- Trimurti Apartment2.9 yr overduePradip Gauru More · Mangaon, RaigarhP52000022600· 27.3% built
- Shree Datta Leela Apartment2.9 yr overdueYADUNATH BABURAO VIBHUTE · Rane Nagar, NashikP51600015635· 90.9% built
- HILLWOOD2.9 yr overdueSHREEJI LIFESPACES PRIVATE LIMITED · Mumbai City, Mumbai CityP51900012502· 32.3% built
- UNIVERSE I PHASE I2.9 yr overdueGayasuddin Riyazuddin Khan · Thane, ThaneP51700009797· 90.9% built
- YOGI MILAN PHASE IV2.9 yr overdueSHIV BUILDERS · SILVASSA, Dadra & Nagar HaveliP49600000084· 90.9% built
- Sunrise D2.9 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000640· 99.9% built· 3 complaints
- NAMRATA GLORIA2.9 yr overdueNAMRATA CONSTRUCTION · RAVET PUNE, PuneP52100003691· 72.7% built
- KUBERAKSHE2.9 yr overdueAKSHAY BUILDERS · MARUTI NAKA, RaigarhP52000019698· 50.5% built
- PATELS RESIDENCY - E WING2.9 yr overduePARAM BUILDERS AND DEVELOPERS · AMBARNATH, ThaneP51700023093· 9.1% built
- 45 SHASHWAT AVENUE - B2.9 yr overdueSAMARTTHA PRISHA PROPERTIES · PUNAWALE, PuneP52100021932· 90.9% built· 5 complaints
- Ruparel Elara2.9 yr overdueShree Siddhivinayak Infrastructure & Realty · Borivali, Mumbai SuburbanP51800014328· filed Dec 2019 → now Dec 2023· 56.4% built· 10 complaints
- MAHAVIR KUNJ D WING B TYPE C2.9 yr overdueRajesh Realtors · Palghar, PalgharP99000028618· 90.9% built
- Legacy Vista2.9 yr overdueLEGACY LIFESPACES LLP · Rahatani, PuneP52100024212· 86.4% built
- SAI KAMAL2.9 yr overdueACE DEVELOPER · NEXT TO KAUSHAL BUNGLOW, PuneP52100018894· 90.9% built
- MANAHIL HEIGHTS2.9 yr overdueK D CONSTRUCTION · Chiplun (M Cl), RatnagiriP52800011982· 52.7% built
- PALM SPRINGS PHASE - I2.9 yr overdueArvel Developers · ALIYALI VILLAGE, PalgharP99000016750· 89.1% built
- PANCHAVATI PALACE2.9 yr overdueCHINTAMANI CONSTRUCTION · BHUSAWAL, JalgaonP49900021412· 0.1% built
- Dashmesh Crystal2.9 yr overdueDashmesh Infrastructure · kharvai naka, ThaneP51700020525· 90.9% built
- Kalpataru Radiance D2.9 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000579· filed Jun 2022 → now Dec 2023· 97.2% built· 47 complaints
- Sunrise B2.9 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000922· 93.9% built· 1 complaint
- INDUSTRIAL BUILDING NO 12.9 yr overdueSHREE NARAYAN INDUSTRIAL DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000011126· filed Dec 2021 → now Dec 2023· 57.1% built
- ARKADE EARTH - HAZEL2.9 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800022666· 90.9% built
- Kohinoor Square Phase 22.9 yr overdueKohinoor CTNL Infrastructure Company Private Limited · Ward GNorth, Mumbai CityP51900012308· 81.8% built· 2 complaints
- Nirman Milestone2.9 yr overdueNIRMAN VENTURE · Mukai Chowk, PuneP52100022161· 80% built· 1 complaint
- PEARL HARMONY2.9 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800004224· filed Dec 2021 → now Dec 2023· 46.7% built
- Royal Sandesh Dawa Bazar2.9 yr overdueGARG HOTELS & REAL ESTATE PRIVATE LIMITED · Nagpur (M Corp.), NagpurP50500009211· 73.9% built
- Lotus Pearls2.9 yr overdueSwayambhu Properties · Mamurdi, PuneP52100002516· 14.5% built
- PRATHMESH DARSHAN2.9 yr overdueJAYDEEP MAHALAXMI CONSTRUCTION · Kurla, Mumbai SuburbanP51800009248· 72.2% built· 4 complaints
- CELLO MAGIC TOUCH PHASE 12.9 yr overdueCELLO MAGIC TOUGH · PALGHAR EAST, PalgharP99000018271· 36.4% built
- PYRAMID ELEMENTS2.9 yr overduePYRAMID INFRATECH CO · Thane, ThaneP51700013897· 81.8% built
- KRISHNA KUNJ2.9 yr overduePRANIT VASANT SHEDJI · OTHONIAL COLONY, SangliP53100021380· 81.8% built
- KISHOR NIWAS2.9 yr overdueRATNA PREMJIBHAI GALA · Borivali, Mumbai SuburbanP51800014618· 0% built
- BHAWANI CONSTRUCTION2.9 yr overdueBHAWANI CONSTRUCTIONS · Mira-Bhayandar (M Corp.), ThaneP51700012204· 27.3% built
- Whista 1st Street2.9 yr overdueNarang & Mahaveer Developers LLP · Andheri, Mumbai SuburbanP51800013101· 35.7% built
- GREEN SQUARE2.9 yr overdueRASKAR REALTORS THROUGH ITS PROPRIETOR VIJAY NIVRUTTI RASKAR · BORHADEWADI MOSHI, PuneP52100018311· 81.1% built
- MAA MAHALAXMI RESIDENCY2.9 yr overdueMAA VAISHNAVI INFRA · SINDHI (MEGHE), WardhaP50400020774· 95.5% built
- Vaiga2.9 yr overdueSOHANLAL SHANKARLAL VISHNOI · Chinchwad, PuneP52100022419· 99.8% built
- CASALINO TOWERS PHASE II2.9 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100023594· 9.1% built· 1 complaint
- AASAWARI CO. OP. HSG.SOCIETY2.9 yr overdueVYAS BUILDCON PVT. LTD. · IDEAL COLONY, PuneP52100024235· 81.8% built
- ARKADE EARTH - FERN2.9 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800004750· 88.5% built· 1 complaint
- POORVA SHRUSHTI A BUILDING2.9 yr overdueTejas Pooja Associates · WADGOAN KH, PuneP52100014650· 90.9% built
- BALAJI RESIDENCY2.9 yr overdueOM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010313· 80.9% built
- CLASSIC RESIDENCY2.9 yr overdueCLASSIC CONSTRUCTION CO. · Vasai, PalgharP99000005113· 90.9% built
- EMPIRE HEIGHTS2.9 yr overdueMAHADEV LIFESPACES LLP · NODE DRONAGIRI, RaigarhP52000016430· 88% built
- Utkarsha Phase - III2.9 yr overdueMakarand Madhav Kulkarni · Utkarsha Colony, Borude Mala, Ahmednagar., AhmednagarP52200019301· 90.9% built
- PARISHRAM RESIDENCY CO-OP HSG SOC LTD2.9 yr overduePARISHRAM RESIDENCY CO OPERATIVE HOUSING SOCIETY LIMITED · NR COMFORT ZONE, NashikP51600020643· 81.8% built
- NAVDURGA SHIV COMPLEX - B WING2.9 yr overdueNAVDURGA SHIV COMPLEX - B WING · SAMISHRA NAGAR,, RaigarhP52000020317· 4.5% built
- GAMI REAGAN2.9 yr overdueSHRI GAMI INFOTECH PVT LTD · Thane, ThaneP51700013200· 93% built
- Sunrise C2.9 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000625· 92.9% built
- DEV SAI GARDEN2.9 yr overdueDEV HOMES · Navade, RaigarhP52000014142· 90.9% built
- CHANDRABHAGA PLAZA2.9 yr overdueVINAYAK GANPAT OWALEKAR · ULWE NODE NAVI MUMBAI, RaigarhP52000024226· 73.4% built
- MAN RESIDENCES2.9 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700008980· 31.4% built
- VASANT OASIS CAMELIA BLDG 132.9 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000921· 46.4% built· 8 complaints
- BAUG-E-MOHAMMED2.9 yr overdueRIZWAN HABIB MALIK · Ward E, Mumbai CityP51900010538· filed Dec 2022 → now Dec 2023· 90.5% built
- SHRIDATTADARSHAN APARTMENT2.9 yr overdueSAHYADRI BUILDCON · DAMODAR NAGAR, NashikP51600023976· 90.9% built
- ORCHID TOWERS2.9 yr overdueSAVALI CONSTRUCTIONS · PADMAWATI NAGARI, NEAR SANGRAM NAGAR, AurangabadP51500033091· 90.9% built
- FIA FLORENZA2.9 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000016116· 90.9% built
- DEDGAONKAR ARCADE2.9 yr overdueTRINITY FACADES PRIVATE LIMITED · GURUWAR PETH PUNE, PuneP52100021263· 70.9% built
- OMKAR ENCLAVE2.9 yr overdueOMKAR ENTERPRISES · Kalyan, ThaneP51700007523· 90.9% built
- ORION WEST2.9 yr overdueGIRISH & ASSOCIATES · Andheri, Mumbai SuburbanP51800023726· 90.9% built
- SANDESH CITY APARTMENTS- 42.9 yr overdueSandesh Infrastructures Pvt Ltd · Jamtha, NagpurP50500010124· 81.2% built· 1 complaint
- ARKADE EARTH-DAFFODIL2.9 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800004440· 88.5% built
- CASALINO TOWERS - PHASE 12.9 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100014588· 18.2% built
- Ganeshwadi CHS LTD - S.R.A2.9 yr overdueAshok Rajaram Gupta · Bhatwadi, Mumbai SuburbanP51800010062· 2.7% built· 80 complaints
- AGARWAL PALAZZO2.9 yr overdueBALAJI DEVELOPERS · BORIVALI WEST, Mumbai SuburbanP51800017406· 98.6% built
- NAV-VISHWADHAM CHSL2.9 yr overdueWOLFPACK HOUSING CORPORATION · Andheri, Mumbai SuburbanP51800001669· 90.9% built
- LODHA PARK2.9 yr overdueLODHA DEVELOPERS LIMITED · Ward GSouth, Mumbai CityP51900001339· filed Dec 2021 → now Dec 2023· 90.9% built· 75 complaints
- SAFA PARK C BUILDING2.9 yr overdueSAFA BUILDERS & DEVELOPERS · PETH MAP, RatnagiriP52800015797· 90.9% built
- DREAM ONYX2.9 yr overdueOM SAI DEVELOPERS · ULWE, RaigarhP52000008835· 30.2% built
- 173 West Oaks2.9 yr overdueSigma Housing · Wakad, PuneP52100024201· 79.6% built
- Metro Life Maxima Residences Phase II2.9 yr overdueRAMA SYNERGY SPACES · Next to Indira College of Commerce and Science, PuneP52100023984· 75.3% built· 11 complaints
- RAJ FLORENZA2.9 yr overdueRAJ REALTORS · Vijay Park, ThaneP51700001219· 90.9% built
- ATHARV PALACE2.9 yr overdueJAGRUTI ENTERPRISES · Andheri, Mumbai SuburbanP51800008512· 90.9% built
- Wakad Business Bay2.9 yr overdueMihir Projects · Behind Tip Top International Hotel, PuneP52100021744· 90.9% built· 1 complaint
- VISION HEIGHTS WING D2.9 yr overdueFIONA REALTY PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800010431· filed Jun 2021 → now Dec 2023· 81.8% built
- Kalpataru Radiance A2.9 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000591· filed Jun 2022 → now Dec 2023· 98.3% built· 27 complaints
- RAJ HERITAGE 12.9 yr overdueRAJ REALTY BUILDERS AND DEVELOPERS PRIVATE LIMITED · RAMDEV PARK, ThaneP51700020259· 90.9% built
- Shivam Greens2.9 yr overdueM.K.DEVELOPERS · Badlapur, ThaneP51700014478· 46.4% built
- Green Park Business Center2.9 yr overduePrafulla Bhimdeo Taware · Near to Rui Hospital, PuneP52100014188· 90.9% built
- RUDRAKSHA BUILDING NO 112.9 yr overdueRAJ UNIVERSAL · DAHISAR EAST, Mumbai SuburbanP51800021545· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- RAJ BAUG2.9 yr overdueNEHALDHARA REALTORS · Neral, RaigarhP52000000813· 28.5% built
- Sankalp Siddhi Wing E2.9 yr overdueGarve Patil Associates · Kalambe T. Thane (CT), KolhapurP53000004632· 30.5% built
- Orange City Wholesale Market - Phase IV2.9 yr overdueORANGE CITY MALLS PRIVATE LIMITED · Danagunj, NagpurP50500015076· 27.3% built
- addressOne - Phase 52.9 yr overduePeninsula Land Limited · Near MCA Stadium Gahunje Pune, PuneP52100018855· 78.2% built· 5 complaints
- SHIV SAI RESIDENCY2.9 yr overdueSHIV SAI BUILDERS AND DEVELOPERS · AMBERNATH, ThaneP51700018693· 4.5% built
- 39 PART PLUS 40 PART WADGAON KH TAL HAVELI DIST PUNE PHASE I2.9 yr overduePMAY CELL,PUNE MUNICIPAL CORPORATION · WADGAON KH, PuneP52100023682· 90.9% built
- VRAJ BUNGALOW A2.9 yr overdueSHREE INFRA PROJECT · Indiranagar, NashikP51600009871· 72.7% built
- HIRA KUTIR CHS LTD2.9 yr overdueH RISHABRAJ PROJECTS · Borivali, Mumbai SuburbanP51800005267· 9.1% built
- OM KAVISH EXCELLENCY2.9 yr overdueOM JAI KAVISH REALTORS · VALAN NAKA, PalgharP99000020278· 78.2% built
- Green Heights2.9 yr overdueGreen Environment Constructions · Thane, ThaneP51700004561· 90.9% built
- S R SCHEME AT RAHUL NAGAR, SEWREE2.9 yr overdueSHIVSHAHI PUNARVASAN PRAKALP LTD · Ward FSouth, Mumbai CityP51900005130· 90.9% built
- Terraform Dwarka2.9 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002826· 91.2% built· 1 complaint
- KalpaVruksha C2.9 yr overdueVaichal Constructions Pvt Ltd · -, PuneP52100019364· 90.9% built
- The Cliff Garden2.9 yr overdueVH Township Private Limited · Maan, Hinjawadi, PuneP52100004906· 90.9% built
- Bhavani Heights2.9 yr overdueKalyani Enterprises · Badlapur (M Cl), ThaneP51800003594· 59.1% built· 9 complaints
- DAFFODILS K BUILDING2.9 yr overdueVISHHRAM DEVELOPERS · SOMATANE, PuneP52100011485· 81.8% built· 1 complaint
- ABHILASHA2.9 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100024895· 9.1% built
- SRISHTI PRIDE PHASE 1- WING A2.9 yr overdueKRISHNA ENTERPRISE · Kurla, Mumbai SuburbanP51800010994· 99.6% built
- Bellezon2.9 yr overdueVivek Patrick Pimenta · Khopwadi, PalgharP99000022464· 20% built
- SHIVKRUPA PRESTIGE2.9 yr overdueSHIVKRUPA CONSTRUCTION · DHAYRI, PuneP52100023925· 62.7% built
- RITESH EMPIRE2.9 yr overdueSAPPHIRE DEVELOPERS · Kalyan, ThaneP51700013877· 95.5% built· 2 complaints
- Dream Opal2.9 yr overdueD D Constructions · Ulawe, RaigarhP52000013656· 90.5% built
- Hubtown Harmony Retail2.9 yr overdueHeet Builders Private Limited · Matunga East, Mumbai CityP51900017699· 80.9% built
- N B OPAL PHASE -I2.9 yr overdueNanasaheb Bhintade Spacess Pvt. Ltd. · Near Podar international school, PuneP52100023516· 98.2% built· 1 complaint
- NABHA NAYAN APARTMENT2.9 yr overdueGAURAV CONSTRUCTION · PATHARDI SHIVAR, NashikP51600015193· 90.9% built
- VANALIKA-PARADISE- III -3B2.9 yr overdueM/S. AVIOR MAJESTIQUE PROPERTIES · Mulshi, PuneP52100016963· 90.9% built· 2 complaints
- DAFFODIL GREENS F BUILDING2.9 yr overdueVISHHRAM NLP ASSOCIATES · DAUND, PuneP52100011911· 64.1% built· 2 complaints
- Prakash Pratima2.9 yr overdueAnant Developers · GARIBACHA WADA, ThaneP51700022999· 43.6% built
- Venkatesh Paradise B wing2.9 yr overdueSANJAY DNYANOBA JAGTAP · BUND GARDEN ROAD, PuneP52100001428· 37.5% built
- Altus2.9 yr overdueArham Lifespace Realty · Balewadi, PuneP52100020726· 81.8% built
- AURUM2.9 yr overdueKAMAL DEVELOPERS · NAVI MUMBAI, RaigarhP52000024006· 90.9% built
- Emerald Park2.9 yr overdueBalasaheb Vyankatrao Gaikwad · Punawale, PuneP52100001532· 69.1% built
- HYDE PARK RESIDENCY F1 BUILDING PHASE2.9 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700008542· 90.9% built
- AKASH PRESTIGE2.9 yr overdueDEEPAK ANANDA DHANOKAR · KARMYOGI NAGAR, NashikP51600023118· 84.5% built
- ACROPOLIS2.9 yr overdueVORA ASSOCIATES · BORIVALI WEST, Mumbai SuburbanP51800004939· 90.5% built
- GOPALKRISHNA SANKUL2.9 yr overdueMAAD CONSTRUCTION · NAIGAON EAST, PalgharP99000010352· 87.3% built· 1 complaint
- Redevelopment of JUHU ANKUR CHS LTD2.9 yr overdueKDI HOLDINGS PVT. LTD. · Andheri, Mumbai SuburbanP51800004899· 90.9% built· 2 complaints
- VAIBHAVI HEIGHTS2.9 yr overdueYASHPAL DEWANAND KHOBRAGADE · Datala, ChandrapurP50900008437· 87.9% built
- Runwal Bliss Wing - A2.9 yr overdueEvie Real Estate Private Limited · Kurla, Mumbai SuburbanP51800001670· 98% built· 9 complaints
- VASANT OASIS ZINNIA BLDG 172.9 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000980· 40.9% built· 7 complaints
- AMAN PLAZA2.9 yr overdueAMAN CONSTRUCTIONS · OPP NATIONAL ENGLISH SCHOOL, AhmednagarP52200014104· 90.9% built
- 7 Plumeria Drive- Phase 22.9 yr overdueB A Consulting · Punawale, PuneP52100023970· 44.7% built
- GALAXY APARTMENT2.9 yr overdueORCHID CONSTRUCTION · Vasai-Virar City (M Corp), PalgharP99000011081· filed Dec 2018 → now Dec 2023· 90.9% built
- SHIVSHAKTI2.9 yr overdueATUL HARISHCHANDRA YELBHAR · CHAKAN NAGAR PALIKA, PuneP52100010645· filed Dec 2019 → now Dec 2023· 81.8% built
- VRAJ BUNGALOW B2.9 yr overdueSHREE INFRA PROJECT · indiranagar, NashikP51600009649· 72.7% built
- Essgee Options One Phase I2.9 yr overdueGMJ BUILDERS & DEVELOPERS · Ward GNorth, Mumbai CityP51900017841· 81.1% built
- Gingelia Residential2.9 yr overdueAcme Housing India Private Limited · Thane (M Corp.), ThaneP51700001033· filed Dec 2022 → now Dec 2023· 51.7% built· 8 complaints
- VISION STARWEST PHASE - 22.9 yr overdueVISION CREATIVE DEVELOPERS · TATHAWADE, PuneP52100026625· 90.9% built
- ZEE SAHYADRI2.9 yr overdueZEE COM TRADE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800006241· 0% built
- Sandesh City Apartment 12.9 yr overdueSandesh Infrastructures Pvt Ltd · Jamtha, NagpurP50500006822· 91.1% built
- Horizons at Wakad, Phase-22.9 yr overdueADI REALTIES · Wakad, PuneP52100024872· 70.9% built
- MORELLA2.9 yr overdueGLOBAL PROPERTIES · MARUNJI, PuneP52100017772· 80% built
- CHINTAMANI HABITAT DAFFODILS TYPE A1 - D2.9 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700001558· 46.1% built
- 104 HIG tenaments on S.N. 47,57,58 at Mouje Akoli, Amravati2.9 yr overdueAmravati Housing And Area Development Board Amravati · Akoli, AmravatiP50300023822· 13.6% built
- Construction of 96 Ts EWS, 6 Ts MIG, 40 shops and 1 MHADA office on F P No 109 110 savedi Ahmednaga2.9 yr overdueNASHIK HOUSING & AREA DEVELOPMENT BOARD · Savedi, AhmednagarP52200019849· 50.9% built
- YashONE Hinjawadi - Phase 12.9 yr overdueVilas Javdekar Eco Shelters Private Limited · Hinjawadi, PuneP52100019468· 99.2% built
- ATHARVA2.9 yr overdueKedar Vikasrao Deshpande · Baner, PuneP52100022966· 90.9% built
- SEJAL VIHAR2.9 yr overdueNitin Laxman Jadhav · NEAR WATER TANK, NashikP51600023934· 9.1% built
- Daga Sapphire Infinity2.9 yr overdueDaga Infratech Pvt Ltd · CAMP, AmravatiP50300007253· filed Dec 2019 → now Dec 2023· 31.8% built· 2 complaints
- ASHOK ODYSSEY - B WING2.9 yr overdueSANYAM REALTORS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800004418· 90.9% built· 5 complaints
- ANIRUDHA SAI2.9 yr overdueSHANKAR SHIMGYA PATIL · Ulawe, RaigarhP52000006099· filed Dec 2018 → now Dec 2023· 90.9% built
- B-SQUARE2.9 yr overdueSQUARE ESTATE · AMBAD, NashikP51600014876· 90.9% built
- PLOT NO.7, VIVA, PIRANGUT2.9 yr overduePACT REAL ESTATE PRIVATE LIMITED · Pirangut, PuneP52100002681· 56.4% built
- Navkar Tower Part 12.9 yr overdueNavkar Estate and Homes Pvt Ltd · Vasai, PalgharP99000007525· 90.4% built
- New Suraj Tower2.9 yr overdueEkdanta Constructions and Developers · Thane, ThaneP51700015400· 90.9% built
- 43 Privet Drive- C Building2.9 yr overdueS S Properties · Balewadi, PuneP52100025169· 70% built
- MAYUR CHS LTD2.9 yr overdueMahesh Shriram Borkar · NAUPADA, ThaneP51700024371· 90.9% built
- MARATHON NEXZONE AURA -22.9 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000669· 72.7% built· 6 complaints
- TERRAFORM DWARKA2.9 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002718· 91.2% built
- VIJAY CHS LTD2.9 yr overdueSAI LIFE DEVTAA REALTORS · Kurla, Mumbai SuburbanP51800008457· filed Dec 2022 → now Dec 2023· 90.9% built· 3 complaints
- DREAM DIVINE2.9 yr overdueDIVINE DEVELOPERS · KARANJADE, RaigarhP52000010021· 50.1% built
- Kyan Resorts And Clubs Private Limited Phase 32.9 yr overdueKyan Resorts & Clubs Private Limited · Mothe Wengaon, RaigarhP52000009821· 69.1% built
- COSMOS ENCLAVE - CHESTNUT2.9 yr overdueMONARCH DEVELOPERS · THANE, ThaneP51700015892· 90.9% built
- DAMODARPRIYA2.9 yr overdueSHREE CHAMUNDA REALTY · NAVI MUMBAI, RaigarhP52000023284· 98.5% built
- SHAH KINGDOM PHASE I A WING2.9 yr overdueSHAH GROUP BUILDERS LTD · Navi Mumbai (M Corp.), ThaneP51700006697· 30.7% built· 2 complaints
- Annapurna Aquarius2.9 yr overdueAnnapurna Properties · BHAYANDER WEST, ThaneP51800002185· 90.9% built
- NINE STAR GRANDEUR2.9 yr overdueNINE STAR HOME MAKERS · SHIVAJI CHAUK, PalgharP99000021931· 3% built
- Orange City Wholesale Market-Phase I2.9 yr overdueORANGE CITY MALLS PRIVATE LIMITED · Danaganj, NagpurP50500015077· 27.3% built
- VASANT OASIS LILLIUM BLDG 162.9 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000918· 36.7% built· 2 complaints
- Dominion Park2.9 yr overdueAmalfi Realty Pvt Ltd · Near PCMC water tank, PuneP52100024698· 10.5% built
- GANPATI RESIDENCY2.9 yr overdueGANPATI RESIDENCY · Badlapur (M Cl), ThaneP51700011720· 49.5% built
- Menlo Homes Kharadi Next Phase I2.9 yr overdueMENLO REALTY LLP · Wagholi, PuneP52100005881· 81.8% built· 1 complaint
- ARKADE EARTH - GARDENIA2.9 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800010074· 88.5% built
- MAN BUSINESS SPACES2.9 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700006944· 21.8% built
- AUDUMBER SHRUSHTI2.9 yr overdueKATHOD DAMA BHOIR · NEAR ST LAWRENCE INTERNATIONAL SCHOOL, BEFORE MUTHA COLLEGE, MHASOBA NAGAR, UMBARDE, ThaneP51700015962· 30% built
- Parshvanath2.9 yr overdueACORP REALTY · Andheri, Mumbai SuburbanP51800017960· 90.9% built
- SAVALIYA AVENUE2.9 yr overdueSHREE SAVALIYA HOUSING LLP · Goddeo Village, ThaneP51700021757· 50.5% built
- VRINDAVAN HOMES2.9 yr overdueSHREE RUJVE ENTERPRISES · Bandhiwali, RaigarhP52000011360· filed Dec 2022 → now Dec 2023· 86% built
- AURIS SERENITY TOWER 22.9 yr overdueTRANSCON-SHETH CREATORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001413· 72.7% built· 18 complaints
- SPAN ELITE2.9 yr overdueSPAN STRUCTURES · Pushpak Node, Vahal,, RaigarhP52000021503· 90.9% built
- SHREE RAJ VIHAR APARTMENT2.9 yr overdueRAHUL BHASKARRAO THAKARE · MAKHMALABAD PANCHVATI, NashikP51600017066· 90.9% built
- VARAD VINAYAK RESIDENCY2.9 yr overdueHIMANSHU SHAM TENDULKAR · MAHADEV ALI, PalgharP99000019232· 90.9% built
- Kalpataru Radiance C2.9 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000482· filed Jun 2022 → now Dec 2023· 97% built· 37 complaints
- FOREST COUNTY-PH 32.9 yr overdueAjanta Enterprises · Near Eon IT parkP52100017681· 76.6% built
- PEARL MAJESTIC2.9 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800015348· 90.9% built
- K K HEIGHTS2.9 yr overdueK K DEVELOPERS · Nanded Waghala (M Corp.), NandedP51100014171· 27.3% built
- SAI TIRTH PHASE I2.9 yr overduePINNACLE CORPORATION · JOVELI, ThaneP51700020430· 90.9% built
- WESTERN RIVER RESIDENCY2.9 yr overdueVGT Constructions · Bhosari, PuneP52100010759· filed Dec 2022 → now Dec 2023· 78.6% built· 1 complaint
- Sunteck West World 2, Tivri, Naigaon East2.9 yr overdueSunteck Realty Limited · Tivri, PalgharP99000017627· 90.9% built· 8 complaints
- SHIVRAJ RESIDENCY2.9 yr overdueSHREE SAI DEVELOPERS · PIRANGUTE, PuneP52100022479· 81.8% built
- AASHVI HEIGHTS2.9 yr overdueAASHVI GROUP · Panvel, RaigarhP52000019874· 27.3% built
- MANORAMA HEIGHTS2.9 yr overdueMAULI KRUPA DEVELOPERS · SECTOR NO 9, PuneP52100024419· 28.2% built
- Dattaprasad Residency2.9 yr overdueVAASTU VAIBHAV CONSTRUCTIONS · Aagartakli, NashikP51600027844· filed Dec 2022 → now Dec 2023· 90.9% built
- GOKULDHAM RESIDENCY2.9 yr overdueOM BUILDERS AND DEVELOPERS · PRATAP MILL COMPOUND, JalgaonP49900015187· 4.6% built
- SRISHTI OASIS PH 2 WING B SANDS2.9 yr overdueSHIV KRUPA ENTERPRISE · Kurla, Mumbai SuburbanP51800005548· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- SAI SATYAM RESIDENCY2.9 yr overdueSAI SATYAM GROUP · WADEGHAR, ThaneP51700015767· 60.6% built
- BHOOMI CELESTIA -A1 WING2.9 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Librity Garden, Opp. S.N.D.T. Girls Collage, Mumbai SuburbanP51800010810· filed Dec 2022 → now Dec 2023· 63.6% built
- Arch Kusum2.9 yr overdueARCH DEVELOPERS · Padegaon, AurangabadP51500023812· 81.8% built
- BLUE BELLS PHASE 22.9 yr overdueKAVITA DEVRAM WALHEKAR · RAJIV GANDHI INFOTECH PARK, PHASE - II, MAAN, HINJAWADI, PuneP52100031327· filed Mar 2022 → now Dec 2023· 81.8% built
- Empire Estate 12.9 yr overdueJaved Yasin Kojar · Kaman village, PalgharP99000030913· 74.4% built
- Pushpakunj Homes2.9 yr overdueBHAKTI BUILDERS · Near Lokmanya Hospital, PuneP52100031893· 72.7% built
- ARIHANT ENCLAVE2.9 yr overdueM/s Arihant Enterprise · Andheri, Mumbai SuburbanP51800030594· 23.6% built
- CRD Gardenia Apartments 6 - Phase III2.9 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000049411· 81.8% built
- RUTUGANDH2.9 yr overdueNAKSHATRA BUILDCON · MHASKARNES COLONY 2, PuneP52100029278· 63.6% built
- 18 Latitude Commercial2.9 yr overdueG D Square Developer · Punawale, PuneP52100008782· filed May 2019 → now Dec 2023· 81.8% built
- Mohan Altezza II2.9 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700007011· filed Dec 2019 → now Dec 2023· 90% built· 2 complaints
- Shree Heights2.9 yr overdueAarc Constructions · Sahkar Nagar, AkolaP50100032701· 81.8% built
- REGALIA2.9 yr overdueYASHODHAN SHANTI REALTORS · Vasai-Virar City (M Corp), PalgharP99000009586· filed Dec 2020 → now Dec 2023· 90.9% built
- SARTHAK2.9 yr overdueAmco Landmark LLP · Pune City, PuneP52100030813· 81.8% built
- SWASTIK ELEGANCE2.9 yr overdueSwastik Realtors · Swastik park Chembur, Mumbai SuburbanP51800031928· 90.9% built