All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 4 of 48.
Aurangabad
- Choudhary Bhuvi landmarks - I · TisgaonNEST DEVELOPERS · P51500004842 · possession Dec 2019 · 54.8% built
- OMICRON ASPIRE · Aurangabad (M Corp.)OMICRON DEVELOPERS · P51500004987 · possession Jun 2018 · 66.6% built
- NAMAN VIHAR · TisgaonSANJAY SHYAMLAL VYAS · P51500005043 · possession May 2019 · 50% built
- Choudhary Bhuvi Landmarks - II · TisgaonNEST DEVELOPERS · P51500005055 · possession Dec 2022 · 66.8% built
- UDYOG KAUSHALYA · NaigaonFAITH BUILD CONSTRUCTIONS PVT LTD · P51500005067 · possession Dec 2030 · 30.3% built
- BHASKAR VASTUPURTI · AURANGABADPRATIK BUILDCON · P51500005068 · possession Dec 2024 · 51.8% built
- Adinath Suvastu · Satara (CT)ADINATH DEVELOPERS · P51500005255 · possession Dec 2019 · 90.9% built
- GOLOK CARNATION · Wadgaon Kolhati (CT)GOLOK DEVELOPERS · P51500005262 · possession Dec 2026 · 58.5% built
- The HUB · Shendra KamangarZAMBAD INFRASTRUCTURE LIMITED · P51500005443 · possession Dec 2019 · 88.6% built
- JAI NILAYA BUILDING A · SHAHNOORWADINISHA CONSTRUCTIONS · P51500005563 · possession Jun 2018 · 81.8% built
- SIMPLICITY G BUILDING · FattepurASCENTVENTURES · P51500005615 · possession Jun 2023 · 90.9% built
- TAWDE NISHIGANDH · DevlaiTAWDE BUILDERS AND ASSOCIATES · P51500005654 · possession Dec 2027 · 64.8% built
- YASHRAJ TOWER · Aurangabad (M Corp.)RUTUJA DEVELOPERS · P51500005659 · possession Nov 2018 · 85.9% built
- SAMARTH RESIDENCY · Shendra KamangarAKSHAY BUILDERS AND DEVELOPERS · P51500005674 · possession Jul 2018 · 25.5% built
- SAI NAKSHATRA BUILDING A AND B PHASE- I · NAKSHATRAWADI AURANGABADVIKAS LAXMAN CHAUDHARY · P51500005710 · possession Dec 2019 · 90.9% built
- SHIVAR · ApatgaonECON DEVELOPERS · P51500005733 · possession Dec 2026 · 22.1% built
- SILVER PARK · Near sai mandirPRASHANT MAHABALESHWAR RAIKAR · P51500005919 · possession Dec 2019 · 86.4% built
- vrundavan residency · Aurangabad (M Corp.)Tejal Builders and Developers · P51500006020 · possession Dec 2022 · 71.8% built
- SHRINATH PARK · PisadeviSHRI NATH VIHAR CONSTRUCTIONS · P51500006059 · possession Jun 2022 · 81.8% built
- BLUE BELLS · Aurangabad (M Corp.)PREMCHAND BUILDERS AND DEVELOPERS · P51500006113 · possession Dec 2021 · 90.9% built
- KALYANI SAI VISHWA · SAWANGIRAJASHREE UDYOG · P51500006121 · possession Mar 2028 · 73.9% built
- Prasad Nagar · Aurangabad (M Corp.)Prasad Construction · P51500006151 · possession Dec 2017 · 90.9% built
- Ramchintan Park · AurangabadMewani Infrstrcture · P51500006207 · possession Oct 2026 · 53.8% built
- Sakshi Varad Vinayak Phase II · AURANGABADSAKSHI BUILDERS · P51500006213 · possession Oct 2018 · 90.9% built
- Ved Mantra · Aurangabad (M Corp.)Rajesh Baburao Dole · P51500006217 · possession Jul 2018 · 81.4% built · 1 complaint
- ELITE SQUARE · Aurangabad (M Corp.)SHRINIWAS ASSOCIATES · P51500006306 · possession Dec 2019 · 46.4% built
- SILVER PARK · Near Sai MandirSUDESH RANCHODDAS VAISHNAV · P51500006425 · possession Jul 2018 · 90.9% built
- kalyani classic · Aurangabad (M Corp.)Bhagwan pandurang Ghadge · P51500006528 · possession Apr 2018 · 63.6% built
- PUSHPVIHAR · Aurangabad (CB)A K ENTERPRISES · P51500006569 · possession Jul 2019 · 68.4% built
- KUMBHESHWAR PARK · KubhephalRAM VIJAY DEVELOPERS · P51500006656 · possession Mar 2018 · 100% built
- KALYANI SAI SWAROOP · Aurangabad (M Corp.)J K BUILDERS AND DEVELOPERS · P51500006684 · possession Mar 2019 · 75% built
- Radhakrishna Residency Phase II · MitmitaSAKSHI BUILDERS · P51500006840 · possession Dec 2021 · 90.9% built
- TEJAL SANSKRUTI · Aurangabad (M Corp.)YASHRAJ INFRASTRUCTURE · P51500007020 · possession Jan 2018 · 100% built
- S S PARK · Aurangabad (M Corp.)S S DEVELOPERS · P51500007039 · possession Mar 2019 · 88.6% built
- SAI SAMRUDDHI PARK · Aurangabad (M Corp.)LANDMARK INFRASTRUCTURE · P51500007073 · possession Sept 2019 · 89.1% built
- OM PLATINA · Satara (CT)PUNJAB SHIVAJIRAO TAUR · P51500007102 · possession Dec 2021 · 89.1% built
- SAI SANKULPHASE II · Aurangabad (M Corp.)TIRUPATI BUILDERS AND DEVELOPERS · P51500007119 · possession Sept 2018 · 86.8% built
- SAINAGARI PHASE 1 · ShendrabanSai Sharaddha Builders and Developers · P51500007328 · possession Dec 2024 · 66.7% built
- PRASANNA SUYASH · SundarwadiPRASANA SUYASH BUILDERS AND DEVELOPERS · P51500007449 · possession Dec 2018 · 36.5% built
- SAI KAMAL · Waluj Mahanagar 1OM SAI KAMAL BUILDERS AND DEVELOPERS · P51500007461 · possession Jun 2018 · 90.9% built
- SAI GHARKUL · Aurangabad (M Corp.)TIRUPATI DEVELOPERS · P51500007496 · possession Sept 2018 · 85.5% built
- RAMESHWARAM · NAIK NAGARUPADHYAYA REALITIES · P51500007678 · possession Dec 2019 · 89.1% built
- PARIJAT C · Aurangabad (M Corp.)DEVEN DEVELOPERS · P51500007708 · possession May 2019 · 58.6% built
- Classic Samarth Villa · Aurangabad (M Corp.)Shree Rajrajeshwar Builders & Developers · P51500007813 · possession Jun 2019 · 90.9% built
- varun residency · nakashtrawadiVARUN RESIDENCY · P51500007831 · possession Mar 2018 · 73.2% built
- JABINDA RESIDENCY TYPE-I · Aurangabad (M Corp.)JAWANDHA CONSTRUCTION PRIVATE LIMITED · P51500007851 · possession Dec 2021 · 81.8% built
- AKSHAD PURAM · Gangapur JahagirVANSH BUILDCON · P51500007853 · possession Nov 2018 · 78.2% built
- DHRUV GOKULDHAM · SundarwadiDHRUV BUILDCON · P51500007864 · possession Dec 2024 · 88.9% built
- PRINCE TOWER · Aurangabad (M Corp.)ADITYA BUILDCON · P51500007890 · possession Dec 2019 · 90.9% built
- JAY SHRI KRISHNA SANKUL · Aurangabad (M Corp.)hariomconstruction · P51500007901 · possession Dec 2018 · 44.5% built
- Amrut Sai Solitaire · Opp. MTDCShivaji Construction Company · P51500007917 · possession Jul 2019 · 76.4% built
- CHAITANYA ARYAN CITY · TisgaonRAHUL BASWANT NANDGAWALI · P51500007926 · possession Aug 2018 · 90.9% built
- NOORJAHAN APARTMENT · OSMANPURABALAJI CHANDRABHAN PATIL · P51500008027 · possession Sept 2019 · 90.9% built
- PARIJAT-A · Aurangabad (M Corp.)DEVEN DEVELOPERS · P51500008142 · possession Jan 2019 · 81.8% built
- S S PARK PHASE 2 · Aurangabad (M Corp.)S S DEVELOPERS · P51500008157 · possession Mar 2019 · 72.7% built
- MANOMAY RESIDENCY · Gut No 58Gayatri Developers · P51500008163 · possession Dec 2021 · 90.9% built
- Meera Square · Aurangabad (M Corp.)Sandesh Bhivsan Wagh · P51500008177 · possession Feb 2021 · 100% built
- BIZ SQUARE · Gut No 58SAM REALTIES · P51500008228 · possession Apr 2025 · 73.2% built
- AARYA CASA · Aurangabad (M Corp.)RAJVEER INFRA PROJECTS · P51500008230 · possession Dec 2021 · 45.5% built · 1 complaint
- TIRUPATI TOWER · Aurangabad (M Corp.)PRADEEP SURYAKANT BAPTE · P51500008273 · possession Mar 2019 · 59.1% built
- Amrut Sai Kalpavruksha · Near A S ClubAmrut Developers · P51500008665 · possession Jul 2018 · 90.9% built
- Building C - D · Aurangabad (M Corp.)Shreenath Constructions · P51500009104 · possession May 2018 · 90.9% built
- K B RESIDENCY · HARSOOLK B INFRA · P51500009150 · possession Dec 2022 · 90.9% built · 1 complaint
- INDRADHANU-A · TisgaonPARTHRAJ DEVELOPERS PVT. LTD. · P51500009346 · possession Dec 2018 · 90.9% built
- SIDDHI PARK PLATINUM · Aurangabad (M Corp.)VACK BUILDERS AND DEVELOPERS PVT LTD · P51500009751 · possession Dec 2021 · 30.6% built
- SAHARE TRADE CENTRE · SillodPUSHPA NANDKISHOR SAHARE · P51500009964 · possession Mar 2023 · 80% built
- SHAMIT SINGLETON · Aurangabad (M Corp.)S S SINGLETON · P51500009966 · possession Aug 2019 · 57.4% built · 4 complaints
- Sumeru residency · Aurangabad (M Corp.)Sumeru Realities · P51500009995 · possession Mar 2018 · 80.9% built
- SAI REGENCY · Wadgaon Kolhati (CT)S S R VENTURS · P51500010121 · possession Sept 2020 · 100% built
- NISHA BAFNA PLAZA · NEAR MONDHA NAKATAPADIA AND KASLIWAL VENTURES · P51500010207 · possession Sept 2022 · 66.5% built
- SAI BAN · SundarwadiBKT Group · P51500010316 · possession Mar 2025 · 100% built
- MATRIX COMPLEX · Kalda CornerVishwa Developers · P51500010410 · possession Dec 2026 · 63.6% built · 1 complaint
- BHAGIRATHI VAIBHAV · Aurangabad (M Corp.)M/S VAIBHAV DEVELOPERS · P51500010547 · possession Dec 2017 · 75.5% built
- Shamit Octozone Sunder Heritage · Aurangabad (M Corp.)SUNDER HERITAGE · P51500010697 · possession Feb 2028 · 46.9% built
- Krushnasundar Residency · Aurangabad (M Corp.)Sanjay Baliram Jadhav · P51500010862 · possession Dec 2017 · 90.9% built
- AQ HEIGHTS · Aurangabad (M Corp.)AQ INFRASTRUCTURE PRIVATE LIMITED · P51500011237 · possession Feb 2021 · 76.4% built
- SHAMIT OCTOZONE SUNDER SIDDHI · Aurangabad (M Corp.)SUNDER SIDDHI · P51500011267 · possession Aug 2019 · 72% built · 13 complaints
- AMRUT SAI PLAZA PH 2 · Silk Mill ColonyShree Amrut Sai Developer Pvt.Ltd · P51500011307 · possession Jul 2026 · 78.2% built
- SHREE SHIVNATH DEVELOPERS · KubhephalSHREE SHIVNATH DEVELOPERS · P51500011333 · possession Jun 2019 · 24.6% built
- KARTIKI VALLEY · Aurangabad (M Corp.)SHASHWAT ASSOCIATES · P51500011380 · possession Dec 2018 · 81.8% built
- HARI OM NAGAR · DevlaiRRB BUILDER · P51500011402 · possession Sept 2020 · 69.4% built
- AMAR KRISHNA KUNJ · UTTRANAGRIAMAR BUILDERS AND DEVELOPERS · P51500011448 · possession Dec 2020 · 90.9% built
- Neeraj Vihar · Aurangabad (M Corp.)Rajendra Surana · P51500011515 · possession Aug 2019 · 60.5% built
- SAINATHVILLA Phase II · SundarwadiSainath Builders & Developers · P51500011537 · possession May 2018 · 93% built
- Shree Hari Park · Aurangabad (M Corp.)Hari Chandra Construction · P51500011569 · possession Oct 2018 · 63.6% built
- FLORA PHASE I · TISGAONTAPADIA CONSTRUCTIONS LIMITED · P51500011591 · possession Jun 2019 · 79.7% built
- The Auracon · GarkhedaAuracon Ventures · P51500011621 · possession Dec 2026 · 89.1% built
- GANESHKUNJ APARTMENT · NEAR SAI BABA MANDIRGURULAXMI BUILDERS · P51500011695 · possession Sept 2022 · 90.9% built
- VENKATESH VISHWA · AURANGABADTIRUPATI BUILDERS AND DEVELOPERS · P51500011725 · possession Mar 2022 · 50.9% built
- SAMBHAJI RESIDENCY · BidkinBABURAO PUNJARAM THANGE · P51500011831 · possession May 2019 · 81.8% built
- BHASKAR VASTUPURTI APARTMENT · Aurangabad (M Corp.)PRATIK BUILDCON · P51500011897 · possession Oct 2020 · 55.9% built
- AKSHAD NAGAR · Shendra KamangarVANSH HEIGHTS · P51500012002 · possession Aug 2019 · 83.6% built
- NIRMAN BHARATI CITY CENTRE · Aurangabad (M Corp.)CITY BHARATI TECHNO HEROTAGE LLP · P51500012003 · possession Dec 2018 · 90.9% built
- Omkara Heights · Aurangabad (CB)MCM Developers · P51500012038 · possession Dec 2017 · 81.8% built
- SAHARE PRIDE · Sillod (M Cl)PUSHPA NANDKISHOR SAHARE · P51500012110 · possession Mar 2018 · 90.9% built
- ARCH GULMOHAR · Aurangabad (M Corp.)ARCH DEVELOPERS · P51500012291 · possession Mar 2021 · 90.9% built
- Amrut Sai Jais Ekdant · OsmanpuraAmrut Developers · P51500012339 · possession Jul 2018 · 89.1% built
- PRAGATI PHASE III · Honaji nagarM/S. PRAGATI INFRASTRUCTURES · P51500012353 · possession Dec 2019 · 90.9% built
- Oasis Insignia Phase-2 · Aurangabad (M Corp.)Oasis Landmarks · P51500012426 · possession Dec 2018 · 81.8% built
- KALYANI SAI ENCLAVE · Aurangabad (M Corp.)J K BUILDERS AND DEVELOPERS · P51500012465 · possession Dec 2019 · 59.1% built
- SAMARTH HEIGHTS · Aurangabad (M Corp.)SAMARTH VASTUPURTI · P51500012554 · possession May 2018 · 78.6% built
- VAMANANAD · Aurangabad (M Corp.)VAISHALI ANIL DESHMUKH · P51500012582 · possession Mar 2019 · 46.8% built
- S S PARK IST PHASE · Aurangabad (M Corp.)S S DEVELOPERS · P51500012611 · possession Mar 2018 · 84.1% built
- AQ TOWN · JALAN NAGARAQ INFRASTRUCTURE PRIVATE LIMITED · P51500012659 · possession Aug 2035 · 76.4% built
- GULAB VISHWA · Bhavsing puraPROPERTY VISHWA DEVELOPERS · P51500012690 · possession Dec 2020 · 61.4% built
- SHREE SAI RESIDENCY PART 4 · TisgaonRAOSAHEB SHRIPAL UDGAVE · P51500012708 · possession Dec 2017 · 90.9% built
- PARMAR NAKSHTRA · Aurangabad (M Corp.)SHREE AMBIKA ESTATES AND DEVELOPERS · P51500012797 · possession Mar 2018 · 68.2% built
- VIRAJ PEARL · Aurangabad (M Corp.)M/S. R.P. PATEL & SONS. · P51500013087 · possession Apr 2019 · 48.2% built
- CONSTRUCTION OF 240 EWS T/S ON GUT NO 09 NAKSATRAWADI AURANGABAD · NAKSHATRAWADICHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) · P51500013212 · possession Apr 2019 · 78.2% built
- PRIDE CENTURY THE OVAL · Pannalal NagarABAD ESTATE AOP · P51500013233 · possession Mar 2022 · 90.9% built
- PRIDE CENTURY EDEN GARDEN · Pannalal NagarABAD ESTATE AOP · P51500013235 · possession Sept 2022 · 90.9% built
- PRIDE CENTURY THE LORDS · Pannalal NagarABAD ESTATE AOP · P51500013248 · possession Mar 2023 · 90.9% built
- Ekdant Srushti Phase-2 · Aurangabad (CB)NANDA SANJEEVKUMAR KANKARIYA · P51500013266 · possession Dec 2022 · 14.5% built
- LOTUS RESIDENCY BUILDING C AND D · TisgaonSAJANSING MOTILAL JARWAL · P51500013304 · possession Aug 2019 · 90.9% built
- RATHI MAXIMA PHASE II · Aurangabad (M Corp.)D R CONSTRUCTIONS · P51500013398 · possession Aug 2019 · 90.9% built
- SUNRISE VILLE · CIDCO WALUJ MAHANAGAR-1AMAR BABASAHEB JADHAV · P51500013419 · possession Dec 2026 · 90.8% built
- Anita Apartment · Aurangabad (M Corp.)Arifuddin Nooruddin Siddiqui · P51500013489 · possession Nov 2018 · 27.3% built
- RENUKA COTTAGE · Satara (CT)CHETAN HIRALAL SHARMA · P51500013490 · possession Dec 2017 · 40% built
- Vantagio · OsmanpuraVyankatesh Infra · P51500013507 · possession Dec 2019 · 59.1% built
- SARA GREEN · WALUJTRINETRESHWARI BUILDCON · P51500013552 · possession Mar 2019 · 90.9% built
- ARCH GULMOHAR B-WING · Aurangabad (M Corp.)ARCH DEVELOPERS · P51500013559 · possession Dec 2021 · 81.8% built
- VARAD VATTSALYA · Gandheli Phata, Gandhile RoadGruhvattsalya Builders & Developers LLP · P51500013580 · possession Dec 2026 · 55.5% built
- Shree Hari complex · TisgaonHari Chandra Construction · P51500013650 · possession Dec 2019 · 63.6% built
- SAO KAMALABAI DREAM HOME PROJECT RESIDENCY · NEAR MADHUBAN HOTELV R CONSTRUCTIONS · P51500013653 · possession Oct 2023 · 90.9% built
- Omkar Residency · Aurangabad (M Corp.)SAMARTH DEVELOPERS · P51500013702 · possession Dec 2019 · 90.9% built
- SARA SAMRUDDHI - PHASE 1 · MIT COLLEGESARA PROPERTIES · P51500013783 · possession Mar 2020 · 81.8% built
- SHREE KRISHNA RESIDENCY · GolwadiKARWA CONSTRUCTIONS AND DEVELOPERS · P51500013874 · possession Dec 2022 · 90% built
- DATTARAJ HEIGHTS · SAWANGIPUSHPA NANDKISHOR SAHARE · P51500013996 · possession Oct 2022 · 90.9% built
- GEETANJALI RESIDENCY · TisgaonSwami Samarth Builders and Developers · P51500014296 · possession Dec 2023 · 90.9% built
- BHUVI GHARKUL · NARALIBAGBhuvi Landmarks LLP · P51500014339 · possession Dec 2021 · 90.9% built · 2 complaints
- BHAGY-PRABHA · KANCHANWADIBHAGYASHRI CONSTRUCTION · P51500014401 · possession Dec 2021 · 20% built
- SHRI DURGANAND HEIGHTS · Aurangabad (M Corp.)Babulal Punjaji Magar · P51500014424 · possession Dec 2022 · 90.9% built
- MSQUARE HEIGHTS · Aurangabad (M Corp.)SHAIKH AHEMAD YAKUB · P51500014491 · possession Dec 2028 · 31.8% built
- SHRADDHA COLONY · PalshiNACHIKETA DEVELOPERS · P51500014546 · possession Mar 2022 · 90.9% built
- SAI SARTHAK · AURANGABADPRAVIN MAHARUDRA NAGARGOJE · P51500014639 · possession Jun 2022 · 18.2% built
- APURV RESIDENCY · KARMADUKARDEPATIL DEVELOPERS · P51500014665 · possession Dec 2021 · 90.9% built
- Vrundavan Heights · WalujVrundawan Builders and Developers · P51500014741 · possession Dec 2021 · 51.8% built
- Millenia Heights · BhagyanagarLaxminarayan Shriramji Attal · P51500014763 · possession Dec 2019 · 98.2% built
- YASHRAJ ANGAN · SAVANGIRUTUJA DEVELOPERS · P51500014780 · possession Dec 2021 · 54.4% built
- RIDDHI SIDDHI PLAZA · CIDCO N-4GOPAL TRILOKCHAND AGRAWAL · P51500014798 · possession Dec 2017 · 64.5% built
- NIDHIKRUPA RESIDENCY · PLOT NO 19BSUMTILAL MANGILAL KATARIYA · P51500014861 · possession May 2019 · 21.8% built
- MORYA PARK PHASE II · HARSULHARSIDDHI BUILDERS · P51500015005 · possession Jun 2019 · 22.7% built
- AURANGABAD TRADE CENTRE · MITMITA,AURANGABADAURANGABAD TRADE CENTRE · P51500015009 · possession Dec 2018 · 90.9% built
- YOGRAJ SRUSHTI · AURANGABADYOGRAJ GROUP · P51500015073 · possession Jun 2019 · 42.7% built
- PEACE APARTMENT · PadegaonSaleem Shamsher Patel · P51500015185 · possession Jul 2021 · 74.1% built
- Skyz Hill Bagade Tower · JaisingpuraMukhtar Nisar Syed · P51500015203 · possession Dec 2019 · 58.6% built
- kamal enclave · JALAN NAGARprafulla prakash nagapurkar & others · P51500015262 · possession Dec 2019 · 90.9% built
- PRATAPGAD · AURANGABADVASTUSHRI PROMOTORS AND DEVELOPERS · P51500015280 · possession Dec 2023 · 49.8% built
- KULSWAMINI RESIDENCY · SHENDRABANSUDHAKAR VIKRAM PHAD · P51500015298 · possession Dec 2027 · 24.1% built
- GRAND TEN · GOLWADIGadiya Reality Scheme · P51500015430 · possession Sept 2019 · 62.8% built
- TIRUPATI RESIDENCY BUILDING C · NEAR CIDCO WATER TANKSAJANSING MOTILAL JARWAL · P51500015607 · possession Sept 2020 · 90.9% built
- AADINATH RESIDENCY · SHANTIPURAM/S AADINATH PROPERTIES · P51500015645 · possession Mar 2023 · 90.9% built
- MY WORLD BUILDING B1-B2-B3 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015772 · possession Dec 2024 · 31.8% built
- MY WORLD BUILDING A4 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015775 · possession Mar 2024 · 100% built · 1 complaint
- MY WORLD BUILDING A1-A2 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015785 · possession Mar 2024 · 100% built
- MY WORLD BUILDING A3 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015790 · possession Mar 2024 · 100% built
- MY WORLD BUILDING B4-B5-B6 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015814 · possession Dec 2024 · 47.7% built
- MY WORLD BUILDING B7-B8-B9 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015842 · possession Mar 2024 · 100% built
- ROYAL AVENUE · AREF COLONYALTAF AHMED MANJOOR AHMED MOHAMMED · P51500015856 · possession May 2018 · 100% built
- MY WORLD PLOT NO 2 BUILDING D1 TO D6 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015862 · possession Dec 2026 · 89.1% built
- Indrayani Towers · SataraGRAND BUILDERS AND DEVELOPERS · P51500015879 · possession Mar 2020 · 90.9% built
- DREAM HOME APARTMENT · AREF COLONYDREAM HOME CONSTRUCTIONS · P51500015881 · possession Mar 2018 · 100% built
- MY WORLD PLOT NO 3 · CHIKALTHANASIMAR PRIDE VENTURES LLP · P51500015899 · possession Dec 2026 · 93.3% built
- YASHRAJ GARDEN PHASE 1 · AURANGABADYASHRAJ INFRASTRUCTURE · P51500015997 · possession Sept 2020 · 41.8% built
- SARA PARIVARTAN SECTOR B - PH 2 · SAWANGISARA PROPERTIES · P51500016122 · possession Apr 2023 · 89.4% built
- DISHA SQUARE · DISHA SQUARE SUTGIRNI T POINT GARKHEDA PARISARDEVANANAD NARAYANRAO KOTGIRE · P51500016197 · possession Dec 2026 · 70.9% built
- AASHEERWAD HOMES · JYOTINAGARM/S. DRUSHTI DEVELOPERS · P51500016220 · possession Mar 2023 · 81.8% built
- CHANDRAMOULI PINNACLE · Satara ParisarCHANDRAMOULI PINNACLE · P51500016229 · possession Dec 2022 · 90.9% built
- GEETABAN RESIDENCY · Near Railway StationBHAISHREE VENTURES · P51500016327 · possession Dec 2021 · 81.8% built
- SARA SANGAM PHASE 1 · BAJAJ NAGARJAGRUT SARA ASSOCIATES · P51500016384 · possession Dec 2021 · 89.1% built
- SWAPNABAN · NEAR GRAMPANCHAYAT OFFICEBHAISHREE VENTURES · P51500016418 · possession Dec 2022 · 76.8% built
- SAI SPARSH · ITKHEDA AURANGABADVIKAS LAXMAN CHAUDHARY · P51500016484 · possession Apr 2024 · 90.9% built
- CHANDRA SAI APARTMENT · KANCHANWADICHANDRA BUILDER AND DEVELOPERS · P51500016559 · possession Mar 2027 · 37.3% built
- Hrim Ssky City Phase IV · SATARA PARISARAshok Baheti · P51500016766 · possession Dec 2027 · 90.9% built
- MORAYA PARK PHASE III · HARSULHARSIDDHI BUILDERS · P51500017172 · possession Dec 2022 · 32.7% built
- Khinvasara Autumn · Pannalal NagarRavindra Champalal Khinvasara · P51500017415 · possession Dec 2028 · 67.7% built
- GOLD MAPLE · NEAR ABHUSHAN PARKJAIN INFRA · P51500017523 · possession Mar 2024 · 72.7% built
- RYANS RESIDENCY · SHIOORSANCHETI GAUTAM KACHARDAS · P51500017633 · possession Jul 2026 · 87.9% built
- Khinvasara Icon · Khinvasara Park EastRavindra Champalal Khinvasara · P51500017660 · possession Jul 2022 · 30.5% built
- SHARDA ICON · SHAHANOORWADIRAHUL VISHWANATH TOBRE · P51500017851 · possession Aug 2024 · 100% built
- FLORACITY · SHENDRAPREETANSH REALTY LLP · P51500018071 · possession Sept 2023 · 81.5% built
- SMS ARCADE WING C · SEVEN HILLAayush Madhusudan Agrawal · P51500018133 · possession Dec 2019 · 90.9% built
- Arch Nikunj · MitmitaARCH DEVELOPERS · P51500018153 · possession Dec 2026 · 90.9% built
- Hiranya Enclave · Sun City B/H Best Prize MallRushikesh Tanaji Chavan · P51500018267 · possession Dec 2027 · 90% built
- RAJ LAXMI RESIDENCY · SATARAAMARDEEP PANDHARINATH GHUGE · P51500018303 · possession Oct 2024 · 90.9% built
- SAI RESIDENCY · GOLWADI BYPAASSai Shraddha Construction & Developers · P51500018321 · possession Dec 2020 · 100% built
- KISAN PARK · PISADEVIP51500018345 · possession Dec 2026 · 20.1% built
- TULIP HEIGHTS · NAKSHTRAWADIRAHUL INDARCHAND MUTHA · P51500018441 · possession Dec 2028 · 7.5% built
- TULIP HEIGHTS · ITKHEDAASK VENTURES PVT LTD · P51500018605 · possession Feb 2020 · 81.8% built
- SAI PARADISE PROJECT B · ItkhedaAvenuegold Landmarks LLP · P51500018753 · possession Oct 2021 · 90.9% built
- GURUCHARAN HERITAGE · HarsoolLAKSHYAVINAYAK DEVELOPERS · P51500018829 · possession Dec 2026 · 87.3% built
- Jalna Commercial Complex · Jalna Industrial Area Phase IIIJalna Commercial Complex Private Limited · P51500019033 · possession Dec 2022 · 100% built
- ISHANYA TRADE CENTRE · SHENDRA JAHANGIRARIHANT VIYAAN VENTURES · P51500019186 · possession Dec 2023 · 100% built
- Shri Ramrao Residency Apartment Phase 2 · TuljapurBalasaheb Sambhaji Dighe · P51500019379 · possession Dec 2027 · 55% built
- My Home · ShahnoorwadiSIMAR PRIDE VENTURES LLP · P51500019553 · possession Mar 2025 · 84.1% built
- AJAY HEIGHTS · SATARASHRINIWAS INFRA · P51500019612 · possession Mar 2023 · 72.7% built
- SUVARNANEEL HOUSING STREET · GUT NO 86 AND 87GRAFFIC INFRASTRUCTURE PVT LTD · P51500019798 · possession Mar 2027 · 73% built
- Sahavas Apartments · OsmanpuraYojak Developers · P51500019967 · possession Feb 2025 · 90.7% built
- Amrut Sai Gold Star · Opp 30 GreenAMRUT SAI GOLD STAR · P51500020039 · possession Apr 2027 · 78.2% built
- BHUVI VISHWABAN · AURANGABADBhuvi Landmarks LLP · P51500020149 · possession Mar 2023 · 78.2% built
- PADMINI HEIGHTS · Senanagar Colony, Mauze Mustafabad, AurangabadSHRIKANT VISHWANATH KAVATHALKAR · P51500020187 · possession Jan 2022 · 50.9% built
- SILVER OAKS VILLAS · NEAR MIT COLLEGENAVKAR CONSTRUCTION · P51500020485 · possession Apr 2022 · 90.9% built
- Infinity Homes · PadegaonBarkatulla Shaukatulla Siddiqui · P51500020552 · possession Dec 2029 · 81.8% built
- Khatod Arcade · SataraAshok Ramnath Khatod · P51500020629 · possession Mar 2027 · 71.8% built
- HARI JYOTI PARK (PART - I) · SATARA PARISARSHREE HARI HOUSING RESORTS AND INFRA · P51500020749 · possession Sept 2020 · 1 complaint
- SATIMATA APARTMENT · TISGAONKRUTADNYA BUILDER AND DEVELOPERS · P51500020900 · possession Dec 2022 · 39.5% built
- TAJ RESIDENCY GULSHAN · JALAN NAGAR000ZAHINI MAHFUZA BANO · P51500021072 · possession May 2023 · 90.9% built
- RADHA KRUSHNA VILLA PHASE 1 · SundarwadiSAINAATH BUILDERS AND DEVELOPERS · P51500021253 · possession Dec 2027 · 77.4% built
- TIRUPATI HEIGHTS BUILDING A AND B · CIDCO Mahanagar 1SAJANSING MOTILAL JARWAL · P51500021589 · possession Mar 2022 · 90.9% built
- VARUN ENCLAVE · SATARA PARISARSANJAY JAGGANNATH KOLHI · P51500021700 · possession Jun 2023 · 100% built
- Hrim Ssky City Phase V · Beed By PassAshok Baheti · P51500021974 · possession Dec 2032 · 9.1% built
- Aurum Subhalaya · Satara ParisarAuracon Infra Prop. Manoj Kapurchand Kala · P51500022033 · possession Dec 2027 · 72.1% built
- SHRI JYOTIDARSHAN · AURANGABADDHANRAJ BABURAO PATWARI · P51500022102 · possession Aug 2024 · 95.5% built
- TIRUMALA HILL APPARTMENT · GARKHEDAMUKUND GOVINDRAO KULKARNI · P51500022166 · possession Dec 2024 · 77.8% built
- SHRINIVAS PARK · CIDCO WALUJ MAHANAGAR 1SHRINIVAS BUILDCON · P51500022271 · possession Dec 2023 · 90.9% built
- Cherekar Pristine · BhagyanagarPremkumar Bapurao Kulkarni · P51500022297 · possession Dec 2020 · 62.3% built
- SAMYAK ESTATE · NEAR LIEBHER CHOWKSAMYAK REALTORS · P51500022385 · possession Dec 2023 · 81.8% built
- ARCH BUSINESS CENTER · SHENDRAM/s. Arch Developers · P51500022967 · possession Dec 2026 · 81.8% built
- TIRUPATI PARK · TisgaonSai Shraddha Construction & Developers · P51500023158 · possession Dec 2024 · 100% built
- SHRIRAM RESIDENCY · BHAVSINGPURAUNIQUE BUILDCON · P51500023327 · possession Mar 2027 · 83% built
- VIMAL SHANTI SHELTER · WALUJANIL SHANTILAL CHORDIYA · P51500023715 · possession Dec 2026 · 55.8% built
- AJIT RESIDENCY · BEED BY PASS ROADAJIT DEVELOPERS · P51500023785 · possession Dec 2022 · 90.9% built
- Arch Kusum · PadegaonARCH DEVELOPERS · P51500023812 · possession Dec 2023 · 81.8% built
- White House By Sai Builders · GarkhedaSai Builders · P51500023865 · possession Dec 2025 · 90.9% built
- DIAMOND CITY · SATARA PARISAR, BEED BY PASS, AURANGABADNATH DEVELOPERS · P51500023988 · possession Dec 2028 · 19.3% built
- SARA SANGAM PANCHGANGA BUILDING · BAJAJ NAGARJAGRUT SARA ASSOCIATES · P51500024081 · possession May 2022 · 90.9% built
- HariRaaj Luxuria · JAWAHAR COLONYRAAJ BUILDTECH · P51500024158 · possession Dec 2024 · 90.9% built
- SARA SANGAM PLOT 1 · BAJAJ NAGARJAGRUT SARA ASSOCIATES · P51500024165 · possession Dec 2025 · 89.1% built
- RAMHARI NAGAR · CHIKALTHANA MIDCGANESH RAMRAO JADHAV · P51500024249 · possession Dec 2026 · 81.8% built
- GULAB VILLA · BANSILAL NAGARSAGAR PROPERTIES · P51500024411 · possession Sept 2020 · 97.7% built
- VILLO 67 · ITKHEDACHOUDHARY BHAISHREE LANDMARKS LLP · P51500024894 · possession Dec 2027 · 66.6% built
- UNITY PARK · NEAR MAHADABAHETI LANDMARK · P51500024945 · possession Jan 2027 · 76.9% built
- Arch Crystal · ShendraSHRI ARCH DEVELOPERS · P51500024991 · possession Dec 2026 · 45.5% built
- Anmol Residency · ItkhedaAbhay Housrao Shirsat and Sandeep Housrao Shirsat · P51500025196 · possession Dec 2025 · 95.5% built
- SARA VATIKA · NEAR PROPOSED ISKON TEMPLESAKAMBARI BUILDCON · P51500025439 · possession Sept 2024 · 90.9% built
- LEELA ONE · JAI NAGRA NEW USMANPURASHUBHAM JAIDEEP RANA · P51500025850 · possession Jun 2025 · 90.9% built
- CONSTRUCTION OF 368 EWS T/S UNDER PMAY AND 168 MIG ON S.NO.68 AT PADHEGOAN ,DIST-AURANGABAD · AURANGABADCHHATRAPATI SAMBHAJINAGAR HOUSING AND AREA DEVELOPMENT BOARD ( A REGIONAL UNIT OF MHADA) · P51500026531 · possession Mar 2026 · 78.2% built
- SHUBH LABH HEIGHTS · GARKHEDABhuvi Landmarks LLP · P51500026771 · possession Apr 2026 · 72.7% built
- TIRUPATI TOWER BUILDING A · CIDCO MAHANAGAR-1SAJANSING MOTILAL JARWAL · P51500027064 · possession Apr 2023 · 100% built
- GAIA Shrushti · Satara ParisarZambad Disha Pride Infrastructure LLP · P51500027185 · possession Jun 2022 · 90.9% built
- AKSHAD SUPER CITY PHASE- II · NEAR SHENDRA MIDCVANSH INFRASTRUCTURE · P51500027259 · possession Apr 2025 · 25.5% built
- Chandramouli Pinnacle Building Wing A · Satara ParisarCHANDRAMOULI PINNACLE · P51500027437 · possession Jun 2025 · 100% built
- SUDARSHAN HEIGHTS · ROSHAN HOUSING SOCIETYDEEPAK VENKATRAO KULKARNI · P51500027497 · possession Jun 2024 · 69.5% built
- DEOGIRI PLAZA · BEED BYPASSAGRAGANYA BUILDCON · P51500027859 · possession Jun 2025 · 90.9% built
- Mahalakshmi Heights · MustafabadParth Infra · P51500028095 · possession Apr 2026 · 63.6% built
- LOTUS HOUSE · CIDCO MAHANAGAR-1SAJANSING MOTILAL JARWAL · P51500028187 · possession Sept 2023 · 100% built
- TIRUPATI TOWER BUILDING B · CIDCO MAHANAGAR 1SAJANSING MOTILAL JARWAL · P51500028238 · possession Jun 2023 · 100% built
- AADINATH PROSPERA · NANDANVAN COLONYAADINATH PROPERTIES · P51500028644 · possession Sept 2025 · 81.8% built
- PAWAR PARADISE · NEAR SOUTH CITYSHIVSHAKTI BUILDERS AND DEVELOPERS · P51500028920 · possession Sept 2022 · 100% built
- Arch Kundan · ShivajinagarManthan Associates · P51500029050 · possession Dec 2025 · 81.8% built
- GODAVARI PARK · LADGAONPRIME INFRA · P51500029239 · possession Dec 2026 · 35% built
- SARA PARIVARTAN G - 12, 13, 14 type building · NAYGAONSARA PROPERTIES · P51500029499 · possession Mar 2023 · 89.1% built
- Kalyani Park Phase II · PisadeviBharat Janardhan Kale · P51500029516 · possession Apr 2027 · 35.1% built
- Arch Kanchan · ShivajinagarARCH DEVELOPERS · P51500029712 · possession Dec 2025 · 81.8% built
- Udyog Kalpak · ItkhedaKalpak Developers · P51500029919 · possession Dec 2023 · 90.7% built
- GOKULDHAM · SATARAGIRIRAJ DEVELOPERS · P51500030191 · possession Dec 2026 · 81.8% built
- SARA VATIKA A3 AND A4 TYPE BUILDING · NEAR PROPOSED ISKCON TEMPLESAKAMBARI BUILDCON · P51500030233 · possession Jul 2025 · 66.4% built
- SHIV SRUSHTI · Shendra JahangirSHIVTEJ BUILDERS & DEVELOPERS · P51500030274 · possession Dec 2030 · 80.2% built
- MANALI DWARKAPURAM · Waluj Mahnagar 1SSD BUILDERS AND DEVELOPERS · P51500030314 · possession Jul 2024 · 25% built
- TIRUPATI VASTU · TISGAONSAJANSING MOTILAL JARWAL · P51500030449 · possession Dec 2023 · 100% built
- SARA SANGAM GANGA BLDG · BAJAJNAGARJAGRUT SARA ASSOCIATES · P51500030505 · possession Mar 2024 · 90.9% built
- GAIA CARNIVAL - ROW HOUSES · Gut no. 308, South Republic, Near Sudhakar Nagar, Satara parisar, AurangabadZambad Disha Pride Infrastructure LLP · P51500030703 · possession Dec 2024 · 90.9% built
- Saffron Landscape Phase I · SataraSaffron Associates · P51500031063 · possession Dec 2026 · 89.5% built
- ARHAM URBANIA · GARKHEDA PARISARARHAM BUILDERS AND DEVELOPERS · P51500031188 · possession Dec 2029 · 96.4% built
- BiZZ Tower · Plot No. P 4/1INVESTZONE CONSTRUCTION ALLIANCE INDIA PRIVATE LIMITED · P51500031204 · possession Aug 2026 · 100% built
- SAI ADINATH MAJESTIC · SATARA PARISAR AURANGABADA V ASSOCIATES · P51500031247 · possession Oct 2026 · 72.7% built
- SEETA PARK · At PisadeviLAXMAN KONDIA KALE · P51500031373 · possession Dec 2030 · 78.2% built
- AURA SQUARE - KALYAN HEIGHTS · KUMBEPHALKALYAN HEIGHTS · P51500031700 · possession Dec 2027 · 55.5% built
- NABHRAJ TRILOK HEIGHTS · ShahnoorwadiNABHRAJ BUILDERS AND DEVELOPERS PVT LTD · P51500032020 · possession Dec 2029 · 34% built
- SARA VENKATESH F TYPE BUILDING · BAJAJ NAGARSARA TOWERS PVT LTD · P51500032237 · possession Mar 2024 · 81.8% built
- SAEE CONSTRUCTIONS · DEVLAI PARISARSAEE CONSTRUCTIONS · P51500032381 · possession Mar 2023 · 100% built
- SAMARTH RESIDENCY · UTTARA NAGRIS B ASSOCIATES · P51500032439 · possession Sept 2025 · 85.5% built
- SAMARTHA VIHAR · Pundlik Nagar Road, Garkheda, AurangabadSAMARTH DEVELOPERS · P51500032520 · possession Nov 2026 · 80% built
- MADHURA MAULI PRIDE · ASHRAFPURMADHURA BUILDERS AND DEVELOPERS · P51500032531 · possession Dec 2026 · 81.8% built
- Arch Dosti · OSMANPURASushsil Bharuka HUF · P51500032658 · possession Dec 2027 · 19.1% built
- Ramanand Square East · HarsoolShruti Heights LLP · P51500032689 · possession Dec 2026 · 90.9% built
- ELEMENTS ARIA · SHAHNOORWADIPADMANABH BUILDERS · P51500032743 · possession Dec 2027 · 72.3% built
- SARA ANGAN B2, B3, C1 AND C2 TYPE BUILDING · NEAR SHENDRA MIDCSara Infrastructures · P51500032885 · possession Dec 2026 · 90.9% built
- PARSHWA HEIGHTS · SATARA PARISARABHISHEK DEVELOPERS · P51500033069 · possession Sept 2026 · 75.8% built
- ORCHID TOWERS · PADMAWATI NAGARI, NEAR SANGRAM NAGARSAVALI CONSTRUCTIONS · P51500033091 · possession Dec 2023 · 90.9% built
- Vighnaharta Towers · Pisadevi AurangabadVighnaharta Constrcutions · P51500033129 · possession Dec 2025 · 66.4% built
- SNEH MANJIRI RESIDENCY · AURANGABADVIKAS LAXMAN CHAUDHARY · P51500033160 · possession Jan 2027 · 68.6% built
- Arch Natraj · cidcoManthan Associates · P51500033165 · possession Dec 2027 · 90.9% built
- SHREE OMKAR RESIDENCY · SURANA NAGAR, AURANGABADVIKAS LAXMAN CHAUDHARY · P51500033245 · possession Dec 2026 · 67.5% built
- HARI OM HEIGHTS · HARSOOL, AURANGABADDEEP VIJAY CONSTRUCTION · P51500033315 · possession Aug 2025 · 81.4% built
- APEX PARIJAT PHASE 4 · SHAHNOORWADIS. S. ENTERPRISES · P51500033445 · possession Dec 2027 · 90.9% built
- NIKUNJ NAGAR - PHASE 2 · Satpal NagarSANJAY SHYAMLAL VYAS · P51500033660 · possession Dec 2026 · 90.9% built
- Anandam Residency · DeolaiA B Developers · P51500033671 · possession Dec 2027 · 81.8% built
- SARA SAHYADRI PARK · NEAR GANGAPUR PHATASARA LANDMARKS · P51500033910 · possession Dec 2026 · 28.5% built
- SUKRUT APARTMENTS · OSMANPURA, DARGAH ROADSHODHAN YASHWANT JOSHI · P51500033918 · possession Dec 2025 · 81.8% built
- Tirupati Galaxy · Tisgaon CIDCOSAJANSING MOTILAL JARWAL · P51500034038 · possession Dec 2023 · 100% built
- LOTUS PARK · TisgaonSAJANSING MOTILAL JARWAL · P51500034156 · possession Dec 2024 · 90.9% built
- Vishwakarma Heights · Kanchan wadiASHW AMBIKA VENTURES · P51500034200 · possession Dec 2027 · 45.5% built
- Tirupati Vishwa · Mahanagar 1SAI DEVELOPERS · P51500034327 · possession Dec 2024 · 90.9% built
- SALASAR BLISS · AURANGABADRAMESHKUMAR JEETMAL BAGARIA · P51500034407 · possession Dec 2026 · 65.7% built
- JD Villas · SATARA AREAJD Villas · P51500034527 · possession May 2022 · 90.9% built
- Ranveer Oriana · BalapurOptricon India LLP · P51500034588 · possession Dec 2027 · 36.7% built
- Guru Gajanan Square · GarkhedaAnil Madhavrao Agraharkar · P51500034772 · possession Dec 2028 · 9.1% built
- SARA PARIVARTAN-AMENITY BUILDING-A · SARA PARIVARTANSARA PROPERTIES · P51500034773 · possession Dec 2024 · 51.8% built
- SHRI GOVINDAM HEIGHTS · SATARA DEVLAISHREE VYANKATESHA INFRA · P51500034840 · possession Mar 2027 · 90.2% built · 1 complaint
- SURYA APARTMENT · PADAMPURASUYASH INFRASTRUCTURES · P51500034867 · possession Dec 2025 · 100% built
- VIYAAN ANANTA PHASE II · SATARARIDDHI VIYAAN VENTURES · P51500035035 · possession Mar 2027 · 73.5% built · 1 complaint
- SAEE TOWN · DEVLAI GUT NO 140RUDRA CONSTRUCTIONS · P51500035187 · possession Dec 2028 · 60% built
- BHAGYA GARDEN CITY PHASE I · VRUNDAWAN GARDENBHAGYA CONSTRUCTION · P51500045263 · possession Mar 2026 · 90.9% built
- ATHARVA PARK PHASE - I · AurangabadSHIVSAI CONTRACTORS · P51500045300 · possession Mar 2027 · 56.3% built
- Aakash Ganga Phase I · NakshatrawadiAakash Ganga Developers · P51500045306 · possession Dec 2026 · 63.6% built
- SWAR KALYAN · SITUATED AT SHANTA COLONY (MITRA NAGAR), BEHIND AKASHWANI, AURANGABADDEEPAK VENKATRAO KULKARNI · P51500045348 · possession Apr 2027 · 89.5% built
- BHAGYA GARDEN CITY PHASE II · GARDEN AREABHAGYA CONSTRUCTION · P51500045606 · possession Dec 2026 · 27.3% built
- Surekha Residency · ItkhedaUTTAM BHAURAO PATIL, ASHISH UTTAMRAO PATIL AND PRITI SUDHIR MAKNIKAR · P51500045627 · possession Dec 2026 · 81.8% built
- RAMTARA RESIDENCY · RAMTARA RESIDENCYRAMTARA REALTY · P51500045652 · possession Mar 2028 · 25.3% built
- SAI SHREE APARTMENT · VIDYA NAGARVikas Sudarshan Yadav · P51500045722 · possession May 2027 · 82.7% built
- BUSINESS TRIANGLE · TISGAONBUSINESS TRIANGLE · P51500045725 · possession Mar 2027 · 9.1% built
- TRILOK VISTA · SATARA PARISARTRILOK BUILDCON · P51500045751 · possession Mar 2027 · 50% built
- INDRAYANI PRIDE · ULKANAGARIINDRAYANI CONSTRUCTIONS · P51500045770 · possession May 2025 · 30.9% built
- KINGS CITY · BALAPURPREETANSH DEVELOPERS · P51500045884 · possession Dec 2028 · 84.8% built
- RAJ ADITYA · ITKHEDARAHUL BASWANT NANDGAWALI · P51500045943 · possession Dec 2026 · 87.3% built
- SARA SANGAM - NARMADA AND SHARAYU BUILDING · NEAR BHONDAVE ENGLISH SCHOOLJAGRUT SARA ASSOCIATES · P51500045949 · possession Mar 2025 · 89.3% built
- Sharda Heights · near paithan gateSWANAND REALTIES · P51500046206 · possession Dec 2024 · 90.9% built
- Trupti Park · AurangabadDhanraj Baburao Patwari · P51500046390 · possession Apr 2026 · 77.7% built
- SNEH-DHANASHRI · SITUATED AT SAMARTH NAGAR,DEEPAK VENKATRAO KULKARNI · P51500046508 · possession Jun 2027 · 76.4% built
- SAI SHRADDHA RESIDENCY · BRIJWADISHRI SAI BUILDERS AND DEVELOPERS · P51500046576 · possession Dec 2025 · 81.8% built
- VYANKATESH PARADISE · BRIJWADI, AURANGABADTIRUPATI INFRA · P51500046742 · possession Dec 2029 · 65.9% built
- VENKATESH RESIDENCY · DEOLAIAkshay Buildcon · P51500046928 · possession Dec 2026 · 20.6% built
- ABK JAGIRDAR TOWN PLAZA · MAKAI GATE ROAD, AURANGABADABK REALTY · P51500047019 · possession Mar 2027 · 100% built
- Ambai Residency · Rachanakar ColonyShivansh Realty · P51500047045 · possession Mar 2025 · 90.9% built
- Leela Kutir · NakshatrawadiINSPIRA REALTY LLP · P51500047125 · possession Sept 2026 · 78.1% built
- BALAJI SOLASTA · SATARA PARISARCreative Group · P51500047134 · possession Mar 2027 · 90.9% built
- SHASHWAT SONALI KUNJ · WALUJ MAHANAGARSHASHWAT GROUP · P51500047147 · possession Dec 2027 · 58.9% built
- KALASH LANDMARK · TISGAONKALASH GROUP · P51500047227 · possession Mar 2026 · 87.3% built
- RYANS RESIDENCY NX - 81 · NEAR SHIVOOR BANGLASANCHETI GAUTAM KACHARDAS · P51500047292 · possession Mar 2027 · 45% built
- Nabhraj Trimurti · Shreyanagar, OsmanpuraNABHRAJ BUILDERS AND DEVELOPERS PVT LTD · P51500047311 · possession Feb 2025 · 90.9% built
- PARGAONKAR NAGAR - II · AURANGABADRUDRA BUILDERS AND DEVELOPERS · P51500047669 · possession Aug 2025 · 4.8% built
- RMG PLAZA · ISADVI ROADBhagyoday Builders & Developers · P51500047675 · possession Oct 2028 · 26.6% built
- SAI SUMAN PRIDE · GARKHEDA, AURANGABADAADESHWAR CONSTRUCTION · P51500047705 · possession Nov 2024 · 79.5% built
- MAHAVIR RESIDENCY · WALUJ MAHANAGAR-1NIRMAN VENTURES · P51500047819 · possession Sept 2024 · 90.9% built
- SHIVAM RESIDENCY · GUT NO. 184, TISGAONS R ASSOCIATES · P51500047888 · possession Dec 2026 · 20.5% built
- Nandan Vatika Wing B · OsmanpuraNandan Constructions · P51500047993 · possession Mar 2027 · 85.9% built
- Tridal-B · AurangabadTrishul Constructions · P51500048055 · possession Dec 2026 · 36.8% built
- SHREE MAHALAXMI SAUBHAGYA-02 · SATARA PARISARSWAPNIL MORESHWAR KULKARNI · P51500048109 · possession Mar 2026 · 90.9% built
- NAVKAR TOWER · GarkhedaNAVKAR INFRA · P51500048210 · possession Mar 2027 · 58.6% built
- Gursahani Twin Tower · N4 CidcoShree Hinglajmata Constructions · P51500048239 · possession Oct 2026 · 90.9% built
- Saffron Landmarks · SataraSaffron Associates · P51500048247 · possession Jun 2027 · 40% built
- CHANDRAMOULI PINNACLE 2 · SATARACHANDRAMOULI PROPERTIES · P51500048481 · possession Dec 2026 · 77.1% built
- AMBIKA APARTMENT · NEAR EMRALD CITY,JANKI HOTELMUKUND GOVINDRAO KULKARNI · P51500048648 · possession Dec 2025 · 100% built
- SHITAL NAGAR · PadegoanSANJAY SHYAMLAL VYAS · P51500048680 · possession Dec 2028 · 67.5% built
- VITHAI RESIDENCY · PISADEVISHRINIVASA DEVELOPER · P51500048858 · possession Dec 2027 · 46.3% built
- Nandan Vatika Wing A · OsmanpuraNandan Constructions · P51500048921 · possession Mar 2027 · 42.7% built
- Sara Angan Phase-1 A1 -B1 Type Building · Gangapur jahagirSara Infrastructures · P51500049187 · possession Dec 2025 · 89.5% built
- ASHIRWAD TOWER · Kanchanwadi, Paithan Road, AurangabadSAMARTH DEVELOPERS · P51500049228 · possession Dec 2026 · 90.9% built
- NABHRAJ NIKUNJ · SHENDRANABHRAJ BUILDERS AND DEVELOPERS PVT LTD · P51500049264 · possession Dec 2028 · 39.5% built
- Infinity Business Park · SARVEY NO 03/P, VILLAGE BAIJIPURA, SECTOR P 1, TOWN CENTRE CIDCO, AURANGABADABOLI ADVISORS LLP · P51500049300 · possession Sept 2028 · 37.7% built
- MILESTONE 44 · SUNDARWADIMILESTONE CONSTRUCTION AND DEVELOPERS · P51500049324 · possession Jun 2028 · 81.8% built
- SHRI VITHUMAULI PARK · POST PALSHI, AURANGABADSHRI VITTHUMAULI CONSTRUCTIONS BUILDERS AND DEVELOPERS · P51500049537 · possession Feb 2028 · 116.3% built
- GURUCHHAYA APARTMENT · JALAN NAGARUNIQUE BUILDERS · P51500049582 · possession Dec 2024 · 90.9% built
- Dream World Phase I · MIDC ChikalthanaManjeet Landmark LLP · P51500049793 · possession Dec 2028 · 70.2% built
- SERENE TOWERS · ShahanoorwadiNarayani Realty · P51500049807 · possession Dec 2026 · 100% built · 1 complaint
- Shri Sanskruti · DevlaiShri Developers · P51500049833 · possession Dec 2026 · 81.8% built
- AURIC HOMES · MIDC ShendraAshok Baheti · P51500049985 · possession Dec 2027 · 28.2% built
- DAR-UL-AMAN · SAWANGISQUARE-A DEVELPOERS LLP · P51500050046 · possession Dec 2026 · 100% built
- One World Phase I · PratapNagar ShahnoorwadiSIMAR PRIDE VENTURES LLP · P51500050146 · possession Dec 2028 · 47.1% built · 1 complaint
- KASHI GOPAL PARK · BUS STAND ROADKAMALAKAR SABNE, SUDHAKAR SABNE, PRABHAKAR SABNE AND MADHUKAR SABNE · P51500050284 · possession Dec 2029 · 18.2% built
- Renuka Nagari · Narayanpur Kh.Shlok Realty · P51500050288 · possession Mar 2027 · 13.6% built
- Happy Homes Happy Street Wing B · CIDCO Waluj Mahanagar IVShakti Lifespaces Pvt Ltd · P51500050368 · possession Dec 2026 · 90.9% built
- 36 Greens · NEAR 30 GREENSA.M.PATEL INFRA PVT LTD · P51500050638 · possession Nov 2027 · 28% built
- Suvidhi Signature · Chikalthana Industrial AreaSunder Ajanta Hospitality · P51500050642 · possession Dec 2027 · 90.9% built
- Happy Homes Happy Street Wing A · CIDCO Waluj MahanagarShakti Lifespaces Pvt Ltd · P51500050787 · possession Dec 2026 · 90.9% built
- AADINATH GLORIA · Sandesh NagarAADINATH PROPERTIES · P51500050856 · possession Jan 2026 · 87.3% built
- Amrut Sai Gold Star Phase II · AurangabadAMRUT SAI GOLD STAR · P51500050887 · possession Mar 2027 · 50.9% built
- YASHRAJ RESIDENCY · SURVEY NO 14 3Nandkishor Vitthalrao Sahare · P51500050919 · possession Mar 2027 · 27.3% built
- PADMAVATI SANKUL · BHIMASHANKAR COLONY , MUSTAFABADHARI OM CONSTRUCTION · P51500050997 · possession Dec 2028 · 81.8% built
- TAMBE VILLA · Ring RoadMURLIDHAR PANDHARINATH TAMBE · P51500051006 · possession Mar 2028 · 65% built
- GROUP HOUSING SCHEME · PISADEVIVAKRATUND DEVELOPERS · P51500051044 · possession Mar 2026 · 21.4% built
- NAVKAR RESIDENCY · SATARA PARISARNAVKAR BUILDCON · P51500051052 · possession Dec 2026 · 40.9% built
- JABINDA GRANDEUR · BEED BYPASSJABINDA REALTY · P51500051186 · possession Dec 2028 · 77.7% built
- SHREE RENUKA SANKUL · NEAR GOL NAKAYOGESH YASHVANT MAHAJAN · P51500051201 · possession Jul 2024 · 45% built
- Nabhraj Gharkul · CHIKALTHANANabhraj Construction · P51500051228 · possession Dec 2028 · 29.5% built
- SAGAR HEIGHTS · KANCHANWADIDEEPAK VENKATRAO KULKARNI · P51500051392 · possession Apr 2028 · 90.9% built
- RUKHMINI CHHAYA RESIDENCY · ITKHEDASWAMI SAMARTH DEVELOPERS · P51500051416 · possession Apr 2029 · 71.8% built
- ISHANYA HEIGHTS · AURANGABADVIVAAN INFRA · P51500051507 · possession Oct 2025 · 42.7% built
- PANCHSHIL ELITE · SURANA NAGAR, JALNA ROAD, BAIJIPURA AURANGABADPANCHSHIL LANDMARKS · P51500051648 · possession Dec 2026 · 57.7% built
- RENUKA DHAM · SATARAKUNDALWAL BUILDERS LLP · P51500051656 · possession May 2028 · 51.8% built
- GuruGanesh Vista · KesharsinghpuraVardhman Mahavir Infra (AOP) · P51500051729 · possession Dec 2026 · 31.5% built
- HAPPY HOMES · MITMITAGAYATRI ASHOK MULE · P51500051755 · possession Mar 2027 · 19.7% built
- PRATIK ANGAN · NAKSHATRAWADI, AURANGABADPRATIK ABHIRUCHI · P51500051773 · possession Dec 2028 · 72.2% built
- PARAM SUVARNVASTU · ITKHEDAParam Developers · P51500052126 · possession Mar 2028 · 61.5% built
- 55 HAPPYNEST · SundarwadiRupesh Prakashchand Mutha · P51500052128 · possession Jun 2028 · 63.4% built
- Nabhraj RYAN BUSINESS HUB · MondhaNABHRAJ BUILDERS AND DEVELOPERS PVT LTD · P51500052587 · possession Dec 2030 · 63.6% built
- Trupti Kalash Heights · AurangabadMangalkalash Creations LLP · P51500052688 · possession Dec 2028 · 56.9% built
- SHIVSAMARTH RESIDENCY · chikalthanaSamarth infra · P51500052807 · possession Aug 2028 · 37.8% built
- CHAVAN TOWERS · Sahakar NagarCHAVAN BUILDCON LLP · P51500052851 · possession Dec 2027 · 61.8% built
- SHIV VATIKA · WADGAON KOLHATIGurudatta Towers · P51500053033 · possession Dec 2028 · 17.9% built
- RENUKA RESIDENCY · SHENDRASARA PROPERTIES · P51500053144 · possession Dec 2027 · 83.6% built
- SARA SANGAM KAVERI BUILDING · WALUJ MAHANAGAR-IJAGRUT SARA ASSOCIATES · P51500053231 · possession Dec 2028 · 90.5% built
- SHIV TARA PARK · HARSULSHREE GANESH BUILDERS AND DEVELOPERS · P51500053353 · possession Dec 2027 · 72.7% built
- UDYOG KALPAK C · ITKHEDAKalpak Developers · P51500053599 · possession Jan 2027 · 97.5% built
- BHOOMI PARK · AurangabadSHRIDHAR SHANKARRAO MULEY · P51500053632 · possession Mar 2028 · 61.4% built
- KRUSHNA ULTIMA · SundarwadiPRACHITI DEVELOPERS · P51500053860 · possession Dec 2027 · 9.1% built
- PREM KUNJ · waluj mahanagar 1AZMAT ANWAR SHAIKH · P51500053939 · possession Dec 2028 · 53.2% built
- OM DREAM VILLA · SATARARANVEER INFRA · P51500053950 · possession Mar 2027 · 79.1% built
- Vasant Vihar Luxuria · ItkhedaDreamhome Builders · P51500053987 · possession Dec 2028 · 77.7% built
- GATEWAY AT SHENDRA · SHENDRA MIDCYGROUP INFRA · P51500054308 · possession Dec 2027 · 61.4% built
- VENKATESHWARA HEIGHTS · SHENDRA JAHANGIRNIRMAN INDIA · P51500054374 · possession Dec 2027 · 28.6% built
- SAINATH VIHAR · SATARAKALE JAGDALE BUILDERS & DEVELOPERS · P51500054391 · possession Nov 2028 · 63.6% built
- NABHRAJ KALPATARU · CHIKALTHANAAKASH RAJESH BUTOLE and RAJESH BALABAX BUTOLE · P51500054470 · possession Dec 2028 · 28.2% built
- YASHRAJ DREAM CITY · AshrafpurYASHRAJ INFRASTRUCTURE · P51500054526 · possession Dec 2027 · 68.6% built
- OCTOZONE · NAKSHATRAWADI AURANGABADSUNDER SIDDHI · P51500054635 · possession Dec 2028 · 58.8% built
- SIGNATURE 27 · SATARA PARISARJAGRUTSARA REALTORS LLP · P51500054759 · possession Dec 2028 · 131.8% built
- PARAM CASA ROYAL · SHANOORWADIPARAM CASA DEVELOPERS · P51500054904 · possession Dec 2028 · 63.6% built
- Aakash Ganga Phase II · Mouje-NakshtrawadiAakash Ganga Developers · P51500054973 · possession Feb 2027 · 63.6% built
- Disha Swarajya Pratapgad C and D · GarkhedaAPA Combine LLP · P51500055052 · possession Dec 2027 · 19.3% built
- Disha Swarajya Pratapgad A and B · GarkhedaAPA Combine LLP · P51500055092 · possession Dec 2027 · 22.7% built
- 18 LAXMI ELITES · SATARA PARISARSAI LAXMI BUILDCON · P51500055205 · possession Dec 2026 · 11.8% built
- PARVATI HILLS · Golwadi, Nagar-II, CIDCO, Waluj MahanagarKISAN KHANDERAO DHONDARE · P51500055239 · possession Mar 2030 · 1.9% built
- Disha Swarajya Shivneri · GarkhedaAPA Combine LLP · P51500055297 · possession Dec 2027 · 42.3% built
- THE OAK · Chhatrapati SambhajinagarABK DEVELOPERS · P51500055417 · possession Jan 2028 · 66.4% built
- GOKULDHAM RESIDENCY · PISADEVIGOKULDHAM RESIDENCY · P51500055530 · possession Dec 2028 · 34.1% built
- THE URBAN OASIS · TISGAON WALUJ MAHANAGARAMRUT NISHA SAI LANDMARKS · P51500055571 · possession Mar 2028 · 79.3% built
- SHREE BALAJI HEIGHTS · RAJMATA JIJAU HOUSING SOCIETY , GARKHEDA AURANGABADARJUN NITIN PATIL · P51500055587 · possession Mar 2028 · 46.4% built
- GRAND TWELVE · CHHATRAPATI SAMBHAJI NAGARVEDANT SHIRISH GADIYA · P51500055594 · possession Mar 2027 · 45% built
- DEEPNAND RESIDENCY · ITKHEDADEEPNAND DEVELOPERS · P51500055835 · possession Dec 2028 · 34.5% built
- Shubharambh Residency Phase 1 · PisadeviSudip Infrastructure AOP · P51500055873 · possession Dec 2028 · 31.7% built
- SHRINIVAS PARK · POKHARISHRINIVAS BUILDERS AND DEVELOPERS · P51500055945 · possession Dec 2028 · 28.4% built
- Papdiwal Vastu Homes · Pannalal NagarAnjali Sanjay Papdiwal · P51500055986 · possession Dec 2026 · 40.5% built
- SHRIKRUSHNA VIHAAR · TisgaonSHRI LAXMI DEVELOPERS · P51500056221 · possession Dec 2027 · 19.5% built
- DSK SHRUSHTI · PAITHANDSK GROUP · P51500056470 · possession Dec 2028 · 40.9% built
- Pearl City · ChikalthanaShivansh Realty · P51500066468 · possession Dec 2028 · 70.6% built
- BELPATRA VILLAS · SATARA VILLAGESandesh Bhivsan Wagh · P51500066511 · possession Dec 2026 · 3% built
- DWARKA PARK · SAWANGIVENKATESH LAND DEVELOPERS · P51500076705 · possession Oct 2028 · 41.6% built
- Trillium Tower · Waluj Mahanagar 1 CIDCORamesh Sohanlal Sarda · P51500077030 · possession Jun 2028 · 48.2% built
- Tirupati Vastu NX · Nagar 1SAJANSING MOTILAL JARWAL · P51500077292 · possession Dec 2026 · 24.8% built
- FORTUNE PROSPERA · CHIKALTHANA MIDCSWIFT ENGINEERING COMPANY PRIVATE LIMITED · P51500077300 · possession Dec 2031 · 21.8% built
- Tirupati Park NX · Nagar 1SAJANSING MOTILAL JARWAL · P51500077468 · possession Dec 2026 · 38.2% built
- SARA SWARAJYA PHASE-I · WADGAON KOLHATI NAGAR 1SARA INFRASTRUCTURES · P51500077523 · possession Dec 2030 · 36.4% built
- Sumeru Pearls · OsmanpuraSumeru Realities · P51500077589 · possession Jun 2027 · 62.3% built
- The Solitairee Phase I · ItkhedaDizzi Land Farms Private Limited · P51500077590 · possession Dec 2030 · 9.1% built
- ADINATH AANGAN PHASE 1 · DEOLAIKRPS PROPERTIES · P51500077736 · possession Aug 2027 · 31.5% built
- ABK AURIX · ShahnoorwadiGopal Balaprasad Ajmera · P51500077895 · possession Dec 2027 · 40.6% built
- FORTUNE SKYLINE · ITKHEDASRIJAY BUILDERS · P51500078137 · possession Dec 2029 · 33.6% built
- MILLENNIUM BUSINESS CENTER · JALNA ROADMILLENNIUMPRO NEST LLP · P51500078329 · possession Oct 2029 · 40% built
- Shree Radhe Kunj · Shendra JahangirSHREE CREATORS AND DEVELOPERS · P51500078368 · possession Mar 2027 · 60.9% built
- JANKI HEIGHTS · SHENDRASHREE BALAJI BUILDCON · P51500078462 · possession Dec 2029 · 46.4% built
- Rajgad- Swaraj Nagar · Gut No. 02 (Part)M S M Infra · P51500078515 · possession Mar 2028 · 6.8% built
- TIRUPATI CARNIVAL · Ta and Di Chhatrapati SambhajinagarSSBD Builders and Developers LLP · P51500078527 · possession Dec 2028 · 10.9% built
- ABHILASHA TOWER · MOUJE- ITKHEDAECO BUILDERS AND DEVELOPERS · P51500078575 · possession Dec 2026 · 53.1% built
- Kashi Vrundavan · SahajatpurSAKSHI BUILDERS · P51500078996 · possession Dec 2026 · 65% built
- Capital Trade Centre · ShahnoorwadiKRK Landmark LLP · P51500079387 · possession Jan 2030 · 19.1% built
- The Solitairee Phase II · ItkhedaDizzi Land Farms Private Limited · P51500079637 · possession Dec 2030 · 32.7% built
- SHILP GAURAV HEIGHTS · GARKHEDAShilp Constructions · P51500079845 · possession Dec 2027 · 63.6% built
- A V TOWERS · PADEGAONAARAV CONSTRUCTION AND DEVELOPERS · P51500079875 · possession Dec 2029 · 20.9% built
- PMAY U Sundarwadi 9 · Mauje SundarwadiAurathrone Infra · P51500079904 · possession Dec 2030 · 15.7% built
- ARADHYA RESIDENCY · DEOLAIADIYOGI CONSTRUCTIONS · P51500080198 · possession Dec 2029 · 9.1% built
- KRUSHNAKUNJ BUSINESS HUB · GARKHEDAKVG BUILDERS · P51500080215 · possession Dec 2030 · 9.1% built
- VIVAAN ELITES · ItkhedaBCD Reality · P51500080450 · possession Dec 2030 · 36.8% built
- WADKAR NAKSHATRA · TILAK NAGARLAXMIRAMAN MAHANTAPPA WADKAR · P51500080618 · possession Mar 2030 · 38.2% built
- SEETA PARK -WING A.B AND C · NEAR SHIVAJI PUTLALAXMAN KONDIA KALE · P51500080978 · possession Dec 2030 · 21.2% built
- Siddhivinayak Trade Center · ShendraMulti-Trek Infra LLP · P51500080982 · possession Dec 2029 · 72.7% built
- VENKATESHWARA PARK · Mauje Warud kaziSHREE VENKATESH INFRA · P51500081019 · possession Mar 2027 · 11.4% built
- 18 VILLAS · BhavsingpuraLEELADHAR REALTY · P51500081044 · possession Dec 2030 · 9.1% built
Jalna
Nashik
- AANUSHREE RESIDENCY · IndiranagarABHAY CHANDMAL JAIN · P51600000075 · possession Mar 2018 · 30.3% built
- Nayantara Presidency Phase 2 · Rajiv nagarPancharatna Builcon Pvt. Ltd · P51600000079 · possession Mar 2025 · 79.5% built · 1 complaint
- ANANDVANN · IGATPURISARVPPRATHAM DEVELOPERS PVT. LTD. · P51600000085 · possession Dec 2019 · 100% built · 1 complaint
- Nayantara Presidency Phase 4 · Rajiv nagarPancharatna Builcon Pvt. Ltd · P51600000098 · possession Mar 2028 · 69.5% built · 1 complaint
- HARI SPARSH II · Bhagur RuralDHARAN INFRA-EPC LIMITED · P51600000119 · possession Mar 2018 · 69.1% built
- Nayantara Presidency Phase 3 · Rajiv nagarPancharatna Builcon Pvt. Ltd · P51600000133 · possession Mar 2027 · 71.5% built · 2 complaints
- BUSINESS SQUARE · NashikVASTUKRUPA CONSTRUCTION (INDIA) PVT LTD · P51600000211 · possession Sept 2020 · 90.9% built
- Anmol Nayantara City Two phase 2 · Karmayogi nagarBafna Realtors Pvt Ltd · P51600000215 · possession Jul 2024 · 81.8% built
- HARI VATIKA · SANSARIDHARAN INFRA-EPC LIMITED · P51600000220 · possession Jun 2018 · 74.5% built
- HARI SPARSH PHASE III · Bhagur RuralDHARAN INFRA-EPC LIMITED · P51600000225 · possession Jun 2019 · 90.5% built
- HARI NAMAN · DeolaligaonDHARAN INFRA-EPC LIMITED · P51600000228 · possession Sept 2018 · 81.8% built
- Nayantara Presidency Phase 1 · Bombay Agra HighwayPancharatna Builcon Pvt. Ltd · P51600000245 · possession May 2024 · 100% built · 1 complaint
- AARADHYA RESIDENCY · DeolaligaonABHAY CHANDMAL JAIN · P51600000297 · possession Jun 2018 · 36.4% built
- Anmol Nayantara City One phase 4 · NashikBafna Realtors Pvt Ltd · P51600000299 · possession Dec 2021 · 71.2% built
- HARI KIRAN · VIHITGAONKARDA BUILDCON PRIVATE LIMITED · P51600000349 · possession Dec 2018 · 90.9% built
- Anmol Nayantara City One Phase 3 · NashikBafna Realtors Pvt Ltd · P51600000354 · possession Dec 2018 · 69.8% built
- HARI KRISHNA PHASE III · DeolaligaonNARESH JAGUMAL KARDA · P51600000375 · possession Mar 2019 · 90.9% built
- HARI AAKRUTI · Kathe GalliKARDA BUILDCON PRIVATE LIMITED · P51600000423 · possession Dec 2019 · 90.9% built · 4 complaints
- HARI VASANT · GANGAPUR ROADHari Vasant Association of Allottees · P51600000534 · possession Sept 2026 · 31 complaints
- Anmol Nayantara City One Phase 1 · NashikBafna Realtors Pvt Ltd · P51600000539 · possession Dec 2018 · 79.6% built · 1 complaint
- THE WATERFRONT · JALALPURHARISH VEERAPPA KANCHAN · P51600000543 · possession Sept 2019 · 46.4% built
- Anmol Nayantara City One phase 2 · NashikBafna Realtors Pvt Ltd · P51600000565 · possession Dec 2018 · 70.2% built · 1 complaint
- EKTA GREENVILLE PHASE 2 WING O , P , Q AND R · NashikEKTA HOUSING PRIVATE LIMITED · P51600000685 · possession Dec 2026 · 80.1% built · 9 complaints
- BEVERLLY HILLS PHASE - III · DwarkaMadhoor Buildwell Pvt. Ltd. · P51600000718 · possession Sept 2022 · 39.2% built
- HOME CLASSIC · Nashik (M Corp.)SHAILENDRA TUKARAM SALUNKE · P51600000742 · possession Jan 2023 · 86.8% built
- SHREESAMARTH APARTMENT · WADALA SHIWARSHREEYOG PROPERTIES · P51600000748 · possession Dec 2018 · 90.9% built
- HOME PARADISE · NEAR HOTEL JATRAPRASHANT FAKIRA KHAIRNAR · P51600000771 · possession Jan 2023 · 88.2% built
- ATHARVA SANSKRUTI · Nashik (M Corp.)SIDDHIVINAYAK BUILDTECH · P51600000801 · possession Oct 2020 · 90.9% built
- GARDEN VIEW · PanchakAJIT SURESH BANE · P51600000880 · possession Nov 2020 · 81.8% built
- FOG CITY PHASE-2 NSV · Igatpuri (M Cl)NEW STEP VENTURES · P51600001046 · possession Dec 2019 · 82.7% built
- CRESCENT APARTMENT · Gangapur RoadJHALA INFRATECH · P51600001071 · possession Dec 2019 · 68.2% built
- United Sanskruti Phase I · NashikUnited Builders · P51600001099 · possession Mar 2018 · 86.1% built
- OM APARTMENT · NashikBHAVIN HEMANTKUMAR BHARATIA · P51600001180 · possession Mar 2019 · 100% built
- NIRMAN DWARKAPURAM · DWARKA ANNEXNIRMAN ESTATE DEVELOPERS PVT LTD · P51600001184 · possession Jun 2020 · 90.9% built
- Hari Sanskruti Phase I · DeolaliDHARAN INFRA-EPC LIMITED · P51600001194 · possession Mar 2026 · 84.5% built
- Samraat Nucleus - Project 01 · Bhabha NagarM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · P51600001208 · possession Dec 2019 · 88.6% built
- EKTA GREENVILLE PHASE 1 WING I AND J · NashikEKTA HOUSING PRIVATE LIMITED · P51600001224 · possession Oct 2019 · 88.1% built · 1 complaint
- Anmol Nayantara City One Phase 5 · NashikBafna Realtors Pvt Ltd · P51600001252 · possession Dec 2021 · 56.7% built · 1 complaint
- MADHOORS ANANDAM · DwarkaMadhoor Buildwell Pvt. Ltd. · P51600001270 · possession Dec 2026 · 78.7% built · 3 complaints
- SHREE TIRUMALA HARINIWAS APARTMENT · SatpurROONGTA HOMES LLP · P51600001282 · possession Mar 2019 · 90.9% built
- ROONGTA TOWNSHIP PHASE IV APARTMENT · NASHIKROONGTA BUILDERS AND DEVELOPERS · P51600001287 · possession Jun 2018 · 90.9% built