Mumbai Suburban
- Sea Jewel · BorivaliSea Jewel Property Developers LLP · P51800009552 · possession Dec 2021 · 36.8% built
- SHREE SHIVSAMARTH RESIDENCY · KurlaSHREE SHIV SAMARTH DEVELOPERS · P51800009568 · possession Jan 2022 · 78.4% built
- PALLADIUM · BorivaliCHHEDA BUILDERS · P51800009569 · possession Dec 2021 · 100% built
- Avirahi Homes Building 3 · BorivaliV.M.Associates · P51800009582 · possession Oct 2020 · 100% built · 9 complaints
- ADHRIT · BorivaliMUNDARA DEVELOPERS · P51800009600 · possession Dec 2026 · 84.5% built · 7 complaints
- Royal Fantasy Phase I · AndheriRoyal Fantasy Constructions Private Limited · P51800009606 · possession Jun 2022 · 84.2% built · 5 complaints
- Gajanan Plaza · BorivaliBalaji Construction Co. · P51800009622 · possession Dec 2027 · 80.9% built · 28 complaints
- Neelkamal Heights · BorivaliOSHO Developers · P51800009687 · possession Dec 2017 · 100% built
- SHUBH AASHISH · MumbaiA B BUILDER & DEVELOPERS PVT LTD · P51800009692 · possession Dec 2019 · 90.9% built
- GAURAV PALACE · BorivaliRAVI FOUNDATION · P51800009695 · possession Dec 2017 · 100% built · 2 complaints
- Laxmi Business Park · AndheriLaxmi Industrial Estate · P51800009704 · possession Dec 2018 · 68.2% built
- SAI ASHISH II · KurlaKUKREJA CONSTRUCTION CO · P51800009725 · possession Dec 2017 · 72.7% built
- DNS TOWER · KurlaRajendra Dattatray Sawant · P51800009731 · possession Dec 2019 · 90.9% built · 2 complaints
- CRYSTAL PRIDE · BorivaliCRYSTAL CONSTRUCTION COMPANY · P51800009735 · possession Jun 2026 · 78.6% built
- SIGMA EMERALD · ANDHERISIGMA REALTORS (INDIA) PRIVATE LIMITED · P51800009738 · possession Aug 2022 · 90% built
- AETHER WING B2 - PHASE 1A - UPTO 20TH FLOOR · BorivaliROMELL PROPERTIES PRIVATE LIMITED · P51800009739 · possession Dec 2023 · 100% built
- Sanskruti Splendour · BORIVALISanskruti Nirman Pvt. Ltd. · P51800009760 · possession Dec 2022 · 58.2% built · 1 complaint
- SUPRABHAT CLASSIC · Sahkar NagarDENNIS JAMES FERNANDES · P51800009781 · possession Dec 2026 · 70.7% built · 14 complaints
- SAFAL SAI AND SAFAL SAINATH · KELKARWADIMANGALNATH DEVELOPERS PVT LTD · P51800009799 · possession Oct 2026 · 65.2% built · 12 complaints
- SUDARSAN CHS LTD · AndheriREGENT SPACES · P51800009804 · possession Mar 2019 · 6.4% built
- SAMARTH ENCLAVE H WING ANDHERI CHHAYA CHS · AndheriSAMARTH ERECTORS AND DEVELOPERS · P51800009806 · possession Dec 2026 · 43.4% built · 3 complaints
- TRIBECA · AndheriNESTOR BUILDERS & DEVELOPERS PRIVATE LIMITED · P51800009815 · possession Dec 2019 · 90.9% built · 2 complaints
- KURLA SAHAYOG CHS LTD., BLDG. NO.68 · KurlaPARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED · P51800009819 · possession Jun 2025 · 90.9% built · 6 complaints
- BIZ POINT · KurlaN N DATAR & ASSOCIATES · P51800009838 · possession Dec 2027 · 90.2% built · 1 complaint
- PRUTHI ANNEXE · AndheriRAJA DEVELOPERS · P51800009856 · possession Sept 2026 · 90.9% built · 1 complaint
- N SQUARE · Andheriparthesh developers private limited · P51800009863 · possession Dec 2022 · 100% built · 2 complaints
- Sumit Garden Grove · ChikoowadiSumit Garden Grove Construction LLP · P51800009864 · possession Dec 2022 · 45.5% built
- DARPAN HEIGHTS · BorivaliDUDHAL INFRA · P51800009866 · possession Jun 2018 · 88.2% built
- MANTRI PARIJAT · AndheriPENTAGON PREMISES PRIVATE LIMITED · P51800009873 · possession Dec 2018 · 60% built
- MAHARSHI HEIGHTS · Malad EastAIYANNAR ENTERPRISES · P51800009876 · possession Dec 2028 · 41.5% built
- Royal Fantasy Phase III · AndheriRoyal Fantasy Constructions Private Limited · P51800009920 · possession Jun 2026 · 65.3% built
- Polys Cooperative Housing society · BorivaliPARSH HOUSING PVT LTD · P51800009952 · possession Jul 2018 · 59.1% built
- NISHCHAY WING F · BorivaliSHREERAJ DEVELOPER LLP · P51800009954 · possession Dec 2024 · 87.7% built · 1 complaint
- PRATHAM · AndheriVARDHMAN ENTERPRISES · P51800009959 · possession Dec 2022 · 90.9% built · 7 complaints
- AL-BURHAN CHS-Phase-I · AndheriRAJ ROMELL REALTORS · P51800009971 · possession Dec 2020 · 80.5% built
- NEPTUNE ELEVE WING B · KurlaNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · P51800009976 · possession Dec 2026 · 0.9% built · 3 complaints
- GULRAJ HEIGHTS · KurlaM/S NEETA DEVELOPER · P51800009977 · possession Mar 2018 · 90% built
- SAFAVI CHS LTD · AndheriRAJ BUILDERS · P51800009984 · possession Oct 2020 · 84.5% built
- Sainik Enterprises · BorivaliCaptain Dilip Kopikar · P51800010016 · possession Dec 2018 · 100% built
- MANGALDEEP CHSL. · BorivaliDHARIWAL CONSTRUCTIONS (INDIA) PRIVATE LIMITED · P51800010018 · possession Dec 2019 · 90.9% built
- Shubham Solitude · KurlaShubham Enterprise · P51800010051 · possession Dec 2021 · 80% built
- SABARI SHAAN · KurlaShankheshwar Properties Pvt Ltd · P51800010056 · possession Dec 2018 · 93.2% built · 1 complaint
- Ganeshwadi CHS LTD - S.R.A · BhatwadiAshok Rajaram Gupta · P51800010062 · possession Dec 2023 · 2.7% built · 80 complaints
- Sai Radha Complex · KurlaG. K. Realtors · P51800010063 · possession Jul 2022 · 86.1% built
- TRIVENI · AndheriSHREENATH INFRAPROJECTS · P51800010070 · possession Sept 2018 · 82.8% built
- P.K ARCH · AndheriP.K. Homes · P51800010071 · possession Jun 2023 · 100% built
- ARKADE EARTH - GARDENIA · Kanjurmarg EastArkade Developers Private Limited · P51800010074 · possession Dec 2023 · 88.5% built
- Chandraraj Complex · Malad WestShree Sai Shraddha Associates · P51800010076 · possession Dec 2026 · 90.9% built
- SHIV GAURI · Greater Mumbai (M Corp.) (Part) (802794)BHOOMI REALTORS · P51800010081 · possession Dec 2018 · 52.3% built · 1 complaint
- HANSINI ELEGANCE · BorivaliKARSAN BACHU SATRA · P51800010085 · possession Mar 2025 · 64.6% built
- Gurbani B · KurlaHeena Construction Co · P51800010088 · possession Jul 2018 · 86.4% built
- PRATIMA CO-OPERATIVE HOUSING SOCIETY · AndheriSUBHASH VELJI CHAWDA · P51800010091 · possession Aug 2018 · 21.5% built
- NAVJEEVAN HEIGHTS · malad eastKonark Shakti Group of Companies · P51800010116 · possession Sept 2018 · 90.9% built
- Golden Heights @ SMGK URBANA · JOGESHWARI WESTSMGK DEVELOPERS PVT. LTD. · P51800010146 · possession Aug 2025 · 100% built
- ARIHANT · KurlaPLAHA AND MEHTA ASSOCIATES · P51800010147 · possession Sept 2022 · 80.7% built
- DPS AISHWARYA · BorivaliBP INFRA KALINDI DEVELOPERS · P51800010149 · possession Dec 2027 · 4 complaints
- Suparshwa Urbana · AndheriSuparshwa Estate · P51800010166 · possession Oct 2020 · 86.4% built
- 81 AUREATE · AndheriPYRAMID DEVELOPERS · P51800010171 · possession Dec 2019 · 98% built · 25 complaints
- OM PALACE · AndheriOM PALACE · P51800010191 · possession Aug 2027 · 24.5% built
- REDEVLOPMENT OF SUNDRESH CHS LTD · BorivaliRAJ CORPORATION · P51800010206 · possession Dec 2018 · 72.7% built
- Sangita Aspire - Sale Portion and Ratilal Thakarshi SRA CHS Ltd - Rehab Portion · AndheriSangita Realty · P51800010228 · possession Dec 2017 · 100% built
- Arihant Enclave · BorivaliKDS Developers Pvt. Ltd. · P51800010229 · possession Dec 2019 · 95.9% built
- SCORPIO · BorivaliJASANI REALTY PVT.LTD · P51800010230 · possession Dec 2026 · 67% built
- SALE BUILDING · AndheriSankalp Developers and Project Consultants · P51800010233 · possession Oct 2028 · 4.3% built · 2 complaints
- malad shanti · Borivalisachit thakkar · P51800010257 · possession Oct 2020 · 22.4% built
- Halai Constructions · AndheriHalai Constructions · P51800010271 · possession Dec 2018 · 89.5% built
- RAJ RANI PRIDE · MumbaiGeetaraj Realtors · P51800010293 · possession Dec 2022 · 100% built · 2 complaints
- FOREFRONT NORTHEAST-100 · AndheriForefront Realty Private Limited · P51800010359 · possession Dec 2028 · 27.3% built
- ANTHURIUM · KurlaVIBHA PROPOERTIES LLP · P51800010361 · possession May 2023 · 90.9% built
- Siddharth Residency Building no 2 wing d and e · KurlaRamesh Jadhavji Gajra · P51800010378 · possession Dec 2022 · 90.9% built
- Akar Pinnacle · BorivaliAkar Creations Private Limited · P51800010382 · possession Dec 2017 · 100% built · 1 complaint
- MARATHON NEOSQUARE A · KurlaMARATHON NEXTGEN REALTY LTD · P51800010386 · possession Dec 2026 · 85.9% built · 4 complaints
- SKYLON SPACES · BorivaliSAI KRUPA DEVELOPERS · P51800010405 · possession Dec 2019 · 90.9% built
- ND Enclave · AndheriN & D Constructions LLP · P51800010411 · possession Dec 2019 · 90.5% built
- MADHUBAN A AND A1 WING · BorivaliM.D. DEVELOPERS · P51800010413 · possession Oct 2020 · 90.9% built · 3 complaints
- VISION HEIGHTS WING D · AndheriFIONA REALTY PRIVATE LIMITED · P51800010431 · possession Dec 2023 · 81.8% built
- ROYAL ORCHID · KurlaSHRI GANESH DEVELOPERS · P51800010432 · possession Dec 2019 · 79.5% built
- Grace Grandeur · AndheriGRACE ESTATE DEVELOPMENT VENTURE - Parvez Suleman Lakdawala (Proprietor) · P51800010438 · possession Apr 2027 · 2 complaints
- Ankur Palace · BorivaliOSHO Developers · P51800010439 · possession Feb 2021 · 70.5% built · 2 complaints
- Transcon Ramdev Plaza · AndheriTranscon Iconica Private Limited · P51800010457 · possession Dec 2026 · 65% built · 14 complaints
- SOLITAIRE BUSINESS PARK · KurlaCRESCENT REALTY DEVELOPERS PRIVATE LIMITED · P51800010460 · possession Dec 2021 · 40.9% built · 1 complaint
- RUDRA · BorivaliShree DPS Project and Services Pvt. Ltd. · P51800010461 · possession Dec 2019 · 90.9% built · 1 complaint
- Alta Monte and Signet · BorivaliERA REALTORS PRIVATE LIMITED · P51800010463 · possession Dec 2027 · 95% built · 306 complaints
- PALAI TOWERS · BorivaliN D DEVELOPERS · P51800010465 · possession Dec 2026 · 74% built · 7 complaints
- Rite Prime · AndheriRite Developers Pvt. Ltd. · P51800010472 · possession Dec 2017 · 90.9% built
- Govind Nagar SRA CHS Ltd. · mahakaliDrishti Developers II · P51800010475 · possession Sept 2025 · 98.7% built
- SAMAJ DARSHAN · BorivaliH RISHABRAJ DEVELOPERS · P51800010479 · possession Apr 2023 · 90.9% built · 39 complaints
- RAVIRAJ TARANG · BorivaliRAVINDRA SHANKAR SAWANT · P51800010482 · possession Dec 2022 · 60.6% built · 1 complaint
- ADCON MERIDIAN · AndheriHI SKY REALTY · P51800010498 · possession Dec 2019 · 90.9% built
- PEARL PALACE · AndheriCHANDIWALA ENTERPRISES · P51800010505 · possession Dec 2021 · 100% built · 1 complaint
- Bhagwati Ashish · AndheriPritesh Damji Savla · P51800010515 · possession May 2024 · 88.6% built · 4 complaints
- Madonna · BorivaliMichael Rodrigues · P51800010569 · possession Dec 2022 · 90.9% built · 2 complaints
- ROMELL AETHER WING B1 · BorivaliROMELL PROPERTIES PRIVATE LIMITED · P51800010574 · possession Dec 2021 · 100% built · 2 complaints
- UPKAR CHS LTD · BorivaliTEJAS DINESH SHAH · P51800010621 · possession Sept 2018 · 80.5% built
- SHRI HARI BUILDING · BorivaliSHRI NEELKANTH DEVELOPERS · P51800010627 · possession Jan 2020 · 90.9% built
- SOLOMON RESIDENCY · KurlaVINAYAKA REALTORS AND DEVELOPERS · P51800010650 · possession Dec 2021 · 100% built
- VKLAL HARI PHASE I · .VEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED · P51800010657 · possession Dec 2026 · 67.7% built
- Tapsya Co. Op. Housing Soc. LTD. · VERSOVA 4 BUNGLOWSNEMINATH HOMES PRIVATE LIMITED · P51800010695 · possession Jan 2021 · 100% built · 1 complaint
- ZEE SWASTIK · AndheriZEE RPM BUILDERS AND DEVELOPERS LLP · P51800010732 · possession Dec 2021 · 19.7% built · 1 complaint
- gagangiri Elanza · KurlaPalan Realty Private Limited · P51800010768 · possession Mar 2022 · 99.5% built
- galaxy royale · BorivaliM R REALTORS · P51800010773 · possession Oct 2020 · 100% built · 1 complaint
- Jay Krishna · KurlaShreegoandevi Enterprises Private Limited · P51800010788 · possession Dec 2027 · 83.7% built
- Lashkaria Empress · MumbaiLashkaria Housing & Infrastructure Private Limited · P51800010789 · possession May 2023 · 100% built
- SAMARTH ENCLAVE F AND G WING ANDHERI CHHAYA CHS · AndheriSAMARTH ERECTORS AND DEVELOPERS · P51800010790 · possession Dec 2026 · 74.3% built · 5 complaints
- GREEN ACRES · BorivaliNIRMAN REALTORS AND DEVELOPERS LTD · P51800010794 · possession Dec 2026 · 88.6% built · 28 complaints
- BHOOMI CELESTIA -A1 WING · Librity Garden, Opp. S.N.D.T. Girls CollageSASHWAT CONSTRUWELL PRIVATE LIMITED · P51800010810 · possession Dec 2023 · 63.6% built
- Chetna Kunj CHS · BorivaliK Merchant Construction Ltd · P51800010821 · possession Dec 2019 · 69.1% built
- Yashwant Height · BorivaliM.P. GLOBAL HEIGHT PRIVATE LIMITED · P51800010825 · possession Dec 2026 · 69.8% built · 3 complaints
- Jhelum · KurlaSatre Infrastructure Private Limited · P51800010836 · possession Dec 2021 · 85.5% built
- Bougainvillea · AndheriRicha Realtors Private Ltd. · P51800010842 · possession Dec 2026 · 98.2% built · 15 complaints
- REDEVELOPMENT OF THE STATE BANK OF INDIA SIDDHESHWAR CO OP HOUSING SOC LTD · KurlaORRA REALTORS PRIVATE LIMITED · P51800010846 · possession Dec 2017 · 80.9% built
- M M SPECTRA · KurlaM. M. DEVELOPERS - SHRAMJIVI · P51800010867 · possession Oct 2019 · 98.2% built · 9 complaints
- CHISHTIYA HEIGHTS · KurlaRAJDEEP ASSOCIATES · P51800010873 · possession Nov 2019 · 63.6% built
- BLUE FORTUNA · AndheriATUL PROJECTS INDIA PRIVATE LIMITED · P51800010900 · possession Sept 2020 · 90.9% built · 1 complaint
- RUDRAKSH · KurlaSANDU DEVELOPERS · P51800010914 · possession Oct 2019 · 100% built
- Laxmi Nagar · BorivaliRELIABLE CONSTRUCTIONS · P51800010918 · possession Dec 2026 · 57.6% built · 21 complaints
- LAXMI CALLISTA · BorivaliLAXMIDEVI DEVELOPERS · P51800010929 · possession Sept 2019 · 87.4% built · 2 complaints
- NIDHAAN CLOVER - B · KurlaNIDHAAN BUILDCON PRIVATE LIMITED · P51800010930 · possession Jan 2022 · 89.1% built
- WINSPACE AMELIO · -BINI BUILDERS PRIVATE LIMITED · P51800010932 · possession Jun 2023 · 90.9% built
- Sai Prasad · AndheriSumit Snehashish Joint Venture · P51800010933 · possession Sept 2019 · 39.1% built
- SHRADDHA INFINITY · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800010938 · possession Aug 2020 · 43.5% built
- SAMET SIKAR MAHAL · BorivaliKothari Construction Company · P51800010946 · possession Dec 2018 · 90.9% built
- SANGHVI JEWEL · BorivaliSANGHVI REALTORS · P51800010958 · possession Dec 2026 · 75.9% built · 1 complaint
- GAURAV LEGEND · AndheriMonarch and Querish Builders · P51800010967 · possession Jun 2026 · 52.1% built · 47 complaints
- REDEVELOPMENT OF STATE BANK OF INDIA EMPLOYEES SHREE CO-OP HOUSING SOC LTD · AndheriORRA REALTORS PRIVATE LIMITED · P51800010979 · possession Dec 2021 · 53.6% built
- ANAND · AndheriSUNNYSIDE DEVELOPERS · P51800010991 · possession Mar 2018 · 100% built
- SRISHTI PRIDE PHASE 1- WING A · KurlaKRISHNA ENTERPRISE · P51800010994 · possession Dec 2023 · 99.6% built
- EKTA APPARTMENT FROM 18TH FLOOR TO 22ND FLOOR · BorivaliADITYA ENTERPRISE · P51800011046 · possession Dec 2026 · 38.8% built
- SIDDHIVINAYAK · BorivaliTriumph Ventures · P51800011066 · possession Jun 2021 · 90.9% built · 4 complaints
- MULUND KAVITA KIRAN CHS · KurlaIndu Enterprise · P51800011080 · possession Dec 2020 · 90.9% built · 2 complaints
- BALAJI APARTMENT · KurlaTRIDEV REALTY AND CONSTRUCTION PVT LTD · P51800011083 · possession Dec 2026 · 99.6% built
- KENORITA GARMENT HUB · AndheriKeshvi Developers Pvt Ltd · P51800011101 · possession Mar 2018 · 82.3% built
- KSHITIJ VILLA · BorivaliKESARI HARIDAS MALI · P51800011141 · possession Dec 2028 · 45.1% built
- SHIVBLISS · KurlaRUSHI BUILDER & DEVELOPER · P51800011156 · possession Dec 2025 · 77.3% built · 9 complaints
- mam trilok · KurlaLEELA ENTERPRISES · P51800011162 · possession Mar 2026 · 90.9% built
- Shreeji Plaza Wing B · BORIVALISIDDHARTH ENTERPRISES · P51800011168 · possession Sept 2026 · 168.3% built · 1 complaint
- Serenity- Bldg 1 · KurlaJVPD Properties Private Limited · P51800011181 · possession Jul 2026 · 7.3% built · 392 complaints
- LOTUS · BorivaliRAJESHWAR LAND DEVELOPERS PRIVATE LIMITED · P51800011190 · possession Dec 2026 · 99.1% built
- KAILASH HEIGHTS · BorivaliRANJANA CONSTRUCTION PVT LTD · P51800011192 · possession Dec 2019 · 72.7% built
- SAI VAIBHAV · BorivaliANIL GANGARAM SAWANT · P51800011223 · possession Jun 2018 · 90.5% built
- SETHIA DARSHAN · AndheriSETHIA INFRASTRUCTURE PVT LTD · P51800011224 · possession Dec 2026 · 87.3% built · 4 complaints
- Aditya Aryan / Ejaj · BorivaliDinesh C Agarwal · P51800011231 · possession Mar 2019 · 90.9% built · 1 complaint
- PREETI SANGAM CHS · BorivaliKANDIVALI PRITI SANGAM CO-OP HOS SOC LTD · P51800011235 · possession Mar 2024 · 30.2% built · 3 complaints
- NEMINATH APARTMENT SRA CHS AND SHREE SIDDHAGIRI SRA CHS · BorivaliSUBHASH VELJI CHAWDA · P51800011251 · possession Dec 2019 · 41.9% built
- KAVYA KCD PRESTINE · KANDIVALI WESTKAVYA KCD BUILDCON LLP · P51800011252 · possession Sept 2028 · 52.6% built
- SIDDHARTH NAGAR PASCHIM JAGRUTI CHS LTD · BorivaliSHIVAM PARIVAR DEVELOPERS PVT LTD · P51800011260 · possession Dec 2026 · 42.4% built · 5 complaints
- Bhavani Plaza · MumbaiPadmakar Purushottam Gokarna · P51800011262 · possession Jun 2027 · 80.7% built · 16 complaints
- Gokul Gagan Apartments · BorivaliAraddhana Enterprises · P51800011276 · possession Dec 2017 · 90.9% built
- GEM PLAZA · AndheriGEM PATH DEVELOPERS · P51800011279 · possession Jun 2018 · 90.9% built
- UDAYA BHUVAN · CHEMBURSHREE KRISHNA HOMES PVT LTD · P51800011308 · possession Sept 2020 · 40.5% built
- KINGS APARTMENTS · AndheriSHREE SIDDHI CONSTRUCTIONS · P51800011320 · possession Dec 2018 · 75% built
- K L REGALIA · AndheriK L HOUSING LLP · P51800011323 · possession Sept 2020 · 67.5% built
- GARUDA SHATRUNJAY · BorivaliMESSERS SHREE UMIYA BUILDERS & DEVELOPERS · P51800011329 · possession Jun 2026 · 49.4% built · 22 complaints
- One · AndheriE D Developers Private Limited · P51800011338 · possession Aug 2018 · 90.9% built
- JAIHIND · KurlaS.P. ERECTORS AND DEVELOPERS PRIVATE LIMITED · P51800011367 · possession Dec 2027 · 45.9% built
- Lotus Prestige · BorivaliEssen Builders and Developers · P51800011399 · possession Dec 2017 · 90.9% built
- Pant Nagar Shankar Sadan CHS Ltd · KurlaK. Nakrani Associates · P51800011401 · possession Aug 2019 · 90.9% built · 1 complaint
- KANCHAN CHSL · BorivaliC H PATIL AND SONS LLP · P51800011409 · possession Sept 2020 · 90.9% built
- SAIKRUPA CHSL · Near Eksar TalaoC H PATIL AND SONS LLP · P51800011410 · possession Dec 2024 · 69.5% built
- AVIGHNA RESIDENCY · Malad EastKonark Shakti Group of Companies · P51800011421 · possession Dec 2018 · 90.9% built
- NIVAN · AndheriM/S. PARADIGM REAL ESTATES LLP · P51800011423 · possession Oct 2019 · 90% built
- JAI SHREERAM PRASANNA CHSL · KurlaRIYAZ RAMZAN SHAH · P51800011427 · possession Aug 2026 · 72.6% built · 1 complaint
- LEVEL - The Residences · AndheriM/s Siroya Keystone · P51800011428 · possession Dec 2026 · 99.5% built · 14 complaints
- Sanskriti · BorivaliJEM AND ASSOCIATES · P51800011430 · possession Jun 2027 · 57.3% built
- THAIS RESIDENCY · AndheriMERCHANT CONSTRUCTIONS PVT. LTD. · P51800011454 · possession Mar 2018 · 70.5% built · 6 complaints
- RASHMI SADHNA · BorivaliMODIS NAVNIRMAN LLP · P51800011482 · possession Aug 2019 · 63.6% built
- NAVNEET SADAN CHS LTD · KurlaSHREE SWAMI SAMARTH BUILDERS & DEVELOPERS · P51800011489 · possession Dec 2022 · 80% built
- DIVYAM HEIGHTS · AndheriHERSH CONSTRUCTION · P51800011500 · possession Dec 2031 · 61.1% built
- Vicenza Residency/Commercial · MumbaiSSV BUILDERS AND DEVELOPERS PVT LTD · P51800011517 · possession Dec 2027 · 3.3% built · 20 complaints
- BORIVALI SAHAKAR NIKETAN · BorivaliAMAR ENTERPRISES · P51800011527 · possession Jun 2018 · 69.5% built · 1 complaint
- NEW BHAGYASHREE CHS LTD · AndheriK. ANAND CONSTRUCTION PRIVATE LIMITED · P51800011529 · possession Feb 2018 · 100% built
- Laxmi Krupa CHS Ltd. · BorivaliM/s. Shreepad Developers · P51800011532 · possession Jun 2023 · 68.2% built · 2 complaints
- Redevelopment of Sultanabad Darshan CHS Ltd · AndheriAFTAB CONSTRUCTIONS · P51800011533 · possession Dec 2021 · 90.9% built
- Aranya The Park · BorivaliAnuradha Real Estate Developers Pvt Ltd · P51800011594 · possession Dec 2027 · 49.5% built · 9 complaints
- ONE MERAKI - Wing A & Wing B · CHEMBURMeraki Habitats LLP · P51800011606 · possession Dec 2025 · 99.5% built
- CVII · KurlaPARDIS CONSTRUCTION LLP · P51800011608 · possession Mar 2018 · 90.9% built
- BHOOMI CELESTIA - A WING · Librity Garden, Opp. S.N.D.T. Girls CollageSASHWAT CONSTRUWELL PRIVATE LIMITED · P51800011623 · possession Dec 2024 · 30.5% built
- VKLAL VISHNU PHASE I · DahisarVEEKAYLAL INVESTMENT COMPANY PRIVATE LIMITED · P51800011626 · possession Dec 2026 · 90.9% built · 6 complaints
- Laxmi Developers · BorivaliManoj Krishna Dhanawade · P51800011637 · possession Jun 2023 · 44.9% built · 2 complaints
- SHREE SUMITRA APARTMENTS · BorivaliSHREE MAHALAKSHMI CONSTRUCTIONS · P51800011651 · possession Dec 2018 · 38.8% built
- Serendipity At BKC · AndheriForum Homes Pvt Ltd · P51800011662 · possession Dec 2024 · 100% built · 3 complaints
- VIOLETTE VALLEY · MumbaiAQUA MARINE ENTERPRISES · P51800011664 · possession Dec 2017 · 90.9% built
- LABH SAMARTH HEIGHT · AndheriM.V. LABH ASSOCIATES · P51800011676 · possession Mar 2024 · 90.9% built
- MOBIN HEIGHTS · AndheriGAHLOT DEVELOPMENT SERVICES PVT. LTD. · P51800011697 · possession Dec 2026 · 75.9% built
- S. N. SAKET CO-OP HOUSING SOCIETY LIMITED · BorivaliMAN VIRAJ CONSTRUCTION · P51800011708 · possession Dec 2019 · 100% built
- Regent Orchid - Hema Niwas CHSL · AndheriRDB Mumbai Infrastructures Private Limited · P51800011724 · possession Sept 2019 · 90.9% built
- ATMARAM CHSL · BorivaliNAMOREALTY AND INFRA LLP · P51800011731 · possession Sept 2022 · 80% built
- BEACON CHSL · BorivaliBHUSHAN ANANT VICHARE · P51800011740 · possession Jun 2019 · 48.2% built
- nehru nagar ekta co op hsg soc ltd · KurlaRachana Homes · P51800011743 · possession Sept 2020 · 60.3% built
- NIVANT CHS LTD · VILE PARLE WESTM L CONSTRUCTIONS · P51800011747 · possession Dec 2020 · 100% built
- Girivan Shivkunj · ChemburShri Sati Builders and Developers Private Limited · P51800011754 · possession Mar 2020 · 79.1% built
- CONWOOD PARAGON · BorivaliCONSOLIDATED CROP PROTECTION PRIVATE LIMITED · P51800011758 · possession Dec 2027 · 63.6% built · 14 complaints
- ELEGANCE · VersovaPawankumar Prabhu · P51800011759 · possession Dec 2023 · 100% built
- TRIDEV ANUBHAV · Mulund WestTRIDEV REALTY AND CONSTRUCTION PVT LTD · P51800011760 · possession Dec 2026 · 86.8% built
- LAXMI ENCLAVE · BorivaliSHREE LAXMIDEVI DEVELOPERS · P51800011762 · possession Jun 2018 · 100% built
- Odhav Baug · KurlaS. K. CONSTRUCTION · P51800011780 · possession Sept 2018 · 68.2% built
- WINDSOR · AndheriTHE WINDSOR · P51800011781 · possession Dec 2020 · 72.7% built
- EKJYOT SANMAAN · KurlaDHEERAJ P VOHRA · P51800011782 · possession Dec 2023 · 90.9% built · 1 complaint
- Regent Heights-New Ganga Niwas CHSL · AndheriRDB Mumbai Infrastructures Private Limited · P51800011798 · possession Jun 2022 · 84.5% built
- MANRAJ VIEW · KurlaEkta Developers · P51800011821 · possession May 2026 · 40.9% built
- SAPTARATNA TOWERS · AndheriRAJA CONSTRUCTIONS COMPANY · P51800011864 · possession Dec 2017 · 100% built
- KATEELESHWARI APARTMENT · Mulund Check nakaKATEELESHWARI DEVELOPERS PRIVATE LIMITED & RAMANI BROTHERS · P51800011873 · possession Dec 2021 · 90.9% built
- ASPIRE RESIDENCY · MULUND WESTASPIRE RESIDENCY LLP · P51800011875 · possession Feb 2021 · 90.9% built
- Rolex SRA CHS · AndheriSQUARE CONSTRUCTIONS · P51800011887 · possession Dec 2025 · 90.9% built
- Mayur Tower · AndheriGeopreneur Spire Realty · P51800011901 · possession Dec 2026 · 87.3% built · 15 complaints
- REDEVELOPMENT OF NEW APSARA CHS LTD · MumbaiAPSARADEVELOPERS · P51800011928 · possession Sept 2018 · 100% built
- AUDUMBAR · Borivali EastVAS BUILDER & DEVELOPERS · P51800011943 · possession Dec 2019 · 41.5% built
- SHIVDARSHAN SRA CHS LTD · KurlaSHREE SWAMI SAMARTH BUILDERS · P51800011946 · possession Dec 2018 · 95.3% built
- OM SAI AMRUT CHS · BorivaliSHREE SAI SWAMI DEVELOPERS · P51800011998 · possession Dec 2018 · 81.8% built
- ASTORIA TOWER B · BorivaliCONWOOD REALTY PRIVATE LIMITED · P51800012007 · possession Dec 2027 · 39.1% built · 8 complaints
- SAI RACHANA APARTMENT · KurlaSHRI SAI BHOO RACHANA · P51800012011 · possession Dec 2019 · 65.9% built · 1 complaint
- HILTON ENCLAVE WING A, B, B-1 · KurlaBHAVANI DEVELOPERS PVT LTD · P51800012042 · possession Jun 2023 · 90% built · 4 complaints
- GIRIRAJ APARTMENTS · MULUND WESTMETRO DWELLERS PRIVATE LIMITED · P51800012045 · possession Dec 2019 · 55.5% built · 1 complaint
- Laaffaires Avenue Commercial and Laflor Residency Commercial · KurlaSSV Realtors · P51800012063 · possession Dec 2028 · 7.9% built · 7 complaints
- Saptashringi · KurlaSiroya Developers Pvt Ltd · P51800012064 · possession Jun 2026 · 43.5% built
- NANDANVAN · BORIVALIKOSMOS DEVELOPERS · P51800012073 · possession Jun 2023 · 23.6% built
- THE KOLLAGE · Andheri (East)ZIRE RUSHI CONSTRUCTION · P51800012084 · possession Aug 2026 · 99.9% built · 4 complaints
- ADCON RESIDENCY · BorivaliADCON INFRASTRUCTURE · P51800012085 · possession Dec 2018 · 90.9% built · 2 complaints
- THE JOTE MAHAL · KurlaSHIRISH MADHAV KULKARNI · P51800012097 · possession Jan 2021 · 75% built
- OMKARESHWAR CHS PROP · AndheriNEW LAXMI ENTERPRISES · P51800012099 · possession Dec 2021 · 53.2% built
- Grishma Heights · kandivali westRIGHT CHANNEL CONSTRUCTION PVT LTD · P51800012108 · possession Jun 2022 · 97.7% built
- TIMMY RESIDENCY · AndheriHARVINDERPAL TIRATHPAL MEHTA · P51800012112 · possession Dec 2018 · 72.7% built
- Cosmopolis Phase 1 · AndheriCosmos Homes India Pvt. Ltd. · P51800012114 · possession Dec 2017 · 72.7% built · 5 complaints
- KAPADIA AVENUE · BorivaliL J ENTERPRISE · P51800012139 · possession Mar 2022 · 90.9% built
- Aspire · BorivaliM/s Radheshyam Developers · P51800012142 · possession Oct 2026 · 67.7% built · 2 complaints
- NEELKANTH TIRTH CO. OP. HOUSING SOC. LTD. · MUMBAIMAVERICK REALTORS · P51800012145 · possession Oct 2023 · 99.1% built
- LUMA TOWERS A & B · AndheriECC-KONARK JOINT VENTURE · P51800012155 · possession Jun 2026 · 74.1% built · 16 complaints
- MAITRI SIYA APARTMENT · BorivaliMAITRI AND PP REALTORS · P51800012159 · possession Jun 2019 · 35.4% built
- LABH SHRIVALLI · AndheriLABHARTI INFRASTRUCTURE · P51800012182 · possession Dec 2018 · 84.5% built
- New Mahavir Darshan Chsl · BorivaliLMP GROUP · P51800012191 · possession Mar 2018 · 54.1% built
- ADCON IRIS · AndheriADCON INFRAPROJECTS PVT.LTD. · P51800012207 · possession Jun 2019 · 72.7% built
- SIDDHI VINAYAK · BorivaliSHREE GANESH ENTERPRISES · P51800012209 · possession Dec 2026 · 9.1% built · 3 complaints
- MASS METROPOLIS · CHEMBURGRACE URBAN DEVELOPMENT CORPORATION · P51800012210 · possession Sept 2026 · 90.9% built · 13 complaints
- NEPTUNE ELEVE WING D · KurlaNEPTUNE VENTURES AND DEVELOPERS PRIVATE LIMITED · P51800012220 · possession Dec 2026 · 0.9% built · 5 complaints
- Gardina Chs. Ltd. · AndheriTUSHAR VISHRAM PATEL · P51800012226 · possession Jun 2024 · 100% built · 3 complaints
- Jeevan Heights · Kandivali WestJ. P. Realtors · P51800012228 · possession Dec 2020 · 56.1% built
- MAHAVIR NAGAR ANSHUL PLAZA CHS LTD UPTO 8 FLOORS · BorivaliVIDISHA REAL ESTATE DEVELOPERS PVT LTD · P51800012231 · possession Mar 2019 · 100% built
- SWARAJ KALASH · KurlaRAJ HOMES PYRAMID GROUP · P51800012233 · possession Oct 2020 · 100% built · 2 complaints
- Shreedham Classic · AndheriShreedham Construction Private Limited · P51800012234 · possession Dec 2019 · 89.9% built · 1 complaint
- Sumit Samarth Arcade · BorivaliSumit Woods Pvt Ltd · P51800012260 · possession Dec 2018 · 75.8% built
- KAATYAYNI ENCLAVE · AndheriSTARWING DEVELOPERS PRIVATE LIMITED · P51800012277 · possession Mar 2018 · 100% built
- PEBBLES MARINA APARTMENTS · AndheriPEBBLES INFRA PROJECTS LTD · P51800012288 · possession Jul 2023 · 56.4% built
- ROHINI RESIDENCY OF JEEVAN KUNJ CHS LTD · KurlaAARYAN REALTORS · P51800012290 · possession Dec 2017 · 90.9% built
- ROMELL AETHER WING B 2-PHASE 2 34TH TO 39TH FLOORS · BorivaliROMELL PROPERTIES PRIVATE LIMITED · P51800012298 · possession Dec 2025 · 100% built
- SONALI CO-OPERATIVE HOUSING SOCIETY LTD · KurlaPARADISE REALTORS · P51800012312 · possession Feb 2022 · 100% built
- VISHWAVILLA · BorivaliGLASSWOOD AND LUCKY DEVELOPERS · P51800012317 · possession Jul 2018 · 72.7% built
- ANU-SMERA RESIDENCES · KurlaBALAN & CHHEDA DEVELOPERS PRIVATE LIMITED · P51800012341 · possession Dec 2018 · 100% built
- SHARNAM HEIGHTS · BorivaliSHYAM BIHARILAL GEHANI · P51800012351 · possession Dec 2019 · 90.9% built
- SHRADDHA ORCHID AVENUE · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800012384 · possession Apr 2018 · 89.5% built · 1 complaint
- Center Court · KurlaRicardo Constructions Private Limited · P51800012386 · possession Aug 2028 · 0% built · 12 complaints
- Jeevan Jyot · AndheriOm Shiv Constructions Co · P51800012397 · possession Dec 2021 · 100% built
- MARUTI · BorivaliINVENTION REALTORS PRIVATE LIMITED · P51800012405 · possession Mar 2024 · 86.8% built
- VILAS VAIBHAV CHS · BorivaliTUVIN CONSTRUCTIONS LLP · P51800012414 · possession Dec 2027 · 39% built · 3 complaints
- CITY PRIDE · AndheriCITYMAKER BUILDER PRIVATE LIMITED · P51800012418 · possession Jan 2022 · 70% built
- Transcon Fortune 500 Tower 1 · KurlaSamta Builders Pvt. Ltd. · P51800012431 · possession Dec 2026 · 27.3% built · 8 complaints
- TULSI CHAMBERS · KurlaSURANA CONSTRUCTION (CHEMBUR ) · P51800012437 · possession Jun 2026 · 90% built · 15 complaints
- Un Named · BorivaliSanjay Fakirchand Garg · P51800012444 · possession Feb 2021 · 44.5% built
- The Ghatkopar Nilkantha Chs Ltd · KurlaSchemaatics · P51800012450 · possession May 2022 · 90.9% built
- PAI NIWAS · BorivaliAAKAR CONSTRUCTIONS · P51800012455 · possession Dec 2017 · 90.9% built
- 117 RESIDENCY · chemburV3 PARTNERS · P51800012457 · possession Dec 2019 · 50% built
- K K SOLITAIRE · KurlaNavin M Mehta · P51800012460 · possession Jan 2021 · 90.9% built
- RBI Employees Siddhivinayak CHS Ltd · BorivaliVASUNDHARA BUILDERS · P51800012461 · possession Dec 2020 · 72.9% built
- Nityanand Nagar Vibhag IV Cooperative Housing Society Limited · Andheri EastBAJAJ INTERNATIONAL REALTY PRIVATE LIMITED · P51800012464 · possession Jun 2027 · 90.9% built · 7 complaints
- MULTAN HEIGHTS · AndheriS D BHALERAO CONSTRUCTIONS PVT LTD · P51800012470 · possession Dec 2018 · 90.9% built
- GULMOHUR · SINDHI SOCIETYSANJAY JUMANI · P51800012498 · possession Jul 2019 · 76.4% built
- Shree Dattakrupa Height Buidling No 125 · KurlaEkdanta Constructions Pvt Ltd · P51800012504 · possession Dec 2018 · 89.1% built
- KILBIL RATAN · MULUNDR P COMBINES · P51800012507 · possession Dec 2021 · 90.9% built
- Ruparel Skygreens I · BorivaliShree Siddhivinayak Infrastructure & Realty · P51800012513 · possession Dec 2026 · 78.2% built · 267 complaints
- Shivneri CHS Ltd · AndheriShree Chamunda Properties · P51800012532 · possession Sept 2020 · 56.7% built
- Gayatri Bhuvan · BorivaliIndra Realtors · P51800012569 · possession Dec 2017 · 90.9% built
- NEHRU NAGAR AMRAPALI CHS LTD · KurlaSAMRUDDHI DEVELOPERS · P51800012607 · possession Dec 2018 · 85% built · 16 complaints
- ISHAAN ENCLAVE · KurlaISHAAN DEVELOPERS · P51800012610 · possession Mar 2027 · 61.5% built · 1 complaint
- REDEVELOPMENT OF DADASAHEB GAIKWADNAGAR · BorivaliMAHARASHTRA POLICE CO-OPERATIVE HOUSING FEDERATION LTD. · P51800012619 · possession Jul 2028 · 25% built
- The Sanctuary · KurlaRunwal Construction Private Limited · P51800012621 · possession Jul 2028 · 85.1% built · 62 complaints
- Radha Krishna · BorivaliShri Krishna Chaitanya Enterprises · P51800012626 · possession Sept 2019 · 90.9% built
- GALAXY PINNACLE · AndheriMR REALTORS · P51800012634 · possession Mar 2021 · 45.5% built · 2 complaints
- Malwani Sea View CHS LTD · BorivaliMalwani Sea View CHS LTD · P51800012674 · possession Mar 2018 · 90.9% built
- SANA ARCADE · KurlaKADRI CONSTRUCTION CO. · P51800012722 · possession Dec 2019 · 72.7% built
- BHushan Plaza CHSL · BorivaliBhushan Enterprises · P51800012726 · possession Dec 2018 · 90.9% built
- A. H. Heights · Jogeshwari WestA.H. Constructions · P51800012784 · possession Dec 2027 · 36.4% built · 1 complaint
- Bhushan Enclave CHSL · BorivaliBhushan Enterprises · P51800012821 · possession Jun 2018 · 90.9% built
- PATEL ASSOCIATES A/C JAY SONAL · BorivaliPATEL ASSOCIATES A/C JAY SONAL · P51800012832 · possession Dec 2022 · 100% built · 2 complaints
- Jaliyan Heights Goregaon · Goregaon EastJaliyan Developer · P51800012880 · possession Dec 2024 · 84.5% built · 2 complaints
- Malwani West View CHS LTD · BorivaliMalwani West View CHS LTD · P51800012895 · possession Mar 2018 · 90.9% built
- Jaliyan Heights Borivali · BorivaliJaliyan Developer · P51800012925 · possession Jun 2022 · 67.5% built · 1 complaint
- VIGHNESHWAR COOPERATIVE HOUSING SOCIETY LIMITED · KurlaVIGHNESHWAR COOP HOUSING SOCIETY LIMITED · P51800012941 · possession Dec 2026 · 60% built
- BASIL RESIDENCY · KurlaPOSEIDON REALTORS · P51800012947 · possession Dec 2026 · 0% built · 5 complaints
- Bhushan Heritage CHSL · BorivaliBhushan Enterprises · P51800012948 · possession Dec 2018 · 81.8% built · 2 complaints
- Aman · BorivaliAVALON RESIDENCY LLP · P51800012980 · possession Jan 2030 · 36.4% built
- MOULICK ENCLAVE · KurlaSrushti Sangam Developers Pvt Ltd · P51800012986 · possession Dec 2026 · 58% built · 10 complaints
- Malwani Asha Jeevan CHS LTD · BorivaliMalwani Asha Jeevan CHS LTD · P51800012990 · possession Mar 2018 · 90.9% built
- Emerald Isle - T10 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800013052 · possession Dec 2023 · 72.5% built · 4 complaints
- Whista 1st Street · AndheriNarang & Mahaveer Developers LLP · P51800013101 · possession Dec 2023 · 35.7% built
- MITHA NAGAR ARCHANA CHS LTD · BorivaliDHANSHREE DEVELOPERS PVT LTD · P51800013116 · possession Jun 2019 · 67.5% built · 3 complaints
- SHRI UPENDRA CHSL · BorivaliHARSHAL ENTERPRISES · P51800013142 · possession Dec 2026 · 58.3% built
- REDEVELOPMENT OF KRIPADHAM CHS LTD · BorivaliKRIPA REALTORS · P51800013163 · possession Dec 2017 · 90.9% built
- Kenorita Jewels · BorivaliK R Shoppers Pvt. Ltd. · P51800013176 · possession Dec 2017 · 99.5% built
- Exotica · AndheriHilal Merchant · P51800013188 · possession Dec 2017 · 100% built
- Emerald Isle - T15 · KurlaLarsen & Toubro Ltd. (Realty Division) · P51800013214 · possession Dec 2023 · 90.2% built · 5 complaints
- SAMYAKTH BLISS BUILDING 2 · AndheriSamyakth Realties · P51800013227 · possession Dec 2017 · 90.9% built
- SOLITAIRE · AndheriRAJENDRA PUNDLIKRAO GODSHALWAR · P51800013228 · possession Dec 2017 · 90.9% built
- Kalpataru Radiance E · BorivaliKeyana Estate LLP · P51800013245 · possession Jun 2022 · 46.9% built
- ELEMENT · MALAD (WEST)BHARAT MANUBHAI PATEL · P51800013319 · possession Mar 2018 · 100% built · 1 complaint
- PATEL ASSOCIATES · BorivaliPURSHOTTAM KALUBHAI PATEL · P51800013348 · possession Dec 2018 · 89.2% built
- PHOENIX HEIGHTS · ANDHERIMohid Construction Co · P51800013366 · possession Dec 2029 · 37.5% built · 4 complaints
- Andheri Sriram Krupa and Gurudev Nityanand Co-operative Housing Society · AndheriPARSH HOUSING PVT LTD · P51800013380 · possession Sept 2021 · 100% built
- AJMERA ICONIC · BorivaliAJMERA ICONIC · P51800013436 · possession Dec 2031 · 24.1% built · 1 complaint
- MIDAS-BHAKTI MEADOWS · KurlaIRENE EDWYN DMELLO · P51800013457 · possession May 2026 · 76.4% built · 19 complaints
- SHAKUNTALA SILVER BLISS · KurlaOSWAL REALTORS · P51800013474 · possession Mar 2019 · 90.9% built
- SHIV PARVATI CHS LTD PHASE -1 · BorivaliJAYESHJAGRUTI DEVELOPERS PVT LTD · P51800013524 · possession Dec 2026 · 78.3% built
- Crystal Plaza · AndheriM/s. Crystal Developers · P51800013584 · possession Mar 2018 · 100% built
- SAMARTH RESIDENCY · BorivaliAJAY SITARAM SURVE · P51800013678 · possession Dec 2022 · 90.9% built · 2 complaints
- Lodha Supremus - Andheri · AndheriLODHA DEVELOPERS LIMITED · P51800013696 · possession Aug 2022 · 90.9% built · 1 complaint
- Ruparel Optima Ph I · BorivaliRuparel Infra & Realty Pvt Ltd · P51800013701 · possession Dec 2026 · 0% built · 292 complaints
- SIDDHI APARTMENT CHS · MALADK. TALSANIA CONSTRUCTIONS · P51800013801 · possession Dec 2025 · 100% built
- Godrej Platinum Wing B4 · KurlaGodrej & Boyce Mfg. Co. Ltd. · P51800013802 · possession Dec 2022 · 100% built
- Redevelopment of Existing Building No. 5 known as Mahavir Nagar Tri-star CHSL · Mahaveer Nagar Kandivali WestBHARAT REALTY VENTURE PRIVATE LIMITED · P51800013803 · possession Dec 2023 · 100% built
- PREM BUILDERS · AndheriPREM BUILDERS · P51800013919 · possession Oct 2026 · 72.3% built
- Subham Bileshwar · Ghatkopar (East)Subham Developers · P51800013930 · possession Dec 2018 · 90.9% built
- DIVYAM RESIDENCY · BorivaliBHAVESH MAHENDRA MEHTA · P51800013937 · possession Dec 2017 · 100% built
- REDEVELOPMENT OF DIVYA JYOTI CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliD V DEVELOPERS LLP · P51800013943 · possession Dec 2021 · 81.8% built
- ENSO SANZA · BorivaliSai Aastha Developers · P51800013955 · possession Jun 2026 · 82.5% built · 30 complaints
- VICTORY ARCH · HARIDAS NAGARTHAKKAR BUILDERS AND DEVELOPERS · P51800013975 · possession Mar 2023 · 93.6% built
- GEM PARADISE · Vira Desai Road Andheri westVAYUPUTTRA BUILDERS & INFRASTRUCTURES PVT. LTD. · P51800014003 · possession Jul 2021 · 90.9% built · 7 complaints
- Piramal Revanta - Tower 2 · Mulund westPRL Developers Private Limited · P51800014021 · possession Sept 2023 · 100% built · 5 complaints
- BANDRA NORTH GULMOHAR AVENUE · AndheriSHIVALIK VENTURES PRIVATE LIMITED · P51800014036 · possession Dec 2026 · 73.9% built · 37 complaints
- Lawns And Beyond - Phase 3, Omkar International District · AndheriLawns And Beyond - Phase 3, Omkar International District · P51800014037 · possession Mar 2027 · 42.3% built · 89 complaints
- Lawns And Beyond - Phase 2, Omkar International District · AndheriLawns And Beyond - Phase 2, Omkar International District · P51800014105 · possession Mar 2027 · 48.7% built · 127 complaints
- THE PLATINA · BorivaliTANVI CONSTRUCTION PVT LTD · P51800014131 · possession Dec 2028 · 77.3% built
- Sudesh · AndheriAnkur Premises Developers LLP · P51800014138 · possession Feb 2021 · 88.2% built
- RASHMI SHEELA · BorivaliMODIS NAVNIRMAN LLP · P51800014151 · possession Feb 2021 · 90.9% built
- MOUNT BLISS · Nardas NagarRANJANA BUILDERS AND DEVELOPERS · P51800014154 · possession Dec 2021 · 90.9% built
- ARYAN TOWER · AndheriARYAN TOWER · P51800014175 · possession Dec 2026 · 68% built · 1 complaint
- VARDHAN HEIGHTS · KurlaVARDHAN HOUSING · P51800014198 · possession Jun 2026 · 58% built · 8 complaints
- CHANDAK STELLA · BorivaliSAROJ LANDMARK REALTY LLP · P51800014201 · possession Mar 2022 · 100% built
- THE POLARIS · DAHISAR EASTTANVI CONSTRUCTION PVT LTD · P51800014217 · possession Dec 2028 · 8.2% built
- GHARKUL · BorivaliAJITKUMAR CHS LTD · P51800014246 · possession Dec 2021 · 27.3% built
- GHATKOPAR PARK VIEW CHS LIMITED · KURLAEV AND SARAF REALTY · P51800014255 · possession Jan 2025 · 86.4% built
- RAJKAMAL · AndheriRAJ CONSTRUCTIONS · P51800014287 · possession Nov 2021 · 100% built
- NIDHAAN CINEPLAZA · KurlaM/S. NIDHAAN BUILDCON PRIVATE LIMITED · P51800014315 · possession Sept 2018 · 63.2% built
- Ruparel Elara · BorivaliShree Siddhivinayak Infrastructure & Realty · P51800014328 · possession Dec 2023 · 56.4% built · 10 complaints
- NIRVAANA HEIGHTS · KurlaNIRVAANA CONSTRUCTIONS LLP · P51800014340 · possession Jun 2027 · 51.8% built · 1 complaint
- SHRIJI HERITAGE · KANDIVALI WESTSHRIJI APARTMENTS CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800014345 · possession Dec 2025 · 100% built · 3 complaints
- SURVE TOWER · KurlaMEENA VIKAS RAIKAR · P51800014364 · possession Dec 2026 · 90.9% built
- ROMELL DIVA PHASE II - 17TH TO 20TH FOOR · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800014389 · possession Dec 2025 · 82.3% built
- GURU DWARKA · BorivaliBSRD INFRABUILD PRIVATE LIMITED · P51800014414 · possession Jun 2027 · 57.7% built · 1 complaint
- ROMELL DIVA PHASE III - 21ST TO 23RD FLOOR · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800014484 · possession Dec 2025 · 82.3% built · 1 complaint
- PLATINUM LIFE · ANDHERI WESTSAMUDRA DARSHAN GRUHPRAVESH LLP · P51800014518 · possession Dec 2025 · 90.7% built · 14 complaints
- SWAMI DARSHAN · Junction of M. G. Road and Hunbow LaneGIRISH Rupshi GADA · P51800014536 · possession Dec 2022 · 64.1% built
- AGAA RESIDENCY · AndheriAGAA ENTERPRISES · P51800014577 · possession Dec 2026 · 81.8% built
- SAGAR DARSHAN CHS LTD · BorivaliNIRMITEE DEVELOPERS · P51800014616 · possession Mar 2020 · 27.3% built
- Propose Redevelopment of Uma Smruti · KurlaJai Bhavani Constructions · P51800014617 · possession Dec 2017 · 72.7% built
- KUMBHAVATI NIWAS · BorivaliKRISHNA BHOORARAM PUROHIT · P51800014619 · possession Dec 2021 · 69.1% built
- Redevelopment of MCGB Staff Gilbird CHSL, Gilbird Hill Road, Andheri West · AndheriSunteck Realty Limited · P51800014646 · possession Apr 2023 · 100% built · 2 complaints
- EAST POINT. · KurlaA A PROPERTY DEVELOPERS · P51800014661 · possession Dec 2027 · 36.7% built
- GRANDNESS · BorivaliM/S OM SAATH REALTIES LLP · P51800014703 · possession Dec 2022 · 100% built · 11 complaints
- CHARKOP JINPREM CO OP HOUSING SOCIETY LTD · KANDIVALI WESTCHARKOP JINPREM CO. OP. HOUSING SOCIETY LTD · P51800014718 · possession Dec 2021 · 56.8% built
- KAILASH RESIDENCY · KurlaTRIDEV SHREEJI ASSOCIATES · P51800014738 · possession Aug 2026 · 80% built
- KAVERI HEIGHTS · BORIVALI WESTKAVERI GOLD · P51800014759 · possession Dec 2021 · 100% built
- AVENUE 641 · BORIVALIDIMPLE CREATIONS · P51800014768 · possession Sept 2020 · 90.9% built
- Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai · AndheriSunteck Realty Limited · P51800014845 · possession Jun 2023 · 81.8% built
- Lodha Patel Estate - Tower C, D · BorivaliMACROTECH DEVELOPERS LIMITED · P51800014860 · possession Jul 2023 · 81.8% built · 5 complaints
- Lodha Patel Estate - Tower E, F · BorivaliMACROTECH DEVELOPERS LIMITED · P51800014869 · possession Oct 2023 · 81.8% built · 7 complaints
- Lodha Patel Estate - Tower A, B · BorivaliMACROTECH DEVELOPERS LIMITED · P51800014891 · possession Jul 2023 · 81.8% built · 2 complaints
- SAI SANSAR · CHEMBURCONCRETE BUILDERS · P51800014906 · possession Dec 2023 · 100% built
- SWASTIK EMERALD · KurlaSwastik Realtors · P51800014935 · possession Dec 2022 · 90.9% built
- M.K Heritage · AndheriM.K Heritage · P51800014952 · possession Dec 2026 · 39.5% built
- KK Grande · ChemburKK Realty · P51800014986 · possession Dec 2018 · 33.2% built
- AARAMBH WING C -D · BorivaliSATELLITE DEVELOPERS PVT LTD · P51800015002 · possession Jan 2023 · 72.7% built · 2 complaints
- AURUS · MUMBAIKINGSTAY REAL ESTATE PRIVATE LIMITED · P51800015024 · possession Mar 2024 · 90.9% built
- SAI DARSHAN · GHATKOPAR KIROLSAI DARSHAN · P51800015047 · possession Dec 2021 · 86.4% built
- AARAMBH WING E - F · BorivaliSATELLITE DEVELOPERS PVT LTD · P51800015057 · possession Sept 2023 · 72.7% built · 3 complaints
- ARIHANT HEIGHTS · KurlaARIHANT INFRASTRUCTURE COMPANY · P51800015068 · possession Dec 2026 · 76.4% built · 3 complaints
- Bhandup Citizen CHS Ltd · Bhandup WCastle Floors PMS Pvt Ltd · P51800015109 · possession Mar 2028 · 56.4% built · 3 complaints
- VEER SIDDHANAK CHS LTD · KurlaOM SAI GRIHA NIRMAN PVT LTD · P51800015156 · possession Dec 2026 · 86.6% built · 2 complaints
- THE PARK RESIDENCES PHASE-I · OSHIWARADEVLAND INFRACON PVT. LTD. · P51800015211 · possession Jul 2025 · 42.7% built
- SKY ANNEX · KurlaStans Buildtech Homes Private Limited · P51800015214 · possession Dec 2028 · 28.7% built
- AUDUMBAR CHS LTD · VILE PARLE EASTREGENT BUILDERS · P51800015235 · possession Mar 2022 · 100% built
- SHREE MANIK VISHWA · BorivaliANIL GANGARAM SAWANT · P51800015282 · possession Dec 2027 · 61.5% built
- SKYE GRANDEUR · GHATKOPAR EASTV K DEVELOPERS · P51800015316 · possession Feb 2022 · 79.1% built
- VAIBHAV CHOWK SRA CHS LTD · BHANDUP WESTSUNIL MOHAN JOSHI · P51800015339 · possession Dec 2026 · 3.6% built · 2 complaints
- 73 East · BorivaliP51800015343 · possession Dec 2026 · 99.1% built · 2 complaints
- PEARL MAJESTIC · AndheriCHANDIWALA ENTERPRISES · P51800015348 · possession Dec 2023 · 90.9% built
- NEW GOPAL PREMISES CO-OPERATIVE SOCIETY LIMITED · BORIVALI WESTKAMLA REALTY (BOMBAY) · P51800015373 · possession Dec 2021 · 100% built
- Singers Wood · AndheriPanchavati Constructions LLP · P51800015387 · possession Feb 2021 · 100% built
- Puneet Sanjivani Phase 1 Floor 0 to Floor 16 · KurlaPuneet Developers · P51800015397 · possession Dec 2024 · 90.9% built
- TWIN GALAXY · KurlaTWIN DEVELOPERS · P51800015405 · possession Dec 2027 · 76.3% built · 1 complaint
- DEVCHHAYA · RAWALPADA DAHISAR EASTHARSHAL ENTERPRISES · P51800015406 · possession Jul 2024 · 90.9% built
- NEHRU NAGAR VISHWADHAM CHS LTD · KurlaAPCON CONSTRUCTION COMPANY · P51800015420 · possession Dec 2026 · 70.9% built · 3 complaints
- GAURISHANKAR BUNGALOW REDEVELOPMENT · Shreekrishna NagarS S REALITY · P51800015462 · possession Dec 2019 · 90.9% built
- CRYSTAL PARADISE RESIDENCES · AndheriPrithvi Sthapti LLP · P51800015472 · possession Nov 2024 · 72.3% built
- KANJUR MATRUCHHAYA CHS LTD · KurlaSUNIL DINKAR SHINDE · P51800015513 · possession Jun 2022 · 90.9% built
- Avant Heritage II-Basement plus stilt plus 3 Podium plus 20 Upper Habitable Floors · AndheriAishwarya Avant Builders LLP · P51800015537 · possession Dec 2022 · 80% built · 5 complaints
- VASANT OASIS DANICA BLDG NO 15 · AndheriNEEPA REAL ESTATES PRIVATE LIMITED · P51800015556 · possession Dec 2022 · 76.4% built
- MANTHAN ACROPOLIS · KurlaMANTHAN DEVELOPMENT CORPORATION · P51800015626 · possession Dec 2026 · 39.5% built
- MANTRI BUSINESS PLAZA · KurlaMANTRI BROTHERS · P51800015633 · possession Dec 2026 · 100% built
- VISHNU BHASKAR CHS LTD · KurlaSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · P51800015748 · possession Mar 2024 · 90.9% built · 1 complaint
- AIM Residency Phase I · AndheriA M ENTERPRISES · P51800015762 · possession Mar 2024 · 90% built
- Sethia Imperial Avenue · BorivaliSai Enterprises · P51800015798 · possession Dec 2026 · 90% built · 31 complaints
- Nahid Heights · BorivaliM/S Nahid Enterprises · P51800015811 · possession Dec 2026 · 90.9% built · 2 complaints
- Nav Vani · GhatkoparGiriraj builders and developers · P51800015835 · possession Dec 2020 · 86.4% built
- SHREEJI RESIDENCY · MULUND WESTshree siddhivinayak construction co · P51800015912 · possession Jan 2021 · 33.6% built
- PAHHAL AVENUE · BorivaliUmmang Realtors LLP · P51800015919 · possession Dec 2019 · 45.5% built
- THE PALAZZO · AndheriI.S.Builders · P51800015924 · possession Dec 2026 · 90.9% built
- KABRA PRIMERA · JVPD SCHEMEKABRA ESTATE AND INVESTMENT CONSULTANTS · P51800015963 · possession Dec 2023 · 94.5% built · 1 complaint
- Techno IT Park · Eksar BorivaliSureshwari Enterprises · P51800015974 · possession Mar 2019 · 90.9% built
- VASANT OASIS CARNATION BLDG NO 19 · AndheriNEEPA REAL ESTATES PRIVATE LIMITED · P51800015981 · possession Dec 2021 · 100% built · 2 complaints
- NISHCHAY - WING E · REVENUE MAJUE DAHISARSHREERAJ DEVELOPER LLP · P51800015985 · possession Dec 2024 · 89.5% built
- MARATHON EMINENCE · MULUND WESTNEXZONE BUILDCON LLP · P51800016063 · possession Dec 2023 · 81.8% built
- PARVATI SADAN · PLOT NO 49A PARVATI SADAN FRONT OF DHANLAXMI BANK CHEMBUR MUMBAIMEENA BUILDER UNIT OF V N RAIKAR HUF · P51800016081 · possession Jun 2021 · 87.3% built
- GEETA BHAWAN · AndheriMAHADWIP DEVELOPERS · P51800016086 · possession May 2019 · 100% built
- MAMTA · ANDHERI WESTSHIVAM DEV INFRACON PVT LTD · P51800016215 · possession Mar 2023 · 85.5% built
- New Deepali Co-Op. housing Society ltd. · Vile Parle EastAKME PROPERTIES · P51800016260 · possession Mar 2025 · 100% built
- Redevelopment of Prateeksha CHS Ltd · BorivaliASHIANA ENTERPRISES · P51800016261 · possession Sept 2018 · 90.9% built
- REDEVELOPMENT OF NAVCHANDRAKUNJ CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800016377 · possession Mar 2022 · 39.5% built
- DIVINE TOWERS · MALAD WESTKABRA ESTATE AND INVESTMENT CONSULTANTS · P51800016392 · possession Dec 2021 · 98.6% built
- PEARL OASIS · PATHANWADIBAHIST ENTERPRISES PVT LTD · P51800016403 · possession Dec 2024 · 79.5% built
- VIGHNAHARTA SRA CHS LTD · KurlaPARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED · P51800016404 · possession Dec 2028 · 0% built · 2 complaints
- PRITHVI APARTMENT · BorivaliHITENDRA NIMBALKAR · P51800016469 · possession Dec 2020 · 90.9% built
- Lodha Patel Estate - Tower G · BorivaliMACROTECH DEVELOPERS LIMITED · P51800016528 · possession Aug 2023 · 90.9% built
- DREAM ARIHANT OASIS · Ghatkopar (E)DREAM ARIHANT INFRASTRUCTURE COMPANY · P51800016568 · possession Dec 2026 · 72.5% built · 1 complaint
- Samadhan · AndheriShivam Parivar Developers Pvt Ltd · P51800016620 · possession Jun 2021 · 90.9% built · 8 complaints
- NEW VANDANA CO-OP HSG. SOC. LTD. · BorivaliBhoomi Associates · P51800016757 · possession Dec 2022 · 64.5% built
- business bay · AndheriRITU MULTITRADE SERVICES PVT LTD · P51800016955 · possession Dec 2030 · 81.4% built
- GHARKUL HEIGHT · KurlaANGATH PROPERTIES LLP · P51800017037 · possession Jun 2026 · 26.4% built · 23 complaints
- SHIV GANGA · BorivaliANJANI KUMAR COMPANY PRIVATE LIMITED · P51800017043 · possession Jun 2023 · 90.9% built
- KRISHNA HERITAGE · KANDIVALI WESTKRISHNA ENTERPRISES · P51800017093 · possession Dec 2022 · 90.9% built
- Maxima · AndheriOberoi Constructions Limited · P51800017154 · possession Jun 2023 · 99.6% built · 1 complaint
- valera chsl · MUMBAIKAMPA PROJECTS LLP · P51800017210 · possession Nov 2021 · 100% built
- SUGRA HERITAGE CHS LTD · NEXT TO BOHRA MASJIDMS DEVELOPERS · P51800017335 · possession Dec 2021 · 100% built
- APNA DESH CHS LTD. · BorivaliVASUNDHARA BUILDERS · P51800017376 · possession Mar 2023 · 100% built · 1 complaint
- AGARWAL PALAZZO · BORIVALI WESTBALAJI DEVELOPERS · P51800017406 · possession Dec 2023 · 98.6% built
- KAILASA · CHEMBUR WESTDEVNANI DEVELOPERS · P51800017580 · possession Dec 2022 · 90.9% built · 2 complaints
- NEW SAILEE HERITAGE · Borivalisaileedevelopers · P51800017631 · possession Oct 2029 · 22.3% built
- PROPOSED REDEVELOPMENT OF PRAKASHKUNJ CHSL · BorivaliYASH REALTORS & DEVELOPERS · P51800017722 · possession Sept 2026 · 90.2% built
- CORNERSTONE · KurlaOjas Corporation · P51800017746 · possession Dec 2022 · 100% built
- MONTANA PHASE - 3 · KurlaLOHITKA PROPERTIES LLP · P51800017754 · possession Dec 2026 · 100% built · 13 complaints
- Puneet Sanjivani Phase 3 Floor 21 to Floor 23 · KurlaPuneet Developers · P51800017800 · possession Feb 2024 · 90.9% built
- Mandor Heights Phase-II · BorivaliA S K Construction Co · P51800017804 · possession Mar 2023 · 81.8% built · 2 complaints
- Puneet Sanjivani Phase 2 Floor 17 to Floor 20 · KurlaPuneet Developers · P51800017842 · possession Feb 2024 · 90.9% built
- JUHU ACROPOLIS · AndheriBHARAT REALTY VENTURE PRIVATE LIMITED · P51800017864 · possession Jun 2023 · 90.9% built
- Universal Garden- B Wing · AndheriPagarani Universal Infrastructure Pvt Ltd · P51800017902 · possession Dec 2026 · 99.5% built · 2 complaints
- Parshvanath · AndheriACORP REALTY · P51800017960 · possession Dec 2023 · 90.9% built
- Alliance Ravi Kiran · KurlaALLIANCE CITY DEVELOPERS REALTORS PVT LTD · P51800018068 · possession Oct 2022 · 90.9% built
- Piramal Revanta - Tower 3 · Mulund WestPRL Developers Private Limited · P51800018099 · possession Dec 2025 · 100% built · 3 complaints
- PRUTHVI SHAKUN · VILE PARLE (EAST)PRUTHVI ENTERPRISE · P51800018162 · possession Sept 2023 · 18.2% built
- Hill Casa · AndheriHUSAIN TAHER PATNI · P51800018188 · possession Dec 2026 · 77.3% built
- RADHAKRISHNA CHS LTD · Kandivli WestWESTIN SANKALP DEVELOPERS · P51800018207 · possession Dec 2022 · 90.9% built
- Times Square- C WIng · AndheriNTPL DEVELOPERS,LLP · P51800018273 · possession Mar 2020 · 28.2% built
- TRISHABH GREENS - WING A · CHEMBUR NAKA, CHEMBUR EASTRISHABH ENTERPRISES · P51800018331 · possession Dec 2025 · 90.9% built
- TRISHABH GREENS - WING B · CHEMBUR NAKA, CHEMBUR EASTRISHABH ENTERPRISES · P51800018350 · possession Dec 2025 · 81.8% built
- SAI ORCHID AND SAI FORTUNE BUSINESS CENTRE · KurlaM/S SAI SHAKTI REALTORS · P51800018363 · possession Jun 2028 · 74.5% built
- Laxminarayan SRA CHS Ltd · KurlaShree S S Developers Private Limited · P51800018454 · possession Dec 2026 · 64.2% built
- GHATKOPAR SHILPAKALA CHS LIMITED · GARODIA NAGARM/S SUN-VUB · P51800018507 · possession Dec 2022 · 10.7% built
- PRATIK PARADISE · KurlaPRATIK DEVELOPERS · P51800018598 · possession Mar 2022 · 100% built
- REGENT HILL A B C D AND E WING · KurlaHGP Community Pvt. Ltd. · P51800018620 · possession Jun 2025 · 90.9% built · 2 complaints
- Shree Swami Samarth Krupa · KurlaShoreline Builders Pvt Ltd · P51800018673 · possession Aug 2024 · 19.8% built · 3 complaints
- Vishal Sagar · KurlaJ R Properties LLP · P51800018676 · possession Dec 2022 · 81.6% built
- REDEVELOPMENT OF ABHIRAM CHSL · KANDIVALI WESTPRANAV CONSTRUCTIONS LIMITED · P51800018680 · possession Jun 2023 · 90.9% built
- Suma Sam CHSL · BorivaliSuma Sam Co-op. Hsg. Soc. Ltd. · P51800018744 · possession Oct 2022 · 90.9% built
- Jayakunj Apartment CHSL · BorivaliJayakunj Apartment CHSL · P51800018749 · possession Oct 2022 · 90.9% built
- DIVUM · BorivaliDYNAMIX CONTRACTORS & BUILDERS PRIVATE LIMITED · P51800018784 · possession Oct 2025 · 83.9% built · 2 complaints
- IZARRA · AndheriORNO INFRAPROJECTS PVT LTD · P51800018888 · possession Sept 2024 · 90.9% built · 2 complaints
- Bellissimo Mulund T2 · KurlaLodha Developers Limited · P51800018893 · possession Jun 2027 · 45.9% built · 1 complaint
- KRIPA ALLURE · AndheriKRIPA ONENESS PRIVATE LIMITED · P51800018912 · possession May 2022 · 79.5% built
- ALAG STELLA · MULUND EASTALAG PROPERTY CONSTRUCTIONS PVT. LTD. · P51800018925 · possession Jun 2022 · 82.3% built
- SHEETAL VAIBHAV · KHAR WESTD.G.S TOWNSHIP PRIVATE LIMITED · P51800019010 · possession Dec 2025 · 89.5% built
- PADMAVATI TOWERS · AndheriGOLD GHAR CONSTRUCTIONS PVT LTD · P51800019132 · possession Dec 2026 · 58.2% built
- Shri Sadashiv CHSL · AndheriBhoomi Shashwat Estate Pvt. Ltd. · P51800019208 · possession Dec 2021 · 46.8% built
- I Wing Samarth Enclave Andheri Chhaya CHS · Andheri EastSAMARTH ERECTORS AND DEVELOPERS · P51800019223 · possession Jun 2029 · 7.3% built · 10 complaints
- VASUNDHARA HEIGHTS · MULUND WESTVASUNDHARA MRK PROPERTIES PVT LTD · P51800019256 · possession Dec 2024 · 90.9% built
- ROYAL PRISTO · BorivaliROYAL REALTORS · P51800019529 · possession Dec 2026 · 81.4% built · 4 complaints
- LIGHTHALL E WING · KurlaGamma Constructions Pvt Ltd · P51800019614 · possession Mar 2023 · 88.5% built
- SIENNAA WING F · BorivaliS D Corporation Private Limited · P51800019693 · possession Dec 2027 · 59.5% built · 31 complaints
- NIDHAAN CLOVER - A · KurlaNIDHAAN BUILDCON PRIVATE LIMITED · P51800019932 · possession Jun 2024 · 86.4% built
- Atmosphere O2 · KurlaAtmosphere Realty Pvt Ltd · P51800019950 · possession Dec 2026 · 82.2% built · 13 complaints
- COMMERZ 54 · AndheriSHREE VINAYAK REALITY PRIVATE LIMITED · P51800020069 · possession Jun 2026 · 52.1% built
- Prime Vista · KurlaRUPVAKULA PROPERTIES PVT. LTD · P51800020122 · possession Sept 2026 · 78.9% built · 13 complaints
- Mayfair The View · KurlaMAYFAIR HOUSING · P51800020140 · possession Dec 2024 · 82.6% built
- AASHRINA · Ghatkopar KirolM/s. Vira Realspace LLP · P51800020167 · possession Sept 2022 · 100% built · 1 complaint
- AARADHYA EASTWIND · KurlaMICL DEVELOPERS LLP · P51800020183 · possession Dec 2024 · 90.9% built
- Paradigm Antalya · AndheriGajaanan Property Developers Private Limited · P51800020208 · possession Dec 2036 · 11.3% built · 88 complaints
- Kalpataru Bliss Apartments · AndheriKlassik Vinyl Products LLP · P51800020262 · possession Sept 2025 · 81.5% built · 3 complaints
- MASCARENHAS APARTMENT · I C COLONYSAI UNIVERSAL REALTORS & DEVELOPERS LLP · P51800020282 · possession Dec 2026 · 46.8% built
- Lotus Royale · JuhuArvind Danabhai Desai · P51800020315 · possession Mar 2023 · 90.9% built
- "SALE BLDG NO. 6 (A & B) WING KNOWN AS NORTHERN SUPREMUS & NORTHERN HILLS BUILDING NO. 1 & 2" · BorivaliN.ROSE DEVELOPERS PVT LTD · P51800020350 · possession Dec 2026 · 86.1% built · 1 complaint
- OM TRIMURTI · OPP OBEROI MALLJE AND VEE INFRASTRUCTURE · P51800020394 · possession Aug 2024 · 85.5% built · 1 complaint
- SAVANNAH AVALON · AndheriSavannah Real Estate Pvt. Ltd · P51800020465 · possession Oct 2023 · 81.8% built
- RAGHAV ONE · KurlaRAGHAV RAJ BUILDERS & DEVELOPERS LLP · P51800020496 · possession Jun 2021 · 100% built · 2 complaints
- Terraform Dwarka - Wing C · KurlaMoney Magnum Nest Pvt Ltd · P51800020608 · possession Dec 2027 · 53.9% built · 3 complaints
- Terraform Dwarka - Wing D · KurlaMoney Magnum Nest Pvt Ltd · P51800020666 · possession Dec 2027 · 54.9% built · 2 complaints
- Shikhar · AndheriPTR Universal · P51800020732 · possession Apr 2024 · 97.3% built
- GORAI KINARA CHS LTD · BorivaliJINAM BB REALTORS · P51800020736 · possession Dec 2026 · 43.2% built · 3 complaints
- ALAG CAPITAL · KurlaALAG PROPERTY CONSTRUCTIONS PVT. LTD. · P51800020773 · possession Dec 2026 · 43.6% built · 1 complaint
- KUKREJA GARDENS WING A · BHANDUP WESTTOLARAM AND CO · P51800020817 · possession Apr 2024 · 73.3% built · 1 complaint