Nashik
- SHILP MERIDIAN · JAIL ROADHEMANT DATTATRAYA GAIKWAD · P51600055808 · possession Mar 2028 · 67.3% built
- MANGALMURTI PARK · Karna Nagar, Opposite RTO OfficeSAVITA MOHAN SANGLE · P51600055854 · possession Mar 2028 · 57.3% built
- Istana · Village GirnareWATERSTONE LLP · P51600055869 · possession Dec 2027 · 47.6% built
- Sarode Park Phase 1 - Building No. A · Behind Mhada Building, PathardiNarayan Labhu Sarode · P51600055886 · possession Dec 2026 · 54.5% built
- Racca Legacy · Near Racca Garden, Racca ColonyPoonam Shrenik Surana · P51600055900 · possession Dec 2026 · 60% built
- MAA KARNI KRUPA SUREKHA HEIGHTS · MAUJE MAKHMALABAD - 2 SHIWAR MAKHMALABAD PANCHVATI NASHIKSHREE RADHEY GROUP · P51600055903 · possession Dec 2026 · 60% built
- Feriha Heights · Wadala, ShiwarAroma Developers · P51600055909 · possession Mar 2027 · 49.1% built
- SHIV EMPIRE · PANCHAK SHIWARLandmark infra · P51600055916 · possession Dec 2027 · 27.3% built
- TANISHQ PARK ROYALS · Near Taran TalavM S BUILDERS & DEVELOPERS · P51600055929 · possession Dec 2026 · 47.3% built
- SAHAJ APARTMENT · NEAR MIRA KRUSHNA TEMPLE, BEHIND K. K. WAGH COLLEGESANKHLA BUILDCON · P51600055975 · possession Mar 2027 · 60% built
- ASHAPURI KALPTARU · AYODHYA NAGARIASHAPURI CONSTRUCTIONS · P51600056070 · possession Dec 2026 · 32.7% built
- C.M.R LEGACY APARTMENT · GANGAPUR ROADMERIDIEN REALTY · P51600056083 · possession Dec 2027 · 16.8% built
- Orchid Park · Rasbihari Link RoadRajashree Developers · P51600056087 · possession Dec 2026 · 74.1% built
- Ashapuri Pride · Pathardi RoadShree Developers · P51600056102 · possession Dec 2026 · 72.7% built
- BHAWANI HEIGHTS · PATHARDI PHAYAPUNDALIK MAHADU JADHAV · P51600056129 · possession Dec 2027 · 62.7% built
- RAGRANG CO-OP HOUSING SOCIETY LTD · SAUBHAGYA NAGARNice Home · P51600056131 · possession Jul 2028 · 62.7% built
- DAKSH TRIVERRA · Pramod Mahajan UdhyanDAKSH REALTY · P51600056133 · possession Mar 2030 · 40.9% built
- RAVIRAJ HEIGHTS APARTMENT · MAUJE PIMPALGAON BAHULA SHIWARSAI BUILDCON · P51600056139 · possession Oct 2032 · 46.8% built
- SHREE GANESH EMPIRE · Near Hutama SmarkSHREE GANESH CONSTRUCTION · P51600056157 · possession Dec 2032 · 64.1% built
- Sara Annexe · Jail Road, Nashik RoadN M Pekhale Infra Private Limited · P51600056167 · possession Dec 2028 · 41.4% built
- YAMUNA HEIGHTS · NASHIK RAODKIRAN DINKAR KHARJUL · P51600056258 · possession Dec 2028 · 36.9% built
- VRAJ SAMARTH SKY · RASBIHARI SCHOOLDHAIRYA DEVELOPERS · P51600056280 · possession Jan 2029 · 47.3% built · 1 complaint
- GEMINI HEIGHTS V · DHONGADE NAGAR MAUJE PATHARDI SHIWARVIKAS SRI DUTT SHARMA GEMINI · P51600056314 · possession Dec 2029 · 33.6% built
- Gajra Vrindavan Krishna Apartments · PathardiGAJRA INFRA PRIVATE LIMITED · P51600056354 · possession Dec 2026 · 64.5% built
- Gajra Vrindavan Radha Apartments · PathardiGAJRA INFRA PRIVATE LIMITED · P51600056391 · possession Dec 2026 · 45.5% built
- Siyaram Avenues · NashikAmrut Lifespaces · P51600056452 · possession Dec 2026 · 74.8% built
- RUSHIRAJ HIGHLANDS APARTMENT · Datta Chowk Gangapur Road NashikJHALA INFRATECH · P51600056460 · possession Mar 2029 · 23.2% built
- SHRI URJA NEST · ICHHAMANI NAGAR BEHIND GARDEN COUNTYASHAPURA INFRA · P51600056483 · possession Mar 2027 · 45.5% built
- GOVIND RIVERINE C WING · MAKHMALABAD SHIVARGOVIND BHAUSAHEB MADHWAI · P51600056504 · possession Jan 2028 · 27.3% built
- Shree Ganesh Fortune · Aanandwali NashikPrakash Raman Chaudhari · P51600076611 · possession May 2027 · 48.6% built
- Balaji Palladium · Besides Hotel Surbhi, Gadkari ChowkBalaji Buildcon · P51600076643 · possession Dec 2028 · 19.3% built
- SAAKAR AVENUE · PATHARDI PHATAGALAXY BUILDCON · P51600076680 · possession Dec 2026 · 90.9% built
- MOINODDIN HASAN TOWER · NEAR JMCT COLLAGEPARVIN GAMIR SHAIKH · P51600076687 · possession Aug 2027 · 66.8% built
- 24 Gems · Wazare NagarT M Estates LLP · P51600076779 · possession Dec 2026 · 77.3% built
- PANDAV DARSHAN APARTMENT · PATHARDI PHATASAHYADRI BUILDCON · P51600076797 · possession Dec 2027 · 90.9% built
- The River · Near Bendkule Nagar, AnandwalliSurana Fortune Realtors · P51600076804 · possession Dec 2029 · 23.5% built
- OMKAR PRIDE · Opposite Bhikusa Paper Mill, Hirawadi Road, NashikOMKAR ASSOCIATES · P51600076837 · possession Feb 2029 · 23.6% built
- Vighnahar Apartment · Behind Panchkrushna Lawns, Konark Nagar, AdgaonAkash Developers · P51600076907 · possession Dec 2028 · 37.7% built
- VIHAN GLORY · KAILASH NAGARBAPARAM DEVELOPERS · P51600076910 · possession Mar 2027 · 39.1% built
- Sakar Imperia · Near Roongta Bellisimo, Vrundavan NagarDhwani Developers · P51600077009 · possession Dec 2028 · 38.2% built
- SAPTASHRUNGI HEIGHTS · KAILASH NAGAR, NEAR MIRCHI HOTELSHREE SAPTASHRUNGI CONSTRUCTIONS · P51600077016 · possession Mar 2027 · 70% built
- SHRI BALAJI HEIGHTS · SATANA CITY SATANA BAGLAN NASHIKSHRI BALAJI DEVELOPERS · P51600077019 · possession Jul 2027 · 75.5% built
- Neelam Srushti · Behind Nyra Petrol Pump, MhasrulNeelam Builders And Developers · P51600077022 · possession Dec 2027 · 60.5% built
- BEL AIR · NASHIKA C JAIN BUILDERS AND DEVELOPERS LLP · P51600077025 · possession Dec 2030 · 33.9% built
- ASHTAVINAYAK HEIGHTS · VRUNDAVAN NAGARASHTAVINAYAK BUILDERS AND DEVELOPERS · P51600077045 · possession Mar 2027 · 100% built
- SANGAMNERE COMPLEX · WATER TANKVISHAL BUILDERS AND DEVELOPERS · P51600077046 · possession Dec 2028 · 77.3% built
- Vandana Gauri Co-operative Housing Society Ltd. Nashik · Opposite Tarwala Nagar Garden, Tarwala Nagar, PanchvatiSkyline Builders · P51600077091 · possession Dec 2027 · 72.7% built
- VIVANTA SQUARE · Opposite Metro ZoneBIRARI INFRACON · P51600077111 · possession May 2027 · 71.3% built
- SHREE SADGURU VINAYAK COMMERCIAL COMPLEX · ASHOK STAMBSHRI SADGURU ASSOCIATES · P51600077144 · possession Mar 2028 · 70.9% built
- Olympus · Bendkule NagarOlympus Builders And Developers · P51600077170 · possession Mar 2029 · 40.5% built
- SHREE PADMARAJ RESIDENCY · BEHIND VIJAY MAMTA CINEMAS, WADALA, NASHIKSHREEKAR CONSTRUCTION · P51600077176 · possession Apr 2028 · 45.9% built
- RAJASHREE PRIDE APARTMENT · MAHALAXMI NAGAR MIDC AMBADNEW RAJASHREE PROPERTIES · P51600077182 · possession Dec 2028 · 55.5% built
- SHANTI KIRAN APARTMENT · PATHARDI PHATASAHYOG VASTU UDYOG · P51600077226 · possession Dec 2027 · 163.6% built
- Manikkrupa Co-operative Housing Society Limited Nashik · SHAKTI NAGAR, PANCHVATISiddhaganesh Builders And Developers · P51600077245 · possession Dec 2027 · 43.1% built
- SNEHANKIT · NASHIKANIL SHANTARAM AMRUTKAR · P51600077333 · possession Jun 2027 · 81.8% built
- SUBHASHREE CO OP HSG SOC · DWARKALAXMI BUILDCRAFTS · P51600077365 · possession Mar 2027 · 40% built
- LOTUS PARK · SIDDHIVINAYAK NAGAR, OPP. PAWAR LAWNSSHREE PANCHMUKHI DEVELOPERS · P51600077404 · possession Mar 2027 · 33.6% built
- THREE LEAVES PHASE THREE · GOVIND NAGAR NASHIKDEEPAK INFRA AND HOMES PRIVATE LIMITED · P51600077479 · possession Dec 2030 · 44.5% built
- Morya Park · Ambad Khurd ShiwarRavindra Developers Private Limited · P51600077536 · possession Mar 2028 · 28.2% built
- Shree Ganesh Vista · Holaram ColonySonali Realty · P51600077544 · possession Dec 2027 · 56.8% built
- Bait E Muhammad Phase 1 · RAHMAT NAGAR, OPP. VITTHAL RUKMINI TEMPLE, WADALAOnyx Constructions · P51600077618 · possession Dec 2029 · 50.9% built · 1 complaint
- SAI KUBER PROJECT · DESHWANDISAI KUBER BUILDERS AND DEVELOPERS · P51600077676 · possession Dec 2026 · 33.6% built
- PAVANSUT PRIDE · PATHARDI PHATAPAWANSUT DEVELOPERS · P51600077772 · possession Mar 2028 · 80.9% built
- Shree Ganesh Heights · Pathardi ShiwarSAI PRASAD BUILDERS AND DEVELOPERS · P51600077829 · possession Dec 2026 · 69.1% built
- GURUKUL PLAZA · PATHARDI SHIWARMODKESHWAR DEVELOPERS · P51600077865 · possession Dec 2027 · 20% built
- KRUSHNA VIJAY HEIGHTS · NASHIKShree Sarvadnya Builders and Developers · P51600077867 · possession Feb 2028 · 67.3% built
- Shri Krushnakunj Co Operative Housing Society · NashikShree Builders and Developers Nsk · P51600077937 · possession Dec 2027 · 59.1% built
- Shankheshwar Ro-Bunglows · VaniS. S. Creation · P51600077963 · possession Dec 2026 · 58.2% built
- Meru Heritage · VihitgaonAmit Builders and Developers · P51600078175 · possession Dec 2027 · 35.6% built
- AKASH EMPIRE · MUMBAI NAKADEEP CONSTRUCTION BUILDERS & DEVELOPERS · P51600078187 · possession Dec 2031 · 30.5% built
- SITAI HEIGHTS 2 · MOUJE NASHIK SHIWARRUDRA INFRA · P51600078196 · possession Dec 2028 · 61.8% built
- Shree Govind Residency · Aditya Nagar, Near Supreme HospitalShree Shyam Developers · P51600078235 · possession Dec 2026 · 69.1% built
- Shubham Enclave · Behind Motiwala medical College, Dhruv NagarManda Bhimrao Patekar · P51600078252 · possession Dec 2026 · 63.6% built
- Padmanabhan Heights · Bendkule NagarEkdanta Realtors · P51600078286 · possession Dec 2026 · 83.6% built
- Vrindavan Heights · Kathegalli NashikRavindra Rangrao Mistry · P51600078383 · possession Dec 2028 · 42.7% built
- SERENE MEADOWS · SHRI KRISHNA NAGARBhushan Laxmanrao Thangan · P51600078384 · possession Dec 2027 · 43.6% built
- GURU TIRTH APARTMENT · NASHIKANUP BUILDERS & DEVELOPERS · P51600078526 · possession Sept 2029 · 172.7% built
- Raghuveer Park · Nashik RoadRNK Landmarks LLP · P51600078540 · possession Dec 2027 · 21.8% built
- HILL TOP HEIGHTS APARTMENT · DEOLALI SHIWARDHRUVIKA DEVELOPERS · P51600078566 · possession Mar 2027 · 65.5% built
- OM SAI HAIGHT · NASHIKKANHAIYA REALTY · P51600078569 · possession Jun 2029 · 66.4% built
- Saptrang Co-operative Housing Society Limited · Patil LaneSaptrang Co op Housing Society Limited · P51600078726 · possession Oct 2027 · 50% built
- Gajanan Nest - Wing A,B,C · near jagannath mandirJaiprasad constructions and developers LLP · P51600078766 · possession Dec 2031 · 46.6% built
- UNITY TOWER · NashikUNITY CONSTRUCTIONS · P51600078784 · possession Dec 2027 · 54.1% built
- SHREE SAI PALACE · NASHIK SHIWARSHREE SAI BUILDCON · P51600078798 · possession Dec 2027 · 31.5% built
- Palm Hills 03 · GondedumalaSarvppratham Developers Private Limited · P51600078869 · possession Dec 2027 · 48.9% built
- SAMRUDDHI VILLA · NASHIKSANSKAR BUILDERS AND DEVELOPERS · P51600078888 · possession Mar 2026 · 74.5% built
- SIDDHARTH BLOSSOM · AMBAD KHURD NASHIKRAJMOHINI ASSOCIATES · P51600079006 · possession Nov 2027 · 48.5% built
- SEVEN COLORS · NASHIKSEVEN COLORS · P51600079024 · possession Jun 2028 · 28.2% built
- SHREE TRAMBAKRAJ HILLS · NASHIKSHREE BUILDCON · P51600079066 · possession Mar 2028 · 61.8% built
- SUDARSHAN EMPIRE · DasakSUDARSHAN KERU SANGALE · P51600079093 · possession Nov 2029 · 43.6% built
- SKY53 · AnandvalliSKY53 · P51600079201 · possession Jun 2027 · 36.9% built
- Shiv - Maa Bhagwati Park · MakhmalabadShivurja Builders Private Limited · P51600079348 · possession Mar 2029 · 87.3% built
- LAXMIPRABHA AND LAXMICHAYA · MAKHMALABAD SHIWAR, PETH ROADSOHAM CONSTRUCTIONS · P51600079363 · possession Dec 2028 · 48.6% built
- ATHARVA SKY PARK · Opposite Misal Katta Hotel, Adgaon, PanchvatiSIDDHIVINAYAK BUILDTECH · P51600079374 · possession Dec 2029 · 45.7% built
- ELICA DELIGHT · NASHIKELICA CONSTRUCTION · P51600079407 · possession Dec 2032 · 28.2% built
- YAMUNA PARK · BHAGURYAMUNA GREENS BUILDCON · P51600079414 · possession Dec 2028 · 33% built
- SIDDHIVINAYAK TOWER APARTMENT · NEAR SAHYADRI UDYANSANDHYA PATIL · P51600079445 · possession Sept 2028 · 19.1% built
- SAMARTHA MALHAR · VADNER DUMALACHANDRAKANT RAMKRISHNA GODSE · P51600079462 · possession Dec 2030 · 35% built
- Shree Shrimant Legacy · College Road, Opposite BYK College, NashikRohan Enterprises · P51600079585 · possession Dec 2027 · 77.7% built
- Saptashrungi Annex · Mhasrul ShiwarSeven Peaks Constructions · P51600079602 · possession Oct 2027 · 71.8% built
- Komal Galaxy · Peth naka, PanchavatiKishan Holaram Adwani · P51600079632 · possession Jun 2027 · 41.8% built
- Ayodhya Central Park · Near Muktidham Temple, Bytco PointHarak Patil Buildcon · P51600079639 · possession Dec 2029 · 9.1% built
- Abhirang Tower · MakhamalabadShreeabhirang Builders and Developers · P51600079645 · possession Dec 2030 · 62.7% built
- Green Apple · Jayshankar Chowk, Kathe GalliMurli Construction · P51600079653 · possession Dec 2027 · 37.3% built
- Vedraj Bliss · NashikVedraj Multi Services · P51600079670 · possession Dec 2027 · 49.1% built
- Sai Vihang Co Operative Housing Society Ltd. Nashik · Parijat Nagar,Maitri Developers · P51600079731 · possession Dec 2028 · 27.3% built
- VIGHNAHARTA APARTMENT · PALSEASHTAVINAYAK CONSTRUCTION · P51600079738 · possession Dec 2027 · 56.4% built
- KALANIKETAN PRIDE · Wadala ShiwarELICA BUILDERS · P51600079864 · possession Jul 2027 · 79.1% built
- SHIVMANAS ROW BUNGALOW · TRIMBAKESHWAR, NASHIKROSES AND ROCKS INFRA PRIVATE LIMITED · P51600079948 · possession Dec 2026 · 22.1% built
- Snehankita Society · NashikShree Builders and Developers NX · P51600080006 · possession Jan 2029 · 40% built
- SHREE GANESH ROW BUNGALOWS · SATPUR SHIWARG P ASSOCIATES · P51600080152 · possession Sept 2027 · 72.7% built
- SHREEPANDURANG APARTMENT · UTTARA NAGARSWAMI CONSTRUCTIONS · P51600080259 · possession Mar 2029 · 52.7% built
- VRAJ MURLI APARTMENT · Nashik shiwarVRAJ DEVELOPERS · P51600080350 · possession Dec 2029 · 51.4% built
- Gulafsha Tower · Mumbai NakaMoinuddin Hasan Construction · P51600080390 · possession Dec 2027 · 54.5% built
- STAR APEX · GOVIND NAGARDEEPAK INFRA AND HOMES PRIVATE LIMITED · P51600080393 · possession Dec 2030 · 14.5% built
- INDO ASIAN SIGNATURE · MAUJE, TALEGOANINDO ASIAN BUILDCON PRIVATE LIMITED · P51600080423 · possession Mar 2030 · 12.2% built
- YUVRAJ AND VIJAY ARISE · NASHIKYUVRAJ & VIJAY INFRA DEVELOPERS · P51600080428 · possession Jul 2027 · 75% built
- SHREE GANESH GREENS · PATHARDI PHATASHRINIVAS BUILDWELL · P51600080460 · possession Mar 2028 · 46.4% built
- Vijay Sanskruti · Saykheda RoadVRV Construction · P51600080504 · possession Dec 2026 · 65.5% built
- SHREE PLATINUM HEIGHTS · NASHIKSHREE DEVELOPERS · P51600080505 · possession Mar 2028 · 58.8% built
- VARAD HEIGHTS · NASHIK ROAD EASTVarad Associates · P51600080577 · possession Mar 2029 · 46.4% built
- Rosewood - I J and K Wing · Shree Venkatesh NagarIshanya Buildcon · P51600080593 · possession Dec 2031 · 9.1% built
- Bachhav Empire · MalegaonAbhijit Ashok Soygaonkar · P51600080605 · possession Mar 2029 · 27.3% built
- AVDHOOT APARTMENT · OPP GANESH MAHADEO MANDIR JIJAMATA COLONY DHRUVA NAGAR GANGAPUR NASHIKRAJENDRA BUILDERS and DEVELOPERS (PROP RAJENDRA PANDIT SONAJE) · P51600080729 · possession Mar 2029 · 40.9% built
- SUNRISE SUMMIT · BEHIND YAMAHA SHOWROOM NASHIKSAWANT INFRA PROJECTS · P51600080769 · possession Mar 2027 · 59.8% built
- RAJASHREE SIDDHIVINAYAK · KAMATWADENANDINI UDAY KOTHAWADE · P51600080837 · possession Mar 2028 · 26.4% built
- Prakash Chhaya Apartment · Upnagar, NashikDhruved Construction · P51600080875 · possession May 2027 · 19.1% built
- Govind Elite · Pathardi PhataLadani Developers · P51600080927 · possession Nov 2028 · 48.2% built
- MORESHWAR HEIGHT · MAKHMALABADJIJAI DEVELOPERS · P51600080940 · possession Mar 2029 · 68.2% built
- Shree Eknath Kunj · Sai Shrusti NagarShree Eknath Buildmat · P51600081051 · possession Dec 2029 · 45.5% built
SINNAR
Thane
- MAYFAIR VISHWARAJA · Near Ganesh MandirMAYFAIR HOUSING PRIVATE LIMITED · P51700000001 · possession Jun 2018 · 90.9% built
- UNNATHI WOODS PHASE VII A · ThaneUNNATHI ESTATES · P51700000002 · possession Dec 2025 · 90.9% built · 5 complaints
- THE PALMS · ThaneMETRO DEVELOPMENT · P51700000006 · possession Mar 2019 · 91.5% built
- N G Silver Spring · ThaneRNA Builders (NG) · P51700000009 · possession Dec 2018 · 90.9% built · 1 complaint
- THE WHITE VILLAS · THANESt. Angelo's VNCT Ventures Pvt. Ltd. · P51700000038 · possession Dec 2026 · 58% built
- GOLDSTAR DECENT HOMES · ThaneGOLDSTAR SANKALP CONSTRUCTION · P51700000053 · possession Dec 2019 · 82.9% built
- TULSI AAHAN · AmbarnathRAJ GROUP · P51700000064 · possession Dec 2019 · 73.9% built
- NG GRAND PLAZA PHASE I · ThaneOM NAMAH SHIVAY DEVELOPERS PRIVATE LIMITED · P51700000068 · possession Dec 2019 · 54.8% built
- Juhi Serenity · ThaneVijaykumar Baldev Bajaj · P51700000074 · possession Dec 2023 · 100% built
- Eagleton · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000089 · possession Dec 2022 · 90.9% built
- Hampton · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000091 · possession Dec 2022 · 90.9% built
- Evergreen Heights · ThaneVijay Vasudev Wadhwa · P51700000095 · possession Dec 2018 · 100% built · 6 complaints
- Bharat Ecovistas Phase II · Shilphata Junction, ThaneBHARAT REALTY VENTURE PRIVATE LIMITED · P51700000111 · possession Dec 2023 · 95.5% built · 10 complaints
- Barrington · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000117 · possession Dec 2022 · 90.9% built
- Godrej Emerald Thane · ThaneGodrej Greenview Housing Private Limited · P51700000120 · possession Jun 2026 · 99.6% built · 29 complaints
- PALAVA LAGOONA A TO F · KalyanPalava Dwellers Private Limited · P51700000124 · possession Jun 2018 · 78.2% built · 2 complaints
- PALAVA - ELITE - A to J · KalyanPalava Dwellers Private Limited · P51700000125 · possession Jan 2018 · 78.2% built · 3 complaints
- Clifton · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000129 · possession Dec 2022 · 90.9% built · 1 complaint
- Preston · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000139 · possession Dec 2022 · 90.9% built
- PALAVA - UNO H - O · KalyanPalava Dwellers Private Limited · P51700000142 · possession Dec 2017 · 78.2% built · 4 complaints
- Willowcrest · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000146 · possession Dec 2022 · 90.9% built
- SHREE SAI LEELA · AmbarnathSHREE SAI BUILDERS & DEVELOPERS · P51700000149 · possession Jun 2018 · 81.8% built
- Fairway · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000152 · possession Dec 2022 · 90.9% built
- Cloverdale · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000153 · possession Dec 2022 · 90.9% built
- NILOY · AmbarnathSHREE SAI BUILDERS & DEVELOPERS · P51700000166 · possession Dec 2019 · 81.8% built
- Solus · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000193 · possession Dec 2024 · 90.9% built
- Solitaire B · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000197 · possession Dec 2024 · 90.9% built
- LODHA SPLENDORA PLATINO E TO G , VIVANT A TO D · ThaneLODHA DEVELOPERS LIMITED · P51700000199 · possession Jun 2019 · 78.2% built · 14 complaints
- SHREE SAI PANACHE · AmbarnathGYANDEV BUILDERS & DEVELOPERS · P51700000216 · possession Dec 2020 · 81.8% built
- BRITTO HOUSE · AmbarnathSHREE SAI BUILDERS & DEVELOPERS · P51700000235 · possession Dec 2018 · 81.8% built
- LODHA SPLENDORA - PLATINO - B · ThaneLODHA DEVELOPERS LIMITED · P51700000258 · possession Mar 2019 · 81.8% built
- PALAVA - PASEO - D to H · KalyanPalava Dwellers Private Limited · P51700000269 · possession Jun 2018 · 81.3% built · 1 complaint
- Serein Phase 1 · ThaneARDENT PROPERTIES PRIVATE LIMITED · P51700000295 · possession Mar 2023 · 100% built · 19 complaints
- Obelia B · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000304 · possession Dec 2022 · 100% built
- Amantra Phase 2 · BhiwandiTATA HOUSING DEVELOPMENT COMPANY LIMITED · P51700000308 · possession Mar 2018 · 100% built · 14 complaints
- Obelia A · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000315 · possession Dec 2022 · 100% built
- N G CANARY · ThaneRNA Builders (NG) · P51700000320 · possession Dec 2019 · 39.1% built
- Omkar Heights · MandaSwati Enterprises · P51700000327 · possession Dec 2017 · 90.9% built
- PALAVA VIENTO A to D · KalyanPalava Dwellers Private Limited · P51700000342 · possession Mar 2018 · 81.8% built · 3 complaints
- PATEL PLANET - JUPITER · AmbarnathDHANLAXMI DEVELOPERS · P51700000352 · possession Jul 2018 · 51.8% built
- Hubtown Greenwoods E Wing · ThaneHubtown Limited · P51700000358 · possession Jan 2021 · 81.7% built
- Hubtown Greenwoods A wing · ThaneHubtown Limited · P51700000365 · possession Sept 2018 · 87% built
- Panvelkar Estate - Stanford - Phase 1 · AmbarnathPanvelkar Infrastructures Private Limited · P51700000366 · possession Dec 2019 · 83% built
- Hubtown Greenwoods D Wing · ThaneHubtown Limited · P51700000369 · possession Jan 2021 · 90.9% built · 2 complaints
- Palava Cielo A - F · KalyanPalava Dwellers Private Limited · P51700000378 · possession Dec 2018 · 81.8% built · 2 complaints
- PALAVA LAKESIDE A to H · KalyanPalava Dwellers Private Limited · P51700000384 · possession Jul 2018 · 78.2% built · 10 complaints
- PALAVA ELITE K TO T · KalyanPalava Dwellers Private Limited · P51700000389 · possession Jul 2018 · 78.2% built · 10 complaints
- PALAVA REGALIA A to F · KalyanPalava Dwellers Private Limited · P51700000390 · possession Dec 2018 · 78.2% built · 2 complaints
- PALAVA PRIMIA E to J · KalyanPalava Dwellers Private Limited · P51700000391 · possession Feb 2019 · 78.2% built
- PALAVA VISTA A to D · KalyanPalava Dwellers Private Limited · P51700000395 · possession Apr 2018 · 81.8% built · 2 complaints
- PALAVA LAKESIDE I TO O · KalyanPalava Dwellers Private Limited · P51700000410 · possession Jan 2018 · 78.2% built · 5 complaints
- Solitaire C · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000413 · possession Dec 2024 · 90.9% built
- PALAVA EVIVA K to T, URBANO A, B, C and F, URBANO I to T · KalyanLodha Developers Limited · P51700000419 · possession Jun 2019 · 78.2% built · 4 complaints
- Palava Clara J-M · KalyanLodha Developers Limited · P51700000420 · possession Oct 2022 · 81.8% built · 2 complaints
- FORTUNA B · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000427 · possession Dec 2019 · 100% built
- Panvelkar Estate - Rockford · AmbarnathVijay Ramchandra Panvelkar · P51700000431 · possession Dec 2019 · 72.7% built
- SHANKHESHWAR PLATINUM-PHASE 1 · KalyanSHANKHESHWAR KREATERS · P51700000445 · possession Mar 2019 · 90.9% built
- PALAVA CLARA A to D, D1 · KalyanLodha Developers Limited · P51700000448 · possession Feb 2022 · 81.8% built · 5 complaints
- SAI SHRUSHTI HEIGHTS-B4 · ThaneSAI SHRUSHTI ENTERPRISES · P51700000450 · possession Dec 2018 · 63.6% built
- AMBER VISTA · KalyanGURUKRUPA ENTERPRISES · P51700000456 · possession Jul 2024 · 90.9% built
- SHANKHESHWAR CRYSTAL-PHASE 1 · TitwalaSHANKHESHWAR KREATERS · P51700000463 · possession Dec 2018 · 90.9% built
- Haware Pinnacle · BhiwandiSuresh Kashinath Haware · P51700000464 · possession Sept 2020 · 78.2% built
- FONTANA A ,B, I and J · KalyanPalava Dwellers Private Limited · P51700000506 · possession Dec 2022 · 81.8% built · 2 complaints
- MARATHON NEXWORLD AURA-2 · ThaneMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · P51700000507 · possession Jun 2024 · 26.3% built · 3 complaints
- PALAVA - AURELIA - D TO G · KalyanPalava Dwellers Private Limited · P51700000511 · possession Jan 2022 · 81.8% built · 1 complaint
- MY CITY - PHASE I - PART I · KalyanHORIZON PROJECTS PVT LTD · P51700000528 · possession Dec 2022 · 100% built · 25 complaints
- PALAVA CLARA E - I · KalyanLodha Developers Limited · P51700000540 · possession Dec 2020 · 81.8% built · 1 complaint
- PALAVA SAVANA AND SIENA · KalyanLodha Developers Limited · P51700000546 · possession Feb 2021 · 90.9% built · 6 complaints
- Platinum Tower · ThaneHaware's Housing Development Finance Corporation Ltd. · P51700000549 · possession Jun 2023 · 72.7% built
- D4 IRIS · ThaneNeelkanth Mansions and Infrastructure Pvt. Ltd. · P51700000552 · possession Sept 2020 · 100% built
- Kamdhenu Commerz · ThaneKAMDHENU BUILDERS AND DEVELOPERS · P51700000559 · possession Dec 2019 · 93.6% built
- PALAVA URBANO D AND E · KalyanLodha Developers Limited · P51700000577 · possession Oct 2022 · 78.9% built · 1 complaint
- Kalpataru Hills - Building 2A · ThaneKalpataru Properties (Thane) Pvt. Ltd. · P51700000584 · possession Dec 2022 · 98.5% built · 2 complaints
- SALASAR GREENS · ThaneSALASAR ESTATE DEVELOPERS LLP · P51700000586 · possession Dec 2026 · 36.4% built
- N G BAVENO · ThaneRNA Builders (NG) · P51700000589 · possession Dec 2021 · 30.3% built
- PALAVA FONTANA C - H · KalyanPalava Dwellers Private Limited · P51700000596 · possession Dec 2020 · 78.2% built · 2 complaints
- Panvelkar Crown · AmbarnathRahul Vijay Panvelkar · P51700000598 · possession Dec 2018 · 90.9% built
- Sharvari Primero · KalyanSHARVARI REALTORS LLP · P51700000601 · possession Dec 2017 · 9.8% built
- Hubtown Greenwoods F Wing · ThaneHubtown Limited · P51700000602 · possession Jan 2021 · 90.9% built · 7 complaints
- Courtyard - Ivy · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700000611 · possession Dec 2021 · 86.9% built · 3 complaints
- Tokyo Bay Phase - 1 · ThanePuranik Tokyo Bay Private Limited · P51700000618 · possession Oct 2023 · 90.9% built · 6 complaints
- Sunrise C · ThaneAgile Real Estate Pvt. Ltd. · P51700000625 · possession Dec 2023 · 92.9% built
- Sunrise A · ThaneAgile Real Estate Pvt. Ltd. · P51700000635 · possession Dec 2023 · 98.5% built · 1 complaint
- Sunrise D · ThaneAgile Real Estate Pvt. Ltd. · P51700000640 · possession Dec 2023 · 99.9% built · 3 complaints
- THANEKAR PARKLAND · AmbarnathAJAY MADHUKAR THANEKAR · P51700000644 · possession Dec 2019 · 43.9% built · 3 complaints
- MARATHON NEXWORLD AURA-1 · Betawade GaonMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · P51700000652 · possession Dec 2023 · 46.5% built · 32 complaints
- Panvelkar Homes - Phase II · AmbarnathOm Sai Constructions · P51700000656 · possession Jun 2018 · 90.9% built
- Courtyard - Ornella · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700000681 · possession May 2023 · 52.7% built · 3 complaints
- MARATHON NEXTOWN EMERALD · ThaneMARATHON ENER-GEN LLP · P51700000686 · possession Dec 2020 · 100% built
- Rumahbali Phase 2 · ThanePuranik Builders Limited · P51700000689 · possession Dec 2023 · 100% built · 1 complaint
- PALAVA URBANO G AND H · KalyanLodha Developers Limited · P51700000696 · possession Dec 2022 · 81.8% built · 1 complaint
- Amanda Shopping · ThaneHIRANANDANI PROPERTIES PRIVATE LIMITED · P51700000704 · possession Dec 2019 · 90.9% built
- Courtyard - Onyx · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700000714 · possession May 2023 · 53% built · 2 complaints
- SARVODAY AANAND · KalyanOM SAI LAND DEVELOPERS · P51700000725 · possession Jun 2026 · 56.8% built
- Immensa D · ThaneAgile Real Estate Pvt. Ltd. · P51700000732 · possession Dec 2025 · 89.8% built · 27 complaints
- VASANT FIONA · ThaneSheth Developers Private Limited · P51700000734 · possession Dec 2019 · 100% built · 6 complaints
- SKY VILLAS WING A1 AND WING A2 · KalyanVERTEX NEWTON PROJECTS PRIVATE LIMITED · P51700000736 · possession May 2023 · 100% built
- PRAMUKH SADAN · AmbarnathSAHAJANAND DEVELOPERS · P51700000743 · possession Mar 2019 · 41.8% built
- PATEL RESIDENCY NX · AmbarnathNAVNIRMAN DEVELOPERS · P51700000745 · possession Jul 2018 · 46% built
- RAUNAK HEIGHTS · ThaneUNNATHI ASSOCIATES · P51700000766 · possession Dec 2025 · 90.9% built · 3 complaints
- Alpinia · ThaneAcme Housing India Private Limited · P51700000778 · possession Dec 2021 · 91.3% built · 10 complaints
- Kondilkar Residency · AmbarnathAditi Construction · P51700000782 · possession Jan 2019 · 90.9% built
- PALAVA CLUSTER 2-06 - A - G, I - N · KalyanLodha Developers Limited · P51700000802 · possession Jun 2022 · 78.2% built · 2 complaints
- AMRUT VISHWA PHASE 2 · AmbarnathSAI SHRADHA DEVELOPERS · P51700000808 · possession Dec 2019 · 51.4% built
- PADMALAXMI · ThaneKEDAR BHIKAJI BAPAT · P51700000815 · possession Mar 2018 · 73.6% built
- Mohan Areca · AmbarnathMOHAN LIFESPACES LLP · P51700000829 · possession Dec 2022 · 88.6% built · 14 complaints
- Courtyard - Florence · ThaneCOURTYARD REAL ESTATE PRIVATE LIMITED · P51700000831 · possession Dec 2021 · 86.9% built · 2 complaints
- SAPTASHREE HEIGHTS · ThaneSAPTASHREE REALITY PRIVATE LIMITED · P51700000837 · possession May 2018 · 100% built · 2 complaints
- Iris · ThaneHIRANANDANI PROPERTIES PRIVATE LIMITED · P51700000847 · possession Dec 2019 · 100% built
- ASHOK SMRUTI DEFG · ThaneM/s Keytech · P51700000864 · possession Dec 2019 · 84.5% built
- PATELS RESIDENCY · AmbarnathPARAM BUILDERS AND DEVELOPERS · P51700000865 · possession Mar 2019 · 56.4% built
- PATELS PRIDE · AmbarnathPRIDE INFRASTRUCTURE · P51700000874 · possession Dec 2018 · 81.8% built
- JAI MATADEE · ThaneAARADHANA DEVELOPERS · P51700000884 · possession Mar 2019 · 50% built
- KEYSTONE SOLISTA · ThaneKeystone Lifespaces Private Limited · P51700000885 · possession Dec 2023 · 100% built
- ANNAPURNA JEWELS · ThaneANNAPURNA CREATORS · P51700000893 · possession Jun 2019 · 88.2% built
- Puranik City Reserva Phase 1 · ThanePuranik Builders Limited · P51700000912 · possession Mar 2029 · 99% built · 19 complaints
- Sunrise B · ThaneAgile Real Estate Pvt. Ltd. · P51700000922 · possession Dec 2023 · 93.9% built · 1 complaint
- Immensa E · ThaneAgile Real Estate Pvt. Ltd. · P51700000924 · possession Dec 2025 · 89.7% built · 19 complaints
- Sunrise E · ThaneAgile Real Estate Pvt. Ltd. · P51700000925 · possession Dec 2023 · 99.4% built · 1 complaint
- Immensa B · ThaneAgile Real Estate Pvt. Ltd. · P51700000927 · possession Dec 2025 · 99% built · 25 complaints
- Hotel · ThaneROMA BUILDERS PRIVATE LIMITED · P51700000928 · possession Dec 2024 · 90.9% built
- Aarambh - C · ThaneM/s. Annapurna Lifespaces LLP · P51700000940 · possession Jun 2026 · 90.9% built
- SATYAM SHEELA · AmbarnathSHREE SATYAM GROUP · P51700000943 · possession Dec 2022 · 60.6% built · 1 complaint
- Rustomjee Azziano Wing J · ThaneKapstone Constructions Private Limited · P51700000950 · possession Mar 2019 · 87% built · 1 complaint
- MARATHON NEXTOWN CORAL · ThaneMARATHON ENER-GEN LLP · P51700000952 · possession Jun 2023 · 72.7% built · 2 complaints
- SUDAMA REGENCY BUILDING NO 1, 5 · ThaneSHREE SIDDHIVINAYAK ENTERPRISES · P51700000953 · possession Oct 2018 · 71.4% built · 1 complaint
- ANNAPURNA JYOTI · ThaneANNAPURNA ASSOCIATES · P51700000957 · possession Dec 2021 · 90.9% built
- Embassy One Thane - 1A 1B 1C · ThaneTapir Constructions Limited · P51700000958 · possession Aug 2026 · 100% built · 20 complaints
- ASHAR MAPLE PHASE 1 BUILDING NO.2 · ThaneMs ASHAR REALTORS · P51700000969 · possession Dec 2022 · 100% built
- ASHAR 16 WING C PHASE III · ThaneMs ASHAR REALTORS · P51700000972 · possession Dec 2018 · 90.9% built
- Balaji Symphony phase 3 · ThaneVinay Agrawal · P51700000973 · possession Jun 2028 · 100% built · 3 complaints
- LODHA AMARA - TOWER 29,31 · ThaneLODHA DEVELOPERS LIMITED · P51700000981 · possession Jul 2022 · 81.8% built · 1 complaint
- MEERA AVALON · AmbarnathSARASWATI CORP · P51700000986 · possession Feb 2022 · 90.9% built
- Euro Ville Phase I · KharadeVastu Rachana JV · P51700001003 · possession Dec 2022 · 78.2% built
- SPARSH · ThaneIndiapride Infraspaces · P51700001008 · possession Dec 2021 · 35% built
- Rustomjee Azziano Wing F · ThaneKapstone Constructions Private Limited · P51700001021 · possession Mar 2019 · 90.9% built · 8 complaints
- THANEKAR PARADISE · AmbarnathAJAY MADHUKAR THANEKAR · P51700001024 · possession Dec 2021 · 27.9% built
- LODHA AMARA - TOWER 32,33 · ThaneLODHA DEVELOPERS LIMITED · P51700001030 · possession Aug 2022 · 81.8% built · 5 complaints
- LODHA AMARA - TOWER 26, 27, 28, 30, 34, 35 · ThaneLODHA DEVELOPERS LIMITED · P51700001031 · possession Dec 2021 · 78.2% built · 18 complaints
- Dandelia · ThaneAcme Housing India Private Limited · P51700001032 · possession Dec 2018 · 82.3% built
- Gingelia Residential · Thane (M Corp.)Acme Housing India Private Limited · P51700001033 · possession Dec 2023 · 51.7% built · 8 complaints
- Immensa A · ThaneAgile Real Estate Pvt. Ltd. · P51700001039 · possession Dec 2025 · 99.8% built · 24 complaints
- Immensa C · ThaneAgile Real Estate Pvt. Ltd. · P51700001040 · possession Dec 2025 · 98.9% built · 24 complaints
- Rustomjee Azziano Wing G · ThaneKapstone Constructions Private Limited · P51700001060 · possession Mar 2019 · 90.9% built · 4 complaints
- LODHA AMARA - TOWER 1 - 5, 7 - 19 · ThaneLODHA DEVELOPERS LIMITED · P51700001065 · possession Nov 2019 · 78.2% built · 26 complaints
- ASHAR 16 WING E PHASE I · ThaneMs ASHAR REALTORS · P51700001081 · possession Dec 2018 · 90.9% built
- Immensa G · ThaneAgile Real Estate Pvt. Ltd. · P51700001083 · possession Dec 2025 · 70.4% built · 13 complaints
- Euro Ville Phase II · KharadeVastu Rachana JV · P51700001090 · possession Dec 2022 · 54.5% built
- Rustomjee Azziano Wing I · ThaneKapstone Constructions Private Limited · P51700001093 · possession Dec 2020 · 75.8% built · 1 complaint
- RUNWAL GARDEN CITY - DAHLIA · ThaneRUNWAL DEVELOPERS LIMITED · P51700001095 · possession Dec 2023 · 100% built · 2 complaints
- VALLABH C H S LTD PROPOSED · KalyanSpendor Shelters Private Limited · P51700001106 · possession Jun 2019 · 31.8% built
- SAI CHARAN COMPLEX BUILDING NO 3 · ThaneOM SAI CHARAN BUILDERS · P51700001132 · possession Dec 2022 · 90.9% built
- ASHWA PLATINUM · ThaneASHWAMEDH BUILDERS AND DEVELOPERS · P51700001143 · possession Dec 2019 · 59.3% built · 1 complaint
- Stella Grand Central · ThaneFortune Infracreators Private Limited · P51700001150 · possession Dec 2026 · 88.8% built · 9 complaints
- CASA UNIVIS - CIELO D · ThaneLODHA DEVELOPERS LIMITED · P51700001153 · possession Mar 2018 · 90.9% built
- ASHAR 16 WING A PHASE V · ThaneMs ASHAR REALTORS · P51700001159 · possession Dec 2018 · 90.9% built
- ASHAR 16 WING B PHASE IV · ThaneMs ASHAR REALTORS · P51700001169 · possession Dec 2018 · 100% built
- PATELS SIGNATURE · AmbarnathSERENE INFRATECH CO · P51700001172 · possession Mar 2022 · 38.2% built
- Cloud 36 -Phase I · ThaneGeeCee Ventures Limited · P51700001178 · possession Dec 2018 · 100% built
- Shivsai Paradise · ThaneBHARAT AGRI FERT & REALTY REALTY LTD · P51700001183 · possession Dec 2028 · 18.5% built
- RAJ FLORENZA · Vijay ParkRAJ REALTORS · P51700001219 · possession Dec 2023 · 90.9% built
- Tresora Grand Central · ThaneFortune Infracreators Private Limited · P51700001221 · possession Dec 2026 · 81.8% built · 1 complaint
- ORCHID · ThaneMEHTA REALTORS · P51700001234 · possession Mar 2019 · 72.7% built
- MARATHON NEXTOWN SAPPHIRE · OFF KALYAN SHIL ROADMARATHON ENER-GEN LLP · P51700001265 · possession Jun 2024 · 85.9% built
- OLIVE-1 · ThaneJVM ENTERPRISE · P51700001276 · possession Dec 2019 · 35.9% built
- Immensa F · ThaneAgile Real Estate Pvt. Ltd. · P51700001278 · possession Dec 2025 · 91.1% built · 25 complaints
- Building No. A, Richmond of Rutu City Complex · ThaneHARASIDDH DEVELOPERS · P51700001284 · possession Jun 2022 · 100% built · 1 complaint
- PREMIER SEAVIEW · ThaneAYUB HUSAIN KHATRI · P51700001286 · possession Dec 2018 · 90.9% built
- Immensa H · ThaneAgile Real Estate Pvt. Ltd. · P51700001310 · possession Dec 2025 · 66.6% built · 19 complaints
- VISHWAJEET MANOR · AmbarnathABHIJEET REALTY · P51700001321 · possession Dec 2019 · 45.5% built
- SHUBHAM · ThaneSagar Enterprise · P51700001323 · possession Aug 2018 · 72.7% built
- Riverview Classic Building No.2,Phase II · KalyanRUTU BUILDERS · P51700001351 · possession Jun 2019 · 98.6% built · 1 complaint
- SPAN EXOTICA-WING B · ThaneSIDDHIVINAYAK DEVELOPERS · P51700001353 · possession Mar 2019 · 89.1% built
- Krishna - B Wing · ThaneNeelkanth Palm Realty · P51700001361 · possession May 2022 · 100% built · 6 complaints
- RUNWAL PEARL · ThaneRunwal Construction Private Limited · P51700001383 · possession Dec 2024 · 95.5% built · 6 complaints
- MOTIRAM PURAM · AmbarnathNAYAN DILIP DALAL · P51700001387 · possession May 2022 · 18.2% built
- ANA Avant Garde Phase 1 · ThaneSTEELFAB ENGINEERING CORPORATION · P51700001388 · possession Dec 2019 · 97.4% built · 25 complaints
- jyoti breeze · ThaneVENKATESH CONSTRUCTION · P51700001403 · possession Dec 2026 · 78.2% built
- Rustomjee Azziano Wing H · ThaneKapstone Constructions Private Limited · P51700001453 · possession May 2019 · 89.1% built
- VIHANGS VERMONT · ThaneVIHANG ENTERPRISES · P51700001458 · possession Dec 2022 · 84% built · 3 complaints
- COSMOS ENCLAVE · ThaneASHIRWAD DEVELOPERS · P51700001476 · possession Jun 2019 · 33.9% built · 1 complaint
- GRAPE CITY PHASE I · ANANDVALLI BEHIND SHRI GURUJI HOSPITALMs AMBER ESTATE · P51700001499 · possession Dec 2019 · 90.9% built
- Pelican · ThaneROMA BUILDERS PRIVATE LIMITED · P51700001511 · possession Dec 2024 · 100% built
- DAHLIA BLDG A D AND E · ThaneHAWARE ENGINEERS AND BUILDERS PRIVATE LIMITED · P51700001515 · possession Oct 2020 · 73.5% built · 3 complaints
- Rustomjee Aurelia 1 · ThaneKapstone Constructions Private Limited · P51700001516 · possession Jun 2022 · 80.7% built · 2 complaints
- Casa Royale - Grande · ThaneLodha Buildcon Private Ltd (Lodha Develoopers Pvt Ltd) · P51700001517 · possession Jul 2018 · 81.8% built · 9 complaints
- THE HELIOS · ThaneRAJ LAXMI DEVELOPERS · P51700001555 · possession Dec 2031 · 9.1% built · 2 complaints
- CHINTAMANI HABITAT DAFFODILS TYPE F · Shahapur (CT)JASHNANI CONSTRUCTION PRIVATE LIMITED · P51700001557 · possession Dec 2017 · 81.8% built
- CHINTAMANI HABITAT DAFFODILS TYPE A1 - D · Shahapur (CT)JASHNANI CONSTRUCTION PRIVATE LIMITED · P51700001558 · possession Dec 2023 · 46.1% built
- TARANGAN · ThaneMAISON CONSTRUCTIONS PRIVATE LIMITED · P51700001560 · possession May 2018 · 100% built
- MEERA PARK ROYALE · AmbarnathSARASWATI BUILDCON · P51700001561 · possession Jan 2022 · 88.1% built
- GOPAL KRISHNA · ThaneSONAL DEV-CON PVT LTD · P51700001570 · possession Apr 2027 · 90.9% built
- MAITHILI PRIDE · ThaneMAITHILI KALPVRUKSH PRIVATE LIMITED · P51700001574 · possession Dec 2021 · 100% built
- SIDDHICITY · AmbarnathSiddhitech Homes Private Limited · P51700001597 · possession Jun 2019 · 85.2% built · 24 complaints
- DIVYA JYOT COMPLEX · AmbarnathSHREE ADITI DEVELOPERS · P51700001599 · possession Dec 2021 · 57% built
- Flamingo · ThaneROMA BUILDERS PRIVATE LIMITED · P51700001611 · possession Dec 2024 · 100% built
- SPAN EXOTICA · Thaneinfinity creators · P51700001619 · possession May 2018 · 100% built
- Harmony Signature Towers · ThaneDEEPAK RAJENDRA JAIN · P51700001622 · possession Dec 2018 · 100% built · 6 complaints
- SAMRIDDHI · ThaneA G SUPERSTRUCTURES PVT LTD · P51700001636 · possession Dec 2021 · 98.9% built
- Kohinoor Castles · AmbarnathKohinoor Castles · P51700001641 · possession Mar 2021 · 90.9% built
- VISHWAJEET ELITE · AmbarnathVISHWAJEET MEADOWS · P51700001654 · possession Dec 2019 · 31.4% built
- ORIANA BUSINESS PARK · ThaneDREAM BUSINESS VENTURE · P51700001659 · possession Mar 2019 · 35.9% built
- EVERGREEN RESIDENCY C WING · BADLAPUR GAONBALAJI CONSTRUCTION · P51700001677 · possession Dec 2022 · 90.9% built
- EKDANT DEVELOPERS · KalyanEKDANT DEVELOPERS · P51700001682 · possession Jun 2022 · 90.9% built
- RAJ ESTATE · ThaneD.V.BUILDERS & DEVELOPERS PVT. LTD. · P51700001702 · possession Jun 2018 · 90.9% built
- Q Residences R1 · ThaneAurum RealEstate Developers Limited · P51700001722 · possession Dec 2021 · 95.1% built · 4 complaints
- SHETH AVALON - PHASE 1 · ThaneSheth Developers Private Limited · P51700001729 · possession Dec 2021 · 99.7% built · 11 complaints
- Kailash Gardens · KalyanSHREE LAXMI ENTERPRISES · P51700001752 · possession Jul 2026 · 100% built
- Kashish Park Tower B · ThaneKashish Park Realtors · P51700001799 · possession Dec 2022 · 100% built
- Sai Satyam Homes · KalyanSai Satyam Developers · P51700001809 · possession Dec 2022 · 90.9% built
- JAINAM RESIDENCY · AmbarnathKBP CORPORATION · P51700001820 · possession Jul 2022 · 15.9% built
- REDEVELOPMENT OF PARIJAT BUILDING OF SANKSRITI NAGAR COOP HSG SOC LTD · ThaneOJASS CONSTRUCTIONS · P51700001851 · possession Dec 2021 · 90.9% built
- CHINTAMANI HABITAT DAFFODILS TYPE G - E · Shahapur (CT)JASHNANI CONSTRUCTION PRIVATE LIMITED · P51700001853 · possession Sept 2020 · 63% built
- RAJ OAKS · ThaneRAJ CORPORATION · P51700001861 · possession Dec 2019 · 100% built
- Aditi Plaza · AmbarnathChintamani Construction · P51700001865 · possession Jun 2018 · 90.9% built
- Madan Vilas · ThaneIshaan Enterprise · P51700001871 · possession Mar 2019 · 90.9% built · 1 complaint
- Saket Iris · KalyanANIL SHILPAYATAN PRIVATE LIMITED · P51700001875 · possession Apr 2019 · 90.9% built
- ASHAR 16 WING D PHASE II · ThaneMs ASHAR REALTORS · P51700001926 · possession Dec 2018 · 90.9% built · 1 complaint
- SIDDHICITY PHASE-V · AmbarnathSiddhitech Homes Private Limited · P51700001928 · possession Dec 2021 · 51.8% built · 42 complaints
- Amrut Siddhi · Near Railway StationJayshree Builders · P51700001930 · possession Dec 2023 · 90.9% built
- OSTWAL ORCHID BUILDING NO. 9 TO 12 · ThaneASHA ENTERPRISES · P51700001968 · possession Dec 2023 · 100% built
- Platinum · ThaneSilver Enterprises · P51700001981 · possession Dec 2018 · 81.8% built
- SUKUR ENCLAVE PHASE 1 · ThaneRAJARAM CONSTRUCTION · P51700001982 · possession Dec 2018 · 90.9% built
- ELCANTO · ThaneDEDHIA BUILDERS AND DEVELOPERS (INDIA) LLP · P51700001985 · possession Dec 2018 · 100% built · 7 complaints
- DEEP AANGAN · AmbarnathPAREKH INFRAPROJECTS · P51700001986 · possession Dec 2019 · 33.4% built
- SHREE HAVEN · ThaneSHREE HOUSING CO · P51700002002 · possession Dec 2027 · 87% built
- GNP GALAXY PHASE - I · AmbarnathROSHNI ENTERPRISES · P51700002007 · possession Dec 2022 · 81.8% built
- RAIL VIEW · ThaneUMESH NARESH JAIN · P51700002009 · possession Dec 2019 · 90.9% built
- Trishul Goldfield · ThaneTrishul Goldfield · P51700002010 · possession Jun 2027 · 100% built
- Plan S Business Park · SHIRWANEM/s. Vishwa Green Realtors Private Limited · P51700002027 · possession Dec 2024 · 62.4% built · 3 complaints
- RAUNAK DELIGHT · ThaneUNNATHI ASSOCIATES · P51700002037 · possession Dec 2018 · 90.9% built
- CHARMS HEIGHTS PHASE-I B1-B4 · TitwalaCharms Developers · P51700002055 · possession Mar 2018 · 90.9% built · 2 complaints
- MERIDIAN MYSTIC · ThaneMANOJ AWASTHI · P51700002065 · possession Dec 2019 · 100% built
- paramount park · Kalyandilip sudhakar deshmukh · P51700002072 · possession Dec 2034 · 35.4% built
- EKRAM ICON · ThaneVIKRAM GROUP · P51700002077 · possession Dec 2022 · 100% built
- BHAKTI PEARL - C · ThaneBHAKTI CORPORATION · P51700002089 · possession Dec 2017 · 100% built · 1 complaint
- TRITAN MEADOWS · ThaneTULIP REALTY · P51700002100 · possession Mar 2018 · 74.2% built · 1 complaint
- CHOICE AMBE DEEP · ThaneAMBE DEEP ENTERPRISES · P51700002104 · possession Dec 2018 · 73.5% built
- Terraform Arcade · ThaneMoney Magnum Constructions · P51700002110 · possession Jul 2022 · 63.6% built
- GNP GALAXY PHASE - II · AmbarnathROSHNI ENTERPRISES · P51700002123 · possession Jan 2022 · 81.8% built
- ARYAN ONE WING G AND H · AmbarnathKonark Lifespaces · P51700002130 · possession Jul 2019 · 89.5% built
- Puranik Home Town - E · ThanePuranik Builders Limited · P51700002158 · possession Dec 2026 · 90.9% built · 1 complaint
- MANOHAR VIKAS SHREEJI PARAISO PHASE 1 · AmbarnathDEEPLAXMI DEVELOPERS · P51700002188 · possession May 2022 · 90.9% built
- Mayfair Palmeira · ThaneMAYFAIR MARU DEVELOPERS · P51700002231 · possession Dec 2031 · 7.3% built · 15 complaints
- Shree Sai Pooja · AmbarnathM/s Mahalaxmi Construction Co. · P51700002237 · possession Dec 2019 · 90.9% built
- Mohan Suburbia IV · AmbarnathMOHAN LIFESPACES LLP · P51700002244 · possession Dec 2020 · 90.9% built · 1 complaint
- REGENCY ELLANZA · ThaneBALAJI REGENCY PROPERTIES · P51700002262 · possession Dec 2017 · 100% built · 2 complaints
- MANSAROVAR RESIDENCY C WING · ThaneKIRAN REALTY · P51700002268 · possession Dec 2022 · 90.9% built
- PEARL · ThaneSagar Enterprise · P51700002276 · possession Aug 2019 · 90.9% built
- Anthurium · ThaneAARTI ESTATES · P51700002317 · possession Oct 2023 · 70% built
- BLUE DIAMOND RESIDENCY · AmbarnathKIMAYA CONSTRUCTION · P51700002359 · possession Dec 2019 · 90.9% built
- SAWLARAM SRUSHTI · KalyanSHREE SAI BUILDERS AND DEVELOPERS · P51700002398 · possession Dec 2017 · 73.1% built
- TRICITY PALACIO · ThaneTRICITY REALTY LLP · P51700002400 · possession Sept 2023 · 95.5% built
- AMAR ORCHID · KalyanAMAR REALTY · P51700002411 · possession Jun 2018 · 90.9% built
- Thana Co-Op Housing Society Sopan · ThaneAditya Associates · P51700002433 · possession Dec 2021 · 20.9% built
- UMA ASHISH B WING · AmbarnathPARASIYA DEVELOPES · P51700002434 · possession Jul 2018 · 88.2% built
- GODREJ VIHAA PHASE 2 · AmbarnathK. R. REAL ESTATE PVT. LTD. · P51700002442 · possession Aug 2022 · 90.9% built · 1 complaint
- SAHAKAR PREMIER · ThanePREMIER REALTY · P51700002452 · possession Jul 2023 · 27.3% built
- SHREE SANKALP · ThaneSHREE CONSTRUCTIONS · P51700002456 · possession Jul 2019 · 100% built · 1 complaint
- Virat Vastu · Kalyan-Dombivali (M Corp.)SHREEJI REALTY · P51700002467 · possession Dec 2018 · 93.2% built
- INDRAPRASTH WING C · ThaneSONAM SPARK INFRA LIMITED · P51700002491 · possession Sept 2020 · 57% built
- WADHWA RHODESIA · BhiwandiWADHWA BUILDCON LLP · P51700002499 · possession Dec 2026 · 50.5% built · 6 complaints
- SKY HILL · AmbarnathSEVEN HILL BUILDCON · P51700002510 · possession Apr 2019 · 81.8% built · 2 complaints
- ASHWA ANNEX · ThaneASHWAMEDH CONSTRUCTION · P51700002512 · possession May 2018 · 90.9% built
- NIRMAL · KalyanBhalchandra Vinayak Wadnerkar · P51700002522 · possession Dec 2026 · 90.9% built
- Mohan Waters Edge I · AmbarnathMOHAN LIFESPACES LLP · P51700002550 · possession Dec 2021 · 89.1% built
- SHREE MANGALMURTI · KalyanSHIVAM UNIVERSAL · P51700002559 · possession Mar 2018 · 80% built
- YOGI NIWAS · AmbarnathELITE INFRASTRUCTURE · P51700002560 · possession Jun 2018 · 52.3% built
- SHANTI SEVEN · ThaneSHANTISTAR BUILDERS · P51700002572 · possession Dec 2019 · 89.1% built
- ANMOL SAPPHIRE · ThaneM/s Ekdant Housing · P51700002581 · possession Aug 2019 · 100% built
- JOSHI DATTA NAGAR · KalyanBhalchandra Vinayak Wadnerkar · P51700002586 · possession Dec 2027 · 90.9% built
- MADHUBAN F1 F2 · TitwalaAbhilasha Venture · P51700002614 · possession Sept 2020 · 90.9% built
- DEEPMALA CHS LTD · ThaneS. D. Bhalerao Associates · P51700002627 · possession Dec 2027 · 37.3% built · 22 complaints
- PRIDE PALMS QUEENS A2 PHASE 2 · ThaneLARKINS REALTORS · P51700002657 · possession Dec 2021 · 80% built
- GOLDEN VALLEY · AmbarnathA PLUS REALTY · P51700002661 · possession Feb 2023 · 67.3% built
- Tai-Nana Sadan · KalyanShree Samarth Developers · P51700002666 · possession Dec 2018 · 39.1% built
- CHARMS HEIGHTS PHASE-II A1-A2 · TitwalaCharms Developers · P51700002670 · possession Mar 2021 · 90.9% built
- Terraform K - Residences · ThaneMoney Magnum Constructions · P51700002673 · possession May 2026 · 90.9% built
- GODREJ VIHAA PHASE 1 · AmbarnathK. R. REAL ESTATE PVT. LTD. · P51700002689 · possession Jul 2022 · 90.9% built · 3 complaints
- Anand Sagar Enclave · KalyanVPA Developers · P51700002701 · possession May 2018 · 54.5% built
- OASIS ROYALE · ThaneMAGESTIC PREMISES PRIVATE LIMITED · P51700002717 · possession Dec 2018 · 44.1% built
- Saarvi Corner · ThaneSaarvi Infratech · P51700002720 · possession Dec 2018 · 9.6% built
- JP SYMPHONY · AmbarnathRISALI DEVELOPERS · P51700002726 · possession Mar 2022 · 89.1% built
- MARUTI DARSHAN · ThaneKOMAL DREAM BUILDERS PRIVATE LIMITED · P51700002727 · possession Jul 2019 · 73.4% built
- Mohan Willows I · AmbarnathMOHAN LIFESPACES LLP · P51700002731 · possession Jun 2019 · 90.9% built · 1 complaint
- Regency Antilia Phase - I · UlhasnagarREGENCY NIRMAN LTD · P51700002735 · possession Jun 2019 · 100% built
- Elito Grand Central · ThaneFortune Infracreators Private Limited · P51700002741 · possession Dec 2026 · 62.6% built · 13 complaints
- Leelaangan · AmbarnathPravin Kashinath Haware · P51700002749 · possession Dec 2022 · 77.5% built · 1 complaint
- SUKHKARTA I CO-OPERATIVE HOUSING SOCIETY LIMITED · ThaneFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700002752 · possession Dec 2018 · 83.6% built
- Maithili · ThaneSHARDA VASTU NIRMITEE PVT. LTD. · P51700002777 · possession Mar 2019 · 78.4% built
- Kohinoor Lifestyle · KalyanSonu Anil Hotchandani · P51700002787 · possession Dec 2020 · 90.9% built · 1 complaint
- SWAMI HIGHLANDS · Badlapur (M Cl)SHREE SWAMI SAMARTH ASSOCIATES · P51700002816 · possession Dec 2019 · 90.9% built
- Regency Sarvam Phase - 8 · TitwalaREGENCY NIRMAN LTD · P51700002824 · possession Aug 2018 · 90.9% built
- NILGAGAN CO-OPERATIVE HOUSING SOCIETY LIMITED · ThaneFSK BUILDERS & DEVELOPERS PRIVATE LIMITED · P51700002833 · possession Dec 2019 · 90.9% built
- SAI PROVISO - AASHLESHA · ThaneSAI PROVISO DEVELOPERS · P51700002842 · possession Dec 2019 · 100% built · 1 complaint
- YASHODHARA CO-OP HOUSING SOCIETY · AmbarnathSURESH KESHAVRAO YASHVANTRAO · P51700002868 · possession Jan 2021 · 9.1% built
- Regency Antilia Phase - II · UlhasnagarREGENCY NIRMAN LTD · P51700002911 · possession Jun 2019 · 100% built
- Zenia · ThaneROMA BUILDERS PRIVATE LIMITED · P51700002912 · possession Dec 2018 · 72.7% built
- UMA GALAXY · TITWALAUMIYA ENTERPRISES · P51700002937 · possession Dec 2022 · 94.1% built
- K T PREMIA · BhiwandiK T & CO · P51700002939 · possession Dec 2023 · 90.9% built
- UMIYA ARCADE WING A AND B · TitwalaUMIYA CONSTRUCTION COMPANY · P51700002949 · possession Apr 2018 · 60.9% built
- Shankar Heights Phase 4 · AmbarnathLaxmi Kamal Associates · P51700002953 · possession Jun 2022 · 67.1% built
- AND SUNFLOWER · ThaneANANTNATH DEVELOPERS · P51700002966 · possession Dec 2019 · 90.9% built · 1 complaint
- Seven Eleven Construction Apna Ghar · ThaneNarendra Lalchand Mehta · P51700002976 · possession Sept 2018 · 61.8% built · 2 complaints
- Silver Oak at Prestige Residency · ThanePRESCON Realtors & Infrastructures Pvt. ltd. · P51700002982 · possession Dec 2020 · 100% built · 1 complaint
- ARCH GARDENS I AND II · ThaneSAI PREM DEVELOPERS PRIVATE LIMITED · P51700002994 · possession Dec 2019 · 87.9% built
- VARAD VINAYAK COMPLEX · AmbarnathSHREE BALAJI BULDERS AND DEVELOPERS · P51700003008 · possession Dec 2018 · 70% built
- Vrindavan Park · KalyanMohammed Salim Yusuf · P51700003010 · possession Jun 2019 · 88.5% built
- Glorio Grand Central · ThaneEkdant Constructions and Developers Private Limited · P51700003017 · possession Dec 2026 · 57% built · 6 complaints
- MAITRI SAI SAMARTHA · KalyanMAITRI RACHANA · P51700003061 · possession Nov 2018 · 90.9% built
- TRIVENI MAJESTA - WING A - PHASE I · KalyanTRIVENI LIFESTYLE DEVELOPERS LLP · P51700003079 · possession Dec 2021 · 90.9% built
- MAITRI PRASAD · KalyanMAITRI CONSTRUCTION · P51700003086 · possession Nov 2018 · 81.8% built
- RITU RAYYAN · ThaneRITU INFRASTRUCTURE PVT LTD · P51700003099 · possession Dec 2021 · 50% built
- ARIHANT ANMOL PHASE II · AmbarnathARIHANT VATIKA REALTY PRIVATE LIMITED · P51700003112 · possession Mar 2022 · 90.9% built · 4 complaints
- Gagangiri Arcade · KalyanAKRUTI ASSOCIATES · P51700003151 · possession May 2018 · 84.8% built
- SAMRUDDHI GURUPRASAD · KalyanSAMRUDDHI DEVELOPERS · P51700003156 · possession Aug 2018 · 90.9% built
- GREY STONE HEIGHTS · ThaneGREYSTONE SPACES LLP · P51700003166 · possession Mar 2019 · 100% built
- SHREE GOPINATH SUBLIME · ThaneVEDANT CONSTRUCTION · P51700003177 · possession Jun 2022 · 90.9% built
- OSHO DAYARAM · ThanePARVATI CONSTRUCTION CO. · P51700003187 · possession Dec 2022 · 90.9% built
- RAUNAK CITY SECTOR IV - D2 · KalyanRAUNAK CORPORATION · P51700003210 · possession Dec 2025 · 90.9% built
- Lifestyle City Kalyan - Victory A · KalyanNirmal Lifestyle (Kalyan) Private Limited · P51700003212 · possession Jul 2019 · 64.6% built · 13 complaints
- SAI NAND · ThaneJ J TECHNOCRATS · P51700003217 · possession Mar 2018 · 90.9% built
- MAHALAXMI PARADISE · AmbarnathSHREE MAHALAXMI BUILDERS AND DEVELOPERS · P51700003224 · possession Jul 2019 · 52.7% built
- NAKSHTRA · ThaneHAWARE ENGINEERS & BUILDERS PRIVATE LIMITED · P51700003236 · possession Oct 2020 · 100% built · 8 complaints
- RATTAN GALAXY · AmbarnathRATTAN PROPERTIES AND PROJECTS PRIVATE LIMITED · P51700003240 · possession Apr 2018 · 83.6% built
- UTSAV · ThaneAAMANTRAN DEVELOPERS · P51700003251 · possession Nov 2018 · 100% built
- TRICITY PANACHE · ThaneTRICITY REALTY LLP · P51700003260 · possession Sept 2023 · 100% built
- AAI CHS LTD · KalyanKALASH DEVELOPERS · P51700003266 · possession Jun 2018 · 90.5% built
- Lifestyle City Kalyan - Applause A · KalyanNirmal Lifestyle (Kalyan) Private Limited · P51700003274 · possession Oct 2022 · 79.1% built · 30 complaints
- Uma Vatika · AmbarnathUma Creative · P51700003281 · possession Jun 2019 · 66.8% built
- Vaikunth Cluster 4 · ThanePEPL Developers Pvt Ltd · P51700003283 · possession Dec 2023 · 88.6% built · 11 complaints
- KUMKUM CORNER · ThaneRAJU JAIN · P51700003288 · possession Dec 2019 · 99.1% built
- GLOBE BUSINESS PARK · AmbarnathPIONEER INDUSTRIES · P51700003290 · possession Dec 2022 · 81.8% built
- Rukmini Garden Building No 2 · Titwala EastMARUTI RAGHUNATH JADHAV · P51700003299 · possession Dec 2021 · 90.9% built
- SHREE SIDDHIVINAYAK HEIGHTS · TitwalaAJIT KRISHNAN RATNAM · P51700003326 · possession Dec 2019 · 90.9% built
- ATLANTA EDENWORLD PHASE I · ThaneSAI BALAJI DEVELOPER · P51700003328 · possession Nov 2018 · 90.4% built
- SAI SHARNAM · KalyanANJANA SAHEBRAO CHAVAN · P51700003329 · possession Jul 2019 · 100% built · 3 complaints
- MARUTI PRAKRUTI DHAM · AmbarnathAVISHKAR DEVELOPERS · P51700003338 · possession Dec 2018 · 49.6% built
- MOTIRAM PRIVILEGE · AmbarnathVANITA ENTERPRISES · P51700003347 · possession May 2018 · 90.9% built
- MAHAVIR PRIDE · AmbarnathMAATRU KRUPA ENTERPRISES · P51700003354 · possession Sept 2018 · 87% built
- UNNATHI WOODS PHASE III - C1 · ThaneUNNATHI ESTATES · P51700003359 · possession Dec 2018 · 90.9% built
- SKYLINE-II · ThaneUNIQUE SHANTI NEMINATH DEVELOPERS LLP · P51700003362 · possession Sept 2018 · 89.1% built
- RAUNAK CITY SECTOR IV - D1 · KalyanRAUNAK CORPORATION · P51700003377 · possession Dec 2025 · 90.9% built
- SUNRISE GLORY PHASE II · ThaneSUNRISE LIFESPACES LLP · P51700003397 · possession Dec 2022 · 90.9% built · 10 complaints
- VASANT ELITE · KalyanM/S VASANT BUILDERS AND DEVELOPERS · P51700003400 · possession Jun 2019 · 90.9% built
- Neelkanth Woods Bungalow L 57 · ThaneT Bhimjyani Realty Pvt.Ltd. · P51700003404 · possession Nov 2021 · 95.5% built
- DEVTARA HEIGHTS · Thanesavera construction co · P51700003412 · possession May 2023 · 88.2% built
- Starliving · ThaneTheme Developers Private Limited · P51700003414 · possession Dec 2028 · 29.5% built · 6 complaints
- LA ARIHANT HERITAGE · AmbarnathLA ARIHANT BUILDERS AND DEVELOPERS · P51700003423 · possession Dec 2028 · 43.5% built · 12 complaints
- SAPPHIRE HEIGHTS · ThaneSPACE CORPORATION · P51700003426 · possession Dec 2024 · 60.9% built
- SOHAM PLAZA · TitwalaSAIBHAKTI BUILDERS · P51700003435 · possession Dec 2017 · 90.9% built
- JP SYNERGY PHASE 1 BUILDING NO-2 · AmbarnathAASHVI DEVELOPERS · P51700003438 · possession Dec 2019 · 100% built
- SHUBAN Society · KalyanShrikrishna Marathe · P51700003453 · possession Feb 2019 · 58.2% built
- Belantara · ThaneToday Royal Infra · P51700003464 · possession Dec 2019 · 100% built
- GAURAV SAFFRON · ThaneRavi Developments · P51700003472 · possession Jun 2026 · 69.9% built · 40 complaints
- OM SAI VIHAR · MandaJai Mahalaxmi Enterprises · P51700003493 · possession May 2018 · 87.3% built
- BORIVALI YASH PRABHA CHS LTD · ThaneUNIQUE SHANTI DEVELOPERS LLP · P51700003496 · possession Dec 2021 · 100% built
- VASUDEV SKY HIGH · ThaneSHREE PRATHAMESH DEVELOPER · P51700003503 · possession Jun 2019 · 59% built
- Vaikunth Cluster 1 · ThanePEPL Developers Pvt Ltd · P51700003535 · possession Dec 2022 · 86.4% built · 9 complaints
- Lifestyle City Kalyan- Platano B · KalyanNirmal Lifestyle (Kalyan) Private Limited · P51700003540 · possession Jan 2023 · 68.2% built · 40 complaints
- Lifestyle City Kalyan - Applause B · KalyanNirmal Lifestyle (Kalyan) Private Limited · P51700003543 · possession Sept 2023 · 58.6% built · 26 complaints
Raigarh
- Satyam Mayfair · UlaweRajesh Dharamvir Gulati · P51700000363 · possession Dec 2021 · 100% built
- SATYAM AURA · PanvelRajesh Dharamvir Gulati · P51700000541 · possession Sept 2020 · 100% built
- PARSHVA AANGAN · UranSONALI MEHUL DOSHI · P51700000724 · possession Dec 2019 · 37.6% built
- Sai Proviso County · PanvelProviso Builders and Developers · P51700002042 · possession Dec 2023 · 84% built · 4 complaints
- Sai World Empire · Panvelparadisesuperstructures · P51700002446 · possession Oct 2024 · 99.3% built · 2 complaints
- Shanti Glory · PanvelAshapura Realty · P51700002533 · possession Sept 2019 · 90.9% built · 1 complaint
- BALAJI AURA · TALOJARELIABLE REALTIES · P51700003428 · possession Aug 2024 · 97.7% built · 1 complaint