All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 45 of 48.
Sangli
- Sukhakarta Residency · swapnanagari vishrambag sangliPradeep Shridhar Phadke · P53100031334 · possession Sept 2024 · 81.8% built
- SHRIPADVALLABH VANDAN · NEAR MARUTI MANDIRASSOCIATED DEVELOPERS · P53100031912 · possession Jun 2023 · 81.8% built
- SHIV RESIDENCY · VAKHARBHAGM AND K BUILDERS · P53100032201 · possession Dec 2024 · 90.9% built
- SUMATI SUMAN · VIJAY NAGAR TO KUPWAD ROADSACHIN SUMATILAL BEDMUTHA · P53100032400 · possession Dec 2025 · 80.9% built
- VASTUSHRI · NEAR PETROL PUMMPREAL LAND MARK DEVELOPERS LLP · P53100032624 · possession Mar 2024 · 90.9% built
- BALWANT EMPIRE · SANGLIUTTAM NAGESH ARAGE · P53100033076 · possession Dec 2024 · 90.9% built
- NAVKAR · Gulmohar Colony, Behind Architecture and engineering Hall SangliKaro Constructions · P53100033281 · possession Dec 2025 · 13.2% built
- VARAD AVIGHNA · OPP COLLECTOR OFFICESTAR NAKSHTRA REALITY LLP · P53100033345 · possession Mar 2025 · 90.9% built
- VIJAY APARTMENT · ABHAYNAGARVIJAY VISHWANATH TAKALE · P53100033402 · possession Dec 2025 · 72.7% built
- GLEN AVENUE · NEAR ARAWATTIGI PUMPCHETAN MOHAN ARAWATTIGI · P53100033421 · possession Mar 2027 · 81.8% built
- Shreya Plaza · Near Laxmi MandirMane and Khot Associate · P53100033574 · possession Dec 2023 · 81.8% built
- SHREE GANESH ALANKAR · VISHRAMBAGPRIME ASSOCIATES · P53100034004 · possession Mar 2025 · 90.9% built
- PARAS PLAZA · SAMVSHARAN CHOUKM.K.BUILDERS & DEVELOPERS · P53100034111 · possession Dec 2025 · 90.9% built
- infinity tower by samani · balaji mill roadVAARUSH DEVELOPERS LLP · P53100034355 · possession Dec 2026 · 23.6% built
- LAXMI HEIGHTS · Laxmi Nagar KupwadNASALAPURE KULKARNI BUILDERS AND DEVELOPERS · P53100034987 · possession Jan 2025 · 63.6% built
- BALAJI RESIDANCY · BHARAT SUIGIRNI KUWADM.K.BUILDERS & DEVELOPERS · P53100045198 · possession Dec 2026 · 80% built
- AMI PARK · RAMKRISHNA PARAMHANS SOCIETYNEXON INFRA · P53100045377 · possession Dec 2024 · 63.5% built
- VIJAYALAXMI ARCADE · MirajTrimurti Infracon · P53100045764 · possession Nov 2025 · 99.1% built
- SHREE RESIDENCY · Survey No. 2239 Balwant Bunglow Shivaji Housing Society Sangli 416416Sharad Hindurao Patil · P53100045798 · possession Dec 2025 · 66.5% built
- VISION CITY · HASARA CHOWKVISION GROUP · P53100045960 · possession Sept 2027 · 70.2% built
- THE PAVILION · GOVT COLONYADITYABUILDCON · P53100046044 · possession Dec 2025 · 86.4% built
- AASHIYANA RESIDENCY · OPP SURYA HOTELIMRAN PAPAMIYA MULLA · P53100046552 · possession Mar 2024 · 29.1% built
- ADINATH DECCAN · NEAR CIRCUIT HOUSEDECCAN VENTURES · P53100046981 · possession Aug 2025 · 67.3% built
- Pranav Corner · TuljainagarPranav Builders · P53100047076 · possession Dec 2024 · 64.5% built
- SIDDHIVINAYAK · KUPWADSAACHI DEVELOPERS · P53100047420 · possession Sept 2024 · 81.8% built
- SAMAVSHARAN PRIDE · BEHIND NEW COURT BUILDINGVIDYODAY DEVELOPERS · P53100047547 · possession Dec 2027 · 81.8% built
- DATT-KEDAR SAHNIVAS · KUPWAD SANGLIDATTAGURU ASSOCIATES · P53100047577 · possession Sept 2025 · 81.8% built
- Euphoria Pride Building A West Side · North Shivaji NagarSwastik Vastu Private Limited · P53100047641 · possession Apr 2026 · 81.8% built · 2 complaints
- AURA · Hasara chowk'P' SQUARE CONSTRUCTIONS · P53100047676 · possession Oct 2030 · 66.1% built
- SAI VRINDAVAN · OPP. WALCHAND COLLEGE BACK GATEGANESH BABURAO KOLI · P53100047913 · possession Dec 2025 · 81.8% built
- Dwait Residency · Vijay NagarTRIMURTI DEVELOPERS AND BUILDERS · P53100047952 · possession Aug 2024 · 100% built
- Anjaneya · Near District CourtSunita Pradeep Patwardhan · P53100048007 · possession Oct 2027 · 85.5% built
- GANESH SPHURTI · NEAR HOTEL DALCHANITRIMITI DEVELOPERS · P53100048039 · possession Dec 2025 · 90.9% built
- VRAJ · MOTI CHOWKSATULKUMAR VRAJLAL ANKOLA · P53100048228 · possession Dec 2025 · 52.3% built
- SAFALYA · VISHRAMBAGHRISHIKESH SHRIPAD DESHPANDE · P53100048427 · possession Aug 2025 · 90.9% built
- SWAYAMBHU JEWELS · CHADANI CHOWKSWAYAMBHU SIDDHI DEVELOPERS · P53100048449 · possession Dec 2026 · 80.9% built
- SAMARTH GIRNAR HEIGHTS · VISHRAMBAGsamarth associates · P53100048691 · possession Dec 2026 · 73.2% built
- MALHAR PLAZA · OPP MAHASOBA GATESHINTRE SHETE DEVLOPERS · P53100048822 · possession Dec 2026 · 31.8% built
- SHRI MADHUBAN HEIGHTS · VASANTNAGARPRUTHVI BUILDERS AND DEVELOPERS · P53100048829 · possession May 2025 · 48.6% built
- AJANTA COMPLEX · DATTANAGARKAVITA RAMCHANDRA PAWAR · P53100048987 · possession Jun 2026 · 80% built
- KAUMUDI RESIDENCY · GOVT COLONY VISHRAMBAG 416415SATYAJIT GOVIND LELE · P53100049004 · possession Dec 2026 · 90.9% built
- Avantika Residency · SAMARTH NAGARUTTAM LAHU MOHITE · P53100049078 · possession Mar 2027 · 45.5% built
- MANOMAY · TRITHANKAR COLONY NEAR SHARDA HOUSING SOC.,YUVRAJ JAYSINGRAO PATIL · P53100049168 · possession Dec 2026 · 65.8% built
- VISHNU HARI REGENCY · OPP GHANSHYAM NAGARAVANEESH BUILDCON LLP · P53100049307 · possession Dec 2026 · 60% built
- MIRJE DERAM CITY · -MIRJE AND ASSOCIATES · P53100049354 · possession Jun 2027 · 70.8% built
- MAHALAXMI TOWER · MANTRI COLONYMAHALAXMI CONSTRUCTIONS · P53100049431 · possession Dec 2024 · 81.8% built
- Taksh Residency · Mahalaxmi ChowkMadhusamruddhi Associates · P53100049718 · possession Dec 2025 · 81.8% built
- VIVANTA · NORTH SHIVAJINAGARSA BUILDERS AND DEVELOPERS · P53100049872 · possession Dec 2025 · 81.8% built
- Usha Enclave · Mangalmurti Colony, SangliKalash Developers · P53100050076 · possession Apr 2026 · 62.3% built
- Mayuresh Plaza · WarnaliMayuresh Vinayak alias Milind Tamhankar · P53100050096 · possession Dec 2026 · 14.5% built
- AMOGH · YESHWANT NAGARVENKATESH BUILDCON · P53100050110 · possession Dec 2025 · 28.6% built
- Shivalay · Nishant Colony- SangliSUKHKARTA DEVELOPERS · P53100050271 · possession Jul 2026 · 60.9% built
- SAISAMRUDDHI · MANE CHOWKPRAVIN CHAVAGONDA CHOUGULE · P53100050399 · possession Dec 2025 · 163.6% built
- KP TOWER · VITTHAL NAGAR SANGLIRAVINDRA SHANKAR KHILARE · P53100050541 · possession Oct 2025 · 63.2% built
- SAI SONAI SAHANIVAS · Behind Resham Gathi mangal Karyalay, Near Kids Paradise School, VishrambagVISHWA MALHAR CONSTRUCTION · P53100050613 · possession Dec 2026 · 40.9% built
- GIRNAR PARK · Walneswadi KupwadNIlesh Dnyaneshwar Khot · P53100050942 · possession Dec 2026 · 30% built
- Fortune Business Hub · KadegaonFortune Enterprises · P53100051255 · possession Dec 2026 · 23.6% built
- SIDHARTH APARTMENT · NEAR CHINTAMANI SOCIETYNIRMITI DEVELOPERS · P53100051440 · possession Jul 2024 · 81.8% built
- GALAXY TOWER · VIJAYNAGARSHIVDATTA BUILDERS & CONTRACTORS · P53100051445 · possession Nov 2026 · 60% built
- JAYBHAWANI COMPLEX · OPP OMSHRI HOSPITALJAYBHAWANI INFRA · P53100051696 · possession Dec 2028 · 68.2% built
- AMAR HEIGHTS · NAAMAR CHAND ATTAR · P53100051706 · possession Jun 2027 · 82.7% built
- R CITY MALL · NEAR MADHAVNAGAR BUS STANDYOGSHIVRUTU LAND DEVELOPERS PRIVATE LIMITED · P53100051734 · possession Dec 2026 · 81.8% built
- Agrawal Exotica · Sanglikar mala, MirajMR AGRAWAL NILESH NEMICHAND (HUF) · P53100051821 · possession Mar 2026 · 50.9% built
- UNITY HARMONY · near bapat colonyUNITY CONTRACTORS · P53100051932 · possession Dec 2026 · 72.7% built
- Kamal Ranjini · Shivaji NagarGOKHALE AND ASSOCIATES · P53100052290 · possession May 2027 · 23.1% built
- MAYUR CONVENTION CENTER · NEAR RELIANCE PETROL PUMPSHIVGAYATRI BUILDCON PRIVATE LIMITED · P53100052993 · possession Dec 2027 · 46.8% built
- BHOSALE EMPIRE · DINANATH CHOWKBHOSALE DEVELOPERS · P53100053023 · possession May 2026 · 70.9% built
- SAICHARAN HEIGHTS · WARANALI, SANGLIASHTANG DEVELOPERS · P53100053178 · possession Jun 2027 · 20.9% built
- ANANDVAN · near arya hotel wanlesswadiMILESTONE BUILDERS · P53100053274 · possession Feb 2027 · 67.7% built
- VEDANT DEWELLS · OLD KUPWAD ROADYOGIVALLABH BUILDERS AND DEVELOPERS · P53100053582 · possession Dec 2026 · 54.5% built
- Meridian Towers · VitaPrakash Shankarrao Kadam · P53100053589 · possession Dec 2027 · 38.6% built
- Diamond Arcade · Vita- ShahunagarPrashant Vasantrao Kirdat Patil · P53100053745 · possession Dec 2026 · 67.3% built
- PARIKH ELEGANCE · KUNTE MALALUXUS QURATORS LLP · P53100053901 · possession Dec 2026 · 84.5% built
- Airawat · Sangli Miraj Kupwad (M Corp.)SHUBHASHREEDEVELOPERS · P53100054007 · possession Mar 2027 · 69.5% built
- NIRMITI RESIDENCY WING E · NEAR POLICE STATIONSWASTIVASTU DEVELOPERS LLP · P53100054063 · possession Jul 2027 · 81.8% built
- GALAXY HEIGHTS · MOUJE- ISLAMPURMUNIR MOHAMADHUSEN PATWEKAR · P53100054096 · possession Dec 2027 · 20% built
- AGRAWAL VASTU · MirajMR AGRAWAL NILESH NEMICHAND (HUF) · P53100054179 · possession Dec 2026 · 30.9% built
- PLATINUM PLAZA · NEAR PRIME LPG PUMPASHOK BABGONDA PATIL · P53100054213 · possession Oct 2028 · 44.5% built
- Digambar Residency · BRAMHANPURI MIRAJSATYAJIT GOVIND LELE · P53100054271 · possession Dec 2027 · 58.2% built
- NAKSHTRA · DATTANAGARSHIV-NAKSHTRA DEVELOPERS LLP · P53100054463 · possession Dec 2029 · 15.5% built
- SHRI KRUPA ICON · WARNALITATYASAHEB SAMBHAJI KHOT · P53100054941 · possession Nov 2026 · 47.7% built
- SHRIRAM SOLITAIRE · SangliShriram Solitaire · P53100055242 · possession Dec 2027 · 18.2% built
- VISTA MAJESTIC · NEAR GANPATI MANDIRBAJIRAO BALARAM PATIL AND SHRIKANT VYANKATRAO SHINDE · P53100055255 · possession Oct 2026 · 65.9% built
- RUDRAKSHA · vishrambagJAYRAJ VASANT SAGARE · P53100055695 · possession Dec 2027 · 62.7% built
- Siddhivinayak-Laxmi · Krushnali VasahatBalaji Associates · P53100055749 · possession Sept 2026 · 64.1% built
- GUNJATE CORNER · shamraonagarBABASAHEB BAPUSAHEB GUNJATE · P53100056286 · possession Dec 2027 · 38.2% built
- ATLANTIIS · SangliGRIFFIN INNFRA · P53100076608 · possession Dec 2028 · 8.2% built
- EVARA ESTATE · VISHRAMBAGDSDB REALTY LLP · P53100076645 · possession Dec 2030 · 20% built
- MANIDWEEP · government colonyVASTU LAXMI DEVELOPERS · P53100076801 · possession Dec 2027 · 36.4% built
- Agrawal Donage Heights · Shivaji Nagar MirajVighnesh Nilesh Agrawal · P53100076904 · possession Dec 2028 · 0.9% built
- SHUBHAM EXOTICA · NORTH SHIVAJINAGARSRIVARI SHUBHA DEVELOPERS LLP · P53100076951 · possession Dec 2027 · 63.6% built
- NAGMANI · SHIRALAAJAY BHAUSO JADHAV · P53100077343 · possession Dec 2026 · 9.1% built
- SHRI GAYATRI · SANGLIANIKET BALASAHEB BHOSALE · P53100077373 · possession Dec 2027 · 46.4% built
- SHREE KRUPA CITY · NEAR PODAR INTERNATIONAL SCHOOLTATYASAHEB SAMBHAJI KHOT · P53100077488 · possession Dec 2029 · 16.8% built
- YELKOT VISION · NEAR BAPUSAHEB SALUNKHE COLLEGEYELKOT BUILDERS PVT LTD · P53100077598 · possession Dec 2027 · 45.5% built
- OJAS 2 · KupwadVISA DEVELOPERS · P53100078498 · possession May 2027 · 47.9% built
- RAJ TOWERS · BEHIND SAMARTH HOSPITALRAJ TOWERS · P53100078748 · possession Dec 2028 · 40.5% built
- KALASH RESIDENCY · BEHIND SWATI GAS AGENCYKAIZEN LANDMARKS · P53100079005 · possession Dec 2026 · 61.8% built
- VRINDAVAN · --SRIKRISHNA DEVELOPERS · P53100079014 · possession Dec 2026 · 27.3% built
- Jeevan Anand · WANLESSWADISMS LIFE SPACE PRIVATE LIMITED · P53100079031 · possession Dec 2027 · 56.4% built
- Audumber Residency · IslampurShailesh Prakash Desai · P53100079578 · possession May 2028 · 44.3% built
- SKYLINE HERITAGE · NEAR NANDANVAN HOTELYATIN DHARMENDRA MODI · P53100079651 · possession Dec 2028 · 38.2% built
- UNIVERSAL TRADE CENTER · NEAR IDBI BANKUNIVERSAL DEVELOPERS · P53100079798 · possession Dec 2028 · 36.4% built
- SAPTARSHI · GULMOHAR COLONYSAGAR SUMANT KULKARNI · P53100079828 · possession Dec 2026 · 62.7% built
- SHIVSHAKTI ROYAL II · SHRIRAM NAGARGAYATRI DEVELOPERS · P53100079908 · possession Dec 2027 · 24.5% built
- SHAKTI PRESTIGE · OPP SHIVAJI STADIUMSHAKTI BUILDCON · P53100080028 · possession Dec 2030 · 22.7% built
- MAHANKALI HEIGHTS PHASE VII · VIDYANAGARPRAVIN DNYANESHWAR MALI · P53100080119 · possession Dec 2027 · 29.1% built
- Skyline Residency · TasgaonIrfan Abbas Momin · P53100080888 · possession Apr 2029 · 9.1% built
- ANAND VIHAR RESIDENCY · SHANIWAR PETHKAVITA KISHOR KULKARNI · P53100081015 · possession Dec 2028 · 47.7% built
Palghar
- Happinest Boisar Phase III · PalgharMahindra Lifespace Developers limited · P99000000106 · possession Dec 2018 · 81.8% built · 1 complaint
- EKTA PARKSVILLE PHASE III · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000109 · possession Dec 2023 · 100% built · 125 complaints
- BROOKLYN PARK PHASE II · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000110 · possession Sept 2023 · 89.8% built · 13 complaints
- EKTA PARKSVILLE PHASE II · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000115 · possession Dec 2026 · 90% built · 52 complaints
- EKTA PARKSVILLE PHASE I · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000116 · possession Jul 2023 · 98.9% built · 32 complaints
- BROOKLYN PARK PHASE I · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000134 · possession Nov 2020 · 89.4% built · 7 complaints
- BROOKLYN PARK PHASE III · VasaiEKTA PARKSVILLE HOMES PVT. LTD. · P99000000148 · possession Jul 2023 · 88.6% built · 17 complaints
- Mahavir Krupa D · PalgharRajesh Construction · P99000000244 · possession Dec 2017 · 100% built
- Sunshine Palace · VasaiShantee Housing · P99000000257 · possession Mar 2018 · 90.9% built
- BROOKLYN PARK PHASE IV · VasaiEKTA HOUSING PRIVATE LIMITED · P99000000417 · possession Dec 2026 · 68.9% built · 54 complaints
- VBHC Greendew · PalgharVBHC MUMBAI VALUE HOMES PRIVATE LIMITED · P99000000515 · possession Jul 2019 · 33.2% built · 1 complaint
- VBHC Greenglade · PalgharVBHC MUMBAI VALUE HOMES PRIVATE LIMITED · P99000000542 · possession Feb 2023 · 81.8% built
- FIA CONSTRUCTION COMPANY - FIA PRIDE · PalgharNIMISH LAXMICHAND PASAD · P99000000701 · possession Dec 2018 · 90.9% built
- N G SHREE RAM VAN PHASE I · .J M G REALTORS PVT LTD · P99000000747 · possession Dec 2020 · 82% built
- New Haven Compact Boisar II Phase I · PalgharSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · P99000000811 · possession Nov 2020 · 78.2% built · 13 complaints
- VRINDAVAN COMPLEX · PalgharPATIL BUILDERS · P99000000827 · possession Nov 2020 · 90.9% built
- MUKUNDA HEIGHTS · VasaiSai Mukunda Builder and Developers · P99000000853 · possession May 2022 · 46.4% built · 1 complaint
- Gokul Park · VasaiSai Ganesh Realtors · P99000000895 · possession Dec 2019 · 53.6% built
- Imperial Classic · VasaiStar Builders · P99000000898 · possession Apr 2018 · 50% built
- VBHC Greenwoods · PalgharVBHDC Bangalore Value Homes Private Limited · P99000000974 · possession Jun 2019 · 81.8% built · 1 complaint
- New Haven Boisar II Phase II · PalgharSMART VALUE HOMES (BOISAR) PRIVATE LIMITED · P99000000997 · possession Nov 2020 · 72.7% built · 3 complaints
- FIA DAFFODILS · PalgharNIMISH LAXMICHAND PASAD · P99000001022 · possession Dec 2018 · 81.8% built
- Imperial Heritage · VasaiShree Ganesh Ventures · P99000001053 · possession Dec 2021 · 90.9% built
- DAULAT GARDENS · PalgharAhura Construction JV · P99000001241 · possession Dec 2024 · 79.8% built
- Imperial Shelter · VasaiImperial Shelter · P99000001277 · possession Oct 2020 · 49.5% built
- SUNSHINE GREEN PARK PHASE 2 · VasaiSHantee Homes Realty LLP · P99000001294 · possession Jun 2025 · 52.3% built · 3 complaints
- SUNSHINE GREEN PARK PHASE I · VasaiSHantee Homes Realty LLP · P99000001370 · possession Mar 2018 · 90.9% built · 4 complaints
- LAXMI COMPLEX · PalgharSHUBHLAXMI REALTORS · P99000001371 · possession Sept 2018 · 81.8% built
- SUNSHINE SAPPHIRE · VasaiShantee Housing · P99000001441 · possession Nov 2020 · 90.9% built · 9 complaints
- SARGAM AVENUE · VasaiShantee Housing · P99000001489 · possession Mar 2018 · 90.9% built · 1 complaint
- VBHC Greenwoods · PalgharVBHDC Bangalore Value Homes Private Limited · P99000001539 · possession Jun 2019 · 81.8% built · 3 complaints
- MANIBHADRA HEIGHTS · VasaiSHREE CONSTRUCTION · P99000001594 · possession Dec 2022 · 88.3% built
- BACHRAJ LANDMARK · VasaiBACHRAJ DEVELOPERS · P99000001630 · possession Dec 2018 · 100% built
- POONAM HEIGHTS · VasaiPOONAM MEGA DEVELOPERS · P99000001663 · possession Dec 2019 · 90.9% built · 2 complaints
- Shree Shakun Greens · VasaiShree Shakun Realty Pvt Ltd · P99000001708 · possession Dec 2019 · 98.6% built · 5 complaints
- SPANISH RESIDENCY · VasaiSHANTEE REALTY AND LIFE SPACE · P99000001765 · possession Mar 2019 · 89.1% built · 3 complaints
- INDRAPRASTH COMPLEX · PalgharSWASTIK DEVELOPERS · P99000001847 · possession Apr 2022 · 90.9% built
- Imperial Residency · VasaiShree Ganesh Coporation · P99000001975 · possession Dec 2018 · 35.2% built
- SUPREME POINT PHASE I · PalgharK K INFRASTRUCUTRE · P99000002058 · possession Nov 2018 · 90.9% built
- GULMOHAR HERITAGE BUILDING NO 3 WING C AND D · VasaiVIVA SWASTIK HOMES · P99000002070 · possession May 2019 · 90.9% built
- POONAM HEIGHTS · VasaiPOONAM REALTY · P99000002118 · possession Dec 2019 · 90.9% built
- TULIP RESIDENCY · PalgharBRRIGHT REALTORS · P99000002162 · possession Dec 2018 · 90.9% built
- AGARWAL PARAMOUNT · VasaiAGARWAL REALTORS · P99000002207 · possession Dec 2023 · 90.9% built
- SAI RAJ · VasaiSAI DHARA ENTERPRISE · P99000002245 · possession Dec 2019 · 90% built
- NIDHI REALTY PHASE I · VasaiLALIT NAGINDAS DOSHI · P99000002258 · possession Dec 2024 · 80.2% built
- BRAHMAND RESIDENCY · MASOLIBHAVI REALITY LLP · P99000002353 · possession Jun 2024 · 90.9% built
- INFINITI INDUSTRIAL ESTATE I · Vasai-Virar City (M Corp)ACETRON CONSTRUCTION LLP · P99000002356 · possession Dec 2018 · 32.1% built
- Omkar · VasaiOmkar Developers · P99000002389 · possession Nov 2023 · 86.4% built
- AGARWAL EXOTICA · VasaiAGARWAL REALTORS · P99000002405 · possession Dec 2022 · 90.9% built
- Avenue D - Phase III · VasaiVenus Developers · P99000002430 · possession Jun 2019 · 34.1% built · 1 complaint
- SHUBHAM GALAXY · Vasai-Virar City (M Corp)ARHAM NEEJDEEP REALTORS · P99000002476 · possession Jan 2021 · 90% built
- BHAKTI PARK · PalgharMHATRE REALTORS · P99000002478 · possession Dec 2027 · 127% built
- POONAM PARK VIEW PHASE I · VasaiPOONAM HOMEMAKER LLP · P99000002563 · possession Jun 2019 · 100% built
- BLDG NO-16 VIOLET · VasaiM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · P99000002573 · possession Mar 2022 · 87% built
- SEA GRAPES · VasaiNINE REALTY BUILDERS · P99000002584 · possession Jun 2023 · 90.7% built
- SNEH KUNJ APARTMENT · PalgharS.K.DEVELOPERS · P99000002592 · possession Dec 2017 · 89.1% built
- MALHAR · PalgharHARIKRISHNA ENTERPRISES · P99000002593 · possession Jan 2021 · 52.7% built
- OSWAL LIFESPACES - PHASE 1 · PalgharOSWAL LIFESPACES · P99000002598 · possession Mar 2024 · 81.8% built · 1 complaint
- Atmaram Park · VasaiSuyash Developers · P99000002606 · possession Jan 2019 · 81.8% built
- Riddhi Siddhi Industrial Complex · VasaiRiddhi Siddhi Builders & Developers · P99000002625 · possession Jan 2024 · 81.8% built
- VINAY UNIQUE HEIGHTS · VasaiSUV DEVELOPERS · P99000002691 · possession Dec 2019 · 83.6% built
- NINE AURA CONSTRUCTION · Vasai-Virar City (M Corp)NINE AURE CONSTRUCTION · P99000002729 · possession Dec 2026 · 42.7% built
- BROOKLYN PARK · PalgharCHANDIWALA ENTERPRISES · P99000002745 · possession Jul 2025 · 100% built
- RITU DREAMS · VasaiRITU REALITY · P99000002765 · possession Dec 2019 · 71.4% built
- ROMAN RESIDENCY · VasaiShantee Housing · P99000002849 · possession Feb 2021 · 88.3% built
- BLUEBELL IMPERIAL · VasaiDeepak Bhupatrai Vora · P99000002856 · possession Dec 2019 · 33.3% built
- IPSIT NAVODAY PHASE 1 · PalgharIPSIT ENTERPRISE · P99000002933 · possession Dec 2017 · 65.5% built · 1 complaint
- HEAVEN HILLS · PalgharXL REALTORZ · P99000002974 · possession Jun 2019 · 81.8% built · 2 complaints
- VIVA CITY - A5 · VasaiVIVA WINNER VENTURE RELATORS LLP · P99000002985 · possession Jun 2026 · 78% built
- MANIBHADRA AVENUE · VasaiMANIBHADRA AVENUE · P99000003027 · possession Jan 2021 · 90.4% built · 1 complaint
- Surya Kirti Heights and Tower · VirarS R & Shah Vala Associates · P99000003052 · possession Dec 2026 · 81.4% built · 6 complaints
- Anand Kirti Tower · DongareS R and Shah Developers · P99000003076 · possession Dec 2026 · 58.4% built · 37 complaints
- MATOSHRI HEIGHTS · VasaiNAGESH HEMANT PATIL · P99000003089 · possession Oct 2026 · 70.5% built
- ZEAL REGENCY · VasaiBLUE BARON REALTORS · P99000003182 · possession Mar 2024 · 81.8% built · 14 complaints
- FIA CONSTRUCTION COMPANY FIA IMPERIA · PalgharNIMISH LAXMICHAND PASAD · P99000003189 · possession Oct 2021 · 62.7% built
- PRIDE INDUSTRIAL ESTATE · VasaiRIDDHI DEVELOPERS · P99000003219 · possession Dec 2023 · 81.8% built
- NICON INFINITY PHASE 1 · VasaiNICON INFRA LLP · P99000003227 · possession Dec 2020 · 90.9% built
- YESHWANT VINAYAK COMPLEX · VasaiSHREE CHINTAMANI DEVELOPERS · P99000003231 · possession May 2025 · 90.9% built
- VIVA CITY -A9 · VIRAR WESTVIVA WINNER VENTURE REALTORS LLP · P99000003243 · possession Jun 2025 · 38.8% built · 1 complaint
- VIVA CITY - A3 · VasaiVIVA WINNER VENTURE REALTORS LLP · P99000003245 · possession Jun 2026 · 89.5% built · 9 complaints
- ANAND VIEW · VasaiSHREE ADESHWAR BUILDER AND DEVELOPER · P99000003252 · possession Dec 2019 · 72% built
- Devakinagar · PalgharEmpire Developers · P99000003256 · possession Apr 2022 · 90.9% built
- PAVITRADHAM · VasaiPAVITRA GRUH SAHAY LLP · P99000003262 · possession Mar 2019 · 100% built · 1 complaint
- GLOBAL ARCADE · VasaiNINE ASSOCIATE DEVELOPERS · P99000003305 · possession Dec 2021 · 79.1% built
- Gundecha Woods Phase 1 · PalgharGundechaConstructionPvtLtd · P99000003314 · possession May 2019 · 89.1% built · 1 complaint
- VASTUSRUSHTI NIRVANA · PalgharOrion Realtors · P99000003358 · possession Dec 2018 · 8.4% built
- Hayaat Green · VasaiM M Enterprises · P99000003365 · possession Mar 2019 · 90.9% built
- Kalash · VasaiKemi Creation earlier known as Taru Venture · P99000003386 · possession Dec 2022 · 90.9% built
- RELIABLE TOWNSHIP / RT- L TO O WING · VasaiRELIABLE REALTORS · P99000003390 · possession Dec 2018 · 81.8% built
- IDEAL AVENUE ,BLDG NO.3,A-WING · PalgharSNEHAL ARNEST DCUNHA · P99000003409 · possession Dec 2029 · 83.6% built
- KONARK RESIDENCY · VasaiUNIVERSAL REALTORS · P99000003440 · possession Dec 2018 · 83% built
- HAYAAT GALAXY · VasaiM M Enterprises · P99000003445 · possession Dec 2021 · 90.9% built
- VIVA CITY - A4 · VasaiVIVA WINNER VENTURE RELATORS LLP · P99000003476 · possession Jun 2026 · 72.6% built · 5 complaints
- KT Garden City - Phase III · VasaiM/s. Sainagar Development Corporation · P99000003521 · possession Jun 2018 · 82.4% built
- Sky Heights · VasaiSadguru Developers · P99000003527 · possession Sept 2020 · 90.9% built
- RAJHANS KSHITIJ IRIS WING E F G · VasaiPRAGATI INFRASTRUCTURES · P99000003532 · possession Dec 2018 · 86.4% built
- Solitaire II · VasaiShree Satya Sai Developers · P99000003564 · possession Mar 2019 · 95.5% built
- KINGSTON COURT · VasaiMAHALAXMI ENTERPRISES · P99000003618 · possession Dec 2019 · 70.6% built
- SHUBHANGAN GREENS · PalgharSHREE SAI DEVELOPERS · P99000003622 · possession Jun 2018 · 79.1% built
- RG-C,D · VasaiRELIABLE REALTOUCH · P99000003657 · possession Dec 2026 · 37.3% built · 2 complaints
- Riddhi Siddhi Greens · PalgharRiddhi Siddhi Realtors · P99000003664 · possession Dec 2018 · 81.8% built
- GHANSHYAM ENCLAVE-GREEN MEADOWS-E WING · BHABHOLA BANGLI ROADGHANSHYAM ENTERPRISES · P99000003723 · possession Dec 2024 · 90.9% built
- SHREE RAM HEIGHTS · VasaiSHREE RAM REALTY · P99000003747 · possession Dec 2026 · 74.5% built · 3 complaints
- Sky Avenue · VasaiShreeji Corporation · P99000003755 · possession Mar 2019 · 90.9% built
- Serenity Garden Wing D · VasaiUnity Estates & Developers · P99000003766 · possession Jul 2019 · 88.5% built
- IPSIT NAVODAY PHASE 5 · PalgharIPSIT ENTERPRISE · P99000003777 · possession Jun 2024 · 60.5% built
- Hayaat Tower · VasaiSky Developers · P99000003783 · possession Apr 2019 · 81.8% built
- SHASHWAT DREAMS · PalgharShashwat Industrial Developers · P99000003784 · possession Oct 2021 · 100% built
- LABH HEIGHTS · VasaiLABH ASSOCIATES · P99000003792 · possession Dec 2025 · 90.9% built
- Sunshine Phase II · VasaiSTAR DEVELOPERS · P99000003797 · possession Dec 2018 · 63.6% built
- Hayaat Moon · VasaiNewstar Builders · P99000003825 · possession Oct 2021 · 22.7% built
- AGARWAL SOLITAIRE · VasaiAGARWAL BUILDERS · P99000003833 · possession Mar 2019 · 90.5% built · 1 complaint
- CASITA ENCLAVE · VasaiM/S PLATINUM REALTORS · P99000003868 · possession Dec 2021 · 90.9% built
- Atmaram Plaza · VasaiShreeyan Developers · P99000003881 · possession Dec 2019 · 45.5% built
- SHIV RESIDENCY · PalgharMAHI DEVELOPERS · P99000003893 · possession Sept 2025 · 63.6% built
- BLDG NO-9 M.BARIA TWIN TOWER · VasaiM/s MAGNATES ENTERPRISES · P99000003970 · possession Nov 2020 · 98.2% built
- K. D. SAICON · VasaiK. D. VENTURE · P99000003992 · possession Sept 2022 · 81.8% built · 1 complaint
- GARDEN AVENUE K- K4 · VasaiSRIDUTT CONSTRUCTIONS · P99000004018 · possession Jan 2021 · 100% built · 2 complaints
- SAI RACHANA APARTMENT · PalgharSingh enterprises Builders & developers · P99000004057 · possession Dec 2027 · 81.8% built
- YASHWANT HEIGHTS · VasaiMANGALMURTI DEVELOPERS · P99000004110 · possession Dec 2018 · 90.9% built
- Anand Park Mamta Heights · PalgharSachin Shantilal Joshi · P99000004112 · possession Mar 2025 · 77.3% built · 1 complaint
- RICHMOND TOWN PHASE II LAKE EXOTICA · VasaiM/S HOMAGE DEVELOPERS · P99000004129 · possession Jan 2021 · 90.9% built
- VIVA CITY - A8 · VIRAR WESTVIVA WINNER VENTURE RELATORS LLP · P99000004130 · possession Jun 2025 · 45.5% built · 1 complaint
- OCEAN PEARL · PalgharOCEAN DEVELOPERS · P99000004132 · possession Dec 2018 · 37.3% built
- Virar Bolinj Yogiraj CHS Ltd · Vasai-Virar City (M Corp)Shree Jivdani Samarpan Developers · P99000004134 · possession Jan 2024 · 90.9% built
- NEW NANDDHAM · VasaiKIRAN ENTERPRISES · P99000004153 · possession Mar 2023 · 81.8% built
- PARADISE RESIDENCY · VasaiPARIKH INVESTMENT AND DEVELOPMENT PVT. LTD. · P99000004196 · possession Dec 2021 · 40.9% built
- BLISS INDUSTRIAL ESTATE -02 · VasaiBLISS DEVELOPERS · P99000004226 · possession Dec 2018 · 34.5% built
- SPRING FIELD · PalgharM/S. SHYAM SAGAR DEVELOPERS · P99000004250 · possession Jun 2027 · 81.8% built
- BLDG NO-1 M.BARIA EVEREST · VasaiMORESHWAR KRUSHNA BARIA · P99000004326 · possession Mar 2022 · 90.9% built · 5 complaints
- SIGNATURE B - BLISS · PalgharANS REALTY · P99000004350 · possession Dec 2018 · 90.9% built
- CRYSTAL PARK - PHASE II · PalgharK K BUILDERS & DEVELOPERS · P99000004379 · possession Dec 2019 · 84.5% built
- Navkar City Phase II Part 2 · VasaiNavkar Estate and Homes Pvt Ltd · P99000004423 · possession Dec 2026 · 89.8% built
- Divine Residency · VasaiGuruPrabhu Builders & Developers · P99000004430 · possession Aug 2022 · 90.9% built
- SS BUILDERS BUILDING NO. 8 · VasaiS S BUILDERS · P99000004466 · possession Dec 2021 · 61.4% built
- PRANAV APARTMENT · PalgharAARYA DEVELOPERS · P99000004490 · possession Mar 2018 · 90.9% built
- BHOOMI CLASSIC BUILDING NO. 2 · VasaiAPNA SAI BUILDERS AND DEVELOPERS · P99000004505 · possession Dec 2026 · 45.5% built
- ALOK REGENCY · VasaiALOK CONSTRUCTION · P99000004517 · possession Sept 2019 · 80% built
- SAI ENCLAVE · VasaiM/S. RADHEYA CONSTRUCTION COMPANY · P99000004529 · possession Dec 2021 · 60.6% built
- PARADISE GRANDEUR · VasaiPARIKH INVESTMENT AND DEVELOPMENT PVT. LTD. · P99000004547 · possession Jun 2023 · 36.4% built
- Unnatti Anmol · PalgharUnnatti Infra · P99000004567 · possession Dec 2018 · 72.7% built
- NAVKAR CITY Phase I part 3 · VasaiNavkar Estate and Homes Pvt.Ltd. · P99000004573 · possession Dec 2021 · 89.7% built
- EMERALD TOWER A WING · VasaiS & S PARTNERS · P99000004579 · possession Dec 2019 · 100% built
- Sumit Greendale NX · PalgharSumit Pragati Shelters LLP · P99000004678 · possession Apr 2019 · 83.4% built
- Gokul Park · VasaiShyaam Realty (Prop.- L. P. Agarwal) · P99000004682 · possession Mar 2018 · 100% built
- Haridwar Siddh · Virar WestHaridwar Corp · P99000004713 · possession Dec 2026 · 87.7% built · 2 complaints
- SS Builders Building No.7 · VasaiS S BUILDERS · P99000004734 · possession Dec 2019 · 81.8% built
- SUGANDHI VIHAR PHASE II · PalgharSAI VIHAR BUILDERS AND DEVELOPERS · P99000004800 · possession Nov 2026 · 67.6% built
- VIVA CITY - A1 · VasaiVIVA WINNER VENTURE RELATORS LLP · P99000004874 · possession Dec 2020 · 56.4% built · 2 complaints
- Sai Sawali A · VasaiP V REALTY · P99000004922 · possession Dec 2017 · 90.9% built
- Nidhi Palace · PalgharBhagawati Construction · P99000004975 · possession Apr 2018 · 50% built
- Emerald Tower · VasaiS M Enterprises · P99000004995 · possession Sept 2020 · 90% built
- THE SCENIC RESIDENCY PHASE I · VasaiP99000005001 · possession Jun 2026 · 46.4% built · 4 complaints
- Rebecca Queen · VasaiRebecca Ventures · P99000005006 · possession Dec 2020 · 73.6% built
- Nakshatra Greens · VasaiJSB Buildcon LLP · P99000005051 · possession Jun 2019 · 90.9% built · 1 complaint
- VEDANGI DEVELOPERS · VasaiVEDANGI DEVELOPERS · P99000005089 · possession Jan 2020 · 90.9% built
- Mittal Enclave Mittal Centre Shopping B-3 · VasaiSealink Construction Co. Pvt. Ltd. · P99000005104 · possession Dec 2018 · 72.7% built
- RAJ HILLS PHASE II · VasaiSACHIN YAGNESHWAR PATIL · P99000005109 · possession Dec 2017 · 86.8% built
- CLASSIC RESIDENCY · VasaiCLASSIC CONSTRUCTION CO. · P99000005113 · possession Dec 2023 · 90.9% built
- SHEETAL ANJALI · Vasai-Virar City (M Corp)D.G.LAND DEVELOPERS PRIVATE LIMITED · P99000005155 · possession Dec 2019 · 48.9% built
- NINE STAR RESIDENCY ROHINI BUILDING · PalgharTRINITY CONCRETE STRUCTURES PRIVATE LIMITED · P99000005167 · possession Jul 2022 · 72.7% built
- SHRI RAJENDRA SRUSHTI · PalgharSRUSHTI DEVELOPERS · P99000005173 · possession Dec 2021 · 81.8% built
- DIVYAL HEIGHTS · VasaiDISHANT BUILDERS AND LAND DEVELOPERS · P99000005192 · possession Oct 2021 · 90.9% built
- VICTORY HEIGHTS · VasaiPANCHMUKHI BUILDERS AND DEVELOPERS · P99000005198 · possession Dec 2019 · 90.9% built · 3 complaints
- Maple Terraces Building No. A-15 · PalgharMessrs. Axis Dwellings LLP · P99000005233 · possession Dec 2021 · 80.9% built
- STAR BUILDERS AND DEVELOPERS · VasaiSTAR BUILDERS & DEVELOPERS · P99000005302 · possession Dec 2017 · 90.9% built
- KANTI NX · VasaiMAHAVIR REALTORS · P99000005321 · possession Mar 2019 · 90.9% built
- ARPAN RESIDENCY · VasaiAKASH DEVELOPERS · P99000005384 · possession Nov 2022 · 90.9% built
- Leona Residency · VasaiErral Poshan Furtado · P99000005389 · possession Dec 2017 · 57.3% built
- Rashmi Star City Phase 2 · VasaiRashmi Star City Phase 2 · P99000005391 · possession Dec 2026 · 44.7% built · 7 complaints
- SAI YASHODHAN BLDG NO. 2 · Palghardeepak sadanand hanchate · P99000005416 · possession Dec 2027 · 90.9% built · 1 complaint
- THE WOODS- MAPLE AVENUE A WING · VasaiSURE DWELL DEVELOPERS · P99000005435 · possession Dec 2021 · 90.9% built
- SWASTIK RESIDENCY · PalgharSUGANDHI SWASTIK BUILDERS & DEVELOPERS · P99000005439 · possession Dec 2026 · 36.8% built
- Balaji Platinum Block No.10, Type C1, A Wing · VasaiTirupati Constructions Co · P99000005450 · possession Dec 2026 · 100% built
- Anand Villa II · VasaiMehr Lalit Nihilani · P99000005497 · possession Dec 2027 · 90.9% built · 2 complaints
- Shree Ganesh Kuteer · VasaiShree Mahalaxmi Ventures · P99000005498 · possession Mar 2018 · 100% built
- GANDHI INDUSTRIAL PARK · Ambiste Kh.GANDHI BUILDERS PVT LTD · P99000005517 · possession Jan 2026 · 90.9% built
- I.K. GROUP · PalgharI K GROUP · P99000005540 · possession Dec 2019 · 58.8% built
- Sai Anand · VasaiSairam Corporation · P99000005553 · possession Mar 2019 · 90.9% built
- CD HEIGHT · VasaiKALPANA BUILDCON · P99000005581 · possession Dec 2022 · 60.2% built
- KRISHNA NAGRI · PalgharKRISHNA DEVELOPERS · P99000005597 · possession Dec 2025 · 59.4% built
- MAITRY HEIGHTS · VasaiRAJ MAITRY & ESKON DEVELOPERS · P99000005628 · possession Dec 2024 · 56.7% built
- THE WOODS MAPLE AVENUE B WING · VasaiPIMENTA DEVELOPERS · P99000005658 · possession Dec 2021 · 90.9% built
- KRISHN KUNJ COMPLEX · VasaiKARMA CONSTRUCTION CO · P99000005676 · possession Dec 2017 · 90.9% built
- SHANTI LIFE SPACES 2 · VasaiSHETH AND CHOPRA DEVELOPERS · P99000005741 · possession Dec 2020 · 100% built
- Waman Nagar · VasaiWAMAN DEVELOPERS · P99000005742 · possession Dec 2018 · 100% built
- WESTERN PARK · VasaiSHAKTI DEVELOPERS · P99000005755 · possession Dec 2022 · 84.1% built
- RITU GARDENIA PHASE 2 · VasaiRITU BUILDERS AND DEVELOPERS · P99000005759 · possession Dec 2027 · 68.2% built · 1 complaint
- CRYSTAL PARK PHASE III · PalgharK K BUILDERS & DEVELOPERS · P99000005782 · possession Dec 2019 · 34.8% built
- G M HEIGHT · VasaiGARODIA & MAKWANA DEVELOPERS · P99000005833 · possession Dec 2019 · 70% built
- QUEENS VILLA · PalgharSHASHI KULDEEP OSTWAL · P99000005836 · possession Jul 2026 · 40.3% built
- RME PLAZA · VasaiRME ASSOCIATES · P99000005850 · possession Jul 2018 · 84.5% built
- ROYAL GARDEN · VIRARIMAX INFRA · P99000005888 · possession Jun 2027 · 87.7% built
- RELIABLE UTKARSH A,B WING · VasaiRELIABLE PRISM CONSTRUCTION CO. · P99000005891 · possession Jul 2022 · 47.3% built
- Navkar City Phase II Part-4 · VasaiNavkar Estate and Homes Pvt Ltd · P99000005905 · possession Dec 2026 · 90% built
- Apex Wildernest · VasaiApex Creators · P99000005939 · possession Mar 2019 · 53.9% built
- AARKAY GOLD · VasaiAAR KAY ENTERPRISES · P99000005943 · possession Sept 2020 · 65.5% built
- ZAHRA LAND · Vasai-Virar City (M Corp)ZAHRA LAND DEVELOPERS · P99000005947 · possession Jul 2023 · 36.9% built
- ANAND VIEW A WING · VasaiSHREE ARIHANT DEVELOPERS · P99000005956 · possession Dec 2019 · 72.5% built
- Swastik Epitome Building 2 Phase III 15 to 21 floors · VasaiMAHAVIR HOMES · P99000005964 · possession Mar 2027 · 76.8% built
- Sai Darshan Type C · Dahanu (M Cl)DINESH SADANAND BARI · P99000005978 · possession Mar 2018 · 52.7% built
- PUSHPAM A · VasaiARHAM REALTORS · P99000005979 · possession Jul 2018 · 90.9% built
- VASTUSRUSHTI · PalgharVASTUSRUSHTI REALTORS LLP · P99000005981 · possession Dec 2018 · 8.4% built
- DATTANI VERTEX WING CD PHASE III · VasaiBRIJESH SATISH DATTANI · P99000005990 · possession Dec 2023 · 90.5% built
- SHREE RAGHUVEER SAMARTH APARTMENT · VasaiVED SAMARTH · P99000006023 · possession Jun 2018 · 90.9% built
- Nakshatra Primus · VasaiJSB Dream Homes Private Limited · P99000006041 · possession Jun 2019 · 87.3% built · 1 complaint
- VANAMALA · VasaiNAVINKUMAR SUBHASH CHORGHE · P99000006045 · possession Dec 2021 · 90.9% built
- AAKASH COMPLEX · PalgharLXMI INFRA · P99000006053 · possession Nov 2026 · 79% built · 1 complaint
- AADHARSHILA SAPPHIRE · PalgharAADHARSHILA CONSTRUCTION · P99000006075 · possession Jun 2018 · 63.2% built
- OSTWAL VALLEY · PalgharSHREE OSTWAL BUILDERS LTD · P99000006087 · possession Jul 2019 · 86.4% built
- VITHAL HARI TOWER · VasaiVITHAL ENTERPRISES · P99000006107 · possession Mar 2024 · 46.4% built
- Asher Enclave · VasaiAmol Anthony Pereira · P99000006117 · possession May 2023 · 75.3% built
- Braj Paradise · PalgharBraj Developer · P99000006122 · possession May 2018 · 61.8% built
- Bafna Meadows Phase 1 · PalgharSuvidha Realtors · P99000006123 · possession Dec 2018 · 79.7% built
- ACROPOLIS 2 · VasaiBhoomi & Arkade Associates · P99000006132 · possession Dec 2022 · 89.1% built · 42 complaints
- SAI NAGAR · -SHUBHVASTU REALCON · P99000006133 · possession Dec 2027 · 64% built
- Balaji Platinum Block No.10, Type D2, C Wing · VasaiTirupati Constructions Co · P99000006135 · possession Dec 2026 · 100% built
- Poonam Prime · VasaiPrime Developers · P99000006206 · possession Jan 2019 · 81.8% built
- Avani Residency · PalgharAVANI RESIDENCY · P99000006263 · possession Dec 2026 · 45.6% built · 5 complaints
- KANTI AVENUE · VasaiMAHAVIR REALITY · P99000006288 · possession Dec 2021 · 95.5% built
- ANAND HEIGHT WING BAND C · VasaiSHREE ADESHWAR CORPORATION · P99000006290 · possession Jul 2028 · 70.7% built · 1 complaint
- KONARK EMBESSY · VasaiUNIVERSAL REALTORS · P99000006316 · possession Dec 2018 · 88.6% built
- Ambrosia building 2 · PalgharPawan Abhimanyu Singh · P99000006358 · possession Dec 2018 · 40.5% built
- YASHWANT INFRA · VasaiYASHWANT INFRA · P99000006395 · possession Oct 2021 · 100% built
- MOURYA DEVELOPER · VasaiMOURYA DEVELOPER · P99000006396 · possession Jun 2018 · 79.1% built
- GOKUL GRAND - 1, 2 & 3 · PalgharGOKUL GRAND - 1, 2 & 3 · P99000006400 · possession May 2026 · 75.9% built · 1 complaint
- BLISS · PalgharSEA CRESTS BUILDCON LLP · P99000006419 · possession Jun 2018 · 90.9% built
- Pareira Paradise · VasaiTrinity Developers · P99000006451 · possession Dec 2017 · 89.1% built
- GLOBAL ARENA · VasaiDDPL GLOBAL INFRASTRUCTURE PVT. LTD. · P99000006463 · possession May 2018 · 90% built · 1 complaint
- FIA IMPERIA · PalgharFIA LUXURY HOME DEVELOPERS · P99000006476 · possession Dec 2021 · 90.9% built
- Regency Homes · VasaiWILSON V MANUEL GONSALVES · P99000006502 · possession Jun 2019 · 34.5% built
- Hayaat Garden · VasaiM M Enterprises · P99000006530 · possession Mar 2018 · 81.8% built
- Signature Residency · PalgharMUNIR ABDULLATIF GAZI · P99000006550 · possession Dec 2028 · 38.7% built · 43 complaints
- Mittal Enclave Gokul Sector Bldg No 4 · VasaiSealink Construction Co. Pvt. Ltd. · P99000006573 · possession Oct 2020 · 90% built
- Apeksha Imperial · VasaiKOTHARI CREATION · P99000006604 · possession Mar 2023 · 78% built · 2 complaints
- MITHILA DHAM · PalgharNAVAL RAMBAHADUR SINGH · P99000006624 · possession Mar 2022 · 61.8% built
- Ambrosia building 3 · PalgharPawan Abhimanyu Singh · P99000006660 · possession Dec 2018 · 37.3% built · 1 complaint
- Arron Complex Phase 1 · PalgharArron Builders and Developers · P99000006677 · possession Jan 2018 · 86.4% built
- RAJHANS KSHITIJ, ASPEN, WING C · VasaiAJMERA DEVELOPERS · P99000006700 · possession Dec 2018 · 90.9% built
- Swastik Epitome Building 2 Phase I Ground to 7 floors · BEHIND D MARTHemant Ramesh Mhatre · P99000006718 · possession Dec 2026 · 83.6% built · 2 complaints
- SHRI KAMBESHWAR HEIGHTS · VasaiSHRI KAMBESHWAR & SONS · P99000006801 · possession Dec 2021 · 90.4% built
- MIDAS GLORY · VasaiDHMP INFRA · P99000006814 · possession Mar 2019 · 54.5% built
- KISHOR KUNJ · VasaiBHAGWATI BUILDERS AND DEVELOPERS · P99000006836 · possession Mar 2021 · 90.9% built
- ICON RESIDENCY · PalgharICON BUILDERS AND DEVELOPERS · P99000006871 · possession Jun 2027 · 89.5% built
- Ameya Woods · VasaiAmeya Squares · P99000006892 · possession Dec 2021 · 90.9% built
- OSTWAL WONDER CITY · PalgharSHREE OSTWAL BUILDERS LTD · P99000006909 · possession Dec 2021 · 89.1% built
- VELSONS HEIGHTS · Vasai-Virar City (M Corp)VELSONS DEVELOPERS · P99000006958 · possession Jun 2024 · 90.7% built
- Rashmi Star City Phase 5 · VasaiRashmi Star City Phase 5 · P99000006967 · possession Dec 2026 · 74.6% built · 7 complaints
- RELIABLE TOWNSHIP /RT-C TO K WING · VasaiRELIABLE REALTORS · P99000007052 · possession Dec 2018 · 78.2% built
- AMRUT YOG · Vasai-Virar City (M Corp)SAVITA BUILDERS AND DEVELOPERS · P99000007065 · possession Mar 2018 · 72.9% built
- VIVA VEDANTA - BLDG NO. 2 · VasaiVIVA HOMES PRIVATE LIMITED · P99000007076 · possession Dec 2017 · 90.9% built
- SAI PARIVAR · VasaiSAI PARIVAR CONSTRUCTION COMPANY · P99000007079 · possession Jan 2021 · 90.9% built
- Earth Residency · PalgharEarth Builder & Developers · P99000007170 · possession Sept 2020 · 90.9% built
- NINE STAR RESIDENCY PURVA · PalgharSai Mudraa Construction · P99000007206 · possession Dec 2018 · 50% built
- PARVATI NAGAR · VasaiSHREE GANESH DEVELOPER · P99000007211 · possession Dec 2026 · 62% built
- VINAYRAJ REGENCY · PalgharSHUBH ASSOCIATES · P99000007254 · possession Oct 2018 · 88% built
- MEENAKSHI HEIGHTS PHASE 1 · VasaiVIVA MEENAKSHI REALTY · P99000007255 · possession Jun 2019 · 32.5% built
- NINE STAR RESIDENCY PHALGUNI · PalgharKRISHA CONSTRUCTIONS · P99000007286 · possession Dec 2018 · 81.8% built
- Navpad Nidhi · PalgharNavpad Realtors · P99000007326 · possession Dec 2018 · 90.9% built
- LAKEVIEW APARTMENT · VasaiTRIMURTI BUILDERS AND DEVELOPERS · P99000007342 · possession Dec 2019 · 28.8% built · 1 complaint
- CRYSTAL RESIDENCY · VasaiSAI CRYSTAL HOMES · P99000007345 · possession Dec 2017 · 84.5% built
- PARASNATH NAGARI BUILDING NO 5 · VasaiSHREE PARASNATH BUILDERS · P99000007350 · possession Dec 2021 · 63.3% built
- POONAM PALLAZO · VasaiPOONAM SHANTI DEVELOPERS · P99000007365 · possession Dec 2021 · 90.9% built
- KUMKUM Sector 7 Building 23 Wing F · Vasai-Virar City (M Corp)Kalash Developers · P99000007366 · possession Jul 2023 · 90.9% built
- VIVA AAKANKSHA COMPLEX PHASE 1 · Vasai-Virar City (M Corp)VIVA AAKANKSHA BUILDERS & DEVELOPERS · P99000007383 · possession Dec 2017 · 77.5% built
- Acropolis 1 · Virar WestBhoomi & Arkade Associates · P99000007415 · possession Dec 2021 · 89.1% built · 29 complaints
- MAYUR ENCLAVE · VIRAR WESTM K & BROTHERS · P99000007416 · possession Dec 2026 · 82.3% built
- VIJAY HEIGHTS · VasaiVIJAY HEIGHTS · P99000007422 · possession Oct 2019 · 45.5% built
- Nikhil Tower Building No 2 · Vasai-Virar City (M Corp)M/S. SAMARTH BUILDERS & LAND DEVELOPERS · P99000007481 · possession Nov 2021 · 90.9% built
- SILVER GREEN · Palghar SILVER GREEN · P99000007490 · possession Dec 2026 · 62.7% built
- Emerald Sky · VasaiShalem Rojes Gonsalves · P99000007524 · possession Dec 2018 · 73.6% built
- Navkar Tower Part 1 · VasaiNavkar Estate and Homes Pvt Ltd · P99000007525 · possession Dec 2023 · 90.4% built
- THE WOODS · VasaiVILEENA ALLEN GONSALVES · P99000007560 · possession Dec 2018 · 90.9% built
- SEAGULL BLDG 3 · VasaiDANGE DEVELOPERS · P99000007599 · possession Dec 2018 · 78.1% built
- Ambrosia building 1 · PalgharPawan Abhimanyu Singh · P99000007608 · possession Dec 2018 · 41.8% built
- Swastik Jayshree · PalgharSwastik Construction · P99000007637 · possession Mar 2018 · 84.1% built
- ADORE HOMES · PalgharADORE HOMES · P99000007658 · possession Dec 2026 · 89.7% built
- Datta Prayag Apartment · Dahanu (M Cl)Milind Dattatraya Mavle · P99000007660 · possession Jun 2018 · 37.7% built
- UNITY GARDEN · PalgharUNITY LAND DEVELOPERS · P99000007688 · possession Mar 2018 · 51.4% built
- Relax Homes · IbhadpadaMohd Sajid Abdul Salam Pasha · P99000007696 · possession Dec 2017 · 75.9% built
- VINAY UNIQUE HOMES · Vasai-Virar City (M Corp)VINAYUNIQUE REALTORS · P99000007717 · possession Dec 2019 · 88.2% built · 2 complaints
- APEX DEVELOPERS · Vasai-Virar City (M Corp)APEX DEVELOPERS · P99000007741 · possession Jan 2025 · 70.9% built
- K M RESIDENCY · PalgharKM REALITY · P99000007750 · possession Dec 2027 · 77.3% built
- Rashmi Star City Phase 3 · VasaiRashmi Star City Phase 3 · P99000007752 · possession Dec 2026 · 57.2% built · 3 complaints
- VEENA DYNASTY PH II · VasaiNIKUNJ DEVELOPERS · P99000007769 · possession Dec 2019 · 89.1% built
- Nine Star Residency Revati · PalgharNINE LIFESPACE DEVELOPERS · P99000007772 · possession Dec 2018 · 60.9% built
- SHREE LAMBODAR HEIGHTS · Vasaishree sadguru enterprises · P99000007786 · possession Feb 2023 · 90.9% built
- Dias Residency Park · SativaliM/s Dias Properties & Projects · P99000007801 · possession Dec 2022 · 31.5% built
- Future Build Realtors · VasaiFuture Build Realtors · P99000007807 · possession Feb 2021 · 100% built
- SUKHKARTA · nallasopara westSUKHKARTA DEVELOPERS · P99000007883 · possession Mar 2027 · 75.9% built
- RELIABLE SWAPNA NAGARI-1,2,5,8,13,14,15 · VasaiRELIABLE TARANG · P99000007894 · possession Dec 2025 · 87% built
- YASHVANT SRUSTI · PalgharINSTACROISSANCE LIMITED · P99000007915 · possession Jul 2024 · 90.9% built
- VEER 2 · PalgharVeer Global Infraconstruction Limited · P99000007946 · possession Dec 2021 · 100% built
- VISHAKA · PalgharKRISHA LIFESPACE DEVELOPERS · P99000007992 · possession Dec 2018 · 35.2% built
- VIDYA SAGAR VILLA · PalgharRAVINDRA SHANKAR SAWANT · P99000008038 · possession Dec 2022 · 64.1% built · 2 complaints
- Sunrise Apt. · PalgharParadise Developers · P99000008059 · possession Dec 2026 · 80.9% built
- VAKRATUNDA · PalgharAMIT HARSHAVADAN AGASKAR · P99000008078 · possession Mar 2019 · 90.9% built
- PARSHWANATH DARSHAN · DurvesPARSHWANATH DEVELOPERS · P99000008080 · possession Dec 2026 · 36.1% built
- DATTANI VERTEX WING AB PHASE I · VasaiBRIJESH SATISH DATTANI · P99000008090 · possession Dec 2023 · 90.5% built
- VAKRATUNDA ENTERPRISES · PalgharVAKRATUNDA ENTERPRISES LLP · P99000008100 · possession Dec 2026 · 64.5% built
- TANIA HORIZON · VasaiTANIA INFRACON PRIVATE LIMITED · P99000008114 · possession Feb 2029 · 86.8% built
- MAITRY POOJA BUILDING NO.3 · Vasai-Virar City (M Corp)MAITRY POOJA BUILDERS & DEVELOPERS · P99000008122 · possession Dec 2021 · 90.9% built
- SPACE HEIGHTS · WalivSPACE ASSOCIATES · P99000008214 · possession Dec 2021 · 43.6% built
- DATTANI LINEAR WING ABC PHASE I · VasaiBRIJESH SATISH DATTANI · P99000008218 · possession Dec 2023 · 81.4% built · 1 complaint
- Anora Residency · BH. PARIKH COMMERCIAL CENTER, VIRAR WESTANORA RESIDENCY · P99000008234 · possession Jul 2026 · 81.5% built
- Moreshwar Apartments · Near Vaghulsar MandirWHITE LOTUS REALTORS PRIVATE LIMITED · P99000008251 · possession Aug 2018 · 90.9% built
- TANIA PLANET · VasaiFRENTANIA REALTOUCH BUILDERS PRIVATE LIMITED · P99000008261 · possession Jan 2018 · 73.6% built
- SIGNATURE C - CREST · PalgharANS REALTY · P99000008275 · possession Sept 2018 · 90.9% built
- KALASH · VasaiKemi Infrastructures earlier known as Taru Realtors · P99000008304 · possession Dec 2022 · 90.9% built
- MUNISH SMRITI · Vasai-Virar City (M Corp)MUNISH INFRA LLP · P99000008317 · possession Dec 2020 · 100% built
- SAI BABA NAGAR · MahimSai Developers · P99000008318 · possession Jun 2024 · 46.8% built
- Shadawal Impression Building C1 C2 · PalgharKailash Builders · P99000008322 · possession Dec 2018 · 74.1% built
- HARI GANGA 2 · Vasai-Virar City (M Corp)BHARAT CHINTAMANI PATIL · P99000008327 · possession Jul 2018 · 45.5% built
- BHOOMI PRIDE · Vasai-Virar City (M Corp)MEHTA DEVELOPERS · P99000008331 · possession Jan 2018 · 90.9% built
- SAI RESIDENCY · VasaiSAI RIDDHI CONSTRUCTION · P99000008335 · possession Dec 2022 · 48.6% built
- VIVA CITY-A2 · Virar WestVIVA WINNER VENTURE RELATORS LLP · P99000008341 · possession Dec 2020 · 54.1% built · 10 complaints
- SHRI INDUSTRIAL ESTATE · VasaiSHRI ENTERPRISES · P99000008391 · possession Sept 2020 · 65.5% built
- KAILASH TOWER · VASAIKAILASH DEVELOPERS · P99000008452 · possession Dec 2024 · 90.9% built · 5 complaints
- GREEN HEIGHTS · VasaiSAI LEELA REALTORS · P99000008455 · possession Dec 2022 · 90.9% built
- VIVA KINGSTON CROWN · Vasai-Virar City (M Corp)Viva Mahalaxmi Associates · P99000008460 · possession Mar 2019 · 90.9% built
- DATTANI PRISM · VasaiBRIJESH SATISH DATTANI · P99000008471 · possession Dec 2019 · 90.9% built · 1 complaint
- MIDAS ENCLAVE · Vasai-Virar City (M Corp)MANJULA CONSTRUCTIONS · P99000008488 · possession Dec 2017 · 87.3% built
- Mittal Enclave Bldg no 3 Wing CDE · VasaiSealink Construction Co. Pvt. Ltd. · P99000008509 · possession Dec 2018 · 90.9% built
- RUTURAJ VASTUSHILP PHASE II A B C WINGS · VasaiRUTURAJ VASTUSHILP · P99000008517 · possession Jun 2026 · 80% built
- SHREE KRUSHNA ARCADE · VasaiAVAAS BUILDERS AND DEVELOPERS · P99000008526 · possession Dec 2026 · 54.1% built · 2 complaints
- Navkar City Phase-I-Part-4 · naigaonNavkar Estate & Home Pvt Lts · P99000008528 · possession Dec 2026 · 90.9% built
- Balaji Platinum Block No.10, Type E, E Wing · VasaiTirupati Constructions Co · P99000008533 · possession Dec 2026 · 100% built
- OSTWAL DREAM LAND · PalgharSHREE OSTWAL BUILDERS LTD · P99000008545 · possession Dec 2019 · 90.9% built
- Kohinoor Apartment · VasaiPATRICK FRANCIS ALMEIDA · P99000008551 · possession May 2018 · 90.9% built
- BLDG NO-3 ROSE · YASHWANT NAGARM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · P99000008563 · possession Mar 2022 · 90.9% built
- STAR GLORIOUS · Vasai-Virar City (M Corp)STARLITE CONSTRUCTIONS · P99000008579 · possession Jun 2023 · 90% built
- CELLO DECENT HOMES PHASE 2 · PALGHARDECENT HOMES · P99000008582 · possession Jul 2019 · 90.9% built
- Hayaat Centre · Vasai-Virar City (M Corp)Hayaat Enterprises · P99000008584 · possession Mar 2018 · 81.8% built
- VINAY UNIQUE IMPERIA · Vasai-Virar City (M Corp)IMPERIUM BUILDCON LLP · P99000008596 · possession Dec 2019 · 81.8% built · 8 complaints
- SAI SANGAM APARTMENT · VasaiSAI SANGAM CONSTRUCTION CO · P99000008631 · possession Oct 2020 · 90.9% built
- Mittal Enclave Mittal Centre Shopping B-1 · Vasai-Virar City (M Corp)Sealink Construction Co. Pvt. Ltd. · P99000008632 · possession Dec 2018 · 72.7% built
- RELIABLE UTKARSH C , D WING · VASAIRELIABLE PRISM CONSTRUCTION CO. · P99000008640 · possession Jul 2022 · 42.5% built
- KAILASH HEIGHTS · Vasai-Virar City (M Corp)KAILASH DEVELOPERS · P99000008653 · possession Jun 2024 · 90% built
- VASAI ONE -BLDG 2 · VasaiVASAI ONE REALTY · P99000008656 · possession Dec 2018 · 90% built
- FALAK NUMA · VasaiNAVID MOHAMMED HUSSAIN CHINDE · P99000008662 · possession Dec 2021 · 72.7% built
- Luxury Empire Township Phase III · PalgharMUNIR ABDULLATIF GAZI · P99000008697 · possession Dec 2030 · 10.9% built · 21 complaints
- Balaji Platinum Block No.10, Type C, B Wing · VasaiTirupati Constructions Co · P99000008702 · possession Dec 2026 · 100% built
- JAY VIJAY NAGARI NO 1 · VasaiSUMATINATH BUILDERS · P99000008704 · possession Jul 2028 · 85.9% built · 3 complaints
- JAY VIJAY NAGARI NO 2 · VasaiSUMATINATH BUILDERS · P99000008746 · possession Jul 2028 · 81.4% built · 4 complaints
- LUIZA HOMES · Vasai-Virar City (M Corp)LUIZA HOMES · P99000008748 · possession Dec 2021 · 15.9% built
- Nakshatra Greens - Phase II · VasaiJSB Buildcon LLP · P99000008753 · possession Dec 2021 · 90.9% built · 1 complaint
- Gomes Garden · VasaiJudith Builders & Devlopers · P99000008786 · possession Aug 2018 · 90% built
- Greenwood Residency · VasaiGuruprabhu Builders and Developers · P99000008823 · possession Aug 2018 · 90.9% built
- Ornate Galaxy Phase I · VasaiSai Ornate Developers · P99000008854 · possession Oct 2020 · 85.3% built
- NAKODA HEIGHTS 4 · VasaiSHRINATH REALTORS · P99000008910 · possession Feb 2021 · 90.9% built · 1 complaint
- EMANUEL BUILDING · VasaiD & M BUILDERS · P99000008922 · possession Dec 2018 · 90.9% built
- SUGANDHI SQUARE · BolinjR. N. REALTY · P99000008924 · possession Dec 2026 · 27.7% built
- Maple Terraces Building No. B-10 · shelwaliMessrs. Axis Dwellings LLP · P99000008935 · possession Dec 2021 · 90% built
- VINODINI · VasaiRUBY ENTERPRISES · P99000008946 · possession Dec 2017 · 90.9% built
- SHALIBHADRA YASH · VasaiSUMATINATH BUILDERS · P99000008956 · possession Jul 2026 · 83.8% built
- SHUBHAM PARADISE · Vasai-Virar City (M Corp)ARHAM REALTORS · P99000008958 · possession Jun 2023 · 90.5% built
- C VINAYAK INDUSTRIAL ESTATE · PalgharVINAYAK CONSTRUCTION · P99000008974 · possession Dec 2022 · 72.7% built
- NINE REALTORS · VasaiNine Realtors · P99000008995 · possession Aug 2018 · 90.9% built
- Almighty Villas · VasaiAlmighty Developers · P99000008997 · possession Jul 2022 · 72.4% built
- VASTU SHILP DEVELOPERS · Vasai-Virar City (M Corp)VASTU SHILP DEVELOPERS · P99000009007 · possession Jan 2018 · 89.8% built
- RUSHABH INDUSTRIAL ESTATE · Vasai-Virar City (M Corp)RUSHABH ENTERPRISES · P99000009026 · possession Mar 2018 · 61.8% built
- ZAR EMPIRE · Vasai-Virar City (M Corp)ZAR BUILDERS & DEVELOPERS · P99000009027 · possession Dec 2025 · 52.7% built
- KUSUM PARK · PalgharSUNSHINE BUILDERS · P99000009057 · possession Feb 2022 · 54.1% built
- Tulip Anchor Park · VasaiLakozy Buliders LLP · P99000009059 · possession Dec 2019 · 90.9% built · 1 complaint
- GANESHA HOMES · PalgharSHRI GANESH KRIPA · P99000009071 · possession Nov 2027 · 74.1% built
- Rashmi Star City Phase 4 · Naigaon EastRashmi Realty Builders Pvt Ltd · P99000009093 · possession Dec 2026 · 28.6% built · 13 complaints
- ICCHAPURTI SAI PRESTIGE · VasaiMAHAVIR VENTURES · P99000009115 · possession Dec 2019 · 87.9% built
- PARASNATH NAGARI · UMROLISHREENATH ENTERPRISES · P99000009121 · possession Sept 2027 · 7.6% built
- KINJAL COMPLEX · PalgharKINJAL ENTERPRISES · P99000009135 · possession Jun 2018 · 90.9% built
- INDUSTRIAL PROJECT · Vasai-Virar City (M Corp)SUVIDHA BUILDERS AND DEVELOPERS · P99000009165 · possession Dec 2021 · 81.8% built
- REGAL HEIGHTS · VasaiSUVIDHA ENTERPRISES · P99000009178 · possession Dec 2021 · 49.1% built
- POOJA TOWNSHIP · PalgharPOOJA TOWNSHIP · P99000009231 · possession Dec 2027 · 44.9% built
- RENUKA RESIDENCY · police stationHIMANSHU SHAM TENDULKAR · P99000009241 · possession Dec 2019 · 81.8% built
- Nine Star Landmark Ph-I Bldg-1 ASTER · PalgharNINE HOMEMAKERS · P99000009255 · possession Dec 2021 · 9.1% built
- SATU AURA · PalgharSATU REALTY · P99000009278 · possession May 2018 · 90.9% built
- Nakshatra Ozone · TivariJSB Homes LLP · P99000009297 · possession Dec 2021 · 90.9% built
- PRIYESH HEIGHTS · HDIL TOWNSHIPPRIYESH ENTERPRISES · P99000009305 · possession Dec 2025 · 81.8% built
- Nisarg Shrushti Phase-1 · Behind Mahavir GardenArvel Realtors · P99000009330 · possession Apr 2022 · 90.9% built
- LAXMI RESIDENCY · Vasai-Virar City (M Corp)OM SAI ENTERPRISE · P99000009380 · possession Dec 2019 · 90.9% built
- NAVKAR CITY PHASE II PART I · naigaonNavkar Estate and Homes Pvt Ltd · P99000009437 · possession Dec 2021 · 89.9% built
- CRD Gardenia Apartments 1 · PalgharDr Chandrashekhar Raghunath Dound · P99000009462 · possession Dec 2019 · 81.8% built
- CLEMENT REGENCY · VasaiCLEMENT REGENCY · P99000009464 · possession May 2019 · 54.5% built
- THE WOODS JUNIPER B WING · VasaiPLATINUM REALTY · P99000009479 · possession Dec 2021 · 90.9% built
- IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B · UMROLISHREE SAI SAMARTH BUILDERS AND DEVELOPERS · P99000009483 · possession Apr 2027 · 38.2% built
- Pratham residency · TembhodeCreative Constructions · P99000009497 · possession Jan 2019 · 81.8% built
- GOKUL NAGAR · PalgharFIVESTAR REALTORS · P99000009505 · possession Dec 2026 · 47% built · 4 complaints
- ROOP RAJAT PARK PHASE 1 · PalgharMAHAVIR ASSOCIATES · P99000009521 · possession Jul 2018 · 82.7% built
- REGALIA · Vasai-Virar City (M Corp)YASHODHAN SHANTI REALTORS · P99000009586 · possession Dec 2023 · 90.9% built
- PRITHVI SRISHTI · PalgharPRITHVI ANAND REALTY · P99000009593 · possession Jun 2018 · 47.7% built