- Veridian at Emerald Isle 12C · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800029888 · possession May 2027 · 181.9% built
- Veridian at Emerald Isle 14A and 14B · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800029892 · possession May 2027 · 100% built · 3 complaints
- Veridian at Emerald Isle 13A and 13B · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800029893 · possession Sept 2027 · 100% built · 1 complaint
- Shubh Parshwa · KurlaS. Siddharth Construction Co. (Panchshil) · P51800029898 · possession Jun 2027 · 59.1% built
- MARATHON MONTE CARLO 3 · KurlaMARATHON REALTY PVT LTD · P51800029900 · possession Dec 2026 · 96.4% built
- GAURI EXCELLENCY NX · BorivaliM/S GAURI LAND DEVELOPERS LLP · P51800029939 · possession Jun 2026 · 80.2% built · 1 complaint
- Vijayagar · BorivaliSKYLINE LANDMARK PROJECTS PRIVATE LIMITED · P51800029943 · possession Dec 2022 · 90.9% built
- HIGHLAND A B C D AND E Wing · KurlaHGP Community Pvt. Ltd. · P51800029948 · possession Dec 2026 · 85.5% built
- HORIZON SHLOKA · MULUND WESTHORIZON PROMOTERS INDIA LTD · P51800029955 · possession May 2023 · 90.9% built
- Arkade Serene · Sunder Nagar Malad WestArkade Developers Private Limited · P51800029961 · possession Jun 2024 · 74.5% built
- SAFAL GOLF RESIDENCES · KurlaMANGALNATH DEVELOPERS PVT LTD · P51800029994 · possession Oct 2027 · 20.9% built · 4 complaints
- Crescent Nexus- (Ascent) · AndheriASCENT INFRASPACE PRIVATE LIMITED · P51800030043 · possession Apr 2027 · 56.4% built · 2 complaints
- BANDRA BOON CHS LTD · BANDRA WESTMASS JAKS ASSOCIATE VENTURES · P51800030090 · possession Sept 2026 · 74.6% built
- AMARJYOTI CHS LTD · Chembur East, MumbaiMAJESTIC ROYALE DEVELOPERS · P51800030116 · possession Sept 2024 · 100% built
- Rajshree Eleven East · KurlaPanchsheel 1 Upgrade LLP · P51800030117 · possession Dec 2024 · 85.4% built
- PUNEET KALPAVRIKSHA · KurlaPUNEET PRATEEKSHA SPACES · P51800030146 · possession Apr 2027 · 33.5% built
- MAYAANK HEIGHTS · BorivaliN. K. LIFESTYLE · P51800030223 · possession Mar 2024 · 90.9% built
- AJMERA ARHAM · BorivaliVISHAL CONSTRUCTION · P51800030227 · possession Jul 2027 · 57.1% built
- ARBUDA DARSHAN CHS LTD. · AndheriSUPREME REALTORS · P51800030268 · possession Dec 2023 · 100% built
- Supreme Elenor · KurlaSupreme Mega Constructions LLP · P51800030270 · possession Aug 2024 · 70.9% built
- Redevelopment of Vasishtha Krupa Co-operative Housing Society Ltd. · Kandivali EastKaustubh Construction Private Limited · P51800030271 · possession Aug 2025 · 100% built
- THE ACE · BorivaliTANVI CONSTRUCTION PVT LTD · P51800030288 · possession Apr 2029 · 64.5% built
- Rite Civis · Bhandup WestYashodanand Developers · P51800030301 · possession Dec 2023 · 42.3% built · 2 complaints
- Transcon Triumph Tower 3 · AndheriTranscon Triumph Phase 2 Private Limited · P51800030321 · possession Jan 2027 · 80.6% built · 4 complaints
- AVYUKTA RAJHANS · BorivaliSHIVOHAM INFRAHOMES LLP · P51800030322 · possession Dec 2024 · 100% built
- SAI AKSHI · KurlaUVK BUILDERS & DEVELOPERS LLP · P51800030330 · possession Apr 2027 · 50% built · 1 complaint
- Silver Crest · AndheriGold Coin Builders · P51800030332 · possession Dec 2025 · 83.3% built
- RAGHAV AMARA · Kurla EastRAGHAV RAJ BUILDERS & DEVELOPERS LLP · P51800030338 · possession Sept 2024 · 100% built
- BELLA CASA · AndheriKonark Bella Casa LLP · P51800030388 · possession Apr 2027 · 78.2% built
- KABRA DIAMANTE · BELWALKAR WADI GOREGAON WESTKABRA AND ASSOCIATES · P51800030391 · possession Dec 2025 · 100% built · 3 complaints
- KUSH SYMPHONY · Mulund WestKush Buildcon LLP · P51800030410 · possession Jun 2025 · 90.9% built
- ANUSAYA · KurlaSatre Infrastructure Pvt. Ltd. · P51800030415 · possession Oct 2027 · 90.9% built
- Utkarsh · Santacruz EastAmbrosial Developers Private Limited · P51800030434 · possession Mar 2025 · 83% built
- ANTARIKSH AVALON · PANTNAGAR GHATKOPAR EASTANTARIKSH REALTORS PRIVATE LIMITED · P51800030439 · possession Dec 2025 · 87.7% built
- Dadamiyas Deluxe Apartment · KurlaDadamiya Infrastructure & Deluxe Infra · P51800030492 · possession Mar 2023 · 81.8% built
- Redevelopment of Dadarkar Apartment CHSL · BorivaliSankalp Structures Private Limited · P51800030506 · possession Jul 2027 · 37.3% built
- HARMONY · BorivaliSHREENATH ASSOCIATES · P51800030510 · possession Dec 2026 · 66.4% built
- RISHABRAJ AGNEL · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800030530 · possession Aug 2024 · 90.9% built
- Artteza · AndheriSUNVISION ESTATES · P51800030554 · possession Nov 2026 · 78.9% built · 4 complaints
- GOVIND SOLITAIRE · KurlaSHANKH DEVELOPERS LIMITED LIABILITY PARTNERSHIP · P51800030555 · possession Jun 2026 · 71.8% built
- ARIHANT ENCLAVE · AndheriM/s Arihant Enterprise · P51800030594 · possession Dec 2023 · 23.6% built
- NEW AVANTI CHSL · BorivaliBALAJI ENTERPRISES · P51800030643 · possession Feb 2027 · 66.4% built
- RISHABRAJ RAMESHWAR · BorivaliH RISHABRAJ REALTY · P51800030723 · possession Aug 2024 · 90.9% built
- RADIANT 59 · AndheriVEER JALARAM DEVELOPERS · P51800030749 · possession Apr 2027 · 83% built
- MARATHON NEOPARK ASHOKA WING C · KurlaMARATHON NEXTGEN REALTY LTD · P51800030752 · possession Oct 2028 · 38.2% built
- Swashraya Andheri CHS Ltd · nr Juhu LaneDEM CONSTRUCTIONS LLP · P51800030781 · possession Feb 2024 · 67.4% built
- Solitaire Edge · BorivaliMAHAVEER CONSTRUCTION · P51800030831 · possession Apr 2027 · 90.9% built
- OMKAR CHSL · KurlaMAAULI CREATIONS PVT. LTD · P51800030846 · possession May 2025 · 100% built
- Alpine Primo · AndheriALPINE INFRAHEIGHTS LLP · P51800030851 · possession Apr 2027 · 75.6% built · 5 complaints
- TRIENITY 1 PHASE II · BorivaliTRIENITY PRIME PROPERTY PROJECTS LLP · P51800030871 · possession Jul 2027 · 73.2% built · 1 complaint
- ROYAL ALTEZZA · KurlaSHRI GANESH DEVELOPERS · P51800030908 · possession Aug 2026 · 94.1% built
- HARI KUNJ III WING A · KurlaHARI KUNJ III WING A · P51800030919 · possession Aug 2029 · 9.1% built
- EUPHORIA · BorivaliFAIRMONT CONSTRUCTIONS PRIVATE LIMITED · P51800030945 · possession Dec 2028 · 21.8% built · 2 complaints
- Sunteck Pinnacle 1 · BorivaliSunteck Realty Limited · P51800030947 · possession Apr 2028 · 75.3% built · 4 complaints
- PARLE NIMESH CO-OP. HSG. SOC. LTD. · VILE PARLE EASTCHINTAMANI COMMERCIAL VENTURES · P51800030964 · possession Sept 2024 · 90% built
- LAXMI SHRUSHTI - WING B · BorivaliLAXMIDEVI DEVELOPERS · P51800030965 · possession Jun 2027 · 98.3% built · 2 complaints
- JEANDVEEKEDARNATH · BorivaliJE AND VEE INFRASTRUCTURE · P51800030984 · possession Apr 2027 · 27.3% built
- RUSHABH APARTMENT · BorivaliR R BUILDERS · P51800030994 · possession Nov 2026 · 49.5% built · 1 complaint
- MITTAL RESIDENCES · MumbaiASHA DEVELOPERS · P51800030998 · possession Jan 2032 · 81.8% built
- Charkop Akash Kiran CHS Ltd · BorivaliSangam Developers · P51800031000 · possession Apr 2027 · 90% built
- Samarth Reva · BorivaliSamarth Erectors and Developers - Mariyamman · P51800031028 · possession Dec 2026 · 52.7% built
- SHEEL APARTMENTS BY MAYFAIR · AndheriMAYFAIR HOUSING PRIVATE LIMITED · P51800031040 · possession Dec 2024 · 82.7% built
- RISHABRAJ SUJAI · MALAD EASTRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800031075 · possession Aug 2024 · 90.9% built
- Crystal Palladian 207 · GHATKOPAR WESTSri Sai Nidhi Realtors Private Limited · P51800031122 · possession Oct 2026 · 63.6% built · 1 complaint
- JEANDVEEVISHWANATH · BorivaliJE AND VEE INFRASTRUCTURE · P51800031136 · possession Apr 2027 · 27.3% built
- Pratap Elegance · Lallubhai ParkDowntown Lifespaces LLP · P51800031141 · possession Mar 2025 · 100% built
- RISHABRAJ PRIDE · DAHISAR WESTRRIL LIMITED · P51800031144 · possession Aug 2023 · 90.9% built
- Magic Tower · AndheriSwarna Highrise Construction · P51800031150 · possession Apr 2028 · 37.2% built · 4 complaints
- MILESTONE · BorivaliMILESTONE · P51800031163 · possession Apr 2030 · 17.3% built
- SHRISTI RESIDENCY - PHASE 1 · AndheriRANBIR REAL ESTATE AND DEVELOPERS LLP · P51800031167 · possession Dec 2026 · 81.8% built · 42 complaints
- MAHAKALI HILLS · AndheriMohid Construction Co · P51800031191 · possession Dec 2026 · 27% built · 1 complaint
- Neelkanth Enclave D Wing Siddhartha · KurlaBhaveshwar Properties Pvt Ltd · P51800031210 · possession Jun 2024 · 100% built
- PADMA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliHARITARA CONSTRUCTION COMPANY PRIVATE LIMITED · P51800031219 · possession Jan 2027 · 35.5% built
- KINGS MY HOMES · KurlaNilesh Laxmikant Kudalkar · P51800031220 · possession Apr 2030 · 90.5% built · 2 complaints
- TRITON · SANTACRUZ WESTJade Constructions Private Limited · P51800031222 · possession Jul 2025 · 90.5% built
- KHAR HIRA PREMISES CO OP SOCIETY LTD · AndheriL NAGPAL DEVELOPERS · P51800031276 · possession Feb 2024 · 78.2% built
- Piramal Revanta - Tower 4 · Mulund WestPRL Developers Private Limited · P51800031310 · possession Mar 2026 · 100% built · 3 complaints
- ZEN GARDENS · KANDIVALI WESTKonark Shakti Group of Companies · P51800031317 · possession Dec 2025 · 181.9% built
- Lodha Kandivali Project - Tower 3 · Akurli VillageLodha Developers Limited · P51800031346 · possession Jun 2026 · 81.8% built
- Manusmruti CHSL · BorivaliGoyal Wedevelopment Pvt Ltd · P51800031359 · possession Mar 2024 · 100% built
- Lodha Mulund Project Tower 1 · KurlaLodha Developers Limited · P51800031360 · possession Sept 2027 · 81.8% built · 2 complaints
- Sanghvi Edge · AndheriSangvi Lifespace Private Limited · P51800031420 · possession Apr 2027 · 43.4% built · 1 complaint
- Elysian Tower B · BorivaliOberoi Realty Limited · P51800031456 · possession Jun 2027 · 77.1% built
- RAY · BorivaliManish Builders & Developers · P51800031492 · possession Aug 2026 · 81.1% built · 1 complaint
- TRIDHAATU ARANYA - A DREAM · KurlaTRIDHAATU ARANYA DEVELOPERS LLP · P51800031547 · possession Dec 2027 · 0% built · 3 complaints
- Arkan · Jogeshwari WestGajaanan Property Developers Private Limited · P51800031563 · possession Apr 2028 · 26.2% built
- MARY VILLA · BorivaliH&D PROJECTS · P51800031597 · possession Dec 2023 · 81.8% built
- Castalia · BorivaliTriax Developers LLP · P51800031613 · possession Jul 2027 · 82.2% built · 3 complaints
- REDEVELOPMENT OF SPARSH CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800031623 · possession Mar 2025 · 90.9% built
- HS ALAG · KurlaHS ALAG REALTY LLP · P51800031693 · possession Dec 2024 · 90.9% built
- Nirvaana Crown · KurlaNIRVAANA CREATORS LLP · P51800031705 · possession Oct 2027 · 0% built
- Apoorva Rise · ChemburApoorva Housing · P51800031714 · possession Dec 2024 · 97.7% built
- NAHUR GAONTHAN SHIV SHAKTI CHS LTD · MULUND WESTOM BUILDERS AND DEVELOPERS · P51800031723 · possession Jul 2027 · 72.5% built
- BELLA VISTA · NASIDHARTH ENTERPRISES · P51800031740 · possession Dec 2026 · 100% built
- ASMI LEGACY · BorivaliASMI DEVELOPERS · P51800031746 · possession Apr 2027 · 41.3% built
- AGARWAL FLORESTA - OAK · BorivaliHOMEWELL REALTY LLP · P51800031760 · possession Oct 2027 · 46.5% built
- Rite Fortis · Borivali WestRITE HOUSING DEVELOPERS · P51800031781 · possession Mar 2023 · 86.4% built
- PUSHP-VATIKA · AndheriANISH SHAH & MANISH SHAH · P51800031796 · possession Dec 2024 · 85% built
- REDEVELOPMENT OF SILVERENE CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800031840 · possession Mar 2024 · 90.9% built
- Chaitanya Om Shivam - Om Shivam Premises CSL · Borivali WestChaitanya Enterprises · P51800031843 · possession May 2024 · 100% built
- D SOLITAIRE · BorivaliKRISHNAN AND KAMAL ASSOCIATES · P51800031850 · possession Jun 2026 · 64.7% built
- ALAG ASHTAPAD · KurlaCONTOUR DEVELOPERS LLP · P51800031922 · possession Dec 2024 · 90.9% built
- SWASTIK ELEGANCE · Swastik park ChemburSwastik Realtors · P51800031928 · possession Dec 2023 · 90.9% built
- KANDIVALI BASANT BAHAR · KANDIVALI WEST, MUMBAIWESTIN SANKALP DEVELOPERS · P51800031940 · possession Dec 2023 · 40% built
- BELLA- WING A AND B · KurlaLUCEAT REALTORS PRIVATE LIMITED · P51800031973 · possession Jul 2026 · 104.5% built
- Intelligentia Axis by Haware Properties · BorivaliHaware Intelligentia Properties LLP · P51800031976 · possession Apr 2027 · 46.7% built · 1 complaint
- KOJAR IMPERIA · MALAD WESTKOJAR REALTY · P51800031982 · possession Dec 2025 · 109% built
- PANCHAM PINNACLE · KurlaPANCHAM BUILDCON PRIVATE LIMITED · P51800031994 · possession Apr 2027 · 97.3% built
- Ghodawat Skystar LLP · BorivaliGhodawat Skystar LLP · P51800032000 · possession Oct 2026 · 64.1% built
- Onyx · BorivaliShreeram Builders · P51800032011 · possession Mar 2027 · 55% built
- Pragati Revanta · GhatkoparPragati Enterprises · P51800032025 · possession Dec 2024 · 90.9% built
- ALAG ARANYA · Panth NagarALAG AARCHIE LLP · P51800032034 · possession Dec 2024 · 90.9% built
- GEETANJALI PARADISE · BorivaliVASUNDHARA DEVELOCUS LLP · P51800032045 · possession Apr 2027 · 95.5% built
- Shree Balaji 7 · KurlaSaptrishi Landmarks LLP · P51800032058 · possession Sept 2027 · 55.2% built · 3 complaints
- OM SHREENATH KRUPA CHS LTD · BorivaliOM SHREENATH KRUPA CO OPERATIVE HOUSING SOCIETY LTD · P51800032074 · possession Apr 2027 · 96.6% built
- Omkaar Pride · Ghatkopar EastVardhman Developers · P51800032084 · possession Jul 2027 · 47.5% built · 2 complaints
- ASMI LEGEND · BorivaliANGEL CONSTRUCTION COMPANY · P51800032085 · possession Dec 2027 · 64.7% built · 3 complaints
- SENROOFS PHASE - III · KurlaPIONEER HOUSING · P51800032087 · possession Apr 2028 · 87.5% built · 2 complaints
- 52 PARK AVENUE · AndheriDAN KUTIR CHSL · P51800032136 · possession Aug 2024 · 90.9% built
- SHREEJI SKY RISE TOWER · BorivaliShreeji Construction · P51800032149 · possession Dec 2026 · 86.8% built
- Fortune Elite · Mulund Westm/s. Fortune Reality Ventures · P51800032153 · possession Oct 2025 · 181.8% built
- Ganesh Bhuvan CHS Ltd · KurlaShree Swami Samarth Developers (Project Ganesh Bhuvan) · P51800032161 · possession Apr 2028 · 49.3% built
- Supreme Imperial · BorivaliSupreme Real Estate Developer · P51800032164 · possession Apr 2025 · 94.5% built
- Mahavir Majesty · Kandivali WestMahavir Builders · P51800032166 · possession Sept 2026 · 100% built
- Krishna Milan Heights · AndheriMilan Interbuilt Private Limited · P51800032172 · possession Nov 2026 · 62.4% built
- JITEN CHS · ANDHERI WESTM/s Keytech · P51800032184 · possession Mar 2026 · 99.8% built
- The Dream · Kandivali WestM/S PARSHVA ENTERPRISES · P51800032203 · possession Oct 2024 · 100% built
- Sudarshan CHS Ltd · Ghatkopar - EastSUDARSHAN CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800032217 · possession Jun 2026 · 90.9% built
- Arunodaya Tower · KurlaRajawadi Arunodaya Co-Operative Housing Society Limited · P51800032224 · possession Apr 2027 · 62% built · 1 complaint
- Pratap Gaurav · AndheriJPV PEARL LLP · P51800032248 · possession Jul 2027 · 45% built
- RGS ANANTYA · CHEMBURSINGH HOLDING PVT LTD · P51800032255 · possession Jun 2023 · 90.9% built
- VASANTOASIS BLOSSOM BLDG 20 WING A AND WING B · AndheriNEEPA REAL ESTATES PRIVATE LIMITED · P51800032286 · possession Apr 2027 · 63.6% built · 2 complaints
- Marina Enclave Wings OP Phase III · BorivaliGurukrupa Developers D.N.Nagar Project · P51800032311 · possession Jun 2023 · 100% built
- Kandivali Sai Prassana CHS Ltd · Kandivali WestAshwin Enterprise · P51800032312 · possession Oct 2023 · 90.9% built
- REDEVELOPMENT OF MALAD MARUDHAR CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800032320 · possession Jan 2025 · 100% built
- ADVENT NEEL · AndheriREGENT ASSOCIATES · P51800032332 · possession Dec 2024 · 78.9% built
- ALAG ARTIS · GHATKOPAR EASTALAG LIFESPACE LLP · P51800032385 · possession Dec 2024 · 84.5% built
- KRUPA · GOREGAON EASTAASAMANTA REALTY · P51800032389 · possession Mar 2024 · 90.9% built
- NEHRU NAGAR SHIV VAIBHAV CHS LTD BLDG NO 38 · KurlaPARSN CONSTRUCTION AND DEVELOPERS PRIVATE LIMITED · P51800032409 · possession Apr 2027 · 82.7% built
- Dinaco Darshan CHS LTD · Dahisar WestDinaco Darshan CHSL · P51800032422 · possession Jan 2027 · 64.9% built
- GOVIND PRAKASH SRA CHS LTD · MULUND EASTOMSAI DEVELOPERS · P51800032427 · possession Dec 2026 · 40.9% built
- RBIES Jaidatta CHSL · Haridas NagarRBIES Jaidatta CHSL · P51800032429 · possession Dec 2023 · 100% built
- Drushti Sapphire · Ghatkopar EastDrushti Realtors Pvt Ltd · P51800032434 · possession Apr 2025 · 54.5% built · 7 complaints
- Sapphire Tower · ChemburMukesh Ramesh Bajaj And Manjit Singh Jodh Singh Abrol · P51800032456 · possession Sept 2027 · 41.7% built
- REDEVELOPMENT OF RAMESH MANDIR CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800032468 · possession Apr 2025 · 76.9% built
- Om Shivalaya CHS Ltd · AndheriDipti Home Makers Pvt Ltd · P51800032469 · possession Dec 2026 · 94.5% built
- VIRA ELEGANCE · AndheriWE BUILD REALTY · P51800032474 · possession Nov 2026 · 100% built
- ALAG OLIVE · GHATKOPAR EASTALAG OLIVE LLP · P51800032510 · possession Dec 2024 · 89.5% built
- Redevelopment of Om Yogeshwar CHS Ltd · AdarshVAMA LIFESTYLES · P51800032528 · possession Oct 2023 · 82.6% built
- THE SANCTUARY - TOWER 2 · KurlaRunwal Construction Private Limited · P51800032538 · possession Jul 2027 · 58.3% built · 1 complaint
- KAVERI HEIGHTS · PANT NAGAR, GHATKOPAR EASTShree Mishal Sundaram Realty Ventures LLP · P51800032557 · possession Dec 2026 · 181.8% built
- VIKAS ORNATE · KurlaARICIA CONSTRUCTION · P51800032578 · possession Apr 2027 · 48.8% built
- AIM PARADISE · AndheriS.K. ENTERPRISES · P51800032579 · possession Dec 2026 · 81.8% built
- Lodha Kandivali Project - Tower 5 · BorivaliLodha Developers Limited · P51800032605 · possession Jul 2026 · 81.8% built
- DREAM OLYMPIA · KurlaDream Developers · P51800032632 · possession Apr 2027 · 30% built
- SHANTI HEIGHTS · MULUND WESTSUNNY DEVELOPERS · P51800032643 · possession Dec 2024 · 97.7% built
- Building no 3 Wing C Aquila · BorivaliS D CORPORATION PRIVATE LIMITED · P51800032647 · possession Apr 2027 · 45.5% built · 1 complaint
- AYANA · AndheriARMAAN REAL ESTATE PRIVATE LIMITED · P51800032667 · possession Dec 2025 · 90.9% built
- SPRINGWOODS · BorivaliPRATIK CONSTRUCTION · P51800032668 · possession Apr 2027 · 48% built · 4 complaints
- Shree Rajrajeshwari Chhaya Chs Ltd. · Bhandup EastSUNIL DINKAR SHINDE · P51800032685 · possession Dec 2024 · 90.9% built
- SUPREME MADHUKAR · BORIVALISUPREME ENTERPRISE · P51800032692 · possession Jan 2025 · 86.8% built
- ROMELL CORNERSTONE · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800032709 · possession Mar 2024 · 90.9% built
- BORIVALI PADAM CHSL · BORIVALI WESTAMISHA CONSTRUCTIONS PRIVATE LIMITED · P51800032736 · possession Aug 2025 · 81.8% built
- VRINDAVAN · BorivaliDINESH AMRUTLAL THAKKAR · P51800032747 · possession Dec 2025 · 90.9% built
- Hubtown Seasons - Ardennes · KurlaJoynest Premises Private Ltd · P51800032784 · possession Jun 2026 · 77.3% built
- VARDHMAN PEARL · MALAD WESTDIWALI DEVELOPERS · P51800032809 · possession Dec 2024 · 36.4% built
- ATLANTIS TOWER · AndheriWEST AVENUE REALTY · P51800032826 · possession Jul 2027 · 79.8% built
- 95WEST · BorivaliSTANS BUILDTECH REALTY · P51800032841 · possession Apr 2028 · 13.9% built
- Marina Enclave Wings Q and R with Kindergarten Phase - IV · Malvani Malad WestGURUKRUPA DEVELOPERS D N NAGR PROJECT · P51800032847 · possession Dec 2025 · 71.4% built
- MAPLE SHADES · AndheriSHANDOR HOMES LLP · P51800032858 · possession May 2025 · 100% built
- SATRA ONE · GOREGAON WESTBLEU NOIR INFRASTRUCTURE DEVELOPMENT PVT. LTD. · P51800032891 · possession Dec 2024 · 46.2% built · 1 complaint
- Ajit Mulund CHS · MulundYug Developers · P51800032940 · possession Jun 2024 · 64% built
- AJMERA MANHATTAN BUILDING 3A AND 3B · KurlaAJMERA REALTY AND INFRA INDIA LTD · P51800032948 · possession Jun 2027 · 59.7% built · 1 complaint
- INA APARTMENT CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliYASH REALTORS · P51800032952 · possession Dec 2026 · 2.3% built
- 72 Marina - Phase I - Tierra and Torres · KurlaD S Developers · P51800032960 · possession Apr 2027 · 47.3% built · 1 complaint
- Veena Smart Homes · BorivaliV.D. Infratech Private Limited · P51800032966 · possession Dec 2026 · 81.8% built · 1 complaint
- SEQUOIA · AndheriAUM PRIMA LLP · P51800032970 · possession Dec 2024 · 56.8% built
- Sidhivinayak Flora · KurlaSIDHIVINAYAK CONSTRUCTIONS · P51800033003 · possession Apr 2027 · 89.3% built · 1 complaint
- GOKUL PARADISE · BorivaliSHREE RADHE CONSTRUCTION · P51800033025 · possession Apr 2028 · 36.4% built
- VARDHMAN CASTLE PHASE I · SANTACRUZ WESTVENUS DEVELOPMENT CORPORATION · P51800033033 · possession Dec 2023 · 0.2% built
- GSA GRANDEUR A and B Wing · BorivaliG S A CONSTRUCTIONS · P51800033045 · possession Dec 2027 · 40.1% built
- CHANDRATEJ CHS LTD · BorivaliELESH RAVJIBHAI RATHOD · P51800033067 · possession Feb 2027 · 90.9% built
- SAGAR RESHAM CHSL · BANDRA WESTENORM NAGPAL REALTY LLP · P51800033072 · possession Jan 2024 · 100% built
- PARLASHRAY CHSL · VILE PARLE EASTSai Ganesh Properties and Holdings LLP · P51800033078 · possession Oct 2024 · 90.9% built
- Vishwas Niketan by viiaan · AndheriSOMANI BUILDTECH LLP · P51800033151 · possession Apr 2027 · 81.8% built
- Samarth Aura Phase -1 · KurlaShree Ashapura Combine · P51800033159 · possession Apr 2027 · 79.1% built
- Modispaces Valley View · BorivaliModispaces Real Estate Pvt Ltd · P51800033185 · possession Jun 2024 · 100% built
- Abhilash Phase II · ChemburSANJONA BUILDERS · P51800033199 · possession Mar 2027 · 81.8% built · 1 complaint
- N N TOWER · AndheriL NAGPAL BUILDERS LLP · P51800033235 · possession Oct 2023 · 100% built
- AURIS ILARIA TOWER B · BorivaliTRANSCON-SHETH CREATORS PRIVATE LIMITED · P51800033238 · possession Aug 2028 · 45.6% built · 4 complaints
- Kanchan Sheila CHS · Mulund WestYug Developers · P51800033242 · possession Jun 2024 · 64.6% built
- CHANDAN HIRA · GOREGAON WESTBALI SHELTERS LLP · P51800033253 · possession Sept 2024 · 90.9% built
- Sanghvi Parsssva Jivdaya · KurlaSanghvi Constructions · P51800033259 · possession Dec 2026 · 54.5% built
- BHAVESHA CO-OPERATIVE HOUSING SOCIETY LTD · ANDHERI (WEST)BEAUTIFUL PROPERTIES PRIVATE LIMITED · P51800033264 · possession Nov 2023 · 90.9% built
- RAUNAK CENTRUM - A · KurlaRaunak Jigna Associates · P51800033269 · possession Apr 2029 · 38.5% built · 8 complaints
- Kalpataru Summit · KurlaArimas Real Estate Private Limited · P51800033272 · possession Jun 2027 · 56.1% built
- SARVODAYA PRIDE · KurlaJYOTIRADITYA REALTORS AND DEVELOPERS LLP · P51800033300 · possession Apr 2027 · 65.9% built
- SAI SASTHA SAMRAT · SHIVAJI CHOWKMS SAI SASTHA ENTERPRISES · P51800033301 · possession Dec 2025 · 100% built
- Monte Verita West Tower · BorivaliB G Shirke Redevelopment and GAS P L · P51800033312 · possession Mar 2027 · 34.5% built · 5 complaints
- SEYCHELLES · AndheriSHUBHAM ENTERPRISES · P51800033314 · possession Dec 2023 · 87.5% built
- Mehta Premiere-Residential · MagathaneAsiatic Trading and Construction Company · P51800033388 · possession Dec 2025 · 99.5% built
- MAHESHWAR KRIPA CHSL · GHATKOPAR EASTMAHESHWAR KRIPA C0-OPERATIVE HOUSING SOCIETY LIMITED · P51800033398 · possession Mar 2026 · 81.8% built
- 55 Evana · AndheriParsh Realty · P51800033403 · possession Dec 2024 · 100% built
- North Star · GovandiNorth Property Developers LLP · P51800033438 · possession Apr 2027 · 43.3% built · 4 complaints
- RISHABRAJ PARK VISTAS · BORIVALI WESTH RISHABRAJ REALTY · P51800033442 · possession Dec 2025 · 59.1% built
- OM MOTI NAGAR CHSL · ROSHAN NAGAR, CHANDAVARKAR ROADRENOVATOR CONSTRUCTION · P51800033454 · possession Mar 2025 · 100% built
- Avanya Tower C · BorivaliAniline Properties Private Limited · P51800033462 · possession Apr 2027 · 85.9% built · 1 complaint
- Avenue 57 · AndheriV J DEVELOPER · P51800033470 · possession Apr 2033 · 73.5% built
- ACE AVENUE · MULUND WESTAce properties · P51800033494 · possession Jun 2024 · 90.9% built
- SWAMINARAYAN DHAM · AndheriARA BUILDERS PRIVATE LIMITED · P51800033497 · possession Dec 2026 · 80% built
- OM DHANLAXMI HEIGHTS · VIKHROLIV P REALTY · P51800033503 · possession Dec 2026 · 81.8% built · 2 complaints
- TRILOK PARK · KANDIVALI WESTRAJESH TRILOKCHAND CHOPRA · P51800033509 · possession Dec 2025 · 86.4% built
- CENTRAL PARK · KurlaV LAXMI NURSES DEVELOPERS LLP · P51800033540 · possession May 2026 · 115.2% built · 1 complaint
- CASA RAMIRO · AndheriPRESCOTT HOUSING LLP · P51800033552 · possession Mar 2024 · 90.9% built
- MAHINDRA ALCOVE WING A AND C · KurlaMahindra Lifespace Developers limited · P51800033573 · possession Oct 2026 · 13.2% built
- Vidya Nidhi · Goregaon WestLaxmi Aakar Realty · P51800033588 · possession Mar 2024 · 90.9% built
- PRATHAMESH SOLITAIRE · BorivaliMANGESH TUKARAM SAWANT · P51800033599 · possession Oct 2027 · 49.7% built
- JADE GARDENS TOWER A · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033601 · possession Oct 2025 · 61.4% built
- ATTHIS at L and T Realty Elixir Reserve · PowaiLarsen & Toubro Ltd. (Realty Division) · P51800033618 · possession Sept 2027 · 81.4% built · 1 complaint
- UK LUXECITY - E - F · BorivaliDamodar Suruchi Developers Pvt. Ltd · P51800033664 · possession Mar 2028 · 43.9% built
- Spring Meadows · BorivaliRenaissance Enterprises · P51800033680 · possession Apr 2027 · 90.9% built
- Monte Verita - East Tower · BorivaliM/s B G Shirke Redevelopment and GAS P L · P51800033728 · possession Mar 2027 · 21.8% built · 9 complaints
- Jyoti Skyline · AndheriJyoti Shelter · P51800033753 · possession Dec 2026 · 84.5% built · 1 complaint
- KRISHNA NIWAS · Goregaon EastK.PATELAND CO · P51800033756 · possession Dec 2025 · 90.9% built
- SHREE VRINDAVAN · BorivaliSRK VRINDAVAN · P51800033761 · possession Jun 2027 · 72.1% built
- Gagan 45 · KurlaGagangiri Developers · P51800033764 · possession Dec 2025 · 90.9% built
- RENDEZVOUS PREMISES CO-OP SOCIETY LTD · MumbaiJGB BUILDERS LLP (CA to Owner) · P51800033783 · possession Dec 2024 · 95.5% built
- Motivilla · Goregaon WestAAKAR SHIV INFRA VENTURE · P51800033793 · possession Mar 2024 · 90.9% built
- GADGIL NIWAS CO-OP. HOUSING SOCIETY LTD · AndheriGOLD COIN BUILDERS LLP · P51800033807 · possession Dec 2025 · 100% built
- BLUE LOTUS · AndheriRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800033826 · possession Dec 2025 · 100% built
- Anjani Tirth · Borivali (West)Geeta Space Realtors · P51800033828 · possession Dec 2024 · 90.9% built
- Atmosphere O2 Tower-G · KurlaAtmosphere Realty Pvt Ltd · P51800033845 · possession Apr 2029 · 63.4% built
- PALMERA · AndheriNVK Realty LLP · P51800033870 · possession Apr 2027 · 71.8% built
- RISHABRAJ PHOENIX · BorivaliRISHABRAJ ESTATE DEVELOPERS PVT LTD · P51800033878 · possession Feb 2027 · 85.9% built
- Nirvaana Emerald · KurlaNirvaana Lifespace LLP · P51800033884 · possession Dec 2026 · 38.2% built
- SHIKARA HEIGHTS Phase-I · MumbaiShikara Constructions Pvt. Ltd. · P51800033893 · possession Apr 2028 · 91.9% built · 1 complaint
- Sharon Rose CHSL · MALAD WESTM/s JDN REALTY LLP · P51800033903 · possession Dec 2025 · 84.1% built
- Leo Tower · AndheriDev Land & Housing Private Limited · P51800033905 · possession May 2026 · 100% built
- HERITAGE HOUSE · AndheriGreen Tree Lifescapes LLP · P51800033917 · possession Dec 2024 · 0.9% built
- THE VILE PARLE MEGHALAYA CHSL · VILE PARLE EASTDHRUV INFRASTRUCTURE · P51800033919 · possession Aug 2024 · 90.9% built
- SHRADDHA PRIVILEGE · KANNAMWAR NAGAR VIKHROLI EASTSHRADDHA LANDMARK PRIVATE LIMITED · P51800033921 · possession Dec 2025 · 82.7% built
- Supreme Evana · Bandra WestSupreme Mega Constructions LLP · P51800033931 · possession Jun 2024 · 90% built
- Jade Gardens Tower B · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033945 · possession Oct 2025 · 79.1% built
- Nirvana · BorivaliSiddhivinayak Developers Kurar · P51800033952 · possession Dec 2027 · 62.7% built
- JADE GARDENS TOWER C · Pant Nagar Ghatkopar EastJAIRAJHAPPYHOMES · P51800033954 · possession Oct 2025 · 81.8% built
- Kush Pride · BorivaliKush Housing LLP · P51800033962 · possession Dec 2026 · 77.4% built
- Goregaon Manorath CHS LTD · BorivaliK Anand Infra · P51800033980 · possession Dec 2027 · 47.7% built · 1 complaint
- Gagan 138 · KurlaGAGANGIRI CONSTRUCTION · P51800033983 · possession Dec 2025 · 100% built · 1 complaint
- Park View · Mulund WestPinak Enterprises · P51800033996 · possession Dec 2025 · 89.1% built · 1 complaint
- NISHIGANDHA CHS LTD · KurlaSHRADDHA LANDMARK BUILDERS AND DEVELOPERS · P51800034001 · possession Oct 2023 · 100% built
- North Star-2nd Phase · Upper ChemburNorth Property Developers LLP · P51800034011 · possession Sept 2027 · 27.3% built
- SHRADDHA PLEASANT · KurlaSHRADDHA HOUSING PROJECTS LLP · P51800034014 · possession Jun 2027 · 72.7% built
- ROMELL SERENE · BorivaliROMELL REAL ESTATE PRIVATE LIMITED · P51800034025 · possession Mar 2025 · 81.8% built
- SUPREME HAPPY HOME · Kandivali WestShelby Realty LLP · P51800034043 · possession Mar 2025 · 90.9% built
- KHAR LAXMI NIVAS · KHAR WESTKHAR LAXMI NIWAS DEVELOPERS LLP · P51800034050 · possession Dec 2024 · 100% built
- REDEVELOPMENT OF PLOT NO. 212 · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800034087 · possession Feb 2025 · 90.9% built
- REDEVELOPMENT OF RUSHABH MAHAL CHSL · MALAD EASTPRANAV CONSTRUCTIONS LIMITED · P51800034099 · possession Jun 2025 · 90.9% built
- Neelyog Aashiyana II · KANDIVALI WESTNeelyog Construction Pvt Ltd · P51800034106 · possession Jun 2026 · 90.9% built
- OM MADHUSADAN CHS LTD · CHITRKAR KETKAR MARG VILE PARLE EAST MUMBAIREGENT BUILDERS · P51800034194 · possession Mar 2025 · 93.6% built
- MATRUCHHAYA · BORIVALI EASTM/s. Rishabraj Balaji Infra · P51800034195 · possession Dec 2024 · 0% built · 1 complaint
- Pratap Vista · AndheriParnakutir Real Estate Pvt Ltd · P51800034213 · possession Jun 2028 · 27.3% built · 1 complaint
- Laxmi Sanskruti · Jawahar Nagar, Goregaon WestLAXMIDEVI DEVELOPERS · P51800034219 · possession Feb 2024 · 52.7% built
- Avyukta Breeze · I C ColonyShivoham Associates · P51800034240 · possession Sept 2025 · 72.7% built
- Shivsagar · BorivaliGurukrupa Developers · P51800034270 · possession Jul 2027 · 90.6% built
- TIARA by Swastik Empire · PANTNAGARM/s SWASTIK EMPIRE DEVELOPERS LLP · P51800034308 · possession Dec 2025 · 90.4% built
- ACE AMBIENCE · MULUND WESTAce properties · P51800034328 · possession Dec 2025 · 70.9% built
- SKYLON SUBURBIA · BorivaliSAI KRUPA DEVELOPERS · P51800034335 · possession Dec 2026 · 93% built · 1 complaint
- WESTWOOD · BorivaliP51800034338 · possession Apr 2028 · 60.5% built · 7 complaints
- Agami Eternity · MumbaiAgami Spaces Private Limited · P51800034339 · possession Jul 2027 · 81.8% built
- NASREEN AND HALLS VIEW APARTMENT · KurlaNASREEN AND HALLS VIEW APARTMENT · P51800034358 · possession May 2027 · 77.7% built
- ANNAVISTA · BANDRA WESTTRISONS BUILDERS · P51800034372 · possession Dec 2024 · 74.1% built
- MODIREALTY KALPVRIKSH · ANDHERI WESTMODIREALTY DEVELOPERS PVT LTD · P51800034375 · possession Mar 2025 · 90.9% built
- AURIS BUSINESS CENTRE · SHIMPOLI, BORIVALI WESTDev Pooja Builders Pvt Ltd · P51800034380 · possession Dec 2025 · 63.2% built
- MAGATHANE PRESS ENCLAVE CHSL · BorivaliDHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED · P51800034383 · possession Jul 2027 · 45.5% built
- DEM Cygnus · Kandivali - westDEM ESTATES LLP · P51800034396 · possession Mar 2025 · 90% built
- PRIME GROUP PROJECT GRAND SLAM · DahisarPRIME GROUP · P51800034404 · possession Dec 2023 · 90.9% built
- Navlabh · BorivaliP51800034406 · possession Jun 2027 · 71.8% built
- Aryana Heights · Ghatkopar - EastM/s M Raveshia Realty LLP · P51800034432 · possession Mar 2027 · 78.2% built
- Inayah Residency · BorivaliEmerald Developers · P51800034439 · possession Dec 2028 · 53.3% built
- BORIVALI VEER DHAVAL · BorivaliSHREE DURGA VASTU MAKERS LLP · P51800034441 · possession Jul 2027 · 90.9% built
- AJMERA MANOR · BORIVALI (WEST)AJMERA MANOR PRIVATE LIMITED · P51800034442 · possession Dec 2025
- Sai Laxmi Residency · KurlaOM SAI SSS DEVELOPERS THANE · P51800034454 · possession Apr 2027 · 42.6% built
- MOHAMMEDIMANZIL · AndheriJEM DEVELOPERS AND BUILDERS · P51800034489 · possession Dec 2025 · 55.5% built
- ACE FLORENCE · MULUND WESTAce properties · P51800034518 · possession Aug 2024 · 90.9% built
- Kalpataru Vivant - South Wing B · AndheriAlder Residency Private Limited · P51800034531 · possession Mar 2028 · 91.5% built · 1 complaint
- RAJENDRA NAGAR SWAGAT CHSL · BORIVALI EASTRIDDHI CONSTRUCTIONS · P51800034540 · possession Apr 2027 · 81.5% built
- Hetali Vishnu Bhavan · Akurli, Kandivali EastJayesh Pandya · P51800034561 · possession Dec 2025 · 63% built
- Redevelopment of Gurudeo Geetanjali CHS Ltd. · ChemburHeritage Lifestyles LLP · P51800034564 · possession Dec 2025 · 90.9% built
- AARADHYA EVOQ · AndheriMAN INFRA CONTRACTS LLP · P51800034587 · possession Jun 2026 · 90.9% built
- EPITOME · GARODIA NAGARTHOROUGHBRED REALTY LLP · P51800034589 · possession Dec 2025 · 99.5% built
- CODENAME RARE BY RUNWAL · AndheriRunwal Developers Ltd · P51800034594 · possession Jun 2026 · 90.9% built
- JANGID ELYSIUM · BorivaliIMPRINT CONSTRUCTION PRIVATE LIMITED · P51800034600 · possession Dec 2026 · 55% built
- Neel Kamal · BorivaliRajnikant Sanchala · P51800034626 · possession Dec 2028 · 38.6% built · 3 complaints
- DESTINY ONE · KurlaPADMAMALA DEVELOPERS · P51800034629 · possession Dec 2027 · 39.5% built
- THE ORCHID · KurlaRUDANI REALTY · P51800034630 · possession Jul 2027 · 55.5% built
- RAJENDRA NAGAR RAJ KIRAN CO.OP. HSG. SOC. LTD · BorivaliH M REALTY · P51800034669 · possession Apr 2027 · 87% built
- ORION HEIGHTS · BorivaliCHARKOP ORION CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800034677 · possession Jul 2027 · 82.2% built
- Acharat Baug · AndheriAnkur Premises Developers LLP · P51800034682 · possession Jul 2024 · 39.1% built
- TEJKIRAN · VILE PARLE EASTTEJ KIRAN CO OP HSG SOC LTD · P51800034725 · possession Apr 2024 · 100% built
- VASUNDHARA PARADISE · MumbaiVASUNDHARA DEVELOCUS LLP · P51800034739 · possession Dec 2026 · 100% built
- AXIOM CAPITOL · KurlaAXIOM REFAB CONSTRUCTION (INDIA) PVT LTD · P51800034787 · possession Dec 2025 · 34.1% built
- RISHABRAJ VILLA STELLA · BorivaliH RISHABRAJ REALTY · P51800034790 · possession Dec 2024 · 72.7% built
- Samarpan · Ghatkopar EastHS Construction · P51800034794 · possession Oct 2026 · 172.7% built · 2 complaints
- Elegance Heights · BorivaliSGF Enterprises · P51800034810 · possession Apr 2030 · 27.3% built · 2 complaints
- OPULENT · VIKHROLIREKI DEVELOPERS LLP · P51800034812 · possession Dec 2026 · 90.9% built
- Vindhyagiri · Pahadi Eksar and Pahadi Goregaon EastGio Properties · P51800034813 · possession Dec 2025 · 71.9% built
- REDEVELOPMENT OF TIARA CHSL · MALAD WESTPRANAV CONSTRUCTIONS LIMITED · P51800034818 · possession Oct 2024 · 90.9% built
- MAYFAIR GNYANADEEP · AndheriMAYFAIR HOUSING PRIVATE LIMITED · P51800034829 · possession Jun 2025 · 89.5% built
- Center Plaza Phase 1 · BorivaliB V ENTERPRISES · P51800034832 · possession Apr 2028 · 81.8% built
- Paradigm Anantaara · BorivaliShubhyuvi Infrastructure LLP · P51800034854 · possession Apr 2031 · 0% built · 1 complaint
- SAMPOORNA · KurlaNARAYANPRASAD MAHADEVAN · P51800034856 · possession Aug 2027 · 90.9% built
- Supreme Elysia · AndheriSupreme Mega Constructions LLP · P51800034860 · possession May 2025 · 95.5% built
- GIRIVAR AVENUE · BorivaliMEHTA SPACES · P51800034875 · possession Apr 2027 · 64.7% built
- MODIREALTY WISTERIA · KANDIVALI WESTMODIREALTY DEVELOPERS PVT LTD · P51800034890 · possession Mar 2026 · 100% built
- REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800034915 · possession Sept 2025 · 90.9% built
- SHILA BINA CHS LTD · BorivaliMS INFRASTRUCTURE · P51800034920 · possession Dec 2025 · 100% built
- Rite Amor · MumbaiRite Pragati Developers · P51800034921 · possession Dec 2026 · 80.9% built
- Transcon Triumph Tower 4 · AndheriTranscon Triumph Phase 2 Private Limited · P51800034924 · possession Jul 2027 · 53.2% built
- REDEVELOPMENT OF GOLD COIN CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800034931 · possession Sept 2025 · 90.9% built · 1 complaint
- CHARKOP JEEVAN MANGAL C.H.S. LTD · BorivaliSANDHYA KSHITIJ BUILDERS PRIVATE LIMITED · P51800034943 · possession Jun 2026 · 90.9% built
- DHANRAJ · BORIVALI (W)ANEISHA LIVINGS LLP · P51800034955 · possession Feb 2025 · 90.9% built
- Unicorn Heights · BorivaliTEOAMA INFRASTRUCTURE PRIVATE LIMITED · P51800034960 · possession Jun 2028 · 54.5% built · 1 complaint
- RISHABRAJ VATSAL · KANDIVALI WESTH RISHABRAJ REALTY · P51800034973 · possession Dec 2026 · 90.9% built
- RATAN HERITAGE · AndheriNEXUS BUILDERS & DEVELOPERS · P51800034975 · possession Jul 2027 · 78.6% built
- CHARKOP KSHITIJ CHS LTD · BorivaliCHARKOP KSHITIJ CHSL · P51800034991 · possession Apr 2027 · 79.4% built
- AUDUMBAR APARTMENTS CHS LTD · MALAD WEST MUMBAIMASAKIN DEVELOPERS · P51800034993 · possession Dec 2024 · 90.9% built
- ZENON · BorivaliENTITY DEVELOPERS PRIVATE LIMITED · P51800035006 · possession Dec 2026 · 53.8% built · 1 complaint
- CENTRIO NX BY MJ SHAH · KurlaLAKADAWALA DEVELOPERS PRIVATE LIMITED · P51800035010 · possession Feb 2027 · 70.6% built · 1 complaint
- VIVAN · BorivaliGOREGAON ELECTRICAL INDUSTRIES LLP · P51800035019 · possession Apr 2029 · 52.9% built
- Omkaar Solitaire · KurlaShiddhivinayak Developers · P51800035022 · possession Dec 2026 · 55.6% built · 1 complaint
- Mahirr · Borivali WestShree Balaji Enterprise · P51800035053 · possession Dec 2026 · 100% built
- 104 EAST · BorivaliQUBA INFRA LLP · P51800035079 · possession Jun 2027 · 62.7% built
- GREENAIRY · BorivaliSAROJ LANDMARK REALTY LLP · P51800035093 · possession Oct 2028 · 86% built · 12 complaints
- STAR CHS LTD · POWAIHEALTH COLONIES & CONSTRUCTION PVT.LTD. · P51800035098 · possession Dec 2024 · 23.6% built
- RISHABRAJ GARDENIA · AndheriH RISHABRAJ REALTY · P51800035106 · possession Dec 2024 · 89.1% built
- Avyukta Neelkamal · BorivaliShivoham Associates · P51800035115 · possession Jan 2027 · 100% built · 2 complaints
- KEDAR DARSHAN · BorivaliKOSMOS DEVELOPERS · P51800035123 · possession Apr 2027 · 6.4% built
- SATYAM SOLARIS · KurlaBM INFRA · P51800035156 · possession Dec 2024 · 100% built
- KAVERI HERITAGE · BorivaliKAVERI SHINE BUILDERS AND DEVELOPERS LLP · P51800035190 · possession Mar 2027 · 99.1% built
- Building No 2 Pearl Regency Phase 2 · AndheriPrime Infrabuildcon Pvt. Ltd. · P51800045214 · possession Apr 2028 · 90.9% built
- BHOOMI ANTARA · KurlaBHOOMI LIFESTYLE · P51800045215 · possession Feb 2027 · 89.4% built
- Swastik Platinum · KurlaSUVASYA BUILDERS AND DEVELOPERS LLP · P51800045216 · possession Apr 2027 · 90.9% built
- AMEY APARTMENTS · ANDHERI EASTAMEY REALTY AND CONSTRUCTION LLP · P51800045221 · possession Oct 2026 · 73.6% built
- SIDDHARTH NAGAR SHIVAM CHS LTD · GOREGOAN WESTVIRENDRA HIRALAL DOSHI · P51800045242 · possession Mar 2025 · 100% built
- Borivali New Roma Sadan CHSL · BorivaliSUMUKH INFRAPROJECT · P51800045284 · possession Mar 2027 · 37.5% built
- VISTA · MULUND EASTSARVSHUBH ENTERPRISES · P51800045286 · possession Dec 2025 · 44.6% built
- Rajal Godavari · Kurla WestNisar Properties Private Limited · P51800045303 · possession Sept 2026 · 81.8% built
- ALAG ANANTA · KurlaAlag Square LLP · P51800045309 · possession Jun 2026 · 90.9% built
- AVYUKTA GOCUL · AndheriSHIVOHAM INFRAHOMES LLP · P51800045317 · possession Dec 2024 · 100% built
- IPSIT ANAND MANGAL · BorivaliNAVKAR DEVELOPERS · P51800045322 · possession Apr 2028 · 85.8% built · 1 complaint
- THE JAMBLI GALLI CHS LTD · BORIVALI WESTMAHAVIR CORPORATIONS · P51800045335 · possession Mar 2024 · 81.8% built
- Bellanza Phase 1 - Wing A, B, C at The Prestige City · KurlaPRESTIGE MULUND REALTY PRIVATE LIMITED · P51800045339 · possession Apr 2027 · 3.8% built · 3 complaints
- ARKADE CROWN · BorivaliArkade Developers Private Limited · P51800045342 · possession Dec 2025 · 71.1% built
- Saideep Apartment · AndheriDARSHAN INFRA · P51800045356 · possession Mar 2025 · 90.9% built
- Kalpataru Vivant - South Wing A · AndheriAlder Residency Private Limited · P51800045360 · possession Mar 2028 · 99% built · 1 complaint
- MAYA MAMTA · Borivali WESTGREENBUILDING LIFESCAPES LLP · P51800045381 · possession Oct 2025 · 0% built
- JULIUS WADI CO- OPERATIVE HOUSING SOCIETY · BorivaliSAINATH DEVELOPERS · P51800045395 · possession Apr 2027 · 87.3% built
- RAGHAV MARVEL · NehrunagarRAGHAV RAJ BUILDERS & DEVELOPERS LLP · P51800045396 · possession Aug 2025 · 88.6% built · 4 complaints
- Royale · Vile Parle EastMANGAL BUILDHOME PRIVATE LIMITED · P51800045406 · possession May 2025 · 100% built
- Kalpataru Vivant - North Wing B · AndheriAlder Residency Private Limited · P51800045409 · possession Mar 2028 · 83% built · 1 complaint
- Om Siddhivinayak CHS Ltd · KurlaShree Shiv Samarth Reality · P51800045417 · possession Dec 2028 · 37.9% built
- VIJAYI JWALA · BorivaliChirag Infraprojects Private Limited · P51800045419 · possession Mar 2027 · 100% built
- SHRADDHA ELITE · BORIVALI WESTSHRADDHA DEVELOPERS & REALTORS · P51800045452 · possession Dec 2025 · 90.5% built
- SPLENDOUR · MULUND WESTSUNNY DEVELOPERS & BUILDERS LLP · P51800045467 · possession Dec 2025 · 63.6% built
- NINE ACES CHS LTD · AndheriJMJ MAXRICH BUILDCON · P51800045486 · possession Dec 2023 · 100% built
- ABUNDANCE · KurlaGoodwill Developers · P51800045501 · possession Sept 2026 · 58.5% built · 1 complaint
- Galaxy Heights Tower 1 · BorivaliMaharashtra Police Cooperative Housing Federation Limited · P51800045503 · possession Apr 2027 · 90.9% built
- Jagdale Giriraj · KurlaJAGDALE INFRASTRUCTURE PVT. LTD. · P51800045510 · possession Jan 2027 · 85% built
- SHREE KRISHNA WING A and B · KurlaShreem Properties · P51800045520 · possession Jul 2027 · 79.1% built
- BORIVALI SHALIMAR CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliTASMAI SHREE · P51800045551 · possession Dec 2024 · 90.9% built
- Shilpadatta by Sandu Developers · KurlaSandu Developers Pvt. Ltd. · P51800045569 · possession Apr 2027 · 61.8% built · 1 complaint
- Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd. · ChemburSMERA HOMES LLP · P51800045578 · possession Jun 2025 · 81.8% built
- Jade Residences · KurlaJSR REALTY · P51800045592 · possession Apr 2027 · 35.9% built
- CHOICE AMBE DARSHAN · PANT NAGAR GHATKOPAR (E) MUMBAICHOICE DEVELOPER · P51800045613 · possession Dec 2025 · 90.9% built
- 9 DIVINE · AndheriSACH GORWANI REAL PROJECTS PRIVATE LIMITED · P51800045616 · possession Mar 2027 · 43.6% built
- BHANDUP SANMITRA CHS LTD · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800045620 · possession Jun 2024 · 100% built
- NEERA ENCLAVE · Mulund westSHRADDHA DIVINE REALTORS LLP · P51800045641 · possession Mar 2026 · 100% built
- CHARKOP GITANJALI CO OP HOUSING SOCIETY LIMITED · CHARKOP KANDIVALI WESTCHARKOP GITANJALI CO-OP HOUSING SOCIETY LIMITED · P51800045647 · possession Apr 2027 · 90.9% built
- Shreyaan Residency · KANDIVALI WESTVIDISHA REAL ESTATE DEVELOPERS PVT LTD · P51800045662 · possession Sept 2027 · 100% built
- KHANDELWAL LUXOR WING B · BorivaliSHREE KRISHNA SAI DEVELOPMENT CORPORATION · P51800045675 · possession Dec 2027 · 74.1% built
- SATYAM · AndheriPODDAR INFRACON PRIVATE LIMITED · P51800045715 · possession Dec 2026 · 79.4% built · 1 complaint
- Crescent Heights · Borivali WestHarshmaan Spaces LLP · P51800045723 · possession Apr 2027 · 90.9% built
- PARANJAPE ASPIRE · AndheriPSC REALTORS PRIVATE LIMITED · P51800045731 · possession Jul 2027 · 42.5% built · 1 complaint
- AVIGHNA CHS LTD · CHEMBUR EASTMAJESTIC ROYALE DEVELOPERS · P51800045749 · possession Oct 2024 · 100% built
- SADGURU AVENUE · BorivaliSADGURU KRUPA DEVELOPERS · P51800045763 · possession Apr 2027 · 78.5% built · 1 complaint
- THE SKYCITY · AndheriRappture Projects Private Limited · P51800045767 · possession Apr 2029 · 20.7% built
- Avani Signature · KurlaAvani Buildcon · P51800045772 · possession Apr 2027 · 69.1% built
- KHANDELWAL RESERVE WING B · BorivaliSHREE KRISHNA SAI DEVELOPMENT CORPORATION · P51800045778 · possession Dec 2027 · 79.6% built · 2 complaints
- Kakkad · MumbaiSILVER LAND DEVELOPERS PRIVATE LIMITED · P51800045780 · possession Apr 2027 · 53.6% built
- Purna Rajeshwari · KurlaDHARMI ENTERPRISES · P51800045796 · possession Apr 2028 · 88.2% built
- West Winds · GHATKOPAR EASTGhatkopar Neelkanth Kunj CHSL · P51800045813 · possession Mar 2026 · 75% built
- PALAZZO 90 · GHATKOPAR EASTBLUE CREST DEVELOPERS LLP · P51800045815 · possession Jun 2025 · 100% built
- PRIMESTONE · KurlaKHERECTORS LLP · P51800045817 · possession Jun 2025 · 100% built
- TREVI · BorivaliASHIRWAD NICE DEVELOPERS · P51800045818 · possession Dec 2026 · 90.9% built
- SHIV PARBAT · BorivaliV3 PARTNERS · P51800045822 · possession Jul 2027 · 74.1% built
- SHUBHAM AVALON CO-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR EASTAVVAD HOUSING LLP · P51800045851 · possession Dec 2024 · 90.9% built
- PARMAR PEARL - JAY KOTESHWAR NAGAR CHS LTD · BorivaliParmar Constructions Private Limited · P51800045853 · possession Nov 2026 · 81.5% built
- Swastik Avighna · KurlaSwastik Realtors · P51800045871 · possession Apr 2027 · 44% built
- Malad Sati Darshan CHS Ltd. · BorivaliGoyal Sati Darshan LLP · P51800045878 · possession Jan 2027 · 90.9% built
- Crest Link · Khar WestCREST VENTURES LIMITED · P51800045883 · possession Feb 2026 · 100% built · 1 complaint
- PRIME SQUARE · BorivaliPRIME REALTORS · P51800045886 · possession Feb 2027 · 100% built
- Amber Vihar · J B NagarSHAH & SHAH CONSTRUCTION CORPORATION · P51800045887 · possession Mar 2025 · 100% built
- DOSHI TARACHAND VALAMJI VANIK NIWAS · ChemburSHREE CUTCHI DASHA SHRIMALI VANIK GNYATI · P51800045888 · possession Dec 2024 · 90.9% built
- JOSEPH VILLA · GOREGAON EASTK.PATELAND CO · P51800045891 · possession Dec 2024 · 72.7% built
- Lodha Kandivali Project-Tower 1 · BorivaliLodha Developers Limited · P51800045908 · possession Feb 2028 · 46.4% built · 1 complaint
- Unique Pride · Vikhroli East MumbaiFazal Shaikh · P51800045922 · possession Jun 2027 · 90.9% built
- Kailas Ashish · Ghatkopar EastDNK Developers KA LLP · P51800045948 · possession Aug 2025 · 90.9% built
- ZEE ASHTAVINAYAK · ANDHERI WESTZEE LAND DEVELOPMENT SERVICES · P51800045964 · possession Mar 2026 · 90.9% built · 2 complaints
- New Abhiram CHS LTD · Kastur ParkPeerless Constructions Pvt. Ltd. · P51800045965 · possession Sept 2025 · 73.2% built
- Crest Parkview · Bandra WestCREST VENTURES LIMITED · P51800045968 · possession Oct 2025 · 80.9% built
- VISHWASANGAM · MumbaiVishwashakti Cooperative Housing Society Limited · P51800045980 · possession Dec 2026 · 46.4% built
- Nirvaana Solitaire · KurlaNirvaana Lifespace LLP · P51800045989 · possession Apr 2027 · 37.8% built
- Integrated Ramicon · BorivaliIntegrated Affordable Home Private Limited · P51800045996 · possession Apr 2027 · 79.9% built
- VISHAKHA HEIGHTS AND VISHAKHA REGENCY · KurlaM/s Keytech · P51800046013 · possession Oct 2026 · 62.7% built
- Paras Residency · Goregaon WAureum Spaces LLP · P51800046023 · possession Nov 2026 · 90.9% built
- MADHUBAN HEGHTS · KANDIVALI WESTHIRAL REAL ESTATE DEVELOPERS LLP · P51800046035 · possession May 2025 · 90.9% built
- JADE CHSL · BorivaliSHREE MAHAVIR CONSTRUCTIONS · P51800046042 · possession Apr 2030 · 58.6% built
- SUN SUMIT JEEVAN MANGAL · BorivaliSUN SUMIT VENTURE · P51800046062 · possession Jun 2026 · 81.8% built
- Pruthvi Pushpanjali · AndheriFlying Earth LLP · P51800046070 · possession Jun 2026 · 82.4% built
- GARDEN VIEW · BORIVALI WESTSMLIFE SHREEJI DEVELOPERS LLP · P51800046071 · possession May 2025 · 90.9% built
- Sai Signature Spaces · BorivaliRAMACHANDRAN MUNISAWMY NARAYAN · P51800046083 · possession Jan 2027 · 29.1% built
- SHIVRAJ HEIGHTS WING C · BorivaliSHIVRAJ HEIGHTS WING C · P51800046085 · possession Mar 2027 · 90.9% built
- DLH SIGNATURE · AndheriFlowline Developers Pvt Ltd · P51800046093 · possession Apr 2027 · 77.7% built
- Lodha Woods- Tower 8 · BorivaliLodha Developers Limited · P51800046114 · possession Mar 2029 · 42.7% built · 1 complaint
- Lodha Woods - Tower 7 · BorivaliLodha Developers Limited · P51800046118 · possession Nov 2027 · 81.8% built · 1 complaint
- SHRADDHA PEARL · VILLAGE HARIYALISHRADDHA LANDMARK PRIVATE LIMITED · P51800046124 · possession Dec 2025 · 76.2% built
- Park Altezza · AndheriSHREE MAHAVIR ESTATES TUSHAR BIINDU · P51800046141 · possession Dec 2029 · 75.5% built
- EKTA CREST · CHEMBUREKTA HOUSING PRIVATE LIMITED · P51800046149 · possession Dec 2025 · 93.9% built
- SANSKAR · AndheriSANSKAR DWELLINGS LLP · P51800046200 · possession Dec 2025 · 83.2% built
- SHYAM KUNJ · AndheriBASONS CONSTRUCTIONS · P51800046209 · possession Jul 2024 · 90.9% built
- School View Shreyas CHS Ltd · MUMBAIMAJESTIC ROYALE DEVELOPERS · P51800046219 · possession Sept 2024 · 54.5% built
- SHREE GOVIND KRUPA · BorivaliMAMTORA FOUNDATION · P51800046222 · possession Jun 2026 · 81.8% built
- Shraddha Prominent · KurlaShraddha Landmark Private Limited · P51800046232 · possession Apr 2027 · 71.5% built
- KHANOLKAR BHAVAN CHSL - PARADISE · GOREGAON EASTC H PATIL AND SONS LLP · P51800046246 · possession Dec 2025 · 9.1% built
- Sun Sumit Deepshal · BorivaliSUN SUMIT VENTURE · P51800046252 · possession Apr 2027 · 25.2% built
- ASMI BUSINESS CENTRE · BorivaliASMI CORPORATION · P51800046269 · possession Dec 2028 · 29.9% built
- SUSHANKU AVENUE 36 · SIDDHARTH NAGARSUSHANKU REALTY PRIVATE LIMITED · P51800046272 · possession Nov 2026 · 90.9% built
- Shraddha Panache · Village HariyaliShraddha Landmark Private Limited · P51800046277 · possession Dec 2025 · 81.8% built
- SAUJANYA RACHANAA · ANDHERITERRAFERMA DEVELOPERS LLP · P51800046295 · possession Dec 2025 · 91.8% built
- Lodha Woods - Tower 6 · BorivaliLodha Developers Limited · P51800046327 · possession Nov 2027 · 53.6% built · 1 complaint
- REDEVELOPMENT OF NAV VIKAS CHSL · VILE PARLE EASTSwara Constructions · P51800046341 · possession May 2025 · 57.3% built
- PRIME AURA · BorivaliPRIME GROUP · P51800046359 · possession Oct 2026 · 90.9% built
- Subhash Nagar Building No 15 Mrug Vihar Phase 1 · chemburG A Builders Pvt Ltd. · P51800046368 · possession Dec 2027 · 82.2% built · 2 complaints
- Elenora · AndheriPARINEE VIR BHUVAN REDEVELOPMENT PRIVATE LIMITED · P51800046382 · possession Jan 2027 · 23.6% built
- MASS ZAINAB HEIGHTS · AndheriMASS ZIA DEVELOPMENT CORPORATION · P51800046413 · possession Apr 2027 · 79.8% built · 1 complaint
- AMAIRA RESIDENCY · AndheriAMAIRA RESIDENCY · P51800046422 · possession Jun 2026 · 29.1% built
- SIDDHANATH CO-OPERATIVE HOUSING SOCIETY LIMITED · KurlaSIDDHANATH CO-OP HSG SOC · P51800046426 · possession Apr 2029 · 49.1% built
- PRIME LEGACY · DahisarPRIME GROUP · P51800046428 · possession Dec 2025 · 81.8% built
- LANDMARK · MumbaiJALARAM ICON LLP · P51800046476 · possession Jun 2027 · 100% built
- Ashok Aura - RJ Commercial · AndheriSANYAM REALTORS PRIVATE LIMITED · P51800046477 · possession Apr 2028 · 70.9% built
- Bellanza Phase 2 - Wing D, E, F at The Prestige City · KurlaPRESTIGE MULUND REALTY PRIVATE LIMITED · P51800046488 · possession Oct 2027 · 5.5% built · 1 complaint
- SEJAL KAJAL APARTMENT CHS LTD · BorivaliNeminath Realtors · P51800046493 · possession Nov 2026 · 37.6% built · 1 complaint
- SETHIA PRIDE A WING · BorivaliSethia Infrastructure Pvt. Ltd, · P51800046531 · possession Apr 2027 · 54.8% built
- ODC 1 · Goregaon WestNVN Buildcon LLP · P51800046544 · possession Jul 2026 · 81.8% built
- Tsaaya · BorivaliSambhavparshva Developers Pvt. Ltd. · P51800046545 · possession Apr 2029 · 80% built
- KENORITA JEWELS PHASE II · GOREGAON WEST PAHADIK R SHOPPERS PRIVATE LIMITED · P51800046547 · possession Apr 2028 · 58% built
- ZEE MANU BHARATI · AndheriZEE RPM PROPERTIES LLP · P51800046578 · possession Mar 2027 · 81.8% built
- POONAM CELESTE · KurlaPL7 Realty Pvt. Ltd. · P51800046581 · possession Aug 2027 · 71.3% built
- Redevelopment of Parle Satam CHS Ltd · vile parle eastR R CONSTRUCTIONS · P51800046583 · possession May 2025 · 71.4% built
- Ruparel Panache · AndheriRuparel Infra & Realty Pvt Ltd · P51800046597 · possession Dec 2026 · 80.9% built
- ATMIYA CENTRIA · AndheriUPTURN PROPERTIES LLP · P51800046598 · possession Apr 2027 · 45.5% built
- CITI CHALET · AndheriBASONS CONSTRUCTIONS · P51800046606 · possession Jan 2024 · 90.9% built
- SHEPHERD HORIZON · AndheriGOODBUILD INDIA PRIVATE LIMITED · P51800046622 · possession Nov 2027 · 77.8% built
- Seabliss · AndheriAsshna Developers Westin · P51800046626 · possession Apr 2027 · 90.4% built · 1 complaint
- VANRAI · BorivaliKaustubh Construction Private Limited · P51800046638 · possession Nov 2026 · 100% built
- PUNITA · KANDIVALI WESTLAKSHACHANDI COLUMBIA CORPORATION · P51800046652 · possession Jun 2025 · 100% built
- THE LISA · AndheriSHETHWALA INFRA · P51800046662 · possession May 2025 · 90.9% built
- BIMAL APARTMENT CHSL · MULUND EASTRITE BUILDERS & DEVELOPERS · P51800046666 · possession Apr 2027 · 75.5% built
- REDEVELOPMENT OF KESAR NIKETAN CHSL · BORIVALI EASTPRANAV CONSTRUCTIONS LIMITED · P51800046669 · possession Jan 2026 · 91.8% built
- Dreamsville · BorivaliParadiso Builders Private Limited · P51800046670 · possession May 2024 · 81.8% built
- Notan Casa · BANDRA WESTLIFESPACE HOMES REALTORS LLP · P51800046698 · possession Mar 2026 · 100% built
- Laxmi Kunj · AndheriGeeCee Ventures Limited · P51800046721 · possession Dec 2024 · 88.2% built
- Shelton Elite · AndheriMarriott Realtors Private Limited · P51800046724 · possession Apr 2027 · 71.3% built
- Promesa Midtown · KurlaDarshan Properties · P51800046735 · possession Dec 2026 · 72.7% built
- SURYADARSHAN CHS LTD · BorivaliH&D PROJECTS · P51800046756 · possession Apr 2024 · 70.5% built
- PRIMROSE · BorivaliKaustubh Construction Private Limited · P51800046761 · possession Jul 2026 · 90.7% built
- GATEWAY COMMERCIAL · AndheriLUCRATIVE TRADING LLP · P51800046765 · possession Sept 2027 · 72.3% built
- GATEWAY RESIDENTIAL · AndheriLUCRATIVE TRADING LLP · P51800046773 · possession Jan 2028 · 90.9% built
- SWASTIK DIVINE · KurlaSwastik Realtors · P51800046801 · possession Apr 2027 · 90.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH H PHASE VII · GHATKOPAR EASTMAN REALTORS AND HOLDING PRIVATE LIMITED · P51800046812 · possession Jun 2025 · 63.6% built
- OM RAJA · BHANDUP WESTSAINATH CORPORATION · P51800046827 · possession Sept 2025 · 181.8% built
- Rajshree Aashiyana · Ghatkopar EastGanesh Chhaya Construction LLP · P51800046829 · possession Jun 2025 · 81.8% built
- RAMDEV VEERAL HEIGHTS · BorivaliRAMDEV ASSOCIATES · P51800046833 · possession Dec 2026 · 90.4% built
- Puneet Brahmand · KurlaPUNEET EDIFICE PVT LTD · P51800046881 · possession Apr 2027 · 40% built
- TILLIBAI APARTMENT CO-OP. HSG. SOC. LTD. · BorivaliTILLIBAI CHS. LTD. · P51800046882 · possession Apr 2027 · 41.8% built
- MEGHA EDGE- RED ROSE · BorivaliMEGHA LAKSHMI ENTERPRISE · P51800046888 · possession Oct 2026 · 90.9% built
- SANA ENCLAVE · AndheriSANA ENTERPISES · P51800046890 · possession Sept 2027 · 42.3% built
- INSPIRE RESIDENCY · AndheriSARDAR REALTY · P51800046897 · possession Dec 2026 · 85.5% built
- Puneet Amarjyoti · KurlaPUNEET EDIFICE PVT LTD · P51800046906 · possession Dec 2026 · 46.7% built
- PAREKH RADIANCE · KANDIVALI WESTPAREKH BUILDPROJECTS PRIVATE LIMITED · P51800046909 · possession Mar 2026 · 81.8% built
- Om Ambe Smruti · KurlaOscar Infrastructure Private Limited · P51800046923 · possession Apr 2027 · 99.5% built
- AYESHA HEIGHTS · BorivaliUMAIR CONSTRUCTION · P51800046945 · possession Dec 2027 · 41.8% built
- METRO CROWN COMMERCIAL · KurlaMETRO ENTERPRISES · P51800046960 · possession Apr 2028 · 72.7% built
- RIDHI SIDHI · AndheriKESAR INFRA LLP · P51800046974 · possession Apr 2027 · 79.1% built · 1 complaint
- Chheda Bhuvan · Daulat NagarHaresh Popatlal Chheda · P51800046989 · possession Dec 2026 · 100% built
- BALI DIVINE · GOREGAON WEST MUMBAIBALI ESTATES LLP · P51800047014 · possession Jul 2025 · 81.8% built
- WORLIWALA CHSL · VILE PARLE (EAST)SHAMIK & SANGHVI DEVELOPERS LLP · P51800047017 · possession Dec 2025 · 90.9% built
- METRO CROWN · KurlaMETRO ENTERPRISES · P51800047023 · possession Apr 2028 · 36.8% built
- PRABHAT KUNJ · MumbaiLAKSHMICONSTRUCTION · P51800047024 · possession Jun 2025 · 89.1% built
- Antariksh Ace · AndheriPittie Antariksh Realty Private Limited · P51800047038 · possession Apr 2027 · 90.9% built · 1 complaint