27,983 registered projects with disclosed construction progress or complaint records. Page 47 of 56.
Palghar
- MIT INDUSTRIAL ESTATE NO 2 · Vasai-Virar City (M Corp)BHOOMI ENTERPRISE · P99000005277 · possession Dec 2023 · 30.3% built
- STAR BUILDERS AND DEVELOPERS · VasaiSTAR BUILDERS & DEVELOPERS · P99000005302 · possession Dec 2017 · 90.9% built
- KANTI NX · VasaiMAHAVIR REALTORS · P99000005321 · possession Mar 2019 · 90.9% built
- ARPAN RESIDENCY · VasaiAKASH DEVELOPERS · P99000005384 · possession Nov 2022 · 90.9% built
- Leona Residency · VasaiErral Poshan Furtado · P99000005389 · possession Dec 2017 · 57.3% built
- Rashmi Star City Phase 2 · VasaiRashmi Star City Phase 2 · P99000005391 · possession Dec 2026 · 44.7% built · 7 complaints
- SAI YASHODHAN BLDG NO. 2 · PalgharDeepak Sadanand Hanchate · P99000005416 · possession Dec 2027 · 90.9% built · 1 complaint
- THE WOODS- MAPLE AVENUE A WING · VasaiSURE DWELL DEVELOPERS · P99000005435 · possession Dec 2021 · 90.9% built
- SWASTIK RESIDENCY · PalgharSUGANDHI SWASTIK BUILDERS & DEVELOPERS · P99000005439 · possession Apr 2027 · 36.8% built
- Balaji Platinum Block No.10, Type C1, A Wing · VasaiTirupati Constructions Co · P99000005450 · possession Dec 2026 · 100% built
- Anand Villa II · VasaiMehr Lalit Nihilani · P99000005497 · possession Apr 2028 · 90.9% built · 2 complaints
- Shree Ganesh Kuteer · VasaiShree Mahalaxmi Ventures · P99000005498 · possession Mar 2018 · 100% built
- GANDHI INDUSTRIAL PARK · Ambiste Kh.GANDHI BUILDERS PVT LTD · P99000005517 · possession Jan 2026 · 90.9% built
- I.K. GROUP · PalgharI K GROUP · P99000005540 · possession Dec 2019 · 58.8% built
- Sai Anand · VasaiSairam Corporation · P99000005553 · possession Mar 2019 · 90.9% built
- CD HEIGHT · VasaiKALPANA BUILDCON · P99000005581 · possession Dec 2022 · 60.2% built
- KRISHNA NAGRI · PalgharKRISHNA DEVELOPERS · P99000005597 · possession Dec 2025 · 59.4% built
- MAITRY HEIGHTS · VasaiRAJ MAITRY & ESKON DEVELOPERS · P99000005628 · possession Dec 2024 · 56.7% built
- THE WOODS MAPLE AVENUE B WING · VasaiPIMENTA DEVELOPERS · P99000005658 · possession Dec 2021 · 90.9% built
- KRISHN KUNJ COMPLEX · VasaiKARMA CONSTRUCTION CO · P99000005676 · possession Dec 2017 · 90.9% built
- SHANTI LIFE SPACES 2 · VasaiSHETH AND CHOPRA DEVELOPERS · P99000005741 · possession Dec 2020 · 100% built
- Waman Nagar · VasaiWAMAN DEVELOPERS · P99000005742 · possession Dec 2018 · 100% built
- WESTERN PARK · VasaiSHAKTI DEVELOPERS · P99000005755 · possession Dec 2022 · 84.1% built
- RITU GARDENIA PHASE 2 · VasaiRITU BUILDERS AND DEVELOPERS · P99000005759 · possession Apr 2028 · 74.5% built · 1 complaint
- CRYSTAL PARK PHASE III · PalgharK K BUILDERS & DEVELOPERS · P99000005782 · possession Dec 2019 · 34.8% built
- G M HEIGHT · VasaiGARODIA & MAKWANA DEVELOPERS · P99000005833 · possession Dec 2019 · 70% built
- QUEENS VILLA · PalgharSHASHI KULDEEP OSTWAL · P99000005836 · possession Jul 2026 · 40.3% built
- RME PLAZA · VasaiRME ASSOCIATES · P99000005850 · possession Jul 2018 · 84.5% built
- ROYAL GARDEN · VIRARIMAX INFRA · P99000005888 · possession Oct 2027 · 87.7% built
- RELIABLE UTKARSH A,B WING · VasaiRELIABLE PRISM CONSTRUCTION CO. · P99000005891 · possession Jul 2022 · 47.3% built
- Navkar City Phase II Part-4 · VasaiNavkar Estate and Homes Pvt Ltd · P99000005905 · possession Dec 2026 · 90% built
- SHREE KRISHNA HEIGHTS · PalgharSHREE KRISHNA REALITY · P99000005927 · possession Dec 2025 · 27.3% built
- Apex Wildernest · VasaiApex Creators · P99000005939 · possession Mar 2019 · 53.9% built
- AARKAY GOLD · VasaiAAR KAY ENTERPRISES · P99000005943 · possession Sept 2020 · 65.5% built
- ZAHRA LAND · Vasai-Virar City (M Corp)ZAHRA LAND DEVELOPERS · P99000005947 · possession Jul 2023 · 36.9% built
- ANAND VIEW A WING · VasaiSHREE ARIHANT DEVELOPERS · P99000005956 · possession Dec 2019 · 72.5% built
- Swastik Epitome Building 2 Phase III 15 to 21 floors · VasaiMAHAVIR HOMES · P99000005964 · possession Jul 2027 · 76.8% built
- Sai Darshan Type C · Dahanu (M Cl)DINESH SADANAND BARI · P99000005978 · possession Mar 2018 · 52.7% built
- PUSHPAM A · VasaiARHAM REALTORS · P99000005979 · possession Jul 2018 · 90.9% built
- VASTUSRUSHTI · PalgharVASTUSRUSHTI REALTORS LLP · P99000005981 · possession Dec 2018 · 8.4% built
- DATTANI VERTEX WING CD PHASE III · VasaiBRIJESH SATISH DATTANI · P99000005990 · possession Dec 2023 · 90.5% built
- SHREE RAGHUVEER SAMARTH APARTMENT · VasaiVED SAMARTH · P99000006023 · possession Jun 2018 · 90.9% built
- Nakshatra Primus · VasaiJSB Dream Homes Private Limited · P99000006041 · possession Jun 2019 · 87.3% built · 1 complaint
- VANAMALA · VasaiNAVINKUMAR SUBHASH CHORGHE · P99000006045 · possession Dec 2021 · 90.9% built
- AAKASH COMPLEX · PalgharLXMI INFRA · P99000006053 · possession Mar 2027 · 79% built · 1 complaint
- AADHARSHILA SAPPHIRE · PalgharAADHARSHILA CONSTRUCTION · P99000006075 · possession Jun 2018 · 63.2% built
- OSTWAL VALLEY · PalgharSHREE OSTWAL BUILDERS LTD · P99000006087 · possession Jul 2019 · 86.4% built
- VITHAL HARI TOWER · VasaiVITHAL ENTERPRISES · P99000006107 · possession Mar 2024 · 46.4% built
- Asher Enclave · VasaiAmol Anthony Pereira · P99000006117 · possession May 2023 · 75.3% built
- Braj Paradise · PalgharBraj Developer · P99000006122 · possession May 2018 · 61.8% built
- Bafna Meadows Phase 1 · PalgharSuvidha Realtors · P99000006123 · possession Dec 2018 · 79.7% built
- ACROPOLIS 2 · VasaiBhoomi & Arkade Associates · P99000006132 · possession Dec 2022 · 89.1% built · 42 complaints
- SAI NAGAR · -SHUBHVASTU REALCON · P99000006133 · possession Dec 2027 · 62.5% built
- Balaji Platinum Block No.10, Type D2, C Wing · VasaiTirupati Constructions Co · P99000006135 · possession Dec 2026 · 100% built
- Poonam Prime · VasaiPrime Developers · P99000006206 · possession Jan 2019 · 81.8% built
- Avani Residency · PalgharAVANI RESIDENCY · P99000006263 · possession Apr 2027 · 45.6% built · 5 complaints
- KANTI AVENUE · VasaiMAHAVIR REALITY · P99000006288 · possession Dec 2021 · 95.5% built
- ANAND HEIGHT WING BAND C · VasaiSHREE ADESHWAR CORPORATION · P99000006290 · possession Nov 2028 · 72.5% built · 2 complaints
- KONARK EMBESSY · VasaiUNIVERSAL REALTORS · P99000006316 · possession Dec 2018 · 88.6% built
- Ambrosia building 2 · PalgharPawan Abhimanyu Singh · P99000006358 · possession Dec 2018 · 40.5% built
- YASHWANT INFRA · VasaiYASHWANT INFRA · P99000006395 · possession Oct 2021 · 100% built
- MOURYA DEVELOPER · VasaiMOURYA DEVELOPER · P99000006396 · possession Jun 2018 · 79.1% built
- GOKUL GRAND - 1, 2 & 3 · PalgharGOKUL GRAND - 1, 2 & 3 · P99000006400 · possession May 2026 · 87.6% built · 1 complaint
- BLISS · PalgharSEA CRESTS BUILDCON LLP · P99000006419 · possession Jun 2018 · 90.9% built
- Pareira Paradise · VasaiTrinity Developers · P99000006451 · possession Dec 2017 · 89.1% built
- GLOBAL ARENA · VasaiDDPL GLOBAL INFRASTRUCTURE PVT. LTD. · P99000006463 · possession May 2018 · 90% built · 1 complaint
- FIA IMPERIA · PalgharFIA LUXURY HOME DEVELOPERS · P99000006476 · possession Dec 2021 · 90.9% built
- Regency Homes · VasaiWILSON V MANUEL GONSALVES · P99000006502 · possession Jun 2019 · 34.5% built
- Hayaat Garden · VasaiM M Enterprises · P99000006530 · possession Mar 2018 · 81.8% built
- Signature Residency · PalgharMUNIR ABDULLATIF GAZI · P99000006550 · possession Apr 2029 · 38.7% built · 43 complaints
- Mittal Enclave Gokul Sector Bldg No 4 · VasaiSealink Construction Co. Pvt. Ltd. · P99000006573 · possession Oct 2020 · 90% built
- Apeksha Imperial · VasaiKOTHARI CREATION · P99000006604 · possession Mar 2023 · 78% built · 2 complaints
- MITHILA DHAM · PalgharNAVAL RAMBAHADUR SINGH · P99000006624 · possession Mar 2022 · 61.8% built
- Ambrosia building 3 · PalgharPawan Abhimanyu Singh · P99000006660 · possession Dec 2018 · 37.3% built · 1 complaint
- Arron Complex Phase 1 · PalgharArron Builders and Developers · P99000006677 · possession Jan 2018 · 86.4% built
- RAJHANS KSHITIJ, ASPEN, WING C · VasaiAJMERA DEVELOPERS · P99000006700 · possession Dec 2018 · 90.9% built
- Swastik Epitome Building 2 Phase I Ground to 7 floors · BEHIND D MARTHemant Ramesh Mhatre · P99000006718 · possession Apr 2027 · 83.6% built · 2 complaints
- SHRI KAMBESHWAR HEIGHTS · VasaiSHRI KAMBESHWAR & SONS · P99000006801 · possession Dec 2021 · 90.4% built
- MIDAS GLORY · VasaiDHMP INFRA · P99000006814 · possession Mar 2019 · 54.5% built
- KISHOR KUNJ · VasaiBHAGWATI BUILDERS AND DEVELOPERS · P99000006836 · possession Mar 2021 · 90.9% built
- ICON RESIDENCY · PalgharICON BUILDERS AND DEVELOPERS · P99000006871 · possession Jun 2027 · 89.5% built
- Ameya Woods · VasaiAmeya Squares · P99000006892 · possession Dec 2021 · 90.9% built
- OSTWAL WONDER CITY · PalgharSHREE OSTWAL BUILDERS LTD · P99000006909 · possession Dec 2021 · 89.1% built
- VELSONS HEIGHTS · Vasai-Virar City (M Corp)VELSONS DEVELOPERS · P99000006958 · possession Jun 2024 · 90.7% built
- Rashmi Star City Phase 5 · VasaiRashmi Star City Phase 5 · P99000006967 · possession Dec 2026 · 74.6% built · 7 complaints
- RELIABLE TOWNSHIP /RT-C TO K WING · VasaiRELIABLE REALTORS · P99000007052 · possession Dec 2018 · 78.2% built
- AMRUT YOG · Vasai-Virar City (M Corp)SAVITA BUILDERS AND DEVELOPERS · P99000007065 · possession Mar 2018 · 72.9% built
- VIVA VEDANTA - BLDG NO. 2 · VasaiVIVA HOMES PRIVATE LIMITED · P99000007076 · possession Dec 2017 · 90.9% built
- SAI PARIVAR · VasaiSAI PARIVAR CONSTRUCTION COMPANY · P99000007079 · possession Jan 2021 · 90.9% built
- Earth Residency · PalgharEarth Builder & Developers · P99000007170 · possession Sept 2020 · 90.9% built
- NINE STAR RESIDENCY PURVA · PalgharSai Mudraa Construction · P99000007206 · possession Dec 2018 · 50% built
- PARVATI NAGAR · VasaiSHREE GANESH DEVELOPER · P99000007211 · possession Apr 2027 · 62% built
- VINAYRAJ REGENCY · PalgharSHUBH ASSOCIATES · P99000007254 · possession Oct 2018 · 88% built
- MEENAKSHI HEIGHTS PHASE 1 · VasaiVIVA MEENAKSHI REALTY · P99000007255 · possession Jun 2019 · 32.5% built
- NINE STAR RESIDENCY PHALGUNI · PalgharKRISHA CONSTRUCTIONS · P99000007286 · possession Dec 2018 · 81.8% built
- Navpad Nidhi · PalgharNavpad Realtors · P99000007326 · possession Dec 2018 · 90.9% built
- LAKEVIEW APARTMENT · VasaiTRIMURTI BUILDERS AND DEVELOPERS · P99000007342 · possession Dec 2019 · 28.8% built · 1 complaint
- CRYSTAL RESIDENCY · VasaiSAI CRYSTAL HOMES · P99000007345 · possession Dec 2017 · 84.5% built
- PARASNATH NAGARI BUILDING NO 5 · VasaiSHREE PARASNATH BUILDERS · P99000007350 · possession Dec 2021 · 63.3% built
- POONAM PALLAZO · VasaiPOONAM SHANTI DEVELOPERS · P99000007365 · possession Dec 2021 · 90.9% built
- KUMKUM Sector 7 Building 23 Wing F · Vasai-Virar City (M Corp)Kalash Developers · P99000007366 · possession Jul 2023 · 90.9% built
- VIVA AAKANKSHA COMPLEX PHASE 1 · Vasai-Virar City (M Corp)VIVA AAKANKSHA BUILDERS & DEVELOPERS · P99000007383 · possession Dec 2017 · 77.5% built
- SHREE SIDDHI HEIGHTS · VIRAR(west)ABHAY YASHWANT THITE · P99000007407 · possession Jul 2027 · 77.1% built · 5 complaints
- Acropolis 1 · Virar WestBhoomi & Arkade Associates · P99000007415 · possession Dec 2021 · 89.1% built · 29 complaints
- MAYUR ENCLAVE · VIRAR WESTM K & BROTHERS · P99000007416 · possession Dec 2026 · 82.3% built
- VIJAY HEIGHTS · VasaiVIJAY HEIGHTS · P99000007422 · possession Oct 2019 · 45.5% built
- Nikhil Tower Building No 2 · Vasai-Virar City (M Corp)M/S. SAMARTH BUILDERS & LAND DEVELOPERS · P99000007481 · possession Nov 2021 · 90.9% built
- SILVER GREEN · PalgharSILVER GREEN · P99000007490 · possession Dec 2026 · 62.7% built
- Emerald Sky · VasaiShalem Rojes Gonsalves · P99000007524 · possession Dec 2018 · 73.6% built
- Navkar Tower Part 1 · VasaiNavkar Estate and Homes Pvt Ltd · P99000007525 · possession Dec 2023 · 90.4% built
- THE WOODS · VasaiVILEENA ALLEN GONSALVES · P99000007560 · possession Dec 2018 · 90.9% built
- BHAVANI VIEW · Virar WestBhavani Construction · P99000007598 · possession Oct 2026 · 90.9% built
- SEAGULL BLDG 3 · VasaiDANGE DEVELOPERS · P99000007599 · possession Dec 2018 · 78.1% built
- Ambrosia building 1 · PalgharPawan Abhimanyu Singh · P99000007608 · possession Dec 2018 · 41.8% built
- Swastik Jayshree · PalgharSwastik Construction · P99000007637 · possession Mar 2018 · 84.1% built
- MAHAVIR DARSHAN · global cityMahavir Realtors · P99000007649 · possession Mar 2027 · 90.9% built
- ADORE HOMES · PalgharADORE HOMES · P99000007658 · possession Dec 2026 · 89.7% built
- Datta Prayag Apartment · Dahanu (M Cl)Milind Dattatraya Mavle · P99000007660 · possession Jun 2018 · 37.7% built
- UNITY GARDEN · PalgharUNITY LAND DEVELOPERS · P99000007688 · possession Mar 2018 · 51.4% built
- Relax Homes · IbhadpadaMohd Sajid Abdul Salam Pasha · P99000007696 · possession Dec 2017 · 75.9% built
- VINAY UNIQUE HOMES · Vasai-Virar City (M Corp)VINAYUNIQUE REALTORS · P99000007717 · possession Dec 2019 · 88.2% built · 2 complaints
- APEX DEVELOPERS · Vasai-Virar City (M Corp)APEX DEVELOPERS · P99000007741 · possession Jan 2025 · 70.9% built
- K M RESIDENCY · PalgharKM REALITY · P99000007750 · possession Apr 2028 · 77.3% built
- Rashmi Star City Phase 3 · VasaiRashmi Star City Phase 3 · P99000007752 · possession Dec 2026 · 57.2% built · 3 complaints
- VEENA DYNASTY PH II · VasaiNIKUNJ DEVELOPERS · P99000007769 · possession Dec 2019 · 89.1% built
- Nine Star Residency Revati · PalgharNINE LIFESPACE DEVELOPERS · P99000007772 · possession Dec 2018 · 60.9% built
- SHREE LAMBODAR HEIGHTS · VasaiShree Sadguru Enterprises · P99000007786 · possession Feb 2023 · 90.9% built
- Dias Residency Park · SativaliM/s Dias Properties & Projects · P99000007801 · possession Dec 2022 · 31.5% built
- Future Build Realtors · VasaiFuture Build Realtors · P99000007807 · possession Feb 2021 · 100% built
- SUKHKARTA · nallasopara westSUKHKARTA DEVELOPERS · P99000007883 · possession Mar 2027 · 75.9% built
- RELIABLE SWAPNA NAGARI-1,2,5,8,13,14,15 · VasaiRELIABLE TARANG · P99000007894 · possession Dec 2025 · 87% built
- YASHVANT SRUSTI · PalgharINSTACROISSANCE LIMITED · P99000007915 · possession Jul 2024 · 90.9% built
- VEER 2 · PalgharVeer Global Infraconstruction Limited · P99000007946 · possession Dec 2021 · 100% built
- VISHAKA · PalgharKRISHA LIFESPACE DEVELOPERS · P99000007992 · possession Dec 2018 · 35.2% built
- STAR HEIGHT · Vasai-Virar City (M Corp)ERIC INFRASTRUCTURE · P99000008026 · possession Mar 2025 · 90.9% built
- VIDYA SAGAR VILLA · PalgharRAVINDRA SHANKAR SAWANT · P99000008038 · possession Dec 2022 · 64.1% built · 2 complaints
- Sunrise Apt. · PalgharParadise Developers · P99000008059 · possession Apr 2027 · 80.9% built
- VAKRATUNDA · PalgharAMIT HARSHAVADAN AGASKAR · P99000008078 · possession Mar 2019 · 90.9% built
- PARSHWANATH DARSHAN · DurvesPARSHWANATH DEVELOPERS · P99000008080 · possession Apr 2027 · 36.1% built
- DATTANI VERTEX WING AB PHASE I · VasaiBRIJESH SATISH DATTANI · P99000008090 · possession Dec 2023 · 90.5% built
- VAKRATUNDA ENTERPRISES · PalgharVAKRATUNDA ENTERPRISES LLP · P99000008100 · possession Apr 2027 · 74.3% built
- TANIA HORIZON · VasaiTANIA INFRACON PRIVATE LIMITED · P99000008114 · possession Jun 2029 · 86.8% built
- MAITRY POOJA BUILDING NO.3 · Vasai-Virar City (M Corp)MAITRY POOJA BUILDERS & DEVELOPERS · P99000008122 · possession Dec 2021 · 90.9% built
- SPACE HEIGHTS · WalivSPACE ASSOCIATES · P99000008214 · possession Dec 2021 · 43.6% built
- DATTANI LINEAR WING ABC PHASE I · VasaiBRIJESH SATISH DATTANI · P99000008218 · possession Dec 2023 · 81.4% built · 1 complaint
- Anora Residency · BH. PARIKH COMMERCIAL CENTER, VIRAR WESTANORA RESIDENCY · P99000008234 · possession Jul 2026 · 81.5% built
- Moreshwar Apartments · Near Vaghulsar MandirWHITE LOTUS REALTORS PRIVATE LIMITED · P99000008251 · possession Aug 2018 · 90.9% built
- TANIA PLANET · VasaiFRENTANIA REALTOUCH BUILDERS PRIVATE LIMITED · P99000008261 · possession Jan 2018 · 73.6% built
- SIGNATURE C - CREST · PalgharANS REALTY · P99000008275 · possession Sept 2018 · 90.9% built
- KALASH · VasaiKemi Infrastructures earlier known as Taru Realtors · P99000008304 · possession Dec 2022 · 90.9% built
- MUNISH SMRITI · Vasai-Virar City (M Corp)MUNISH INFRA LLP · P99000008317 · possession Dec 2020 · 100% built
- SAI BABA NAGAR · MahimSai Developers · P99000008318 · possession Jun 2024 · 46.8% built
- Shadawal Impression Building C1 C2 · PalgharKailash Builders · P99000008322 · possession Dec 2018 · 74.1% built
- HARI GANGA 2 · Vasai-Virar City (M Corp)BHARAT CHINTAMANI PATIL · P99000008327 · possession Jul 2018 · 45.5% built
- BHOOMI PRIDE · Vasai-Virar City (M Corp)MEHTA DEVELOPERS · P99000008331 · possession Jan 2018 · 90.9% built
- SAI RESIDENCY · VasaiSAI RIDDHI CONSTRUCTION · P99000008335 · possession Dec 2022 · 48.6% built
- VIVA CITY-A2 · Virar WestVIVA WINNER VENTURE RELATORS LLP · P99000008341 · possession Dec 2020 · 54.1% built · 10 complaints
- SHRI INDUSTRIAL ESTATE · VasaiSHRI ENTERPRISES · P99000008391 · possession Sept 2020 · 65.5% built
- KAILASH TOWER · VASAIKAILASH DEVELOPERS · P99000008452 · possession Dec 2024 · 90.9% built · 5 complaints
- GREEN HEIGHTS · VasaiSAI LEELA REALTORS · P99000008455 · possession Dec 2022 · 90.9% built
- VIVA KINGSTON CROWN · Vasai-Virar City (M Corp)Viva Mahalaxmi Associates · P99000008460 · possession Mar 2019 · 90.9% built
- DATTANI PRISM · VasaiBRIJESH SATISH DATTANI · P99000008471 · possession Dec 2019 · 90.9% built · 1 complaint
- MIDAS ENCLAVE · Vasai-Virar City (M Corp)MANJULA CONSTRUCTIONS · P99000008488 · possession Dec 2017 · 87.3% built
- Mittal Enclave Bldg no 3 Wing CDE · VasaiSealink Construction Co. Pvt. Ltd. · P99000008509 · possession Dec 2018 · 90.9% built
- RUTURAJ VASTUSHILP PHASE II A B C WINGS · VasaiRUTURAJ VASTUSHILP · P99000008517 · possession Oct 2026 · 80% built
- SHREE KRUSHNA ARCADE · VasaiAVAAS BUILDERS AND DEVELOPERS · P99000008526 · possession Dec 2026 · 59.5% built · 2 complaints
- Navkar City Phase-I-Part-4 · naigaonNavkar Estate & Home Pvt Lts · P99000008528 · possession Dec 2026 · 90.9% built
- Balaji Platinum Block No.10, Type E, E Wing · VasaiTirupati Constructions Co · P99000008533 · possession Dec 2026 · 100% built
- OSTWAL DREAM LAND · PalgharSHREE OSTWAL BUILDERS LTD · P99000008545 · possession Dec 2019 · 90.9% built
- VIVA SWARANGAN · PALGHARVIVA HOMES PRIVATE LIMITED · P99000008546 · possession Apr 2027 · 74.5% built · 2 complaints
- Kohinoor Apartment · VasaiPATRICK FRANCIS ALMEIDA · P99000008551 · possession May 2018 · 90.9% built
- BLDG NO-3 ROSE · YASHWANT NAGARM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · P99000008563 · possession Mar 2022 · 90.9% built
- STAR GLORIOUS · Vasai-Virar City (M Corp)STARLITE CONSTRUCTIONS · P99000008579 · possession Jun 2023 · 90% built
- CELLO DECENT HOMES PHASE 2 · PALGHARDECENT HOMES · P99000008582 · possession Jul 2019 · 90.9% built
- Hayaat Centre · Vasai-Virar City (M Corp)Hayaat Enterprises · P99000008584 · possession Mar 2018 · 81.8% built
- VINAY UNIQUE IMPERIA · Vasai-Virar City (M Corp)IMPERIUM BUILDCON LLP · P99000008596 · possession Dec 2019 · 81.8% built · 8 complaints
- SAI SANGAM APARTMENT · VasaiSAI SANGAM CONSTRUCTION CO · P99000008631 · possession Oct 2020 · 90.9% built
- Mittal Enclave Mittal Centre Shopping B-1 · Vasai-Virar City (M Corp)Sealink Construction Co. Pvt. Ltd. · P99000008632 · possession Dec 2018 · 72.7% built
- RELIABLE UTKARSH C , D WING · VASAIRELIABLE PRISM CONSTRUCTION CO. · P99000008640 · possession Jul 2022 · 42.5% built
- KAILASH HEIGHTS · Vasai-Virar City (M Corp)KAILASH DEVELOPERS · P99000008653 · possession Jun 2024 · 90% built
- VASAI ONE -BLDG 2 · VasaiVASAI ONE REALTY · P99000008656 · possession Dec 2018 · 90% built
- FALAK NUMA · VasaiNAVID MOHAMMED HUSSAIN CHINDE · P99000008662 · possession Dec 2021 · 72.7% built
- BLU PEARL · VirarSB LIFESPACES PVT LTD · P99000008670 · possession Oct 2024 · 100% built · 1 complaint
- Luxury Empire Township Phase III · PalgharMUNIR ABDULLATIF GAZI · P99000008697 · possession Apr 2031 · 10.9% built · 21 complaints
- Balaji Platinum Block No.10, Type C, B Wing · VasaiTirupati Constructions Co · P99000008702 · possession Dec 2026 · 100% built
- JAY VIJAY NAGARI NO 1 · VasaiSUMATINATH BUILDERS · P99000008704 · possession Nov 2028 · 85.9% built · 3 complaints
- JAY VIJAY NAGARI NO 2 · VasaiSUMATINATH BUILDERS · P99000008746 · possession Nov 2028 · 81.4% built · 4 complaints
- LUIZA HOMES · Vasai-Virar City (M Corp)LUIZA HOMES · P99000008748 · possession Dec 2021 · 15.9% built
- Nakshatra Greens - Phase II · VasaiJSB Buildcon LLP · P99000008753 · possession Dec 2021 · 90.9% built · 1 complaint
- Gomes Garden · VasaiJudith Builders & Devlopers · P99000008786 · possession Aug 2018 · 90% built
- Greenwood Residency · VasaiGuruprabhu Builders and Developers · P99000008823 · possession Aug 2018 · 90.9% built
- Ornate Galaxy Phase I · VasaiSai Ornate Developers · P99000008854 · possession Oct 2020 · 85.3% built
- NAKODA HEIGHTS 4 · VasaiSHRINATH REALTORS · P99000008910 · possession Feb 2021 · 90.9% built · 1 complaint
- EMANUEL BUILDING · VasaiD & M BUILDERS · P99000008922 · possession Dec 2018 · 90.9% built
- SUGANDHI SQUARE · BolinjR. N. REALTY · P99000008924 · possession Apr 2027 · 27.7% built
- Maple Terraces Building No. B-10 · shelwaliMessrs. Axis Dwellings LLP · P99000008935 · possession Dec 2021 · 90% built
- VINODINI · VasaiRUBY ENTERPRISES · P99000008946 · possession Dec 2017 · 90.9% built
- SHALIBHADRA YASH · VasaiSUMATINATH BUILDERS · P99000008956 · possession Nov 2029 · 83.8% built
- SHUBHAM PARADISE · Vasai-Virar City (M Corp)ARHAM REALTORS · P99000008958 · possession Jun 2023 · 90.5% built
- C VINAYAK INDUSTRIAL ESTATE · PalgharVINAYAK CONSTRUCTION · P99000008974 · possession Dec 2022 · 72.7% built
- NINE REALTORS · VasaiNine Realtors · P99000008995 · possession Aug 2018 · 90.9% built
- Almighty Villas · VasaiAlmighty Developers · P99000008997 · possession Jul 2022 · 72.4% built
- VASTU SHILP DEVELOPERS · Vasai-Virar City (M Corp)VASTU SHILP DEVELOPERS · P99000009007 · possession Jan 2018 · 89.8% built
- RUSHABH INDUSTRIAL ESTATE · Vasai-Virar City (M Corp)RUSHABH ENTERPRISES · P99000009026 · possession Mar 2018 · 61.8% built
- ZAR EMPIRE · Vasai-Virar City (M Corp)ZAR BUILDERS & DEVELOPERS · P99000009027 · possession Dec 2025 · 52.7% built
- KUSUM PARK · PalgharSUNSHINE BUILDERS · P99000009057 · possession Feb 2022 · 54.1% built
- Tulip Anchor Park · VasaiLakozy Buliders LLP · P99000009059 · possession Dec 2019 · 90.9% built · 1 complaint
- GANESHA HOMES · PalgharSHRI GANESH KRIPA · P99000009071 · possession Mar 2028 · 74.1% built
- Rashmi Star City Phase 4 · Naigaon EastRashmi Realty Builders Pvt Ltd · P99000009093 · possession Dec 2026 · 28.6% built · 14 complaints
- ICCHAPURTI SAI PRESTIGE · VasaiMAHAVIR VENTURES · P99000009115 · possession Dec 2019 · 87.9% built
- PARASNATH NAGARI · UMROLISHREENATH ENTERPRISES · P99000009121 · possession Sept 2027 · 7.6% built
- KINJAL COMPLEX · PalgharKINJAL ENTERPRISES · P99000009135 · possession Jun 2018 · 90.9% built
- INDUSTRIAL PROJECT · Vasai-Virar City (M Corp)SUVIDHA BUILDERS AND DEVELOPERS · P99000009165 · possession Dec 2021 · 81.8% built
- REGAL HEIGHTS · VasaiSUVIDHA ENTERPRISES · P99000009178 · possession Dec 2021 · 49.1% built
- POOJA TOWNSHIP · PalgharPOOJA TOWNSHIP · P99000009231 · possession Dec 2027 · 44.9% built
- RENUKA RESIDENCY · police stationHIMANSHU SHAM TENDULKAR · P99000009241 · possession Dec 2019 · 81.8% built
- Nine Star Landmark Ph-I Bldg-1 ASTER · PalgharNINE HOMEMAKERS · P99000009255 · possession Dec 2021 · 9.1% built
- SATU AURA · PalgharSATU REALTY · P99000009278 · possession May 2018 · 90.9% built
- Nakshatra Ozone · TivariJSB Homes LLP · P99000009297 · possession Dec 2021 · 90.9% built
- PRIYESH HEIGHTS · HDIL TOWNSHIPPRIYESH ENTERPRISES · P99000009305 · possession Dec 2025 · 81.8% built
- Nisarg Shrushti Phase-1 · Behind Mahavir GardenArvel Realtors · P99000009330 · possession Apr 2022 · 90.9% built
- LAXMI RESIDENCY · Vasai-Virar City (M Corp)OM SAI ENTERPRISE · P99000009380 · possession Dec 2019 · 90.9% built
- NAVKAR CITY PHASE II PART I · naigaonNavkar Estate and Homes Pvt Ltd · P99000009437 · possession Dec 2021 · 89.9% built
- CRD Gardenia Apartments 1 · PalgharDr Chandrashekhar Raghunath Dound · P99000009462 · possession Dec 2019 · 81.8% built
- CLEMENT REGENCY · VasaiCLEMENT REGENCY · P99000009464 · possession May 2019 · 54.5% built
- THE WOODS JUNIPER B WING · VasaiPLATINUM REALTY · P99000009479 · possession Dec 2021 · 90.9% built
- IDEAL AVENUE BUILDING NO 3 TYPE B1D WING B · UMROLISHREE SAI SAMARTH BUILDERS AND DEVELOPERS · P99000009483 · possession Apr 2027 · 39.5% built
- Pratham residency · TembhodeCreative Constructions · P99000009497 · possession Jan 2019 · 81.8% built
- GOKUL NAGAR · PalgharFIVESTAR REALTORS · P99000009505 · possession Apr 2027 · 47% built · 4 complaints
- ROOP RAJAT PARK PHASE 1 · PalgharMAHAVIR ASSOCIATES · P99000009521 · possession Jul 2018 · 82.7% built
- REGALIA · Vasai-Virar City (M Corp)YASHODHAN SHANTI REALTORS · P99000009586 · possession Dec 2023 · 90.9% built
- PRITHVI SRISHTI · PalgharPRITHVI ANAND REALTY · P99000009593 · possession Jun 2018 · 47.7% built
- CRYSTAL PALLAZO · VasaiSAURABH CONSTRUCTION · P99000009609 · possession May 2018 · 90.9% built
- MUNISH SMRITI · Vasai-Virar City (M Corp)SMRITI INFRAHEIGHTS PRIVATE LIMITED · P99000009677 · possession Dec 2020 · 9.1% built
- SOLITAIRE CASTLE · Village malondePam Infrastructure · P99000009688 · possession Dec 2029 · 76.7% built
- Armaan Crystal Uptown · Vasai EastArmaan Housing LLP · P99000009714 · possession Aug 2026 · 22.7% built · 1 complaint
- GIRIRAJ DARSHAN · PalgharKISHORE S. DUBE · P99000009715 · possession Jun 2023 · 81.8% built
- NAVKAR CITY PHASE II PART 3 · naigaonNAVKAR ESTATE AND HOMES PVT LTD · P99000009716 · possession Dec 2021 · 89.6% built
- Suncity Complex · PalgharSWASTIK BUILDER AND DEVELOPERS · P99000009723 · possession Mar 2019 · 90.9% built
- SHRIKRISHNA HERITAGE · PalgharSHRIKRISHNA VENTURES · P99000009732 · possession May 2018 · 48.2% built
- Vencel Enclave · Vasai-Virar City (M Corp)Rupali Vishal Dabre · P99000009749 · possession Apr 2030 · 75.8% built
- Kuber Kunj · PalgharMahalaxmi Realtors · P99000009752 · possession Oct 2018 · 50% built
- Swastik Laxmi · PalgharSwastik Construction · P99000009764 · possession Jan 2018 · 90.9% built
- CHAWRE TOWER · VasaiLANDMARK CONSTRUCTIONS · P99000009770 · possession Apr 2027 · 61.6% built
- GAURAV HEIGHTS · VasaiMAHAVIR DEVELOPERS · P99000009792 · possession Jul 2027 · 59.4% built · 1 complaint
- Sankalp Heights Building No 2 D E F Wing Phase 1 Ground plus 7th Floor and Phase 2 8th plus 12 floor · VasaiSankalp Builders and Developers · P99000009807 · possession Dec 2027 · 90.9% built · 2 complaints
- BALAJI PLATINUM, Block No. 10, Type C1, D Wing · VasaiTirupati Constructions Co · P99000009822 · possession Dec 2026 · 100% built
- DREAMS HEIGHTS BUILDING NO- I · NAIGAONLODHA BUILDERS AND DEVELOPERS · P99000009825 · possession Sept 2026 · 87.3% built
- VIVAAN HEIGHTS · VasaiMAHAVIR PROPERTIES · P99000009840 · possession Dec 2021 · 90.9% built
- PARASNATH NAGARI BUILDING NO. 1 · VasaiSHREE PARASNATH BUILDERS · P99000009841 · possession Jun 2024 · 80% built · 6 complaints
- SWEET HOME BUILDING 1 · ShirgaonIPSIT ENTERPRISE · P99000009859 · possession Dec 2019 · 18.2% built
- OASIS AND GENESIS · MahimSEA CREST CONSTRUCTION · P99000009868 · possession Mar 2018 · 90.9% built
- APEKSHA COMPLEX · WALIVKOTHARI CONSTRUCTION CO · P99000009883 · possession Apr 2027 · 81.5% built · 1 complaint
- SHANTI ENCLAVE · VasaiSADGURU BUILDERS AND DEVELOPERS · P99000009944 · possession Sept 2020 · 45.1% built
- NINE STAR RESIDENCY KRITIKA · MAKANEYOGESH BIDYE · P99000009956 · possession Dec 2018 · 50.5% built
- Raj Icon · Palghar WestNeelshrushti Builders & Developers · P99000009957 · possession Sept 2019 · 90.9% built
- OPAL FAIRY BELL · VasaiSYLVA LAND DEVELOPERS · P99000009979 · possession May 2023 · 90.9% built
- SAI YASHODHAN BLDG NO.1 · Parasnath NagariDeepak Sadanand Hanchate · P99000009983 · possession Apr 2027 · 90.9% built
- CRD Gardenia Apartments 6 · PalgharDr Chandrashekhar Raghunath Dound · P99000009989 · possession Sept 2022 · 81.8% built
- CRD Gardenia Apartments 2 · PalgharDr Chandrashekhar Raghunath Dound · P99000010008 · possession Dec 2022 · 56.8% built
- Rudra Sai · PalgharRudra Sai Appartment · P99000010012 · possession Dec 2018 · 90.9% built
- Suman Vastu Apartment · IbhadpadaFamid Himamudin Shaikh · P99000010050 · possession Mar 2018 · 33.6% built
- Briza Anchor Park · VasaiLakozy Builders LLp · P99000010053 · possession Dec 2019 · 90.9% built · 4 complaints
- RUTURAJ VASTUSHILP PHASE II D E F WINGS · VasaiRUTURAJ VASTUSHILP · P99000010069 · possession Mar 2023 · 90.9% built
- APEKSHA SHOPPING CENTRE · Vasai-Virar City (M Corp)KOTHARI CONSTRUCTION CO · P99000010073 · possession Dec 2018 · 78.2% built
- HERAMB VILLA · PALGHAR EASTSHILPA DEVELOPERS · P99000010104 · possession Mar 2023 · 90.9% built
- Maple Terraces Building No. B-11 · shelwaliMessrs. Axis Dwellings LLP · P99000010117 · possession Dec 2021 · 90% built
- KANTI REGENCY · VasaiMAHAVIR PROPERTIES · P99000010163 · possession Dec 2021 · 90.9% built
- SHANTI VISTA · BOISARSHAH REALTY AND INFRA · P99000010164 · possession Jul 2018 · 90.9% built
- Trinity Heights · VirarShreeji Realtors · P99000010210 · possession Dec 2022 · 59.1% built
- SHREEMANT · VasaiCHANDRASHEKHAR SHANTARAM DHURI · P99000010256 · possession Dec 2017 · 81.4% built
- NEST LOTUS · PalgharNEST ENTERPRISES · P99000010260 · possession Dec 2018 · 58.2% built · 2 complaints
- Paramount Heights · VasaiM/s Zion Constructions · P99000010275 · possession Jun 2023 · 43.2% built · 1 complaint
- DLASA HEIGHTS · VasaiDLASA DEVELOPERS · P99000010299 · possession Dec 2023 · 95.5% built
- VINAY UNIQUE CORNER · BOLINJVINAYUNIQUE CONSTRUCTION PRIVATE LIMITED · P99000010331 · possession Dec 2019 · 88.2% built
- SAI ASHISH · VasaiG.M ENTERPRISES · P99000010346 · possession Dec 2027 · 100% built
- GOPALKRISHNA SANKUL · NAIGAON EASTMAAD CONSTRUCTION · P99000010352 · possession Dec 2023 · 87.3% built · 1 complaint
- RELIABLE ALEEN A,B,C WING · Vasai-Virar City (M Corp)RELIABLE HOMES · P99000010362 · possession Jul 2018 · 89.1% built
- Dhanya Sativali Nagri Building 10 · Vasai-Virar City (M Corp)Sandesh Lakhuji Jadhav · P99000010377 · possession Dec 2021 · 86.4% built
- Sai Paradise · PalgharSai Paradise · P99000010380 · possession Nov 2018 · 47.4% built
- MAX VENTURE · VasaiMAX VENTURE · P99000010434 · possession Oct 2020 · 81.8% built
- SHUBHANGAN · VasaiS.H.ENTERPRISE · P99000010435 · possession Mar 2018 · 90.7% built
- SANDEEP HEIGHTS · VasaiSB LIFESPACES PVT LTD · P99000010491 · possession Mar 2019 · 90.9% built · 1 complaint
- SUBWAY RESIDENCY · VIRARRAJ ASSOCIATES · P99000010520 · possession Dec 2021 · 41.4% built
- VIMAL HEIGHTS · VasaiSHREE VIMAL DEVELOPERS · P99000010545 · possession Jul 2022 · 90.5% built
- GAYATRI PARK THIRD PHASE · MahimSHREE ASHTVINAYAK BUILDERS & DEVELOPERS · P99000010554 · possession Dec 2026 · 59.5% built
- Navkar Tower- Part-2 · Vasai-Virar City (M Corp)NAVKAR ESTATE AND HOMES PVT. LTD · P99000010564 · possession Dec 2026 · 90.4% built
- DEEP GARDEN · VasaiATHARVA DEVELOPER · P99000010593 · possession Sept 2020 · 81.8% built
- DEEP PRIDE ATO E WING · VasaiDEEP HOMES · P99000010595 · possession Jun 2023 · 90.9% built
- TAAL · Near Global CityAce Property Developers · P99000010690 · possession Apr 2025 · 90.9% built
- Y. K. NAGAR NX · Vasai-Virar City (M Corp)SHREE ASHTAVINAYAK BUILDERS · P99000010747 · possession Dec 2017 · 90% built
- Aditi Empire · VasaiRakhumai Developers · P99000010761 · possession Apr 2022 · 20% built
- GOKUL DHAM · VasaiM/s. Sai Ashirwad Developers · P99000010766 · possession Dec 2018 · 81.8% built
- Siddhivinayak Arcade Bldg4 · VasaiSIDDHIVINAYAK DEVELOPERS · P99000010820 · possession Mar 2018 · 80.5% built
- PIL TOWER · VasaiPIL DEVELOPERS PRIVATE LIMITED · P99000010838 · possession Dec 2026 · 81.1% built · 2 complaints
- GUNAJI VASUDEO COMPLEX · UmroliPURSHOTAM GOPALDAS SEHWANI · P99000010863 · possession Dec 2021 · 100% built
- VAMA PARADISE · VIRAR WESTVAMA LIFESTYLES · P99000010889 · possession Dec 2019 · 90.9% built
- SANTAN ARCADE · VasaiMANUEL DIAGO ALPHUNSO · P99000010892 · possession Dec 2018 · 81.8% built
- NEST RESIDENCY · TembhiTASHA NEST HOME MAKERS PVT LTD · P99000010898 · possession Dec 2018 · 90.9% built · 1 complaint
- Navkar City Phase I Part 2 · don boscoNavkar Estate and homes pvt ltd · P99000010920 · possession Dec 2026 · 90.9% built
- PARADISE · VevoorSAFFRON DEVELOPERS · P99000010941 · possession Dec 2018 · 90.9% built
- GALAXY AVENUE · rajnagarPARSHWANATH REALTORS · P99000010944 · possession May 2022 · 90.9% built
- Ramchandra residency bldg no.1 · VasaiHimali Construction · P99000010975 · possession Sept 2022 · 83.6% built
- OM SAI COMPLEX · BetegaonVARSHA PRAKASH NAIK · P99000010987 · possession Apr 2028 · 71.1% built · 1 complaint
- ABHISHEK APPARTMENT · PARASNATH NAGARIOM SHRI SAI CONSTRUCTION · P99000011014 · possession Apr 2027 · 29.5% built
- JADHAV RESIDENCY · VasaiPALAK BUILDERS · P99000011045 · possession Dec 2019 · 90.9% built
- MATHURADHAM · UmroliRIDDHI SIDDHI REALTY · P99000011054 · possession Dec 2027 · 45.2% built
- SIDDHIVINAYAK CROWN · Vasai-Virar City (M Corp)SIDDHIVINAYAK DELEVOPERS · P99000011070 · possession Dec 2028 · 90% built
- RAJYOG ELANZAA · PalgharRAJYOG INFRA · P99000011072 · possession Dec 2018 · 10.9% built
- GALAXY APARTMENT · Vasai-Virar City (M Corp)ORCHID CONSTRUCTION · P99000011081 · possession Dec 2023 · 90.9% built
- Swastick Heights · VasaiShree Swastick Builders · P99000011121 · possession Jun 2024 · 90.9% built
- INDUSTRIAL BUILDING NO 1 · Vasai-Virar City (M Corp)SHREE NARAYAN INDUSTRIAL DEVELOPERS · P99000011126 · possession Dec 2023 · 57.1% built
- TRINETRA APARTMENT · VASAI VIRARSHREE SAI CONSTRUCTION · P99000011142 · possession Dec 2025 · 90.9% built
- PARASNATH GARDEN-S NO 182-3 196-7 · NEAR STATIONSHREENATH ENTERPRISES · P99000011151 · possession Sept 2027 · 54.5% built · 9 complaints
- Lily Palace · VasaiCaptain Varghese & Sons · P99000011171 · possession Jul 2019 · 55% built
- MAHAVIR SYMPHONY · VasaiRAKESH AMRUTLAL SHAH · P99000011172 · possession Dec 2019 · 90.9% built
- Mohak City Florence · VasaiV.M.S Enterprises · P99000011207 · possession Apr 2022 · 90.9% built
- Sunshine · VikramgadHigh Seas Properties · P99000011218 · possession Mar 2018 · 90.9% built
- VIMAL RESIDENCY · NILEMOREVIMAL DEVELOPERS · P99000011244 · possession Feb 2024 · 99.9% built · 1 complaint
- BUILDING NO. 10 PEREIRA HOUSING COMPLEX · VasaiTHE ALPS DEVELOPERS · P99000011259 · possession Sept 2018 · 72.3% built
- VEER SPLENDOR · VasaiVeer Global Infraconstruction Limited · P99000011282 · possession Dec 2022 · 70% built
- NEST LEAF · TEMBODENEST INFRA · P99000011341 · possession Dec 2024 · 81.8% built · 1 complaint
- BLUEBELL · VasaiNemichand Poonamchand Jain · P99000011370 · possession Dec 2018 · 81.8% built
- RITU GARDENIA PHASE 1 · VasaiRITU BUILDERS AND DEVELOPERS · P99000011391 · possession Dec 2021 · 94.3% built · 1 complaint
- KASHI APARTMENTS · VasaiB M DEVELOPERS · P99000011473 · possession Jul 2018 · 75.3% built
- SHALIBHADRA AMORA · VasaiSUMATINATH BUILDERS · P99000011479 · possession Jul 2028 · 73.3% built
- SOLARIS WING E-1 HDIL LAYOUT · SEC VII BUILDING NO 23SUNSHINE DEVELOPERS · P99000011525 · possession Apr 2027 · 90.9% built
- Rose Anchor Park · VasaiLakozy Builders LLP · P99000011540 · possession Dec 2019 · 90.9% built
- LANDMARK TOWER · VasaiLAND MARK DEVELOPERS · P99000011555 · possession Jun 2018 · 82.7% built
- PARASNATH GARDEN- SNO 200-1-2 · UMROLISHREENATH ENTERPRISES · P99000011584 · possession Jan 2027 · 60.9% built
- GOKULDHAM ZONE 01 · PalgharRaj Shree Nirman Builders Pvt Ltd · P99000011596 · possession Apr 2027 · 70.2% built · 3 complaints
- SHIV PARADISE · saaki nakaHIMANSHU SHAM TENDULKAR · P99000011602 · possession Dec 2018 · 72.7% built
- Prakash Kunj · VasaiJeevan Asha Enterprises · P99000011618 · possession Dec 2017 · 72.7% built
- Navkar City Phase III Part 1 · Vasai-Virar City (M Corp)Navkar Estate and Homes Pvt Ltd · P99000011641 · possession Nov 2022 · 89.5% built
- CASA TERRAZA Wing C · VasaiR. & J. Enterprises · P99000011668 · possession Dec 2021 · 100% built
- Mohak House No.3 A Wing · VasaiV.S. Enterprises · P99000011684 · possession Dec 2022 · 90.9% built · 1 complaint
- TOPAZ HEIGHTS · VasaiTOPAZ HOMES · P99000011693 · possession Dec 2026 · 51.4% built
- PENINSULA HEIGHTS · VIRAR WESTPRIESKA REAL ESTATES PVT. LTD. · P99000011703 · possession Dec 2019 · 43.1% built
- AADESHWAR-2 · PalgharSHREE ADESHWAR BUILDCOM · P99000011704 · possession Jun 2022 · 90.9% built
- SAI BABA RESIDENCY · VasaiTHIM CONSTRUCTION PVT. LTD. · P99000011750 · possession Dec 2025 · 90.9% built
- SAPPHIRE HEIGHTS · VasaiJAMALUDDIN HIMAYATALI SHAIKH · P99000011761 · possession Dec 2022 · 70% built · 1 complaint
- PRAGATI TULIP · PalgharPRAGATI CORPORATION · P99000011793 · possession Nov 2020 · 51.8% built
- BHAVYA HEIGHTS · GLOBAL CITY, HDILMORYA REALTORS · P99000011803 · possession Oct 2027 · 43.6% built · 35 complaints
- Sur Sangam · Near Global CityAce Property Developers · P99000011832 · possession Nov 2026 · 90.9% built · 2 complaints
- RISHABH HEIGHTS · Vasai-Virar City (M Corp)NANDISH CITY INFRATECH & DEVELOPERS PRIVATE LIMITED · P99000011841 · possession Dec 2027 · 80.5% built
- BHAKTI HOME ROYALS · SHIRSAD PHATAJayantilal Dharamshibhai Parmar · P99000011844 · possession Dec 2025 · 61.4% built · 5 complaints
- SHREE NATH NAGAR NO 1 AND 2 · VasaiSHREE NATH NAGAR NO 1 AND 2 · P99000011852 · possession Jul 2028 · 89.3% built
- Navkar City Phase-III Part-2 · vasaiNavkar Estate and Homes Pvt. Ltd. · P99000011854 · possession Dec 2026 · 90.4% built
- Shree Krishna Apartment · VasaiSagar Bhuvanesh Patil · P99000011860 · possession Aug 2019 · 38.2% built
- MEGH MALHAR · Vasai-Virar City (M Corp)EKVIRA BUILDERS · P99000011865 · possession Jun 2028 · 48.6% built
- SHREE RADHEYSHYAM NAGAR · Kudus (CT)SUDESH RADHEYSHYAM GUPTA · P99000011878 · possession Apr 2031 · 54.5% built
- KARRM BRAHMAAND AFFORDABLE HOMES PVT LTD · PalgharKARRM BRAHMAAND AFFORDABLE HOMES PVT LTD · P99000011896 · possession Dec 2026 · 0% built · 85 complaints
- Somershwar Apartment · PalgharHarihar Builders & Developers · P99000011912 · possession Mar 2021 · 53.6% built · 1 complaint
- SIDDHIVINAYAK COMPLEX · PalgharSUGANDHI REALTORS · P99000011924 · possession Apr 2027 · 74.8% built
- GAYATRI PARK PHASE 1 · MahimSHREE ASHTVINAYAK BUILDERS & DEVELOPERS · P99000011925 · possession Dec 2026 · 35% built
- NRK ENTERPRISES · PALGHARNRK ENTERPRISES · P99000011951 · possession Jun 2018 · 85.5% built
- MARBLE ARCH · Vasai-Virar City (M Corp)Avvesh Developers LLP · P99000011971 · possession Nov 2023 · 90.9% built
- SAI SIDDHANT PALACE · VasaiSAI SIDDHANT ENTERPRISES · P99000011985 · possession Dec 2021 · 100% built
- NAVKAR CITY PHASE I PART 1 · don boscoNavkar Estate and Homes Pvt Ltd · P99000011999 · possession Dec 2021 · 90.2% built · 5 complaints
- JUIE · VasaiVERSATILEREALTORSPRIVATELIMITED · P99000012019 · possession Dec 2021 · 90.9% built
- VINAY UNIQUE GARDENS · DONGREVINAYUNIQUE DEVELOPERS · P99000012052 · possession Dec 2019 · 86.4% built · 9 complaints
- SHREE SANDGURU BUILDERS AND DEVELOPERS · VIRAR EASTJAWAHAR MULCHAND BHEDA · P99000012068 · possession Jun 2019 · 90.9% built
- SOLITAIRE HIGHWAY · VASAIAAKAR REALTORS · P99000012069 · possession Dec 2018 · 81.8% built
- MAHALAXMI RESIDENCY · Vasai-Virar City (M Corp)SHREE GURUKRUPA DEVELOPERS · P99000012076 · possession Jul 2022 · 63.6% built
- NEW SKY STAR DEVELOPERS · Vasai-Virar City (M Corp)New Sky Star Developers · P99000012093 · possession Dec 2017 · 90.9% built
- Swastik Epitome Building 2 Phase II 8 to 14 floors · BEHIND D MARTHemant Ramesh Mhatre · P99000012158 · possession Apr 2027 · 56.4% built · 1 complaint
- DEEP CLASSIC TOWER · VasaiSAI SANGAM DEVELOPERS · P99000012178 · possession Dec 2022 · 89.7% built · 6 complaints
- Hayaat Hill · Vasai-Virar City (M Corp)M M Developers · P99000012187 · possession Apr 2019 · 81.8% built
- SAI SHIKHAR · Vasai-Virar City (M Corp)N K PARIVAR BUILDERS & DEVELOPERS · P99000012192 · possession Dec 2021 · 69.1% built
- RELIABLE TOWNSHIP / RT- A, B WING · Vasai-Virar City (M Corp)RELIABLE REALTORS · P99000012236 · possession Dec 2018 · 81.8% built
- MAHAVIR RESIDENCY · Virar WestMAHAVIR CONSTRUCTIONS · P99000012246 · possession Apr 2027 · 81.1% built · 7 complaints
- Luxury Empire Township Phase I · Opposite Eklavya SchoolVEENAA DEVELOPERS PRIVATE LIMITED · P99000012256 · possession Dec 2028 · 74.9% built · 13 complaints
- MANAV MAITRY · Gaothan VillageMANAV REALTORS · P99000012261 · possession Dec 2025 · 72.7% built
- Bhakti Greens · Vasai-Virar City (M Corp)Ombhaktiventures · P99000012268 · possession Dec 2027 · 89.1% built
- BRIGHT GALAXY - BUILDING NO. 2 · Dhumal NagarKAMLESH JAYANTILAL DOSHI · P99000012311 · possession Dec 2019 · 100% built · 1 complaint
- RELIABLE SWAPNA NAGARI-21,22,23,24,25,26,27 · VasaiRELIABLE TARANG · P99000012328 · possession Dec 2025 · 82.1% built · 1 complaint
- Riddhi Siddhi Park · PalgharRiddhi Siddhi Builders · P99000012373 · possession Mar 2019 · 90.9% built
- Mittal Enclave · Vasai-Virar City (M Corp)Sealink Construction Co. Pvt. Ltd. · P99000012403 · possession Dec 2018 · 90.9% built
- VIVA SHELTER - I · Vasai-Virar City (M Corp)CHETANA BUILDERS AND DEVELOPERS · P99000012456 · possession Jan 2021 · 63.2% built · 1 complaint
- Aadinath Complex Bldg No 1 and 2 · Palghar EastChamunda Developers · P99000012472 · possession Dec 2018 · 90.9% built
- STAR SHERATON · Vasai-Virar City (M Corp)STAR BUILDERS & DEVELOPERS · P99000012499 · possession May 2019 · 90.9% built
- HANS VILLAS · VadaRAJKUMARI KRISHANLAL HANS · P99000012519 · possession Oct 2029 · 47.1% built
- OM SAI HEIGHTS II · PalgharCREATIVE ENTERPRISES · P99000012565 · possession Jun 2023 · 90.7% built
- NARMADA MOHAN · VasaiK.M.DEVELOPERS · P99000012568 · possession Dec 2022 · 90.8% built · 5 complaints
- SIDDHIVINAYAK TOWER · VasaiSIDDHIVINAYAK DEVELOPERS · P99000012579 · possession Feb 2018 · 81.6% built
- CASITA ENCLAVE · Vasai-Virar City (M Corp)BHOIR ENTERPRISES · P99000012590 · possession Dec 2021 · 90.9% built
- BABA SAI PALCE CO-OP-HSG LTD · VasaiG R AND SONS · P99000012591 · possession Apr 2027 · 27.3% built
- AV CRYSTAL PRESTIGE · VasaiRELIABLE HOUSING INDIA PRIVATE LIMITED · P99000012675 · possession Apr 2028 · 44.5% built · 5 complaints
- Laxmi Dhule Complex · VasaiDhule Construction Co · P99000012699 · possession Dec 2018 · 82% built
- SHRINATHJI HEIGHTS · NanivaliSHRINATHJI BUILDER AND DEVELOPERS · P99000012732 · possession Dec 2019 · 90.9% built · 2 complaints
- OM SAI INFRA · HDIL LAYOUTOM SAI INFRA · P99000012792 · possession Oct 2027 · 60% built · 4 complaints
- Angel Landmark · VasaiSHREE VIMALNATH INFRA · P99000012799 · possession Mar 2018 · 99.5% built
- Rani minnat enclave · DahanuAMKB BUILDER AND DEVELOPERS · P99000012845 · possession Dec 2018 · 78.8% built · 4 complaints
- JANAVI PLAZA, JANAVI TOWER · WALIVJANAVI BUILDERS & DEVELOPERS · P99000012849 · possession Dec 2017 · 88% built
- SHAKTI INDUSTRIAL ESTATE · PalgharSHAKTI INDUSTRIAL ESTATE · P99000012861 · possession Dec 2026 · 40% built
- Bright Galaxy · Vasai-Virar City (M Corp)BARKAAT BUILDERS · P99000012924 · possession Oct 2027 · 72.7% built · 7 complaints
- SAI HEIGHTS · Vasai-Virar City (M Corp)KULSWAMINI MAHALAXMI DEVELOPERS · P99000012928 · possession Mar 2022 · 30.3% built
- PRITHVI SRUSHTI PHASE 1 · PalgharPRITHVI ANAND REALTY · P99000012951 · possession Sept 2018 · 46.6% built
- SHEETAL BUILDERS AND DEVELOPERS RAMESH RIVANTA · Vasai-Virar City (M Corp)PARESH RAMESH BARIA · P99000012997 · possession Jun 2025 · 90.9% built
- SAI YASH COMPLEX · ShirgaonMahatma Infrasturcture (India) LLP · P99000013008 · possession Dec 2022 · 9.4% built
- aashirwad garden building no.1 wing A · Vasai-Virar City (M Corp)Gajanan Anant Patil · P99000013030 · possession Oct 2026 · 47.3% built
- SPACE ONE · PalgharSPACE SQUARE CONSTRUCTIONS · P99000013054 · possession Dec 2026 · 51.8% built · 19 complaints
- DARSHAN SWAPNALOK PHASE 1 · PalgharINTELLIGENT LANDMARKS LLP · P99000013108 · possession Sept 2020 · 81.8% built
- Mahim Garden · MahimShree Oshiyaji Builders & Developers LLP · P99000013118 · possession Dec 2022 · 45.5% built
- MAJITHIA SWASTIK GALAXY · VasaiSWASTIK ASSOCIATES · P99000013190 · possession Dec 2017 · 89.1% built
- Bharat Arcade · 0Pankaj Chauhan · P99000013206 · possession Mar 2027 · 47.3% built · 4 complaints
- POONAM PALASH · VasaiSUMIT JAWAHARLAL JAIN · P99000013226 · possession Dec 2017 · 81.5% built · 1 complaint
- RENUKA APPARTMENT TYPE G · UMROLI EASTAARYAN SINGH · P99000013252 · possession Apr 2027 · 50.7% built
- SHREE PURAM · UMROLI EASTVASTU REALITIES · P99000013277 · possession Apr 2028 · 90.9% built
- Jupiter Complex · PalgharM/s. JEM Developers · P99000013313 · possession Apr 2027 · 89.3% built · 3 complaints
- OLA MANSION · NEAR TATA HOUSINGANIL BHERULAL BOHARA · P99000013342 · possession Aug 2019 · 81.8% built
- YASHAPARTMENTKWING · PalgharBHAVESH SHANTILAL PAREKH · P99000013382 · possession Dec 2019 · 18.2% built
- SAI BHAKTI COMPLEX · PALGHARSAI BHAKTI DEVELOPERS · P99000013389 · possession Apr 2028 · 81.5% built · 1 complaint
- IDEAL GARDEN · UmroliGAJANAN BUILDERS & DEVELOPERS · P99000013416 · possession Jul 2028 · 33.5% built
- Redevelopment of Ajanta co-op hou.soc ltd · VasaiS R BUILDERS & DEVELOPERS · P99000013423 · possession Apr 2029 · 9.4% built · 1 complaint
- M/s Rohan Associates · Vasai-Virar City (M Corp)ROHAN ASSOCIATES · P99000013458 · possession Mar 2018 · 81.8% built
- SAI SHRADDHA ENCLAVE · PalgharS K DEVELOPERS · P99000013487 · possession Mar 2018 · 90.9% built
- SHREE BALAJI ENTERPRISES · Vasai-Virar City (M Corp)SHREE BALAJI ENTERPRISES · P99000013515 · possession Dec 2018 · 65.5% built
- Mahavir Kunj C · PalgharRajesh Realtors · P99000013519 · possession Dec 2018 · 90.9% built
- IDEAL PARK · UMROLI EASTAJIT DUDHANATH SINGH · P99000013553 · possession Apr 2027 · 41.8% built
- MAHALAXMI NAGAR · ChandrapadaMAHALAXMI HOMEMAKERS PRIVATE LIMITED · P99000013575 · possession Jul 2023 · 40.5% built
- VIMAL CLASSIC · NALLASOPARA-WESTOM VIMAL DEVELOPERS · P99000013593 · possession Dec 2026 · 86.4% built
- SANMUKH SUNSHINE · PalgharSANMUKH SUNSHINE · P99000013607 · possession Oct 2026 · 34.5% built
- Joyville Virar Phase 2 · virarJoyville Shapoorji Housing Private Limited · P99000013612 · possession Sept 2022 · 100% built
- Astavinayak Apartment · PalgharM/s RAJ RIDDHI ASSOCIATES · P99000013684 · possession May 2018 · 40.5% built
- OM SAI · khairepadaMAYFAIR ENTERPRISES · P99000013687 · possession Jul 2020 · 90.9% built
- PARASNATH TOWNSHIP · umroliVeer Global Infraconstruction Limited · P99000013822 · possession Apr 2028 · 0.9% built
- AUDERY AVENUE · Vasai-Virar City (M Corp)MENEZES DEVELOPERS · P99000013842 · possession Dec 2024 · 81.4% built
- SHELTER HEIGHTS · VasaiSHREE VIMALNATH REALITY · P99000013845 · possession Dec 2019 · 60.9% built
- FIA REGENCY · PalgharNIMISH LAXMICHAND PASAD · P99000013880 · possession Dec 2022 · 49.5% built
- SHRI SAI DARSHAN · PalgharOM SAI BUILDERS AND DEVELOEPRS · P99000013904 · possession Dec 2021 · 90.9% built
- TEJAL APARTMENT · VasaiSAIRAM TRADERS · P99000013936 · possession Dec 2017 · 81.8% built
- SHIVARCHAN · VasaiOjas Constructions · P99000013953 · possession Nov 2019 · 90.9% built
- FIA EMERALD · PalgharNIMISH LAXMICHAND PASAD · P99000013971 · possession Dec 2022 · 81.8% built
- MARIAM PARK COMPLEX · VasaiSHAMSHAD & SONS PROPERTY PVT LTD · P99000014057 · possession Dec 2029 · 81.8% built
- SACHIN APARTMENT · PalgharSACHIN CIVIL CONTRACTOR · P99000014061 · possession Nov 2021 · 100% built
- PRITHVI SRISHTI · PalgharPrithvi Anand Housing and Land Developers · P99000014102 · possession Sept 2020 · 90% built
- AMAAN · VasaiKALBAY ABBAS SAYED RIZVI · P99000014133 · possession Dec 2018 · 76.4% built
- RAJSHREE RESIDENCY · PALGHARRAJSHREE REALTY · P99000014145 · possession Oct 2027 · 65.9% built
- CARNIVAL RESIDENCY 1 · VasaiEMMANUEL DEVELOPERS · P99000014179 · possession Dec 2022 · 90.9% built
- Shumail Star Paradise · NALLASOPARA WESTSHUMAIL STAR CONSTRUCTION · P99000014269 · possession Oct 2027 · 88.5% built
- Happinest Boisar Phase IV · PalgharMahindra Lifespace Developers limited · P99000014293 · possession Nov 2020 · 81.8% built · 2 complaints
- Happinest Boisar Phase V CFC · PalgharMahindra Lifespace Developers limited · P99000014295 · possession Nov 2020 · 81.8% built
- SAI REGENCY · VasaiSHREE GURUDATTA ENTERPRISES · P99000014353 · possession Mar 2019 · 56.4% built
- Vishwanath Tower · SamelpadaShahi Builders and Developers · P99000014381 · possession Apr 2028 · 75% built · 1 complaint
- Golden Eye Phase III · PalgharKotak Sons · P99000014416 · possession Feb 2019 · 12.9% built
- GODAI APARTMENT · PALGHARBALWANT ATMARAM PATIL · P99000014419 · possession Mar 2023 · 90.9% built
- RUBY ENCLAVE · PalgharS R CONSTRUCTIONS · P99000014464 · possession Oct 2020 · 100% built
- SAUBHAGYA APARTMENT · DEAF & DUMB SCHOOLMANDA PRAKASH PATIL · P99000014504 · possession Mar 2023 · 27.3% built
- RAJVIR ESTATE NO. 1 · VEVOORRAJVIR REALTY · P99000014513 · possession Aug 2018 · 81.8% built
- SHARDA TOWER - I · VIRAR EASTM/S. CHETANA REALTORS · P99000014523 · possession Dec 2022 · 65.9% built
- ROYAL RESIDENCY · opp .filteration plantHIMANSHU SHAM TENDULKAR · P99000014529 · possession Aug 2020 · 90.9% built
- ELEGANCE · PalgharSHRUSHTI DEVELOPERS · P99000014549 · possession Dec 2021 · 90.9% built
- NIRLON SERENE · Opposite Korton PharmaNIRLON HOUSING INDIA PVT LTD · P99000014593 · possession Oct 2019 · 100% built
- FIA SAPPHIRE · PALGHARNIMISH LAXMICHAND PASAD · P99000014626 · possession Dec 2021 · 90.9% built
- WOLLYWOOD PHASE II · VadaNIRVANA LIFESTYLE VENTURES · P99000014632 · possession Apr 2027 · 61.2% built · 5 complaints
- NITYA DARSHAN · PALGHARNemi Buildcon · P99000014653 · possession Mar 2019 · 36.4% built
- Sai Darshan · TembhodeZenith Enterprises · P99000014724 · possession Jun 2019 · 90.9% built
- GANGA CO OP HSG LTD · NILEMORE NALLASOPARAVIVA RIUM BUILDERS & DEVELOPERS · P99000014743 · possession Oct 2027 · 81.8% built · 1 complaint
- SAI SIDDHI · SAPHALEDHARMENDRA SINGH PARIHAR · P99000014781 · possession Jul 2019 · 52.7% built
- Prutha Residency · DahanuM/s Aum Jivdani Associates · P99000014796 · possession Dec 2021 · 90.9% built
- SAI APARTMENT · NAVAL NAGARHARI OM BUILDERS AND DEVELOPERS · P99000014827 · possession Jan 2022 · 89.1% built
- CLASSIQUE · NEAR NAVALI PHATAKSHRUSHTI DEVELOPERS · P99000014864 · possession Dec 2022 · 90.9% built
- Mahindra Happinest Palghar Phase - I · NandoreMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000014911 · possession Dec 2021 · 81.8% built · 38 complaints
- Riddhivinayak Apartment · NavaliJai Bajarang Construction · P99000014934 · possession Mar 2022 · 87.7% built
- MALHAR LIFESPACES · PALGHAR CITYMALHAR LIFESPACES · P99000014945 · possession Nov 2021 · 90.9% built
- ROYAL ABODE · VasaiKAWALI AND ASSOCIATES · P99000015017 · possession Jan 2022 · 90.9% built
- PRESTIGE APARTMENT · PalgharSAIJAYSHREEBUILDERS · P99000015069 · possession Dec 2021 · 45.5% built
- Sai Baba Nagar Residential with Shopline Building with A B C Wings · Nallasopara WestShreeji Associates · P99000015106 · possession Dec 2026 · 4.2% built
- Madhav Vatika-II · Palghar EastShrijee Krupa Developers · P99000015110 · possession Jan 2021 · 90.9% built
- PRITHVI REGENCY · PALGHARPRITHVI PROPERTY DEVELOPERS · P99000015122 · possession Apr 2021 · 90.9% built
- Shreepati Residency · TembhodeParshva Developers · P99000015139 · possession Mar 2022 · 100% built
- SAI GARDEN RESIDENCY · HIGHWAYSHAHJI ENTERPRISES · P99000015148 · possession Mar 2027 · 90.9% built
- EKVIRA CONSTRUCTION · OPP SUNDARAM SCHOOL WAGHULSAREkvira Construction · P99000015168 · possession Dec 2022 · 100% built
- Ekta Parksville Phase IV · VirarEKTA PARKSVILLE HOMES PVT. LTD. · P99000015239 · possession Apr 2029 · 27.3% built · 3 complaints
- VASANT VILLA · ADARSH NAGARVASANT CONSTRUCTION · P99000015257 · possession Sept 2021 · 0% built · 1 complaint
- OSWAL DREAM CITY PHASE 2 · VILLAGE MAHIM BIDCO CHINTUPADA ROADOSWAL REALTORS PRIVATE LIMITED · P99000015275 · possession Apr 2029 · 38.1% built
- SWAPNLOK RESIDENCY PHASE II · umroliSHIV SAI DEVELOPERS · P99000015323 · possession Apr 2028 · 4.5% built
- Sai Prasad · VasaiSai Prasad Developers · P99000015349 · possession Jan 2022 · 90.9% built
- Parks Developers LLP - Tanishq Gold - Phase 1 · DahanuParks Developers LLP · P99000015423 · possession Dec 2022 · 90.9% built
- Mahindra Happinest Palghar Phase - II · Nandore GrampanchayatMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000015481 · possession Sept 2022 · 81.8% built · 3 complaints
- DRUMAN · SundaramANS REALTY · P99000015524 · possession May 2019 · 100% built
- Ganapati Apartment · Palghar WestJai Bajarang Construction · P99000015531 · possession Dec 2020 · 87.3% built
- Nirman Height · Palghar WestNirman Builder & Developer · P99000015536 · possession Sept 2022 · 90.9% built
- YASH PADMA · PalgharSAI SHRADDHA ENTERPRISES · P99000015545 · possession Dec 2026 · 86.1% built
- PARASNATH TOWNSHIP · PANCHALI GRAM PANCHAYATSHREENATH ENTERPRISES · P99000015590 · possession Jul 2028 · 59.5% built
- VEER - 4 · UMROLI EASTVeer Global Infraconstruction Limited · P99000015602 · possession Sept 2020 · 100% built
- MAHAVIR UTSAV B · PalgharRajesh Construction · P99000015701 · possession Oct 2019 · 90.9% built
- Varun Buildcon · Village SativaliDeepak Bhupatrai Vora · P99000015763 · possession Dec 2019 · 28.6% built
- FIA ORION · PALGHARNIMISH LAXMICHAND PASAD · P99000015786 · possession Dec 2021 · 90.9% built
- BHOOMI NIWAS · PALGHARBHOOMI CORPARATION · P99000015823 · possession Jun 2019 · 0.5% built
- Mahindra Happinest Palghar Phase V · nandoreMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · P99000015852 · possession Dec 2022 · 81.8% built · 2 complaints
- SHRI BALAJI NIWAS · PALGHARBHOOMI ENTERPRISES · P99000015857 · possession Dec 2019 · 72.7% built
- NIRVANA ECO HOMES · PALGHARBALAJI CONSTRUCTION CO. · P99000015865 · possession Dec 2024 · 22.7% built
- KRISHA ARCADE · PalgharKRISHA ARCADE · P99000015883 · possession Dec 2027 · 90% built
- Nine Star Residency - Imperia · PalgharM/s A.K. Developers · P99000015888 · possession Mar 2022 · 48.2% built
- VIRAR BOLINJ YASHWANT KRUPA CO OP HSG SOC LTD · VIRAR WESTVIRAR BOLINJ YASHWANT KRUPA CO OP HSG SOCIETY LTD · P99000015890 · possession Dec 2026 · 64.5% built · 1 complaint
- FIA PARADISE · PALGHARNIMISH LAXMICHAND PASAD · P99000015897 · possession Dec 2022 · 81.8% built
- HARI RESIDENCY PHASE I · VasaiLOTUS LAKSHMINARAYAN HOMES · P99000015966 · possession Apr 2028 · 69.9% built · 6 complaints