All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 46 of 48.
Palghar
- CRYSTAL PALLAZO · VasaiSAURABH CONSTRUCTION · P99000009609 · possession May 2018 · 90.9% built
- MUNISH SMRITI · Vasai-Virar City (M Corp)SMRITI INFRAHEIGHTS PRIVATE LIMITED · P99000009677 · possession Dec 2020 · 9.1% built
- SOLITAIRE CASTLE · Village malondePam Infrastructure · P99000009688 · possession Dec 2029 · 76.7% built
- Armaan Crystal Uptown · Vasai EastArmaan Housing LLP · P99000009714 · possession Aug 2026 · 20.7% built · 1 complaint
- GIRIRAJ DARSHAN · PalgharKISHORE S. DUBE · P99000009715 · possession Jun 2023 · 81.8% built
- NAVKAR CITY PHASE II PART 3 · naigaonNAVKAR ESTATE AND HOMES PVT LTD · P99000009716 · possession Dec 2021 · 89.6% built
- Suncity Complex · PalgharSWASTIK BUILDER AND DEVELOPERS · P99000009723 · possession Mar 2019 · 90.9% built
- SHRIKRISHNA HERITAGE · PalgharSHRIKRISHNA VENTURES · P99000009732 · possession May 2018 · 48.2% built
- Vencel Enclave · Vasai-Virar City (M Corp)Rupali Vishal Dabre · P99000009749 · possession Dec 2029 · 75.8% built
- Kuber Kunj · PalgharMahalaxmi Realtors · P99000009752 · possession Oct 2018 · 50% built
- Swastik Laxmi · PalgharSwastik Construction · P99000009764 · possession Jan 2018 · 90.9% built
- CHAWRE TOWER · VasaiLANDMARK CONSTRUCTIONS · P99000009770 · possession Dec 2026 · 61.6% built
- GAURAV HEIGHTS · VasaiMAHAVIR DEVELOPERS · P99000009792 · possession Mar 2027 · 59.4% built · 1 complaint
- Sankalp Heights Building No 2 D E F Wing Phase 1 Ground plus 7th Floor and Phase 2 8th plus 12 floor · VasaiSankalp Builders and Developers · P99000009807 · possession Dec 2027 · 90.9% built · 2 complaints
- BALAJI PLATINUM, Block No. 10, Type C1, D Wing · VasaiTirupati Constructions Co · P99000009822 · possession Dec 2026 · 100% built
- DREAMS HEIGHTS BUILDING NO- I · NAIGAONLODHA BUILDERS AND DEVELOPERS · P99000009825 · possession Sept 2026 · 87.3% built
- VIVAAN HEIGHTS · VasaiMAHAVIR PROPERTIES · P99000009840 · possession Dec 2021 · 90.9% built
- PARASNATH NAGARI BUILDING NO. 1 · VasaiSHREE PARASNATH BUILDERS · P99000009841 · possession Jun 2024 · 80% built · 6 complaints
- SWEET HOME BUILDING 1 · ShirgaonIPSIT ENTERPRISE · P99000009859 · possession Dec 2019 · 18.2% built
- OASIS AND GENESIS · MahimSEA CREST CONSTRUCTION · P99000009868 · possession Mar 2018 · 90.9% built
- APEKSHA COMPLEX · WALIVKOTHARI CONSTRUCTION CO · P99000009883 · possession Dec 2026 · 81.3% built · 1 complaint
- SHANTI ENCLAVE · VasaiSADGURU BUILDERS AND DEVELOPERS · P99000009944 · possession Sept 2020 · 45.1% built
- NINE STAR RESIDENCY KRITIKA · MAKANEYOGESH BIDYE · P99000009956 · possession Dec 2018 · 50.5% built
- Raj Icon · Palghar WestNeelshrushti Builders & Developers · P99000009957 · possession Sept 2019 · 90.9% built
- OPAL FAIRY BELL · VasaiSYLVA LAND DEVELOPERS · P99000009979 · possession May 2023 · 90.9% built
- SAI YASHODHAN BLDG NO.1 · Parasnath Nagarideepak sadanand hanchate · P99000009983 · possession Dec 2026 · 90.9% built
- CRD Gardenia Apartments 6 · PalgharDr Chandrashekhar Raghunath Dound · P99000009989 · possession Sept 2022 · 81.8% built
- CRD Gardenia Apartments 2 · PalgharDr Chandrashekhar Raghunath Dound · P99000010008 · possession Dec 2022 · 56.8% built
- Rudra Sai · PalgharRudra Sai Appartment · P99000010012 · possession Dec 2018 · 90.9% built
- Suman Vastu Apartment · IbhadpadaFamid Himamudin Shaikh · P99000010050 · possession Mar 2018 · 33.6% built
- Briza Anchor Park · VasaiLakozy Builders LLp · P99000010053 · possession Dec 2019 · 90.9% built · 4 complaints
- RUTURAJ VASTUSHILP PHASE II D E F WINGS · VasaiRUTURAJ VASTUSHILP · P99000010069 · possession Mar 2023 · 90.9% built
- APEKSHA SHOPPING CENTRE · Vasai-Virar City (M Corp)KOTHARI CONSTRUCTION CO · P99000010073 · possession Dec 2018 · 78.2% built
- HERAMB VILLA · PALGHAR EASTSHILPA DEVELOPERS · P99000010104 · possession Mar 2023 · 90.9% built
- Maple Terraces Building No. B-11 · shelwaliMessrs. Axis Dwellings LLP · P99000010117 · possession Dec 2021 · 90% built
- KANTI REGENCY · VasaiMAHAVIR PROPERTIES · P99000010163 · possession Dec 2021 · 90.9% built
- SHANTI VISTA · BOISARSHAH REALTY AND INFRA · P99000010164 · possession Jul 2018 · 90.9% built
- Trinity Heights · VirarShreeji Realtors · P99000010210 · possession Dec 2022 · 59.1% built
- SHREEMANT · VasaiCHANDRASHEKHAR SHANTARAM DHURI · P99000010256 · possession Dec 2017 · 81.4% built
- NEST LOTUS · PalgharNEST ENTERPRISES · P99000010260 · possession Dec 2018 · 58.2% built · 2 complaints
- Paramount Heights · VasaiM/s Zion Constructions · P99000010275 · possession Jun 2023 · 43.2% built · 1 complaint
- DLASA HEIGHTS · VasaiDLASA DEVELOPERS · P99000010299 · possession Dec 2023 · 95.5% built
- VINAY UNIQUE CORNER · BOLINJVINAYUNIQUE CONSTRUCTION PRIVATE LIMITED · P99000010331 · possession Dec 2019 · 88.2% built
- SAI ASHISH · VasaiG.M ENTERPRISES · P99000010346 · possession Dec 2027 · 100% built
- GOPALKRISHNA SANKUL · NAIGAON EASTMAAD CONSTRUCTION · P99000010352 · possession Dec 2023 · 87.3% built
- RELIABLE ALEEN A,B,C WING · Vasai-Virar City (M Corp)RELIABLE HOMES · P99000010362 · possession Jul 2018 · 89.1% built
- Dhanya Sativali Nagri Building 10 · Vasai-Virar City (M Corp)Sandesh Lakhuji Jadhav · P99000010377 · possession Dec 2021 · 86.4% built
- Sai Paradise · PalgharSai Paradise · P99000010380 · possession Nov 2018 · 47.4% built
- MAX VENTURE · VasaiMAX VENTURE · P99000010434 · possession Oct 2020 · 81.8% built
- SHUBHANGAN · VasaiS.H.ENTERPRISE · P99000010435 · possession Mar 2018 · 90.7% built
- SANDEEP HEIGHTS · VasaiSB LIFESPACES PVT LTD · P99000010491 · possession Mar 2019 · 90.9% built · 1 complaint
- SUBWAY RESIDENCY · VIRARRAJ ASSOCIATES · P99000010520 · possession Dec 2021 · 41.4% built
- VIMAL HEIGHTS · VasaiSHREE VIMAL DEVELOPERS · P99000010545 · possession Jul 2022 · 90.5% built
- GAYATRI PARK THIRD PHASE · MahimSHREE ASHTVINAYAK BUILDERS & DEVELOPERS · P99000010554 · possession Dec 2026 · 59.5% built
- Navkar Tower- Part-2 · Vasai-Virar City (M Corp)NAVKAR ESTATE AND HOMES PVT. LTD · P99000010564 · possession Dec 2026 · 90.4% built
- DEEP GARDEN · VasaiATHARVA DEVELOPER · P99000010593 · possession Sept 2020 · 81.8% built
- DEEP PRIDE ATO E WING · VasaiDEEP HOMES · P99000010595 · possession Jun 2023 · 90.9% built
- TAAL · Near Global CityAce Property Developers · P99000010690 · possession Apr 2025 · 90.9% built
- Y. K. NAGAR NX · Vasai-Virar City (M Corp)SHREE ASHTAVINAYAK BUILDERS · P99000010747 · possession Dec 2017 · 90% built
- Aditi Empire · VasaiRakhumai Developers · P99000010761 · possession Apr 2022 · 20% built
- GOKUL DHAM · VasaiM/s. Sai Ashirwad Developers · P99000010766 · possession Dec 2018 · 81.8% built
- Siddhivinayak Arcade Bldg4 · VasaiSIDDHIVINAYAK DEVELOPERS · P99000010820 · possession Mar 2018 · 80.5% built
- PIL TOWER · VasaiPIL DEVELOPERS PRIVATE LIMITED · P99000010838 · possession Dec 2026 · 81.1% built · 2 complaints
- GUNAJI VASUDEO COMPLEX · UmroliPURSHOTAM GOPALDAS SEHWANI · P99000010863 · possession Dec 2021 · 100% built
- VAMA PARADISE · VIRAR WESTVAMA LIFESTYLES · P99000010889 · possession Dec 2019 · 90.9% built
- SANTAN ARCADE · VasaiMANUEL DIAGO ALPHUNSO · P99000010892 · possession Dec 2018 · 81.8% built
- NEST RESIDENCY · TembhiTASHA NEST HOME MAKERS PVT LTD · P99000010898 · possession Dec 2018 · 90.9% built · 1 complaint
- Navkar City Phase I Part 2 · don boscoNavkar Estate and homes pvt ltd · P99000010920 · possession Dec 2026 · 90.9% built
- PARADISE · VevoorSAFFRON DEVELOPERS · P99000010941 · possession Dec 2018 · 90.9% built
- GALAXY AVENUE · rajnagarPARSHWANATH REALTORS · P99000010944 · possession May 2022 · 90.9% built
- Ramchandra residency bldg no.1 · VasaiHimali Construction · P99000010975 · possession Sept 2022 · 83.6% built
- OM SAI COMPLEX · BetegaonVARSHA PRAKASH NAIK · P99000010987 · possession Dec 2027 · 67.7% built · 1 complaint
- ABHISHEK APPARTMENT · PARASNATH NAGARIOM SHRI SAI CONSTRUCTION · P99000011014 · possession Dec 2026 · 29.5% built
- JADHAV RESIDENCY · VasaiPALAK BUILDERS · P99000011045 · possession Dec 2019 · 90.9% built
- MATHURADHAM · UmroliRIDDHI SIDDHI REALTY · P99000011054 · possession Dec 2027 · 50.5% built
- SIDDHIVINAYAK CROWN · Vasai-Virar City (M Corp)SIDDHIVINAYAK DELEVOPERS · P99000011070 · possession Dec 2028 · 90% built
- RAJYOG ELANZAA · PalgharRAJYOG INFRA · P99000011072 · possession Dec 2018 · 10.9% built
- GALAXY APARTMENT · Vasai-Virar City (M Corp)ORCHID CONSTRUCTION · P99000011081 · possession Dec 2023 · 90.9% built
- Swastick Heights · VasaiShree Swastick Builders · P99000011121 · possession Jun 2024 · 90.9% built · 3 complaints
- INDUSTRIAL BUILDING NO 1 · Vasai-Virar City (M Corp)SHREE NARAYAN INDUSTRIAL DEVELOPERS · P99000011126 · possession Dec 2023 · 57.1% built
- TRINETRA APARTMENT · VASAI VIRARSHREE SAI CONSTRUCTION · P99000011142 · possession Dec 2025 · 90.9% built
- PARASNATH GARDEN-S NO 182-3 196-7 · NEAR STATIONSHREENATH ENTERPRISES · P99000011151 · possession Sept 2027 · 54.5% built · 9 complaints
- lily palace · VasaiCaptain Varghese & Sons · P99000011171 · possession Jul 2019 · 55% built
- MAHAVIR SYMPHONY · VasaiRAKESH AMRUTLAL SHAH · P99000011172 · possession Dec 2019 · 90.9% built
- Mohak City Florence · VasaiV.M.S Enterprises · P99000011207 · possession Apr 2022 · 90.9% built
- sunshine · Vikramgadhigh seas properties · P99000011218 · possession Mar 2018 · 90.9% built
- VIMAL RESIDENCY · NILEMOREVIMAL DEVELOPERS · P99000011244 · possession Feb 2024 · 99.9% built · 1 complaint
- BUILDING NO. 10 PEREIRA HOUSING COMPLEX · VasaiTHE ALPS DEVELOPERS · P99000011259 · possession Sept 2018 · 72.3% built
- VEER SPLENDOR · VasaiVeer Global Infraconstruction Limited · P99000011282 · possession Dec 2022 · 70% built
- NEST LEAF · TEMBODENEST INFRA · P99000011341 · possession Dec 2024 · 81.8% built · 1 complaint
- BLUEBELL · VasaiNemichand Poonamchand Jain · P99000011370 · possession Dec 2018 · 81.8% built
- RITU GARDENIA PHASE 1 · VasaiRITU BUILDERS AND DEVELOPERS · P99000011391 · possession Dec 2021 · 94.3% built · 1 complaint
- KASHI APARTMENTS · VasaiB M DEVELOPERS · P99000011473 · possession Jul 2018 · 75.3% built
- SHALIBHADRA AMORA · VasaiSUMATINATH BUILDERS · P99000011479 · possession Jul 2028 · 73.3% built
- SOLARIS WING E-1 HDIL LAYOUT · SEC VII BUILDING NO 23SUNSHINE DEVELOPERS · P99000011525 · possession Dec 2026 · 90.9% built
- Rose Anchor Park · VasaiLakozy Builders LLP · P99000011540 · possession Dec 2019 · 90.9% built
- LANDMARK TOWER · VasaiLAND MARK DEVELOPERS · P99000011555 · possession Jun 2018 · 82.7% built
- PARASNATH GARDEN- SNO 200-1-2 · UMROLISHREENATH ENTERPRISES · P99000011584 · possession Sept 2026 · 15.7% built
- GOKULDHAM ZONE 01 · PalgharRaj Shree Nirman Builders Pvt Ltd · P99000011596 · possession Dec 2026 · 70.2% built · 3 complaints
- SHIV PARADISE · saaki nakaHIMANSHU SHAM TENDULKAR · P99000011602 · possession Dec 2018 · 72.7% built
- Prakash Kunj · VasaiJeevan Asha Enterprises · P99000011618 · possession Dec 2017 · 72.7% built
- Navkar City Phase III Part 1 · Vasai-Virar City (M Corp)Navkar Estate and Homes Pvt Ltd · P99000011641 · possession Nov 2022 · 89.5% built
- CASA TERRAZA Wing C · VasaiR. & J. Enterprises · P99000011668 · possession Dec 2021 · 100% built
- Mohak House No.3 A Wing · VasaiV.S. Enterprises · P99000011684 · possession Dec 2022 · 90.9% built · 1 complaint
- TOPAZ HEIGHTS · VasaiTOPAZ HOMES · P99000011693 · possession Dec 2026 · 51.4% built
- PENINSULA HEIGHTS · VIRAR WESTPRIESKA REAL ESTATES PVT. LTD. · P99000011703 · possession Dec 2019 · 43.1% built
- AADESHWAR-2 · PalgharSHREE ADESHWAR BUILDCOM · P99000011704 · possession Jun 2022 · 90.9% built
- SAI BABA RESIDENCY · VasaiTHIM CONSTRUCTION PVT. LTD. · P99000011750 · possession Dec 2025 · 90.9% built
- SAPPHIRE HEIGHTS · VasaiJAMALUDDIN HIMAYATALI SHAIKH · P99000011761 · possession Dec 2022 · 70% built · 1 complaint
- PRAGATI TULIP · PalgharPRAGATI CORPORATION · P99000011793 · possession Nov 2020 · 51.8% built
- BHAVYA HEIGHTS · GLOBAL CITY, HDILMORYA REALTORS · P99000011803 · possession Jun 2027 · 43.6% built · 34 complaints
- BHAKTI HOME ROYALS · SHIRSAD PHATAJayantilal Dharamshibhai Parmar · P99000011844 · possession Dec 2025 · 61.4% built · 5 complaints
- SHREE NATH NAGAR NO 1 AND 2 · VasaiSHREE NATH NAGAR NO 1 AND 2 · P99000011852 · possession Jul 2028 · 89.3% built
- Navkar City Phase-III Part-2 · vasaiNavkar Estate and Homes Pvt. Ltd. · P99000011854 · possession Dec 2026 · 90.4% built
- Shree Krishna Apartment · VasaiSagar Bhuvanesh Patil · P99000011860 · possession Aug 2019 · 38.2% built
- MEGH MALHAR · Vasai-Virar City (M Corp)EKVIRA BUILDERS · P99000011865 · possession Jun 2028 · 48.6% built
- SHREE RADHEYSHYAM NAGAR · Kudus (CT)SUDESH RADHEYSHYAM GUPTA · P99000011878 · possession Dec 2030 · 54.5% built
- KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD · PalgharKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD · P99000011896 · possession Dec 2026 · 0% built · 84 complaints
- Somershwar Apartment · PalgharHarihar Builders & Developers · P99000011912 · possession Mar 2021 · 53.6% built · 1 complaint
- SIDDHIVINAYAK COMPLEX · PalgharSUGANDHI REALTORS · P99000011924 · possession Dec 2026 · 74.8% built
- GAYATRI PARK PHASE 1 · MahimSHREE ASHTVINAYAK BUILDERS & DEVELOPERS · P99000011925 · possession Dec 2026 · 35% built
- NRK ENTERPRISES · PALGHARNRK ENTERPRISES · P99000011951 · possession Jun 2018 · 85.5% built
- MARBLE ARCH · Vasai-Virar City (M Corp)Avvesh Developers LLP · P99000011971 · possession Nov 2023 · 90.9% built
- SAI SIDDHANT PALACE · VasaiSAI SIDDHANT ENTERPRISES · P99000011985 · possession Dec 2021 · 100% built
- NAVKAR CITY PHASE I PART 1 · don boscoNavkar Estate and Homes Pvt Ltd · P99000011999 · possession Dec 2021 · 90.2% built · 5 complaints
- JUIE · VasaiVERSATILEREALTORSPRIVATELIMITED · P99000012019 · possession Dec 2021 · 90.9% built
- VINAY UNIQUE GARDENS · DONGREVINAYUNIQUE DEVELOPERS · P99000012052 · possession Dec 2019 · 86.4% built · 9 complaints
- SHREE SANDGURU BUILDERS AND DEVELOPERS · VIRAR EASTJAWAHAR MULCHAND BHEDA · P99000012068 · possession Jun 2019 · 90.9% built
- SOLITAIRE HIGHWAY · VASAIAAKAR REALTORS · P99000012069 · possession Dec 2018 · 81.8% built
- MAHALAXMI RESIDENCY · Vasai-Virar City (M Corp)SHREE GURUKRUPA DEVELOPERS · P99000012076 · possession Jul 2022 · 63.6% built
- NEW SKY STAR DEVELOPERS · Vasai-Virar City (M Corp)new sky star developers · P99000012093 · possession Dec 2017 · 90.9% built
- DEEP CLASSIC TOWER · VasaiSAI SANGAM DEVELOPERS · P99000012178 · possession Dec 2022 · 89.7% built · 6 complaints
- Hayaat Hill · Vasai-Virar City (M Corp)M M Developers · P99000012187 · possession Apr 2019 · 81.8% built
- SAI SHIKHAR · Vasai-Virar City (M Corp)N K PARIVAR BUILDERS & DEVELOPERS · P99000012192 · possession Dec 2021 · 69.1% built
- RELIABLE TOWNSHIP / RT- A, B WING · Vasai-Virar City (M Corp)RELIABLE REALTORS · P99000012236 · possession Dec 2018 · 81.8% built
- MAHAVIR RESIDENCY · Virar WestMAHAVIR CONSTRUCTIONS · P99000012246 · possession Dec 2026 · 90.2% built · 7 complaints
- Luxury Empire Township Phase I · Opposite Eklavya SchoolVEENAA DEVELOPERS PRIVATE LIMITED · P99000012256 · possession Dec 2028 · 74.9% built · 13 complaints
- MANAV MAITRY · Gaothan VillageMANAV REALTORS · P99000012261 · possession Dec 2025 · 72.7% built
- BRIGHT GALAXY - BUILDING NO. 2 · Dhumal NagarKAMLESH JAYANTILAL DOSHI · P99000012311 · possession Dec 2019 · 100% built · 1 complaint
- RELIABLE SWAPNA NAGARI-21,22,23,24,25,26,27 · VasaiRELIABLE TARANG · P99000012328 · possession Dec 2025 · 82.1% built · 1 complaint
- Riddhi Siddhi Park · PalgharRiddhi Siddhi Builders · P99000012373 · possession Mar 2019 · 90.9% built
- Mittal Enclave · Vasai-Virar City (M Corp)Sealink Construction Co. Pvt. Ltd. · P99000012403 · possession Dec 2018 · 90.9% built
- VIVA SHELTER - I · Vasai-Virar City (M Corp)CHETANA BUILDERS AND DEVELOPERS · P99000012456 · possession Jan 2021 · 63.2% built · 1 complaint
- Aadinath Complex Bldg No 1 and 2 · Palghar EastChamunda Developers · P99000012472 · possession Dec 2018 · 90.9% built
- STAR SHERATON · Vasai-Virar City (M Corp)STAR BUILDERS & DEVELOPERS · P99000012499 · possession May 2019 · 90.9% built
- HANS VILLAS · VadaRAJKUMARI KRISHANLAL HANS · P99000012519 · possession Jun 2029 · 47.1% built
- OM SAI HEIGHTS II · PalgharCREATIVE ENTERPRISES · P99000012565 · possession Jun 2023 · 90.7% built
- NARMADA MOHAN · VasaiK.M.DEVELOPERS · P99000012568 · possession Dec 2022 · 90.8% built · 5 complaints
- SIDDHIVINAYAK TOWER · VasaiSIDDHIVINAYAK DEVELOPERS · P99000012579 · possession Feb 2018 · 81.6% built
- CASITA ENCLAVE · Vasai-Virar City (M Corp)BHOIR ENTERPRISES · P99000012590 · possession Dec 2021 · 90.9% built
- BABA SAI PALCE CO-OP-HSG LTD · VasaiG R AND SONS · P99000012591 · possession Dec 2026 · 27.3% built
- AV CRYSTAL PRESTIGE · VasaiRELIABLE HOUSING INDIA PRIVATE LIMITED · P99000012675 · possession Dec 2027 · 44.5% built · 5 complaints
- Laxmi Dhule Complex · VasaiDhule Construction Co · P99000012699 · possession Dec 2018 · 82% built
- SHRINATHJI HEIGHTS · NanivaliSHRINATHJI BUILDER AND DEVELOPERS · P99000012732 · possession Dec 2019 · 90.9% built · 2 complaints
- OM SAI INFRA · HDIL LAYOUTOM SAI INFRA · P99000012792 · possession Jun 2027 · 58.6% built · 3 complaints
- Angel Landmark · VasaiSHREE VIMALNATH INFRA · P99000012799 · possession Mar 2018 · 99.5% built
- Rani minnat enclave · DahanuAMKB BUILDER AND DEVELOPERS · P99000012845 · possession Dec 2018 · 78.8% built · 4 complaints
- JANAVI PLAZA, JANAVI TOWER · WALIVJANAVI BUILDERS & DEVELOPERS · P99000012849 · possession Dec 2017 · 88% built
- SHAKTI INDUSTRIAL ESTATE · PalgharSHAKTI INDUSTRIAL ESTATE · P99000012861 · possession Dec 2026 · 40% built
- Bright Galaxy · Vasai-Virar City (M Corp)BARKAAT BUILDERS · P99000012924 · possession Jun 2027 · 72.7% built · 7 complaints
- SAI HEIGHTS · Vasai-Virar City (M Corp)KULSWAMINI MAHALAXMI DEVELOPERS · P99000012928 · possession Mar 2022 · 30.3% built
- PRITHVI SRUSHTI PHASE 1 · PalgharPRITHVI ANAND REALTY · P99000012951 · possession Sept 2018 · 46.6% built
- SHEETAL BUILDERS AND DEVELOPERS RAMESH RIVANTA · Vasai-Virar City (M Corp)PARESH RAMESH BARIA · P99000012997 · possession Jun 2025 · 90.9% built
- SAI YASH COMPLEX · ShirgaonMahatma Infrasturcture (India) LLP · P99000013008 · possession Dec 2022 · 9.4% built
- SPACE ONE · PalgharSPACE SQUARE CONSTRUCTIONS · P99000013054 · possession Dec 2026 · 51.8% built · 19 complaints
- DARSHAN SWAPNALOK PHASE 1 · PalgharINTELLIGENT LANDMARKS LLP · P99000013108 · possession Sept 2020 · 81.8% built
- Mahim Garden · MahimShree Oshiyaji Builders & Developers LLP · P99000013118 · possession Dec 2022 · 45.5% built
- MAJITHIA SWASTIK GALAXY · VasaiSWASTIK ASSOCIATES · P99000013190 · possession Dec 2017 · 89.1% built
- Bharat Arcade · 0Pankaj Chauhan · P99000013206 · possession Mar 2027 · 47.3% built · 4 complaints
- POONAM PALASH · VasaiSUMIT JAWAHARLAL JAIN · P99000013226 · possession Dec 2017 · 81.5% built · 1 complaint
- RENUKA APPARTMENT TYPE G · UMROLI EASTAARYAN SINGH · P99000013252 · possession Apr 2027 · 50.7% built
- SHREE PURAM · UMROLI EASTVASTU REALITIES · P99000013277 · possession Dec 2027 · 90.9% built
- Jupiter Complex · PalgharM/s. JEM Developers · P99000013313 · possession Dec 2026 · 89.3% built · 3 complaints
- OLA MANSION · NEAR TATA HOUSINGANIL BHERULAL BOHARA · P99000013342 · possession Aug 2019 · 81.8% built
- YASHAPARTMENTKWING · PalgharBHAVESH SHANTILAL PAREKH · P99000013382 · possession Dec 2019 · 18.2% built
- SAI BHAKTI COMPLEX · PALGHARSAI BHAKTI DEVELOPERS · P99000013389 · possession Dec 2027 · 81.5% built · 1 complaint
- IDEAL GARDEN · UmroliGAJANAN BUILDERS & DEVELOPERS · P99000013416 · possession Mar 2028 · 33.5% built
- Redevelopment of Ajanta co-op hou.soc ltd · VasaiS R BUILDERS & DEVELOPERS · P99000013423 · possession Dec 2028 · 9.4% built · 1 complaint
- M/s Rohan Associates · Vasai-Virar City (M Corp)ROHAN ASSOCIATES · P99000013458 · possession Mar 2018 · 81.8% built
- SAI SHRADDHA ENCLAVE · PalgharS K DEVELOPERS · P99000013487 · possession Mar 2018 · 90.9% built
- SHREE BALAJI ENTERPRISES · Vasai-Virar City (M Corp)SHREE BALAJI ENTERPRISES · P99000013515 · possession Dec 2018 · 65.5% built
- Mahavir Kunj C · PalgharRajesh Realtors · P99000013519 · possession Dec 2018 · 90.9% built
- IDEAL PARK · UMROLI EASTAJIT DUDHANATH SINGH · P99000013553 · possession Dec 2026 · 41.8% built
- MAHALAXMI NAGAR · ChandrapadaMAHALAXMI HOMEMAKERS PRIVATE LIMITED · P99000013575 · possession Jul 2023 · 40.5% built
- VIMAL CLASSIC · NALLASOPARA-WESTOM VIMAL DEVELOPERS · P99000013593 · possession Dec 2026 · 86.4% built
- SANMUKH SUNSHINE · PalgharSANMUKH SUNSHINE · P99000013607 · possession Oct 2026 · 34.5% built
- Joyville Virar Phase 2 · virarJoyville Shapoorji Housing Private Limited · P99000013612 · possession Sept 2022 · 100% built
- Astavinayak Apartment · PalgharM/s RAJ RIDDHI ASSOCIATES · P99000013684 · possession May 2018 · 40.5% built
- OM SAI · khairepadaMAYFAIR ENTERPRISES · P99000013687 · possession Jul 2020 · 90.9% built
- PARASNATH TOWNSHIP · umroliVeer Global Infraconstruction Limited · P99000013822 · possession Dec 2027 · 0.9% built
- AUDERY AVENUE · Vasai-Virar City (M Corp)MENEZES DEVELOPERS · P99000013842 · possession Dec 2024 · 81.4% built
- SHELTER HEIGHTS · VasaiSHREE VIMALNATH REALITY · P99000013845 · possession Dec 2019 · 60.9% built
- FIA REGENCY · PalgharNIMISH LAXMICHAND PASAD · P99000013880 · possession Dec 2022 · 49.5% built
- SHRI SAI DARSHAN · PalgharOM SAI BUILDERS AND DEVELOEPRS · P99000013904 · possession Dec 2021 · 90.9% built
- TEJAL APARTMENT · VasaiSAIRAM TRADERS · P99000013936 · possession Dec 2017 · 81.8% built
- SHIVARCHAN · VasaiOjas Constructions · P99000013953 · possession Nov 2019 · 90.9% built
- FIA EMERALD · PalgharNIMISH LAXMICHAND PASAD · P99000013971 · possession Dec 2022 · 81.8% built
- MARIAM PARK COMPLEX · VasaiSHAMSHAD & SONS PROPERTY PVT LTD · P99000014057 · possession Dec 2029 · 81.8% built
- SACHIN APARTMENT · PalgharSACHIN CIVIL CONTRACTOR · P99000014061 · possession Nov 2021 · 100% built
- PRITHVI SRISHTI · PalgharPrithvi Anand Housing and Land Developers · P99000014102 · possession Sept 2020 · 90% built
- AMAAN · VasaiKALBAY ABBAS SAYED RIZVI · P99000014133 · possession Dec 2018 · 76.4% built
- RAJSHREE RESIDENCY · PALGHARRAJSHREE REALTY · P99000014145 · possession Jun 2027 · 65.9% built
- CARNIVAL RESIDENCY 1 · VasaiEMMANUEL DEVELOPERS · P99000014179 · possession Dec 2022 · 90.9% built
- Shumail Star Paradise · NALLASOPARA WESTSHUMAIL STAR CONSTRUCTION · P99000014269 · possession Jun 2027 · 88.5% built
- Happinest Boisar Phase IV · PalgharMahindra Lifespace Developers limited · P99000014293 · possession Nov 2020 · 81.8% built · 2 complaints
- Happinest Boisar Phase V CFC · PalgharMahindra Lifespace Developers limited · P99000014295 · possession Nov 2020 · 81.8% built
- SAI REGENCY · VasaiSHREE GURUDATTA ENTERPRISES · P99000014353 · possession Mar 2019 · 56.4% built
- Vishwanath Tower · SamelpadaShahi Builders and Developers · P99000014381 · possession Dec 2027 · 75% built
- Golden Eye Phase III · PalgharKotak Sons · P99000014416 · possession Feb 2019 · 12.9% built
- GODAI APARTMENT · PALGHARBALWANT ATMARAM PATIL · P99000014419 · possession Mar 2023 · 90.9% built
- RUBY ENCLAVE · PalgharS R CONSTRUCTIONS · P99000014464 · possession Oct 2020 · 100% built
- SAUBHAGYA APARTMENT · DEAF & DUMB SCHOOLMANDA PRAKASH PATIL · P99000014504 · possession Mar 2023 · 27.3% built
- RAJVIR ESTATE NO. 1 · VEVOORRAJVIR REALTY · P99000014513 · possession Aug 2018 · 81.8% built
- SHARDA TOWER - I · VIRAR EASTM/S. CHETANA REALTORS · P99000014523 · possession Dec 2022 · 65.9% built
- ROYAL RESIDENCY · opp .filteration plantHIMANSHU SHAM TENDULKAR · P99000014529 · possession Aug 2020 · 90.9% built
- ELEGANCE · PalgharSHRUSHTI DEVELOPERS · P99000014549 · possession Dec 2021 · 90.9% built
- NIRLON SERENE · Opposite Korton PharmaNIRLON HOUSING INDIA PVT LTD · P99000014593 · possession Oct 2019 · 100% built
- FIA SAPPHIRE · PALGHARNIMISH LAXMICHAND PASAD · P99000014626 · possession Dec 2021 · 90.9% built
- WOLLYWOOD PHASE II · VadaNIRVANA LIFESTYLE VENTURES · P99000014632 · possession Dec 2026 · 61.2% built · 4 complaints
- NITYA DARSHAN · PALGHARNemi Buildcon · P99000014653 · possession Mar 2019 · 36.4% built
- Sai Darshan · TembhodeZenith Enterprises · P99000014724 · possession Jun 2019 · 90.9% built
- SAI SIDDHI · SAPHALEDHARMENDRA SINGH PARIHAR · P99000014781 · possession Jul 2019 · 52.7% built
- Prutha Residency · DahanuM/s Aum Jivdani Associates · P99000014796 · possession Dec 2021 · 90.9% built
- SAI APARTMENT · NAVAL NAGARHARI OM BUILDERS AND DEVELOPERS · P99000014827 · possession Jan 2022 · 89.1% built
- CLASSIQUE · NEAR NAVALI PHATAKSHRUSHTI DEVELOPERS · P99000014864 · possession Dec 2022 · 90.9% built
- Mahindra Happinest Palghar Phase - I · NandoreMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000014911 · possession Dec 2021 · 81.8% built · 30 complaints
- Riddhivinayak Apartment · NavaliJai Bajarang Construction · P99000014934 · possession Mar 2022 · 87.7% built
- MALHAR LIFESPACES · PALGHAR CITYMALHAR LIFESPACES · P99000014945 · possession Nov 2021 · 90.9% built
- ROYAL ABODE · VasaiKAWALI AND ASSOCIATES · P99000015017 · possession Jan 2022 · 90.9% built
- PRESTIGE APARTMENT · PalgharSAIJAYSHREEBUILDERS · P99000015069 · possession Dec 2021 · 45.5% built
- Sai Baba Nagar Residential with Shopline Building with A B C Wings · Nallasopara WestShreeji Associates · P99000015106 · possession Dec 2026 · 4.2% built
- Madhav Vatika-II · Palghar EastShrijee Krupa Developers · P99000015110 · possession Jan 2021 · 90.9% built
- PRITHVI REGENCY · PALGHARPRITHVI PROPERTY DEVELOPERS · P99000015122 · possession Apr 2021 · 90.9% built
- Shreepati Residency · TembhodeParshva Developers · P99000015139 · possession Mar 2022 · 100% built
- SAI GARDEN RESIDENCY · HIGHWAYSHAHJI ENTERPRISES · P99000015148 · possession Mar 2027 · 90.9% built
- EKVIRA CONSTRUCTION · OPP SUNDARAM SCHOOL WAGHULSARekvira construction · P99000015168 · possession Dec 2022 · 100% built
- Ekta Parksville Phase IV · VirarEKTA PARKSVILLE HOMES PVT. LTD. · P99000015239 · possession Dec 2028 · 27.3% built · 3 complaints
- VASANT VILLA · ADARSH NAGARVASANT CONSTRUCTION · P99000015257 · possession Sept 2021 · 0% built · 1 complaint
- OSWAL DREAM CITY PHASE 2 · VILLAGE MAHIM BIDCO CHINTUPADA ROADOSWAL REALTORS PRIVATE LIMITED · P99000015275 · possession Dec 2028 · 38.1% built
- SWAPNLOK RESIDENCY PHASE II · umroliSHIV SAI DEVELOPERS · P99000015323 · possession Dec 2027 · 4.5% built
- Sai Prasad · VasaiSai Prasad Developers · P99000015349 · possession Jan 2022 · 90.9% built
- Parks Developers LLP - Tanishq Gold - Phase 1 · DahanuParks Developers LLP · P99000015423 · possession Dec 2022 · 90.9% built
- Mahindra Happinest Palghar Phase - II · Nandore GrampanchayatMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000015481 · possession Sept 2022 · 81.8% built · 2 complaints
- DRUMAN · SundaramANS REALTY · P99000015524 · possession May 2019 · 100% built
- Ganapati Apartment · Palghar WestJai Bajarang Construction · P99000015531 · possession Dec 2020 · 87.3% built
- Nirman Height · Palghar WestNirman Builder & Developer · P99000015536 · possession Sept 2022 · 90.9% built
- YASH PADMA · PalgharSAI SHRADDHA ENTERPRISES · P99000015545 · possession Dec 2026 · 86.1% built
- PARASNATH TOWNSHIP · PANCHALI GRAM PANCHAYATSHREENATH ENTERPRISES · P99000015590 · possession Mar 2028 · 109.8% built
- VEER - 4 · UMROLI EASTVeer Global Infraconstruction Limited · P99000015602 · possession Sept 2020 · 100% built
- MAHAVIR UTSAV B · PalgharRajesh Construction · P99000015701 · possession Oct 2019 · 90.9% built
- Varun Buildcon · Village SativaliDeepak Bhupatrai Vora · P99000015763 · possession Dec 2019 · 28.6% built
- FIA ORION · PALGHARNIMISH LAXMICHAND PASAD · P99000015786 · possession Dec 2021 · 90.9% built
- BHOOMI NIWAS · PALGHARBHOOMI CORPARATION · P99000015823 · possession Jun 2019 · 0.5% built
- Mahindra Happinest Palghar Phase V · nandoreMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000015852 · possession Dec 2022 · 81.8% built · 2 complaints
- SHRI BALAJI NIWAS · PALGHARBHOOMI ENTERPRISES · P99000015857 · possession Dec 2019 · 72.7% built
- NIRVANA ECO HOMES · PALGHARBALAJI CONSTRUCTION CO. · P99000015865 · possession Dec 2024 · 22.7% built
- KRISHA ARCADE · PalgharKRISHA ARCADE · P99000015883 · possession Dec 2027 · 90% built
- Nine Star Residency - Imperia · PalgharM/s A.K. Developers · P99000015888 · possession Mar 2022 · 48.2% built
- VIRAR BOLINJ YASHWANT KRUPA CO OP HSG SOC LTD · VIRAR WESTVIRAR BOLINJ YASHWANT KRUPA CO OP HSG SOCIETY LTD · P99000015890 · possession Dec 2026 · 64.5% built · 1 complaint
- FIA PARADISE · PALGHARNIMISH LAXMICHAND PASAD · P99000015897 · possession Dec 2022 · 81.8% built
- HARI RESIDENCY PHASE I · VasaiLOTUS LAKSHMINARAYAN HOMES · P99000015966 · possession Dec 2027 · 69.9% built · 6 complaints
- ANANT TOWER E AND F · NALASOPARA WESTSHANTINATH ENTERPRISES · P99000015975 · possession Dec 2026 · 70.9% built · 3 complaints
- SIDDHARTH AVENUE C WING · Opp MSEB Staff Quarters Palghar WestHUM DEVELOPERS PRIVATE LIMITED · P99000015995 · possession Mar 2022 · 100% built
- Sarita Appartment · TembhodeKshipra Developers · P99000016046 · possession Sept 2020 · 100% built
- NIRVANA ECO HOME · ALYALEEShree Krishna Developers · P99000016104 · possession Dec 2026 · 88.6% built · 2 complaints
- FIA FLORENZA · PALGHARNIMISH LAXMICHAND PASAD · P99000016116 · possession Dec 2023 · 90.9% built
- GAJANANA · PalgharAMIT HARSHAVADAN AGASKAR · P99000016205 · possession Jun 2022 · 50% built
- JAAI PHASE II · VasaiVERSATILEREALTORSPRIVATELIMITED · P99000016273 · possession Sept 2020 · 90.9% built
- TULSI APARTMENT · VasaiSHEETAL BUILDERS AND DEVELOPERS · P99000016287 · possession Dec 2022 · 90.9% built
- VRINDAVAN COMPLEX · VILLAGE MAHIM,KRISHNARAJ REALTORS · P99000016299 · possession Dec 2022 · 72.7% built
- DARSHAN COMPLEX · BoisarKishor Walhe · P99000016305 · possession Dec 2027 · 50.5% built · 5 complaints
- VRINDHAVAN COMPLEX · PARASNATH NAGARIHOLYSTONE CONSTRUCTION PRIVATE LIMITED · P99000016354 · possession Dec 2026 · 19.8% built
- MIRAYA · MAHIMAMIT HARSHAVADAN AGASKAR · P99000016401 · possession Jun 2022 · 49.1% built
- WOLLYWOOD PHASE III · VadaNIRVANA LIFESTYLE VENTURES · P99000016446 · possession Dec 2026 · 4.5% built · 5 complaints
- OMKARA · PalgharANH NIRMAN · P99000016447 · possession Jun 2022 · 56.8% built
- WOLLYWOOD PHASE IV · VadaNIRVANA LIFESTYLE VENTURES · P99000016676 · possession Dec 2026 · 0% built · 1 complaint
- PALM SPRINGS PHASE - I · ALIYALI VILLAGEArvel Developers · P99000016750 · possession Dec 2023 · 89.1% built
- NARAYAN SHOPPING PARK · NEAR GANESH KUND, BOISAR(EAST) , Dist.-PALGHARPOOJA GROUP OF COMPANY · P99000016863 · possession Mar 2025 · 89.1% built
- POONAM PARK VIEW PHASE II · GLOBAL CITYPOONAM HOMEMAKER LLP · P99000016911 · possession Jun 2021 · 100% built · 2 complaints
- Rajmandir Gardens · PalgharRaj Mandir Reality · P99000016916 · possession Dec 2027 · 45.8% built
- CELLO DECENT HOMES PHASE 3 · NEAR STATION PALGHARDECENT HOMES · P99000016928 · possession Dec 2022 · 71.5% built
- SARGAM RESIDENCY · NAIGAONShantee Housing · P99000016959 · possession Dec 2022 · 87.9% built
- JOLLITY OLIVE · PalgharJOLLITY OLIVE · P99000017374 · possession Dec 2026 · 31.8% built
- FIA REGENCY A · PALGHARNIMISH LAXMICHAND PASAD · P99000017479 · possession Dec 2022 · 70.9% built
- Sunteck West World 1, Tivri, Naigaon East · TivriSunteck Realty Limited · P99000017606 · possession Sept 2023 · 90.9% built · 27 complaints
- Sunteck West World 2, Tivri, Naigaon East · TivriSunteck Realty Limited · P99000017627 · possession Dec 2023 · 90.9% built · 6 complaints
- VAJRESHWARI APARTMENT · UMROLI EASTSHREE ADESHWAR BUILDCOM · P99000017638 · possession Dec 2022 · 86.4% built
- Mahindra Happinest Palghar Phase - IV · NandoreMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000017770 · possession Dec 2022 · 81.8% built
- Mahavir Niwas B · PalgharRAJESH ENTERPRISES · P99000017806 · possession Dec 2020 · 90.9% built
- KUNAL HEIGHT · NALLASOPARASHREE SAI BUILDERS & DEVELOPERS · P99000017836 · possession Dec 2026 · 81.8% built
- SUNSHINE GREEN PARK PHASE -3 · GOKHIVARESHantee Homes Realty LLP · P99000017859 · possession Dec 2026 · 59.1% built · 1 complaint
- INDRAPRASTHA 4 · PalgharPREM CONSTRUCTIONS · P99000017898 · possession Mar 2020 · 90.9% built
- RUSTOMJEE VIRAR AVENUE D1 WING C AND WING D · AVENUE D1KEYSTONE INFRASTRUCTURE PRIVATE LIMITED · P99000017942 · possession Dec 2021 · 81.8% built · 2 complaints
- Mahavir Kunj C Wing A · Mahavir KunjRajesh Realtors · P99000017961 · possession Jan 2020 · 90.9% built
- PRITHVI SRISHTI · TEMBHODEPrithvi Anand Housing and Land Developers · P99000018010 · possession Jun 2022 · 100% built
- RUSTOMJEE VIRAR AVENUE D1 WING A AND WING B AND RETAIL BUILDING · AVENUE D1KEYSTONE INFRASTRUCTURE PRIVATE LIMITED · P99000018043 · possession Dec 2021 · 81.8% built
- CELLO MAGIC TOUCH PHASE 1 · PALGHAR EASTCELLO MAGIC TOUGH · P99000018271 · possession Dec 2023 · 36.4% built
- DATTAGANGA · Dattaganga ComplexGanesh LAnd Developers and Construction Private Limited · P99000018314 · possession Dec 2024 · 51.8% built
- MOONSTONE-WING A · VasaiB. J. ENTERPRISE · P99000018357 · possession Sept 2024 · 39.1% built
- BAFNA CENTRUM PHASE-1 · Palghar WestSUN REALTORS · P99000018461 · possession Dec 2024 · 90.9% built
- AV CRYSTAL · Nallasopara EastA V Crystal Housing LLP · P99000018477 · possession Oct 2024 · 90.5% built
- Anita Complex · Palghar WestNirmit Developers · P99000018491 · possession Dec 2027 · 86.8% built
- Joyville Virar Phase 3 · virarJoyville Shapoorji Housing Private Limited · P99000018521 · possession Dec 2022 · 100% built
- IDEAL PARK BUILDING NO 2 F WING · UMROLIRAMA AND SHANTIRAJ BUILDERS AND DEVELOPERS · P99000018527 · possession Dec 2026 · 40.9% built
- Mahavir Kunj B · PalgharRajesh Realtors · P99000018657 · possession Dec 2020 · 90.9% built
- Rustomjee Virar Avenue L1-L2 And L4 Wing C and D · Avenue L1-L2KEYSTONE INFRASTRUCTURE PRIVATE LIMITED · P99000018694 · possession Jul 2022 · 55.7% built · 1 complaint
- Anant Aakash · VEVOORPravinkumar Lalchand Jain · P99000018796 · possession Oct 2020 · 100% built
- DHANANJAY AVENUE · NR SBI, NALLASOPARA WESTSAI KIRAN BUILDER AND DEVELOPERS · P99000018903 · possession Dec 2026 · 9.1% built · 1 complaint
- Shree Sankatha Shmriti · UmroliShree Mahalaxmi Developers · P99000019002 · possession Mar 2027 · 44.5% built
- VARAD VINAYAK RESIDENCY · MAHADEV ALIHIMANSHU SHAM TENDULKAR · P99000019232 · possession Dec 2023 · 90.9% built
- KIRAN KUNJ · VEVOORPravinkumar Lalchand Jain · P99000019305 · possession Dec 2019 · 90.9% built
- GODAVARI PARK · UMROLIGANESH KRUPA DEVELOPERS · P99000019437 · possession Dec 2026 · 70% built
- SHANTI CLASSIC · VIRAR EASTRACHNA & CRYSTAL DEVELOPERS LLP · P99000019444 · possession Dec 2024 · 100% built · 4 complaints
- MLDC YASHWANT ORCHID PHASE I · VasaiSAI RYDAM REALTORS PVT LTD · P99000019485 · possession Dec 2030 · 62.5% built
- DivyaJal · Navapur RoadDivyaraj Properties LLP · P99000019490 · possession Sept 2026 · 70% built
- Shiv Plaza · Parasnath NagriGanesh Thakur · P99000019525 · possession Dec 2022 · 75% built
- Joyville Virar Phase 5 · virarJoyville Shapoorji Housing Private Limited · P99000019531 · possession Aug 2023 · 99.8% built
- REAL HEIGHTS · OPP EVERSHINE CITYREALTECH DEVELOPMENT ASSOCIATES · P99000019569 · possession Dec 2025 · 86.8% built
- CRD Gardenia Apartments 6 - Phase II · VelgaonDr Chandrashekhar Raghunath Dound · P99000019665 · possession Jun 2021 · 81.8% built
- CRD Gardenia Apartments 2 - Phase II · VelgaonDr Chandrashekhar Raghunath Dound · P99000019691 · possession Mar 2022 · 52.3% built
- DANDEKAR RESIDENCY · NEAR VIJAYA BANKJAYANT VISHNU DANDEKAR · P99000019704 · possession Mar 2022 · 81.8% built
- JAY VIJAY INDUSTRIAL ESTATE · VILLAGE BAPANEJAY JINENDRA REALATORS PRIVATE LIMITED · P99000019741 · possession Dec 2029 · 33.2% built
- OSTWAL WOODS · OPP. UNION PARKSHREE OSTWAL BUILDERS LTD · P99000019832 · possession Dec 2024 · 48.2% built
- NIDAN EMPIRE · NALASOPARA WESTNITIN VITTHALRAO THORAVE · P99000019859 · possession Dec 2026 · 77.3% built · 2 complaints
- Acciano-Aurelia No. 1 · VasaiM/s Ideal Enterprises · P99000019904 · possession Jun 2023 · 32.7% built
- KANTHARIA LAKESIDE · VasaiPROACTIVE HOUSING LLP · P99000020016 · possession Dec 2024 · 81.8% built
- AMAN PARADISE · SATIVALI VASAIS K DEVELOPERS · P99000020134 · possession Sept 2022 · 33.4% built
- SERENITY GARDENS WING E AND F · VasaiUNITY ESTATES & DEVELOPERS · P99000020145 · possession Mar 2027 · 85.2% built
- Vakratund Heights · Palghar EastShivanjali Infrastructure · P99000020206 · possession Dec 2022 · 90.5% built
- Rustomjee Virar Avenue L1-L2 and L4 Wing K · Avenue L4KEYSTONE INFRASTRUCTURE PRIVATE LIMITED · P99000020235 · possession Sept 2024 · 50% built
- AGAMI SAPPHIRE · BOISAR EASTAGAMI ENTERPRISES · P99000020242 · possession Sept 2024 · 89.1% built
- OM KAVISH EXCELLENCY · VALAN NAKAOM JAI KAVISH REALTORS · P99000020278 · possession Dec 2023 · 78.2% built
- DECENT LIFE SPACE 1 · PALGHAR EASTADINATH ASSOCIATES · P99000020318 · possession Dec 2023 · 90.9% built
- FIA EKDANTA · NEAR NEST HOTELMYSTIQUE DEVELOPERS · P99000020344 · possession Dec 2023 · 90.9% built
- KANCHAN BUSINESS CENTER · PALGHARNOVEL BUILDCON · P99000020390 · possession Jun 2024 · 90.9% built
- RADHA KRISHNA RESIDENCY · TEMBHODERADHA KRISHNA REALTY · P99000020418 · possession Dec 2026 · 75.3% built
- NINE STAR PRIDE 1 BUILDING NO 01 · PalgharNINE HOME DEVELOPERS · P99000020434 · possession Dec 2024 · 100% built
- BACHRAJ LIFESPACE · NEAR BIG BAZARBACHRAJ DEVELOPERS · P99000020455 · possession Dec 2024 · 100% built
- WONDER RESIDENCY C WING BUILDING NO 2 · GOKHIVIRE, VASAINEW GALAXY ENTERPRISES · P99000020475 · possession Mar 2022 · 90.9% built
- CRESCENTPOINT-II · KALAWATI MANDIR AREAK K CONSTRUCTION · P99000020521 · possession Dec 2024 · 90.9% built
- Sai Kuteer · VasaiShree Mahalaxmi Enterprises · P99000020537 · possession Apr 2026 · 96.8% built
- FAITH APARTMENT · VasaiFAITH REALTY · P99000020542 · possession Dec 2028 · 43% built
- DEEP HEIGHTS · VasaiSUPER STAR DEVELOPERS · P99000020604 · possession Dec 2024 · 90.9% built
- GARDEN COURT COMPLEX · ADARSHA NAGAROZONE PUNIT JV · P99000020722 · possession Dec 2024 · 72.7% built
- SAI POOJA APARTMENT BUILDING NO. 7 WING -B · UMROLI EASTSHREEYA DEVELOPERS · P99000020818 · possession Mar 2027 · 57.3% built
- NILAM · BOISARNILAM RAMAKANT SANKHE · P99000020822 · possession Dec 2022 · 27.3% built
- Vishwakarma Heights · VasaiM/s VISHWAKARMA NAGAR · P99000020857 · possession May 2027 · 48.4% built
- SAMRUDDHI RESIDENCY PHASE-1 · Saphale WestDharmi Constructions · P99000020901 · possession Dec 2027 · 45.2% built
- Imperial Heritage - B,C Wing · VasaiShree Ganesh Ventures · P99000020908 · possession Dec 2024 · 90.9% built
- SHAMROCK RESIDENCY · VasaiSHantee Homes Realty LLP · P99000020998 · possession Apr 2024 · 80.9% built
- NEMI SOLITAIRE · PalgharNEMI REALTORS · P99000021071 · possession Mar 2023 · 100% built
- MAHAVIR SADAN A · PalgharRajesh Construction · P99000021076 · possession Jun 2021 · 90.9% built
- SHIV KRUPA · Gut 184/A , Umroli VillageSHIVAAY REALTY · P99000021088 · possession Oct 2026 · 87.3% built
- Star Roshan City Building No-5 Wing G · Palghar WestManibhadraa Parivar Infraprojects · P99000021141 · possession Dec 2026 · 70.5% built
- Star Roshan City Building No-6 Wing I · Palghar WestM/s Sumaira Enterprises · P99000021147 · possession Dec 2026 · 38.2% built
- Redevelopement of Sagar Prakash Hsg Co-op Soc · Nallasopara EastTRIMURTI CONSTRUCTION · P99000021177 · possession Dec 2027 · 72.7% built
- OSTWAL DREAM LAND PHASE - II · BOISARSHREE OSTWAL BUILDERS LTD · P99000021182 · possession Jul 2026 · 60.6% built
- DONDE HEIGHTS · VasaiGURUPRABHU REALTORS · P99000021303 · possession Mar 2023 · 90.9% built
- Mahavir Kalp · PalgharRAJESH BUILDERS · P99000021428 · possession Jun 2024 · 90.9% built
- SHIV DARSHAN APARTMENT · TATA COLONYREAL CITY DEVELOPERS · P99000021460 · possession Dec 2026 · 37% built
- 15 Manor - Belvedere 2 · PalgharRV Infra · P99000021466 · possession Dec 2026 · 56.8% built
- Sadguru Aarambh · PalgharVisharia Sadguru Bhoomi LLP · P99000021488 · possession Mar 2023 · 90.9% built
- AVASAR RESIDENCY · BOISAR EASTAMICO BUILDER · P99000021528 · possession Dec 2026 · 51.4% built · 2 complaints
- RUKMINI ENCLAVE · BOISER EASTADITI BUILDERS & DEVELOPERS · P99000021813 · possession Dec 2026 · 71.8% built
- ROMAN RESIDENCY · VasaiShantee Housing · P99000021827 · possession Dec 2023 · 90% built
- ANCHAL GALAXY · PalgharCLORIS CONSTRUCTION PRIVATE LIMITED · P99000021893 · possession Aug 2023 · 0% built · 1 complaint
- NINE STAR GRANDEUR · SHIVAJI CHAUKNINE STAR HOME MAKERS · P99000021931 · possession Dec 2023 · 3% built
- Mahavir Niwas A · PalgharRAJESH ENTERPRISES · P99000021942 · possession Jun 2022 · 90.9% built
- PEACE PLAZA · NEAR ASHOKA KANISHKAMOHAMMED NAJIB CHAWRE & OTHERS · P99000021979 · possession Dec 2023 · 36.4% built
- Blue Pearl Industrial Estate · Village BapaneM/s Mount Realtors · P99000022109 · possession Dec 2022 · 27.3% built
- MITHILA COMPLEX · PalgharNAVAL RAMBAHADUR SINGH · P99000022165 · possession Dec 2028 · 60.6% built
- Haware Nakshatra Phase 3 · Opp Dandekar CollegeHaware Infotech Ltd · P99000022307 · possession Dec 2026 · 93.8% built
- Haware Nakshatra Phase 2 · Opp Dandekar CollegeHaware Infotech Ltd · P99000022309 · possession Dec 2021 · 100% built
- VINAYAKA · PalgharAMIT HARSHAVADAN AGASKAR · P99000022336 · possession Aug 2022 · 27.3% built
- Oasis Gracia · VasaiOasis Developers · P99000022370 · possession Dec 2023 · 51.8% built
- SHIV KRUPA COMPLEX · VasaiSHREE RADHE CONSTRUCTION · P99000022459 · possession Dec 2027 · 22.4% built
- Bellezon · KhopwadiVivek Patrick Pimenta · P99000022464 · possession Dec 2023 · 20% built
- Vidhata Heights · Kardal, SaphalePURSHOTAM GOPALDAS SEHWANI · P99000022524 · possession Dec 2025 · 100% built
- YUKTAM AVENUE WING A AND B · PalgharYUKTAM INFRA & REALTORS PVT LTD · P99000022611 · possession Jun 2028 · 38.2% built
- Nisarg Shrushti Phase-2 · TemnhodeArvel Realtors · P99000022690 · possession Nov 2026 · 81.8% built
- JASH APARTMENT · PADGHESHRI SAI CONSTRUCTION · P99000022810 · possession Dec 2027 · 53.6% built
- SUDHA · TEMBHODESAMARTH REALTY · P99000022954 · possession Dec 2023 · 90.9% built · 1 complaint
- FIA MERIDIAN · PalgharNIMISH LAXMICHAND PASAD · P99000023332 · possession Dec 2023 · 100% built
- UNIQUE CORNER BUILDING NO 2 B WING · STELLA, VASAI WESTUNIQUE LAND REALTY PVT LTD · P99000023334 · possession Mar 2022 · 54.5% built
- Suraksha Smart City - Phase I · RAJAVALI VILLAGEConceptual Advisory Services LLP · P99000023396 · possession Dec 2026 · 67.8% built · 24 complaints
- SAI ABHYUDAY COMPLEX · NALLASOPARA WESTKaivalya Spaces · P99000023714 · possession Jan 2020 · 100% built
- AVENUE 224 · NILEMOREASHOK MOHANLAL MEHTA · P99000023729 · possession Dec 2022 · 76.4% built
- SAVERA COMPLEX · S S PARKUVA INFRA · P99000024115 · possession Dec 2027 · 21.8% built
- MADHUBAN GARDEN · KELVE ROADSAI DREAM HOMES DEVELOPERS · P99000024139 · possession Dec 2026 · 45.5% built
- ANAND BASERA WING I AND J · PalgharPAN INDIA REALTY · P99000024152 · possession Nov 2026 · 59.5% built
- ORCHID VILLAS · CHINCHOTISHARP DEVELOPERS · P99000024168 · possession Dec 2030 · 89.1% built · 2 complaints
- VRINDAVAN GARDEN · KELVE ROADSAI DREAM HOMES DEVELOPERS · P99000024184 · possession Jun 2027 · 36.4% built
- MAHAVIR KUNJ D WING A TYPE C1 · PalgharRajesh Realtors · P99000024188 · possession Dec 2022 · 90.9% built
- Dhuri Infinity Block A part of building having two blocks i.e. A and B · NavjeevanSudhir Kashinath Dhuri · P99000024242 · possession Dec 2026 · 79.5% built
- N G Platinum City · VasaiJ M G REALTORS PVT LTD · P99000024280 · possession Dec 2026 · 37.5% built
- VRINDAVAN GARDEN · KELVE ROAD EASTSAI DREAM HOMES BUILDERS AND DEVELOPERS · P99000024332 · possession Dec 2026 · 27.3% built
- NEW RAJENDRA NAGAR, BALAJI RESIDENCY 3,4 · DHANSARBALAJI INFRA · P99000024334 · possession Dec 2029 · 45.5% built
- K K PARK - PHASE I · NEAR DANDEKAR COLLEGEK.K.CONSTRUCTION · P99000024440 · possession Dec 2027 · 70% built
- SAI DHAM · BetegaonBADSHAH BABA REALTORS & DEVELOPERS LLP · P99000024446 · possession Apr 2027 · 35.5% built
- Prajyot Apartment · Khodaram BaugM/s. Pratiksha Associates · P99000024447 · possession Jun 2027 · 81.8% built
- Shanti Enclave Phase II · AgashiSadguru Builders and Developers · P99000024526 · possession Dec 2023 · 44.1% built
- BALKRUSHNA SANKUL · VadaBALKRUSHNA SANKUL · P99000024527 · possession Dec 2026 · 44.5% built
- NEELKANTH INDUSTRY · Vasai EastSurendra Ramanlal Patel · P99000024700 · possession Dec 2021 · 39.8% built
- MARATHE COMPLEX · PALGHARGPRS REALTY · P99000024943 · possession Dec 2026 · 80.4% built
- MANSI APARTMRNT · Swastik ComplexANMOL DEVELOPERS · P99000025054 · possession Feb 2021 · 90.9% built
- GREENWOODS-2 · abachapadaANEMONES HOSPITALITY AND HOTELS PRIVATE LIMITED · P99000025365 · possession Sept 2020 · 100% built
- signature heights · amsador school vithal mandirsuraj dinesh singh · P99000025366 · possession Dec 2027 · 68.9% built
- DIAMOND MARKET · UMROLI EASTDINESH CHANDRA SHRIRAM GUPTA · P99000025416 · possession Jun 2027 · 44.2% built
- JOHN RESIDENCY · MASOLIJAMES JOHN DSOUZA · P99000025496 · possession Aug 2020 · 90.9% built
- OM SAI DHAM COMPLEX - PHASE 1 · GHOLVIRABHANUSHALI BUILDERS · P99000025540 · possession Dec 2020 · 100% built
- Dmellos Residency · Manikpure CircleM/s Ideal Properties · P99000025569 · possession Jun 2024 · 76.1% built
- VIRKUD PLAZA · PalgharSANJARI BUILDERS · P99000025589 · possession Jun 2024 · 90.9% built
- PRITHVI ANAND KUBER COMPLEX · Near St. John CollegePrithvi Anand Housing and Land Developers · P99000025647 · possession Jul 2026 · 88.6% built · 1 complaint
- NIDHI SHELTER · GOPIPURA-EBMH PROPERTIES PVT LTD · P99000025815 · possession Aug 2020 · 78.6% built
- ROYAL GARDEN · MALYANYSSF ENTERPRISES · P99000025831 · possession Aug 2020 · 90.9% built
- NINE STAR PRIDE II BUILDING NO. 06 · PalgharNINE HOME REALTORS · P99000026178 · possession Jun 2024 · 45.5% built
- NINE STAR PRIDE II BUILDING NO. 07 · PalgharNINE HOME REALTORS · P99000026194 · possession Jun 2024 · 45.5% built
- ELITE HOMES · NALASOPARA WESTCRYSTAL HOMES · P99000026203 · possession Jun 2024 · 90.9% built
- KANCHAN VATIKA · PalgharNovel Build-con · P99000026327 · possession Nov 2023 · 90.9% built
- Holi Complex · Vasai Road WestRakhumai Developers · P99000026548 · possession May 2027 · 18.8% built
- Shree Hari Industrial Estate · ChinchpadaParul and Mona Associates · P99000026567 · possession Jun 2022 · 45.5% built
- PARASNATH NAGARI · UMROLISHREENATH ENTERPRISES · P99000026724 · possession Sept 2027 · 81.8% built
- YASH PLATINA · NEAR PENINSNULA PARK VIRAR WESTMD REALTORS & DEVELOPERS LLP · P99000026746 · possession Sept 2025 · 31.8% built
- Thakur Nagari Building No 6 · PasthalPawan Abhimanyu Singh · P99000026873 · possession Jun 2027 · 64.1% built
- KANCHAN IMPERIAL · PalgharNOVEL BUILDCON · P99000027066 · possession Jun 2025 · 81.8% built
- V SQUARE ARCADE · Near Panch BattiV Square · P99000027100 · possession Oct 2026 · 90.9% built
- DANDEKARS GANDHAKOSH · NEAR VIJAYA BANKJAYANT VISHNU DANDEKAR · P99000027122 · possession Aug 2027 · 43.2% built
- HARIDWAR HERITAGE · VasaiHARIDWAR SYNDICATE · P99000027174 · possession Jun 2026 · 57.3% built
- PALM SPRINGS PHASE - II · ALIYALIArvel Developers · P99000027224 · possession Jun 2027 · 94% built
- VIVA HARITARA · NALLASOPARAM/S.SAI SAMRAT REALTORS · P99000027321 · possession Jun 2029 · 62.2% built
- SHREE SAMARTH KRUPA APARTMENT · VIRAR WESTL P DEVELOPERS · P99000027447 · possession Jun 2023 · 28.6% built
- PARASNATH NAGARI · UMROLI RLY STNSHREENATH ENTERPRISES · P99000027533 · possession Dec 2027 · 53.6% built
- Nakshatra Aarambh · VasaiJSB Shelters LLP · P99000027563 · possession Sept 2026 · 81.8% built · 1 complaint
- IDEAL ENCLAVE · MAUJE UMROLIT. L. REALITIES · P99000027773 · possession Dec 2026 · 41.8% built
- Morning Star · BhabholaM/s. Star Enterprises · P99000027877 · possession Jun 2024 · 51.8% built
- MALOO MARVEL · TUNGARESHWAR PHATARAJIV MOHANLAL MALOO · P99000027988 · possession Jun 2024 · 81.8% built
- Shree Ambe Apartment · Near Hanuman TekdiDivine Land Developers · P99000028003 · possession Sept 2022 · 90.9% built
- VASTU IMPRESSA B-WING · PalgharPradeep Prabhakar Patil · P99000028045 · possession Jun 2027 · 80% built
- WOLLYWOOD PHASE VI · VadaWOLLYWOOD PHASE VI · P99000028063 · possession Sept 2027 · 2 complaints
- NICON INFINITY PHASE 2 · GOKHIWARENICON INFRA LLP · P99000028077 · possession Jun 2025 · 78.6% built · 1 complaint
- SHREE PURAM TOWNSHIP - PHASE 1 · KAMBALGAONShakuntala Realty Pvt Ltd · P99000028083 · possession Jun 2027 · 59.1% built
- Kuteer construction · VasaiKuteer Construction · P99000028174 · possession Jun 2026 · 34.8% built
- MAYFAIR VIRAR GARDENS BUILDING NO 23, 24 and 25 · Virar WestMAYFAIR HOUSING · P99000028348 · possession Sept 2026 · 95% built
- PALM RESIDENCY · LONIPADAFIRDAUS DINSHAW IRANI · P99000028359 · possession Jun 2024 · 90.9% built
- SAMYEKDARSHAN · NAVALIDARSHAN BUILDERS & DEVELOPERS · P99000028611 · possession Jun 2024 · 25.9% built
- MAHAVIR KUNJ D WING B TYPE C · PalgharRajesh Realtors · P99000028618 · possession Dec 2023 · 90.9% built
- AKRUTI PRIME SQUARE · PalgharASHISH ANIL PATIL · P99000028675 · possession Dec 2026 · 49.5% built
- MAHAVIR SADAN B · PalgharRajesh Construction · P99000028787 · possession Dec 2023 · 90.9% built
- KGN COMPLEX · DAHANU JAWHAR ROADKGN DEVELOPERS · P99000028979 · possession Sept 2026 · 13.7% built
- SHRIHARI DARSHAN · VasaiMANGALMURTI DEVELOPERS · P99000028981 · possession May 2026 · 90.9% built
- Ocean Homes - The Pearl · PalgharAditya Creations And Developers LLP · P99000029054 · possession Jun 2028 · 32.6% built
- M BARIA LAKE VIEW · VIRAT NAGARMORESHWAR KRUSHNA BARIA · P99000029111 · possession May 2022 · 54.5% built
- NIDHI HOTEL · SATIVALILALIT NAGINDAS DOSHI · P99000029176 · possession Dec 2026 · 28% built
- STAR COMPLEX · KHANIVALIHERAMBH DEVELOPERS · P99000029193 · possession Dec 2028 · 68.2% built
- Parivar D Wing · Boisar WestTHDC Parivar LLP · P99000029251 · possession Jun 2027 · 52.7% built
- Paramount Enclave, Phase-II, Building No 3, Wing-A, Type-C · Palghar WestBRAJBHOOMI DEVELOPERS · P99000029292 · possession Jun 2027 · 74.5% built · 1 complaint
- GIRDHARI HEIGHTS · VasaiSHREE KRISHNA DEVELOPERS · P99000029298 · possession Apr 2026 · 80.5% built
- GALAXY RESIDENCY · DahanuGALAXY RESIDENCY · P99000029336 · possession Dec 2026 · 90.9% built
- Frenny Platinum Tower · Vasai EastPlatinum Developers · P99000029455 · possession Dec 2026 · 81.2% built
- OAKWOOD PHASE-2 · Nalasopara WestJEEVDANI BUILDERS & DEVELOPERS LLP · P99000029584 · possession Dec 2026 · 17.3% built
- ARCH DEVELOPERS · VASAI EASTARCH DEVELOPERS · P99000029591 · possession Mar 2027 · 51.8% built
- RAJ KIRTI INDUSTRIAL ESTATE · VASAIRAJ DEVELOPERS · P99000029685 · possession Aug 2021 · 81.8% built
- BLISS NIRMAN INDUSTRIAL ESTATE · GoraipadaBLISS DEVELOPERS · P99000029700 · possession Jun 2021 · 81.8% built
- FIA CONSTRUCTION COMPANY A/C FIA ENIGMA · PalgharNIMISH LAXMICHAND PASAD · P99000029742 · possession Dec 2024 · 90.9% built
- RENUKKA ENCLAVE · LONIPADAVANDANA REALTORS · P99000029747 · possession Dec 2023 · 100% built
- FIA CONSTRUCTION COMPANY A/C FIA ENCLAVE · PalgharNIMISH LAXMICHAND PASAD · P99000029790 · possession Dec 2024 · 90.9% built
- Kaivalya Heights · Vasai EastShree Sai Entreprises · P99000029853 · possession Dec 2027 · 66.5% built
- WONDER PARK · Gokhivera, Vasai EastWONDER DEVELOPERS · P99000029971 · possession Sept 2028 · 78.2% built
- SHREE KRISHNA ELEGANCE · GOKHIWARESHREE KRISHNA CONSTRUCTION CO · P99000030028 · possession Dec 2028 · 62% built
- Bhoomi Classic Building No. 02 · Nallasopara WestApna Sai Builders And Developers · P99000030044 · possession Dec 2028 · 63.7% built
- SPACE HEIGHTS - PHASE 2 · WalivSPACE ASSOCIATES · P99000030163 · possession Dec 2023 · 90.9% built
- SAMRUDDHI IND. ESTATE · walivKRISHA BUILDTECH LLP · P99000030200 · possession Jul 2026 · 81.8% built
- VRINDAVAN KUKDY · KUKADESAFAL BUILDERS · P99000030254 · possession Dec 2028 · 7.7% built
- MAHAVIR ASHISH CO-OPERATIVE HOUSING SOCIETY LTD · VasaiYASHRAJ DEVELOPERS · P99000030294 · possession Dec 2026 · 33.6% built
- KRISH MANSION · PALGHARKBAFNA INFRAA PRIVATE LIMITED · P99000030304 · possession Dec 2024 · 81.8% built
- GALAXY HEIGHTS · GOKHIWARESHAKTI DEVELOPERS · P99000030406 · possession Dec 2027 · 44.7% built
- PARVATI HOMES · PALGHARKRISHNA BUILDER & DEVELOPERS · P99000030489 · possession Dec 2027 · 36.4% built
- SUNSHINE ENCLAVE · GOKHIVARESHantee Homes Realty LLP · P99000030524 · possession Dec 2027 · 55.5% built
- KRISHNA APARTMENT · PALGHARASHOK THAKORBHAI PATEL · P99000030577 · possession Dec 2022 · 90.9% built
- ARIHANT ESTATE · SATVALIARIHANT CREATION · P99000030630 · possession Dec 2023 · 33.6% built
- SAI SIDDHI APARTMENT · MAANAASHA REALITY BUILDERS · P99000030657 · possession Dec 2026 · 82.7% built
- Darpan A Wing · PalgharTHDC Siddhivinayak LLP · P99000030707 · possession Jun 2027 · 9.1% built
- NINE STAR PRESTIGE BUILDING NO. 2 · PalgharNINE HOME CREATORS · P99000030824 · possession Dec 2026 · 58.2% built
- NINE STAR PRESTIGE BUILDING NO. 1 · PalgharNINE HOME CREATORS · P99000030830 · possession Dec 2026 · 58.2% built
- SOHO RESIDENCY · NEAR 70 GALAMAHAVIR CONSTRUCTION COMPANY · P99000030867 · possession Dec 2025 · 90.9% built
- UNIQUE AVENUE 210 · NILEMORE, NALASOPARA WESTMANGALMURTI LAND DEVELOPERS · P99000030889 · possession Aug 2026 · 89% built
- Empire Estate 1 · Kaman villageJaved Yasin Kojar · P99000030913 · possession Dec 2023 · 74.4% built
- SHANTI HEIGHTS · VasaiSADGURU BUILDERS AND DEVELOPERS · P99000030943 · possession Dec 2026 · 81.8% built
- VINAY UNIQUE RESIDENCY BLDG NO 7 · BOLINJ, VIRAR WESTJASAMRIT ESTATES PRIVATE LIMITED · P99000031046 · possession Sept 2026 · 86.4% built
- BEGINNING HEIGHTS · NEAR AMBEDKARNAGARANAND MOHAN DUBEY · P99000031183 · possession Dec 2029 · 53.5% built
- Joyville Virar Phase 6 · Virar, BolinjJoyville Shapoorji Housing Private Limited · P99000031256 · possession Mar 2025 · 72.4% built · 3 complaints
- Yesha Arcadia · VasaiYashobhumi Construction · P99000031381 · possession Dec 2026 · 39.5% built
- OMKAR VASTU COMPLEX · PalgharOMKAR DEVELOPERS · P99000031421 · possession Dec 2026 · 47.7% built
- MOONSTONE WING B AND C · VASAIBJ ENTERPRISE · P99000031455 · possession Mar 2025 · 66.4% built
- HELLY APARTMENT · VEVOORSAFFRON DEVELOPERS · P99000031499 · possession Jun 2025 · 67.7% built
- Casa Terraza Phase-3 · DiwanmanR AND J BUILDLINE LLP · P99000031526 · possession Jun 2028 · 16.8% built · 1 complaint
- KARMA PALACE · TEMBHODESHREE SAI DEVELOPERS · P99000031586 · possession Dec 2024 · 90.9% built
- PLATINUM OAK · VIRAR WGREENSPACE CONSTRUCTION PVT LTD · P99000031606 · possession Dec 2022 · 96.4% built
- Aleen Heights · NalasopraAB BUILDERS AND DEVELOPERS · P99000031719 · possession Nov 2026 · 58.6% built
- AMIN COMPLEX · PalgharGAJARYA ASSOCIATES · P99000031744 · possession Mar 2022 · 100% built