All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 19 of 48.
Mumbai Suburban
- TIARA by Swastik Empire · PANTNAGARM/s SWASTIK EMPIRE DEVELOPERS LLP · P51800034308 · possession Dec 2025 · 90.4% built
- ACE AMBIENCE · MULUND WESTAce properties · P51800034328 · possession Dec 2025 · 70.9% built
- SKYLON SUBURBIA · BorivaliSAI KRUPA DEVELOPERS · P51800034335 · possession Dec 2026 · 70% built · 1 complaint
- WESTWOOD · BorivaliP51800034338 · possession Dec 2027 · 59.4% built · 7 complaints
- Agami Eternity · MumbaiAgami Spaces Private Limited · P51800034339 · possession Mar 2027 · 81.8% built
- NASREEN AND HALLS VIEW APARTMENT · KurlaNASREEN AND HALLS VIEW APARTMENT · P51800034358 · possession May 2027 · 77.7% built
- ANNAVISTA · BANDRA WESTTRISONS BUILDERS · P51800034372 · possession Dec 2024 · 74.1% built
- MODIREALTY KALPVRIKSH · ANDHERI WESTMODIREALTY DEVELOPERS PVT LTD · P51800034375 · possession Mar 2025 · 90.9% built
- AURIS BUSINESS CENTRE · SHIMPOLI, BORIVALI WESTDev Pooja Builders Pvt Ltd · P51800034380 · possession Dec 2025 · 63.2% built
- MAGATHANE PRESS ENCLAVE CHSL · BorivaliDHARIWAL DEVELOPERS (INDIA) PRIVATE LIMITED · P51800034383 · possession Mar 2027 · 45.5% built
- DEM Cygnus · Kandivali - westDEM ESTATES LLP · P51800034396 · possession Mar 2025 · 90% built
- PRIME GROUP PROJECT GRAND SLAM · DahisarPRIME GROUP · P51800034404 · possession Dec 2023 · 90.9% built
- Navlabh · BorivaliP51800034406 · possession Apr 2026 · 51.8% built
- Aryana Heights · Ghatkopar - EastM/s M Raveshia Realty LLP · P51800034432 · possession Mar 2027 · 78.2% built
- Inayah Residency · BorivaliEmerald Developers · P51800034439 · possession Dec 2028 · 53.3% built
- BORIVALI VEER DHAVAL · BorivaliSHREE DURGA VASTU MAKERS LLP · P51800034441 · possession May 2026 · 90.9% built
- Sai Laxmi Residency · KurlaOM SAI SSS DEVELOPERS THANE · P51800034454 · possession Dec 2026 · 42.6% built
- MOHAMMEDIMANZIL · AndheriJEM DEVELOPERS AND BUILDERS · P51800034489 · possession Dec 2025 · 55.5% built
- ACE FLORENCE · MULUND WESTAce properties · P51800034518 · possession Aug 2024 · 90.9% built
- Kalpataru Vivant - South Wing B · AndheriAlder Residency Private Limited · P51800034531 · possession Mar 2028 · 91.5% built · 1 complaint
- Hetali Vishnu Bhavan · Akurli, Kandivali EastJayesh Pandya · P51800034561 · possession Dec 2025 · 63% built
- Redevelopment of Gurudeo Geetanjali CHS Ltd. · ChemburHeritage Lifestyles LLP · P51800034564 · possession Dec 2025 · 90.9% built
- AARADHYA EVOQ · AndheriMAN INFRA CONTRACTS LLP · P51800034587 · possession Jun 2026 · 90.9% built
- EPITOME · GARODIA NAGARTHOROUGHBRED REALTY LLP · P51800034589 · possession Dec 2025 · 99.5% built
- CODENAME RARE BY RUNWAL · AndheriRunwal Developers Ltd · P51800034594 · possession Jun 2026 · 90.9% built
- JANGID ELYSIUM · BorivaliIMPRINT CONSTRUCTION PRIVATE LIMITED · P51800034600 · possession Dec 2026 · 55% built
- Neel Kamal · BorivaliRajnikant Sanchala · P51800034626 · possession Dec 2028 · 38.6% built · 3 complaints
- THE ORCHID · KurlaRUDANI REALTY · P51800034630 · possession Mar 2027 · 55.5% built
- RAJENDRA NAGAR RAJ KIRAN CO.OP. HSG. SOC. LTD · BorivaliH M REALTY · P51800034669 · possession Dec 2026 · 87% built
- ORION HEIGHTS · BorivaliCHARKOP ORION CO-OPERATIVE HOUSING SOCIETY LIMITED · P51800034677 · possession Mar 2027 · 71.7% built
- Acharat Baug · AndheriAnkur Premises Developers LLP · P51800034682 · possession Jul 2024 · 39.1% built
- TEJKIRAN · VILE PARLE EASTTEJ KIRAN CO OP HSG SOC LTD · P51800034725 · possession Apr 2024 · 100% built
- VASUNDHARA PARADISE · MumbaiVASUNDHARA DEVELOCUS LLP · P51800034739 · possession Dec 2026 · 100% built
- AXIOM CAPITOL · KurlaAXIOM REFAB CONSTRUCTION (INDIA) PVT LTD · P51800034787 · possession Dec 2025 · 34.1% built
- RISHABRAJ VILLA STELLA · BorivaliH RISHABRAJ REALTY · P51800034790 · possession Dec 2024 · 72.7% built
- Elegance Heights · BorivaliSGF Enterprises · P51800034810 · possession Dec 2029 · 27.3% built · 2 complaints
- OPULENT · VIKHROLIREKI DEVELOPERS LLP · P51800034812 · possession Dec 2026 · 90.9% built
- Vindhyagiri · Pahadi Eksar and Pahadi Goregaon EastGio Properties · P51800034813 · possession Dec 2025 · 71.9% built
- REDEVELOPMENT OF TIARA CHSL · MALAD WESTPRANAV CONSTRUCTIONS LIMITED · P51800034818 · possession Oct 2024 · 90.9% built
- MAYFAIR GNYANADEEP · AndheriMAYFAIR HOUSING PRIVATE LIMITED · P51800034829 · possession Jun 2025 · 89.5% built
- Center Plaza Phase 1 · BorivaliB V ENTERPRISES · P51800034832 · possession Dec 2027 · 81.8% built
- Paradigm Anantaara · BorivaliShubhyuvi Infrastructure LLP · P51800034854 · possession Dec 2030 · 0% built · 1 complaint
- SAMPOORNA · KurlaNARAYANPRASAD MAHADEVAN · P51800034856 · possession Apr 2027 · 90.9% built
- Supreme Elysia · AndheriSupreme Mega Constructions LLP · P51800034860 · possession May 2025 · 95.5% built
- GIRIVAR AVENUE · BorivaliMEHTA SPACES · P51800034875 · possession Dec 2026 · 63.2% built
- MODIREALTY WISTERIA · KANDIVALI WESTMODIREALTY DEVELOPERS PVT LTD · P51800034890 · possession Mar 2026 · 100% built
- REDEVELOPMENT OF NEW SHALIMAR APARTMENTS CHSL · BorivaliPRANAV CONSTRUCTIONS LIMITED · P51800034915 · possession Sept 2025 · 90.9% built
- SHILA BINA CHS LTD · BorivaliMS INFRASTRUCTURE · P51800034920 · possession Dec 2025 · 100% built
- Rite Amor · MumbaiRite Pragati Developers · P51800034921 · possession Apr 2026 · 80.9% built
- Transcon Triumph Tower 4 · AndheriTranscon Triumph Phase 2 Private Limited · P51800034924 · possession Mar 2027 · 52.4% built · 1 complaint
- REDEVELOPMENT OF GOLD COIN CHSL · MUMBAIPRANAV CONSTRUCTIONS LIMITED · P51800034931 · possession Sept 2025 · 90.9% built · 1 complaint
- CHARKOP JEEVAN MANGAL C.H.S. LTD · BorivaliSANDHYA KSHITIJ BUILDERS PRIVATE LIMITED · P51800034943 · possession Jun 2026 · 90.9% built
- DHANRAJ · BORIVALI (W)ANEISHA LIVINGS LLP · P51800034955 · possession Feb 2025 · 90.9% built
- Unicorn Heights · BorivaliTEOAMA INFRASTRUCTURE PRIVATE LIMITED · P51800034960 · possession Jun 2028 · 54.5% built · 1 complaint
- RISHABRAJ VATSAL · KANDIVALI WESTH RISHABRAJ REALTY · P51800034973 · possession Dec 2026 · 90.9% built
- RATAN HERITAGE · AndheriNEXUS BUILDERS & DEVELOPERS · P51800034975 · possession Mar 2027 · 67.3% built
- CHARKOP KSHITIJ CHS LTD · BorivaliCHARKOP KSHITIJ CHSL · P51800034991 · possession Dec 2026 · 79.4% built
- AUDUMBAR APARTMENTS CHS LTD · MALAD WEST MUMBAIMASAKIN DEVELOPERS · P51800034993 · possession Dec 2024 · 90.9% built
- ZENON · BorivaliENTITY DEVELOPERS PRIVATE LIMITED · P51800035006 · possession Dec 2026 · 53.8% built · 1 complaint
- CENTRIO NX BY MJ SHAH · KurlaLAKADAWALA DEVELOPERS PRIVATE LIMITED · P51800035010 · possession Oct 2026 · 65.6% built · 1 complaint
- VIVAN · BorivaliGOREGAON ELECTRICAL INDUSTRIES LLP · P51800035019 · possession Dec 2028 · 52.9% built
- Omkaar Solitaire · KurlaShiddhivinayak Developers · P51800035022 · possession Dec 2026 · 51.5% built · 1 complaint
- Mahirr · Borivali WestShree Balaji Enterprise · P51800035053 · possession Dec 2026 · 100% built
- 104 EAST · BorivaliQUBA INFRA LLP · P51800035079 · possession Jun 2027 · 56.1% built
- GREENAIRY · BorivaliSAROJ LANDMARK REALTY LLP · P51800035093 · possession Jun 2028 · 123.3% built · 8 complaints
- STAR CHS LTD · POWAIHEALTH COLONIES & CONSTRUCTION PVT.LTD. · P51800035098 · possession Dec 2024 · 23.6% built
- RISHABRAJ GARDENIA · AndheriH RISHABRAJ REALTY · P51800035106 · possession Dec 2024 · 89.1% built
- Avyukta Neelkamal · BorivaliShivoham Associates · P51800035115 · possession Sept 2026 · 100% built · 2 complaints
- KEDAR DARSHAN · BorivaliKOSMOS DEVELOPERS · P51800035123 · possession Apr 2027 · 6.4% built
- SATYAM SOLARIS · KurlaBM INFRA · P51800035156 · possession Dec 2024 · 100% built
- KAVERI HERITAGE · BorivaliKAVERI SHINE BUILDERS AND DEVELOPERS LLP · P51800035190 · possession Mar 2027 · 99.1% built
- Building No 2 Pearl Regency Phase 2 · AndheriPrime Infrabuildcon Pvt. Ltd. · P51800045214 · possession Dec 2027 · 90.9% built
- BHOOMI ANTARA · KurlaBHOOMI LIFESTYLE · P51800045215 · possession Feb 2027 · 89.4% built
- Swastik Platinum · KurlaSUVASYA BUILDERS AND DEVELOPERS LLP · P51800045216 · possession Dec 2026 · 86.4% built
- AMEY APARTMENTS · ANDHERI EASTAMEY REALTY AND CONSTRUCTION LLP · P51800045221 · possession Oct 2026 · 73.6% built
- SIDDHARTH NAGAR SHIVAM CHS LTD · GOREGOAN WESTVIRENDRA HIRALAL DOSHI · P51800045242 · possession Mar 2025 · 100% built
- Borivali New Roma Sadan CHSL · BorivaliSUMUKH INFRAPROJECT · P51800045284 · possession Mar 2027 · 36.4% built
- VISTA · MULUND EASTSARVSHUBH ENTERPRISES · P51800045286 · possession Dec 2025 · 44.6% built
- ALAG ANANTA · KurlaAlag Square LLP · P51800045309 · possession Jun 2026 · 90.9% built
- AVYUKTA GOCUL · AndheriSHIVOHAM INFRAHOMES LLP · P51800045317 · possession Dec 2024 · 100% built
- IPSIT ANAND MANGAL · BorivaliNAVKAR DEVELOPERS · P51800045322 · possession Dec 2027 · 88.6% built · 1 complaint
- THE JAMBLI GALLI CHS LTD · BORIVALI WESTMAHAVIR CORPORATIONS · P51800045335 · possession Mar 2024 · 81.8% built
- Bellanza Phase 1 - Wing A, B, C at The Prestige City · KurlaPRESTIGE MULUND REALTY PRIVATE LIMITED · P51800045339 · possession Dec 2026 · 3.8% built · 3 complaints
- ARKADE CROWN · BorivaliArkade Developers Private Limited · P51800045342 · possession Dec 2025 · 71.1% built
- Saideep Apartment · AndheriDARSHAN INFRA · P51800045356 · possession Mar 2025 · 90.9% built
- Kalpataru Vivant - South Wing A · AndheriAlder Residency Private Limited · P51800045360 · possession Mar 2028 · 99% built · 1 complaint
- JULIUS WADI CO- OPERATIVE HOUSING SOCIETY · BorivaliSAINATH DEVELOPERS · P51800045395 · possession Dec 2026 · 87.3% built
- Royale · Vile Parle EastMANGAL BUILDHOME PRIVATE LIMITED · P51800045406 · possession May 2025 · 100% built
- Kalpataru Vivant - North Wing B · AndheriAlder Residency Private Limited · P51800045409 · possession Mar 2028 · 83% built · 1 complaint
- Om Siddhivinayak CHS Ltd · KurlaShree Shiv Samarth Reality · P51800045417 · possession Dec 2028 · 33.6% built
- VIJAYI JWALA · BorivaliChirag Infraprojects Private Limited · P51800045419 · possession Mar 2027 · 100% built
- SHRADDHA ELITE · BORIVALI WESTSHRADDHA DEVELOPERS & REALTORS · P51800045452 · possession Dec 2025 · 90.5% built
- SPLENDOUR · MULUND WESTSUNNY DEVELOPERS & BUILDERS LLP · P51800045467 · possession Dec 2025 · 63.6% built
- NINE ACES CHS LTD · AndheriJMJ MAXRICH BUILDCON · P51800045486 · possession Dec 2023 · 100% built
- ABUNDANCE · KurlaGoodwill Developers · P51800045501 · possession Sept 2026 · 49.8% built · 1 complaint
- Galaxy Heights Tower 1 · BorivaliMaharashtra Police Cooperative Housing Federation Limited · P51800045503 · possession Dec 2026 · 83.4% built
- Jagdale Giriraj · KurlaJAGDALE INFRASTRUCTURE PVT. LTD. · P51800045510 · possession Sept 2026 · 90.9% built
- SHREE KRISHNA WING A and B · KurlaShreem Properties · P51800045520 · possession Mar 2027 · 72.2% built
- BORIVALI SHALIMAR CO-OPERATIVE HOUSING SOCIETY LIMITED · BorivaliTASMAI SHREE · P51800045551 · possession Dec 2024 · 90.9% built
- Shilpadatta by Sandu Developers · KurlaSandu Developers Pvt. Ltd. · P51800045569 · possession Dec 2026 · 61.8% built · 1 complaint
- Redevelopment of Sri Guruvayurappan Balmukund Co-operative Housing Society Ltd. · ChemburSMERA HOMES LLP · P51800045578 · possession Jun 2025 · 81.8% built
- Jade Residences · KurlaJSR REALTY · P51800045592 · possession Dec 2026 · 35.9% built
- 9 DIVINE · AndheriSACH GORWANI REAL PROJECTS PRIVATE LIMITED · P51800045616 · possession Mar 2027 · 43.6% built
- BHANDUP SANMITRA CHS LTD · KurlaSHRADDHA LANDMARK PRIVATE LIMITED · P51800045620 · possession Jun 2024 · 100% built
- NEERA ENCLAVE · Mulund westSHRADDHA DIVINE REALTORS LLP · P51800045641 · possession Mar 2026 · 100% built
- Shreyaan Residency · KANDIVALI WESTVIDISHA REAL ESTATE DEVELOPERS PVT LTD · P51800045662 · possession Sept 2027 · 100% built
- KHANDELWAL LUXOR WING B · BorivaliSHREE KRISHNA SAI DEVELOPMENT CORPORATION · P51800045675 · possession Dec 2027 · 71.1% built
- SATYAM · AndheriPODDAR INFRACON PRIVATE LIMITED · P51800045715 · possession Aug 2026 · 78.5% built · 1 complaint
- PARANJAPE ASPIRE · AndheriPSC REALTORS PRIVATE LIMITED · P51800045731 · possession Mar 2027 · 42.5% built · 1 complaint
- AVIGHNA CHS LTD · CHEMBUR EASTMAJESTIC ROYALE DEVELOPERS · P51800045749 · possession Oct 2024 · 100% built
- SADGURU AVENUE · BorivaliSADGURU KRUPA DEVELOPERS · P51800045763 · possession Dec 2026 · 73.4% built · 1 complaint
- THE SKYCITY · AndheriRappture Projects Private Limited · P51800045767 · possession Dec 2028 · 20.7% built
- Avani Signature · KurlaAvani Buildcon · P51800045772 · possession Dec 2026 · 69.1% built
- KHANDELWAL RESERVE WING B · BorivaliSHREE KRISHNA SAI DEVELOPMENT CORPORATION · P51800045778 · possession Dec 2027 · 75.5% built · 1 complaint
- Kakkad · MumbaiSILVER LAND DEVELOPERS PRIVATE LIMITED · P51800045780 · possession Dec 2026 · 53.6% built
- Purna Rajeshwari · KurlaDHARMI ENTERPRISES · P51800045796 · possession Dec 2027 · 88.2% built
- West Winds · GHATKOPAR EASTGhatkopar Neelkanth Kunj CHSL · P51800045813 · possession Mar 2026 · 75% built
- PALAZZO 90 · GHATKOPAR EASTBLUE CREST DEVELOPERS LLP · P51800045815 · possession Jun 2025 · 100% built
- PRIMESTONE · KurlaKHERECTORS LLP · P51800045817 · possession Jun 2025 · 100% built
- TREVI · BorivaliASHIRWAD NICE DEVELOPERS · P51800045818 · possession Dec 2026 · 90.9% built
- SHIV PARBAT · BorivaliV3 PARTNERS · P51800045822 · possession Mar 2027 · 74.1% built
- SHUBHAM AVALON CO-OPERATIVE HOUSING SOCIETY LIMITED · GHATKOPAR EASTAVVAD HOUSING LLP · P51800045851 · possession Dec 2024 · 90.9% built
- PARMAR PEARL - JAY KOTESHWAR NAGAR CHS LTD · BorivaliParmar Constructions Private Limited · P51800045853 · possession Nov 2026 · 80.9% built
- Swastik Avighna · KurlaSwastik Realtors · P51800045871 · possession Dec 2026 · 44% built
- Malad Sati Darshan CHS Ltd. · BorivaliGoyal Sati Darshan LLP · P51800045878 · possession May 2026 · 82.3% built
- Crest Link · Khar WestCREST VENTURES LIMITED · P51800045883 · possession Feb 2026 · 100% built · 1 complaint
- PRIME SQUARE · BorivaliPRIME REALTORS · P51800045886 · possession Jun 2026 · 93.6% built
- Amber Vihar · J B NagarSHAH & SHAH CONSTRUCTION CORPORATION · P51800045887 · possession Mar 2025 · 100% built
- DOSHI TARACHAND VALAMJI VANIK NIWAS · ChemburSHREE CUTCHI DASHA SHRIMALI VANIK GNYATI · P51800045888 · possession Dec 2024 · 90.9% built
- JOSEPH VILLA · GOREGAON EASTK.PATELAND CO · P51800045891 · possession Dec 2024 · 72.7% built
- Lodha Kandivali Project-Tower 1 · BorivaliLodha Developers Limited · P51800045908 · possession Feb 2028 · 46.4% built · 1 complaint
- Kailas Ashish · Ghatkopar EastDNK Developers KA LLP · P51800045948 · possession Aug 2025 · 90.9% built
- New Abhiram CHS LTD · Kastur ParkPeerless Constructions Pvt. Ltd. · P51800045965 · possession Sept 2025 · 73.2% built
- Crest Parkview · Bandra WestCREST VENTURES LIMITED · P51800045968 · possession Oct 2025 · 80.9% built
- VISHWASANGAM · MumbaiVishwashakti Cooperative Housing Society Limited · P51800045980 · possession Dec 2026 · 46.4% built
- Nirvaana Solitaire · KurlaNirvaana Lifespace LLP · P51800045989 · possession Dec 2026 · 37.8% built
- Integrated Ramicon · BorivaliIntegrated Affordable Home Private Limited · P51800045996 · possession Dec 2026 · 77.8% built
- VISHAKHA HEIGHTS AND VISHAKHA REGENCY · KurlaM/s Keytech · P51800046013 · possession Jun 2026 · 62.7% built
- MADHUBAN HEGHTS · KANDIVALI WESTHIRAL REAL ESTATE DEVELOPERS LLP · P51800046035 · possession May 2025 · 90.9% built
- JADE CHSL · BorivaliSHREE MAHAVIR CONSTRUCTIONS · P51800046042 · possession Dec 2029 · 56.4% built
- SUN SUMIT JEEVAN MANGAL · BorivaliSUN SUMIT VENTURE · P51800046062 · possession Jun 2026 · 81.8% built
- Pruthvi Pushpanjali · AndheriFlying Earth LLP · P51800046070 · possession Jun 2026 · 82.4% built
- GARDEN VIEW · BORIVALI WESTSMLIFE SHREEJI DEVELOPERS LLP · P51800046071 · possession May 2025 · 90.9% built
- Sai Signature Spaces · BorivaliRAMACHANDRAN MUNISAWMY NARAYAN · P51800046083 · possession Sept 2026 · 29.1% built
- SHIVRAJ HEIGHTS WING C · BorivaliSHIVRAJ HEIGHTS WING C · P51800046085 · possession Mar 2027 · 90.9% built
- DLH SIGNATURE · AndheriFlowline Developers Pvt Ltd · P51800046093 · possession Dec 2026 · 77.7% built
- Lodha Woods- Tower 8 · BorivaliLodha Developers Limited · P51800046114 · possession Nov 2028 · 42.7% built · 1 complaint
- Lodha Woods - Tower 7 · BorivaliLodha Developers Limited · P51800046118 · possession Jul 2027 · 81.8% built · 1 complaint
- SHRADDHA PEARL · VILLAGE HARIYALISHRADDHA LANDMARK PRIVATE LIMITED · P51800046124 · possession Dec 2025 · 76.2% built
- Park Altezza · AndheriSHREE MAHAVIR ESTATES TUSHAR BIINDU · P51800046141 · possession Dec 2029 · 75.5% built
- EKTA CREST · CHEMBUREKTA HOUSING PRIVATE LIMITED · P51800046149 · possession Dec 2025 · 93.9% built
- SANSKAR · AndheriSANSKAR DWELLINGS LLP · P51800046200 · possession Dec 2025 · 83.2% built
- SHYAM KUNJ · AndheriBASONS CONSTRUCTIONS · P51800046209 · possession Jul 2024 · 90.9% built
- School View Shreyas CHS Ltd · MUMBAIMAJESTIC ROYALE DEVELOPERS · P51800046219 · possession Sept 2024 · 54.5% built
- SHREE GOVIND KRUPA · BorivaliMAMTORA FOUNDATION · P51800046222 · possession Jun 2026 · 81.8% built
- Shraddha Prominent · KurlaShraddha Landmark Private Limited · P51800046232 · possession Dec 2026 · 61.1% built
- KHANOLKAR BHAVAN CHSL - PARADISE · GOREGAON EASTC H PATIL AND SONS LLP · P51800046246 · possession Dec 2025 · 9.1% built
- Sun Sumit Deepshal · BorivaliSUN SUMIT VENTURE · P51800046252 · possession Dec 2026 · 25.2% built
- ASMI BUSINESS CENTRE · BorivaliASMI CORPORATION · P51800046269 · possession Dec 2028 · 29.9% built
- Shraddha Panache · Village HariyaliShraddha Landmark Private Limited · P51800046277 · possession Dec 2025 · 81.8% built
- Lodha Woods - Tower 6 · BorivaliLodha Developers Limited · P51800046327 · possession Nov 2027 · 53.6% built · 1 complaint
- REDEVELOPMENT OF NAV VIKAS CHSL · VILE PARLE EASTSwara Constructions · P51800046341 · possession May 2025 · 57.3% built
- PRIME AURA · BorivaliPRIME GROUP · P51800046359 · possession Jun 2026 · 90.9% built
- Elenora · AndheriPARINEE VIR BHUVAN REDEVELOPMENT PRIVATE LIMITED · P51800046382 · possession Sept 2026 · 23.6% built
- MASS ZAINAB HEIGHTS · AndheriMASS ZIA DEVELOPMENT CORPORATION · P51800046413 · possession Dec 2026 · 79.8% built · 1 complaint
- AMAIRA RESIDENCY · AndheriAMAIRA RESIDENCY · P51800046422 · possession Jun 2026 · 29.1% built
- SIDDHANATH CO-OPERATIVE HOUSING SOCIETY LIMITED · KurlaSIDDHANATH CO-OP HSG SOC · P51800046426 · possession Dec 2028 · 49.1% built
- PRIME LEGACY · DahisarPRIME GROUP · P51800046428 · possession Dec 2025 · 81.8% built
- LANDMARK · MumbaiJALARAM ICON LLP · P51800046476 · possession Jun 2026 · 100% built
- Ashok Aura - RJ Commercial · AndheriSANYAM REALTORS PRIVATE LIMITED · P51800046477 · possession Dec 2027 · 70.9% built
- Bellanza Phase 2 - Wing D, E, F at The Prestige City · KurlaPRESTIGE MULUND REALTY PRIVATE LIMITED · P51800046488 · possession Jun 2027 · 5.5% built · 1 complaint
- SEJAL KAJAL APARTMENT CHS LTD · BorivaliNeminath Realtors · P51800046493 · possession Jul 2026 · 37.6% built · 1 complaint
- SETHIA PRIDE A WING · BorivaliSethia Infrastructure Pvt. Ltd, · P51800046531 · possession Dec 2026 · 49.5% built
- ODC 1 · Goregaon WestNVN Buildcon LLP · P51800046544 · possession Jul 2026 · 81.8% built
- Tsaaya · BorivaliSambhavparshva Developers Pvt. Ltd. · P51800046545 · possession Dec 2028 · 80% built
- KENORITA JEWELS PHASE II · GOREGAON WEST PAHADIK R SHOPPERS PRIVATE LIMITED · P51800046547 · possession Dec 2027 · 56.6% built
- ZEE MANU BHARATI · AndheriZEE RPM PROPERTIES LLP · P51800046578 · possession Mar 2027 · 81.8% built
- POONAM CELESTE · KurlaPL7 Realty Pvt. Ltd. · P51800046581 · possession Aug 2026 · 71.3% built
- Redevelopment of Parle Satam CHS Ltd · vile parle eastR R CONSTRUCTIONS · P51800046583 · possession May 2025 · 71.4% built
- Ruparel Panache · AndheriRuparel Infra & Realty Pvt Ltd · P51800046597 · possession Dec 2026 · 80.5% built
- ATMIYA CENTRIA · AndheriUPTURN PROPERTIES LLP · P51800046598 · possession Dec 2026 · 91.4% built
- CITI CHALET · AndheriBASONS CONSTRUCTIONS · P51800046606 · possession Jan 2024 · 90.9% built
- SHEPHERD HORIZON · AndheriGOODBUILD INDIA PRIVATE LIMITED · P51800046622 · possession Jul 2026 · 73.6% built
- Seabliss · AndheriAsshna Developers Westin · P51800046626 · possession Dec 2026 · 75.9% built · 1 complaint
- VANRAI · BorivaliKaustubh Construction Private Limited · P51800046638 · possession Jul 2026 · 98.6% built
- PUNITA · KANDIVALI WESTLAKSHACHANDI COLUMBIA CORPORATION · P51800046652 · possession Jun 2025 · 100% built
- THE LISA · AndheriSHETHWALA INFRA · P51800046662 · possession May 2025 · 90.9% built
- BIMAL APARTMENT CHSL · MULUND EASTRITE BUILDERS & DEVELOPERS · P51800046666 · possession Dec 2026 · 75.5% built
- REDEVELOPMENT OF KESAR NIKETAN CHSL · BORIVALI EASTPRANAV CONSTRUCTIONS LIMITED · P51800046669 · possession Jan 2026 · 91.8% built
- Dreamsville · BorivaliParadiso Builders Private Limited · P51800046670 · possession May 2024 · 81.8% built
- Notan Casa · BANDRA WESTLIFESPACE HOMES REALTORS LLP · P51800046698 · possession Mar 2026 · 100% built
- Laxmi Kunj · AndheriGeeCee Ventures Limited · P51800046721 · possession Dec 2024 · 88.2% built
- Shelton Elite · AndheriMarriott Realtors Private Limited · P51800046724 · possession Dec 2026 · 62.4% built
- Promesa Midtown · KurlaDarshan Properties · P51800046735 · possession Dec 2026 · 72.7% built
- SURYADARSHAN CHS LTD · BorivaliH&D PROJECTS · P51800046756 · possession Apr 2024 · 70.5% built
- PRIMROSE · BorivaliKaustubh Construction Private Limited · P51800046761 · possession Jul 2026 · 90.7% built
- GATEWAY COMMERCIAL · AndheriLUCRATIVE TRADING LLP · P51800046765 · possession Sept 2027 · 72.3% built
- GATEWAY RESIDENTIAL · AndheriLUCRATIVE TRADING LLP · P51800046773 · possession Sept 2027 · 90.8% built
- SWASTIK DIVINE · KurlaSwastik Realtors · P51800046801 · possession Dec 2026 · 57.9% built
- GHATKOPAR AVENUE AARADHYA ONE EARTH H PHASE VII · GHATKOPAR EASTMAN REALTORS AND HOLDING PRIVATE LIMITED · P51800046812 · possession Jun 2025 · 63.6% built
- OM RAJA · BHANDUP WESTSAINATH CORPORATION · P51800046827 · possession Sept 2025 · 181.8% built
- Rajshree Aashiyana · Ghatkopar EastGanesh Chhaya Construction LLP · P51800046829 · possession Jun 2025 · 81.8% built
- RAMDEV VEERAL HEIGHTS · BorivaliRAMDEV ASSOCIATES · P51800046833 · possession Aug 2026 · 89.9% built
- Puneet Brahmand · KurlaPUNEET EDIFICE PVT LTD · P51800046881 · possession Dec 2026 · 40% built
- TILLIBAI APARTMENT CO-OP. HSG. SOC. LTD. · BorivaliTILLIBAI CHS. LTD. · P51800046882 · possession Dec 2026 · 41.8% built
- MEGHA EDGE- RED ROSE · BorivaliMEGHA LAKSHMI ENTERPRISE · P51800046888 · possession Jun 2026 · 90.5% built
- SANA ENCLAVE · AndheriSANA ENTERPISES · P51800046890 · possession Sept 2027 · 42.3% built
- INSPIRE RESIDENCY · AndheriSARDAR REALTY · P51800046897 · possession Dec 2026 · 54.4% built
- Puneet Amarjyoti · KurlaPUNEET EDIFICE PVT LTD · P51800046906 · possession Dec 2026 · 46.7% built
- PAREKH RADIANCE · KANDIVALI WESTPAREKH BUILDPROJECTS PRIVATE LIMITED · P51800046909 · possession Mar 2026 · 81.8% built
- Om Ambe Smruti · KurlaOscar Infrastructure Private Limited · P51800046923 · possession Dec 2026 · 99.5% built
- AYESHA HEIGHTS · BorivaliUMAIR CONSTRUCTION · P51800046945 · possession Dec 2027 · 41.8% built
- METRO CROWN COMMERCIAL · KurlaMETRO ENTERPRISES · P51800046960 · possession Dec 2027 · 60.5% built
- RIDHI SIDHI · AndheriKESAR INFRA LLP · P51800046974 · possession Dec 2026 · 79.1% built · 1 complaint
- Chheda Bhuvan · Daulat NagarHaresh Popatlal Chheda · P51800046989 · possession Dec 2026 · 100% built
- BALI DIVINE · GOREGAON WEST MUMBAIBALI ESTATES LLP · P51800047014 · possession Jul 2025 · 81.8% built
- WORLIWALA CHSL · VILE PARLE (EAST)SHAMIK & SANGHVI DEVELOPERS LLP · P51800047017 · possession Dec 2025 · 90.9% built
- METRO CROWN · KurlaMETRO ENTERPRISES · P51800047023 · possession Dec 2027 · 36.8% built
- PRABHAT KUNJ · MumbaiLAKSHMICONSTRUCTION · P51800047024 · possession Jun 2025 · 89.1% built
- Antariksh Ace · AndheriPittie Antariksh Realty Private Limited · P51800047038 · possession Dec 2026 · 90.9% built · 1 complaint
- Aim Horizon · AndheriA.M Enterprises · P51800047046 · possession Dec 2028 · 81.4% built
- Pashmina Casa · AndheriPashmina Buildcon Private Limited · P51800047054 · possession Jun 2026 · 81.6% built
- DINKAR PRASAD BUILDING · AndheriDESAI AND VARMA ASSOCIATES · P51800047066 · possession Dec 2026 · 90.9% built
- Arkade Prime · Andheri EastM/s. Arkade Developers Pvt Ltd. · P51800047081 · possession Dec 2025 · 78.6% built
- MOHITE MARVEL · KurlaMOHITE REALTORS LLP · P51800047161 · possession Sept 2026 · 90.9% built
- OM SUKHKARTA HEIGHTS · KANNAMWAR NAGAR 2 VIKHROLI EASTHIRANI MESTRY DEVELOPERS · P51800047163 · possession Dec 2026 · 90.9% built
- THE SHIVRAM CHS LTD · KurlaBLACKPLINTH REALTORS PVT LTD · P51800047183 · possession Dec 2027 · 41.8% built
- SHREE BALAJI AVENUE · GHATKOPAR EAST MUMBAISHREE BALAJI & CO · P51800047192 · possession Dec 2026 · 58.2% built
- AIKYA ROOTS · KurlaRACEK INDUSTRIES PVT LTD · P51800047194 · possession Jun 2027 · 81.4% built · 2 complaints
- Winterberry Tower and Plaza · KurlaNAHAR BUILDERS LTD. · P51800047208 · possession Mar 2027 · 81.8% built
- IRENE WING B PHASE 1 · BorivaliSheth Creators and Sunvision Private Limited · P51800047209 · possession Oct 2028 · 47.5% built · 2 complaints
- TIGON ELITE · KurlaTIGON REALITY PRIVATE LIMITED · P51800047212 · possession Dec 2026 · 73.5% built
- Jyotsna Heritage Redevelopment of The Dahisar R.K. Nayak Niwasi CHS LTD · DAHISAR EASTM/S SHREE SAINAMAH HOMES LLP · P51800047220 · possession Jun 2025 · 88.2% built
- Modirealty Vatvriksh · BorivaliMODIREALTY DEVELOPERS PVT LTD · P51800047278 · possession Sept 2026 · 72.7% built
- PAREKH CELESTE · GOREGAON WESTYASH AKAR DEVELOPERS LLP · P51800047291 · possession Apr 2027 · 90.9% built
- RAJLAXMI HEIGHTS CHSL · BorivaliRAJMUDRA CONSTRUCTIONS PRIVATE LIMITED · P51800047301 · possession May 2027 · 33.7% built
- Shreeji Atlantis Wing B · BorivaliShreeji Construction · P51800047335 · possession Dec 2027 · 51.5% built · 2 complaints
- NAVRANG NAVKAR · BorivaliOXFORD NAVRANG REALTY LLP · P51800047342 · possession Apr 2026 · 81.8% built
- CHEMBUR DEEP JYOTI CHS LTD · KurlaP M DEVELOPERS · P51800047359 · possession Jul 2026 · 87.3% built
- APEX GREEN WOOD · BorivaliAPEX INFRATEC · P51800047381 · possession Jun 2026 · 72.7% built
- Ashford Regal - Phase II - Wing B Project · KurlaWMI Real Estate Developers LLP · P51800047384 · possession Dec 2027 · 69% built
- Pahuja Business Avenue Phase-I · AndheriShakti Constructions · P51800047394 · possession Dec 2026 · 69.1% built · 1 complaint
- ARC ONE · AndheriCHANDRA GUPTA ESTATES PRIVATE LIMITED · P51800047410 · possession Dec 2026 · 91.8% built
- Sunset Gardens by Marathon · KurlaUnited Enterprises · P51800047418 · possession Dec 2026 · 39.4% built
- Ashford Regal - Phase I - Wing A Project · KurlaWMI Real Estate Developers LLP · P51800047421 · possession Jun 2027 · 78.1% built
- SELF REDEVELOPMENT OF CHARKOP SHALIMAR CHS LTD · BorivaliCHARKOP SHALIMAR CHS LTD · P51800047429 · possession Dec 2026 · 70% built
- FORTUNE PLAZA · BorivaliFORTUNE TOWN PLANNER LLP · P51800047430 · possession Dec 2026 · 100% built
- Shubh Elanza · KurlaShubh Vastu Lifespace LLP · P51800047511 · possession Aug 2026 · 71.8% built
- Pruthvi Park View · Vile Parle EastPruthvi Enterprise · P51800047524 · possession Sept 2025 · 80.5% built
- NATASHA ATLANTIS · KurlaNATASHA DEVELOPERS PVT LTD · P51800047526 · possession Dec 2028 · 44% built
- LINKBAY RESIDENCES PHASE I · AndheriPORTSMOUTH BUILDCON PRIVATE LIMITED · P51800047539 · possession Oct 2028 · 39.8% built · 2 complaints
- Arun Building of Pulivahana CHS Ltd · KurlaAARYAN REALTORS & DEVELOPERS · P51800047550 · possession Dec 2026 · 67.1% built
- PURO HEIGHTS · KurlaPURO CONSTRUCTIONS · P51800047568 · possession Dec 2031 · 0% built · 3 complaints
- Sky City Tower G · BorivaliIncline Realty Private Limited · P51800047575 · possession Dec 2027 · 69% built
- Vaswani Vista One · Kandivali WestVaswani Projects Private Limited · P51800047585 · possession Dec 2026 · 87.3% built
- MILAN MILAP CO OP HOUSING SOCIETY LTD · KurlaMILAN MILAP CO OP HOUSING SOCIETY LIMITED · P51800047599 · possession Dec 2026 · 56.4% built
- PARIJAT CHS SRA LTD · ANDHERI WESTGloriosa Infra and Consultants Private Limited · P51800047617 · possession Dec 2025 · 72.7% built
- Kalpataru Vivant - North Wing E · AndheriAlder Residency Private Limited · P51800047620 · possession Jun 2028 · 71.7% built · 2 complaints
- Kalpataru Vivant - North Wing C · AndheriAlder Residency Private Limited · P51800047621 · possession Jun 2028 · 75.7% built
- Shree Yashodhan · Off Chandavarkar RoadK MEHTA AND COMPANY · P51800047642 · possession Sept 2025 · 100% built
- Gurukripa · KurlaInspira Realty and Infra Private Limited · P51800047648 · possession Sept 2026 · 100% built
- ROSWALT ZAIDEN · AndheriA S HIGHTECH LLP · P51800047680 · possession Dec 2028 · 33.5% built · 12 complaints
- SUPERBIA · KurlaK V DEVCON LIMITED LIABILITY PARTNERSHIP · P51800047715 · possession Dec 2027 · 17.8% built · 1 complaint
- ORCHID TOWER · BorivaliShree Laxmi Estate Pvt. Ltd. · P51800047733 · possession Mar 2027 · 74.1% built · 1 complaint
- SLA AVENUE · AndheriSAMARTH LEELA ASSOCIATES · P51800047778 · possession Dec 2027 · 11.9% built
- UK IONA A - B Wing · AndheriKeemaya Build Private Limited · P51800047785 · possession Dec 2026 · 64.1% built · 3 complaints
- HARESHWAR PRIDE · MumbaiSATYADEEP REALTORS PVT. LTD. · P51800047786 · possession Dec 2026 · 36.8% built · 1 complaint
- Sethia Marine View · BorivaliSETHIA DEVELOPERS · P51800047794 · possession Jun 2027 · 64.5% built
- Bileshwar Darshan CHSL · Vile Parle EastM/s. Desai Residency Private Limited · P51800047797 · possession Dec 2024 · 90.9% built
- ATHARV LAXMI · AndheriSUNVISION HARMONY · P51800047828 · possession Dec 2026 · 90.5% built
- MARS - WING - B · KurlaSUNCITY HOUSING · P51800047829 · possession Dec 2027 · 58.5% built
- HEMKUNJ · Ghatkopar EastMAHENDRA RAVJIBHAI MAKWANA · P51800047837 · possession Jun 2025 · 63.6% built
- Shree Siidha Pride · KurlaGanalaxmi Homes · P51800047845 · possession Dec 2027 · 29.5% built
- TURNER HOUSE · AndheriVARIEGATE REAL ESTATE PRIVATE LIMITED · P51800047873 · possession Mar 2028 · 40.9% built
- SHREE VALLABH · BorivaliMAMTORA ENTERPRISE · P51800047875 · possession Sept 2026 · 59.1% built · 1 complaint
- Manisha Prime · Mulund EastMANISHA ELITE REALTY PRIVATE LIMITED · P51800047877 · possession Dec 2025 · 89.1% built
- Aureate · BorivaliNEXT SPACE REALTY LLP · P51800047880 · possession Jun 2027 · 86.8% built
- KHAR HARI NIKETAN · MumbaiDGLAND DEVELOPERS PVT LTD · P51800047904 · possession Dec 2026 · 27.3% built
- ORNATE SOLITAIRE · BorivaliORNATE DAHISAR DEVELOPERS · P51800047937 · possession Oct 2027 · 54.5% built
- SIGNET · BorivaliDG BUILDERS · P51800047941 · possession Oct 2026 · 35.5% built · 1 complaint
- JEEVAN SHOBHA CHSL AND BHANSALI CHSL · BORIVALI EASTHIRANI REALTORS LLP · P51800047979 · possession Mar 2026 · 81.8% built
- VIEWSTONE · KurlaKHERECTORS LLP · P51800047980 · possession Dec 2025 · 100% built
- AIM Garden · AndheriAIM Developers · P51800047985 · possession Jul 2029 · 75.5% built
- SENGHANI PARADISE · KurlaMANSUKHLAL VELJI SENGHANI · P51800048036 · possession Jun 2026 · 96.4% built
- RUSHABH KIRAN · KurlaRUSHABH KIRAN · P51800048043 · possession Dec 2026 · 90.9% built
- NAV CHETNA · AndheriForishna Developers LLP · P51800048061 · possession Apr 2026 · 42.7% built
- Commercial Wing - NL Plaza and Residential Wing - NL Krishna · BorivaliBEAUTIFUL PROPERTIES PRIVATE LIMITED · P51800048076 · possession Aug 2026 · 79.5% built
- PIXEL · KurlaDHARMI PROPERTIES PVT LTD · P51800048077 · possession Dec 2028 · 69.1% built
- Pride Panorama · KurlaLandcare Realty LLP · P51800048083 · possession Dec 2026 · 72.5% built
- Touchwood B wing · AndheriSHAH AND JAIN ENTERPRISES · P51800048088 · possession Jul 2027 · 4.5% built
- THE NEW ANAND DEEP CHS LTD · KurlaSHREEJEE BUILDCON · P51800048097 · possession Sept 2026 · 52.6% built
- Darpan Niketan Cooperative Society · KurlaBricks and Blocks Construction LLP · P51800048133 · possession May 2025 · 90.9% built
- BHAGYAWAN PRIMROSE · KurlaBHAGYAWATI ENTERPRISES · P51800048138 · possession Dec 2027 · 5.5% built
- Richmond Ananya · KurlaDivine Enterprises · P51800048156 · possession Sept 2026 · 47.2% built
- Meghalok Heights · BorivaliS S Landmark Private Limited · P51800048163 · possession Dec 2026 · 35% built
- SWASTIK SHIVAAY · KurlaSwastik Realtors · P51800048188 · possession Dec 2027 · 44.5% built
- VRINDAVAN ELITE · KurlaMATRIX CONSTRUCTIONS · P51800048196 · possession Oct 2026 · 72.7% built · 1 complaint
- The crown · KurlaElite Associates · P51800048225 · possession Apr 2026 · 86.8% built
- SHEETAL REGALIA · BorivaliD G S TOWNSHIP PRIVATE LIMITED · P51800048237 · possession Dec 2026 · 44.6% built
- DURGA GAYATRI · AndheriMANOJ MOHANLAL GORADIA · P51800048238 · possession Dec 2026 · 60.9% built
- SHRADDHA PRIVA · KurlaShree Mangesh Constructions · P51800048242 · possession Jul 2026 · 90.9% built
- Ashtha Buoyancy - IBTC Borivali East · BorivaliIndo Build Enterprise · P51800048360 · possession Dec 2026 · 35.6% built
- Adarsh Garden Grove · BorivaliAdarsh Enterprises · P51800048361 · possession Dec 2026 · 84.5% built
- DEM PHOENIX · BorivaliDEM BUILDWELL · P51800048376 · possession Jul 2026 · 82.1% built
- GET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED · AndheriGET TOGETHER CO OPERATIVE HOUSING SOCIETY LIMITED · P51800048383 · possession Jul 2027 · 51.4% built · 1 complaint
- SHAMIKH BUILDING · ANDHERI EASTTAMOS ASSOCIATES · P51800048394 · possession Mar 2026 · 82.3% built
- Willow Shades · Bandra West, MumbaiAptrashi Constructions LLP · P51800048423 · possession Feb 2025 · 100% built
- GANGASADAN · GORAS WADINAVPADH REALTY LLP · P51800048440 · possession Mar 2025 · 90.9% built
- VIKAS 11 · KurlaVIKAS LIFESPACE LLP · P51800048458 · possession Jun 2027 · 46.1% built
- Ashford Regal - Phase III - Wing F Project · KurlaWMI Real Estate Developers LLP · P51800048460 · possession Dec 2027 · 70.5% built
- PLATINUM AVENUE · AndheriPLATINUMCORP SMART REALTY LLP · P51800048464 · possession Dec 2026 · 52.6% built
- Mediterranean · Andheri westFortune Investments · P51800048471 · possession Mar 2027 · 66.8% built
- MEADOWS 83 · KurlaSHREEJI REALTORS · P51800048486 · possession Oct 2026 · 80.9% built
- SHREE KRUPA CHSL · BorivaliAMAR ASSOCIATES · P51800048519 · possession Dec 2026 · 65.5% built
- ROYALE 22 · KurlaVS DEVELOPERS · P51800048541 · possession May 2026 · 100% built · 1 complaint
- ELITE RESIDENCY · KurlaElite Construction Co. · P51800048557 · possession Jun 2027 · 39.1% built
- Shraddha Palladium · KurlaShraddha Apex LLP · P51800048579 · possession Dec 2026 · 52.2% built
- TIRUPATI APARTMENTS CHSL · KurlaTIRUPATI APARMTNETS CO OPERATIVE HOUSING SOCIETY LIMITED · P51800048581 · possession Oct 2026 · 72.7% built
- BORIVALI YASHODHAN CHSL · BORIVALI WESTTGN REALTOR LLP · P51800048607 · possession Jun 2025 · 90.9% built
- Krishna Bhuvan · AndheriAshraj Developers Private Limited · P51800048612 · possession Jun 2027 · 82.7% built
- Hetali Sagar · AndheriJayesh Himatlal Pandya · P51800048614 · possession Dec 2026 · 90.9% built
- I-STAY TOWER -G · AndheriI-STAY HOUSING PRIVATE LIMITED · P51800048620 · possession Jun 2028 · 8.2% built
- MULUND KETKI · KurlaMAHAVIR DEVELOPERS · P51800048651 · possession Oct 2027 · 27.3% built
- REDEVELOPMENT OF MALAD AJANTA CHS · BorivaliNARESHBHAI VALLABHBHAI PATEL · P51800048653 · possession Dec 2026 · 46.4% built
- Chandak Treesourus · BorivaliCHANDAK REALTORS PRIVATE LIMITED · P51800048658 · possession Dec 2028 · 77.3% built · 10 complaints
- VATSALYA · MumbaiSAMARTH NIRMAAN · P51800048669 · possession Dec 2026 · 85.9% built
- MDM MAESTRO · AndheriMDM REALTY LLP · P51800048676 · possession Dec 2026 · 52.7% built
- I STAY TOWER K (STUDIO) · AndheriI-STAY HOUSING PRIVATE LIMITED · P51800048681 · possession Jun 2027 · 25% built
- SHEETAL SHREE KAILASH · AndheriTOUGHCONS REALTORS PRIVATE LIMITED · P51800048719 · possession Dec 2026 · 49.3% built
- The Autograph · KurlaChetna Enterprises · P51800048773 · possession Dec 2026 · 45% built · 1 complaint
- Hill Star · BorivaliRight Channel Buildcon LLP · P51800048810 · possession Jun 2027 · 75% built
- JASWANTI JEWEL · BorivaliPARADISE CONSTRUCTION COMPANY · P51800048817 · possession Dec 2027 · 60.7% built
- GOYAL ASPIRE · BorivaliNEXA BUILDCON LLP · P51800048818 · possession Oct 2026 · 87.7% built
- Pratap Cress · BorivaliJPV Realtors Private Limited · P51800048821 · possession Dec 2026 · 46.4% built
- ROYAL BLISS · BorivaliROYAL DEVELOPERS · P51800048835 · possession Dec 2027 · 15.5% built
- Chandraprabha · KurlaManisha Supreme Realty LLP · P51800048875 · possession May 2026 · 87.3% built
- Woods Platina Wing C - Walnut Tower · AndheriSukoon Developers Pvt Ltd · P51800048890 · possession Dec 2026 · 83.6% built
- CHOUHAN LANDMARK · AndheriChouhan Builders India HSG Development Pvt Ltd · P51800048925 · possession Nov 2027 · 36.8% built
- ASTRUM ANNEX · BorivaliASTRUM REALITY PRIVATE LIMITED · P51800048947 · possession Jun 2026 · 81.8% built
- ORCHID VASUNDHARA · AndheriORCHID BUILTCON PVT. LTD. · P51800048969 · possession Dec 2026 · 25.7% built
- SHEETAL MEGHDOOT · BorivaliD G LAND DEVELOPERS PRIVATE LIMITED · P51800048997 · possession Dec 2026 · 63% built
- Swastik Tulip · KurlaSwastik Homes · P51800049000 · possession Dec 2026 · 45.8% built
- HAWARE AMARA · KurlaHAWARE AMARA LLP · P51800049029 · possession Jan 2028 · 81.8% built
- 11.11 BUSINESS PARK · AndheriROCKWELL DEVELOPERS LLP · P51800049065 · possession Dec 2027 · 55% built
- Woods Platina Wing D - Oak Tower · AndheriSukoon Developers Pvt Ltd · P51800049102 · possession Dec 2026 · 83.2% built
- MALAD SUKH SADAN CHSL · BorivaliFERRO BUILD · P51800049106 · possession Dec 2026 · 81.8% built
- SILICON PARK BUILDING NO 3 · BorivaliIMPACT CONSTRUCTION CO · P51800049136 · possession Dec 2027 · 37.9% built
- Merushikhar · Mogra, Andheri EastSavvy Infrastructure Private Limited · P51800049155 · possession Mar 2026 · 55% built · 1 complaint
- Jeevan Tara CHS LTD · AndheriRegent Builders · P51800049161 · possession Mar 2027 · 56.4% built
- Florence Heights A and B Wing · BorivaliM/s Vinayak Developers · P51800049192 · possession Jun 2026 · 76.3% built
- SEVENTY SEVEN · AndheriTROCADERO ASSOCIATES · P51800049193 · possession Mar 2027 · 70.5% built
- Rustomjee Aden · AndheriKeysky Realtors Pvt Ltd · P51800049222 · possession Dec 2026 · 69.8% built
- D J Nest · KurlaDHIRAJ narayandas JADHWANI · P51800049265 · possession Mar 2027 · 76.4% built
- Elegant Residency · AndheriELEGANT BUILDERS AND DEVELOPERS · P51800049271 · possession Dec 2026 · 78.5% built
- ASCEND TOWER · BorivaliM. MAMTORA ASSOCIATES · P51800049273 · possession Dec 2027 · 60.2% built
- SHRI SIDDHIVINAYAK BY DEM · BorivaliDEM Realty LLP · P51800049306 · possession Jun 2026 · 90.9% built
- VIRESHWAR DARSHAN CHS LTD · VILE PARLE EASTVIRESHWAR DARSHAN CHS LTD · P51800049312 · possession Jun 2024 · 70% built
- Gayatri Heights · AndheriGayatri Properties · P51800049323 · possession Jun 2026 · 90.2% built
- Anant Nakshatra Tower 2 · BorivaliM CONSTRUCTION COMPANY · P51800049339 · possession Dec 2026 · 66.4% built
- CITI NEST · ANDHERI - EASTBasons Investments Private Limited · P51800049340 · possession Dec 2024 · 36.8% built
- SACH SPLENDID · AndheriSACH REALTORS · P51800049343 · possession Apr 2027 · 42.7% built
- THE CAPITAL · BorivaliANS LIFESTYLE REALTORS LLP · P51800049366 · possession Dec 2027 · 43.3% built · 1 complaint
- Komal Kounteya CHSL · BorivaliRander Bandhu Corporation LLP · P51800049376 · possession Jun 2026 · 94.5% built
- SARVODAYA HEIGHTS · KurlaCMG ENTERPRISES · P51800049428 · possession Sept 2026 · 70.6% built
- Intelligentia Horizon by Haware Properties · MumbaiHaware Intelligentia Properties LLP · P51800049437 · possession Dec 2027 · 43.6% built · 1 complaint
- RAJDEEP CHS LTD · BorivaliCHINNAPAN SWAMY ANTHONY · P51800049463 · possession Jun 2026 · 90.7% built
- Hitendra Dhamm Shabha Co-operative Housing Society Limited · BorivaliCRYSTAL CONSTRUCTION COMPANY · P51800049489 · possession Sept 2026 · 71.8% built
- PLATINUM VISTA · AndheriPLATINUMCORP SKYTOWERS LLP · P51800049496 · possession Jun 2026 · 60.8% built
- AKSHAYA AND JAYSHREE REDEVELOPMENT · BorivaliNHI DEVELOPERS LLP · P51800049511 · possession Dec 2026 · 63.6% built
- ARHAM ARYA · KurlaMahavir Enterprises · P51800049525 · possession Dec 2026 · 70.5% built
- GS CASA · KurlaPRACH REALCON LLP · P51800049559 · possession Dec 2026 · 71.5% built
- VICEROY PRIVE · BorivaliSIMBA PROPERTIES LLP · P51800049560 · possession Dec 2027 · 74.1% built
- GOODWILL CO OPERATIVE HOUSING SOCIETY LTD · MumbaiTRIMURTI BUILDCON BUILDERS AND DEVELOPERS · P51800049604 · possession May 2026 · 71.8% built
- CHARKOP RAMVIJAY CHS LTD · BorivaliCHARKOP RAMVIJAY CHS LTD · P51800049620 · possession Dec 2026 · 49.8% built
- SHREE SHRINATH DARSHAN · AndheriDisha Realtors · P51800049624 · possession Dec 2026 · 73.6% built
- SIDDHARTH NAGAR SIDDHIVINAYAK CHS LTD · BorivaliINFINITY CONSTRUCTIONS · P51800049630 · possession Dec 2027 · 76.8% built
- ROCK HIGHLAND · BorivaliROCK ESTATES · P51800049632 · possession Dec 2026 · 18.2% built · 2 complaints
- Stellar Heights · AndheriSTARWING DEVELOPERS PRIVATE LIMITED · P51800049642 · possession Dec 2026 · 60.4% built
- Sainath Vrindavan · KurlaKunal Kanaiya Kataria · P51800049646 · possession Dec 2026 · 67.2% built
- SIDDHARTH NAGAR PARADISE CHS LTD · BorivaliINFINITY CONSTRUCTIONS · P51800049649 · possession Dec 2026 · 81.6% built · 1 complaint
- Ajmera Eden · Ghatkopar East MumbaiShree Yogi Realcon Private Limited · P51800049667 · possession Jan 2027 · 12.7% built
- Parleshwar Aangan · Vile Parle EastPanom Developers LLP · P51800049682 · possession Dec 2026 · 90.9% built
- JAY KRISHNA · BorivaliTHE GREEN VENTUREZ · P51800049694 · possession Dec 2025 · 100% built
- Shraddha Pavillion · KurlaShraddha Prime Projects Limited · P51800049739 · possession Jan 2027 · 35.4% built
- Rustomjee Ashiana · AndheriFERRUM REALTORS PRIVATE LIMITED · P51800049755 · possession Feb 2027 · 87.3% built
- BHAGWAN RESIDENCY · KurlaV3 PARTNERS · P51800049808 · possession Oct 2026 · 125.5% built
- ocean view · AndheriSTAR CONSTRUCTION · P51800049811 · possession Dec 2026 · 25% built
- Horizon Giridarshan · Mulund WestHORIZON PROMOTERS INDIA LTD · P51800049813 · possession Jun 2025 · 90.9% built
- Shree Sai Sharan Co op HSG Society Sale Building · Andheri eastP D ASSOCIATES · P51800049814 · possession Oct 2024 · 100% built · 3 complaints
- KANNAMWAR NAGAR DATTA NIWAS · KurlaVIGHNAHARTA HEIGHTS PRIVATE LIMITED · P51800049818 · possession Dec 2026 · 1.8% built
- SIPS Jalaram · Ghatkopar Kirol, MumbaiSIPS Buildcon · P51800049834 · possession Apr 2026 · 100% built
- I-STAY TOWER-F · AndheriI-STAY HOUSING PRIVATE LIMITED · P51800049840 · possession Oct 2028 · 18.2% built
- 140 SHER - E- PUNJAB · AndheriINSHA LIFESTYLE LLP · P51800049852 · possession Jun 2026 · 70.5% built
- SHRADDHA WEST RESIDENCY · AndheriSHRADDHA BUILDCON PVT LTD · P51800049859 · possession Dec 2026 · 35.5% built
- Sunbeam Heights · AndheriSun Beam High Tech Developers Private Limited · P51800049875 · possession Dec 2027 · 34.1% built
- ASHTAVINAYAK APARTMENTS · AndheriSHIV SHRUTI DEVELOPERS LLP · P51800049920 · possession Jun 2026 · 77.7% built
- BLUE STAR CRYSTAL CHSL · BorivaliPARADIGM BLUE STAR LLP · P51800049927 · possession Jul 2027 · 74.8% built
- SHAKTI TROMBAY 88 · KurlaVASHU RAHEJA SONS REALTY LLP · P51800049964 · possession Dec 2025 · 97.7% built
- Kamla Borivli Rajesh · BorivaliKAMLA HOMES AND LIFESTYLES PRIVATE LIMITED · P51800049969 · possession Mar 2027 · 94.6% built
- Rekhaz · Mulund West, MumbaiR Nutan Builders Private Limited · P51800049987 · possession Mar 2027 · 44.5% built
- New Saket Co-operative Housing Society Ltd. · AndheriSM Magnate Construction · P51800049992 · possession Jun 2026 · 89.1% built
- SANJARY APARTMENTS · KurlaR SHAH ENTERPRISES PRIVATE LIMITED · P51800049997 · possession Aug 2026 · 72.3% built
- Drushti Emerald · KurlaSAMARTH DRUSHTI DEVELOPERS · P51800050013 · possession Dec 2026 · 77.7% built
- Swastik Coral · KurlaSwastik Homes · P51800050020 · possession Dec 2027 · 86.5% built
- PREESHA PARADISE · Borivali westVASTU REALTORS AND DEVELOPERS · P51800050024 · possession Dec 2025 · 71.8% built
- Siddhanta 180 · AndheriPraneeta Infrastructure LLP · P51800050026 · possession Jun 2027 · 29.1% built · 1 complaint
- RAJSHREE ASHISH CO-OPERATIVE HOUSING SOCIETY LIMITED · KurlaVINOD PRALHAD CHOUDHARI · P51800050063 · possession Sept 2027 · 52.3% built
- Nehru Nagar Nirmal C.H.S. Ltd. · KurlaDeraiya Realtors Private Limited · P51800050064 · possession Dec 2026 · 90.7% built
- BANDRA SIDDHARTH CO OP HSG SOC LTD · BANDRA WESTL NAGPAL BUILDERS LLP · P51800050072 · possession May 2025 · 100% built
- JAYMALA SADAN CHSL · BorivaliSWAANAND BUILDERS AND CONTRACTORS · P51800050074 · possession Dec 2026 · 26.5% built
- Happy Home Enclave · BorivaliJD & FC Ventures LLP · P51800050078 · possession Dec 2026 · 99.1% built
- SANTACRUZ ANURAG MANDIR CHSL · SANTACRUZS M CONSTRUCTIONS · P51800050095 · possession Aug 2024 · 90.9% built · 1 complaint
- Orient Regency Building No. 1 · KurlaORIENT COMBINE · P51800050097 · possession Dec 2026 · 76.4% built
- CHARKOP NANDANVAN CHSL · BorivaliJADEITE DEVELOPERS LLP · P51800050125 · possession Dec 2026 · 73.8% built · 1 complaint
- Neelyog Regent · KurlaRatan Builders · P51800050133 · possession Mar 2028 · 46.3% built
- Tricity Natraj · Wadhavali, ChemburTricity Realty LLP · P51800050160 · possession Dec 2025 · 77% built
- The Wave · AndheriWebtech Realty LLP · P51800050188 · possession Jul 2026 · 71.3% built
- SHRADDHA GOLD CREST · BorivaliShree Krishna Rahul Developers · P51800050191 · possession Dec 2027 · 41.5% built · 1 complaint
- Kandivali Hanuman Co-op Housing Society Ltd. · BorivaliKandivali Hanuman Co-op Housing Society Ltd. · P51800050192 · possession Nov 2026 · 67.7% built
- Sigma Pearl · AndheriAshapura Shelters Private Limited · P51800050197 · possession May 2026 · 90.9% built
- FAIRFIELD BY S RAHEJA · AndheriS RAHEJA SPACES LLP · P51800050212 · possession Jun 2027 · 44.5% built
- Dhanraj Tower · KurlaGOVINDRAJULU PAPA NAIDU · P51800050240 · possession Jun 2027 · 54.9% built
- MARATHON NEOVALLEY NARMADA WING B · KurlaM/S NEXZONE FISCAL SERVICES PVT LTD · P51800050264 · possession Dec 2027 · 37.3% built · 1 complaint
- Rustomjee Cleon · AndheriKEYSTONE REALTORS LIMITED · P51800050269 · possession Jun 2027 · 78.9% built
- Laxmi Heights · BorivaliM/S LAXMI LIFESPACES · P51800050273 · possession Sept 2026 · 47.3% built
- Navratna · VileparleOm Navratna Enterprises LLP · P51800050281 · possession Mar 2026 · 90.9% built
- Aarambh Phase III by group Satellite · AndheriSatellite Developers Private Limited · P51800050326 · possession Aug 2027 · 1.8% built
- APURVA VAISHALI CHSL · BORIVALI EASTDIRAVYA DEVELOPERS LLP · P51800050330 · possession Sept 2025 · 90.9% built
- SHEETAL SURYA PRAKASH · AndheriVASUNDARA LIFESTYLE PRIVATE LIMITED · P51800050331 · possession Dec 2026 · 23.6% built
- LA GRACE · AndheriEcohomes Ventures · P51800050347 · possession Dec 2026 · 76.8% built
- Rivali Park - Sunburst · BorivaliCCI PROJECTS PRIVATE LIMITED · P51800050351 · possession Aug 2028 · 53.6% built
- Shraddha Presidency · KurlaShraddha Landmark Private Limited · P51800050356 · possession Dec 2026 · 41% built · 1 complaint
- SUPREMO PHASE I SALVIA D WING · KurlaK V BUILDHOME LLP · P51800050377 · possession Dec 2029 · 24.5% built
- NICCO RESIDENCY · AndheriNEELKAMAL REALTY & CONSTRUCTION LLP · P51800050433 · possession Dec 2026 · 28.4% built
- Pramukh Krupa Phase Two · KurlaPinal Realty LLP · P51800050490 · possession Mar 2027 · 65.9% built
- SAMARTH AURA PHASE -2 · KurlaSHREE ASHAPURA COMBINE · P51800050555 · possession Dec 2027 · 90.9% built · 1 complaint
- K L VALERIA · AndheriK L HOUSING LLP · P51800050591 · possession Sept 2026 · 90% built
- Smriti · GOREGAON EASTMahesh Balkrishna Sambhus · P51800050592 · possession Mar 2026 · 81.8% built
- LA SERENA Tower 5, Tower 6 and Tower 7 · BorivaliPEBBLE PARK DEVELOPERS LLP · P51800050593 · possession Dec 2028 · 70.9% built
- Gopal Terrace Co-operative Housing Society LTD · BorivaliPolo Infra Developers Private Limited · P51800050616 · possession Sept 2026 · 54.5% built
- The Waterfront · AndheriM/s Orbit Developers · P51800050617 · possession Aug 2026 · 56.9% built · 1 complaint
- ATRIA ARSHABHARAT · MumbaiDHARTI AAKAR REALTY · P51800050652 · possession Aug 2026 · 36.8% built
- Yogi Sea · Khar (West)Yogi Limited · P51800050666 · possession Sept 2026 · 72.7% built
- Grace Palacio · MumbaiGrace Infracon & Property Developers (I) Private Limited · P51800050668 · possession Dec 2026 · 61.4% built · 1 complaint
- Elysian Tower C, D, E · BorivaliOberoi Realty Limited · P51800050677 · possession Oct 2031 · 44.4% built
- MULUND GIRIRAJ CHSL · MULUND WESTANON DEVELOPERS · P51800050695 · possession Dec 2025 · 65.5% built
- Wadhwa 723 Avenue · AndheriHarshvardhan Constructions · P51800050698 · possession May 2026 · 27.7% built
- Devtaa Pratham · BorivaliVIPUL MITRA CO-OPERATIVE HOUSING SOCIETY · P51800050716 · possession Dec 2026 · 56.4% built
- SUNDER BAUG CHSL · BorivaliS S CONSTRUCTION · P51800050727 · possession Dec 2026 · 64.1% built
- DEM ICON · CharkopDEM Developers LLP · P51800050731 · possession Mar 2026 · 86.6% built
- SKY LARK · AndheriRAJENDRA PUNDLIKRAO GODSHALWAR · P51800050748 · possession Dec 2027 · 18.2% built
- UNIQUE SHINE · KurlaFAZAL MEHMOOD SHAIKH · P51800050757 · possession Dec 2026 · 63.9% built
- DEVBHOOMI · AndheriMETRO CAPITAL · P51800050788 · possession Dec 2026 · 79.9% built
- One Meraki Wing C and Wing D · KurlaMeraki Habitats LLP · P51800050796 · possession Dec 2026 · 84.7% built
- MARQUIS RESIDENCES PHASE 1 · MumbaiEMBASSY ENTERPRISES · P51800050800 · possession Dec 2027 · 90.9% built
- RAGHAV PARIJAT · KurlaRAGHAV Realty Developers · P51800050808 · possession Dec 2026 · 59.1% built
- I-STAY TOWER-E · AndheriI-STAY HOUSING PRIVATE LIMITED · P51800050809 · possession Nov 2028 · 8.2% built
- Arham Aryan · KurlaTrinity Builders · P51800050811 · possession Dec 2026 · 43.2% built
- 24 Karat · AndheriPaper Mill Plant and Machinery Manufacturers Limited · P51800050840 · possession Mar 2029 · 62.9% built · 2 complaints
- RISHABRAJ MANGALESH · BORIVALI WESTRISHABRAJ INFRA LLP · P51800050841 · possession Dec 2026 · 90.9% built
- 19 DEGREE NORTH · AndheriARUNIS EDIFICE PRIVATE LIMITED · P51800050846 · possession Jun 2026 · 66.8% built
- AVNEESH IMPERIUM · KurlaMagnaacasa Infrastructures & Realtors Pvt ltd ( Erstwhile Akshay Housing) · P51800050853 · possession Dec 2027 · 34.1% built
- Pratap Adinath · BorivaliJPV Realtors Private Limited · P51800050861 · possession Dec 2027 · 49.6% built
- VASTU SHILP · BorivaliVastu Nirman Realtors · P51800050892 · possession Dec 2026 · 41.1% built
- Saraswati Square · KurlaMetro Infrastructure · P51800050901 · possession Dec 2027 · 27.3% built
- 5TH ELEMENT · AndheriPRATHAM VARADVINAYAK BUILDERS AND DEVELOPERS PRIVATE LIMITED · P51800050904 · possession Jun 2026 · 76.9% built · 2 complaints
- MARSHAL SRISHTI II · KurlaMARSHAL ENTERPRISES · P51800050922 · possession Dec 2028 · 70.9% built
- K L ASTORIA · BANDRA WESTK L HOUSING LLP · P51800050933 · possession Dec 2025 · 100% built
- Sai Divine · BorivaliSHREEJI DEVELOPERS · P51800050948 · possession Dec 2027 · 29.1% built
- Aishwarya Optima · KurlaAishwarya Associates LLP · P51800050999 · possession Apr 2027 · 63.4% built
- ONE JOGESHWARI · AndheriUNIQUE DEVELOPERS · P51800051003 · possession Dec 2026 · 78.9% built · 3 complaints
- SRISHTI OASIS PH 3 WING C ZONE C1 AND C2 · KurlaSHIV KRUPA ENTERPRISE · P51800051004 · possession Dec 2029 · 65% built
- GIRIRAJ · BorivaliGO DEVELOPER · P51800051058 · possession Dec 2026 · 36.4% built
- ACE INFINIA · MULUND WESTAce properties · P51800051062 · possession Dec 2025 · 44.5% built
- Express Tower CHS · BorivaliKOSMOS DEVELOPERS · P51800051077 · possession Feb 2028 · 58.6% built
- KEVLI PLAZA – A WING AND KEVLI DARSHAN – B WING · KurlaM/s R K AND COMPANY PVT LTD · P51800051082 · possession Dec 2028 · 56.6% built
- VRAJ GATEWAY-APARNA CHSL · BorivaliVRAJ DEVELOPERS · P51800051086 · possession Dec 2028 · 62.1% built
- MARQUIS RESIDENCES PHASE 2 · MumbaiEMBASSY ENTERPRISES · P51800051092 · possession Dec 2028 · 79.1% built
- Shikhhar · BorivaliMAHAVIR LAND DEVELOPER · P51800051096 · possession Sept 2026 · 90.9% built
- SOMANI 72 EAST · KurlaNIRCON DEVELOPERS PVT LTD · P51800051115 · possession Dec 2026 · 44.3% built
- THE LEGEND · KurlaEMPIRE MAITRI FLORA CONSTRUCTIONS LLP · P51800051126 · possession Sept 2026 · 57.7% built
- Shree Pinal Project B · KurlaPinal Realty LLP · P51800051150 · possession Nov 2027 · 20.5% built
- STATE SECTOR BANK EMPLOYEES CHS LTD KAILAS BUILDING · BORIVALI WESTKonark Structural Engineers Private Limited · P51800051152 · possession Mar 2027 · 71.8% built
- BHAVIK DARSHAN CHS LTD AND GAJMUKH CHS LTD · BorivaliKonark Structural Engineers Private Limited · P51800051166 · possession Dec 2027 · 57.3% built
- Godrej Bliss · BorivaliSHIVAM DEVELOPERS · P51800051172 · possession Nov 2029 · 42.8% built · 1 complaint
- MODIREALTY ASHVATTHA · BorivaliMODIREALTY DEVELOPERS PVT LTD · P51800051189 · possession Mar 2027 · 72.3% built
- JAYKANT BLISS · BorivaliCHITALIA BUILDERS · P51800051199 · possession Dec 2026 · 67.7% built
- REDEVELOPMENT OF PEARL PALACE · AndheriPRANAV CONSTRUCTIONS LIMITED · P51800051212 · possession Sept 2027 · 72.7% built
- CHARKOP 1 ABHILASHA CO OPERATIVE HOUSING SOCIETY LIMITED · BorivaliCHARKOP (1) ABHILASHA CO OPERATIVE HOUSING SOCIETY LIMITED · P51800051230 · possession Dec 2026 · 51.4% built
- ShreejiAikyam · BorivaliRushabh Developers · P51800051233 · possession Dec 2028 · 7.9% built
- THE SOLARIS · KurlaSOSAR ENTERPRISES · P51800051256 · possession Dec 2026 · 81.8% built
- J-24 Mahavir Nagar CHS Ltd · BorivaliKONARK RAJENDRA SHAH · P51800051283 · possession Mar 2027 · 69.5% built · 1 complaint
- La Charmaine CHSL · Malad WestJDN DEVELOPERS · P51800051287 · possession Dec 2025 · 63.6% built
- Nav Indralok · KurlaNav Indralok Co-Operative Housing. Society Limited · P51800051310 · possession Dec 2026 · 49.1% built
- Kalpataru Vivant - North Wing A · AndheriAlder Residency Private Limited · P51800051328 · possession Dec 2028 · 74.5% built
- BALAJI DARSHAN · BorivaliSTARSPACE VENTURES PRIVATE LIMITED · P51800051329 · possession May 2026 · 87.3% built
- SHRADDHA CHS ADITYARAJ ANCHOR · KurlaADITYARAJ BUILDERS · P51800051334 · possession Mar 2027 · 68.2% built
- KABRA GARNET - Redevelopment of Jayvikas Premises Co-Op Hsg Soc Ltd · Malad WestKABRA AND ASSOCIATES · P51800051344 · possession Dec 2026 · 57.7% built
- UK IONA C Wing · AndheriKeemaya Build Private Limited · P51800051359 · possession Dec 2027 · 51.4% built
- RAJARAM MANSION · KurlaSHREE RUCHITA CORPORATION · P51800051362 · possession Dec 2027 · 59.1% built