All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 18 of 48.
Mumbai Suburban
- Trade Square 4th to 7th Floor · Andheri EastATUL PROPERTIES · P51800020821 · possession Sept 2026 · 90.9% built · 1 complaint
- Rite Oscar · BorivaliRITE PROPERTIES · P51800020831 · possession Jun 2021 · 90.9% built
- SAMARA · Chembur, MumbaiCharisma Builders Ltd · P51800020854 · possession Oct 2024 · 81.8% built
- ANANTYA · Pant Nagar, Ghatkopar (East)SHREE KRISHNA HOMES PVT. LTD. · P51800020909 · possession Sept 2022 · 57.3% built
- Floors 8 and 9 - The Baya Goldspot · AndheriRenaissance Spaces · P51800020972 · possession Dec 2023 · 100% built · 1 complaint
- REDEVELOPMENT OF PRAVESH CHSL · BORIVALI EASTPRANAV CONSTRUCTIONS LIMITED · P51800020989 · possession Nov 2023 · 64.1% built
- EKTA VERVE · AndheriEKTA WORLD PRIVATE LIMITED · P51800021089 · possession Apr 2024 · 87% built · 2 complaints
- GANESH RESIDENCY · KurlaSHREE VENKATESHWARA DEVELOPERS · P51800021114 · possession Jul 2026 · 58.7% built
- KINGS PARADISE · KurlaNilesh Laxmikant Kudalkar · P51800021131 · possession Dec 2026 · 81.8% built · 2 complaints
- PRIYA CO-OPERATIVE HOUSING SOCIETY LTD. · AndheriARJUNSINGH BHOORSINGH RATHORE · P51800021193 · possession Jun 2026 · 36.7% built · 2 complaints
- MARATHON MILLENNIUM 2 · KurlaTERRAPOLIS ASSETS PVT LTD · P51800021203 · possession Jun 2026 · 29.4% built
- Altavista - Phase 3 · KurlaSPENTA ENCLAVE PRIVATE LIMITED · P51800021249 · possession Jun 2028 · 50.7% built · 1 complaint
- Runwal Pinnacle · KurlaRunwal Enterprises Limited · P51800021322 · possession Dec 2028 · 49.3% built · 8 complaints
- KUKREJA GARDENS WING B · KurlaTOLARAM AND CO · P51800021344 · possession Apr 2026 · 32.5% built · 1 complaint
- MANISHA CORPORATE PARK · KurlaGOVINDRAJULU PAPA NAIDU · P51800021382 · possession Dec 2027 · 100% built
- SIDDHARTH NAGAR SUKHVILLA CHS LTD PHASE- 2 · BorivaliDILIP HIRALAL DOSHI · P51800021400 · possession Mar 2022 · 100% built · 1 complaint
- TULSIDHAM CHS · VILE PARLE WESTSM & HAPPY HOME ASSOCIATES · P51800021413 · possession Sept 2026 · 81.8% built
- RUDRAKSHA BUILDING NO 11 · DAHISAR EASTRAJ UNIVERSAL · P51800021545 · possession Dec 2023 · 90.9% built · 1 complaint
- SATELLITE HEIGHTS · AndheriNEELESHWAR DEVELOPERS · P51800021643 · possession Dec 2026 · 65% built · 11 complaints
- Sorrento · KurlaHGP Community Pvt. Ltd. · P51800021706 · possession Dec 2024 · 90.9% built
- SUMATI SADAN · MALAD (W)MARK LIFE SPACE · P51800021758 · possession Jun 2022 · 81.8% built
- Satellite Elegance · BorivaliNewone Constructions Private Limited · P51800021913 · possession Dec 2026 · 80.6% built · 10 complaints
- SHUBHAM AURA · KurlaAVVAD REALTTY LLP · P51800021965 · possession Dec 2024 · 90.9% built
- SHREE ROYAL HEIGHT · BorivaliROYAL'S RELATORS · P51800022042 · possession Jul 2023 · 81.8% built
- LA PRENDA · AndheriD M LIFESPACES · P51800022314 · possession Dec 2024 · 88.6% built
- ICON · BorivaliRAGHU LEELA REALTORS PRIVATE LIMITED · P51800022327 · possession Dec 2027 · 68% built · 4 complaints
- Mulund Om CHS Ltd · Nahur Village Mulund - WestSUNRISE HOUSING · P51800022406 · possession Dec 2024 · 81.8% built
- CHEMBUR SHRAVAN · CHEMBUR WESTJOHN DENNIS CONSTRUCTIONS PVT. LTD. · P51800022435 · possession Dec 2026 · 42.6% built · 2 complaints
- SRINIKETAN · CHEMBURMAJESTIC ROYALE DEVELOPERS · P51800022438 · possession Dec 2022 · 100% built
- PEARL HANS RESIDENCY - H WING · KurlaPEARL HANS RESIDENCY - H WING · P51800022506 · possession Dec 2025 · 90.9% built
- Neelkanth Jyot CHS LTD. · GhatkoparSchemaatics · P51800022558 · possession Dec 2024 · 41.4% built
- Rose Garden · AndheriVinayaka Realtors and Developers · P51800022587 · possession Mar 2026 · 90.9% built
- ARKADE EARTH - HAZEL · KurlaArkade Developers Private Limited · P51800022666 · possession Dec 2023 · 90.9% built
- PEARL HANS RESIDENCY - G WING · KURLA WESTHARI OM CONSTRUCTION · P51800022670 · possession Dec 2025 · 90.9% built
- BHUVNESHWAR VINTAGE · KurlaS P INFRA · P51800022717 · possession Jun 2026 · 72.7% built
- Pratap Oasis · BorivaliJPV Realtors Private Limited · P51800023003 · possession Dec 2026 · 73.2% built · 2 complaints
- NEHRU NAGAR GURUPRASAD CO-OPERATIVE HOUSING SOCIETY LIMITED · KurlaDERAIYA REALTORS PRIVATE LIMITED · P51800023015 · possession Dec 2025 · 90.9% built · 2 complaints
- YASHOMATI CHSL · KurlaSAMRAT ENTERPRISE · P51800023057 · possession Apr 2026 · 92.3% built
- MITTAL COVE · AndheriVGM Projects LLP · P51800023064 · possession Jun 2023 · 100% built
- 4TH AVENUE Sunteck City, ODC, Goregaon West · BorivaliSatguru Corporate Services Pvt. Ltd. · P51800023072 · possession Dec 2028 · 91.4% built · 24 complaints
- REJUVE 360 - TOWER A · KurlaElevated Avenue Realty LLP · P51800023075 · possession Dec 2026 · 99.6% built · 3 complaints
- HS OZONE · KurlaHS CHETANA ENTERPRISES NX LLP · P51800023081 · possession Jun 2024 · 100% built
- AIM Platinum · AndheriAIM REALTORS PRIVATE LIMITED · P51800023249 · possession Dec 2025 · 96.8% built
- AUREATE · NEAR OLD POST OFFICE VILLAGE KANJUR BHANDUP WBEAUTY GANRAJ CONSTRUCTION LLP · P51800023266 · possession Dec 2026 · 69.5% built · 1 complaint
- RISHABRAJ DIVINE · BORIVALI EAST, MUMBAIM/s. Rishabraj Balaji Infra · P51800023315 · possession Oct 2023 · 9.1% built
- LASHKARIA PEARL · AndheriLashkaria Housing & Infrastructure Private Limited · P51800023377 · possession Nov 2026 · 90.9% built
- SIDDHARTH NAGAR SWAMI VIVEKANAND CHSL · BorivaliDHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED · P51800023386 · possession Dec 2026 · 100% built
- Ananta Apartments · Vileparle eastSMARTSOLUTIONS · P51800023422 · possession Jun 2022 · 55.6% built
- ROMELL MYRA · CTS 382ROMELL PROPERTIES PRIVATE LIMITED · P51800023520 · possession Sept 2026 · 0.8% built
- ROMELL ORBIS · AndheriROMELL PROPERTIES PRIVATE LIMITED · P51800023625 · possession Sept 2026 · 90.7% built
- ORION WEST · AndheriGIRISH & ASSOCIATES · P51800023726 · possession Dec 2023 · 90.9% built
- MESACON JEWEL WING A AND B · AndheriMESACON PROJECTS · P51800023745 · possession Jun 2023 · 62.1% built
- Celestial · Vileparle (East)Darshan Sky High Realty · P51800023749 · possession Feb 2023 · 100% built
- Kalpataru Vienta Tower B · BorivaliKalpataru Retail Ventures Private Limited · P51800023768 · possession Dec 2026 · 88.5% built · 4 complaints
- Kalpataru Elitus · KurlaArimas Real Estate Private Limited · P51800023840 · possession Sept 2028 · 2 complaints
- MESACON JEWEL WING C · AndheriMESACON PROJECTS · P51800023909 · possession Jun 2023 · 79.5% built
- Godrej RKS · ChemburGodrej Projects Development Limited · P51800023915 · possession Dec 2024 · 78.4% built · 8 complaints
- ASHAR MAPLE BIRCH · VAISHALI NAGARMs ASHAR REALTORS · P51800023941 · possession Dec 2025 · 66.8% built · 1 complaint
- KINGS PRIDE · GOVANDI EAST, MUMBAINilesh Laxmikant Kudalkar · P51800023958 · possession Dec 2024 · 82.5% built
- SANKESHWAR DARSHAN · BORIVALI EAST, MUMBAIM/s. Rishabraj Balaji Infra · P51800024086 · possession Oct 2023 · 82.7% built · 2 complaints
- AMARDEEP ALLIANCE · St. Pius Church Mulund WestALLIANCE CITY DEVELOPERS REALTORS PVT LTD · P51800024225 · possession Jul 2024 · 90.9% built · 2 complaints
- ANIRAJ TOWER CHS LTD · KurlaSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · P51800024276 · possession Dec 2027 · 47% built · 3 complaints
- TruEarth Views · Vikhroli (East)TRUEARTH DEVELOPERS PVT LTD · P51800024328 · possession Dec 2025 · 28.7% built · 6 complaints
- TW Gardens · BorivaliVasudev C. Wadhwa Construction · P51800024368 · possession Dec 2027 · 100% built · 2 complaints
- SUMER LIFE · KurlaSUMER CORPORATION · P51800024414 · possession Dec 2027 · 53.4% built · 22 complaints
- SAFAL GANGA SMRUTI · GHATKOPER MAHUL ROAD MUMBAIVARUN HOMES PVT LTD · P51800024417 · possession Nov 2026 · 52.4% built · 3 complaints
- B-1, C Wing · AndheriAccord Land Developers Pvt Ltd · P51800024442 · possession Dec 2028 · 87.3% built
- VIVAN Homes · AndheriImprint Estates Pvt Ltd · P51800024497 · possession Dec 2026 · 100% built
- SHIVDARSHAN PHASE I · BHANDUP WESTSPACE DEVELOPER · P51800024522 · possession Oct 2020 · 81.5% built
- CHAITANYA KOHINOOR · BorivaliCHAITANYA DEVELOPERS · P51800024570 · possession Jun 2023 · 90.9% built
- PATON TOWERS · BorivaliPRAVIN Viram SATRA · P51800024618 · possession Dec 2026 · 87.7% built · 1 complaint
- GHATKOPAR AVENUE AARADHYA ONE EARTH PHASE I · KurlaMAN REALTORS AND HOLDINGS PRIVATE LIMITED · P51800024676 · possession Mar 2025 · 87.6% built
- FAIRMONT · KurlaTRIDENT OZONE LLP · P51800024818 · possession Dec 2026 · 73% built
- Vardhan Royale · BorivaliVardhan Associates · P51800024821 · possession May 2026 · 90.9% built
- The Gateway · KurlaAtmosphere Realty Pvt Ltd · P51800024845 · possession Dec 2026 · 79.5% built · 1 complaint
- EKSAR GURUKRIPA CHS LTD · BorivaliWESTIN HOMES LLP · P51800024875 · possession Jun 2023 · 100% built
- SWASTIK PEARL · KurlaSUVASYA BUILDERS AND DEVELOPERS LLP · P51800024910 · possession Dec 2024 · 75.5% built
- Gayatri CHSL 8th 9th floor · Borivali - WestKhushi Associates · P51800024958 · possession Dec 2021 · 90.9% built
- Pratap Palace · BorivaliJPV Realtors Private Limited · P51800025101 · possession Mar 2029 · 46.4% built
- SHIVKRUPA · BorivaliJE AND VEE INFRASTRUCTURE · P51800025225 · possession Dec 2026 · 48.2% built
- Supreme Headquarter Bandra · Near Link Square MallSupreme Heights LLP · P51800025298 · possession Dec 2024 · 90% built
- Damji Shamji Corporate Square - Wing C · Ghatkopar EastCoronate Constructions · P51800025317 · possession Dec 2026 · 99.8% built
- REDEVELOPMENT OF MALAD AMBER CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800025354 · possession Oct 2023 · 90.9% built
- ARIHANT NIWARA SKY · KurlaDREAM ARIHANT INFRASTRUCTURE COMPANY · P51800025450 · possession May 2027 · 61.4% built
- Shree Suryodaya · KurlaHARIYANA DEVELOPERS · P51800025572 · possession Dec 2026 · 100% built
- NL TAKSASILA · KANDIVALI (WEST)NAHALCHAND LALOOCHAND PVT. LTD. · P51800025643 · possession Jun 2024 · 90.9% built
- Vivaana Heights · AndheriN K BUILDERS & DEVELOPERS · P51800025788 · possession Jun 2026 · 44.3% built · 1 complaint
- Valentina CHS · KurlaShree S S Developers Private Limited · P51800025836 · possession Jun 2026 · 9.1% built
- SOSAR SOLITAIRE · AndheriSOSAR ENTERPRISES · P51800025925 · possession Jun 2024 · 81.8% built
- THE SANCTUARY - TOWER 4 · KurlaRunwal Construction Private Limited · P51800025926 · possession Jun 2026 · 99.8% built · 1 complaint
- FORTUNE HEIGHTS · BorivaliMOHAMED ADAM AND BROS · P51800026006 · possession Apr 2028 · 90.9% built
- ANUTAM · AndheriTRULY HIGHDREAMS REALTORS LLP · P51800026032 · possession Sept 2026 · 14.5% built · 1 complaint
- OM RESIDENCY · Mulund westOscar Infrastructure Private Limited · P51800026044 · possession Jun 2023 · 50.8% built
- ANANYA · AndheriTRYKSHA PROJECTS PRIVATE LIMITED · P51800026054 · possession Jun 2025 · 90.9% built
- VIHAR HEIGHTS · KurlaSaptrishi Homes LLP · P51800026062 · possession Aug 2026 · 60% built · 1 complaint
- Altavista - Phase 4 · KurlaSPENTA ENCLAVE PRIVATE LIMITED · P51800026131 · possession Dec 2029 · 18.2% built
- RUDRA HEIGHTS · AndheriSAGAR MANOJ GORADIA · P51800026165 · possession Sept 2023 · 90.9% built · 1 complaint
- GIRIVAN LA QUINTA · KurlaAbhishek Mahesh Garodia · P51800026169 · possession Apr 2025 · 97.7% built
- LIGHT HALL F WING · KurlaGamma Constructions Pvt Ltd · P51800026229 · possession Sept 2023 · 90.9% built
- Prime Classic · BorivaliPRIME GROUP LLP · P51800026230 · possession Jan 2023 · 90.9% built
- 19 North · KANDIVALIP51800026243 · possession Jun 2025 · 71.5% built
- URBAN WAVES · AndheriHAREKRUSHNA DEVELOPERS LLP · P51800026269 · possession Jul 2027 · 47% built · 1 complaint
- Bhoomi Samarth B Wing · BorivaliSamarth Erectors & Developers · P51800026289 · possession Jun 2024 · 50.9% built
- ROYAL LAGOON E WING · BorivaliRIKKI RONIE DEVELOPERS · P51800026297 · possession Dec 2026 · 35% built
- SHRADDHA CHHAYA · BORIVALI (WEST)SHRADDHA CHHAYA DEVELOPERS LLP · P51800026301 · possession Mar 2023 · 63.6% built
- TRISHABH GREENS - WING C · Chembur EastRISHABH ENTERPRISES · P51800026305 · possession Jun 2027 · 90.9% built
- EMPIRE TOWERS · BorivaliSahakar Ventures · P51800026306 · possession Sept 2024 · 87.3% built
- RISHABRAJ VICINIA · GHATKOPAR EASTH RISHABRAJ DEVELOPERS · P51800026330 · possession Feb 2024 · 90.9% built
- 66 Palazzio · BorivaliParsh Realty · P51800026378 · possession Jun 2025 · 76.5% built
- MONTANA PHASE - 4 · KurlaLOHITKA PROPERTIES LLP · P51800026393 · possession Dec 2026 · 71.8% built · 2 complaints
- SIGNATURE · AndheriVEER SAVARKAR PROJECTS PRIVATE LIMITED · P51800026446 · possession Jun 2025 · 100% built
- Ruparel Livia · KurlaShree Siddhivinayak Classic Construction Private Limited · P51800026450 · possession Jun 2026 · 67.7% built · 8 complaints
- JP Eminence · AndheriJ. P. INFRA (MUMBAI) PRIVATE LIMITED · P51800026524 · possession Jun 2026 · 90.9% built · 1 complaint
- SUMER LIFE CASA · KurlaSUMER CORPORATION · P51800026539 · possession Dec 2027 · 41.6% built · 6 complaints
- Avanya Tower B · BorivaliAniline Properties Private Limited · P51800026590 · possession Sept 2025 · 100% built
- Saraswati Sadan · Vile Parle EastLAKSHMI BUILDERS AND DEVELOPERS · P51800026655 · possession Jul 2024 · 90.9% built
- HIRANI VILLA · AndheriAMI INFRA PROJECTS PRIVATE LIMITED · P51800026708 · possession May 2026 · 90.9% built · 1 complaint
- RAGHAV ONE45 · KurlaRAGHAV RAJ BUILDERS & DEVELOPERS LLP · P51800026775 · possession Feb 2023 · 90.9% built
- DEEPA CHS LTD · VILE PARLE EASTREGENT SPACES · P51800026864 · possession Feb 2025 · 96.4% built
- JADE · ChemburPRIYA CONSTRUCTIONS · P51800026869 · possession Jun 2027 · 27.3% built · 11 complaints
- Ornata - Sapphire · KurlaSPENTA ENCLAVE PRIVATE LIMITED · P51800026905 · possession Jun 2028 · 27.3% built · 1 complaint
- REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSL · BORIVALI WEST MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800026908 · possession Mar 2024 · 86.7% built
- MARATHON NEOVALLEY KAVERI WING A · KurlaM/S NEXZONE FISCAL SERVICES PVT LTD · P51800026955 · possession Jun 2027 · 51.6% built · 3 complaints
- MARATHON NEOVALLEY KAVERI WING B · KurlaM/S NEXZONE FISCAL SERVICES PVT LTD · P51800026970 · possession Jun 2027 · 57.3% built · 1 complaint
- Kalpataru Vienta Tower A · BorivaliKalpataru Retail Ventures Private Limited · P51800027059 · possession Jun 2027 · 83% built
- SUKOON SRA CHS LTD-WING-A. /WESTERN HEIGHTS CTS 394-B&C-WING · BorivaliM V Q DEVELOPERS · P51800027118 · possession Dec 2026 · 80.7% built
- HIMAT MANSION CHS LTD · BorivaliBHATIA BUILDERS AND DEVELOPERS PVT LTDC · P51800027152 · possession Jun 2027 · 81.8% built
- Sethia Aashray-Phase 1 · BorivaliAAKASH DEVELOPERS · P51800027166 · possession Jun 2027 · 90.9% built
- SHRADHA RESIDENCY · AndheriKONARK SHRADHA REALTORS · P51800027190 · possession Jun 2026 · 55.9% built
- SHILPTARU RESIDENCY · Borivalikonark shakti group of company · P51800027203 · possession Jun 2025 · 100% built
- TULSI CHAMBER PHASE II · KurlaSURANA CONSTRUCTION (CHEMBUR ) · P51800027210 · possession Jun 2026 · 85.9% built
- WHITE BERRY RESIDENCY · BorivaliM/S. WHITE BERRY REALSPACES L.L.P. · P51800027240 · possession Jun 2025 · 90.9% built
- Eden · Vile Parle EastSambhavparshva Developers Pvt. Ltd. · P51800027245 · possession Jun 2025 · 100% built
- SHETH CNERGY MALAD · BorivaliSheth Developers Private Limited · P51800027269 · possession Nov 2027 · 26.4% built
- DARSHAN · VILE PARLE EASTArkade Developers Private Limited · P51800027271 · possession Jun 2023 · 67% built
- Kalpataru Elegante · BorivaliNeo Pharma Private Limited · P51800027273 · possession Nov 2027 · 27.2% built · 2 complaints
- PROXIMUS · CHEMBURGeeCee Ventures Limited · P51800027318 · possession Jun 2025 · 89.1% built
- 63 GOLDMEDAL AVENUE · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800027330 · possession May 2027 · 88.2% built · 1 complaint
- RAKHI TOWER PHASE 3 12TH TO 15TH FLOOR PART · BorivaliRAKHI TOWER PHASE 3 12TH TO 15TH FLOOR PART · P51800027354 · possession Jun 2026 · 36.4% built
- O AND S ROYALE · KurlaSUCHITA ORANGE PROJECT ROYALE · P51800027371 · possession Dec 2026 · 81.1% built
- PANT NAGAR SARASWATI CHSL · GHATKOPARKYRAA INFRA PROJECTS · P51800027377 · possession Jun 2026 · 90.9% built · 1 complaint
- ACHARYA ASHRAM SAHAKARI GRIHA RACHANA SANSTHA MARYADIT · OPP DON BOSCO SCHOOL, VAZIRA, BORIVALI WESTVASTU DARSHAN DEVELOPERS LLP · P51800027379 · possession Mar 2026 · 90.9% built
- YASH SHRINE · BorivaliYASHWANT SAMPATRAJ GANDHI · P51800027389 · possession Apr 2026 · 9.1% built
- HARI PRASAD BUILDING · SHRIKRISHNA NAGAR, BORIVALI (EAST)NIRMITEE DEVELOPERS · P51800027395 · possession Nov 2022 · 9.1% built
- MASS IONICS · AndheriMASS BUILDSQUARE STRUCTURE PRIVATE LIMITED · P51800027417 · possession Jun 2026 · 66% built
- JASWANTI BLISS · KurlaASHRAY ESTATES · P51800027448 · possession Sept 2024 · 100% built
- SHIVKUNJ · AndheriSHRADDHA LIFESTYLE LLP · P51800027559 · possession Jun 2027 · 57% built
- NEW GAYATRI DARSHAN CHS · KurlaSHIV SIDDHI ENTERPRISES · P51800027564 · possession Dec 2027 · 63.5% built
- KUSH ELEGANTE · KANDIVALI WESTKUSH REALCON LLP · P51800027575 · possession Sept 2025 · 81.8% built · 1 complaint
- GHATKOPAR AVENUE AARADHYA ONE EARTH E PHASE II · KurlaMAN REALTORS AND HOLDINGS PRIVATE LIMITED · P51800027588 · possession Sept 2025 · 63.6% built
- HAVA MAHAL CHS LTD · MALAD EAST MUMBAIH RISHABRAJ PROJECTS · P51800027606 · possession Jun 2023 · 90.9% built
- SHREE LAXMI VANDAN · KANDIVALI WESTPRAGATI LAND DEVELOPERS · P51800027654 · possession Jun 2025 · 90.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH B PHASE III · KurlaMAN REALTORS AND HOLDINGS PRIVATE LIMITED · P51800027659 · possession Mar 2025 · 63.6% built
- Elysian Tower A · BorivaliOberoi Realty Limited · P51800027667 · possession Jun 2027 · 77.4% built
- AGRAWALS MANNAT · AndheriSHRIMATI ENTERPRISES · P51800027705 · possession Jun 2027 · 36.4% built
- KRISHNA · BorivaliK PATEL AND CO PVT LTD · P51800027726 · possession Jun 2024 · 100% built
- KRISHNA KOYNA · SHIMPOLIJKD ENGINEERS AND INFRASTRUCTURE PRIVATE LIMITED · P51800027749 · possession May 2024 · 20.6% built
- BALI LAXMI · BorivaliBALI SPACES LLP · P51800027818 · possession Jun 2024 · 90.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH F PHASE IV · KurlaMAN REALTORS AND HOLDINGS PVT LTD · P51800027826 · possession Sept 2025 · 63.6% built
- ASHOKA GRANDEUR · BHANDUP WESTDHANRAJ DEVELOPERS · P51800027876 · possession Jun 2028 · 20.5% built · 1 complaint
- SHEETAL DHARMARAJ · MARVE ROADD.G.LAND DEVELOPERS PRIVATE LIMITED · P51800027915 · possession Apr 2024 · 0% built · 1 complaint
- Shastri Nagar Prerna C.H.S.Ltd. · BorivaliConfiable Constructions · P51800027919 · possession Jun 2027 · 71.1% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH I PHASE V · KurlaMAN REALTORS AND HOLDINGS PRIVATE LIMITED · P51800027922 · possession Jun 2026 · 63.6% built
- PRIDE · AndheriSalasar construction · P51800027966 · possession Jun 2023 · 90.9% built · 1 complaint
- Transcon Triumph Tower 2 · AndheriTranscon Triumph Phase 2 Private Limited · P51800027978 · possession Jun 2026 · 90% built · 24 complaints
- W2.O BY SANDU DEVELOPERS · KurlaSandu Developers · P51800027979 · possession Jun 2026 · 55.9% built
- AMANN HIGHLAND PARK · BorivaliMS RELLIANCE CONSTRUCTION CO · P51800028085 · possession Oct 2026 · 44.6% built · 1 complaint
- 72 WEST · AndheriSHETH DEVELOPERS PRIVATE LIMITED · P51800028086 · possession Oct 2026 · 181.6% built · 1 complaint
- REDEVELOPMENT OF PUSHPAWADI CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800028108 · possession Dec 2023 · 43.6% built
- PRABHU PLAZA · BorivaliM/S UNITED HOUSING CORPORATION · P51800028151 · possession Jun 2026 · 77.7% built · 1 complaint
- RAJAN DINAKAR PHATAK AND OTHERS · BorivaliWESTIN SANKALP DEVELOPERS · P51800028236 · possession Jun 2024 · 89.1% built
- UK LUXECITY · BorivaliDamodar Suruchi Developers Pvt. Ltd. · P51800028266 · possession Dec 2027 · 62.8% built · 4 complaints
- Solaris 14th Floor · AndheriHubtown Limited · P51800028276 · possession Jun 2026 · 41.5% built
- Haware Intelligentia Sigma South JVLR Wing C · KurlaSuresh Kashinath Haware · P51800028288 · possession Jun 2026 · 90.9% built
- MAHINDRA ALCOVE WING D AND E · KurlaMahindra Lifespace Developers limited · P51800028352 · possession Jun 2026 · 29.1% built
- GODREJ URBAN PARK · KurlaGODREJ PROPERTIES LIMITED · P51800028364 · possession Sept 2026 · 71.6% built · 2 complaints
- UNICORN · AndheriSaroj Landmark Realty LLP · P51800028365 · possession Jun 2026 · 99.1% built · 4 complaints
- SHRADDHA CLASSIC · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800028400 · possession Jun 2027 · 77.2% built
- ALAG ENDEAVOUR · KurlaALAG ENDEAVOUR · P51800028404 · possession Jun 2026 · 0% built · 7 complaints
- Sky City Tower F · BorivaliIncline Realty Private Limited · P51800028419 · possession Jun 2027 · 73.2% built
- Shree Vrindavan SRA CHS Ltd · KurlaShree Swami Samarth Developers(Project Vrindavan Chs) · P51800028453 · possession Dec 2028 · 68.7% built
- Shreenaths Legacy · AndheriMehul Kirit Mehta · P51800028488 · possession Jul 2024 · 100% built
- Jyoti building · AndheriLAXMI BUILDERS · P51800028489 · possession Dec 2023 · 90.9% built
- DAHISAR SHIVANGAN WING A · DAHISAR EASTYASH ENTERPRISES · P51800028519 · possession Jun 2024 · 40% built · 3 complaints
- AURIS ILARIA TOWER A · BorivaliTRANSCON-SHETH CREATORS PRIVATE LIMITED · P51800028533 · possession Oct 2027 · 54.7% built · 10 complaints
- BLOSSOM RESIDENCY · AndheriHF REALTY · P51800028538 · possession Jun 2026 · 90.8% built
- Monte Verita North Annexe · Gulmohar City, MagathaneM/s B G Shirke Redevelopment and Gas Pvt. Ltd. (Formerly M/s B G Shirke Oil and Gas India Pvt. Ltd.) · P51800028561 · possession Sept 2025 · 48.4% built · 2 complaints
- Purva Clermont Wing A · MumbaiPuravankara Limited · P51800028571 · possession Jun 2027 · 80% built · 1 complaint
- B-1, D Wing · AndheriAccord Land Developers Pvt Ltd · P51800028593 · possession Jun 2028 · 90.9% built
- Siddharth Nagar Samata · Siddhrath NagarWhite Water Developers · P51800028598 · possession Jul 2027 · 81.4% built · 5 complaints
- Adarsh Nagar SRA CHS Ltd. · Kandivali WestBombay Slum Redevelopment Corporation Pvt. Ltd. · P51800028687 · possession Mar 2023 · 81.8% built
- KSHITIJ EMINENCE · KurlaKSHITIJ DEVELOPERS · P51800028688 · possession Jun 2026 · 99.5% built
- Rajkamal · Borivali- WestKhushi Associates · P51800028704 · possession Jun 2025 · 90.9% built
- Pratap Grandeur · BorivaliM/S JPV REALTORS · P51800028713 · possession Jun 2027 · 47.7% built
- GOREGAON SUKHNIWAS CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliDILIP DOSHI · P51800028730 · possession Jun 2024 · 91.8% built
- Nasar Enclave Sale Building A and B Wing · AndheriM/s. Nasar Associates · P51800028733 · possession Jun 2026 · 77.9% built
- 25 West -A (East)Wing · Andheri25 West Realty Private Limited · P51800028736 · possession Jun 2032 · 51.3% built · 7 complaints
- 71 Midtown · KurlaParadigm Dotom Buildheights LLP · P51800028761 · possession Dec 2026 · 19.5% built · 10 complaints
- AIM Avenue · AndheriAIM REALTORS PRIVATE LIMITED · P51800028763 · possession Sept 2024 · 77.7% built
- Tower 28 - C and F · BorivaliShiv Shakti Builders And Developers · P51800028777 · possession Dec 2027 · 3.6% built · 4 complaints
- VERVE · Bangur Nagar, Village Pahadi, Goregaon (West)KOLTE-PATIL DEVELOPERS LIMITED · P51800028783 · possession Jul 2025 · 57.5% built
- AMARYLLIS TOWERS AND PLAZA · KurlaNAHAR BUILDERS LTD. · P51800028801 · possession Jun 2026 · 80.5% built
- Sunteck Pinnacle · BorivaliSunteck Realty Limited · P51800028821 · possession Sept 2023 · 81.8% built
- YAMUNA MAHARANI HEIGHTS · BorivaliK B ASSOCIATES · P51800028829 · possession Sept 2026 · 52.3% built · 2 complaints
- LOVELY CHS. LTD., · BorivaliJINAM REALTORS · P51800028859 · possession Dec 2026 · 43.2% built
- JAYANT VILLA · GHATKOPAR EASTYog Life Spaces LLP · P51800028863 · possession Jan 2025 · 100% built
- Kush Solitaire · Village Malad East MumbaiKush Buildcon LLP · P51800028906 · possession Dec 2023 · 90.9% built
- SHRADDHA VARDAAN · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800028936 · possession Dec 2027 · 74% built · 1 complaint
- Ornata - Amber · KurlaSPENTA ENCLAVE PRIVATE LIMITED · P51800028964 · possession Dec 2029 · 5.5% built · 1 complaint
- MARIGOLD AANGAN · KurlaMARIGOLD CONSTRUCTIONS · P51800029006 · possession Jun 2026 · 81.8% built · 1 complaint
- Prem Zephyr · Mulund WestAshwin Enterprises · P51800029011 · possession Mar 2024 · 90.9% built
- SOUTHFIELD GRAVITY · BHANDUPSOUTHFIELD BUILDCON LLP · P51800029080 · possession Dec 2026 · 50% built · 1 complaint
- PANOM PARK WING E Sale Building No.3 · AndheriPANOM DEVELOPERS LLP · P51800029092 · possession Feb 2023 · 90.9% built
- Vishnu Bhavan Bldg no 4 A wing Valencia CHS and B wing Shree Dutt Guru CHS · KurlaShree S S Developers Private Limited · P51800029116 · possession Apr 2027 · 78.6% built
- Om Laxmi Sadan CHS Ltd · Mulund WestMAVERICK REALTORS · P51800029133 · possession Mar 2025 · 59.5% built · 1 complaint
- Samarth Menaba Heights · BorivaliSamarth Menaba Heights · P51800029225 · possession Dec 2026 · 73.5% built · 6 complaints
- PHOENIX · BorivaliNEMINATH CORP · P51800029237 · possession Mar 2026 · 90.9% built
- RISHABRAJ SURAJ · BORIVALI WESTH RISHABRAJ REALTY · P51800029277 · possession May 2024 · 90.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH G PHASE VI · KurlaMAN REALTORS AND HOLDINGS PRIVATE LIMITED · P51800029288 · possession Jun 2025 · 63.6% built
- CHARKOP SHWETAMBARA CO OPERATIVE HOUSING SOCIETY LIMITED · CHARKOP KANDIVALI WESTCHARKOP SHWETAMBARA COOPERATIVE HOUSING SOCIETY LIMITED · P51800029344 · possession Dec 2025 · 90.9% built · 1 complaint
- HARSHAIL HORNBILL APARTMENT · BorivaliROSEFINCH DEVELOPERS LLP · P51800029350 · possession Dec 2026 · 79.1% built
- REDEVELOPMENT OF POPULAR TERRACE CHSL · BORIVALI WEST MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800029351 · possession Sept 2024 · 90.9% built
- Astrum · BorivaliUpvan Developers · P51800029353 · possession Jun 2026 · 60.2% built · 1 complaint
- Accord Heights · KurlaAccord Builders · P51800029354 · possession Jun 2022 · 100% built
- The Greens - Radhakunj · Kandivali EastEthics Infra Development Pvt Ltd · P51800029355 · possession Feb 2025 · 90% built
- Prime Audumbar · BorivaliPRIME GROUP LLP · P51800029356 · possession Mar 2024 · 100% built
- Haware Altura · KurlaUJJWALA SATISH HAWARE · P51800029411 · possession Apr 2026 · 100% built
- REDEVELOPMENT OF GALA APARTMENTS CHSL · MALAD EASTPRANAV CONSTRUCTIONS LIMITED · P51800029415 · possession Sept 2024 · 90.9% built · 1 complaint
- TAPSYA CHSL PHASE II ADDITIONAL FSI FROM 16TH TO 22ND FLOOR · VERSOVA 4 BUNGLOWSNEMINATH HOMES PRIVATE LIMITED · P51800029453 · possession Dec 2022 · 54.5% built
- KAVITA · KurlaMANISHA ELITE REALTY PRIVATE LIMITED · P51800029470 · possession May 2024 · 100% built
- Jay Shrinath CHSL · Borivli WestK MEHTA AND COMPANY · P51800029479 · possession Jun 2025 · 100% built
- Borivali Nirmala Sadan CHS LTD · Borivali EastShreenath Realty LLP · P51800029552 · possession Jun 2023 · 60% built
- Chaitanya Anand - Lunkhod CHSL · Andheri WestChaitanya Developers · P51800029553 · possession Aug 2024 · 90.9% built
- SHUBH AANGAN WING B · BHANDUP EASTG D REALTORS PVT LTD · P51800029568 · possession Dec 2023 · 90.9% built
- KAMLA PRASANNA JEEVAN BUILDING1 · BORIVALI WESTKAMLA HOMES AND LIFESTYLES PVT LTD · P51800029580 · possession Mar 2025 · 100% built
- DAIVI ETERNEETY · BorivaliYASH DEVELOPMENT · P51800029609 · possession Dec 2026 · 67.5% built
- ORCHID HEIGHTS · BorivaliNIMESH KIRTIKUMAR SHAH · P51800029631 · possession Jun 2026 · 90.9% built
- Suprabha-Shivam Lifestyle · ChemburShivam Lifestyle · P51800029652 · possession Dec 2023 · 90.9% built
- Gagan 139 · KurlaGagangiri Constructions · P51800029662 · possession Nov 2024 · 90.9% built
- Shree Satyam · BorivaliJE AND VEE INFRASTRUCTURE · P51800029730 · possession Dec 2026 · 13.6% built
- PRATHAMESH ELITE · BorivaliSHREE SAINATH DEVELOPERS · P51800029737 · possession Dec 2027 · 35.9% built
- Laizer Elegance · KurlaLaizer Elegance · P51800029739 · possession Sept 2026 · 9.1% built
- MDM Zion · Andheri WestMDM REALTY LLP · P51800029740 · possession Dec 2023 · 90.9% built
- SHASHITARA CHS LTD. · BorivaliS S ENTERPRISES · P51800029768 · possession Dec 2026 · 38.2% built
- PEARL HEAVEN IV · AndheriCHANDIWALA ENTERPRISES · P51800029797 · possession Dec 2026 · 90.9% built
- Aum Avenue · Mulund (West)Aum Realty · P51800029798 · possession Apr 2024 · 100% built
- MALAD RAJESH PARK CHS LTD · MALAD EAST MUMBAIMS DEVELOPERS · P51800029820 · possession Dec 2025 · 100% built
- SKYLINE MAGNUS · GHATKOPAR EASTSKYLINE VENTURES · P51800029825 · possession Dec 2024 · 100% built
- 9 RAJGIR · BorivaliM S KAVITA CONSTRUCTION COMPANY · P51800029847 · possession Dec 2026 · 87.3% built
- Veridian at Emerald Isle 12C · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800029888 · possession May 2027 · 181.9% built
- Veridian at Emerald Isle 14A and 14B · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800029892 · possession May 2027 · 100% built · 3 complaints
- Shubh Parshwa · KurlaS. Siddharth Construction Co. (Panchshil) · P51800029898 · possession Jun 2027 · 59.1% built
- MARATHON MONTE CARLO 3 · KurlaMARATHON REALTY PVT LTD · P51800029900 · possession Dec 2026 · 47.3% built
- GAURI EXCELLENCY NX · BorivaliM/S GAURI LAND DEVELOPERS LLP · P51800029939 · possession Jun 2026 · 80.2% built
- Vijayagar · BorivaliSKYLINE LANDMARK PROJECTS PRIVATE LIMITED · P51800029943 · possession Dec 2022 · 90.9% built
- HIGHLAND A B C D AND E Wing · KurlaHGP Community Pvt. Ltd. · P51800029948 · possession Dec 2026 · 85.5% built
- HORIZON SHLOKA · MULUND WESTHORIZON PROMOTERS INDIA LTD · P51800029955 · possession May 2023 · 90.9% built
- Arkade Serene · Sunder Nagar Malad WestArkade Developers Private Limited · P51800029961 · possession Jun 2024 · 74.5% built
- SAFAL GOLF RESIDENCES · KurlaMANGALNATH DEVELOPERS PVT LTD · P51800029994 · possession Jun 2027 · 20.9% built · 4 complaints
- Crescent Nexus- (Ascent) · AndheriASCENT INFRASPACE PRIVATE LIMITED · P51800030043 · possession Dec 2026 · 56.4% built · 2 complaints
- BANDRA BOON CHS LTD · BANDRA WESTMASS JAKS ASSOCIATE VENTURES · P51800030090 · possession Sept 2026 · 74.6% built
- AMARJYOTI CHS LTD · Chembur East, MumbaiMAJESTIC ROYALE DEVELOPERS · P51800030116 · possession Sept 2024 · 100% built
- Rajshree Eleven East · KurlaPanchsheel 1 Upgrade LLP · P51800030117 · possession Dec 2024 · 85.4% built
- PUNEET KALPAVRIKSHA · KurlaPUNEET PRATEEKSHA SPACES · P51800030146 · possession Dec 2026 · 33.5% built
- MAYAANK HEIGHTS · BorivaliN. K. LIFESTYLE · P51800030223 · possession Mar 2024 · 90.9% built
- AJMERA ARHAM · BorivaliVISHAL CONSTRUCTION · P51800030227 · possession Mar 2027 · 57.1% built
- ARBUDA DARSHAN CHS LTD. · AndheriSUPREME REALTORS · P51800030268 · possession Dec 2023 · 100% built
- Supreme Elenor · KurlaSupreme Mega Constructions LLP · P51800030270 · possession Aug 2024 · 70.9% built
- Redevelopment of Vasishtha Krupa Co-operative Housing Society Ltd. · Kandivali EastKaustubh Construction Private Limited · P51800030271 · possession Aug 2025 · 100% built
- THE ACE · BorivaliTANVI CONSTRUCTION PVT LTD · P51800030288 · possession Dec 2028 · 59.5% built
- Rite Civis · Bhandup WestYashodanand Developers · P51800030301 · possession Dec 2023 · 42.3% built · 2 complaints
- Transcon Triumph Tower 3 · AndheriTranscon Triumph Phase 2 Private Limited · P51800030321 · possession Sept 2026 · 77.4% built · 4 complaints
- AVYUKTA RAJHANS · BorivaliSHIVOHAM INFRAHOMES LLP · P51800030322 · possession Dec 2024 · 100% built
- SAI AKSHI · KurlaUVK BUILDERS & DEVELOPERS LLP · P51800030330 · possession Dec 2026 · 50% built · 1 complaint
- Silver Crest · AndheriGold Coin Builders · P51800030332 · possession Dec 2025 · 83.3% built
- BELLA CASA · AndheriKonark Bella Casa LLP · P51800030388 · possession Dec 2026 · 78.6% built
- KABRA DIAMANTE · BELWALKAR WADI GOREGAON WESTKABRA AND ASSOCIATES · P51800030391 · possession Dec 2025 · 100% built · 3 complaints
- KUSH SYMPHONY · Mulund WestKush Buildcon LLP · P51800030410 · possession Jun 2025 · 90.9% built
- ANUSAYA · KurlaSatre Infrastructure Pvt. Ltd. · P51800030415 · possession Jun 2027 · 90.9% built
- Utkarsh · Santacruz EastAmbrosial Developers Private Limited · P51800030434 · possession Mar 2025 · 83% built
- ANTARIKSH AVALON · PANTNAGAR GHATKOPAR EASTANTARIKSH REALTORS PRIVATE LIMITED · P51800030439 · possession Dec 2025 · 87.7% built
- Dadamiyas Deluxe Apartment · KurlaDadamiya Infrastructure & Deluxe Infra · P51800030492 · possession Mar 2023 · 81.8% built
- Redevelopment of Dadarkar Apartment CHSL · BorivaliSankalp Structures Private Limited · P51800030506 · possession Mar 2027 · 37.3% built
- HARMONY · BorivaliSHREENATH ASSOCIATES · P51800030510 · possession Aug 2026 · 47.3% built
- RISHABRAJ AGNEL · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800030530 · possession Aug 2024 · 90.9% built
- Artteza · AndheriSUNVISION ESTATES · P51800030554 · possession Nov 2026 · 75.7% built · 4 complaints
- GOVIND SOLITAIRE · KurlaSHANKH DEVELOPERS LIMITED LIABILITY PARTNERSHIP · P51800030555 · possession Jun 2026 · 77.7% built
- ARIHANT ENCLAVE · AndheriM/s Arihant Enterprise · P51800030594 · possession Dec 2023 · 23.6% built
- NEW AVANTI CHSL · BorivaliBALAJI ENTERPRISES · P51800030643 · possession Oct 2026 · 66.4% built
- RISHABRAJ RAMESHWAR · BorivaliH RISHABRAJ REALTY · P51800030723 · possession Aug 2024 · 90.9% built
- RADIANT 59 · AndheriVEER JALARAM DEVELOPERS · P51800030749 · possession Dec 2026 · 82% built
- MARATHON NEOPARK ASHOKA WING C · KurlaMARATHON NEXTGEN REALTY LTD · P51800030752 · possession Jun 2028 · 38.2% built
- Swashraya Andheri CHS Ltd · nr Juhu LaneDEM CONSTRUCTIONS LLP · P51800030781 · possession Feb 2024 · 67.4% built
- Solitaire Edge · BorivaliMAHAVEER CONSTRUCTION · P51800030831 · possession Dec 2026 · 90.9% built
- OMKAR CHSL · KurlaMAAULI CREATIONS PVT. LTD · P51800030846 · possession May 2025 · 100% built
- Alpine Primo · AndheriALPINE INFRAHEIGHTS LLP · P51800030851 · possession Dec 2026 · 75.6% built · 3 complaints
- TRIENITY 1 PHASE II · BorivaliTRIENITY PRIME PROPERTY PROJECTS LLP · P51800030871 · possession Mar 2027 · 73.2% built · 1 complaint
- ROYAL ALTEZZA · KurlaSHRI GANESH DEVELOPERS · P51800030908 · possession Aug 2026 · 94.1% built
- HARI KUNJ III WING A · KurlaHARI KUNJ III WING A · P51800030919 · possession Aug 2029 · 9.1% built
- EUPHORIA · BorivaliFAIRMONT CONSTRUCTIONS PRIVATE LIMITED · P51800030945 · possession Dec 2028 · 21.8% built · 2 complaints
- Sunteck Pinnacle 1 · BorivaliSunteck Realty Limited · P51800030947 · possession Dec 2027 · 73.1% built · 4 complaints
- PARLE NIMESH CO-OP. HSG. SOC. LTD. · VILE PARLE EASTCHINTAMANI COMMERCIAL VENTURES · P51800030964 · possession Sept 2024 · 90% built
- LAXMI SHRUSHTI - WING B · BorivaliLAXMIDEVI DEVELOPERS · P51800030965 · possession Jun 2027 · 98.3% built · 2 complaints
- JEANDVEEKEDARNATH · BorivaliJE AND VEE INFRASTRUCTURE · P51800030984 · possession Dec 2026 · 27.3% built
- RUSHABH APARTMENT · BorivaliR R BUILDERS · P51800030994 · possession Jul 2026 · 49.5% built · 1 complaint
- MITTAL RESIDENCES · MumbaiASHA DEVELOPERS · P51800030998 · possession Sept 2031 · 81.8% built
- Charkop Akash Kiran CHS Ltd · BorivaliSangam Developers · P51800031000 · possession Dec 2026 · 90% built
- Samarth Reva · BorivaliSamarth Erectors and Developers - Mariyamman · P51800031028 · possession Dec 2026 · 52.7% built
- SHEEL APARTMENTS BY MAYFAIR · AndheriMAYFAIR HOUSING PRIVATE LIMITED · P51800031040 · possession Dec 2024 · 82.7% built
- RISHABRAJ SUJAI · MALAD EASTRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800031075 · possession Aug 2024 · 90.9% built
- JEANDVEEVISHWANATH · BorivaliJE AND VEE INFRASTRUCTURE · P51800031136 · possession Dec 2026 · 27.3% built
- RISHABRAJ PRIDE · DAHISAR WESTRRIL LIMITED · P51800031144 · possession Aug 2023 · 90.9% built
- Magic Tower · AndheriSwarna Highrise Construction · P51800031150 · possession Dec 2027 · 37.2% built · 4 complaints
- MILESTONE · BorivaliMILESTONE · P51800031163 · possession Dec 2029 · 17.3% built
- SHRISTI RESIDENCY - PHASE 1 · AndheriRANBIR REAL ESTATE AND DEVELOPERS LLP · P51800031167 · possession Dec 2026 · 81.8% built · 37 complaints
- MAHAKALI HILLS · AndheriMohid Construction Co · P51800031191 · possession Dec 2026 · 27% built · 1 complaint
- Neelkanth Enclave D Wing Siddhartha · KurlaBhaveshwar Properties Pvt Ltd · P51800031210 · possession Jun 2024 · 100% built
- PADMA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliHARITARA CONSTRUCTION COMPANY PRIVATE LIMITED · P51800031219 · possession Sept 2026 · 35.5% built
- KINGS MY HOMES · KurlaNilesh Laxmikant Kudalkar · P51800031220 · possession Dec 2029 · 90.5% built · 2 complaints
- TRITON · SANTACRUZ WESTJade Constructions Private Limited · P51800031222 · possession Jul 2025 · 90.5% built
- KHAR HIRA PREMISES CO OP SOCIETY LTD · AndheriL NAGPAL DEVELOPERS · P51800031276 · possession Feb 2024 · 78.2% built
- Piramal Revanta - Tower 4 · Mulund WestPRL Developers Private Limited · P51800031310 · possession Mar 2026 · 100% built · 3 complaints
- ZEN GARDENS · KANDIVALI WESTKonark Shakti Group of Companies · P51800031317 · possession Dec 2025 · 181.9% built
- Lodha Kandivali Project - Tower 3 · Akurli VillageLodha Developers Limited · P51800031346 · possession Jun 2026 · 81.8% built
- Manusmruti CHSL · BorivaliGoyal Wedevelopment Pvt Ltd · P51800031359 · possession Mar 2024 · 100% built
- Lodha Mulund Project Tower 1 · KurlaLodha Developers Limited · P51800031360 · possession Sept 2027 · 81.8% built · 2 complaints
- Sanghvi Edge · AndheriSangvi Lifespace Private Limited · P51800031420 · possession Dec 2026 · 43.4% built · 1 complaint
- Elysian Tower B · BorivaliOberoi Realty Limited · P51800031456 · possession Jun 2027 · 73.3% built
- RAY · BorivaliManish Builders & Developers · P51800031492 · possession Apr 2026 · 81.1% built · 1 complaint
- TRIDHAATU ARANYA - A DREAM · KurlaTRIDHAATU ARANYA DEVELOPERS LLP · P51800031547 · possession Dec 2027 · 0% built · 3 complaints
- MARY VILLA · BorivaliH&D PROJECTS · P51800031597 · possession Dec 2023 · 81.8% built
- Castalia · BorivaliTriax Developers LLP · P51800031613 · possession Mar 2027 · 72.6% built · 2 complaints
- REDEVELOPMENT OF SPARSH CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800031623 · possession Mar 2025 · 90.9% built
- HS ALAG · KurlaHS ALAG REALTY LLP · P51800031693 · possession Dec 2024 · 90.9% built
- Apoorva Rise · ChemburApoorva Housing · P51800031714 · possession Dec 2024 · 97.7% built
- BELLA VISTA · NASIDHARTH ENTERPRISES · P51800031740 · possession Dec 2026 · 100% built
- ASMI LEGACY · BorivaliASMI DEVELOPERS · P51800031746 · possession Dec 2026 · 40.4% built
- AGARWAL FLORESTA - OAK · BorivaliHOMEWELL REALTY LLP · P51800031760 · possession Jun 2027 · 38.1% built
- Rite Fortis · Borivali WestRITE HOUSING DEVELOPERS · P51800031781 · possession Mar 2023 · 86.4% built
- PUSHP-VATIKA · AndheriANISH SHAH & MANISH SHAH · P51800031796 · possession Dec 2024 · 85% built
- REDEVELOPMENT OF SILVERENE CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800031840 · possession Mar 2024 · 90.9% built
- Chaitanya Om Shivam - Om Shivam Premises CSL · Borivali WestChaitanya Enterprises · P51800031843 · possession May 2024 · 100% built
- D SOLITAIRE · BorivaliKRISHNAN AND KAMAL ASSOCIATES · P51800031850 · possession Jun 2026 · 64.7% built
- ALAG ASHTAPAD · KurlaCONTOUR DEVELOPERS LLP · P51800031922 · possession Dec 2024 · 90.9% built
- SWASTIK ELEGANCE · Swastik park ChemburSwastik Realtors · P51800031928 · possession Dec 2023 · 90.9% built
- KANDIVALI BASANT BAHAR · KANDIVALI WEST, MUMBAIWESTIN SANKALP DEVELOPERS · P51800031940 · possession Dec 2023 · 40% built
- BELLA- WING A AND B · KurlaLUCEAT REALTORS PRIVATE LIMITED · P51800031973 · possession Jul 2026 · 104.5% built
- Intelligentia Axis by Haware Properties · BorivaliHaware Intelligentia Properties LLP · P51800031976 · possession Dec 2026 · 46.7% built · 1 complaint
- KOJAR IMPERIA · MALAD WESTKOJAR REALTY · P51800031982 · possession Dec 2025 · 109% built
- PANCHAM PINNACLE · KurlaPANCHAM BUILDCON PRIVATE LIMITED · P51800031994 · possession Dec 2026 · 97.3% built
- Ghodawat Skystar LLP · BorivaliGhodawat Skystar LLP · P51800032000 · possession Jun 2026 · 71.4% built
- Onyx · BorivaliShreeram Builders · P51800032011 · possession Nov 2026 · 55% built
- Pragati Revanta · GhatkoparPragati Enterprises · P51800032025 · possession Dec 2024 · 90.9% built
- ALAG ARANYA · Panth NagarALAG AARCHIE LLP · P51800032034 · possession Dec 2024 · 90.9% built
- GEETANJALI PARADISE · BorivaliVASUNDHARA DEVELOCUS LLP · P51800032045 · possession Dec 2026 · 87.3% built
- Shree Balaji 7 · KurlaSaptrishi Landmarks LLP · P51800032058 · possession Sept 2026 · 55.2% built · 3 complaints
- OM SHREENATH KRUPA CHS LTD · BorivaliOM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD · P51800032074 · possession Dec 2026 · 96.6% built
- Omkaar Pride · Ghatkopar EastVardhman Developers · P51800032084 · possession Jul 2027 · 50% built · 2 complaints
- ASMI LEGEND · BorivaliANGEL CONSTRUCTION COMPANY · P51800032085 · possession Dec 2027 · 63.7% built · 3 complaints
- SENROOFS PHASE - III · KurlaPIONEER HOUSING · P51800032087 · possession Dec 2027 · 87.5% built
- 52 PARK AVENUE · AndheriDAN KUTIR CHSL · P51800032136 · possession Aug 2024 · 90.9% built
- SHREEJI SKY RISE TOWER · BorivaliShreeji Construction · P51800032149 · possession Dec 2026 · 84.2% built
- Fortune Elite · Mulund Westm/s. Fortune Reality Ventures · P51800032153 · possession Oct 2025 · 181.8% built
- Ganesh Bhuvan CHS Ltd · KurlaShree Swami Samarth Developers (Project Ganesh Bhuvan) · P51800032161 · possession Dec 2027 · 49.3% built
- Supreme Imperial · BorivaliSupreme Real Estate Developer · P51800032164 · possession Apr 2025 · 94.5% built
- Mahavir Majesty · Kandivali WestMahavir Builders · P51800032166 · possession Sept 2026 · 100% built
- Krishna Milan Heights · AndheriMilan Interbuilt Private Limited · P51800032172 · possession Jul 2026 · 62.4% built
- JITEN CHS · ANDHERI WESTM/s Keytech · P51800032184 · possession Mar 2026 · 99.8% built
- The Dream · Kandivali WestM/S PARSHVA ENTERPRISES · P51800032203 · possession Oct 2024 · 100% built
- Sudarshan CHS Ltd · Ghatkopar - EastSUDARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800032217 · possession Jun 2026 · 90.9% built
- Arunodaya Tower · KurlaRajawadi Arunodaya Co-Operative Housing Society Limited · P51800032224 · possession Dec 2026 · 62% built · 1 complaint
- Pratap Gaurav · AndheriJPV PEARL LLP · P51800032248 · possession Mar 2027 · 45% built
- RGS ANANTYA · CHEMBURSINGH HOLDING PVT LTD · P51800032255 · possession Jun 2023 · 90.9% built
- VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B · AndheriNEEPA REAL ESTATES PRIVATE LIMITED · P51800032286 · possession Dec 2026 · 63.6% built · 2 complaints
- Marina Enclave Wings OP Phase III · BorivaliGurukrupa Developers D.N.Nagar Project · P51800032311 · possession Jun 2023 · 100% built
- Kandivali Sai Prassana CHS Ltd · Kandivali WestAshwin Enterprise · P51800032312 · possession Oct 2023 · 90.9% built
- REDEVELOPMENT OF MALAD MARUDHAR CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800032320 · possession Jan 2025 · 100% built
- ADVENT NEEL · AndheriREGENT ASSOCIATES · P51800032332 · possession Dec 2024 · 78.9% built
- ALAG ARTIS · GHATKOPAR EASTALAG LIFESPACE LLP · P51800032385 · possession Dec 2024 · 84.5% built
- KRUPA · GOREGAON EASTAASAMANTA REALTY · P51800032389 · possession Mar 2024 · 90.9% built
- NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 · KurlaPARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED · P51800032409 · possession Dec 2026 · 82.7% built
- GOVIND PRAKASH SRA CHS LTD · MULUND EASTOMSAI DEVELOPERS · P51800032427 · possession Dec 2026 · 40.9% built
- RBIES Jaidatta CHSL · Haridas NagarRBIES Jaidatta CHSL · P51800032429 · possession Dec 2023 · 100% built
- Sapphire Tower · ChemburMukesh Ramesh Bajaj And Manjit Singh Jodh Singh Abrol · P51800032456 · possession May 2027 · 41.7% built
- REDEVELOPMENT OF RAMESH MANDIR CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800032468 · possession Apr 2025 · 76.9% built
- Om Shivalaya CHS Ltd · AndheriDipti Home Makers Pvt Ltd · P51800032469 · possession Dec 2026 · 93.2% built
- VIRA ELEGANCE · AndheriWE BUILD REALTY · P51800032474 · possession Nov 2026 · 100% built
- ALAG OLIVE · GHATKOPAR EASTALAG OLIVE LLP · P51800032510 · possession Dec 2024 · 89.5% built
- Redevelopment of Om Yogeshwar CHS Ltd · AdarshVAMA LIFESTYLES · P51800032528 · possession Oct 2023 · 82.6% built
- THE SANCTUARY - TOWER 2 · KurlaRunwal Construction Private Limited · P51800032538 · possession Mar 2027 · 58.3% built
- KAVERI HEIGHTS · PANT NAGAR, GHATKOPAR EASTShree Mishal Sundaram Realty Ventures LLP · P51800032557 · possession Dec 2026 · 181.8% built
- VIKAS ORNATE · KurlaARICIA CONSTRUCTION · P51800032578 · possession Dec 2026 · 48.3% built
- AIM PARADISE · AndheriS.K. ENTERPRISES · P51800032579 · possession Dec 2026 · 81.8% built
- Lodha Kandivali Project - Tower 5 · BorivaliLodha Developers Limited · P51800032605 · possession Jul 2026 · 81.8% built
- DREAM OLYMPIA · KurlaDream Developers · P51800032632 · possession Dec 2026 · 30% built
- SHANTI HEIGHTS · MULUND WESTSUNNY DEVELOPERS · P51800032643 · possession Dec 2024 · 97.7% built
- Building no 3 Wing C Aquila · BorivaliS D CORPORATION PRIVATE LIMITED · P51800032647 · possession Dec 2026 · 38.9% built · 1 complaint
- AYANA · AndheriARMAAN REAL ESTATE PRIVATE LIMITED · P51800032667 · possession Dec 2025 · 90.9% built
- SPRINGWOODS · BorivaliPRATIK CONSTRUCTION · P51800032668 · possession Dec 2026 · 48% built · 3 complaints
- Shree Rajrajeshwari Chhaya Chs Ltd. · Bhandup EastSUNIL DINKAR SHINDE · P51800032685 · possession Dec 2024 · 90.9% built
- SUPREME MADHUKAR · BORIVALISUPREME ENTERPRISE · P51800032692 · possession Jan 2025 · 86.8% built
- ROMELL CORNERSTONE · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800032709 · possession Mar 2024 · 90.9% built
- BORIVALI PADAM CHSL · BORIVALI WESTAMISHA CONSTRUCTIONS PRIVATE LIMITED · P51800032736 · possession Aug 2025 · 81.8% built
- VRINDAVAN · BorivaliDINESH AMRUTLAL THAKKAR · P51800032747 · possession Dec 2025 · 90.9% built
- Hubtown Seasons - Ardennes · KurlaJoynest Premises Private Ltd · P51800032784 · possession Jun 2026 · 77.3% built
- VARDHMAN PEARL · MALAD WESTDIWALI DEVELOPERS · P51800032809 · possession Dec 2024 · 36.4% built
- ATLANTIS TOWER · AndheriWEST AVENUE REALTY · P51800032826 · possession Jun 2026 · 3.6% built
- 95WEST · BorivaliSTANS BUILDTECH REALTY · P51800032841 · possession Dec 2027 · 13.9% built
- Marina Enclave Wings Q and R with Kindergarten Phase - IV · Malvani Malad WestGURUKRUPA DEVELOPERS D N NAGR PROJECT · P51800032847 · possession Dec 2025 · 71.4% built
- MAPLE SHADES · AndheriSHANDOR HOMES LLP · P51800032858 · possession May 2025 · 100% built
- SATRA ONE · GOREGAON WESTBLEU NOIR INFRASTRUCTURE DEVELOPMENT PVT. LTD. · P51800032891 · possession Dec 2024 · 46.2% built · 1 complaint
- Ajit Mulund CHS · MulundYug Developers · P51800032940 · possession Jun 2024 · 64% built
- AJMERA MANHATTAN BUILDING 3A AND 3B · KurlaAJMERA REALTY AND INFRA INDIA LTD · P51800032948 · possession Jun 2027 · 59.7% built · 1 complaint
- INA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliYASH REALTORS · P51800032952 · possession Dec 2026 · 2.3% built
- 72 Marina - Phase I - Tierra and Torres · KurlaD S Developers · P51800032960 · possession Dec 2026 · 46.1% built
- Veena Smart Homes · BorivaliV.D. Infratech Private Limited · P51800032966 · possession Dec 2026 · 79.1% built
- SEQUOIA · AndheriAUM PRIMA LLP · P51800032970 · possession Dec 2024 · 56.8% built
- Sidhivinayak Flora · KurlaSIDHIVINAYAK CONSTRUCTIONS · P51800033003 · possession Dec 2026 · 88.7% built · 1 complaint
- GOKUL PARADISE · BorivaliSHREE RADHE CONSTRUCTION · P51800033025 · possession Dec 2027 · 27.3% built
- VARDHMAN CASTLE PHASE I · SANTACRUZ WESTVENUS DEVELOPMENT CORPORATION · P51800033033 · possession Dec 2023 · 0.2% built
- GSA GRANDEUR A and B Wing · BorivaliG S A CONSTRUCTIONS · P51800033045 · possession Dec 2027 · 49.2% built
- CHANDRATEJ CHS LTD · BorivaliELESH RAVJIBHAI RATHOD · P51800033067 · possession Oct 2026 · 64.1% built
- SAGAR RESHAM CHSL · BANDRA WESTENORM NAGPAL REALTY LLP · P51800033072 · possession Jan 2024 · 100% built
- PARLASHRAY CHSL · VILE PARLE EASTSai Ganesh Properties and Holdings LLP · P51800033078 · possession Oct 2024 · 90.9% built
- Vishwas Niketan by viiaan · AndheriSOMANI BUILDTECH LLP · P51800033151 · possession Dec 2026 · 81.8% built
- Samarth Aura Phase -1 · KurlaShree Ashapura Combine · P51800033159 · possession Dec 2026 · 79.1% built
- Modispaces Valley View · BorivaliModispaces Real Estate Pvt Ltd · P51800033185 · possession Jun 2024 · 100% built
- Abhilash Phase II · ChemburSANJONA BUILDERS · P51800033199 · possession Mar 2027 · 81.8% built · 1 complaint
- N N TOWER · AndheriL NAGPAL BUILDERS LLP · P51800033235 · possession Oct 2023 · 100% built
- AURIS ILARIA TOWER B · BorivaliTRANSCON-SHETH CREATORS PRIVATE LIMITED · P51800033238 · possession Apr 2028 · 45.6% built · 4 complaints
- Kanchan Sheila CHS · Mulund WestYug Developers · P51800033242 · possession Jun 2024 · 64.6% built
- CHANDAN HIRA · GOREGAON WESTBALI SHELTERS LLP · P51800033253 · possession Sept 2024 · 90.9% built
- Sanghvi Parsssva Jivdaya · KurlaSanghvi Constructions · P51800033259 · possession Dec 2026 · 54.5% built
- BHAVESHA CO-OPERATIVE HOUSING SOCIETY LTD · ANDHERI (WEST)BEAUTIFUL PROPERTIES PRIVATE LIMITED · P51800033264 · possession Nov 2023 · 90.9% built
- RAUNAK CENTRUM - A · KurlaRaunak Jigna Associates · P51800033269 · possession Dec 2028 · 37.8% built · 7 complaints
- Kalpataru Summit · KurlaArimas Real Estate Private Limited · P51800033272 · possession Jun 2027 · 56.1% built
- SARVODAYA PRIDE · KurlaJYOTIRADITYA REALTORS AND DEVELOPERS LLP · P51800033300 · possession Dec 2026 · 26.8% built
- SAI SASTHA SAMRAT · SHIVAJI CHOWKMS SAI SASTHA ENTERPRISES · P51800033301 · possession Dec 2025 · 100% built
- Monte Verita West Tower · BorivaliB G Shirke Redevelopment and GAS P L · P51800033312 · possession Mar 2027 · 34.5% built · 5 complaints
- SEYCHELLES · AndheriSHUBHAM ENTERPRISES · P51800033314 · possession Dec 2023 · 87.5% built
- Mehta Premiere-Residential · MagathaneAsiatic Trading and Construction Company · P51800033388 · possession Dec 2025 · 99.5% built
- MAHESHWAR KRIPA CHSL · GHATKOPAR EASTMAHESHWAR KRIPA C0-OPERATIVE HOUSING SOCIETY LIMITED · P51800033398 · possession Mar 2026 · 81.8% built
- 55 Evana · AndheriParsh Realty · P51800033403 · possession Dec 2024 · 100% built
- North Star · GovandiNorth Property Developers LLP · P51800033438 · possession Apr 2027 · 43.3% built · 4 complaints
- RISHABRAJ PARK VISTAS · BORIVALI WESTH RISHABRAJ REALTY · P51800033442 · possession Dec 2025 · 59.1% built
- OM MOTI NAGAR CHSL · ROSHAN NAGAR, CHANDAVARKAR ROADRENOVATOR CONSTRUCTION · P51800033454 · possession Mar 2025 · 100% built
- Avanya Tower C · BorivaliAniline Properties Private Limited · P51800033462 · possession Dec 2026 · 82.1% built · 1 complaint
- Avenue 57 · AndheriV J DEVELOPER · P51800033470 · possession Dec 2032 · 73.5% built
- ACE AVENUE · MULUND WESTAce properties · P51800033494 · possession Jun 2024 · 90.9% built
- SWAMINARAYAN DHAM · AndheriARA BUILDERS PRIVATE LIMITED · P51800033497 · possession Dec 2026 · 77.9% built
- OM DHANLAXMI HEIGHTS · VIKHROLIV P REALTY · P51800033503 · possession Dec 2026 · 81.8% built · 2 complaints
- CENTRAL PARK · KurlaV LAXMI NURSES DEVELOPERS LLP · P51800033540 · possession May 2026 · 115.2% built · 1 complaint
- CASA RAMIRO · AndheriPRESCOTT HOUSING LLP · P51800033552 · possession Mar 2024 · 90.9% built
- MAHINDRA ALCOVE WING A AND C · KurlaMahindra Lifespace Developers limited · P51800033573 · possession Jun 2026 · 13.2% built
- Vidya Nidhi · Goregaon WestLaxmi Aakar Realty · P51800033588 · possession Mar 2024 · 90.9% built
- PRATHAMESH SOLITAIRE · BorivaliMANGESH TUKARAM SAWANT · P51800033599 · possession Oct 2027 · 49.7% built
- JADE GARDENS TOWER A · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033601 · possession Oct 2025 · 61.4% built
- UK LUXECITY - E - F · BorivaliDamodar Suruchi Developers Pvt. Ltd · P51800033664 · possession Dec 2026 · 43.9% built
- Spring Meadows · BorivaliRenaissance Enterprises · P51800033680 · possession Dec 2026 · 90.9% built
- Monte Verita - East Tower · BorivaliM/s B G Shirke Redevelopment and GAS P L · P51800033728 · possession Mar 2027 · 21.8% built · 9 complaints
- Jyoti Skyline · AndheriJyoti Shelter · P51800033753 · possession Dec 2026 · 84.5% built · 1 complaint
- KRISHNA NIWAS · Goregaon EastK.PATELAND CO · P51800033756 · possession Dec 2025 · 90.9% built
- SHREE VRINDAVAN · BorivaliSRK VRINDAVAN · P51800033761 · possession Jun 2027 · 72.1% built
- Gagan 45 · KurlaGagangiri Developers · P51800033764 · possession Dec 2025 · 90.9% built
- RENDEZVOUS PREMISES CO-OP SOCIETY LTD · MumbaiJGB BUILDERS LLP (CA to Owner) · P51800033783 · possession Dec 2024 · 95.5% built
- Motivilla · Goregaon WestAAKAR SHIV INFRA VENTURE · P51800033793 · possession Mar 2024 · 90.9% built
- GADGIL NIWAS CO-OP. HOUSING SOCIETY LTD · AndheriGOLD COIN BUILDERS LLP · P51800033807 · possession Dec 2025 · 100% built
- BLUE LOTUS · AndheriRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800033826 · possession Dec 2025 · 100% built
- Anjani Tirth · Borivali (West)Geeta Space Realtors · P51800033828 · possession Dec 2024 · 90.9% built
- Atmosphere O2 Tower-G · KurlaAtmosphere Realty Pvt Ltd · P51800033845 · possession Dec 2028 · 49.7% built
- PALMERA · AndheriNVK Realty LLP · P51800033870 · possession Dec 2026 · 71.8% built
- RISHABRAJ PHOENIX · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800033878 · possession Feb 2027 · 85.9% built
- Nirvaana Emerald · KurlaNirvaana Lifespace LLP · P51800033884 · possession Dec 2026 · 38.2% built
- SHIKARA HEIGHTS Phase-I · MumbaiShikara Constructions Pvt. Ltd. · P51800033893 · possession Dec 2027 · 91.9% built · 1 complaint
- Sharon Rose CHSL · MALAD WESTM/s JDN REALTY LLP · P51800033903 · possession Dec 2025 · 84.1% built
- Leo Tower · AndheriDev Land & Housing Private Limited · P51800033905 · possession May 2026 · 100% built
- HERITAGE HOUSE · AndheriGreen Tree Lifescapes LLP · P51800033917 · possession Dec 2024 · 0.9% built
- THE VILE PARLE MEGHALAYA CHSL · VILE PARLE EASTDHRUV INFRASTRUCTURE · P51800033919 · possession Aug 2024 · 90.9% built
- SHRADDHA PRIVILEGE · KANNAMWAR NAGAR VIKHROLI EASTSHRADDHA LANDMARK PRIVATE LIMITED · P51800033921 · possession Dec 2025 · 82.7% built
- Supreme Evana · Bandra WestSupreme Mega Constructions LLP · P51800033931 · possession Jun 2024 · 90% built
- Jade Gardens Tower B · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033945 · possession Oct 2025 · 79.1% built
- Nirvana · BorivaliSiddhivinayak Developers Kurar · P51800033952 · possession Dec 2027 · 62.7% built
- JADE GARDENS TOWER C · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033954 · possession Oct 2025 · 81.8% built
- Kush Pride · BorivaliKush Housing LLP · P51800033962 · possession Jun 2026 · 72.3% built
- Goregaon Manorath CHS LTD · BorivaliK Anand Infra · P51800033980 · possession Dec 2027 · 47.7% built · 1 complaint
- Gagan 138 · KurlaGAGANGIRI CONSTRUCTION · P51800033983 · possession Dec 2025 · 100% built · 1 complaint
- Park View · Mulund WestPinak Enterprises · P51800033996 · possession Dec 2025 · 89.1% built · 1 complaint
- NISHIGANDHA CHS LTD · KurlaSHRADDHA LANDMARK BUILDERS AND DEVELOPERS · P51800034001 · possession Oct 2023 · 100% built
- North Star-2nd Phase · Upper ChemburNorth Property Developers LLP · P51800034011 · possession Sept 2027 · 27.3% built
- SHRADDHA PLEASANT · KurlaSHRADDHA HOUSING PROJECTS LLP · P51800034014 · possession Dec 2026 · 72.7% built
- ROMELL SERENE · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800034025 · possession Mar 2025 · 81.8% built
- SUPREME HAPPY HOME · Kandivali WestShelby Realty LLP · P51800034043 · possession Mar 2025 · 90.9% built
- KHAR LAXMI NIVAS · KHAR WESTKHAR LAXMI NIWAS DEVELOPERS LLP · P51800034050 · possession Dec 2024 · 100% built
- REDEVELOPMENT OF PLOT NO. 212 · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800034087 · possession Feb 2025 · 90.9% built
- REDEVELOPMENT OF RUSHABH MAHAL CHSL · MALAD EASTPRANAV CONSTRUCTIONS LIMITED · P51800034099 · possession Jun 2025 · 90.9% built
- Neelyog Aashiyana II · KANDIVALI WESTNeelyog Construction Pvt Ltd · P51800034106 · possession Jun 2026 · 90.9% built
- OM MADHUSADAN CHS LTD · CHITRKAR KETKAR MARG VILE PARLE EAST MUMBAIREGENT BUILDERS · P51800034194 · possession Mar 2025 · 93.6% built
- Pratap Vista · AndheriParnakutir Real Estate Pvt Ltd · P51800034213 · possession Jun 2028 · 27.3% built
- Laxmi Sanskruti · Jawahar Nagar, Goregaon WestLAXMIDEVI DEVELOPERS · P51800034219 · possession Feb 2024 · 52.7% built
- Shivsagar · BorivaliGurukrupa Developers · P51800034270 · possession Mar 2027 · 83.5% built