- HANS ELEGANCE · AndheriSHREE HANS REALTORS LLP · P51800003370 · possession Sept 2018 · 56.4% built
- Arista · BorivaliP51800003375 · possession Jul 2028 · 87.3% built · 63 complaints
- SAMARTH TANISH · BorivaliNITIN DATTARAM SAMANT · P51800003379 · possession Apr 2027 · 78.4% built · 14 complaints
- Sky Residency Loksadan CHS Phase 1 Up to G Plus 7pt. · BorivaliSky Property Developers Private Limited · P51800003387 · possession Dec 2017 · 90.3% built · 1 complaint
- KESAR SCION · KurlaKESAR HOUSING & DEVELOPMENT CO · P51800003391 · possession Dec 2021 · 23.6% built
- White House · AndheriOmega Enterprises · P51800003392 · possession Oct 2027 · 20% built
- Green Wood · AndheriPerfect Construction · P51800003401 · possession Sept 2025 · 100% built
- MULUND MAHAVIRDHAM CO. OP. HOUSING SOC. LTD. · MUMBAIMAVERICK REALTORS · P51800003411 · possession Mar 2027 · 100% built
- SHREE SIDDHI BLDG NO 69 · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800003413 · possession Mar 2024 · 90.9% built
- Kalpataru Avenue · BorivaliNeo Pharma Private Limited · P51800003417 · possession Apr 2022 · 76.3% built · 1 complaint
- OM SHREE SAIDHAM · KurlaS K ENTERPRISE · P51800003439 · possession Dec 2017 · 81.8% built
- CENTRONA ZEST- A · KurlaElevated Avenue Realty LLP · P51800003446 · possession Apr 2027 · 80.5% built · 1 complaint
- Santacruz Prakash CHS Ltd Redevelopment · AndheriPTR Corporations · P51800003452 · possession Dec 2018 · 90.9% built
- MAHAVIR ASHISH · KurlaSarvoday Enterprises · P51800003457 · possession Dec 2019 · 90.9% built
- ASHIRWAD · KurlaVASTAV HOMES · P51800003492 · possession Dec 2019 · 90.9% built
- HIMBINDU · Goregaon WestM/s. Sahajanand Developers · P51800003502 · possession May 2022 · 52.7% built · 5 complaints
- KULDEEP-ISHCHHAYA CHS LTD · MULUND WESTTRIDEV REALTY AND CONSTRUCTION PVT LTD · P51800003506 · possession Dec 2026 · 90.5% built · 3 complaints
- Primus Residences · AndheriGurukrupa Developers · P51800003522 · possession Dec 2022 · 83.9% built · 3 complaints
- SHREY APARTMENT · AndheriADITI CONSTRUCTIONS · P51800003528 · possession Dec 2019 · 43.2% built
- Raj Nirman · BorivaliFERRO BUILD · P51800003531 · possession Jun 2018 · 55.5% built
- AL MARJAAN · AndheriTOWN DEVELOPERS · P51800003556 · possession Jul 2029 · 90% built
- OMKAR CHS LTD · AndheriLAKSHMI BUILDERS AND DEVELOPERS · P51800003558 · possession Jun 2024 · 90.9% built
- Neelyog Virat -B Wing · BorivaliNeelyog Construction Pvt Ltd · P51800003560 · possession Dec 2025 · 99.9% built
- Hubtown Premiere Residences - Commercial · AndheriHubtown Limited · P51800003575 · possession Jul 2026 · 72.7% built · 2 complaints
- SHIV AARADHANA · BorivaliBRIGHTMEN BUILDSPACES LLP · P51800003581 · possession Apr 2027 · 81.6% built
- Sky City Towers A to D · BorivaliIncline Realty Private Limited · P51800003582 · possession Dec 2023 · 100% built · 4 complaints
- Rustomjee Summit · Rajendra NagarKEYSTONE REALTORS LIMITED · P51800003590 · possession Dec 2027 · 90.9% built · 11 complaints
- Amar CHSL · AndheriShiva Shakti Enclaves Private Limited · P51800003597 · possession Dec 2018 · 53.9% built · 2 complaints
- LITTLE MALABAR HILL · KurlaPARDIS CONSTRUCTION LLP · P51800003603 · possession Sept 2022 · 90.9% built
- DLH ORNATE · AndheriDEV LAND & HOUSING PVT LTD · P51800003604 · possession Dec 2018 · 83.6% built · 1 complaint
- Runwal Elegante - Tower A · AndheriRUNWAL DEVELOPERS PVT LTD · P51800003620 · possession Dec 2023 · 100% built · 10 complaints
- ZEE SARGAM · AndheriZEE PRAGATEE DEVELOPERS LLP · P51800003624 · possession Sept 2020 · 48.5% built
- EVERSHINE CROWN · BorivaliEVERSHINE BUILDERS PRIVATE LIMITED · P51800003631 · possession Jun 2022 · 80% built · 5 complaints
- ARKK AVENUE · MumbaiARKK BUILDERS AND DEVELOPERS · P51800003639 · possession Dec 2019 · 86.4% built
- SHAH ARCADE III · BorivaliSHAH HOUSECON PRIVATE LIMITED · P51800003642 · possession Jul 2019 · 95.9% built · 3 complaints
- SHREEJI KRUPA · AndheriPARESH PUJARA AND ABHIRAJ PUJARA (AOP) · P51800003649 · possession Dec 2019 · 90.9% built
- Prem Belaire · KurlaM/s Aryan Infra · P51800003675 · possession Jul 2024 · 90.8% built · 1 complaint
- SABARI HORIZON · KurlaSabari Developers LLP · P51800003677 · possession Oct 2020 · 100% built · 1 complaint
- 11 West · AndheriPARINEE REALTY PRIVATE LIMITED · P51800003709 · possession Dec 2019 · 90.9% built · 2 complaints
- Dhoot Emrald Residency-Jaygun Sagar CHSL · KurlaDHOOT DEVELOPERS PVT. LTD. · P51800003713 · possession Mar 2018 · 76.4% built
- MAITHILI RESIDENCY PHASE-2 · KurlaGLOBAL ORICON DEVELOPERS · P51800003722 · possession Apr 2028 · 49.4% built · 1 complaint
- SHEETAL DWAR · BorivaliSHEETAL ENTERPRISES · P51800003724 · possession Jun 2022 · 35.7% built
- Sagar C.H.S · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800003741 · possession Dec 2023 · 81.8% built · 1 complaint
- KISMET CHSL · SANTACRUZ WESTMidcity Landmarks LLP · P51800003751 · possession Dec 2021 · 69.1% built
- SAFAL TRADEMARK · KurlaJAI MATA DI HOME CONSTRUCTION PVT LTD · P51800003754 · possession Apr 2027 · 81.4% built · 36 complaints
- Lakshmi Vani · KurlaTridhaatu Realty & Infra Pvt Limited · P51800003759 · possession Oct 2018 · 100% built
- Modispaces Tashkent · BorivaliModispaces Real Estate Pvt Ltd · P51800003762 · possession Dec 2018 · 72.7% built
- MAAN PAPPILON · BorivaliMAAN REALTY · P51800003769 · possession Dec 2018 · 67.7% built · 1 complaint
- Moreshwar tower · KurlaYashraj Corporation · P51800003786 · possession Jun 2022 · 51.8% built
- Kisna · AndheriShreeji Realties Private Limited · P51800003802 · possession Dec 2019 · 90.9% built
- Rajal Classic · AndheriRajal Classic · P51800003806 · possession Dec 2028 · 39.8% built · 5 complaints
- BHAWANI HEIGHTS · MajaswadiM/s BHAWANI DEVELOPERS · P51800003807 · possession Jun 2027 · 90.5% built · 2 complaints
- MERIDEAN ASSOCIATES · KurlaMERIDEAN ASSOCIATES · P51800003813 · possession Jun 2018 · 81.8% built
- SANJAR DEVELOPERS AND BUILDERS · BorivaliSANJAR DEVELOPERS & BUILDERS · P51800003814 · possession Dec 2019 · 88.2% built
- MORYA GRAND · AndheriNAKTA INVESTMENT PVT. LTD. · P51800003824 · possession Jul 2026 · 100% built · 14 complaints
- DELTA HOUSE · BorivaliRIGHT CHANNEL CONSTRUCTION PVT LTD · P51800003828 · possession Jun 2026 · 100% built · 6 complaints
- RUDRAKSHA · BorivaliRAJ UNIVERSAL · P51800003842 · possession Jan 2021 · 81.8% built · 1 complaint
- SABARI SHOBHA · KurlaSabari Developers LLP · P51800003844 · possession Nov 2021 · 41.8% built
- THAKUR ASPIRE · BorivaliTHAKUR REALTY PRIVATE LIMITED · P51800003848 · possession Dec 2022 · 21.8% built
- SANGHVI SOLITAIRE · BorivaliSanghvi Premises Private Limited · P51800003858 · possession Jun 2026 · 100% built · 26 complaints
- ZEE SQUARE · AndheriZEE COM TRADE PRIVATE LIMITED · P51800003888 · possession Dec 2021 · 86.8% built
- ZEE SHAAN · AndheriTRISUL DEVELOPERS · P51800003892 · possession Dec 2026 · 88.5% built
- GLORIS RESIDENCY · BorivaliSahakar Developers · P51800003895 · possession May 2018 · 90.9% built
- Paramount · KurlaPrakash Housing Pvt Ltd · P51800003917 · possession Sept 2018 · 90.9% built
- Shreeji Aspire · BorivaliShreeji Construction · P51800003919 · possession Nov 2022 · 100% built · 6 complaints
- MARVEL PRIDE · AndheriMarvellous Builders Private Limited · P51800003921 · possession Feb 2028 · 5 complaints
- CONWOOD HOUSING-PALACE ROYALE · BorivaliCONWOOD HOUSING PRIVATE LIMITED · P51800003934 · possession Sept 2020 · 100% built
- BT SUJATA CHSL · BorivaliC H PATIL AND SONS LLP · P51800003936 · possession Jun 2022 · 63.6% built
- DP STAR TRILOK · KurlaDP BUILDHOMES LLP · P51800003937 · possession Dec 2023 · 87.3% built · 7 complaints
- MAVERICK MOOLDEEP · KurlaJAI SUN MAVERICK REALTORS · P51800003963 · possession Oct 2026 · 83.2% built · 2 complaints
- PAARIJAT CHS LTD · BorivaliMAAN HOUSING DEVELOPMENT · P51800003972 · possession Dec 2018 · 36.4% built · 31 complaints
- DAHISAR SUMATI CHS LTD · BorivaliBHATIA BUILDERS AND DEVELOPERS PVT LTDC · P51800003975 · possession Dec 2021 · 53.6% built
- Sahil Exotica · AndheriBOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · P51800003978 · possession Dec 2023 · 87.3% built · 1 complaint
- SRISHTI OASIS PH 1 WING A PALMS · KurlaSHIV KRUPA ENTERPRISE · P51800003982 · possession Mar 2018 · 90.9% built
- SAHAKAR AVENUE · BorivaliSAHAKAR CORPORATION · P51800003995 · possession Oct 2026 · 100% built
- RAMCHANDRA NIWAS · KurlaSHREE TIRUPATI DEVELOPERS · P51800004025 · possession Jun 2024 · 100% built
- Borivali Dipti Co-op Hsg Ltd · BorivaliShree Riddhi Siddhi Builders · P51800004028 · possession Jun 2019 · 90.9% built
- Kalpataru Magnus · AndheriKalpataru Properties Pvt. Ltd. · P51800004029 · possession Mar 2026 · 83.9% built · 66 complaints
- Heritage Park · AndheriVelentine Developers · P51800004034 · possession Jul 2022 · 90.9% built
- PEARL RESIDENCY - WING-A, COMMERCIAL PHASE-II · AndheriGIRIRAJ ENTERPRISES · P51800004037 · possession Jul 2019 · 69.5% built
- Neelyog Virat -A Wing · BorivaliNeelyog Construction Pvt Ltd · P51800004052 · possession Dec 2026 · 60.9% built · 1 complaint
- ZEE NAYAK · AndheriPRAGATEE ZEE · P51800004058 · possession Dec 2026 · 81.8% built · 1 complaint
- REDEVELOPMENT OF VISHVA ANAND CHS LTD · AndheriR R CONSTRUCTIONS · P51800004066 · possession Dec 2019 · 90.9% built
- MANDLIK NAGAR CHS LTD PHASE II REHAB WING E PT AND F · BorivaliTRIUMPH BUILDERS LLP · P51800004077 · possession Dec 2018 · 46.8% built
- EMERENE HEIGHTS · AndheriRangoli Realtors & Developers · P51800004086 · possession May 2019 · 100% built
- 10 Square · AndheriVIJAY KAMDAR · P51800004094 · possession Jun 2022 · 82.7% built · 2 complaints
- ROOPRAJAT ENCLAVE · BorivaliSIDDHIVINAYAK DEVELOPERS · P51800004097 · possession Apr 2027 · 57.9% built · 25 complaints
- Solitaire II · BorivaliTULSI ENTERPRISE JOINT VENTURE · P51800004102 · possession Dec 2018 · 77.3% built
- SAI PRASAD · KurlaADITYARAJ BUILDERS · P51800004104 · possession Jun 2021 · 55% built
- NAMAN HABITAT · AndheriSHREE NAMAN DEVELOPERS PVT LTD · P51800004108 · possession Dec 2026 · 96.4% built · 7 complaints
- Arham Brindavan · KurlaMahavir Enterprises · P51800004177 · possession Dec 2017 · 90.9% built
- Two Roses · AndheriPrakash Estates · P51800004187 · possession Dec 2021 · 100% built · 4 complaints
- Prisma · AndheriOberoi Constructions Limited · P51800004199 · possession Jun 2018 · 100% built · 15 complaints
- Sheela Smruti CHSL · AndheriBlack Gold Developers Pvt Ltd · P51800004201 · possession May 2020 · 90.9% built
- SAFALYA · AndheriVITAE CONSTRUCTIONS LLP · P51800004205 · possession Jun 2018 · 79.5% built
- ANIKET CHS LTD · AndheriR. R. INFRAVENTURES PRIVATE LIMITED · P51800004219 · possession Dec 2021 · 100% built
- PEARL HARMONY · AndheriCHANDIWALA ENTERPRISES · P51800004224 · possession Dec 2023 · 46.7% built
- Leo Heights · KurlaLeo Heights · P51800004236 · possession Dec 2026 · 43.5% built · 3 complaints
- JYOTI · AndheriV R ASSOCIATES · P51800004260 · possession Mar 2018 · 90.9% built
- THE ROYAL TUSK · BorivaliSOHAM MAHAVIR DEVELOPERS · P51800004265 · possession Dec 2024 · 100% built
- Laxmi Prabha · AndheriTerraferma Developers LLP · P51800004266 · possession Jun 2018 · 100% built
- Tirumala Habitats · KurlaAAP Realtors Ltd. · P51800004278 · possession Jun 2019 · 96.1% built · 17 complaints
- DIWAPRABHU RESIDENCY · BorivaliDiwaprabhu Homes · P51800004311 · possession Jul 2018 · 90.9% built
- CHITRALEKHA HERRITAGE · AndheriH.K.PUJARA BUILDERS · P51800004317 · possession Mar 2019 · 90.9% built
- Modispaces Amazon · BorivaliModispaces Real Estate Pvt Ltd · P51800004328 · possession Dec 2019 · 45.5% built
- The Residency · AndheriLak & Hanware Realty LLP · P51800004331 · possession Oct 2026 · 93.2% built · 4 complaints
- SUDHANSHU CHS LTD · AndheriHARIOM DEVELOPERS · P51800004339 · possession Oct 2018 · 90.9% built
- Dineshkunj CHS Ltd · BorivaliSwastik Realty Pvt Ltd · P51800004364 · possession Mar 2021 · 90.9% built · 1 complaint
- MANTHAN EMBASSY · KurlaMANTHAN DEVELOPMENT CORPORATION · P51800004366 · possession Apr 2029 · 51.8% built · 1 complaint
- GULRAJ PARADISE · KurlaM/S RELIABLE CONSTRUCTION · P51800004371 · possession Sept 2026 · 52.1% built · 22 complaints
- SHREE MANGAL · AndheriMANGAL BUILDHOME PRIVATE LIMITED · P51800004380 · possession Dec 2017 · 90.9% built
- Sunrise Charkop Wing C · BorivaliDhaval Housing AOP · P51800004387 · possession Mar 2022 · 88.6% built
- Yash Orion · BorivaliYASH SKYSCRAPERS PRIVATE LIMITED · P51800004388 · possession Jun 2018 · 100% built
- SHUBHANGI · KurlaOMKAR BUILDERS · P51800004391 · possession Sept 2020 · 90.9% built
- Shreeji Atlantis Wing A · BorivaliShreeji Construction · P51800004400 · possession Dec 2023 · 100% built · 17 complaints
- AVENUE WING B · BorivaliDharmesh Constructions Private Limited · P51800004402 · possession Dec 2026 · 61.4% built · 48 complaints
- Horizon Jewel · BorivaliHORIZON DREAM HOMES PRIVATE LIMITED · P51800004409 · possession Jun 2022 · 100% built · 2 complaints
- Suvidha Solitaire · KurlaSuvidha Solitaire · P51800004412 · possession Dec 2028 · 0% built
- ASHOK ODYSSEY - B WING · KurlaSANYAM REALTORS PRIVATE LIMITED · P51800004418 · possession Dec 2023 · 90.9% built · 5 complaints
- RUDRANSH · BorivaliSPA JAIN REAL ESTATE PRIVATE LIMITED · P51800004422 · possession Dec 2017 · 90.9% built
- Hubtown Seasons - Ecuador Cloud · Chembur EastJoynest Premises Private Limited · P51800004432 · possession Dec 2024 · 81.8% built
- ARKADE EARTH-DAFFODIL · Kanjurmarg EastArkade Developers Private Limited · P51800004440 · possession Dec 2023 · 88.5% built
- Redevelopment of Jai Vijay CHSL - Phase I · MumbaiKOLTE-PATIL DEVELOPERS LIMITED · P51800004446 · possession Sept 2022 · 63.6% built · 2 complaints
- VIRANGULA CHS LTD · BorivaliRISHABRAJ HOUSING · P51800004450 · possession Dec 2018 · 85.9% built
- Redevelopment of Malad Jay Amrat Co-operative Housing Society-Rishab Jay Amrat · BorivaliRishabraj Toughcons City Homes Private Limited · P51800004454 · possession Jun 2023 · 100% built
- NEMINATH ASSOCIATES · AndheriNeminath Associates · P51800004460 · possession Dec 2018 · 90.9% built
- PEARL PLATINUM · AndheriCHANDIWALA ENTERPRISES · P51800004462 · possession Dec 2023 · 42.7% built
- HUM SUB CHSL · BorivaliSHRADDHARPAN DEVELOPERS · P51800004487 · possession Jun 2019 · 90.9% built · 3 complaints
- Vijayraj Residency · AndheriVijayraj Residency · P51800004495 · possession Apr 2028 · 62% built · 35 complaints
- FORTUNE AVIRAHI WING A · borivali westFORTUNE CONSTRUCTIONS · P51800004496 · possession Dec 2026 · 95% built
- Grace Luxuria · BorivaliNew India Construction Co · P51800004501 · possession Dec 2018 · 90.9% built · 3 complaints
- Nero · AndheriSuper Construction Company · P51800004508 · possession Dec 2026 · 72% built · 9 complaints
- Integrated Arya · KurlaIntegrated Spaces Limited · P51800004521 · possession Apr 2029 · 83.5% built · 1 complaint
- SHRI GANESH APARTMENTS · BorivaliMATUSHREE REAL ESTATE DEVELOPERS PRIVATE LIMITED · P51800004536 · possession Jun 2018 · 72.7% built · 1 complaint
- ORCHID RESIDENCES · AndheriH.K.PUJARA BUILDERS · P51800004540 · possession Dec 2018 · 90.9% built
- AERA · KurlaRE Infra Pvt Ltd · P51800004542 · possession Dec 2018 · 34.5% built
- DATTA KRUPA · KurlaSHREE HERAAMBH VASTU NIRMAN LLP · P51800004548 · possession Jan 2021 · 90.9% built
- DP STAR TRIVENI · BHANDUP WESTDP BUILDHOMES LLP · P51800004550 · possession Dec 2024 · 85.5% built
- PLUTO-B -SUNCITY HOUSING PHASE- I · KurlaSUNCITY COMPLEX · P51800004553 · possession Jun 2022 · 90.9% built
- ZEE TULSI · AndheriZEE COM TRADE PRIVATE LIMITED · P51800004559 · possession Dec 2026 · 81.8% built
- CENTRONA NOVA B · KurlaELEVATED AVENUE REALTY LLP · P51800004566 · possession Oct 2027 · 8.2% built · 2 complaints
- SHRIRANG · KurlaVIRENDRA NATWARLAL SHETH · P51800004570 · possession Jun 2022 · 90.9% built · 6 complaints
- PARAG - RESERVE CO-OP HSG SOC · BorivaliSADGURU BUILDSPACESPVT. LTD. · P51800004572 · possession Dec 2020 · 62.5% built
- Om Ganesh Krupa · BorivaliDharma Construction · P51800004592 · possession Jun 2019 · 90.9% built
- ASHOK ODYSSEY - C WING · KurlaSANYAM REALTORS PRIVATE LIMITED · P51800004602 · possession Dec 2023 · 90.9% built · 10 complaints
- SAINATH MALAD SRA CHS · BorivaliSHREE MAHALAXMI ASSOCIATES · P51800004613 · possession Dec 2017 · 90.9% built
- MANEESHA CHSL · KurlaSHAH DEVELOPERS · P51800004616 · possession Dec 2019 · 90.9% built
- Nayana Niwas · BorivaliH.D.Associates · P51800004622 · possession Mar 2018 · 60% built
- POWAI PROJECT · KurlaH.K.PUJARA BUILDERS · P51800004626 · possession Dec 2026 · 90.9% built · 1 complaint
- REDEVELOPMENT OF ULKA CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800004627 · possession Dec 2019 · 90.9% built
- Royal Fantasy Phase II · AndheriRoyal Fantasy Constructions Private Limited · P51800004649 · possession Dec 2026 · 83.6% built · 5 complaints
- Shivoham Heights · BorivaliRajputana Heights · P51800004652 · possession Dec 2017 · 100% built
- SMGK ASSOCIATE RESIDENCY Wing B Phase 2 17th to 20th Floors · AndheriVastu Shilpa Complex Designers Pvt Ltd · P51800004663 · possession Dec 2022 · 51.5% built
- FINE RESIDENCY · AndheriFINE DEVELOPMENTS · P51800004690 · possession Aug 2022 · 90.9% built
- MEGHDOOT · KurlaSHREE BALAJI ASSOCIATES · P51800004699 · possession Dec 2026 · 89.2% built
- Vastu Pinnacle · BorivaliSanwar M Khandelwal · P51800004711 · possession Mar 2022 · 90.9% built · 1 complaint
- Nirmal Lifestyle-Zircon · KurlaNirmal Lifestyle Ltd · P51800004719 · possession Dec 2019 · 71.8% built · 65 complaints
- SHEEL ENCLAVES · AndheriPODDAR INFRACON PRIVATE LIMITED · P51800004722 · possession Dec 2021 · 90.9% built
- BHAVNA KUNJ · BorivaliVINOD INFRASTRUCTURE PRIVATE LIMITED · P51800004724 · possession Dec 2019 · 100% built
- MY RESIDENCY · AndheriHITESH INDRAVADAN PATEL · P51800004728 · possession Dec 2019 · 99.5% built
- CHANDAN CHS LTD · AndheriAUM G M HEIGHTS · P51800004733 · possession Dec 2021 · 90.9% built
- Satwaratna Co Op Hsg Society Ltd · AndheriKISHRAJDEVELOPERS · P51800004735 · possession Jan 2027 · 57.3% built
- AETHER WING B2 - PHASE 1B - FROM 21ST TO 33RD FLOOR · BorivaliROMELL PROPERTIES PRIVATE LIMITED · P51800004737 · possession Dec 2023 · 100% built
- SHALIMAR SHELTERS · BorivaliSADGURU ENTERPRISES · P51800004740 · possession Dec 2019 · 90.9% built
- SUYOG CHS · KurlaADITYARAJ BUILDERS · P51800004742 · possession Jun 2022 · 72.7% built
- ARKADE EARTH - FERN · KurlaArkade Developers Private Limited · P51800004750 · possession Dec 2023 · 88.5% built · 1 complaint
- BHOOMI CELESTIA B-WING · BorivaliSASHWAT CONSTRUWELL PRIVATE LIMITED · P51800004768 · possession Dec 2021 · 61.3% built
- SANJIV CO-OP HSG SOC. LTD. · MumbaiCHETNA HOME LLP · P51800004771 · possession Dec 2018 · 100% built
- Harihareshwar SRA · KurlaM/s Navnath Associates · P51800004789 · possession Dec 2027 · 81.8% built · 4 complaints
- Suvidha CHS Ltd · KurlaAmi & Monika Developers · P51800004792 · possession Mar 2018 · 80.9% built
- OSTWAL TOWER · BorivaliUNNATI BUILDERS · P51800004808 · possession Dec 2018 · 100% built
- RAJSHREE CLOVER · KurlaRajshree Creations · P51800004812 · possession Dec 2019 · 90.9% built
- NL ARYAVARTA · BorivaliNAHALCHAND LALOOCHAND PVT. LTD. · P51800004816 · possession Mar 2019 · 90.9% built · 11 complaints
- Rohan Development · BorivaliM/s Rohan Development · P51800004819 · possession Jul 2018 · 90.9% built · 15 complaints
- Om Shiv Matoshree SRA CHS LTD · BorivaliARJUN ANANT WAGHMARE · P51800004827 · possession Dec 2026 · 87.3% built · 4 complaints
- GAURI EXCELLENCY · BorivaliM/S GAURI LAND DEVELOPERS LLP · P51800004832 · possession Jun 2026 · 82.8% built · 10 complaints
- HRESA - SAINAGAR APARTMENT PVT. LTD. · KurlaBHOLENATH DEVELOPERS LTD. · P51800004835 · possession Nov 2023 · 90.9% built
- SHAKTI UNICUS · MumbaiRAHEJA & CO · P51800004839 · possession Dec 2018 · 90.9% built
- ANDHERI EKTA · AndheriMumbai Shelter Combines LLP · P51800004843 · possession Mar 2023 · 41.8% built
- ARPIT · AndheriTISTA IMPEX PRIVATE LIMITED · P51800004857 · possession Dec 2019 · 56.8% built
- Pampa Co-Operative Housing Society · Goregaon WestARHAM REALTORS LLP · P51800004869 · possession Mar 2018 · 90.9% built
- Skyline wealthspace Wing C2 3 to 8 floors · KurlaSymphony · P51800004870 · possession Mar 2018 · 90.9% built
- REDEVELOPMENT OF METTIVILLA CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800004896 · possession Dec 2028 · 63.2% built
- Redevelopment of JUHU ANKUR CHS LTD · AndheriKDI HOLDINGS PVT. LTD. · P51800004899 · possession Dec 2023 · 90.9% built · 2 complaints
- SWANAND BLDG NO 33 · KurlaHIRANIMANTHAN BUILDERS AND DEVELOPERS · P51800004914 · possession Nov 2024 · 90.9% built
- Udyanjali Chs · AndheriASHRAY DEVELOPERS · P51800004917 · possession Dec 2020 · 39.1% built
- Swastik Plaza C CHS Ltd-AVANA · KurlaPRATIBHA VEEKAY REAL ESTATE LLP · P51800004923 · possession Oct 2020 · 90.9% built
- Shubham Sarayu · KurlaShubham Realty · P51800004927 · possession Mar 2021 · 90.9% built
- ACROPOLIS · BORIVALI WESTVORA ASSOCIATES · P51800004939 · possession Dec 2023 · 90.5% built
- Amity Apartments · AndheriRaajyam Realty LLP · P51800004960 · possession Aug 2022 · 68.6% built · 1 complaint
- Rite Celesta · BorivaliRite Developers Pvt. Ltd. · P51800004974 · possession Dec 2017 · 90.9% built
- Amardeep CHS · KurlaAkshay Sthapatya H.S.A. · P51800004991 · possession Jun 2023 · 81.8% built · 9 complaints
- EKTA TRINITY · AndheriEKTA HOUSING PRIVATE LIMITED · P51800005021 · possession Dec 2022 · 94.3% built
- Joy Legend Wing A · AndheriJAYANT SONI · P51800005022 · possession Dec 2019 · 70% built · 7 complaints
- PANOM PARK PHASE 1 WING A B C AND C EXTENSION · AndheriPANOM DEVELOPERS LLP · P51800005027 · possession Dec 2019 · 90.9% built
- MATRUCHHAYA · KurlaSUJYOTI FININVEST PVT LTD · P51800005037 · possession Sept 2020 · 90.9% built
- Shree Madhusudan CHSL · AndheriSpark Builders & Infra Projects Pvt Ltd · P51800005040 · possession Dec 2018 · 90.9% built
- Santoor Residency · AndheriSpade Realtors LLP · P51800005041 · possession Mar 2021 · 100% built
- ONE BKC · AndheriRaghuleela Builders Private Limited · P51800005047 · possession Dec 2020 · 100% built · 9 complaints
- Emerald Isle - T7 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800005072 · possession Jun 2018 · 100% built · 23 complaints
- SILVERENE · AndheriSHREEJI COMBINE · P51800005090 · possession Dec 2019 · 88.2% built
- ZEE USHA · AndheriZEE COM TRADE PRIVATE LIMITED · P51800005143 · possession Sept 2020 · 85% built
- Neumec godawari · Vile ParleNEUMEC ESTATE DEVELOPER LLP · P51800005145 · possession Dec 2026 · 81.8% built · 4 complaints
- ATHARVA · KurlaMAYA DEVELOPERS · P51800005146 · possession Jul 2027 · 85% built
- DLH METROVIEW · ANDHERI WESTDEV LAND & HOUSING PRIVATE LIMITED · P51800005170 · possession Apr 2018 · 81.8% built · 1 complaint
- 16 MOUNT BLANC · Kurla16 MOUNT BLANC · P51800005179 · possession Dec 2019 · 60% built · 2 complaints
- N AND G CO OP HOUSING SOC LTD · MUMBAIMAVERICK REALTORS · P51800005187 · possession Mar 2027 · 81.8% built
- Azad Nagar Ashta Vinayak CHS Ltd · AndheriRAJVI BUILDERS AND DEVELOPERS · P51800005214 · possession Jul 2023 · 100% built · 1 complaint
- KALINA MARKET · MumbaiKRISHNA ASSOCIATES · P51800005221 · possession Jul 2023 · 51.8% built
- Hubtown Premiere Residences - Malibu · AndheriHubtown Limited · P51800005224 · possession Nov 2029 · 99.8% built · 3 complaints
- ALPHA RESIDENCY · BorivaliKonark Shakti Group of Companies · P51800005227 · possession Oct 2019 · 90.9% built
- Esquire · BorivaliOberoi Realty Limited · P51800005229 · possession Jun 2018 · 100% built · 3 complaints
- ANSHUL HEIGHTS C WING · BorivaliCHANDRAKOSHA KONTRUCTIONS PRIVATE LIMITED · P51800005252 · possession Feb 2021 · 100% built
- VINAYAK PARADISE · KurlaAVANI DEVELOPERS · P51800005258 · possession Mar 2018 · 90.9% built
- HIRA KUTIR CHS LTD · BorivaliH RISHABRAJ PROJECTS · P51800005267 · possession Dec 2023 · 9.1% built
- ASHOK ODYSSEY - A WING · KurlaSANYAM REALTORS PRIVATE LIMITED · P51800005268 · possession Apr 2028 · 73.1% built · 1 complaint
- DANVIJAY C.H.S. LTD · BorivaliANKURDEV BUILDCON · P51800005272 · possession Dec 2019 · 49.1% built
- SIESTA · AndheriPRESTIGE MULUND REALTY PRIVATE LIMITED · P51800005285 · possession Jun 2025 · 77.7% built · 13 complaints
- The Pinnacle · KurlaGERARIE ENTERPRISES AND DEVELOPERS PVT. LTD · P51800005304 · possession Dec 2019 · 90.9% built
- Shanta Bhuvan CHS Ltd. · AndheriLabh Homes Creations And Holdings Pvt. Ltd. · P51800005306 · possession Mar 2020 · 90.9% built · 1 complaint
- Royale Residences B And C Wing · KurlaM/S Rani Creators , Consultant And Service Providers · P51800005315 · possession Jun 2022 · 49.7% built
- SHUBH AANGAN · KurlaG D REALTORS PVT LTD · P51800005320 · possession Jun 2022 · 90.9% built
- Ramkrishna Heights · KurlaPOOJA ENTERPRISES · P51800005327 · possession Dec 2021 · 99.1% built · 1 complaint
- Maruti Bhuvan · MograSuresh Prabhushankar Sharma · P51800005335 · possession Mar 2024 · 72.7% built
- JMDVARDHAM · BorivaliCOSTAL VINCOM PVT LTD · P51800005339 · possession Dec 2019 · 86.4% built
- KRISHNA RESIDENCES PHASE 1 · AndheriKrishna Developers Pvt. Ltd · P51800005340 · possession Dec 2026 · 73.9% built · 21 complaints
- GOLDEN STAR RESIDENCY BUILDING NO 2 · CHIPLUNARUNDHATI AJAY KADAM · P51800005343 · possession Sept 2018 · 90.9% built
- SATELLITE GLORY · AndheriSATELLITE DEVELOPERS PVT LTD · P51800005350 · possession Dec 2020 · 80.3% built
- MANTHAN PLAZA · KurlaMANTHAN DEVELOPMENT CORPORATION · P51800005360 · possession Apr 2028 · 87.3% built · 5 complaints
- Transcon Triumph Tower 1 · AndheriTranscon Developers Pvt. Ltd. · P51800005361 · possession Dec 2022 · 70.8% built · 6 complaints
- Garnet Paladium · AndheriGarnet Construction Limited · P51800005369 · possession May 2026 · 90.9% built · 2 complaints
- GORAI MITASU · BorivaliSumit Woods Pvt. Ltd. · P51800005404 · possession Dec 2017 · 90.9% built
- Avenue Park - I · pathanwadiCB Enterprises · P51800005425 · possession Sept 2024 · 73.5% built · 1 complaint
- CD Plot No 69 Lumiere · AndheriSD SVP Nagar Redevelopment Private Limited · P51800005440 · possession Sept 2020 · 99.7% built · 43 complaints
- IBIS · BorivaliBAU DEVELOPERS PRIVATE LIMITED · P51800005446 · possession Dec 2018 · 100% built
- CENTRONA NOVA-A · KurlaELEVATED AVENUE REALTY LLP · P51800005456 · possession Oct 2027 · 41% built · 3 complaints
- SAI GABHASTI · AndheriP51800005461 · possession Dec 2017 · 80% built
- A and O EMINENTE · BorivaliA and O EMINENTE · P51800005475 · possession Dec 2026 · 49% built · 114 complaints
- Milan Residency · BorivaliM/s Milan Builders · P51800005484 · possession Dec 2020 · 71.8% built
- MOHINI CASTLE · AndheriMOHINI SHELTORS PRIVATE LIMITED · P51800005492 · possession Jun 2023 · 90.9% built
- MANISHA PRIDE · KurlaGOVIND PAPA NAIDU · P51800005495 · possession Dec 2017 · 100% built
- RANJANA HEIGHTS · KurlaNAYAK REALTY · P51800005503 · possession Aug 2022 · 90.9% built · 1 complaint
- RAKHI TOWER PHASE 1 · BorivaliWESTERN DEVELOPMENTS · P51800005504 · possession Dec 2019 · 80.7% built · 1 complaint
- NIDHAAN HOUSE · AndheriNIDHAAN INFRACON PRIVATE LIMITED (FORMERLY KNOWN AS AJAB REAL ESTATE COMPANY PRIVATE LIMITED) · P51800005536 · possession Dec 2023 · 76.4% built
- Radha Madhav CHSL · BorivaliShri Krishna Chaitanya Enterprises · P51800005539 · possession Sept 2019 · 90.9% built · 2 complaints
- Yura Business Park · AndheriYura Business Park Private Limited · P51800005547 · possession Apr 2028 · 54.5% built
- SRISHTI OASIS PH 2 WING B SANDS · KurlaSHIV KRUPA ENTERPRISE · P51800005548 · possession Dec 2023 · 90.9% built · 1 complaint
- KABRA AURUM WING A B C AND D Redevelopment of Goregaon Unnat Nagar II Plot No 51 to 55 CHSL · AndheriKABRA AND ASSOCIATES · P51800005550 · possession Dec 2019 · 81.8% built · 1 complaint
- Rosalia Apartments · AndheriKusum Associates · P51800005568 · possession Jun 2023 · 72.7% built · 5 complaints
- Satyam CHS Ltd · AndheriSwastik Realty Pvt Ltd · P51800005587 · possession Dec 2026 · 100% built
- SUMUKH HILLS · BorivaliM/S.YOGSIDDHI DEVELOPERS · P51800005591 · possession Oct 2023 · 90% built · 3 complaints
- Asmita Sand Dunes · BorivaliSun Developers · P51800005600 · possession Dec 2023 · 100% built
- PHASE 1 SHREE NIKUNJ · BorivaliMAMTORA ENTERPRISE · P51800005606 · possession Oct 2018 · 100% built
- Gurnani Palms Wing A · AndheriInterintel Constructions · P51800005611 · possession Dec 2018 · 90.8% built
- Tridhaatu Aranya · KurlaTRIDHAATU ARANYA DEVELOPERS LLP · P51800005629 · possession Dec 2027 · 82.7% built · 1 complaint
- EXPRESS ZONE B WING · AndheriCELLO SONAL CONSTRUCTION · P51800005634 · possession Jun 2024 · 54.5% built
- ASHWA PLATINUM · KurlaASHWA PLATINUM · P51800005636 · possession Dec 2023 · 84.1% built · 10 complaints
- Vengurlekars Chaitra · AndheriVengurlekars Shreesai Builders and Developers Private Limited · P51800005637 · possession Apr 2027 · 67.4% built · 9 complaints
- Lotus Sky Garden · orlemLotus Logistics and Developers Pvt Ltd · P51800005655 · possession Jun 2027 · 100% built · 3 complaints
- Grand Slam and Game Point · KurlaRicardo Constructions Private Limited · P51800005668 · possession Aug 2028 · 45.5% built · 61 complaints
- Sairah · AndheriMetro Associates · P51800005677 · possession Jun 2019 · 70.5% built
- Central Palace Redevlopment Of Borivali Jitendra Bhavan Co-Op Hsg Ltd · BorivaliJesal Damji Dedhia · P51800005678 · possession Dec 2023 · 100% built
- Runwal Bliss Wing -B · KurlaEvie Real Estate Private Limited · P51800005684 · possession Dec 2023 · 100% built · 7 complaints
- Hubtown Premiere Residences - Bel Air · AndheriHubtown Limited · P51800005688 · possession Jul 2026 · 58.4% built
- SAHAKAR NAGAR GRACE CO-OP. HSG. SOC. LTD · KurlaAPOORVA HOMES · P51800005727 · possession Dec 2021 · 62.1% built
- Rustomjee Elements - Wing SC · AndheriRustomjee Realty Private Limited · P51800005738 · possession Dec 2022 · 69.5% built
- A.N. HEIGHTS · BorivaliH SQUARE BUILDERS · P51800005739 · possession Aug 2026 · 90.5% built · 2 complaints
- OSSIA ENCLAVE · BorivaliR B Developers · P51800005753 · possession Mar 2027 · 72.7% built
- Redevelopment of Om Divya Apartments Co-operative Housing Society Limited · BorivaliM/s Shanti Developers · P51800005768 · possession Feb 2024 · 90.5% built
- VASUNDHARA CHS LTD - Phase II - A and B Wing · BorivaliRELIABLE CONSTRUCTIONS · P51800005777 · possession Dec 2021 · 39.6% built
- HORIZON SAMYAK · KurlaHORIZON PROMOTERS INDIA LTD · P51800005791 · possession Mar 2019 · 90.9% built
- Shanker Smruti CHS LTD · BorivaliShree Shakti Construction Company · P51800005794 · possession Mar 2019 · 78.2% built
- CELESTIAL HEIGHTS · BorivaliAYYAPPA DEVELOPERS PVT. LTD. · P51800005812 · possession Dec 2024 · 46.4% built · 16 complaints
- 126 FLORENCIO · KurlaARHAM ENGINEERS · P51800005828 · possession Sept 2020 · 72.1% built · 8 complaints
- LINKPARK · BorivaliADARSH INDUSTRIAL ESTATE PRIVATE LIMITED · P51800005832 · possession Feb 2027 · 10.2% built · 41 complaints
- N.V. Deshmukh - NEPTUNE GULMOHAR · KurlaVEDANT REALTORS LLP · P51800005834 · possession Dec 2019 · 77.7% built
- ESQUIRE SKYTOWER · KurlaCOSMOS ASHWAMEDH JOINT VENTURE · P51800005840 · possession Jun 2018 · 67.3% built
- DELPHINE CHSL · KandivaliGLASSWOOD REALTY PRIVATE LIMITED · P51800005847 · possession Oct 2028 · 44.5% built
- Rohini Niwas - Building No 15 · KurlaBalkrishna Construction · P51800005852 · possession Dec 2021 · 100% built · 2 complaints
- ATHARV SHAGUN · AndheriM/S ATHARV REALTY · P51800005867 · possession Dec 2021 · 90.9% built
- Priya Apartment · BorivaliJasmina Constructions Pvt. Ltd. · P51800005876 · possession Jun 2023 · 90.9% built · 2 complaints
- Madhukunj CHS Ltd · KurlaP51800005882 · possession Dec 2018 · 81.6% built
- Grande Edifice · BorivaliV6 ENTERPRISES · P51800005896 · possession Apr 2027 · 78.2% built
- CRESENZO RESIDENCES · AndheriPARESH PUJARA AND ABHIRAJ PUJARA (AOP) · P51800005898 · possession Dec 2019 · 90.9% built · 1 complaint
- THE ELITE · KurlaR R D HEIGHTS AND BUILDERS PVT LTD · P51800005901 · possession Apr 2027 · 55.7% built · 15 complaints
- KACHWALA PALACE · AndheriCREST VENTURES LIMITED · P51800005902 · possession Sept 2020 · 81.8% built
- Akash Kiran CHS Ltd · AndheriShamik Enterprises Pvt Ltd. · P51800005909 · possession Dec 2020 · 90.9% built
- Earth Residency Wing C and Wing D · BorivaliEarth Estate Developers Pvt Ltd · P51800005913 · possession Jul 2029 · 18.2% built
- DAHISAR UDAYACHAL CO OP HSG LTD · BorivaliMAA ENTREPRENEURS · P51800005916 · possession Dec 2026 · 90% built · 2 complaints
- 16th Avenue · AndheriMNK Builders LLP · P51800005930 · possession Jun 2018 · 88.2% built
- ASHARA · BorivaliDevleela Developers · P51800005938 · possession Dec 2019 · 98.2% built
- Gagan Giri Co-operative Housing Society Limited · KurlaGagan Giri Co-operative Housing Society Limited · P51800005940 · possession Dec 2026 · 0% built · 19 complaints
- Jaylaxmi CHSL · BorivaliJaywant Ramchandra Keni · P51800005945 · possession Aug 2018 · 90.9% built
- AABIEL AVENUE · Malad WestRIGHT CHANNEL CONSTRUCTION PVT LTD · P51800005950 · possession Oct 2026 · 100% built
- Rajendra Jhaveri Residence · BorivaliUsha Developers · P51800005957 · possession Dec 2018 · 54.1% built
- Grow More Bliss B Wing · BorivaliGrowmore Space Solutions Pvt. Ltd. · P51800005958 · possession Dec 2019 · 81.8% built
- VRAJ DHAM · BorivaliDINESH AMRUTLAL THAKKAR · P51800005968 · possession Feb 2020 · 100% built
- Piramal Revanta - Tower 1 · KurlaPRL Developers Private Limited · P51800005983 · possession Mar 2023 · 100% built · 18 complaints
- RAJ EKJYOT SUKRUTI · KurlaSADGUNA REALTY · P51800006006 · possession Dec 2018 · 90.2% built
- MAHATMA JYOTIBA PHULE CHS LTD · KurlaTRIDEVH CONSTRUCTION COMPANY · P51800006009 · possession Apr 2027 · 64.2% built · 7 complaints
- SANDU SANSKAR · KurlaSANDU SANSKAR BUILDING DEVELOPERS LLP · P51800006033 · possession Sept 2026 · 100% built · 6 complaints
- SHIVSHAKTI · BorivaliSAMARTH ERECTORS & DEVELOPERS · P51800006063 · possession Dec 2018 · 88.5% built
- PARK SOLITAIRE · AndheriAMAZON MANA & ASSOCIATES AOP · P51800006074 · possession Dec 2019 · 87.7% built · 4 complaints
- TEENMURTY SUMMIT · BorivaliM/s Teenmurty Summit Realty LLP · P51800006085 · possession Jul 2022 · 90.9% built
- Sri Balaji Enclave · BorivaliANI ANU DEVELOPERS PRIVATE LIMITED · P51800006089 · possession Dec 2022 · 100% built · 1 complaint
- Rajal - Veer Abhimanyu CHS Ltd · Borivali WestNisar Properties Private Limited · P51800006097 · possession Jun 2023 · 90.9% built · 2 complaints
- TIMES CHAMBER · AndheriADITI CONSTRUCTIONS · P51800006100 · possession Dec 2018 · 90.9% built
- Elite Tower · BorivaliElite Construction Co. · P51800006103 · possession Dec 2027 · 59.1% built
- Aristocrate · AndheriAmit Sudhir Dhadda · P51800006105 · possession Apr 2028 · 40.5% built
- 92 BELLEVUE · BorivaliNRS Developers · P51800006106 · possession Oct 2018 · 90.9% built
- Dattatraya Annex · KurlaIndu Enterprise · P51800006110 · possession Nov 2022 · 81.4% built
- Navkar Girija Sadan · BorivaliNavkar Groups Private Limited · P51800006112 · possession Apr 2028 · 50.6% built · 6 complaints
- Shankeshwar Apartment · BorivaliNavkar Developers · P51800006116 · possession Apr 2027 · 90.9% built · 2 complaints
- CENTRONA ZEN-B · KurlaELEVATED AVENUE REALTY LLP · P51800006139 · possession Apr 2027 · 90.5% built · 1 complaint
- Eternia Towers A to D · KurlaOberoi Constructions Limited · P51800006141 · possession May 2026 · 100% built · 16 complaints
- ROYALE · AndheriKHOKER SYNERGY DEVELOPERS · P51800006143 · possession Sept 2026 · 81.8% built · 3 complaints
- BORIVALI NEELKANTH NAGAR CHS LTD · BorivaliMAHAVIR INFRASTRUCTURE · P51800006154 · possession Jan 2025 · 90.9% built
- SHREE SAI BABA CHS LTD · AndheriS M BUILDERS & DEVELOPERS · P51800006163 · possession Dec 2021 · 45% built
- Gala Amora · AndheriKarishma Realty · P51800006181 · possession Dec 2019 · 23.6% built
- Upper East 97 · UPPER GOVIND NAGARPrima Terra Buildtech Pvt. Ltd. · P51800006231 · possession Nov 2026 · 100% built · 8 complaints
- BENCHMARK PLAZA · Khar WestBENCHMARK PROJECTS PVT LTD · P51800006237 · possession Apr 2027 · 78.1% built · 7 complaints
- CENTRONA ZEN-A · KurlaELEVATED AVENUE REALTY LLP · P51800006239 · possession Apr 2027 · 90.5% built · 2 complaints
- Sanskriti Signature · BorivaliDivisha Developers LLP · P51800006240 · possession Dec 2019 · 90.9% built
- ZEE SAHYADRI · AndheriZEE COM TRADE PRIVATE LIMITED · P51800006241 · possession Dec 2023 · 0% built
- Rite Luxuria · KurlaRite Developers Pvt. Ltd. · P51800006260 · possession Dec 2019 · 90.9% built · 4 complaints
- Vaikunth Dham CHS Ltd · KurlaShivshankar Singh & Others · P51800006275 · possession Dec 2022 · 86.7% built
- GANESHYOG CHS · BorivaliAARUNI HARISHCHANDRA PATIL · P51800006281 · possession Dec 2018 · 55.5% built
- SOHAM REGENCY · BorivaliLAXMIKANT RAMCHANDRA SAWANT · P51800006292 · possession Dec 2017 · 100% built
- Borivli Vasundhara CHS Ltd. · Borivali EastShree Sai Shraddha Developers · P51800006294 · possession Dec 2025 · 72.7% built
- Pure Gold · Chembur MumbaiSUDHIR VASU SHETTY · P51800006305 · possession Mar 2019 · 81.8% built
- Ghatkopar Mahavir Palace · KurlaPramod Mathurbhai Dhabaria · P51800006309 · possession Dec 2017 · 100% built
- AZAD NAGAR SHUBHAM CHSL · AndheriPRATHAMESH KRUPA BUILDCON PRIVATE LIMITED · P51800006313 · possession Jun 2018 · 72.7% built
- VARDHMAN EMPIRE · BorivaliVARDHMAN DEVELOPERS LTD · P51800006315 · possession Dec 2020 · 90.9% built · 2 complaints
- Lotus Residency · MumbaiLotus Logistics and Developers pvt ltd · P51800006322 · possession Dec 2024 · 80.9% built · 2 complaints
- 55 CORPORATE AVENUE BUILDING NO 2 · KurlaTHE CANNONADE CONSTRUCTION COMPANY PVT LTD · P51800006324 · possession Dec 2026 · 100% built
- Anise Grove · BorivaliBhagya Corporation · P51800006331 · possession Dec 2018 · 100% built
- 21 HILLS · BorivaliAMAR DEVELOPERS · P51800006364 · possession Dec 2018 · 93.2% built
- TRAFALGAR TOWER · KurlaM/S. Akshay Radha Kishan Construction · P51800006369 · possession Dec 2022 · 58.3% built
- Tulsi Elanza · KurlaMETRO CAPITAL · P51800006377 · possession Dec 2019 · 27.3% built
- Govind Prakash SRA CHS LTD · KurlaOm Sai Developers · P51800006380 · possession Dec 2018 · 45.5% built
- Muktanand Co-op Housing Society · KurlaKuldeep s Pednekar · P51800006384 · possession May 2022 · 53.6% built · 2 complaints
- Oasis - Tower 1 · BorivaliGlomore constructions · P51800006404 · possession Dec 2021 · 93.5% built · 44 complaints
- SUNFLOWER · KurlaShree Krishna Developers · P51800006422 · possession Jun 2022 · 90.9% built · 6 complaints
- AARYA · AndheriRAJA BUILDERS · P51800006434 · possession Dec 2021 · 67.3% built · 1 complaint
- EDIFICE · KurlaBUILDPRO · P51800006435 · possession Dec 2017 · 55.2% built · 3 complaints
- NEETA NIWAS CHSL · BorivaliC H PATIL AND SONS LLP · P51800006436 · possession Dec 2018 · 90.9% built
- MEDHA CHSL · BorivaliC H PATIL AND SONS LLP · P51800006437 · possession Sept 2020 · 90.9% built
- JYOTI SUKRITI · BorivaliJYOTI BUILDERS · P51800006438 · possession Dec 2026 · 90.9% built · 3 complaints
- JAI GOPI KRISHNA CHSL · KurlaNav Durga Construction Company · P51800006482 · possession Apr 2018 · 90.9% built
- N.M.Joshi Building No.4 Annex · KurlaSHREE DEVELOPERS · P51800006487 · possession Dec 2019 · 80.6% built
- JASWANT HEIGHTS · AndheriL NAGPAL DEVELOPERS · P51800006497 · possession Dec 2018 · 72.7% built
- La Alteza · AndheriEMERALD DEVELOPERS · P51800006504 · possession Apr 2027 · 68.2% built
- Plot No 88 · BorivaliJitesh Bhawarlal Jain · P51800006523 · possession May 2018 · 87.3% built
- BEAUTY HEIGHTS · KurlaBEAUTY SANKALP BUILDERS LLP · P51800006541 · possession Mar 2018 · 100% built
- TARGET THE MALL · BorivaliMAHENDRA JAMNADAS KARA · P51800006542 · possession Dec 2017 · 77.3% built · 2 complaints
- Gyan Kutir · BorivaliSungreens Corp · P51800006548 · possession Mar 2018 · 90.9% built
- NEEL GAGAN SRA CHS LTD · AndheriR G CORPORATION · P51800006552 · possession Dec 2024 · 100% built
- THE ZONE · BorivaliMS AMANN RAJ HOUSING AND DEVELOPMENT CORPORATION · P51800006553 · possession Dec 2026 · 68.6% built · 6 complaints
- Rathod Niwas · AndheriAiM Construction Co. · P51800006556 · possession Jun 2019 · 28.2% built
- SAI SOLITARE · KurlaSamrudhi Associates · P51800006560 · possession Jun 2024 · 89.5% built · 1 complaint
- SHARDA HEIGHTS · AndheriNARENDRA JAGDISHPRASAD AGARWAL · P51800006585 · possession Dec 2018 · 90.9% built
- PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III · AndheriGIRIRAJ ENTERPRISES · P51800006592 · possession Aug 2024 · 52.7% built
- ANMOLPRITI · BorivaliMuktistar Buildcon Private Limited · P51800006598 · possession Jun 2025 · 89.7% built · 6 complaints
- Modispaces Doyle · BorivaliModispaces Real Estate Pvt Ltd · P51800006618 · possession Dec 2018 · 90.9% built
- ALAG BELLA · KurlaALAG PROPERTY CONSTRUCTIONS PVT. LTD. · P51800006661 · possession Jun 2018 · 100% built
- MAYADEVI/ VIKUTHDHAM · BorivaliHOME TODAY RENOVATION INDIA PVT.LTD · P51800006678 · possession Dec 2020 · 47.5% built
- Samkit · AndheriJitendra Kantilal Shah · P51800006683 · possession Jul 2023 · 100% built
- T SQUARE · AndheriK T SONS · P51800006689 · possession Jul 2018 · 100% built
- Stella Residency · Vikhroli EastVaibhavLaxmi Builders and Developers · P51800006691 · possession Oct 2022 · 43.8% built
- STAR PLAZA · BorivaliSEVENSTAR DEVELOPERS · P51800006698 · possession Dec 2026 · 90.5% built · 1 complaint
- O AND S BUSINESS SUITES · KurlaSUCHITA ORANGE HDM PROJECT · P51800006703 · possession Oct 2026 · 81.8% built
- RAUNAK CENTRUM · KurlaRaunak Jigna Associates · P51800006705 · possession Apr 2027 · 41.3% built · 3 complaints
- OM SHUBH LABH · BorivaliBALI REALTY LLP · P51800006707 · possession Jun 2018 · 90.9% built
- 34 Park Estate · BorivaliM/S REDDY BUILDERS & DEVELOPERS · P51800006729 · possession Nov 2028 · 53% built · 28 complaints
- MOHINI TOWER · AndheriMOHINI SHELTORS PRIVATE LIMITED · P51800006731 · possession Dec 2019 · 98.2% built · 1 complaint
- GORAI SHREE RAM TOWER CHS LTD · BorivaliJAGANNATH LAXMAN MORE · P51800006753 · possession Oct 2020 · 90.9% built
- LAXMI HEIGHTS · BorivaliLAXMIDEVI DEVELOPERS · P51800006754 · possession Dec 2018 · 82.7% built
- REDEVLOPMENT OF RAJENDRA NAGAR - SHREE GANESH CHS LTD. · BorivaliKaustubh Construction Private Limited · P51800006765 · possession Dec 2019 · 81.8% built
- DLH DREAM TOWER · AndheriDEV LAND & HOUSING PVT LTD · P51800006778 · possession Mar 2021 · 99.1% built
- RATNA MOHAN TRIVENI CHSL · BorivaliATUL CORPORATES · P51800006783 · possession Dec 2021 · 76.6% built · 1 complaint
- SOHAM RESIDENCY · BorivaliLAXMIKANT RAMCHANDRA SAWANT · P51800006787 · possession Dec 2017 · 100% built
- HELICON HEIGHTS · BorivaliSAHAKAR REALTORS · P51800006790 · possession Mar 2019 · 100% built
- SALE BUILDING NO 1 VAASTU SHANTI WING A B C · AndheriM/S ANSHUMAN DEVELOPERS · P51800006806 · possession Dec 2020 · 90.6% built
- JYOTI PALACE · KurlaWESTBURY CONSTRUCTION PRIVATE LIMITED · P51800006809 · possession Dec 2019 · 65.6% built
- SHRI JAY · BorivaliA J CONSTRUCTION · P51800006818 · possession Dec 2018 · 100% built
- Hubtown Premiere Residences - Tower 2 · AndheriHubtown Limited · P51800006839 · possession Nov 2029 · 18.4% built
- Sunrise Orlem 2B Phase 3 · BorivaliDhaval Housing AOP · P51800006843 · possession Dec 2023 · 83.6% built · 1 complaint
- PLATINUM HEIGHTS · KurlaTRIDENT OZONE LLP · P51800006845 · possession Oct 2027 · 96.8% built
- Parvati Heritage · KurlaAmi & M.D. Developers · P51800006849 · possession Mar 2022 · 100% built
- AMAN · BorivaliKANDUR CORPORATION · P51800006880 · possession Jun 2019 · 90.9% built · 1 complaint
- KHAR YAMUNA BHUVAN CO.OP.HSG. SOC. LTD. · AndheriAUM ASSOCIATES · P51800006884 · possession Mar 2019 · 90.9% built
- UNIQUE ELITA · AndheriANKUR SHUBHAM DEVELOPERS · P51800006885 · possession Dec 2019 · 45.9% built · 1 complaint
- YASH WILLOWS / USHA NIKETAN · BorivaliYASH REALTORS · P51800006889 · possession Dec 2018 · 100% built · 1 complaint
- Ganesh Krupa Co. Op. Housing Soc. Ltd. · AndheriNEMINATH HOMES PRIVATE LIMITED · P51800006896 · possession Jan 2021 · 100% built · 1 complaint
- DHIREN CO OPERATIVE HOUSING SOCIETY · KurlaUTKARSH CONSTRUCTION · P51800006902 · possession Dec 2018 · 90.9% built
- LABURNUM · KurlaSUN BEAM ENTERPRISES · P51800006911 · possession Dec 2021 · 100% built
- Rustomjee Pinnacle · BorivaliKEYSTONE REALTORS LIMITED · P51800006915 · possession Dec 2018 · 100% built
- LAXMAN NIWAS · BorivaliYASH REALTORS · P51800006920 · possession Jun 2018 · 100% built
- Rite Divine · BorivaliRite Developers Pvt. Ltd. · P51800006927 · possession Dec 2018 · 97.4% built
- SHRADDHA VALENCIA · KurlaOM VAISHNAVI DEVELOPERS · P51800006947 · possession Jun 2023 · 90.9% built
- Login · BorivaliBombay Slum Redevelopment Corporation Pvt. Ltd. · P51800006953 · possession Sept 2023 · 90.9% built
- Priya Girish Vihar CHS Ltd · KurlaAmeya Developers · P51800006961 · possession Dec 2017 · 90.9% built
- AMBER EMPIRE · CHEMBUR WESTAMBER CAPRO PRIVATE LIMITED · P51800006968 · possession Apr 2029 · 65.9% built · 2 complaints
- DHARMAPRATAP CHS LTD · KurlaSAI LIFE REALTORS · P51800006987 · possession Mar 2019 · 90.9% built
- SIDDH DARSHAN · KurlaDEEP ASSOCIATES · P51800006988 · possession Dec 2018 · 56.4% built
- Dev Darshan · KurlaCITY ESTATE DEVELOPERS LIMITED · P51800007029 · possession Dec 2022 · 45.5% built · 1 complaint
- SANI MASCOT · AndheriSANI MASCOT DEVELOPERS · P51800007030 · possession Apr 2028 · 62.7% built
- Shreeji Plaza Wing A · MALAD WESTSIDDHARTH ENTERPRISES · P51800007051 · possession Sept 2026 · 90.9% built · 6 complaints
- SAMRUDDHI CHS · KurlaHASMUKH R HIRANI · P51800007054 · possession Dec 2023 · 90.9% built
- SAKET RESIDENCY CO OP HSG SOC LTD · AndheriREGENT BUILDERS · P51800007061 · possession Mar 2018 · 85.5% built
- SABARI HILLGRANGE · chemburSabari Developers LLP · P51800007070 · possession May 2019 · 92.3% built
- SHREE OMKAR · KurlaGurumauli Developers · P51800007074 · possession Jun 2024 · 100% built · 4 complaints
- UK SANGFROID · AndheriKeemaya Build Private Limited · P51800007085 · possession Dec 2021 · 61.8% built · 8 complaints
- RABINDRANATH TAGORE ABHASHAN PRAKALP LAYOUT · MUMBAISSV DEVELOPERS AND BUILDERS MUMBAI PROPRIETOR HEMANT VINAYKANT PARIKH · P51800007086 · possession Dec 2028 · 18.9% built · 47 complaints
- Marina Enclave Wing J,K,L Phase -I · BorivaliGURUKRUPA DEVELOPERS D N NAGAR PROJECT · P51800007088 · possession Dec 2020 · 100% built
- HILL VIEW CHS LTD · AndheriJIRAJ DEVELOPER LLP · P51800007100 · possession Dec 2027 · 50% built
- Ratnadeep · AndheriAnkur Premises Developers LLP · P51800007115 · possession May 2022 · 81.8% built
- SARTHAK HEIGHTS · AndheriSarthak Developers · P51800007127 · possession Dec 2025 · 80.6% built · 16 complaints
- VIJAYA HEIGHTS · BorivaliVIGNAHARTA BUILDERS AND PROJECTS PRIVATE LIMITED · P51800007143 · possession Apr 2031 · 0% built
- MERAKI ARENA · CHEMBURMeraki Habitats LLP · P51800007144 · possession Dec 2022 · 81.8% built
- SOFRANCE WING A · KurlaSOFRANCE WING A · P51800007146 · possession Dec 2027 · 18.2% built · 1 complaint
- SUBHSHRI ARCADE · malad westSUBHSHRIDEVELOPERS · P51800007175 · possession Sept 2024 · 100% built
- LAXMI CHS · BorivaliADITYA DEVELOPERS · P51800007179 · possession Jan 2021 · 76.4% built · 2 complaints
- NIRMAL ANAND CHS · AndheriNirmal Anand CHS LTD · P51800007180 · possession Sept 2023 · 90.9% built
- Kush Sapphire · AndheriKush Buildcon LLP · P51800007193 · possession Dec 2018 · 90.9% built
- SHUBH CHINTAN · KurlaAUM ENTERPRISES · P51800007195 · possession Jun 2022 · 90.9% built
- Grace Iconic Wing A-B · AndheriGrace Property Development Ventures · P51800007207 · possession Jun 2023 · 38.9% built
- SBI RAGVIHAR CHS · BorivaliTuvin Consultancy LLP · P51800007223 · possession Dec 2027 · 72.7% built · 5 complaints
- BRINDAVAN SILVERPARK CHS · BORIVALI WESTBRINDAVAN SILVER PARK CO-OPERVATIVE HOUSING SOCIETY LIMITED · P51800007225 · possession Dec 2029 · 30% built · 6 complaints
- THE HEIGHTS · AndheriDHRUVI PROPERTIES PVT LTD · P51800007232 · possession Apr 2027 · 86.8% built · 9 complaints
- Avirahi Heights · BorivaliABHIGNA ENTERPRISES · P51800007245 · possession Jun 2023 · 100% built · 2 complaints
- VISION HEIGHTS WING C · AndheriFiona Realty Private Limited · P51800007259 · possession Jun 2025 · 78.6% built
- MARS- SUNCITY HOUSING PHASE II · KurlaSUNCITY HOUSING · P51800007268 · possession Apr 2027 · 57.5% built
- OM SAKTHI CO.OP.HSG.SOC.LTD · MUMBAIMAVERICK REALTORS · P51800007273 · possession Sept 2027 · 100% built
- Emerald Isle - T9 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800007280 · possession Dec 2021 · 90% built · 2 complaints
- Das Bhavan CHSL · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800007281 · possession Dec 2018 · 90.9% built
- MOONGIPA ARCADE · AndheriMOONGIPA REALTY PRIVATE LIMITED · P51800007285 · possession Apr 2029 · 99.6% built · 27 complaints
- DARVESH GRAND · AndheriSHYAM SUNDER ESTATES PRIVATE LIMITED · P51800007294 · possession Mar 2018 · 100% built
- SWATI C.H.S. LTD · BorivaliDILIP HIRALAL DOSHI · P51800007302 · possession Jun 2018 · 90.5% built
- Swayambhu Residency · BorivaliYogiraj Builders and Developers · P51800007303 · possession Mar 2023 · 100% built
- BELLA VISTA · CHEMBURARMAND CORPORATION · P51800007308 · possession Dec 2019 · 63.6% built
- LOVEDALE RESIDENCES · BorivaliYASHODHAN UNIQUE CONSTRUCTION COMPANY · P51800007324 · possession Mar 2018 · 99.6% built
- Skicity Phase 1 · KurlaSkicon Infrastructure Co · P51800007336 · possession Apr 2027 · 90.5% built
- NEW EKTA CHS · BorivaliADITYA DEVELOPERS · P51800007346 · possession Dec 2021 · 76.8% built · 9 complaints
- SHREE SATI ASHISH CO OP HOUSING SOCIETY · KurlaSUN-VUB · P51800007372 · possession Jul 2018 · 80% built
- REDEVLOPMENT OF SUN AND MOON CHS LTD. BLDG NO. 12 AND 13 · BorivaliKaustubh Construction Private Limited · P51800007374 · possession Jun 2023 · 81.8% built
- Shanti Niwas · KurlaD.G. Patel & Co. · P51800007402 · possession Dec 2019 · 90.9% built
- Rajhans Helix 3 · KurlaRajhans Infracon (India) Private Limited · P51800007413 · possession Aug 2023 · 90.9% built
- Elanza · AndheriPRAVIN Viram SATRA · P51800007425 · possession Mar 2019 · 90.9% built · 1 complaint
- Neptune Flying Kites A Wing - Right Wing · KurlaNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · P51800007428 · possession Dec 2019 · 90.9% built · 8 complaints
- SANSKRUTI BUILDING NO 2 C WING · AndheriNIRMAN REALTORS AND DEVELOPERS LTD · P51800007436 · possession Apr 2027 · 43.8% built · 5 complaints
- Meridian Court 1 · BorivaliVijaykamal Properties Pvt Ltd · P51800007441 · possession Dec 2027 · 33.3% built · 35 complaints
- MARBLE HEIGHTS · BorivaliSHREE SAI ENTERPRISES · P51800007464 · possession Jun 2021 · 39.1% built
- HARIKRIPA SRA CO OP HGS · KurlaSAI BHAGYAWAN ENTERPRISES · P51800007469 · possession Jun 2019 · 90.9% built
- CASTLE PEAK · KurlaINNERSPACE · P51800007470 · possession Mar 2019 · 69.1% built · 4 complaints
- 111 HYDE PARK · BorivaliMDM REALTY · P51800007477 · possession Dec 2022 · 90.9% built
- SILICON ENCLAVE · KurlaSHILPRIYA BUILDERS AND DEVELOPERS · P51800007484 · possession Oct 2020 · 90.9% built
- Saffron Residency Phase -1 · KURLAAYODHYA CONSTRUCTION CO · P51800007485 · possession Dec 2026 · 88.3% built · 7 complaints
- AHIMSA HEIGHTS · BorivaliAHIMSA BUILDER · P51800007486 · possession Sept 2018 · 72.7% built · 3 complaints
- JEEVAN ANAND · KurlaSUYOG DEVELOPERS · P51800007491 · possession Jun 2023 · 90.9% built
- HARI KUNJ III · KurlaKUKREJA CONSTRUCTION CO · P51800007495 · possession Sept 2020 · 59.1% built
- Sai Pradnya · KurlaDrushti Realtors · P51800007499 · possession Jun 2019 · 74.1% built · 12 complaints
- SUNSHINE TOWER PHASE - I · KurlaS. SIDDHARTH CONSTRUCTION CO · P51800007504 · possession Apr 2027 · 62.6% built · 11 complaints
- BUDDHA VIHAR CHS LTD · KurlaM/S REGAL BUILDERS AND DEVELOPERS · P51800007510 · possession Apr 2027 · 70.9% built · 6 complaints
- DIVYAM HEIGHTS · AndheriHERSH CONSTRUCTION · P51800007515 · possession Apr 2032 · 61.1% built
- KRISHNA · BorivaliSUNIT ENTERPRISE · P51800007521 · possession Apr 2029 · 30.3% built · 8 complaints
- GOKUL HEIGHTS · BorivaliTHAKKAR BUILDERS & DEVELOPERS · P51800007528 · possession Dec 2018 · 81.8% built · 1 complaint
- Stella Sapphire A Wing · KurlaVaibhavLaxmi Builders and Developers · P51800007545 · possession Dec 2019 · 64.3% built
- f RESIDENCES-MALAD · BorivaliM/S RIDDHI SIDDHI CONSTRUCTION · P51800007547 · possession Jul 2022 · 81.4% built · 11 complaints
- A and O ESTADO · KurlaA and O ESTADO · P51800007548 · possession Dec 2026 · 46% built · 2 complaints
- f. RESIDENCES GHATKOPAR- WING A and B · KurlaARIHANT REALTORS · P51800007550 · possession Jul 2019 · 86.8% built · 5 complaints
- Shivam Centrium · AndheriGlobal Buildcon Pvt Ltd · P51800007569 · possession Sept 2020 · 100% built
- SIGNATURE BUSINESS PARK · ChemburSwastik Developers · P51800007575 · possession Dec 2022 · 79.1% built · 1 complaint
- RAJAS RESIDENCY · KurlaPRAMOD SHRIDHAR MOHITE · P51800007577 · possession Dec 2017 · 100% built
- Grace Meadows · BorivaliGrace Suburban Development Venture · P51800007583 · possession Jul 2027 · 100% built
- TRIMURTI CHSL PHASE I - UPTO 15TH FLOOR · KurlaROMELL REAL ESTATE PRIVATE LIMITED · P51800007589 · possession Dec 2021 · 90.9% built
- AAKASHA CHSL · BorivaliTrivenidevelopers · P51800007596 · possession Dec 2017 · 78.6% built
- EASTERN WINDS · KurlaSHREE KRISHNA HOMES PVT. LTD. · P51800007604 · possession Mar 2021 · 70.5% built
- RBI employees Ashish chsl · KASTUR PARKTRIVENI DEVELOPERS · P51800007607 · possession Dec 2022 · 90.9% built · 9 complaints
- RADHAKUNJ CHS · AndheriAUM DEVELOPERS · P51800007609 · possession Jan 2019 · 90.9% built
- SAPPHIRE BUSINESS ANNEXE · KurlaSAPPHIRE DEVELOPERS · P51800007622 · possession May 2022 · 81.8% built
- Ruparel Westsky · BorivaliRUPAREL SHREEJI CONSTRUCTION PVT LTD · P51800007630 · possession Dec 2027 · 48.9% built · 58 complaints
- GOREGAON RASIK CO OP HSG SOCIETY LTD · GOREGAON WESTAAKAR REAL ESTATE DEVELOPERS · P51800007636 · possession Mar 2024 · 90.9% built
- Ace and Matchpoint · MULUND WESTRicardo Constructions Private Limited · P51800007641 · possession Jun 2028 · 53.5% built · 115 complaints
- SHRADDHA AUTUMN PARK · KurlaATHARVA DEVELOPERS · P51800007651 · possession Apr 2028 · 85.3% built · 1 complaint
- INDU GANESH HEIGHTS · KurlaTIGON REALITY PRIVATE LIMITED · P51800007655 · possession Dec 2020 · 42.3% built
- Pushp Vinod - 15 · BorivaliVas Infrastructure Ltd. · P51800007682 · possession Dec 2021 · 50% built
- ONYX APARTMENT - REDEVELOPMENT OF KUNFAYAKUN CHSL BUILDING · BorivaliReFAB CONSTRUCTION (INDIA) PVT. LTD. · P51800007695 · possession Jan 2018 · 68.7% built
- Sunrise Orlem 2A Phase 1 · BorivaliDhaval Housing AOP · P51800007706 · possession Jan 2023 · 90.9% built
- Sunrise Orlem Building 4 · BorivaliDhaval Housing AOP · P51800007714 · possession Dec 2019 · 81.8% built
- FRESSIA RANIBELLO · BorivaliLucent Infra Projects Pvt. Ltd. · P51800007716 · possession Jun 2019 · 100% built
- Prime Builders and Developers - SadhuAdarsh · AndheriPrime Builders and Developers · P51800007720 · possession May 2022 · 69.1% built
- Hiramani Enclave · MumbaiDamji Hirji & Company · P51800007729 · possession Jun 2019 · 100% built
- Dridhena Developers and Realtors · BorivaliDridhena Developers and Realtors · P51800007733 · possession Mar 2023 · 80.5% built
- DHARMANATH KRUPA · BorivaliBALI LANDMARKS LLP · P51800007747 · possession Dec 2018 · 90.9% built
- Orchid Court · Greater Mumbai (M Corp.) (Part) (802794)Pranjee Properties Pvt. Ltd. · P51800007751 · possession Dec 2018 · 90.9% built · 3 complaints
Thane
- Bhavani Heights · Badlapur (M Cl)Kalyani Enterprises · P51800003594 · possession Dec 2023 · 59.1% built · 9 complaints
- DYNAMIC ULTIMA - BLISS · Kalyan-Dombivali (M Corp.)TRIVENI LIFE STYLE DEVELOPERS LLP · P51800004249 · possession Dec 2020 · 90.9% built
- PINE WOOD · KasarvadavaliRDC VENTURES · P51800007505 · possession Jun 2018 · 100% built