · possession Dec 2021 · 81.8% built
- Saffron Heights · AndheriPratham Varadvinayak Developers LLP · P51800003304 · possession Oct 2023 · 100% built
- Emerald Isle - T4, T5, T6 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800003307 · possession Jun 2018 · 100% built · 18 complaints
- SANKALP HERITAGE · BorivaliSHYAM BIHARILAL GEHANI · P51800003309 · possession Dec 2019 · 90.9% built
- Neumec Niwara · AndheriNeumec Venture · P51800003319 · possession Sept 2027 · 85% built · 1 complaint
- Athena · Goregaon WestM/s. Sahajanand Developers · P51800003330 · possession Jan 2024 · 62.7% built · 10 complaints
- Stella Sapphire B WIng · KurlaVaibhavLaxmi Builders and Developers · P51800003333 · possession Dec 2018 · 89.1% built
- Neptunes Lotus · Mulund WestVRUTTI DEVELOPERS LLP · P51800003339 · possession Dec 2027 · 42.1% built
- Bhaveshwar Nagar Building No. 3 · KurlaYog Reality · P51800003355 · possession Mar 2022 · 99.5% built · 1 complaint
- MEGHDOOT RESIDENCY · AndheriMILAN INTERBUILT PRIVATE LIMITED · P51800003357 · possession Mar 2018 · 90.9% built
- Raj - Baiju · BorivaliRaj Arcade Pvt. Ltd. · P51800003361 · possession Dec 2019 · 36.4% built
- HANS ELEGANCE · AndheriSHREE HANS REALTORS LLP · P51800003370 · possession Sept 2018 · 56.4% built
- Arista · BorivaliP51800003375 · possession Mar 2028 · 87.3% built · 61 complaints
- SAMARTH TANISH · BorivaliNITIN DATTARAM SAMANT · P51800003379 · possession Dec 2026 · 75% built · 14 complaints
- Sky Residency Loksadan CHS Phase 1 Up to G Plus 7pt. · BorivaliSky Property Developers Private Limited · P51800003387 · possession Dec 2017 · 90.3% built · 1 complaint
- KESAR SCION · KurlaKESAR HOUSING & DEVELOPMENT CO · P51800003391 · possession Dec 2021 · 23.6% built
- White House · AndheriOmega Enterprises · P51800003392 · possession Jun 2027 · 20% built
- Green Wood · AndheriPerfect Construction · P51800003401 · possession Sept 2025 · 100% built
- SHREE SIDDHI BLDG NO 69 · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800003413 · possession Mar 2024 · 90.9% built
- Kalpataru Avenue · BorivaliNeo Pharma Private Limited · P51800003417 · possession Apr 2022 · 76.3% built · 1 complaint
- OM SHREE SAIDHAM · KurlaS K ENTERPRISE · P51800003439 · possession Dec 2017 · 81.8% built
- CENTRONA ZEST- A · KurlaElevated Avenue Realty LLP · P51800003446 · possession Dec 2026 · 79.5% built · 1 complaint
- Santacruz Prakash CHS Ltd Redevelopment · AndheriPTR Corporations · P51800003452 · possession Dec 2018 · 90.9% built
- MAHAVIR ASHISH · KurlaSarvoday Enterprises · P51800003457 · possession Dec 2019 · 90.9% built
- ASHIRWAD · KurlaVASTAV HOMES · P51800003492 · possession Dec 2019 · 90.9% built
- HIMBINDU · Goregaon WestM/s. Sahajanand Developers · P51800003502 · possession May 2022 · 52.7% built · 5 complaints
- KULDEEP-ISHCHHAYA CHS LTD · MULUND WESTTRIDEV REALTY AND CONSTRUCTION PVT LTD · P51800003506 · possession Dec 2026 · 90.5% built · 3 complaints
- Primus Residences · AndheriGurukrupa Developers · P51800003522 · possession Dec 2022 · 83.9% built · 3 complaints
- SHREY APARTMENT · AndheriADITI CONSTRUCTIONS · P51800003528 · possession Dec 2019 · 43.2% built
- Raj Nirman · BorivaliFERRO BUILD · P51800003531 · possession Jun 2018 · 55.5% built
- AL MARJAAN · AndheriTOWN DEVELOPERS · P51800003556 · possession Mar 2029 · 90% built
- OMKAR CHS LTD · AndheriLAKSHMI BUILDERS AND DEVELOPERS · P51800003558 · possession Jun 2024 · 90.9% built
- Neelyog Virat -B Wing · BorivaliNeelyog Construction Pvt Ltd · P51800003560 · possession Dec 2025 · 99.9% built
- Hubtown Premiere Residences - Commercial · AndheriHubtown Limited · P51800003575 · possession Jul 2026 · 72.7% built · 2 complaints
- SHIV AARADHANA · BorivaliBRIGHTMEN BUILDSPACES LLP · P51800003581 · possession Dec 2026 · 52.8% built
- Sky City Towers A to D · BorivaliIncline Realty Private Limited · P51800003582 · possession Dec 2023 · 100% built · 4 complaints
- Amar CHSL · AndheriShiva Shakti Enclaves Private Limited · P51800003597 · possession Dec 2018 · 53.9% built · 2 complaints
- LITTLE MALABAR HILL · KurlaPARDIS CONSTRUCTION LLP · P51800003603 · possession Sept 2022 · 90.9% built
- DLH ORNATE · AndheriDEV LAND & HOUSING PVT LTD · P51800003604 · possession Dec 2018 · 83.6% built · 1 complaint
- Runwal Elegante - Tower A · AndheriRUNWAL DEVELOPERS PVT LTD · P51800003620 · possession Dec 2023 · 100% built · 10 complaints
- ZEE SARGAM · AndheriZEE PRAGATEE DEVELOPERS LLP · P51800003624 · possession Sept 2020 · 48.5% built
- EVERSHINE CROWN · BorivaliEVERSHINE BUILDERS PRIVATE LIMITED · P51800003631 · possession Jun 2022 · 80% built · 5 complaints
- ARKK AVENUE · MumbaiARKK BUILDERS AND DEVELOPERS · P51800003639 · possession Dec 2019 · 86.4% built
- SHAH ARCADE III · BorivaliSHAH HOUSECON PRIVATE LIMITED · P51800003642 · possession Jul 2019 · 95.9% built · 3 complaints
- SHREEJI KRUPA · AndheriPARESH PUJARA AND ABHIRAJ PUJARA (AOP) · P51800003649 · possession Dec 2019 · 90.9% built
- Prem Belaire · KurlaM/s Aryan Infra · P51800003675 · possession Jul 2024 · 90.8% built · 1 complaint
- SABARI HORIZON · KurlaSabari Developers LLP · P51800003677 · possession Oct 2020 · 100% built · 1 complaint
- 11 West · AndheriPARINEE REALTY PRIVATE LIMITED · P51800003709 · possession Dec 2019 · 90.9% built · 2 complaints
- Dhoot Emrald Residency-Jaygun Sagar CHSL · KurlaDHOOT DEVELOPERS PVT. LTD. · P51800003713 · possession Mar 2018 · 76.4% built
- MAITHILI RESIDENCY PHASE-2 · KurlaGLOBAL ORICON DEVELOPERS · P51800003722 · possession Dec 2027 · 49.4% built · 1 complaint
- SHEETAL DWAR · BorivaliSHEETAL ENTERPRISES · P51800003724 · possession Jun 2022 · 35.7% built
- Sagar C.H.S · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800003741 · possession Dec 2023 · 81.8% built · 1 complaint
- SAFAL TRADEMARK · KurlaJAI MATA DI HOME CONSTRUCTION PVT LTD · P51800003754 · possession May 2026 · 85.5% built · 34 complaints
- Lakshmi Vani · KurlaTridhaatu Realty & Infra Pvt Limited · P51800003759 · possession Oct 2018 · 100% built
- Modispaces Tashkent · BorivaliModispaces Real Estate Pvt Ltd · P51800003762 · possession Dec 2018 · 72.7% built
- MAAN PAPPILON · BorivaliMAAN REALTY · P51800003769 · possession Dec 2018 · 67.7% built · 1 complaint
- Moreshwar tower · Kurlayashraj corporation · P51800003786 · possession Jun 2022 · 51.8% built
- Kisna · AndheriShreeji Realties Private Limited · P51800003802 · possession Dec 2019 · 90.9% built
- Rajal Classic · AndheriRajal Classic · P51800003806 · possession Dec 2028 · 39.8% built · 5 complaints
- MERIDEAN ASSOCIATES · KurlaMERIDEAN ASSOCIATES · P51800003813 · possession Jun 2018 · 81.8% built
- SANJAR DEVELOPERS AND BUILDERS · BorivaliSANJAR DEVELOPERS & BUILDERS · P51800003814 · possession Dec 2019 · 88.2% built
- MORYA GRAND · AndheriNAKTA INVESTMENT PVT. LTD. · P51800003824 · possession Jul 2026 · 100% built · 13 complaints
- DELTA HOUSE · BorivaliRIGHT CHANNEL CONSTRUCTION PVT LTD · P51800003828 · possession Jun 2026 · 90.9% built · 5 complaints
- RUDRAKSHA · BorivaliRAJ UNIVERSAL · P51800003842 · possession Jan 2021 · 81.8% built · 1 complaint
- SABARI SHOBHA · KurlaSabari Developers LLP · P51800003844 · possession Nov 2021 · 41.8% built
- THAKUR ASPIRE · BorivaliTHAKUR REALTY PRIVATE LIMITED · P51800003848 · possession Dec 2022 · 21.8% built
- SANGHVI SOLITAIRE · BorivaliSanghvi Premises Private Limited · P51800003858 · possession Jun 2026 · 100% built · 26 complaints
- ZEE SQUARE · AndheriZEE COM TRADE PRIVATE LIMITED · P51800003888 · possession Dec 2021 · 86.8% built
- ZEE SHAAN · AndheriTRISUL DEVELOPERS · P51800003892 · possession Dec 2026 · 88.5% built
- GLORIS RESIDENCY · BorivaliSahakar Developers · P51800003895 · possession May 2018 · 90.9% built
- Paramount · KurlaPrakash Housing Pvt Ltd · P51800003917 · possession Sept 2018 · 90.9% built
- Shreeji Aspire · BorivaliShreeji Construction · P51800003919 · possession Nov 2022 · 100% built · 5 complaints
- MARVEL PRIDE · AndheriMarvellous Builders Private Limited · P51800003921 · possession Oct 2027 · 5 complaints
- CONWOOD HOUSING-PALACE ROYALE · BorivaliCONWOOD HOUSING PRIVATE LIMITED · P51800003934 · possession Sept 2020 · 100% built
- BT SUJATA CHSL · BorivaliC H PATIL AND SONS LLP · P51800003936 · possession Jun 2022 · 63.6% built
- DP STAR TRILOK · KurlaDP BUILDHOMES LLP · P51800003937 · possession Dec 2023 · 87.3% built · 6 complaints
- MAVERICK MOOLDEEP · KurlaJAI SUN MAVERICK REALTORS · P51800003963 · possession Jun 2026 · 89.9% built · 2 complaints
- PAARIJAT CHS LTD · BorivaliMAAN HOUSING DEVELOPMENT · P51800003972 · possession Dec 2018 · 36.4% built · 31 complaints
- DAHISAR SUMATI CHS LTD · BorivaliBHATIA BUILDERS AND DEVELOPERS PVT LTDC · P51800003975 · possession Dec 2021 · 53.6% built
- Sahil Exotica · AndheriBOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · P51800003978 · possession Dec 2023 · 87.3% built · 1 complaint
- SRISHTI OASIS PH 1 WING A PALMS · KurlaSHIV KRUPA ENTERPRISE · P51800003982 · possession Mar 2018 · 90.9% built
- SAHAKAR AVENUE · BorivaliSAHAKAR CORPORATION · P51800003995 · possession Jun 2026 · 100% built
- RAMCHANDRA NIWAS · KurlaSHREE TIRUPATI DEVELOPERS · P51800004025 · possession Jun 2024 · 100% built
- Borivali Dipti Co-op Hsg Ltd · BorivaliShree Riddhi Siddhi Builders · P51800004028 · possession Jun 2019 · 90.9% built
- Kalpataru Magnus · AndheriKalpataru Properties Pvt. Ltd. · P51800004029 · possession Mar 2026 · 83.9% built · 64 complaints
- Heritage Park · AndheriVelentine Developers · P51800004034 · possession Jul 2022 · 90.9% built
- PEARL RESIDENCY - WING-A, COMMERCIAL PHASE-II · AndheriGIRIRAJ ENTERPRISES · P51800004037 · possession Jul 2019 · 69.5% built
- Neelyog Virat -A Wing · BorivaliNeelyog Construction Pvt Ltd · P51800004052 · possession Dec 2026 · 60.9% built · 1 complaint
- ZEE NAYAK · AndheriPRAGATEE ZEE · P51800004058 · possession Dec 2026 · 81.8% built · 1 complaint
- REDEVELOPMENT OF VISHVA ANAND CHS LTD · AndheriR R CONSTRUCTIONS · P51800004066 · possession Dec 2019 · 90.9% built
- MANDLIK NAGAR CHS LTD PHASE II REHAB WING E PT AND F · BorivaliTRIUMPH BUILDERS LLP · P51800004077 · possession Dec 2018 · 46.8% built
- EMERENE HEIGHTS · AndheriRangoli Realtors & Developers · P51800004086 · possession May 2019 · 100% built
- 10 Square · AndheriVIJAY KAMDAR · P51800004094 · possession Jun 2022 · 82.7% built · 2 complaints
- ROOPRAJAT ENCLAVE · BorivaliSIDDHIVINAYAK DEVELOPERS · P51800004097 · possession Dec 2026 · 57.9% built · 25 complaints
- Solitaire II · BorivaliTULSI ENTERPRISE JOINT VENTURE · P51800004102 · possession Dec 2018 · 77.3% built
- SAI PRASAD · KurlaADITYARAJ BUILDERS · P51800004104 · possession Jun 2021 · 55% built
- NAMAN HABITAT · AndheriSHREE NAMAN DEVELOPERS PVT LTD · P51800004108 · possession Dec 2026 · 96.4% built · 7 complaints
- Arham Brindavan · KurlaMahavir Enterprises · P51800004177 · possession Dec 2017 · 90.9% built
- Two Roses · AndheriPrakash Estates · P51800004187 · possession Dec 2021 · 100% built · 4 complaints
- Prisma · AndheriOberoi Constructions Limited · P51800004199 · possession Jun 2018 · 100% built · 15 complaints
- Sheela Smruti CHSL · AndheriBlack Gold Developers Pvt Ltd · P51800004201 · possession May 2020 · 90.9% built
- SAFALYA · AndheriVITAE CONSTRUCTIONS LLP · P51800004205 · possession Jun 2018 · 79.5% built
- ANIKET CHS LTD · AndheriR. R. INFRAVENTURES PRIVATE LIMITED · P51800004219 · possession Dec 2021 · 100% built
- PEARL HARMONY · AndheriCHANDIWALA ENTERPRISES · P51800004224 · possession Dec 2023 · 46.7% built
- Leo Heights · KurlaLeo Heights · P51800004236 · possession Dec 2026 · 43.5% built · 2 complaints
- JYOTI · AndheriV R ASSOCIATES · P51800004260 · possession Mar 2018 · 90.9% built
- THE ROYAL TUSK · BorivaliSOHAM MAHAVIR DEVELOPERS · P51800004265 · possession Dec 2024 · 100% built
- Laxmi Prabha · AndheriTerraferma Developers LLP · P51800004266 · possession Jun 2018 · 100% built
- Tirumala Habitats · KurlaAAP Realtors Ltd. · P51800004278 · possession Jun 2019 · 96.1% built · 17 complaints
- DIWAPRABHU RESIDENCY · BorivaliDiwaprabhu Homes · P51800004311 · possession Jul 2018 · 90.9% built
- CHITRALEKHA HERRITAGE · AndheriH.K.PUJARA BUILDERS · P51800004317 · possession Mar 2019 · 90.9% built
- Modispaces Amazon · BorivaliModispaces Real Estate Pvt Ltd · P51800004328 · possession Dec 2019 · 45.5% built
- The Residency · AndheriLak & Hanware Realty LLP · P51800004331 · possession Jun 2026 · 93.2% built · 4 complaints
- SUDHANSHU CHS LTD · AndheriHARIOM DEVELOPERS · P51800004339 · possession Oct 2018 · 90.9% built
- Dineshkunj CHS Ltd · BorivaliSwastik Realty Pvt Ltd · P51800004364 · possession Mar 2021 · 90.9% built · 1 complaint
- MANTHAN EMBASSY · KurlaMANTHAN DEVELOPMENT CORPORATION · P51800004366 · possession Dec 2026 · 51.8% built · 1 complaint
- GULRAJ PARADISE · KurlaM/S RELIABLE CONSTRUCTION · P51800004371 · possession Sept 2026 · 52.1% built · 18 complaints
- SHREE MANGAL · AndheriMANGAL BUILDHOME PRIVATE LIMITED · P51800004380 · possession Dec 2017 · 90.9% built
- Sunrise Charkop Wing C · BorivaliDhaval Housing AOP · P51800004387 · possession Mar 2022 · 88.6% built
- Yash Orion · BorivaliYASH SKYSCRAPERS PRIVATE LIMITED · P51800004388 · possession Jun 2018 · 100% built
- SHUBHANGI · KurlaOMKAR BUILDERS · P51800004391 · possession Sept 2020 · 90.9% built
- Shreeji Atlantis Wing A · BorivaliShreeji Construction · P51800004400 · possession Dec 2023 · 100% built · 17 complaints
- AVENUE WING B · BorivaliDharmesh Constructions Private Limited · P51800004402 · possession Dec 2026 · 58.8% built · 40 complaints
- Horizon Jewel · BorivaliHORIZON DREAM HOMES PRIVATE LIMITED · P51800004409 · possession Jun 2022 · 100% built · 2 complaints
- ASHOK ODYSSEY - B WING · KurlaSANYAM REALTORS PRIVATE LIMITED · P51800004418 · possession Dec 2023 · 90.9% built · 5 complaints
- RUDRANSH · BorivaliSPA JAIN REAL ESTATE PRIVATE LIMITED · P51800004422 · possession Dec 2017 · 90.9% built
- ARKADE EARTH-DAFFODIL · Kanjurmarg EastArkade Developers Private Limited · P51800004440 · possession Dec 2023 · 88.5% built
- Redevelopment of Jai Vijay CHSL - Phase I · MumbaiKOLTE-PATIL DEVELOPERS LIMITED · P51800004446 · possession Sept 2022 · 63.6% built · 2 complaints
- VIRANGULA CHS LTD · BorivaliRISHABRAJ HOUSING · P51800004450 · possession Dec 2018 · 85.9% built
- Redevelopment of Malad Jay Amrat Co-operative Housing Society-Rishab Jay Amrat · BorivaliRishabraj Toughcons City Homes Private Limited · P51800004454 · possession Jun 2023 · 100% built
- NEMINATH ASSOCIATES · AndheriNeminath Associates · P51800004460 · possession Dec 2018 · 90.9% built
- PEARL PLATINUM · AndheriCHANDIWALA ENTERPRISES · P51800004462 · possession Dec 2023 · 42.7% built
- HUM SUB CHSL · BorivaliSHRADDHARPAN DEVELOPERS · P51800004487 · possession Jun 2019 · 90.9% built · 3 complaints
- Vijayraj Residency · AndheriVijayraj Residency · P51800004495 · possession Dec 2027 · 42.7% built · 35 complaints
- Grace Luxuria · BorivaliNew India Construction Co · P51800004501 · possession Dec 2018 · 90.9% built · 3 complaints
- Nero · AndheriSuper Construction Company · P51800004508 · possession Dec 2026 · 68.7% built · 9 complaints
- Integrated Arya · KurlaIntegrated Spaces Limited · P51800004521 · possession Dec 2028 · 83.5% built · 1 complaint
- SHRI GANESH APARTMENTS · BorivaliMATUSHREE REAL ESTATE DEVELOPERS PRIVATE LIMITED · P51800004536 · possession Jun 2018 · 72.7% built · 1 complaint
- ORCHID RESIDENCES · AndheriH.K.PUJARA BUILDERS · P51800004540 · possession Dec 2018 · 90.9% built
- AERA · KurlaRE Infra Pvt Ltd · P51800004542 · possession Dec 2018 · 34.5% built
- DATTA KRUPA · KurlaSHREE HERAAMBH VASTU NIRMAN LLP · P51800004548 · possession Jan 2021 · 90.9% built
- DP STAR TRIVENI · BHANDUP WESTDP BUILDHOMES LLP · P51800004550 · possession Dec 2024 · 85.5% built
- PLUTO-B -SUNCITY HOUSING PHASE- I · KurlaSUNCITY COMPLEX · P51800004553 · possession Jun 2022 · 90.9% built
- ZEE TULSI · AndheriZEE COM TRADE PRIVATE LIMITED · P51800004559 · possession Dec 2026 · 81.8% built
- CENTRONA NOVA B · KurlaELEVATED AVENUE REALTY LLP · P51800004566 · possession Jun 2027 · 8.2% built · 2 complaints
- SHRIRANG · KurlaVIRENDRA NATWARLAL SHETH · P51800004570 · possession Jun 2022 · 90.9% built · 6 complaints
- PARAG - RESERVE CO-OP HSG SOC · BorivaliSADGURU BUILDSPACESPVT. LTD. · P51800004572 · possession Dec 2020 · 62.5% built
- Om Ganesh Krupa · BorivaliDharma Construction · P51800004592 · possession Jun 2019 · 90.9% built
- ASHOK ODYSSEY - C WING · KurlaSANYAM REALTORS PRIVATE LIMITED · P51800004602 · possession Dec 2023 · 90.9% built · 10 complaints
- SAINATH MALAD SRA CHS · BorivaliSHREE MAHALAXMI ASSOCIATES · P51800004613 · possession Dec 2017 · 90.9% built
- MANEESHA CHSL · KurlaSHAH DEVELOPERS · P51800004616 · possession Dec 2019 · 90.9% built
- Nayana Niwas · BorivaliH.D.Associates · P51800004622 · possession Mar 2018 · 60% built
- POWAI PROJECT · KurlaH.K.PUJARA BUILDERS · P51800004626 · possession Dec 2026 · 90.9% built · 1 complaint
- REDEVELOPMENT OF ULKA CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800004627 · possession Dec 2019 · 90.9% built
- Royal Fantasy Phase II · AndheriRoyal Fantasy Constructions Private Limited · P51800004649 · possession Dec 2026 · 83% built · 5 complaints
- Shivoham Heights · BorivaliRajputana Heights · P51800004652 · possession Dec 2017 · 100% built
- SMGK ASSOCIATE RESIDENCY Wing B Phase 2 17th to 20th Floors · AndheriVastu Shilpa Complex Designers Pvt Ltd · P51800004663 · possession Dec 2022 · 51.5% built
- FINE RESIDENCY · AndheriFINE DEVELOPMENTS · P51800004690 · possession Aug 2022 · 90.9% built
- MEGHDOOT · KurlaSHREE BALAJI ASSOCIATES · P51800004699 · possession Dec 2026 · 89.2% built
- Vastu Pinnacle · BorivaliSanwar M Khandelwal · P51800004711 · possession Mar 2022 · 90.9% built · 1 complaint
- Nirmal Lifestyle-Zircon · KurlaNirmal Lifestyle Ltd · P51800004719 · possession Dec 2019 · 71.8% built · 65 complaints
- SHEEL ENCLAVES · AndheriPODDAR INFRACON PRIVATE LIMITED · P51800004722 · possession Dec 2021 · 90.9% built
- BHAVNA KUNJ · BorivaliVINOD INFRASTRUCTURE PRIVATE LIMITED · P51800004724 · possession Dec 2019 · 100% built
- MY RESIDENCY · AndheriHITESH INDRAVADAN PATEL · P51800004728 · possession Dec 2019 · 99.5% built
- CHANDAN CHS LTD · AndheriAUM G M HEIGHTS · P51800004733 · possession Dec 2021 · 90.9% built
- Satwaratna Co Op Hsg Society Ltd · AndheriKISHRAJDEVELOPERS · P51800004735 · possession Sept 2026 · 57.3% built
- AETHER WING B2 - PHASE 1B - FROM 21ST TO 33RD FLOOR · BorivaliROMELL PROPERTIES PRIVATE LIMITED · P51800004737 · possession Dec 2023 · 100% built
- SHALIMAR SHELTERS · BorivaliSADGURU ENTERPRISES · P51800004740 · possession Dec 2019 · 90.9% built
- SUYOG CHS · KurlaADITYARAJ BUILDERS · P51800004742 · possession Jun 2022 · 72.7% built
- ARKADE EARTH - FERN · KurlaArkade Developers Private Limited · P51800004750 · possession Dec 2023 · 88.5% built · 1 complaint
- BHOOMI CELESTIA B-WING · BorivaliSASHWAT CONSTRUWELL PRIVATE LIMITED · P51800004768 · possession Dec 2021 · 61.3% built
- SANJIV CO-OP HSG SOC. LTD. · MumbaiCHETNA HOME LLP · P51800004771 · possession Dec 2018 · 100% built
- Harihareshwar SRA · KurlaM/s Navnath Associates · P51800004789 · possession Dec 2027 · 81.8% built · 4 complaints
- Suvidha CHS Ltd · KurlaAmi & Monika Developers · P51800004792 · possession Mar 2018 · 80.9% built
- OSTWAL TOWER · BorivaliUNNATI BUILDERS · P51800004808 · possession Dec 2018 · 100% built
- RAJSHREE CLOVER · KurlaRajshree Creations · P51800004812 · possession Dec 2019 · 90.9% built
- NL ARYAVARTA · BorivaliNAHALCHAND LALOOCHAND PVT. LTD. · P51800004816 · possession Mar 2019 · 90.9% built · 11 complaints
- Rohan Development · BorivaliM/s Rohan Development · P51800004819 · possession Jul 2018 · 90.9% built · 15 complaints
- Om Shiv Matoshree SRA CHS LTD · BorivaliARJUN ANANT WAGHMARE · P51800004827 · possession Dec 2026 · 87.3% built · 4 complaints
- GAURI EXCELLENCY · BorivaliM/S GAURI LAND DEVELOPERS LLP · P51800004832 · possession Jun 2026 · 82.8% built · 10 complaints
- HRESA - SAINAGAR APARTMENT PVT. LTD. · KurlaBHOLENATH DEVELOPERS LTD. · P51800004835 · possession Nov 2023 · 90.9% built
- SHAKTI UNICUS · MumbaiRAHEJA & CO · P51800004839 · possession Dec 2018 · 90.9% built
- ANDHERI EKTA · AndheriMumbai Shelter Combines LLP · P51800004843 · possession Mar 2023 · 41.8% built
- ARPIT · AndheriTISTA IMPEX PRIVATE LIMITED · P51800004857 · possession Dec 2019 · 56.8% built
- Pampa Co-Operative Housing Society · Goregaon WestARHAM REALTORS LLP · P51800004869 · possession Mar 2018 · 90.9% built
- Skyline wealthspace Wing C2 3 to 8 floors · KurlaSymphony · P51800004870 · possession Mar 2018 · 90.9% built
- REDEVELOPMENT OF METTIVILLA CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800004896 · possession Dec 2028 · 63.2% built
- Redevelopment of JUHU ANKUR CHS LTD · AndheriKDI HOLDINGS PVT. LTD. · P51800004899 · possession Dec 2023 · 90.9% built · 2 complaints
- SWANAND BLDG NO 33 · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800004914 · possession Nov 2024 · 90.9% built
- Udyanjali Chs · AndheriASHRAY DEVELOPERS · P51800004917 · possession Dec 2020 · 39.1% built
- Swastik Plaza C CHS Ltd-AVANA · KurlaPRATIBHA VEEKAY REAL ESTATE LLP · P51800004923 · possession Oct 2020 · 90.9% built
- Shubham Sarayu · KurlaShubham Realty · P51800004927 · possession Mar 2021 · 90.9% built
- ACROPOLIS · BORIVALI WESTVORA ASSOCIATES · P51800004939 · possession Dec 2023 · 90.5% built
- Amity Apartments · AndheriRaajyam Realty LLP · P51800004960 · possession Aug 2022 · 68.6% built · 1 complaint
- Rite Celesta · BorivaliRite Developers Pvt. Ltd. · P51800004974 · possession Dec 2017 · 90.9% built
Thane
- DYNAMIC CREST PHASE I - RIMO/EVEREST · DOMBIVALISNEH MAKEWELL LLP · P51800001460 · possession Dec 2022 · 72.7% built
- Heena Presidency · Mira RoadNeha Developers · P51800001920 · possession Dec 2026 · 97.3% built
- Annapurna Aquarius · BHAYANDER WESTAnnapurna Properties · P51800002185 · possession Dec 2023 · 90.9% built
- Bhavani Heights · Badlapur (M Cl)Kalyani Enterprises · P51800003594 · possession Dec 2023 · 59.1% built · 9 complaints
- DYNAMIC ULTIMA - BLISS · Kalyan-Dombivali (M Corp.)TRIVENI LIFE STYLE DEVELOPERS LLP · P51800004249 · possession Dec 2020 · 90.9% built
Raigarh
Mumbai City
- MONTESOUTH-3 · Ward ESWAYAM REALTORS & TRADERS LLP · P51800001681 · possession Jun 2024 · 43.6% built
- Orchid Atrium · Ward GNorthGawde And Associates · P51800002120 · possession Dec 2018 · 100% built
- MONTESOUTH-6 · Ward ESWAYAM REALTORS & TRADERS LLP · P51800002818 · possession Jun 2026 · 76.1% built · 1 complaint