11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 30 of 59
- SUYOG AMARDHAN4.7 yr overdueSUYOG STAR DEVELOPERS · Parvati, PuneP52100010912· filed Nov 2019 → now Nov 2021· 90.9% built
- VIVANTA LIFE VERONIKA4.7 yr overdueVIVANTA REALTY · Pimpale Saudagar, PuneP52100002206· 90.9% built
- Neelkanth Woods Bungalow L 574.7 yr overdueT Bhimjyani Realty Pvt.Ltd. · Thane, ThaneP51700003404· 95.5% built
- VIDYA VILAS4.7 yr overdueRajyog Builders through its Proprietor Vinayak Alias Prakash Shankar Manohar · Mulshi, PuneP52100013901· 90.9% built
- STAR ONE REALCON PVT LTD4.7 yr overdueSTAR ONE REALCON PVT LTD · Versova, Mumbai SuburbanP51800008499· filed Dec 2019 → now Nov 2021· 91.8% built
- Om Shiv Vatika A Wings4.7 yr overdueOm Shiv Developers · Badlapur (M Cl), ThaneP51700014398· 90.9% built
- AXIS VERTIGA4.7 yr overdueAXIS LIFESPACES LLP · PUNE, PuneP52100003159· filed Nov 2019 → now Nov 2021· 90.9% built
- Mantra Moments Phase 64.7 yr overdueMANTRA PROPERTIES · Pimpri Chinchawad (M Corp.), PuneP52100014375· 27.3% built· 2 complaints
- BHONSALE PATIL RESIDENCY4.7 yr overdueDEEVA ASSOCIATES · SWAMI VIVEKANANDNAGAR, SataraP52700025640· 90.9% built
- SHETH MIDORI4.7 yr overdueSHETH INFRAWORLD PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800000882· filed May 2019 → now Nov 2021· 90.9% built· 116 complaints
- UTKARSH PALACE4.7 yr overdueUTKARSH BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600009009· filed Jul 2019 → now Nov 2021· 90.9% built
- Redevelopment of Chembur Sandhya CHSL4.7 yr overdueHeritage Lifestyles & Developers Pvt. Ltd. · Kurla, Mumbai SuburbanP51800001760· filed Dec 2018 → now Nov 2021· 90.9% built· 1 complaint
- VINAYAKA BLISS4.7 yr overdueVinayaka Developers · Pimpri Chinchawad (M Corp.), PuneP52100014359· filed Jul 2019 → now Nov 2021· 95.5% built
- SABARI SHOBHA4.7 yr overdueSabari Developers LLP · Kurla, Mumbai SuburbanP51800003844· filed Nov 2020 → now Nov 2021· 41.8% built
- SHIVSAGAR PLATINUM4.7 yr overdueSABLE ASSOCIATES · Haveli, PuneP52100003789· filed Mar 2018 → now Nov 2021· 89.5% built
- BISTURIBAI TOWER4.7 yr overdueGauri Vinayak Builder and Developers Pvt Ltd · Vadavali Bk., ThaneP51700011660· filed May 2018 → now Nov 2021· 53.6% built
- Serenity Heights4.7 yr overdueAristocrat Marketing Ltd · Kurla, Mumbai SuburbanP51800002492· filed May 2019 → now Nov 2021· 90.9% built
- SAMARTH GARDEN WINGS F AND G4.7 yr overdueS.A.Developers · Kurla, Mumbai SuburbanP51800009013· filed Dec 2017 → now Nov 2021· 90.9% built· 2 complaints
- Nikhil Tower Building No 24.7 yr overdueM/S. SAMARTH BUILDERS & LAND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000007481· filed Jun 2019 → now Nov 2021· 90.9% built
- M K Thakur Complex Phase 14.7 yr overdueVraj Ratan Buildcon Pvt Ltd · Thane, ThaneP51700009111· 89.9% built
- Ramkrishna Plaza - C Building4.7 yr overdueRamkrishna Builder And Developers · Chiplun (M Cl), RatnagiriP52800003578· 90.9% built
- HERAMB4.7 yr overduePRAMOD ANANT ABHYANKAR · Chiplun (M Cl), RatnagiriP52800012505· 52.7% built
- Shyam Flora4.7 yr overdueShardaben Madhubhai Vaghela · Wadala Shiwar, NashikP51600015630· 81.8% built
- DA Marvel4.7 yr overdueDhanait Ahire Associates · Mhasrul, NashikP51600015377· 90.9% built
- Veena Serenity4.7 yr overdueVEENA REALCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800000016· 76.8% built· 17 complaints
- JUNCTION 1764.7 yr overdueBhima builders & developers · Kolhapur (M Corp.), KolhapurP53000000545· 66.4% built
- Pawan Sut Row Houses4.7 yr overdueChampaben Dhirajlal Metalia · Ambad, NashikP51600025642· 72.9% built
- sagar tarang b4.7 yr overduesagar m bonde · panchavati, NashikP51600015745· 90.9% built
- SARVODAY SQUARE PHASE 1 BLDG. NO. 3,4 AND 74.7 yr overdueSHREE SQUAREFEET ENTERPRISES LLP · Ambarnath, ThaneP51700010034· 90.9% built
- Mblu4.7 yr overdueMETADESIGN INDIA PVT LTD · chembur, Mumbai CityP51900006531· 72.7% built· 1 complaint
- GREEN WOODS4.7 yr overdueVANTAGE LAND DEVELOPERS · Thane, ThaneP51700010446· 96.4% built· 1 complaint
- KALASHREE4.7 yr overdueSACHIN ABHAYKUMAR OSWAL · RAJARAMPURI E WARD, KolhapurP53000019464· 89.1% built
- PURUSHOTTAM KSHITIJ4.7 yr overdueabhijit bhaskar kelkar · Kalyan, ThaneP51700008243· filed Dec 2019 → now Dec 2021· 90.9% built
- Vrundavan Heights4.7 yr overdueVrundawan Builders and Developers · Waluj, AurangabadP51500014741· 51.8% built
- SHIVDATTA SRUSHTI4.7 yr overdueSHIVDATTA BUILDERS & CONTRACTORS · KUPWAD SANGLI, SangliP53100015908· 81.8% built
- Shankeshwar Darshan4.7 yr overdueShankeshwar Developers · Haveli, PuneP52100000830· filed Dec 2019 → now Dec 2021· 81.8% built
- Shri Siddhivinayak Vastu Prakalp Phase 24.7 yr overdueGandhi Developers · Kasarali, RatnagiriP52800016127· 90.9% built
- ARCH SAPTARANG4.6 yr overdueARCH DEVELOPERS · Padegaon, AurangabadP51500002803· 81.8% built
- N G BAVENO4.6 yr overdueRNA Builders (NG) · Thane, ThaneP51700000589· filed Dec 2019 → now Dec 2021· 30.3% built
- MORAJ PRIDE4.6 yr overdueMORAJ INFRATECH PRIVATE LIMITED · Thane, ThaneP51700008474· 55.5% built
- SWAPNANAGARI4.6 yr overdueSwapnashilpa Housing LLP · Near Rajendra Nagar, KolhapurP53000000097· 90.9% built
- NEST4.6 yr overdueSKYLINE ENTERPRISES · NEAR ORCHID SCHOOL, PuneP52100026122· 72.7% built
- Prutha Residency4.6 yr overdueM/s Aum Jivdani Associates · Dahanu, PalgharP99000014796· 90.9% built
- Westernhills V1 - V94.6 yr overdueHigh Seas Properties Private Limited · Sus, PuneP52100002728· filed Dec 2019 → now Dec 2021· 89.1% built
- Krishna Residency4.6 yr overdueS P Construction · Khalapur, RaigarhP52000000007· 90.9% built
- NEW THANA CHS4.6 yr overdueGAURANG PROPERTIES PVT. LTD. · BHASKAR COLONY, ThaneP51700007377· filed Dec 2019 → now Dec 2021· 18.2% built
- REDEVELOPMENT OF PARIJAT BUILDING OF SANKSRITI NAGAR COOP HSG SOC LTD4.6 yr overdueOJASS CONSTRUCTIONS · Thane, ThaneP51700001851· 90.9% built
- MURLIDHAR PLAZA4.6 yr overdueSAIPOOJAN ENTERPRISES · Badlapur (M Cl), ThaneP51700010173· 45.5% built
- SHUBH NISARG4.6 yr overdueVARDHAMAN AND VASTU ASSOCIATES · Badlapur (M Cl), ThaneP51700013375· 16.1% built
- NAYANTARA ASSOCIATES4.6 yr overdueNAYANTARA ASSOCIATES · Kalyan, ThaneP51700010238· 84.5% built
- BA IRIS4.6 yr overdueBhandari Patel Venture · Moze Engineering College, PuneP52100013967· 90.9% built
- JADHAV MARKET4.6 yr overdueS J Construction Co · Badlapur (M Cl), ThaneP51700005308· 81.8% built
- Sai Greens Building 14.6 yr overduesaisanskruti developers pvt.ltd · Khedshi, RatnagiriP52800007214· 48.2% built
- Krishna Plaza4.6 yr overdueKrishna Plaza Developers · Old Jalna, JalnaP51400019777· 72.7% built
- BHAKTI MEERA4.6 yr overdueMEGHASWANA BHONGADE ASSOCIATES · Varale, PuneP52100003491· filed Dec 2019 → now Dec 2021· 9.3% built
- MATRUPREM APARTMENT4.6 yr overdueRAJENDRA RAMCHANDRA PHANSE · Jalgaon, RatnagiriP52800009239· filed Dec 2019 → now Dec 2021· 39.1% built
- TROODOS HEIGHTS4.6 yr overdueSHIVGANGA DEVELOPERS · Shewalewadi, PuneP52100007606· filed Dec 2019 → now Dec 2021· 81.8% built
- HARMAIN HERITAGE4.6 yr overdueSQUARE CONSTRUCTION · Chiplun (M Cl), RatnagiriP52800009162· filed Dec 2019 → now Dec 2021· 48.2% built
- YASHRAJ ANGAN4.6 yr overdueRUTUJA DEVELOPERS · SAVANGI, AurangabadP51500014780· 54.4% built
- Vardan Residency4.6 yr overdueNilesh Atmaram Bhuran · Kherdi, RatnagiriP52800014998· 31.8% built
- NASA CAPITAL4.6 yr overdueUTTAM NAGESH ARAGE · KWC COLLAGE, SangliP53100018792· 81.8% built
- PRIVIA 94.6 yr overduePRIVIA BUILDERS LLP · MOSHI, PuneP52100007271· 90.9% built
- MAJESTIC VILLA4.6 yr overdueSKY CITY DEVELOPERS · Uran, RaigarhP52000002768· 81.8% built
- KANAKIA PARIS4.6 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000122· filed Sept 2019 → now Dec 2021· 98.3% built· 11 complaints
- Lok Nagari Developer Ph - II4.6 yr overdueLok Nagari Developer · Ambarnath East, ThaneP51700010802· filed Dec 2019 → now Dec 2021· 90.9% built· 4 complaints
- Park Land - 1 - i4.6 yr overdueYashvastu Developers · Pune City, PuneP52100002945· filed Dec 2019 → now Dec 2021· 74.4% built
- HAPPY HOME C WING4.6 yr overdueENTEE DEVELOPERS · Kurla, Mumbai SuburbanP51800002874· filed Dec 2019 → now Dec 2021· 81.8% built· 3 complaints
- CHEMBUR HEIGHTS II4.6 yr overdueKUKREJA CONSTRUCTION CO · Kurla, Mumbai SuburbanP51800001916· filed Jun 2019 → now Dec 2021· 87.3% built
- APURV RESIDENCY4.6 yr overdueUKARDEPATIL DEVELOPERS · KARMAD, AurangabadP51500014665· filed Dec 2019 → now Dec 2021· 90.9% built
- SHRI KRISHNA VIHAR4.6 yr overdueSHAILESH INFRASTRUCTURE PRIVATE LIMITED · Amravati (M Corp.), AmravatiP50300003987· filed Dec 2019 → now Dec 2021· 81.8% built
- ARIHANT ALOKI PHASE I4.6 yr overdueARIHANT AASHIYANA PRIVATE LIMITED · Karjat, RaigarhP52000004014· filed Dec 2019 → now Dec 2021· 86.3% built
- AUM TRIMURTI C BUILDING4.6 yr overdueM/S BUILT UP · Haveli, PuneP52100001581· filed Dec 2019 → now Dec 2021· 90% built
- SUNCITY 24.6 yr overdueKUKREJA INFRASTRUCTURES · Nagpur (M Corp.), NagpurP50500005011· 90.9% built
- Runal Gateway Phase 14.6 yr overdueRajendra Suresh Jain · Kiwale, PuneP52100002021· filed Dec 2019 → now Dec 2021· 90.3% built· 2 complaints
- Trade Park Phase14.6 yr overdueVTP Mohite Associates · UNDRI, PuneP52100000518· filed Dec 2019 → now Dec 2021· 90.9% built
- SATYAVINAYAK GARDEN4.6 yr overdueRamchandra Balkrishna Katgalkar · Lanja (CT), RatnagiriP52800008332· filed Dec 2019 → now Dec 2021· 73.2% built
- Kalpataru Ph-14.6 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600014684· 39.4% built
- VASUNDHARA CHS LTD - Phase II - A and B Wing4.6 yr overdueRELIABLE CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800005777· filed Dec 2019 → now Dec 2021· 39.6% built
- EPIC PHASE II4.6 yr overdueSHIVSAGAR PROMOTERS & DEVELOPERS · Wagholi, PuneP52100005410· 73% built
- Fiama Residency4.6 yr overdueFIAMA CONSTRUCTION COMPANY · Thane, ThaneP51700005483· 90.9% built
- AUDUMBER4.6 yr overdueDATTASAI ASSOCIATES · Kherdi (CT), RatnagiriP52800003183· 90.9% built
- Sai Pearl Phase 24.6 yr overdueSSD PROMOTERS AND BUILDERS · Pimpale Saudagar, PuneP52100000868· 69.3% built
- LAIJAI NAGARI4.6 yr overdueKAMLESH BACHEWAR · Wadi Bk., NandedP51100005371· 63% built
- RITU GARDENIA PHASE 14.6 yr overdueRITU BUILDERS AND DEVELOPERS · Vasai, PalgharP99000011391· 94.3% built· 1 complaint
- SAMRIDDHI4.6 yr overdueA G SUPERSTRUCTURES PVT LTD · Thane, ThaneP51700001636· filed Dec 2019 → now Dec 2021· 98.9% built
- VENKATESH NAVITA4.6 yr overdueSHREE VENKATESH REALTY · Ambegaon Khurd, PuneP52100017807· 90.9% built
- SHREE SAMARTH KRUPA CO OP HOUSING SOCIETY LTD4.6 yr overdueSHANTAI DEVELOPERS · Behind Rasbihari School, Bali Marg, NashikP51600013315· 72.7% built
- SAI ENCLAVE4.6 yr overdueM/S. RADHEYA CONSTRUCTION COMPANY · Vasai, PalgharP99000004529· 60.6% built
- PROFILE EMPYREAN4.6 yr overdueProfile Properties · PASHANP52100015723· 90.9% built
- JANKI REGENCY4.6 yr overdueADESHWAR DEVELOPERS · MIRA ROAD (E), ThaneP51700019075· 81.8% built
- SANKALP TOWERS4.6 yr overdueSANKALP REALITY · Sangli Miraj Kupwad (M Corp.), SangliP53100005098· 26.4% built
- SIDDHI SHARDA4.6 yr overdueJOGESH MADHUKAR SADVILKAR · Khed-bhadgaon, RatnagiriP52800005204· 90.9% built
- TARA RESIDENCY4.6 yr overduePRASHANT RAJARAM MESTRY · Karvanchiwadi, RatnagiriP52800014165· 92.3% built
- MARATHON EMBLEM-24.6 yr overdueUNITED ENTERPRISES · Kurla, Mumbai SuburbanP51800000556· filed Dec 2019 → now Dec 2021· 45% built
- Maple Terraces Building No. B-114.6 yr overdueMessrs. Axis Dwellings LLP · shelwali, PalgharP99000010117· filed Mar 2018 → now Dec 2021· 90% built
- Redevelopment of Lamplight CHSL4.6 yr overdueShree Mahavir Estates · Mumbai, Mumbai SuburbanP51800002461· filed Dec 2019 → now Dec 2021· 76.8% built
- SUVIDHA SQUARE4.6 yr overdueSUVIDHA MILIND BUSINESS VENTURES · Andheri, Mumbai SuburbanP51800008291· filed Dec 2019 → now Dec 2021· 99.5% built
- MONTECITO Phase II - E Building4.6 yr overdueAmit Vastu Ventures LLP · Parvati, PuneP52100002014· filed Jun 2019 → now Dec 2021· 93.2% built· 1 complaint
- NANDINI BELLUS4.6 yr overdueVENUS INFRA · MANJARI Bk, PuneP52100002950· 52.3% built· 1 complaint
- NANDANVAN COLINA4.6 yr overdueSAI SANKALP DEVELOPERS · AMBEGAON BK, PuneP52100014132· filed Mar 2021 → now Dec 2021· 39% built
- Gomes Apartment CHS4.6 yr overdueMetro Associates · Borivali, Mumbai SuburbanP51800002316· 50% built
- Vidyasagar Residency4.6 yr overdueM/S P B Builders and Developers · Kolhapur (M Corp.), KolhapurP53000008070· 90.9% built
- Anant Greens Phase I4.6 yr overdueAnant Realty · Karjat, RaigarhP52000000955· 90.9% built
- PRIDE PALMS QUEENS A2 PHASE 24.6 yr overdueLARKINS REALTORS · Thane, ThaneP51700002657· 80% built
- Pushp Complex4.6 yr overduePushpam Constructions · Phaltan (M Cl), SataraP52700001598· 81.8% built
- KUMBHAVATI NIWAS4.6 yr overdueKRISHNA BHOORARAM PUROHIT · Borivali, Mumbai SuburbanP51800014619· 69.1% built
- TRIVENI MAJESTA - WING A - PHASE I4.6 yr overdueTRIVENI LIFESTYLE DEVELOPERS LLP · Kalyan, ThaneP51700003079· 90.9% built
- Arya Apartment4.6 yr overdueAvinash Omprakash Yadav · Nr. Holy Flower School, NashikP51600019053· 90.9% built
- EUPHORIA4.6 yr overdueTODAY GLOBAL BUILDERS · Panvel, RaigarhP52000004727· filed Dec 2019 → now Dec 2021· 98.2% built
- Pristine Prolife III4.6 yr overduePRISTINE DEVELOPERS · WAKAD, PuneP52100000897· 95.5% built
- KARTIKYA KUNJ 24.6 yr overdueSUNIL CHAMANLAL GUPTA · ULWE, RaigarhP52000014867· 72.7% built
- SHREEJI GARDEN4.6 yr overdueSHUBH DEVELOPERS · Badlapur, ThaneP51700012054· 24.4% built
- AAFCON DEVELOPERS ASHOKANAND CHSL4.6 yr overdueAAFCON DEVELOPERS · Borivali, Mumbai SuburbanP51800007787· 71.8% built
- Matoshree Gruh Sankul4.6 yr overduePrashant Sambhaji Dabholkar · Kherdi (CT), RatnagiriP52800010333· 81.8% built
- RATNA MOHAN TRIVENI CHSL4.6 yr overdueATUL CORPORATES · Borivali, Mumbai SuburbanP51800006783· filed Dec 2018 → now Dec 2021· 76.6% built· 1 complaint
- Jhelum4.6 yr overdueSatre Infrastructure Private Limited · Kurla, Mumbai SuburbanP51800010836· 85.5% built
- RIVA ICONIC B4.6 yr overdueROHAN SUBHASH PATIL · Near ST stand, Sangli, SangliP53100017582· 81.8% built
- Wing B of Composite Building No 1 Imperial Edge4.6 yr overdueSD Corporation Private Limited · Ward ABCD, Mumbai CityP51900000723· 99.6% built· 1 complaint
- OM PLATINA4.6 yr overduePUNJAB SHIVAJIRAO TAUR · Satara (CT), AurangabadP51500007102· filed Dec 2019 → now Dec 2021· 89.1% built
- HARISHREE RESIDENCY-14.6 yr overdueHARISHREE CREATIONS · Ambarnath(M Cl), ThaneP51700013029· 66.4% built
- SPLENDID COUNTY PHASE III4.6 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100016493· 90.9% built
- STEVELAND4.6 yr overdueCALVIN PROPERTIES · Kurla, Mumbai SuburbanP51800001625· 90.9% built
- ORIENTAL PLAZA4.6 yr overdueMARK CONSTRUCTION · Jaysingpur (M Cl), KolhapurP53100003847· filed Jul 2019 → now Dec 2021· 90.9% built
- Oasis - Tower 14.6 yr overdueGlomore constructions · Borivali, Mumbai SuburbanP51800006404· filed Dec 2019 → now Dec 2021· 93.5% built· 44 complaints
- SHOBHA HEIGHTS4.6 yr overdueANUP VIKAS PATIL · GADHINGLAJ, KolhapurP53000015035· 90.9% built
- HIVE 654.6 yr overdueTRINITY GREEN HOMES · Pimple Nilakh, PuneP52100017395· 81.8% built
- GALAXY GARDEN PLOT 14.6 yr overdueS K DEVELOPERS · Karjat, RaigarhP52000006725· filed Dec 2019 → now Dec 2021· 65.6% built
- ARKADE ART PHASE 24.6 yr overdueARKADE REALTY · Thane, ThaneP51700004092· 71.1% built· 1 complaint
- Bloomdale Building 064.6 yr overdueMahindra Bebanco Developers Limited · MIHAN, NagpurP50500015285· 90.9% built· 1 complaint
- LOTUS - PHASE 1 B WING4.6 yr overdueRAVIKARAN CONSTRUCTION · Sus, PuneP52100007781· 69.1% built
- Viraj City Phase II4.6 yr overdueBhuyekar Patil Construction Company · Kagal (M Cl), KolhapurP53000004289· 90.9% built
- Empire Palms4.6 yr overdueEMPIRE CONSTRUCTION ·P52000008505· filed Sept 2020 → now Dec 2021· 27.3% built
- Retail A4.6 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000000436· 81.8% built
- GANGA GLITZ F. BLDG4.6 yr overdueLegends County Landmark Pvt Ltd · Pune City, PuneP52100000259· 88.4% built
- Redevelopment of Apsara CHS Ltd.4.6 yr overdueHeritage Lifestyles & Developers Pvt.Ltd. · Kurla, Mumbai SuburbanP51800001743· filed Dec 2019 → now Dec 2021· 72.3% built
- MAPLE CITY PHASE I4.6 yr overdueSHREE CHINTAMANI ENTERPRISES · Badlapur (M Cl), ThaneP51700009222· 73.3% built
- KANAKIA SEVENS4.6 yr overdueKANAKIA SPACES REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000388· 84.9% built· 17 complaints
- AYESHA RESIDENACY4.6 yr overdueS N ENTERPRISES · MAHADNAKA, RatnagiriP52800014514· 81.8% built
- GOREGAON JANSEVA CHS LTD WING A AND B4.6 yr overdueKARWA AND KEWAL KIRAN REALTORS · Borivali, Mumbai SuburbanP51800008236· 90.9% built
- ETASHA4.6 yr overdueKRISALA LIMAN LANDMARKS LIMITED LIABILITY PARTNERSHIP · Pimpri Chinchawad (M Corp.), PuneP52100012581· 90.9% built
- Atmamalik Apartment4.6 yr overdueHrishita Buildcon & Infrastructures Pvt. Ltd. · Shiwar, NashikP51600010688· filed Dec 2018 → now Dec 2021· 55.2% built
- SWAPNAPOORTI4.6 yr overdueM/S SHIV SAMRUDDHI DEVELOPERS · Andheri, Mumbai SuburbanP51800002012· filed Dec 2019 → now Dec 2021· 63.6% built
- UNITY SPLENDOUR4.6 yr overdueUNITY INFRASTRUCTURE · Pune City, PuneP52100004208· filed Dec 2018 → now Dec 2021· 76.8% built
- GLOBAL ARCADE4.6 yr overdueNINE ASSOCIATE DEVELOPERS · Vasai, PalgharP99000003305· filed Dec 2019 → now Dec 2021· 79.1% built
- AVIRON CLASSIC4.6 yr overdueSANJAY TALAKSHI SAVLA · Borivali, Mumbai SuburbanP51800008626· filed Dec 2019 → now Dec 2021· 65% built
- SHETH AVALON - PHASE 14.6 yr overdueSheth Developers Private Limited · Thane, ThaneP51700001729· 99.7% built· 11 complaints
- KANTI AVENUE4.6 yr overdueMAHAVIR REALITY · Vasai, PalgharP99000006288· filed Mar 2018 → now Dec 2021· 95.5% built
- National Harmony4.6 yr overdueSunny Housing [india] P Ltd · Panvel, RaigarhP52000002508· 90.9% built
- AADITYA PEARL4.6 yr overdueSANGHVI REALTY PIVATE LTD. · Ward ABCD, Mumbai CityP51900004271· 81.8% built
- SAHAKAR NAGAR GRACE CO-OP. HSG. SOC. LTD4.6 yr overdueAPOORVA HOMES · Kurla, Mumbai SuburbanP51800005727· filed Dec 2019 → now Dec 2021· 62.1% built
- MIDTOWN4.6 yr overdueMIDTOWN · Daman, DamanP49500000003· filed Dec 2019 → now Dec 2021· 90.9% built
- KRISHNA ANANDAM 24.6 yr overdueKRISHNA CONSTRUCTIONS · Pannase Layout, NagpurP50500012118· 90.9% built
- PANACHE PHASE IV4.6 yr overdueTRIMURTI SAI NATH INFRAS LLP · Katraj, PuneP52100019294· 27.3% built
- OSTWAL WONDER CITY4.6 yr overdueSHREE OSTWAL BUILDERS LTD · Palghar, PalgharP99000006909· 89.1% built
- Dreams Carnival-A building4.6 yr overdueSam Developers · Charholi Phata, PuneP52100004235· 90.9% built
- MOHAN PALMS4.6 yr overdueV M CONSTRUCTIONS · Thane, ThaneP51700011876· 27.3% built
- Courtyard - Ivy4.6 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000611· 86.9% built· 3 complaints
- GP TOWER4.6 yr overdueGP DEVELOPERS · Bhandara (M Cl), BhandaraP50600012727· filed Dec 2019 → now Dec 2021· 30.9% built
- Shubham Solitude4.6 yr overdueShubham Enterprise · Kurla, Mumbai SuburbanP51800010051· 80% built
- N G ECLAT A WING PHASE III4.6 yr overdueNARINDERPAL ROSHANLAL GUPTA · Andheri, Mumbai SuburbanP51800008047· 53.4% built· 1 complaint
- AADITYA ELEGANCE4.6 yr overdueSANGHVI REALTY PIVATE LTD. · Ward GNorth, Mumbai CityP51900004603· 90.9% built
- SAI SASTHA CRYSTAL4.6 yr overdueMS SAI SASTHA ENTERPRISES · Kurla, Mumbai SuburbanP51800002006· 90.9% built
- KESAR SCION4.6 yr overdueKESAR HOUSING & DEVELOPMENT CO · Kurla, Mumbai SuburbanP51800003391· 23.6% built
- TULJAI SRUSHTI4.6 yr overdueTuljai Properties · NEAR KIDS PYARADISE SCHOOL, SangliP53100021168· 81.8% built
- Kesar Equinox4.6 yr overdueKESAR CORPORATION · Ward FNorth, Mumbai CityP51900005362· 23.6% built
- Aadinath Tarangan4.6 yr overdueArihant Vastu Nirman Pvt. Ltd · Nachane (CT), RatnagiriP52800004447· 90.9% built
- Palladium Grand Phase-II-K4.6 yr overdueRaojee Constructions · DHANORIP52100007018· 90.9% built
- ZEE SQUARE4.6 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800003888· filed Dec 2019 → now Dec 2021· 86.8% built
- RAJDEEP COMPLEX4.6 yr overdueRAJTARA PROMOTERS · BHOSALE MALA, SataraP52700015431· 90.9% built
- SHILP DARSHAN COOP HOUSING SOCIETY4.6 yr overdueSHILP DARSHAN COOP HOUSING SOCIETY · PANCHAK, JAIL RAOD, NashikP51600014943· 90.9% built
- Ornate Kallisto Phase I4.6 yr overdueOrnate Buildcon Developers · Bhiwandi, ThaneP51700011610· filed Dec 2019 → now Dec 2021· 81.8% built· 1 complaint
- Shri Swami Samarth Residency4.6 yr overdueShri Swami Samartha Developers · Thane, ThaneP51700010749· filed Jan 2020 → now Dec 2021· 4.5% built
- ARCHIT GALAXY4.6 yr overdueV S ENTERPRISES · SERENE MEADOWS, NashikP51600014613· 90.9% built
- ECO PARK4.6 yr overdueDELIGHT DEVELOPERS · CHARHOLI, PuneP52100002220· filed Dec 2019 → now Dec 2021· 90.9% built· 2 complaints
- RAJ VAIBHAV NX4.6 yr overdueSHREE GANESH CONSTRUCTION COMPANY · DOMBIVLI, ThaneP51700008703· 90.9% built
- KRISHNA C AND D WING4.6 yr overdueNINA BUILDERS · BADLAPUR WEST, ThaneP51700015548· 81.8% built
- HARISHREE RESIDENCY-24.6 yr overdueHARISHREE CREATIONS · Ambarnath(M Cl), ThaneP51700013198· 44.5% built
- Elite Solitaire 154.6 yr overdueVIJAY ASSOCIATES (WADHWA) · Thane, ThaneP51700006610· 90.9% built· 8 complaints
- ARCH GULMOHAR B-WING4.6 yr overdueARCH DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500013559· 81.8% built
- M SQUARE DREAMLAND4.6 yr overdueM SQUARE PROPERTIES · THITE VASTIP52100018686· 90.9% built
- Panvelkar Utsav Phase I4.6 yr overdueSai Swarg Enterprises · Valivli, ThaneP51700013199· 90.9% built
- UNIQUE ORBIT II4.6 yr overdueUNIQUE SHANTI REALTORS · MIRA ROAD EAST, ThaneP51700009949· filed Dec 2020 → now Dec 2021· 90.9% built
- Mateshwari Desire4.6 yr overdueMateshwari Housing LLP · AKURLI VILLAGE, RaigarhP52000012066· filed Dec 2019 → now Dec 2021· 15.5% built· 1 complaint
- STERLING SHELTERS4.6 yr overdueICON DEVELOPERS · Haveli, PuneP52100022411· 81.8% built
- THE WINDSOR4.6 yr overdueGADIRAJU SUBRAMANYAM RAJU PROPRIETOR OF TIRUPATHI ENTERPRISES · Borivali, Mumbai SuburbanP51800000118· filed Dec 2019 → now Dec 2021· 58.4% built· 2 complaints
- PALKAR RESIDANCY4.6 yr overdueSandeep Balkrishna Walavalkar · Kankavali, SindhudurgP52900008832· filed Dec 2019 → now Dec 2021· 81.8% built
- Market Place4.6 yr overdueVTP Mohite Associates · UNDRI, PuneP52100000587· filed Dec 2019 → now Dec 2021· 90.9% built
- Prathamesh Palms4.6 yr overduePRASHANT JAISWAL · Nagpur (M Corp.), NagpurP50500005510· 77.7% built
- MANORAMA COMPLEX4.6 yr overdueKEDAR CONSTRUCTION · Sawantwadi (M Cl), SindhudurgP52900006912· filed Dec 2019 → now Dec 2021· 90.9% built
- EELA Phase-II4.6 yr overdueM/s. Siddhashila Developers · Punawale, PuneP52100004281· filed Dec 2020 → now Dec 2021· 90.9% built
- Ace Residency4.6 yr overdueAce Infra · Kolhapur (M Corp.), KolhapurP53000000422· 59.5% built
- ARV Newtown4.6 yr overdueVedant Infracon · Pisoli, PuneP52100002738· 90.9% built
- ADINATH ASTHA4.6 yr overdueSHREE RIDDHI SIDDHI CONSTRUCTIONS · SECTOR-2A, RaigarhP52000014792· 90.9% built
- REGAL HEIGHTS4.6 yr overdueSUVIDHA ENTERPRISES · Vasai, PalgharP99000009178· 49.1% built
- DHRUVA4.6 yr overdueSANJEEVANI LANDSCAPE DHRUVA · PUNAWALE, PuneP52100000555· 42.5% built
- SAI PARADISE4.6 yr overdueHaresh Premchand Chandwani · Baner, PuneP52100002660· 72.6% built
- Shivaji Park4.6 yr overdueAAradhya Landmarks & Infra Pvt. Ltd. · Kudal (CT), SindhudurgP52900010548· 79.6% built· 1 complaint
- VARAD4.6 yr overduePhoenix Developers · Washi Naka, KolhapurP53000016211· 90.9% built
- RAINBOW HEIGHTS4.6 yr overduePATIL AND ASSOCIATES · Sangli Miraj Kupwad (M Corp.), SangliP53100008809· filed Dec 2019 → now Dec 2021· 90.9% built
- Saarrthi Savvy Homes4.6 yr overdueSiddharth Value Homes Limited Liability partnership · Hinjavadi (CT), PuneP52100001288· filed Dec 2019 → now Dec 2021· 90.9% built· 3 complaints