All MahaRERA projects
23,645 registered projects with disclosed construction progress or complaint records. Page 7 of 48.
Nashik
- VAISHNAVI PLAZA · ADGOAN SHIVARTRIMURTI CONSTRUCTION · P51600032657 · possession Apr 2027 · 57.3% built
- Vitthal Park · Samarth nagarRAMESHWAR ASSOCIATES · P51600032672 · possession Dec 2024 · 27.3% built
- Laxmi Commercial Complex · RACCA COLONYSHREE BALAJI CONSTRUCTIONS · P51600032710 · possession Dec 2027 · 65% built
- VIJAY ANAND · GOKUL NAGARIPRASAD VYANKTESH KANT · P51600032715 · possession Jul 2024 · 82.5% built
- VINAYAK NIWAS · OJHARPARMANAND SHRIKRISHNA PATIL · P51600032757 · possession Mar 2023 · 73.2% built
- Shree Kalash Residency · Kathe Galli,DwarkaSHREE KRUPA ENTERPRISES · P51600032761 · possession Mar 2025 · 100% built
- SHIV ORCHID · NASHIK ROADSIDDHIVINAYAK CONSTRUCITONS · P51600032776 · possession Jun 2024 · 89.1% built
- JACOB SKY BLUE · PATHARDI SHIWAR NASHIKJACOB DANIEL CHARUVILA · P51600032787 · possession Dec 2026 · 100% built
- GURUDARSHAN APARTMENT · PAHARDI PHATA NASHIKSAHYADRI BUILDCON · P51600032852 · possession Dec 2026 · 100% built
- ADITYA PRIDE · PATHARDI PHATAADITYA BUILDCON · P51600032888 · possession Dec 2026 · 50.5% built
- SHREENANDAN · KATHE GALLI NASHIKSHREEYOG PROPERTIES · P51600032910 · possession Jun 2025 · 90.9% built
- SPAN HORIZON · Opposite Jay Malhar Temple, Beside Chetana Nagar.SPAN BUILDCON · P51600032939 · possession Dec 2027 · 52.3% built
- ADWAIT PLAZA · AMBAD SHIWARM M ASSOCIATES · P51600033009 · possession Dec 2025 · 100% built
- NANDAN RESIDENCY · JAIL ROADSAHEJ BUILDERS AND DEVELOPERS LLP · P51600033017 · possession Jan 2029 · 58.8% built
- AASMAN CO-OPERATIVE HOUSING SOCIETY LTD · BODHALE NAGARAasman Co-Operative Housing Society Limited · P51600033051 · possession Jan 2024 · 90.9% built
- PARKSYDE NEST PHASE-3A · PANCHAVATI ANNEXJAIKUMAR CONSTRUCTIONS LTD · P51600033065 · possession Dec 2025 · 92.3% built
- Shivalik Skygreen · Dnyaneshwar Nagar, Pathardi PhataYogeshwar Realty · P51600033085 · possession Dec 2026 · 63.8% built
- OM SAI RAM · PATHARDI PAHATAOM DEVELOPERS · P51600033111 · possession Dec 2026 · 72.7% built
- LAXMI VILLAS · MhasrulUMESH BHAGWAN MUNDE · P51600033149 · possession Dec 2022 · 51.8% built
- SAAKAR SYMPHONY · NASHIKGALAXY BUILDCON · P51600033163 · possession Dec 2026 · 87.3% built
- SUN CITY · NASHIKSAMRUDDHI BUILDERS & DEVELOPERS · P51600033203 · possession Dec 2026 · 93.9% built
- SHANTI ENCLAVE · PATHARDI PHATA NASHIKMAHAVIR BUILDERS AND DEVELOPERS PVT.LTD. · P51600033208 · possession Dec 2026 · 100% built
- NILKANTH APARTMENT · MHASRULBAG BUILDCON · P51600033232 · possession Dec 2023 · 81.8% built
- Rushi Hans · Aanandwalli, ChandshiAnkur Chaturbhai Rakholiya · P51600033251 · possession Dec 2025 · 9.1% built
- Shreeniwas Apartment · Chetna Nagar, Rane Nagar, NashikSANDEEP VIJAY KOTHAWADE · P51600033255 · possession Dec 2024 · 100% built
- VEDRAJ ELITE · TARWALA NAGARSadguru Buildcon · P51600033270 · possession Apr 2025 · 89.1% built · 1 complaint
- SHATAYU KARWA · MakhamalabadGREEN CANOPY PROPERTIES LLP · P51600033346 · possession Mar 2025 · 90.9% built
- LABH MEADOWS · NASHIKL K CONSTRUCTION · P51600033370 · possession Dec 2026 · 81.8% built
- ELICA REJOICE · BEHIND PRAKASH PETROL PUMP, NEAR ASHWINI HOSPITALELICA DEVELOPERS · P51600033408 · possession Mar 2027 · 44.4% built
- SHREE GANESH PLAZA · KONARK NAGAR NASHIKSHRINIVAS BUILDWELL · P51600033434 · possession Dec 2026 · 63.6% built
- PRIDE · ICCHAMANI COLONY, NASIKMOHIT DILIP KHIVASARA · P51600033498 · possession Jul 2024 · 72.7% built
- Pooja Vertex Apartment · mahatma nagarpooja constructions · P51600033500 · possession Dec 2027 · 96.4% built
- GOVINDA HEIGHTS · GIRIDHAR NAGAR PATHARDI NAHSIKGOVINDA DEVELOPERS · P51600033508 · possession Dec 2026 · 100% built
- PANCHARATNA HEIGHTS · NEAR MAULI LAWNSPANCHARATNA BUILDERS · P51600033520 · possession Dec 2024 · 82.5% built
- MORYA RESIDENCY · NEAR ADITYA HALL, INDIRA NAGAR, NASHIKSHRIRAM BUILDERS AND DEVELOPERS · P51600033550 · possession Jun 2025 · 90.9% built
- NIKETAN CLASSIC · NEAR MAHATMA NAGAR SATPURNIKETAN INFRA · P51600033592 · possession Jan 2026 · 90.9% built
- VEDANT AARTI APARTMENT · MAUJE SINNAR - 1 SHIWARVANDANA GORAKSHNATH MHASKE · P51600033600 · possession Dec 2025 · 90.9% built
- Tanishq Samrudhi · Jijamata ColonyLaxmikant Bhaskar Kothawade · P51600033607 · possession Dec 2023 · 43.2% built
- ANAND AVENUE · AMBADDEEPAK PANDURANG MATALE · P51600033614 · possession Dec 2024 · 59.1% built
- CHHATRAPATI CHAMBERS · NR NAVAN CHAWL NASHIK ROAD CENTRAL JAIL ROAD NASHIK ROAD NASHIKSAI CONSTRUCTION · P51600033617 · possession Dec 2025 · 90.9% built
- Swarajya Apartment · NashikKalash Developers Associates · P51600033621 · possession Mar 2024 · 72.7% built
- ROONGTA FLORENZA APARTMENT · NASHIKROONGTA HOMES LLP · P51600033635 · possession Dec 2024 · 89.1% built · 3 complaints
- Shreeji Floating Villas · Serene Meadows, Gangapur Road, NashikSHREEJI LIFE SPACE · P51600033645 · possession Dec 2027 · 75.4% built
- RAJASHREE CHINTAMANI · NASHIKRAJASHREE BUILDTECH · P51600033659 · possession Dec 2026 · 72.7% built
- DREAM RESIDENCY APARTMENT · ADGAON SHIWARDREAM BUILDTECH · P51600033666 · possession Mar 2025 · 90.9% built
- ANJNEYA RESIDENCY · BANDAVANE NAGARSUREKHA SURESH DHAMANE · P51600033672 · possession Jan 2024 · 39.1% built
- Sai Sanskruti · Near Motiwala College, Dhruv Nagar, Gangapur Road, NashikANIL SHANKAR AHER · P51600033681 · possession Oct 2025 · 100% built
- GOLDEN ROW BUNGLOW · VANIS S FLORA · P51600033715 · possession Sept 2026 · 100% built
- PRANAV HEIGHTS · GOLE COLONYSHRI SADGURU ASSOCIATES · P51600033716 · possession Dec 2024 · 79.5% built
- Vanraj Flora · Gangapur RoadABHIJIT VAMANRAO PATIL · P51600033720 · possession Jun 2026 · 72.7% built
- SUKHAYUSH APARTMENT · PANCHAVATI NASHIKSHRINATH REALTY · P51600033727 · possession Dec 2025 · 100% built
- DURGA ENCLAVE · NASHIKSULBHA HEMANT DESHPANDE · P51600033735 · possession Jan 2027 · 81.8% built
- GOVIND PARADISE · ADGAONGOVIND BHAUSAHEB MADHWAI · P51600033749 · possession Oct 2024 · 27.3% built
- MAA BHAGWATI RESIDENCY APARTMENT · NASHIKROONGTA LANDMARKS LLP · P51600033773 · possession Mar 2029 · 37.2% built
- SAMARTH HEIGHTS · MHASRUL SHIWARSHILPA YOGESH KUMAWAT · P51600033804 · possession Sept 2024 · 90.9% built
- GEMINI HEIGHTS IV APARTMENT · MAUJE PATHARDI - 1 SHIWAR MURLIDHAR NAGAR PATHARDI PHATA NASHIKVIKAS GEMINI SHRI DATTA SHARMA GEMINI · P51600033806 · possession Jan 2027 · 90.9% built
- Jubiliant Heights · College roadEkdanta Realtors · P51600033861 · possession Dec 2024 · 100% built
- SAI HEIGHTS APARTMENT · SHANI CHOWK SHRAMIK NAGARSHRI SAI CONSTRUCTION · P51600033867 · possession Jan 2025 · 90.9% built
- Shreeji Residency · Avdhoot ColonySUGAM KISHOR CHANIYARA · P51600033874 · possession Dec 2025 · 90.9% built
- ELIXIR GIRIK · CHANDSHIELIXIR BUILDERS · P51600033898 · possession Dec 2024 · 90.9% built
- SUKAN CORNER APARTMENT · PATHARDIAPPULKUMAR VITHALBHAI RAKHOLIYA · P51600033941 · possession Jan 2024 · 81.8% built
- ROONGTA ELEGANTE APARTMENT · NASHIKROONGTA LANDMARKS LLP · P51600033975 · possession Dec 2025 · 58.7% built · 5 complaints
- MADHAV PARK · BHAGUR DEOLALIASHWINI DIPAK DHOLI · P51600034049 · possession Dec 2026 · 153.1% built
- GREENLANDS · PANCHVATISUDHIR SUNIL BODKE · P51600034059 · possession Dec 2026 · 70.5% built
- Mahaveer Heights · NashikMahaveer Builders and Developers · P51600034067 · possession Sept 2026 · 81.8% built
- THE GRAND BY PARKSYDE PHASE - 1 · CHANDSHIJAIKUMAR CONSTRUCTIONS LTD · P51600034070 · possession Apr 2027 · 59.1% built
- GANESH ESSENCE · TAPOVAN, NANDUR DASAKPEBBLE INFRACON LLP · P51600034077 · possession Mar 2027 · 48.6% built
- THE GRAND BY PARKSYDE PHASE - 2 · CHANDSHIJAIKUMAR CONSTRUCTIONS LTD · P51600034104 · possession Apr 2027 · 100% built
- SIDDHIVINAYAK HEIGHTS · NEAR SHIVAJI NAGAR, OZAR (MIG), NASHIKSIDDHIVINAYAK BUILDTECH · P51600034123 · possession Dec 2026 · 70% built
- Nirmay Heights · Agartakli ShiwarNirmay Infra · P51600034133 · possession Dec 2026 · 89% built
- PADMASHREE Apartment · Adgaon-1PADMA BUILDCON · P51600034162 · possession Dec 2024 · 100% built
- SHIVSRUSHTI ANNEX · MAKHMALABADVISHAL LAXMAN GADEKAR · P51600034167 · possession Feb 2025 · 90.9% built
- ELITE RIAAN · SHRAMIK NAGAR SATPURM/s. RIAAN ANKIT REALTECH · P51600034237 · possession Feb 2025 · 90.9% built
- MADHAV PRIDE · ADGAONFourth Dimension Properties · P51600034272 · possession Dec 2025 · 90.9% built
- FOG LUXURIA-P6AND7 -SAPPHIRE · FOG LUXURIAVirendra Vijaysing Pardeshi · P51600034284 · possession Dec 2027 · 10.9% built
- V N PLEDGE APARTMENT · MANEKSHA NAGARCENTURY BUILDERS and DEVELOPERS · P51600034299 · possession Dec 2025 · 90.9% built
- KAMAL ELITE · PATHARDIKAMAL BUILDTECH · P51600034336 · possession Dec 2025 · 81.8% built
- Shreejis Gujral Arcade · Dwarka, NashikSHREEJI LIFE SPACE · P51600034337 · possession Sept 2026 · 99.5% built
- Laxmi High Rise · Konark Nagar near St Peters English Medium SchoolABHISHEK DATTATRAYA MALODE · P51600034340 · possession Jan 2025 · 100% built
- FOG LUXURIA-P8 -SAPPHIRE · FOG LUXURIAVirendra Vijaysing Pardeshi · P51600034354 · possession Dec 2027 · 51.4% built
- CHAIRMAN HEM CO-OP. HOUSING SOCIETY LTD. · INDIRANAGARJK INFRASTRUCTURES · P51600034403 · possession Sept 2024 · 90.9% built
- Yashodhan Heights · NashikBHUSHAN SURYABHAN JADHAV · P51600034412 · possession Oct 2024 · 97.3% built
- TREELAND PHASE-5 · GANGAPUR ROADABH DEVELOPERS PRIVATE LIMITED · P51600034430 · possession Dec 2026 · 61.4% built
- NEELKANTH HEIGHTS · HIRE NAGARYATIN ANNASAHIB WANI · P51600034435 · possession Dec 2025 · 89.5% built
- Shreeji Magnet · NashikSHREEJI LIFE SPACE · P51600034437 · possession Dec 2025 · 154.1% built
- SHREE KRISHNA HEIGHTS · BEHIND GANDHI NAGARM/S JK BUILDCON · P51600034471 · possession Mar 2027 · 81.8% built
- BRIJ NIKUNJ APARTMENT · INDIRA NAGARSANDEEP GULABCHAND GUPTA · P51600034476 · possession Oct 2024 · 87.7% built
- Amrutdhara Housing Complex Phase - I · Indiranagar EastRadheya Constructions & Developers Proprietor Ravi Raghunath Mahajan · P51600034501 · possession Apr 2027 · 9.1% built
- OLIVE GARDEN · NASHIKOLIVE INFRASTRUCTURE · P51600034504 · possession Sept 2026 · 65.5% built
- Shreeji The Crown · Near Prakash Petrol PumpSHREEJI LIFE SPACE · P51600034517 · possession Jun 2028 · 50.4% built
- TULSI NIRVANA APARTMENT · NASHIKTULSI CONSTRUCTION · P51600034546 · possession Jun 2026 · 68.2% built
- SHREE GANADHISH PARK · WADALA NASHIKC K DEVELOPERS · P51600034580 · possession Sept 2026 · 73.6% built
- Shreeji Celestia · NashikSHREEJI LIFE SPACE · P51600034613 · possession Jun 2028 · 59% built
- SHREE DATT GLORY · MHASRUL NASHIKVILAS DATTATRAY KHAIRNAR · P51600034624 · possession Mar 2024 · 81.8% built
- ALAMPAT BUSINESS CENTRE · COLLEGE ROADKARTIK BUILDCON · P51600034684 · possession Mar 2025 · 78.2% built
- Antonia - The Sky Villa · NashikRadheya Constructions & Developers Proprietor Ravi Raghunath Mahajan · P51600034689 · possession Dec 2027 · 0% built · 1 complaint
- TREELAND PHASE-2 · GANGAPUR ROADABH DEVELOPERS PRIVATE LIMITED · P51600034705 · possession Dec 2026 · 63.2% built
- THE CHOUPAAL · TIDKE COLONY, NASHIKKALANTRI AND BANG PROPERTIES · P51600034715 · possession Mar 2027 · 80.5% built
- BHAVYA TOWERS · Sinnar Phata, Nashik RoadNARESH PUNJABHAI PATEL · P51600034718 · possession Dec 2027 · 1.8% built
- RAJASHREE MANGLAM · NASHIKRAJASHREE PROPERTIES · P51600034726 · possession Dec 2026 · 100% built
- SAMRUDDHI APARTMENT · NASHIKVAISHNAVI CONSTRUCTION · P51600034731 · possession Dec 2026 · 90.9% built
- AKSHAR PARK · MAKHMALABAD PANCHVATIASHIRWAD CONSTRUWELL · P51600034758 · possession Feb 2027 · 81.8% built
- JACOB SKY VIEW · NASHIKJACOB DANIEL CHARUVILA · P51600034769 · possession Dec 2026 · 100% built
- RAJASHREE CELEBRIA · NASHIKRAJASHREE BUILDTECH · P51600034781 · possession Dec 2026 · 88.2% built
- SAPTASHRUNGI CHARAN · NASHIKPRAGATI DEVELOPERS · P51600034782 · possession Dec 2026 · 90.9% built
- SHREE MADHULAXMI APARTMENT · NEAR LOKMANYA HOSPITALPANKAJ DINKAR SHILWATE · P51600034785 · possession Mar 2024 · 30.9% built
- SNEHANKUR · NASHIKANIL SHANTARAM AMRUTKAR · P51600034798 · possession Dec 2026 · 100% built
- SUPER MARKET · BHOR TOWNSHIPVSI BUILDERS AND DEVELOPERS · P51600034814 · possession Mar 2024 · 18.2% built
- NARAYAN CO-OPERATIVE HOUSING SOCIETY LTD. · BEHIND SWAMI SAMARTH KENDRANARAYAN INFRA · P51600034888 · possession Mar 2025 · 100% built
- FAKHAR GALAXY APARTMENT · INDIRA NAGARBUSHRA BUILDERS · P51600034894 · possession Mar 2026 · 100% built
- AASTHA RESIDENCY · TILAKWADIMANOJ MADHUKAR TOSHNIWAL · P51600034910 · possession Dec 2025 · 90.5% built
- SHANTI KRUPA · NASHIKSAHYOG VASTU UDYOG · P51600034958 · possession Dec 2026 · 66.8% built
- BAITUL AKHTAR APARTMENT · SARDA CERCLE NASHIKM/s MUFTI-E-AZAM-HIND BUILDCON · P51600034967 · possession Jan 2027 · 62.7% built
- VALENCIA RIVERSIDE APARTMENT · Gangapur RoadVINAYAKA BUILDERS · P51600034969 · possession Sept 2026 · 86.8% built
- Rajeshwar Residency · Bhagwa ChowkArihant Builders and Developers · P51600034970 · possession Mar 2027 · 36.4% built
- CHANDRA-TARA · CHURCH GATENIRMAAN ENGINEERS AND CONTRACTORS · P51600034999 · possession Mar 2024 · 12.7% built
- SNEHABANDH CO-OP HOUSING SOCIETY LTD · IndiranagarJK BUILDCON · P51600035092 · possession Mar 2025 · 90.9% built
- BHOLEBABA HEIGHTS · MAKHMALABAD SHIWAR, NASHIKSHARAD DINKAR DESHMUKH · P51600035162 · possession Jan 2025 · 84.1% built
- SHIVSIDDHI HEIGHTS · NASHIKPANKAJ SUDHAKAR GAVALI · P51600045197 · possession Dec 2026 · 60.5% built
- SUGANDHA HEIGHTS · NASHIKGAURAV CHANDRAPAL KAJALE · P51600045262 · possession Dec 2027 · 42.3% built
- Park Enclave · Bankar Mala, Near Amrut ShilpDales Estate · P51600045314 · possession Dec 2028 · 55% built
- SAMARTH PLAZA · CHETANA NAGAR NASHIKPATIL ASSOCIATES · P51600045329 · possession Dec 2024 · 100% built
- MAYURI APARTMENT · NASHIKRAVSAHEB REVBA SHELAR · P51600045334 · possession Dec 2026 · 100% built
- KRISHNA HEIGHTS · NASHIKCHAITANYARAJ BUILDTECH PRIVATE LIMITED · P51600045341 · possession Dec 2026 · 100% built
- NISHIGANDH APARTMENT · KAMATWADEC B CONSTRUCTION · P51600045379 · possession Mar 2026 · 90.9% built
- BALAJI RESIDENCY · NASHIK SHIWARSHREE BALAJI DEVELOPERS · P51600045391 · possession Nov 2025 · 81.8% built
- PLATINUM PLAZA · OPP RAMAYAN BUNGLOWRIDDHI SIDDHI DEVELOPERS · P51600045414 · possession Mar 2027 · 86.4% built
- SHREE RAM LALLA NIWAS APARTMENT · NASHIKROONGTA HOMES LLP · P51600045450 · possession Jun 2025 · 78.2% built
- Parshuram Krupa Apartment · Madhli Galli, Tiwanda ChowkSukruti Constructions · P51600045453 · possession Sept 2024 · 81.8% built
- YASH PRIME · SHIVAJI NAGARSHAHSIKANT YASHWANT TARGE · P51600045511 · possession Dec 2025 · 88.6% built
- RAJASHREE NARAYANI · NASHIKRAJASHREE BUILDTECH · P51600045558 · possession Dec 2026 · 90.9% built
- OMKARA PARK WING B · Dhruv NagarOMKARA BUILDCON · P51600045585 · possession Dec 2024 · 81.8% built
- Jeevan Anand · MhasrulReal Buildcon · P51600045594 · possession May 2026 · 81.8% built
- VYANKATESH HEIGHTS · MHASRULSANGALEJI GROUP · P51600045621 · possession Apr 2024 · 72.7% built
- MARHABA RESIDENCY · NASHIKCRESCENT BUILDCON · P51600045628 · possession Dec 2027 · 88.9% built
- SAKAR PALACE · ADGAONMANISH PURUSHOTTAM NARODIYA · P51600045654 · possession Dec 2029 · 17% built
- SHREYA CLASSIC APARTMENT · MAUJE AGARTAKALI SHIWARSHREYA DEVELOPERS · P51600045656 · possession Jan 2027 · 90.9% built
- Tulsi Tirth Apartment · Deolali ShiwarMakani Buildcon · P51600045678 · possession Dec 2028 · 86.5% built
- SHREENEELKANTH APARTMENT · RAJIV NAGARSWAMI CONSTRUCTIONS · P51600045701 · possession Mar 2025 · 90.9% built
- Sunrise Tower · NashikAkshay Vinod Tatiya And Pratik Prakash Badgujar · P51600045705 · possession Jun 2026 · 72.7% built
- Pawa Blossom · WadalaPawa Construction · P51600045718 · possession May 2027 · 65.5% built
- KRISHNA PALACE · AMBAD KHURDSHIV DEVELOPERS · P51600045721 · possession Dec 2027 · 81.8% built
- Sunshine Glory · NashikAmit Lifespace LLP · P51600045727 · possession Dec 2026 · 71.2% built
- STAR PLUS B · NASHIK ROADDEEPAK KALYANJI CHANDE · P51600045827 · possession Dec 2028 · 51.4% built
- Ambika Harmony · Mayur Vihar ColonyAmbika Buildcon · P51600045830 · possession Jun 2025 · 78.2% built
- KAMAL RESIDENCY · PATHARDI SHIVARKAMAL BUILDCON · P51600045877 · possession Dec 2026 · 81.8% built
- RUDRANSH PARK · OZARASHOK SHIVNARAYAN LADDHA · P51600045916 · possession Sept 2026 · 66.4% built
- CASTLE O CLIFF · NASHIKP51600045924 · possession Mar 2024 · 81.8% built
- The Wellness Square · Pathardi Phata, NashikV Qube · P51600045927 · possession Dec 2025 · 50.5% built
- SAI RUDRA HEIGHTS · NASHIKSHREE BALAJI BUILDERS AND DEVELOPERS · P51600045979 · possession Dec 2026 · 100% built
- RENUKA POOJA APARTMENT · PATHARDI PHATAA K INFRA · P51600046005 · possession Mar 2026 · 90.9% built
- SAI KALASH APARTMENT · Panchak ShiwarSWASTIK ESTATES · P51600046015 · possession Dec 2026 · 72.7% built
- SHUBHKALYAN HEIGHTS · NASHIKPRASAD DATTATRAYA SANGALE · P51600046019 · possession Dec 2026 · 100% built
- SAMRUDDHI SKY GREENS · GANGAPUR ROADAnandraj Infrastructure LLP · P51600046048 · possession Jan 2027 · 7.3% built
- SAINATH HEIGHTS · ANANDWALIDHRUVED CONSTRUCTION · P51600046125 · possession May 2024 · 0.7% built
- YASH HEIGHTS · KAMATHWADEDEELIPRAO DAULATRAO DEORE · P51600046131 · possession Dec 2024 · 9.1% built
- Aurum Apartment · Lahoti NagarLahoti Builders And Developers · P51600046156 · possession Dec 2025 · 90.9% built · 1 complaint
- AROHI HEIGHTS · PANCHAVATIROHINI SUBHASH PAWAR · P51600046183 · possession May 2024 · 72.7% built
- SAI SHRADDHA APARTMENT · KAMATHWADE SHIVARSAI PRASAD BUILDERS AND DEVELOPERS · P51600046248 · possession Dec 2026 · 90.5% built
- SHUKLA BUSINESS TOWER · AmbadDEAL CONSTRUCTION · P51600046278 · possession Apr 2029 · 45% built
- Shree Uday · Opp Dwarka Post officeRAM CONSTRUCTIONS · P51600046294 · possession May 2027 · 78.2% built
- Rajyog Heights · NashikVasundhara Yogesh Gosavi · P51600046329 · possession Dec 2026 · 71.8% built
- LOTUS RESIDENCY · LAMKHEDE MALALOTUS INFRA · P51600046349 · possession Mar 2026 · 90.9% built
- Jagruti Co-operative Housing Society Ltd. · Shingada TalavMayur Builder & Developers · P51600046354 · possession Dec 2026 · 77.7% built
- Aarambh Elite · Gangapur roadKothari Housing Company · P51600046518 · possession Jun 2027 · 89.5% built
- GLOBAL VILLE · MORADE MALASHRADDHA INFRA · P51600046691 · possession Mar 2027 · 42.3% built
- ROONGTA ASHOK VIHAR APARTMENT · NASHIKSHREE CHAWO SATI BUILDERS PRIVATE LIMITED · P51600046725 · possession Jan 2025 · 81.8% built
- Revati Sunanda Apartment · Beside Namco Bank, Hanuman WadiRevati Infra Engineers · P51600046785 · possession Mar 2025 · 81.8% built
- ROONGTA EXQUISITE APARTMENT · NASHIKROONGTA LANDMARKS LLP · P51600046803 · possession Sept 2026 · 60.5% built
- ROONGTA PRECISO APARTMENT · NASHIKROONGTA HOMES LLP · P51600046804 · possession Sept 2025 · 53.9% built · 3 complaints
- SHILP ALASKA · DASAK SHIWARDEVSAN INFRASTRUCTURE PRIVATE LIMITED · P51600046817 · possession Jun 2029 · 31.6% built
- KRUSHNAPREM HEIGHTS · KOTHULE MALA MAKHMALABAD ROADPRAMILA BALASAHEB KOTHULE · P51600046824 · possession Dec 2025 · 100% built
- Mirage Tower · NashikUNITY CONSTRUCTIONS · P51600046828 · possession Dec 2025 · 72.7% built
- Yamuna Pride · Pimpalgaon NajikYamuna Constructions · P51600046854 · possession Dec 2027 · 40.9% built
- Varad Residency · NASHIK ROAD EASTVarad Associates · P51600046873 · possession Mar 2027 · 90% built
- SAICRYSTALS · MAKHMALABADJAY DEVELOPERS · P51600046879 · possession Jul 2027 · 8.6% built
- PUSHTI ARCADE · Neat Swiss trafalgar pathardi phataPUSHTI DEVELOPERS · P51600046887 · possession Jul 2026 · 81.8% built
- Shilpa Madhuvan · Nashik Road EastShilpa Estate · P51600046955 · possession Mar 2027 · 45.9% built
- RAJASHREE APRICUS · NASHIKRAJASHREE BUILDCON · P51600046966 · possession Dec 2026 · 51.8% built
- SAI CASTLE · GANGAPUR ROADJAY DEVELOPERS · P51600047073 · possession Jul 2027 · 61.4% built
- SAMRUDDHI VIHAR · PATHARDI SHIWARSANSKAR BUILDERS AND DEVELOPERS · P51600047132 · possession Dec 2026 · 81.6% built
- SHREE VARAD APARTMENT · HAGWANE MALASHREE RENUKA BUILDERS · P51600047143 · possession May 2024 · 72.7% built
- SHAH S SADGURU RESIDENCY PHASE II · CHEHADI PUMPINGSHAH BUILDERS · P51600047168 · possession Dec 2025 · 72.7% built
- Vishakha Co Op Hsg Society · Opposite Vasant MarketVISHAKHA CHS LTD · P51600047219 · possession Jul 2026 · 73.6% built
- NOOR INFINITY · ROYAL COLONY LANE NO.1SHAKIL AHMED BAHSIR AHMED SHAIKH · P51600047243 · possession Dec 2027 · 98.6% built
- VASTUPURTI GALAXY · BEHIND UDYOG BHAVANVAIBHAV DATTATRYA MUTRAK · P51600047258 · possession Oct 2023 · 54.5% built
- RANJIT CO OP HSG SOC LTD · NASHIKRANJIT CO OP HOUSING SOCIETY LIMITED NASHIK · P51600047266 · possession Dec 2026 · 90.9% built
- UMIYA VIJAY APARTMENT · NEAR BALI MANDIR, PANCHAVATIIMPERIAL REALTY · P51600047270 · possession Mar 2026 · 49.1% built
- SHYAM AASHIRWAD · PANCHAVATIJAIDEEP VINODRAI TANK · P51600047309 · possession Aug 2025 · 54.5% built
- SHREE MURALIDHAR HEIGHTS · ADGAON SHIWARSHREE BUILDCON · P51600047373 · possession Mar 2025 · 90.9% built
- Saujanya Co-operative Housing Society Ltd. Nashik · NEAR KBT COLLEGEADIRAJ CONSTRUCTION · P51600047395 · possession Dec 2024 · 90.9% built
- DAKSH ENCLAVE · PATHARDIR K CONSTRUCTION · P51600047403 · possession Jun 2027 · 70% built
- MANGALMURTI AVENUE · AMBADS M DEVELOPERS · P51600047452 · possession Dec 2026 · 81.8% built
- ROYAL HERITAGE · DASAK SHIVARSADGURU ASSOCIATES · P51600047464 · possession Dec 2026 · 81.8% built · 1 complaint
- Tapovan Orchid · DwarkaRUDDHI BUILDCON PVT. LTD. · P51600047487 · possession Dec 2025 · 69.5% built
- Ashok Elite · Opposite Nakshatra Lawns, AnandwalliAmit Builders · P51600047517 · possession Dec 2026 · 82.5% built
- Sunrise Apartment · Mane NagarPurushottam Naran Patel · P51600047549 · possession Mar 2026 · 81.8% built
- MAHADEV APARTMENT · MHASRUL SHIWAR, NASHIKUMIYAKRIPA BUILDCON · P51600047552 · possession Mar 2025 · 90.9% built
- SHREE BHAGWATI CO-OP HSG SOCIETY · BYTCO POINTVINAY MAGANLAL KARNAVAT · P51600047578 · possession Dec 2025 · 90.9% built
- Karmaa Shubh Vastu · PathardiKarmaa Ventures · P51600047592 · possession Oct 2024 · 85.5% built
- Devdatta Apartment · Wadala Shivar, NashikAjay Madhavrao Mahajan And Makarand Sudhakar Puranik · P51600047601 · possession May 2025 · 90.9% built
- Antariksha Avenue · Makhmalabad, NashikA K BUILDWELL · P51600047605 · possession Dec 2027 · 51% built
- DBS Empyrean · Next to Reliance Petrol Pump, Pipeline Road, Gangapur RoadShree Dream Builders · P51600047666 · possession Dec 2027 · 75.9% built
- THREE LEAVES PHASE ONE · GOVIND NAGARDEEPAK INFRA AND HOMES PRIVATE LIMITED · P51600047728 · possession Dec 2030 · 17.7% built
- SHREE GANESH CRESCENT · ANANDWALLI GANGAPUR ROAD NASHIKPRAKASH RAMAN CHAUDHARI · P51600047729 · possession Dec 2027 · 57.7% built
- JAYSHREE BLISS · PANCHAVATIJAYSHREE INFRA PROJECTS · P51600047741 · possession Mar 2024 · 81.8% built
- VIHAAN GLORY APARTMENT · NEAR HINDI SCHOOL MAUJE PIMPALGAON BAHULA SHIWARTIRUPATI BUILDCON · P51600047757 · possession Feb 2026 · 90.9% built
- Anantam Tower · Shiwar-PanchakAVINASH TULSIO PARWANI · P51600047787 · possession Mar 2027 · 57% built
- BELLE VUE ISLE · GOVIND NAGARBELLE VUE INFRA · P51600047823 · possession Dec 2025 · 47.3% built
- PADMA VISHWA LANDMARK · OPPOSITE RACCA GARDENSiddhi Construction · P51600047864 · possession Dec 2026 · 90.9% built
- SHIV PALACE APARTMENT · MHASRUL SHIWARUNITY BUILDCON · P51600047898 · possession Mar 2027 · 85.5% built
- Jivan Ganga Phase II · Nagare Mala, Pimpalgaon BahulaS & O Infra · P51600047900 · possession Dec 2026 · 50% built
- KAUSHALYA HEIGHTS · MAKHMALABADMAULI DEVELOPERS · P51600047905 · possession Dec 2024 · 81.8% built
- SOLESTA · KARMAYOGI NAGARNIRMITI BUILDERS AND DEVELOPERS · P51600047945 · possession Dec 2027 · 13.6% built
- AATMAJ APARTMENT CO OPERATIVE HOUSING SOCIETY LIMITED · MAHATMA NAGARDMASS DEVELOPERS · P51600048016 · possession Dec 2025 · 61.4% built
- RAJASHREE CHERISH · NASHIKRAJASHREE CONSTRUWELL · P51600048017 · possession Dec 2026 · 49.1% built
- HARSH AVENUE · PANCHAKSHREE SWAMI BUILDCON · P51600048030 · possession Aug 2024 · 38.6% built
- SHILP ALASKA · DASAK SHIWARDEVSAN INFRASTUCTURE PRIVATE LIMITED · P51600048075 · possession Jun 2028 · 43.2% built
- VIRAT PLAZA · MHASRUL SHIWARHARSHAL HANMANTE BUILDERS AND DEVELOPERS PRIVATE LIMITED · P51600048087 · possession Sept 2026 · 60.9% built
- SHIVNEEL HEIGHTS · NASHIKKRUPASINDHU CONSTRUCTIONS · P51600048114 · possession Dec 2026 · 32.3% built
- Bhavik Apartment Co. Op. Hsg. Society · Sharanpur Road NashikHiray and Jagtap Associates · P51600048132 · possession Oct 2028 · 81.8% built
- Sai Vishwa Residency · Kathe Galli, DwarkaOm Sai Buildcon · P51600048141 · possession Oct 2028 · 84.5% built
- EMPYREAN HOMES · Wadala ShiwarAJINKYA VILAS PHAD · P51600048197 · possession Mar 2028 · 53.6% built
- BALAJI HEIGHTS · NASHIKBALAJI DEVELOPERS · P51600048203 · possession Dec 2026 · 71.4% built
- Welcome Co-Operative Housing Society Ltd. · PanchavatiWeclome Co-Operative Housing Society Ltd · P51600048204 · possession Jun 2025 · 90.9% built
- Avani Co-Operative Housing Society Ltd · PanchavatiAvani Co-Operative Housing Society Ltd · P51600048205 · possession Dec 2024 · 9.1% built
- RAJASHREE CHINTAN · NASHIKRAJASHREE PROPERTIES · P51600048227 · possession Dec 2026 · 100% built
- SAI DATTA TOWER B · MAKHMALABAD SHIWARAPURVA BUILDERS and DEVELOPERS · P51600048231 · possession Oct 2026 · 71.8% built
- Nanekar Heights · DeolaliKalki Developers · P51600048259 · possession Dec 2027 · 60% built
- Sanket Luxuria · Tipre ColonySHREE SANKET DEVELOPERS · P51600048264 · possession Dec 2026 · 90.9% built
- SHIVNERI RESIDENCY · PATOLE MALA, NASHIK ROADNice Home · P51600048370 · possession Dec 2025 · 90.9% built
- DEEPANJALI HEIGHTS APARTMENT · SHRIRAM NAGAR AYODHYA NAGARI PANCHVATISHREYA CONSTRUCTION · P51600048373 · possession Nov 2026 · 81.8% built
- SHIVALAY APARTMENT · SHINDEBHARAT SURESH DHERINGE · P51600048374 · possession Dec 2026 · 51.8% built
- MATRUDHAM CO-OP HOUSING SOCIETY · DASAKMatrudham Co-Op Housing Society · P51600048418 · possession Jul 2027 · 81.8% built
- Yogesh Co-Operative Housing Society · Kulkarni GardenRavindra Developers Private Limited · P51600048451 · possession Dec 2025 · 90.9% built
- SHIVANCHI APARTMENT · NASHIKJ J BUILDERS · P51600048461 · possession Oct 2024 · 90.9% built
- Paradise Business Plaza · NashikElite Constructions · P51600048492 · possession Dec 2027 · 65.9% built
- ABD PRIDE · NEAR RTO OFFICEANUP BUILDERS & DEVELOPERS · P51600048494 · possession Dec 2025 · 90% built
- VRAJ SAMARTH · INDIRA NAGARDHAIRYA DEVELOPERS · P51600048496 · possession Oct 2026 · 81.8% built
- HARI VIJAY CO. OP. HSG. SOC. LTD · DWARKASIDDHIVINAYAK DEVELOPERS · P51600048515 · possession Mar 2025 · 90.9% built
- Qadri Plaza · NashikHaidar Sadruddin Khot · P51600048531 · possession Dec 2030 · 70.5% built
- TEMPLE VIEW APARTMENT · GULMOHAR NAGAR MHASRUL PANCHVATI NASHIKFATTECHAND GHEVARCHAND BAGMAR · P51600048539 · possession Sept 2025 · 90.9% built
- SAI OMKAR HEIGHTS APARTMENT · AT NASHIKNEW BALAJI BUILDER AND DEVELOPERS · P51600048547 · possession Dec 2027 · 58.2% built
- AAVAAS · Opposite Gems School, HirawadiA L Realty · P51600048548 · possession Dec 2026 · 61.4% built
- BELLE VUE ROYALE · ADGAONBELLE VUE REALTY · P51600048560 · possession Dec 2026 · 87.3% built
- HIGHNESS PLAZA · NASHIKEKANTA CONSTRUCTION · P51600048571 · possession Jan 2026 · 63.6% built
- Shraddha Govind · Bodhale NagarS S Builders and Developers · P51600048572 · possession Oct 2026 · 81.8% built
- Samruddhi Haripath · Parijat NagarSamruddhi Realty · P51600048577 · possession Dec 2027 · 72.7% built
- ANTARANG APARTMENT · NashikSHRINATH REALTY · P51600048580 · possession Dec 2027 · 90% built
- Joshi Baug Co-op Housing Society · Behind Khatib DairyShubharambh Buildcon · P51600048592 · possession Dec 2026 · 85% built
- SAKAR PRIME · Morade Nagar, Mhasrul ShivarMUKTABEN PURUSHOTTAM NARODIA · P51600048611 · possession Jun 2025 · 81.8% built
- SHANTI PRIDE · MAKHAMALABAD SHIWARMANDABAI RAMESH KOTHULE · P51600048630 · possession Dec 2026 · 90.9% built
- SHREEMALHAR APARTMENT · GANGAPUR ROADSHREESWAMI CONSTRUCTIONS · P51600048639 · possession Dec 2025 · 90.9% built
- SHIVSHANKAR APARTMENT · PIMPALGAON BAHULA SHIVAR, NASHIKDATTA NIVRUTTI SHEJVAL · P51600048646 · possession Mar 2025 · 90.9% built
- RIDDHI SIDDHI APARTMENT · SHAHU NAGARDEV DEVELOPERS · P51600048683 · possession Dec 2027 · 65% built
- RIVER RIDGE · MAKHAMALABADSHASHIKANT NARAYAN YEOLA · P51600048689 · possession Dec 2026 · 81.8% built
- KALANTRI ELLIOTTE · NASHIKSHRINIVAS BUILDTECH · P51600048712 · possession Dec 2027 · 52.7% built
- Raghav height · opposite shell petrol pumpSuman Debendranath Ghosh · P51600048713 · possession Nov 2027 · 67.7% built
- MAHALAXMI VRUNDAVAN · NASHIKSHREE MAHALAXMI CONSTRUCTION · P51600048721 · possession Mar 2026 · 81.8% built
- VRAJ METROPOLIS SOUTH · DWARKASHREE INFRA SPACE · P51600048726 · possession Dec 2032 · 84.1% built
- The Northland by Madhu Vitthal · MhasrulNorthland Realty · P51600048737 · possession Dec 2028 · 60.5% built
- NILKANTH HEIGHTS APARTMENT · PRASHANT NAGARVINAYAK INFRA · P51600048774 · possession Mar 2026 · 90.9% built
- DWEEP COOP HOUSING SOCIETY LTD · THATTE NAGAR NASHIKUDAY KASHINATH GHUGE · P51600048775 · possession Oct 2026 · 55% built
- Vivaan by Madhu Vitthal · Makhmalabad, NashikDhanait Ahire Associates · P51600048786 · possession Dec 2026 · 81.8% built
- Casa Bella Homes · Balwant Nagar, Behind Wisdom High SchoolJayashri Chintaman Patil · P51600048790 · possession Dec 2025 · 56.8% built
- NAKSHTRA AVENUE · Mane NagarSHYAM DEVELOPERS · P51600048799 · possession Jul 2027 · 54.5% built
- SUKRUTI NILAYA · GANGAPUR ROADSUKRUTI CONSTRUCTIONS · P51600048811 · possession Dec 2024 · 11.8% built
- BALAJI VILLAS · SatpurRahul Bhaskar Musale · P51600048813 · possession Apr 2027 · 49.1% built
- Vrindavan Park · Sinnar, NashikSahara Buildcon · P51600048816 · possession Dec 2026 · 33.2% built
- ADVAIT APARTMENT · GOVIND NAGARGRANDMARK SPACES · P51600048825 · possession Dec 2025 · 81.8% built
- VRAJ CENTRAL VISTA · Rajiv NagarDHAIRYA DEVELOPERS · P51600048828 · possession Nov 2033 · 59.1% built
- SHREE KAMAL RESIDENCY · KAMATHWADASHREE DEVELOPERS · P51600048846 · possession Dec 2024 · 90.9% built
- Jai Jinendra Apartment · Mhasrul ShivarH D DEVELOPERS · P51600048859 · possession Sept 2025 · 61.8% built
- VAIDEHI PARK · Kathe Nagar, Kathe Lane, DwarkaRAM CONSTRUCTIONS · P51600048867 · possession Nov 2026 · 88.4% built
- SHREE TIRUMALA MAGNIZENT APARTMENT · NASHIK SHIWAR NASHIKROONGTA HOMES LLP · P51600048872 · possession Dec 2026 · 81.8% built
- Millennium Towers · NashikNasa Construction Pvt Ltd · P51600048892 · possession Mar 2030 · 44.8% built
- SHRIYA RESIDENCY · MAKHAMALABAD NASHIKDHATINGAN ASSOCIATES · P51600048985 · possession May 2025 · 90.9% built
- BHAGIRATH PARK · SR CTS GAT NO 450/1/1 SATPURSHREE CONSTRUCTION · P51600049007 · possession Oct 2026 · 64.7% built
- Snehmai Co Op Housing Society Limited Nashik · In Front of ST WorkshopSnehmai Co Op Housing Society Limited Nashik · P51600049008 · possession Apr 2029 · 40.3% built
- Mahalaxmi City Centre · PanchvatiMetro Properties · P51600049017 · possession Dec 2027 · 35.7% built
- Krushnakunj Apartment · Nivrutti Nagar, Near Jatra Hotel, AdgaonPankaj Chhotulal Patil · P51600049025 · possession Dec 2026 · 89.5% built
- Samruddhi Tower · Canal RoadSamruddhi Infrastructures · P51600049047 · possession Mar 2027 · 69.1% built
- Yashoda Miracle · Rathi AmraiPawar Properties · P51600049152 · possession Mar 2027 · 92.5% built
- SAMARTH HEIGHTS · S.NO 1061/3 (1122) SINNERATUL VILAS KANKATE · P51600049163 · possession Nov 2027 · 72.7% built
- VASANTPUSHPA · INDIRANAGARKTG ASSOCIATES · P51600049199 · possession Dec 2025 · 90.9% built
- SHIVRAM RESIDENCY · PATHARDI NASHIKMAHESHWAR ENTERPRISES · P51600049208 · possession Dec 2024 · 90.9% built
- VRINDAVAN DHAM · NASHIKRAJMUDRA CONSTRUCTIONS · P51600049214 · possession Dec 2028 · 42.4% built
- TRIMBAK SANKUL · DEOLALI SHIVARSARATHI CONSTRUCTION COMPANY · P51600049267 · possession Dec 2026 · 60.9% built
- SHYAM ANAND · MAKHAMALABADHEENA SATISHBHAI CHAVDA · P51600049282 · possession Aug 2025 · 81.8% built
- Ganesha Pride · Lamkhede MalaVardhaman Suvalal Lodha · P51600049402 · possession Dec 2028 · 90.9% built
- MAHADEO SHRUSHTI · NASHIKMAHADEO BUILDCON · P51600049425 · possession Jun 2025 · 82.3% built
- GOVIND VRINDAVAN · KAMATWADAVIVAAN INFRAPROJECT · P51600049476 · possession Jan 2027 · 53.2% built
- SHABINA PARK · NASHIKTAMBOLI BUILDTECH · P51600049527 · possession Jan 2027 · 87.3% built
- JAY PRAKASH CO. HSG. SOCIETY · NASHIK ROADJ B DEVELOPERS · P51600049535 · possession Dec 2025 · 90.9% built
- OM PRIDE · SADGURU NAGAR NASHIK MAHARASHTRATIRUPATI DEVELOPERS · P51600049538 · possession Dec 2026 · 32.7% built
- SUNSHINE ELITE · NASHIKSAI RAM CONSTRUCTION · P51600049584 · possession Dec 2026 · 90.9% built
- CHANDRALEKHA PRIDE · CHETNA NAGGAROM BUILDERS · P51600049591 · possession Feb 2024 · 45.5% built
- SHREE VAIBHAV CLASSIC · RANE NAGARDSJ GROUP · P51600049625 · possession Nov 2025 · 90.9% built
- BRAHMA HEIGHTS · NASHIKR S & CO · P51600049647 · possession Mar 2025 · 67.7% built
- VRAJ WIND SPACE · NASHIK SHIWARVRAJ INFRA SPACE · P51600049738 · possession Dec 2026 · 54.5% built
- SHYAM AURA · NASHIKMADHUBHAI VITHTHALBHAI VAGHELA · P51600049765 · possession Feb 2026 · 44.5% built
- CLASSIC HEIGHTS APARTMENT · MAUJE GANGAPUR SHIWAR NEAR MOTIWALA HOMEOPATHIC MEDICAL COLLAGESINGH CONSTRUCTIONS · P51600049798 · possession Oct 2026 · 90.9% built
- BHOOMI IMPERIA · PATHARDIJAAP BUILDERS & DEVELOPERS · P51600049822 · possession Dec 2026 · 50.9% built
- ASHAPURI GIRIJA · NASHIKEKDANT DEVELOPERS · P51600049826 · possession Jun 2025 · 79.1% built
- NATURES PRIDE · PATHARDI SHIWARCAPSULE CONSTRUCTION LLP · P51600049843 · possession Dec 2028 · 90.9% built
- SHREE GANESHA HEIGHTS · NASHIKYASHVANT ENTERPRISES · P51600049863 · possession Mar 2027 · 90.9% built
- Indu Park · Eknath NagarSONAWANE INFRA · P51600049869 · possession Mar 2026 · 90.9% built
- KALPVAN APARTMENT · RAJIV NAGARBHAGWATI BUILDCON · P51600049893 · possession Dec 2027 · 38.2% built
- SWAPNAPURTI APPARTMENT · SAIKHEDAAVHAD BUILDERS AND DEVELOPERS LIMITED · P51600049930 · possession Dec 2025 · 90.9% built
- Ambika Vrundavan · Amrutdham PanchavatiAmbika Buildcon · P51600049995 · possession Oct 2026 · 72.7% built
- SAI SHRUSHTI · NASHIKSHREE SAI DEVELOPERS · P51600050028 · possession Dec 2027 · 54.1% built
- AMAR SAHAJEEVAN · DHARMAJI COLOLNY SHIVAJI NAGAR NASHIKAMAR BUILDTECH PRIVATE LIMITED · P51600050071 · possession Sept 2026 · 47.7% built
- LATIKA HEIGHTS · MHASRUL SHIWARM/S SHREE SAI CONSTRUCTIONS · P51600050104 · possession Dec 2026 · 72.3% built
- DIVINE RESIDENCY · ZAVERI COLONEYANIKET ANANT PATIL · P51600050105 · possession Dec 2026 · 53.6% built
- PANHALA APARTMENT · INDIRA NAGAR OPP GURU GOVIND SINGH COLLAGENARESH ASHOKRAO BHADAKWADE · P51600050107 · possession Dec 2028 · 40% built · 2 complaints
- MANI VISTA · AdgaonDHARMISHTHA MANISH NARODIA · P51600050114 · possession Dec 2028 · 81.8% built
- Adhish Avenue · Nashik ShiwarShah Estates · P51600050136 · possession Dec 2026 · 81.8% built
- SAI CHHAYA APARTMENT · KALASKAR NAGAR, NEAR TRIKONI BUNGLOWPM BUILDERS AND DEVELOPERS · P51600050145 · possession Mar 2026 · 49.1% built
- KANSARA SHRADDHA APARTMENT · MHASRUL PANCHVATIPRERANA ENTERPRISES · P51600050152 · possession Dec 2028 · 45.5% built
- SHIVGANGA HILLS · PATHARDI NASHIKMAHESHWAR ENTERPRISES · P51600050161 · possession Dec 2024 · 90.9% built
- STAR AVENUE · Ambad NashikNARKHEDE INFRA · P51600050174 · possession Dec 2026 · 56.8% built
- PURPLE AASHRAY APARTMENT · SATPURKIRAN JAYANTIBHAI PATEL · P51600050208 · possession Dec 2025 · 90.9% built
- K K TOWER APARTMENT · Kurdukar Nagar NashikSHANTAI DEVELOPERS · P51600050228 · possession Dec 2029 · 67.7% built
- VISHWA SWARUP HEIGHTS · PATHARDI SHIWARVISHWA CONSTRUCTION · P51600050317 · possession Dec 2026 · 90.9% built
- SHREE MURLIDHAR PARK PHASE I · AT POST GHOTI BKRAJENDRA MADHUKAR KALE · P51600050334 · possession Dec 2026 · 90.9% built
- SULALIT HEIGHTS · MHASRUL SHIWARHARSHAL HANMANTE BUILDERS AND DEVELOPERS PRIVATE LIMITED · P51600050345 · possession Dec 2026 · 90.7% built
- INDRAPRASTHA AVENUE · UNTWADIROYAL BUILDCON · P51600050373 · possession Dec 2028 · 75% built
- Shree Gajanan Residency · Opp. Poddar SchoolNew Shree Pawanputra Developers · P51600050411 · possession Dec 2027 · 106.1% built
- TORNA · ADGAONVASTUSHILP REALTY · P51600050447 · possession Mar 2025 · 81.8% built
- DATTA PREM APARTMENT · JAIL ROAD NASHIK ROAD NASHIKPREMCHAND NIMBAJI PATIL · P51600050475 · possession Aug 2026 · 81.8% built
- Shree Omkar Avenue · Nashik Road EastShree Buildcon & Associates · P51600050493 · possession Aug 2027 · 17.1% built
- SHREE RAM KRUSHNA HEIGHTS · NASHIKKISAN SHIVRAM BALLAL · P51600050495 · possession May 2025 · 56.4% built
- ATMAKRUPA ROW HOUSES · BEHIND BANK OF MAHARASHTRASAGAR GORAKH BAGUL · P51600050552 · possession Jan 2025 · 100% built
- SHRI GANESH APARTMENT · MHASRULANIL HIRALAL BHANDARI · P51600050646 · possession Dec 2025 · 0.9% built
- MADHUCHANDRA HILLS · UNHALE MALASUNRISE DEVELOPERS · P51600050654 · possession Jan 2028 · 27.3% built
- GURUSIDDHI KRUPA · WADALADEVIDAS RAMCHANDRA KULKARNI · P51600050655 · possession Mar 2027 · 75.5% built
- Beta Square · Thatte NagarSubhash Damodar Patil · P51600050709 · possession Dec 2031 · 34.1% built
- Sarathi Heights · SatpurSAKET SANJAY SAYANKAR · P51600050717 · possession Jun 2025 · 76.4% built
- Samruddhi Elite · AnandwalliA K Developers · P51600050718 · possession Dec 2028 · 66.8% built
- Golden Nest · Durga NagarProgressive Builders · P51600050774 · possession Jan 2027 · 79.1% built
- SHEETAL JAL APARTMENT · NASHIKS G BUILDERS · P51600050801 · possession Dec 2026 · 40.9% built
- Laxman Complex · SatpurSanjay Kashinath Sayankar · P51600050810 · possession Dec 2027 · 50.7% built
- Revati Anandvan · AnandwaliRevati Group · P51600050817 · possession Dec 2028 · 69% built
- IMPERIAL HEIGHTS · Mahesh NagarMr. Ashok Uttam Puri and Mrs. Meena Ashok Puri · P51600050834 · possession Dec 2026 · 76.4% built
- SHUBH KALASH APARTMENT · NASHIKSWASTIK ESTATES · P51600050886 · possession Dec 2029 · 81.8% built
- KASTURI SPACE · NASHIKKALPANA HIRAJI PAWAR · P51600050950 · possession Jun 2027 · 47.7% built
- CAPITAL DREAMZ · GUNJALBABA NAGARR B & CO. · P51600050969 · possession Dec 2027 · 55.5% built · 1 complaint
- Ramkrishna Hari Apartment · NashikVishant Vilas Chumbhale · P51600051040 · possession Dec 2026 · 52.3% built
- VEDANT PRASAD APARTMENT · MAUJE SINNAR - 1 SHIWAR DWARKA NAGARGORAKSHANATH DASHRATH MHASKE · P51600051049 · possession Dec 2028 · 90.9% built
- TULSI VASUNDHARA · AMRUTDHAMTULSI DEVELOPERS · P51600051073 · possession Apr 2028 · 36.4% built
- MANSI RESIDENCY · PATHARDI SHIWAR NASHIKSHRADDHA DEVELOPERS · P51600051139 · possession Jun 2025 · 90.9% built
- SHRI KRUSHNA KUNJ TOWER · NASHIKSHANKAR DILIP SURYAWANSHI · P51600051164 · possession Dec 2026 · 61.8% built
- Ashtavinayak Granduer · Serene Meadows, AnandwalliManisha Mahendrakumar Sharma · P51600051234 · possession Dec 2025 · 90.9% built
- ADITI ENCLAVE APARTMENT · SHRAMIK NAGAR SATPURDADA SANTU KANDEKAR · P51600051239 · possession Dec 2027 · 48.2% built
- SHREE GITARJUN · MAKHMALABADINFINIA BUILDCON · P51600051247 · possession Aug 2026 · 40.9% built
- SHREE GOKUL COOP HOUSING SOCIETY LTD · TARWALA NAGARFOURTH DIMENSION DEVELOPERS · P51600051263 · possession Apr 2027 · 100% built
- SUKAN SANKUL · PATHARDI SHIWARSHAILESHKUMAR VITHALBHAI RAKHOLIYA · P51600051291 · possession Mar 2027 · 55.6% built
- The Emerald · PathardiLuxshri Ventures LLP · P51600051297 · possession Dec 2026 · 79.1% built
- Mahalakshmis Divine Heights · Vikas Colony, Radha Nagari, NashikVishal Uttam Rai · P51600051300 · possession Dec 2026 · 81.8% built
- GANESH PRIDE · NASHIKSHRINIVAS BUILDWELL · P51600051301 · possession Dec 2026 · 90.9% built
- QASRUL KHULAFA · NEAR ASHOKA SCHOOLKANAK DEVELOPERS · P51600051303 · possession Apr 2028 · 48.2% built
- Vastu Avenue · Dhruv NagarApurva Builders & Developers · P51600051304 · possession Aug 2026 · 72.7% built
- Padma Vishwa Mangalam · Navshya Ganpati, Sector CMangalmurti Builders · P51600051326 · possession Mar 2026 · 88.6% built
- AARADHYA RESIDENCY PHASE II · NASIKORADA C JAIN BUILDERS AND DEVELOPERS LLP · P51600051353 · possession Dec 2026 · 90.9% built
- SHREE HARI PALACE · ADGAONHASMUKHBHAI JERAMBHAI SUHAGIYA · P51600051414 · possession Dec 2027 · 32.2% built
- BHARDWAJ APARTMENT CO OP HOUSING SOCIETY · GANGAPURKKQ CONSTRUCTIONS LLP · P51600051420 · possession Mar 2027 · 81.8% built
- SHRI LAXMI NARAYAN VILLAS · NARAYAN BAPU NAGAR, JAIL ROAD, NASHIKMadhoor Buildwell Pvt. Ltd. · P51600051490 · possession Dec 2027 · 15.9% built
- Laxmi Heights Apartment · Bankar MalaGopi Kanayalal Allthakkar · P51600051504 · possession Dec 2026 · 77.3% built
- New Pawanputra Business Point · Pathardi Phata NashikNew Shree Riddhi Siddhi Developers · P51600051583 · possession Dec 2026 · 53.9% built
- SHIV HEIGHTS · HIRAWADI PANCHAVATI NASHIKSAI SHRADDHA DEVELOPERS · P51600051591 · possession Mar 2027 · 81.8% built
- Prabhu County · Near Trikoni GardenPacific Builders · P51600051601 · possession Mar 2028 · 65.6% built
- SHIVTEJ ROW HOUSES · CHEHDI BKNILKANTH CONSTRUCTION · P51600051625 · possession Dec 2026 · 54.5% built
- ALPINE · PANCHAVATIPUSHPRIT REALTY · P51600051628 · possession Mar 2028 · 70.2% built
- SHREEJI OVATION · Near R D CircleSHREEJI AND KARE DEVELOPERS · P51600051630 · possession Dec 2026 · 71.8% built
- Aashirwad · Opp. DS Tailors, Patil ColonyMalpure Group · P51600051638 · possession May 2027 · 76.8% built
- SIR VISVESAVARAYA CO OPERATIVE HOUSING SOCIETY · IndiranagarAditya Developers · P51600051710 · possession Dec 2026 · 85.5% built
- Highfield Residency · NashikMARVEL PROPERTIES · P51600051737 · possession Dec 2027 · 59.5% built
- Swaraj 1 and 2 BHK Homes · Behind Bhaji Market, SatpurKothawale Patil Builders And Developers Pvt. Ltd. · P51600051745 · possession Dec 2027 · 46.6% built
- BUSINESS CAPITAL · PANCHAVATIVSR VENTURES · P51600051771 · possession Sept 2026 · 14.5% built
- KAUSHALYA EMPIRE · Aanandwali ShiwarSHREE BALAJI DEVELOPERS · P51600051789 · possession Sept 2026 · 53.2% built
- Shree Ramkrishna Heights · Ashtavinayak Nagar, ChunchaleMukeshbhai Shambhubhai Dalsaniya · P51600051829 · possession Dec 2026 · 68.6% built
- ASTER AVENUE · SHINGADA TALAV, BESIDES JAIN MANDIRKIRTI VENTURES · P51600051869 · possession Dec 2027 · 60% built
- ALEEF BREEZE APARTMENT · SHIWAR NASHIKKHATIB BUILDERS AND DEVELOPERS · P51600051921 · possession Nov 2026 · 83.2% built
- Meghaa Square · Gangapur road, AnandwalliPrakash Raman Chaudhari · P51600051952 · possession Dec 2026 · 42.3% built
- SWASTIK MANGAL APARTMENT · KAMATWADESHREEMANGAL CONSTRUCTION · P51600051953 · possession Mar 2027 · 66.1% built · 4 complaints
- HARIOM ENCLAVE · KSHIRSAGAR COLONYHARIOM GROUP · P51600051993 · possession Mar 2026 · 77.3% built
- SHRIRAM SAHNIWAS · RANE NAGAROJAS PROMOTERS AND BUILDERS · P51600052060 · possession Jun 2028 · 154.5% built
- Narayani Dham · Near Sant Tukaram GardenHemant Ramesh Jadhav · P51600052072 · possession Dec 2028 · 38.6% built
- AKSHAR NISARG · NEAR BHAGWAN BABA NAGARCHAUDHARI BUILDCON · P51600052125 · possession Mar 2027 · 90.9% built
- SHREEMURLIDHAR PARK PHASE II · TAL IGATPURI DIST NASHIKRAJENDRA MADHUKAR KALE · P51600052130 · possession Mar 2027 · 49.5% built
- SHYAM VISTA · WADALA NASHIKSHYAM BUILDCON · P51600052139 · possession May 2025 · 100% built
- SHREE SAI APARTMENT · NASHIKSUNILKUMAR JUGALBHAKT SINGH · P51600052157 · possession Dec 2026 · 100% built
- SHREEMURLIDHAR PARK PHASE IV · TAL IGATPURI DIST NASHIKRAJENDRA MADHUKAR KALE · P51600052171 · possession Mar 2029 · 60% built
- NILKANTH ALPHA · MAKHMALABADNILKANTH BUILD · P51600052183 · possession Dec 2030 · 81.8% built
- SHREE SAMARTH HEIGHTS · NASHIKSHRI SWAMI SAMARTH BUILDERS AND DEVELOPERS · P51600052209 · possession Jun 2025 · 81.8% built
- LIFE 360 · PATHARDI SHIWARVELOCITY INFRA PROJECTS · P51600052232 · possession Dec 2027 · 13.1% built
- RENUKA ELITE APARTMENT · DAMODAR NAGARGOODWILL MAGNET · P51600052360 · possession Mar 2027 · 88.6% built
- Shree Vitthal Towers - Building C and D · NashikroadMr. Shripad Vinayak Thombare and Suyash Construwell Pvt Ltd through Director Sanjay Shantaram Sangle · P51600052363 · possession Dec 2027 · 42.5% built
- Mohan Residency · New Mhasoba Mandir, NashikDayma Builders and Developers · P51600052380 · possession Sept 2026 · 81.8% built
- Daffodil · Off Ganpapur RoadRajendra Harikishan Dhawan · P51600052382 · possession Mar 2026 · 81.8% built
- SURAJ PARK · NASHIKSEVA DEVELOPERS · P51600052435 · possession Jun 2027 · 61.3% built
- Sairaj Sky Pavilion Apartment · MakhmalabadSAIRAJ BUILDERS AND DEVELOPERS · P51600052447 · possession Dec 2027 · 57.3% built
- Rambaug · Kathe Galli, DwarkaMahajan Buildpro LLP · P51600052459 · possession Dec 2029 · 18.5% built
- SHREEJI ELEGANCE · Govind NagarSHREEJI LIFE SPACE · P51600052463 · possession Dec 2026 · 72.3% built
- SHANTIPRASAD CO-OP HOUSING SOCIETY · NEAR GUJRATHI HOSPITALVINAY MAGANLAL KARNAVAT · P51600052466 · possession Dec 2026 · 81.8% built
- Babubhais Krishnakunj · Near Pumping Station, Chavan ColonyVinod Dilipkumar Majithia · P51600052493 · possession Dec 2026 · 36.4% built
- Vastu Shilp · Gangapur Gaon, Gangapur RoadApurva Builders & Developers · P51600052520 · possession Dec 2028 · 41.8% built
- SHASHI SIDDHI ANNEXE · NASHIKSIDDHIVINAYAK ASSOCIATES · P51600052603 · possession Dec 2028 · 55% built · 1 complaint
- HIGHLAND SKY · Adgaon ShiwarALI JANAMUDDIN SIDDIQUI · P51600052632 · possession Jul 2026 · 37.3% built
- The Landmark Apartment · Nashik roadAD ENTERPRISES · P51600052634 · possession May 2028 · 81.8% built
- Atharva Park · Opp. Gomashe Petrol Pump, PathardiDHANESH NARAYAN SARODE · P51600052643 · possession Dec 2026 · 81.8% built
- Kamlaba Business Avenue · Gole ColonyKashibas Infratech · P51600052647 · possession Dec 2025 · 43.6% built
- Gajanan Park phase 3 - Building D · Saraf NagarJaiprasad constructions and developers LLP · P51600052658 · possession Dec 2027 · 90.9% built
- Abhinav · Nashik RoadA C JAIN BUILDERS AND DEVELOPERS LLP · P51600052680 · possession Dec 2026 · 95.5% built
- Reliable Commercial Complex · NashikShree Balaji Developers · P51600052728 · possession Dec 2025 · 72.7% built
- Sai Aanand · B/H Dindori Nagar Panchayat Office, DindoriAshwini Buildcon · P51600052834 · possession Dec 2028 · 71.1% built
- THE PLATINUM MALL BY PARKSYDE · PANCHWATI ANNEXJAIKUMAR CONSTRUCTIONS LTD · P51600052862 · possession May 2028 · 52.7% built
- NAMAVIRA APARTMENT · GOVIND NAGARAASTHA DEVELOPERS · P51600052863 · possession Dec 2026 · 75.5% built
- Katware Business Square · Near Mirchi Hotel SignalKatware Builders & Developers · P51600052878 · possession Jun 2027 · 73.6% built
- AASHRAY RESIDENCY · Raka Colony Sharanpur Road NashikSHRINATH REALTY · P51600052879 · possession Dec 2027 · 79.1% built
- Shilpa Millennium · Canada Corner, NashikShilpa Estate · P51600052884 · possession Sept 2026 · 17.3% built
- CLASSIC PARADISE · NASHIKSINGH CONSTRUCTIONS · P51600052925 · possession Dec 2026 · 88.6% built
- PUSHKRAJ NAKSHATRA · SatpurPUSHKRAJ BUILDCON · P51600052964 · possession Jun 2026 · 81.8% built
- FAIZ-E-RASUL PARK · MADINA NAGARSHAUKATALI ISMAIL GHASWALA · P51600052978 · possession Mar 2028 · 25.7% built
- Malpani Central · Trimurti Chowk, NashikAshish Hemant Malpani · P51600052986 · possession Dec 2028 · 50.5% built
- Akruti Co-operative Housing Society Limited · NashikSPITI CONSTRUCTION PRIVATE LIMITED · P51600052998 · possession May 2026 · 73.6% built
- THE PRIVILEGE HOMES · NASHIKSAYALI SUBHASH KALE · P51600053074 · possession Dec 2027 · 90.9% built
- SHREEJI ELEVATE · RAJIV NAGARSHREEJI LIFE SPACE · P51600053196 · possession Dec 2028 · 55.6% built
- Madhuban · Near panchvati College, Kevadiban, PanchvatiGajra Associates · P51600053205 · possession Dec 2027 · 41.4% built
- SRI SAMARTHA AANGAN · MAUJE MAKHAMALABAD - 2 SHIWAR MAKHAMALABAD PANCHVATI NASHIKSRI SAMARTHA ASSOCIATES · P51600053207 · possession Jun 2027 · 81.8% built
- DATTARAJ APARTMENT · NASHIKB K BUILDERS · P51600053250 · possession Dec 2027 · 90.9% built
- SHREE BALAJI PARK · PATHARDI SHIWARSHREE BALAJI ASSOCIATES · P51600053272 · possession Aug 2027 · 72.7% built
- Shree Eknath Heights · NashikShree Eknath Buildcon · P51600053289 · possession Dec 2027 · 81.8% built
- Muktangan · Opposite Motiwala College, Gangapur RoadVAISHNAV CONSTRUCTIONS · P51600053296 · possession Dec 2027 · 24.5% built
- DATTAPRASAD APARTMENT · MAKHMALABADB K BUILDERS · P51600053319 · possession Dec 2027 · 62.7% built
- The Poetree Villa Resort · Kawanai, IgatpuriShiloh Holiday Homes Hospitalityy LLP · P51600053355 · possession Dec 2030 · 27.3% built
- RAJASHREE ASMITA · NASHIKRAJASHREE ASMITA PROPERTIES · P51600053375 · possession Dec 2027 · 90.9% built
- B SQUARE · DindoriBURAD BUILDCON · P51600053381 · possession Dec 2026 · 9.1% built
- Gurudeep Apartment · NASHIK ROADANUP BUILDCON · P51600053395 · possession Jun 2026 · 84.1% built
- Nirmal Park · Nandanvan LawnsNirmal Samruddhi · P51600053417 · possession Feb 2026 · 86.8% built
- PARAM LUXURIA · BEHIND JAIN MANDIR ADGAONPARAM INFRASPACE · P51600053436 · possession Mar 2026 · 48.2% built
- Vedas Harmony · Kalaskar Nagar, PanchvatiSai Developers · P51600053529 · possession Dec 2026 · 75% built
- SHRI GAJANAN PARK APARTMENT · MAUJE NASHIK CITY 4 SHIWAR CHETNA NAGAR INDIRA NAGARSHRI GAJANAN BUILDERS and DEVELOPERS · P51600053559 · possession Jan 2028 · 90.9% built
- GOVIND RIVERINE · MAKHMALABAD SHIVARGOVIND BHAUSAHEB MADHWAI · P51600053590 · possession Jan 2028 · 30% built
- VRAJ CAPITAL · NEAR SAMARTH HOSPITALKAPILAVASTU CREATORS · P51600053605 · possession Jul 2028 · 45% built
- SAMARTH ANEX · OPP SHELL PETROL PUMPMAHADEV DEVELOPERS · P51600053622 · possession Jun 2028 · 68.2% built
- Mahalaxmi Heights · OjharPrashant Genu Pagar · P51600053630 · possession Jul 2026 · 81.8% built
- SHREE HARIHAR APARTMENT · SAMARTH NAGAR PANCHAVATISHREE REALTORS · P51600053657 · possession Mar 2027 · 90.9% built
- Sai Yamuna Park · Near Ashoka College, Chandshi,SURYA CONSTRUCTION · P51600053678 · possession Dec 2026 · 61.4% built
- DEV DARSHAN HEIGHTS APARTMENT · NEAR SAPNA TALKIESGOODWILL PRIDE · P51600053690 · possession Mar 2027 · 81.8% built
- Fateh Legacy · DwarkaOverseas Fateh Developers LLP · P51600053723 · possession Dec 2027 · 9.1% built
- Harshawardhan Building Number 1 Co Op Hsg Soc Limited Nashik · MADHUBAN COLONYVIPUL DILIP GARJE · P51600053739 · possession Dec 2027 · 53.6% built
- Riverdale Phase I · NashikArpanna Motors Private Limited · P51600053803 · possession Dec 2026 · 24.4% built
- Solitaire · Behind Ayyapa MandirIND DEVELOPERS · P51600053845 · possession Dec 2028 · 60.6% built
- LENKAR S MAJESTIQ · DWARKAKBSL PROPERTIES · P51600053872 · possession Dec 2028 · 71.4% built · 1 complaint
- PRAYAG NAKSHATRA · SAWATA NAGARPRAYAG REALTY · P51600053874 · possession Mar 2029 · 62.7% built
- ICCHAMANI HEIGHTS · BEHIND KK WAGH COLLEGEICCHAMANI BUILDCON · P51600053900 · possession Jul 2027 · 90.9% built
- BALAJI PRESTIGE · RTO OFFICERAHUL POPATRAO KAKULTE · P51600053955 · possession Dec 2026 · 36.4% built
- SIDDHIVINAYAK TOWN SQUARE · MORE NAGARSIDDHIVINAYAK DEVELOPERS · P51600053976 · possession Dec 2027 · 12.7% built
- ASHAPURI AMRAPALI · NASHIKRISHIKESH ANIL WANI · P51600054083 · possession Jun 2028 · 18.6% built
- KESAR CLASSIC · Anand Nagar, Nashik RoadKESAR INFRASPACES LLP · P51600054090 · possession Dec 2025 · 56.8% built
- MITHUN P KANKARIYA AND 3 OTHERS-Kankariyas The Address · Near Water Tank ,Jail RoadRAAS REALTORS · P51600054092 · possession Mar 2027 · 90.9% built
- Ananta Residency · Lonkar MalaInfinity Buildcon · P51600054209 · possession Dec 2026 · 71% built
- AMRAPALI · NashikDEEPAK INFRA AND HOMES PRIVATE LIMITED · P51600054225 · possession Nov 2027 · 32.3% built
- BALAJI BUSINESS CENTER · MHASRUL, NASHIKBAG BUILDCON · P51600054377 · possession Jul 2026 · 59.7% built
- LOTUS HEIGHTS · PANCHAVATI NASHIKJAY AMBE PROPERTIES · P51600054441 · possession Dec 2029 · 38.2% built
- Divyadarshan Co-operative Housing Society Ltd · Vise MalaSAI VAISHNAVI BUILDCON · P51600054503 · possession Jun 2027 · 60% built
- Neelkamal Sarita Phase 3 · Next to Unnati SchoolShree Neelkamal Housing & Infrastructure · P51600054554 · possession Dec 2026 · 10.1% built
- Palm Hills 02 · GondedumalaSARVPPRATHAM DEVELOPERS PVT. LTD.. · P51600054597 · possession Dec 2026 · 59.7% built
- RAUNAK VIVANTA · RAMDAS SWAMI NAGAR AGARTAKLI SHIVAR UPNAGARKGR DEVELOPERS · P51600054634 · possession Nov 2028 · 51.8% built
- MUKUND CO-OP HOUSING SOCIETY · NASHIK ROADSAMRAT BUILDCON · P51600054653 · possession Dec 2026 · 54.5% built
- VINAYAK RESIDENCY · Adgaon ShiwarAkshat Developers and Construction Company · P51600054654 · possession Mar 2027 · 90.9% built
- Ashiyana Luxuria · Ashoka MargBrijwasi Infratech · P51600054655 · possession Dec 2028 · 90.9% built
- KALAPURNAM PARK PHASE 2 · Within Cantonment limits of Deolali cantonment boardDINKAR MURLIDHAR PALDE · P51600054659 · possession Sept 2028 · 16.1% built
- ASPIRE BUSINESS POINT · Mhasrul Shiwar NashikSHIV DEVELOPERS · P51600054675 · possession Dec 2026 · 74.1% built
- SHREE SADGURU KRUPA HEIGHTS · Gangapur ShiwarSHREE SADGURU KRUPA CONSTRUCTION · P51600054680 · possession Dec 2026 · 81.8% built
- Laxminarayan Heaven · Warkarai Chowk, Opposite SSK World Club, PathardiSahajanand Builders And Developers · P51600054919 · possession Dec 2028 · 55% built
- Rass Residency - Building A · Opposite Passport Office, Nashik RoadRass Developers · P51600054924 · possession Dec 2026 · 90.9% built
- PARADISE GARDENS C WING · NASHIKSUHAIL UMAR SHAIKH · P51600054966 · possession Dec 2026 · 73.2% built
- TANISHQ PARK RESIDENCY · NASHIK ROADMITTAL BUILDCON · P51600055027 · possession Dec 2027 · 68% built
- LATAVISHWA · NASHIKSHREE DEVELOPERS · P51600055063 · possession Dec 2026 · 36.4% built
- TABEER VISTA · WADALATABEER PROPERTIES · P51600055175 · possession Dec 2026 · 67.3% built
- RAUNAKK HEIGHTS · CHAPPRU SOCIETY BEHIND UTSAV MANGAL KARYALIYA NASHIK ROADKMR BUILDERS & ASSOCIATES · P51600055194 · possession Dec 2028 · 89.1% built
- Surya Heights · Pingale Colony, MakhmalabadBhavani Constructions · P51600055295 · possession Dec 2028 · 58.2% built
- Primrose Residency · Jail Road, DasakBhumit Real Estate Private Limited · P51600055296 · possession Dec 2027 · 56.8% built
- QASRUL KHULAFA 3 · NashikMakani Buildcon · P51600055345 · possession Dec 2027 · 46.4% built
- MORYA PRIDE · SUCHITA NAGARMORYA BUILDRS AND DEVELOPERS · P51600055378 · possession Dec 2027 · 90.9% built
- SYMPHONY CO-OP HOUSING SOCIETY · DHONGADE MALAJ B CONSTRUCTION · P51600055437 · possession Dec 2026 · 67.7% built
- Advait · Hirawadi, PanchvatiANANDA DEVELOPERS · P51600055487 · possession Dec 2028 · 27.3% built
- VEDANT AANANDVAN · PRAKASH NAGARGORAKSHNATH DASHRATH MHASKE · P51600055491 · possession Dec 2029 · 30.5% built
- Chintamani Elite · SoygaonAnup Ramanlal Pahade · P51600055501 · possession Jan 2027 · 80.9% built
- SAPTASHRUNGI POOJA · PATHARDI PHATASAPTASHRUNGI DEVELOPERS · P51600055593 · possession Dec 2028 · 54.5% built
- HARI KUNJ HEIGHTS APARTMENT · NEAR WASAN NAGARGOODWILL REALTORS · P51600055600 · possession Mar 2027 · 40% built
- UNIVERSAL PRIDE · OZARUNIVERSAL BUILDCON · P51600055655 · possession Dec 2027 · 47.3% built
- AJANTA NAGARI CO OP HSG SOCIETY · NASHIK ROADKHILENDRA DILIP KUMAR MOHABIYA · P51600055674 · possession Aug 2026 · 74.1% built
- PARAMESHWARAM RESIDENCY · DEOLALI GAONVASUDEVAY BUILDERS & DEVELOPERS · P51600055693 · possession Dec 2028 · 28.2% built
- NIRMITI GLORY · VIR SAVARKAR NAGARNIRMITI BUILDERS AND DEVELOPERS · P51600055796 · possession Dec 2027 · 35.7% built