RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 45 of 59
- FIA FLORENZA2.6 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000016116· 90.9% built
- VTPSolitaire Building C AND D2.6 yr overdueWESTERNCITY TOWNSHIPS LLP · pashan, PuneP52100022428· 87.2% built· 3 complaints
- Vaikunth Cluster 42.6 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003283· 88.6% built· 11 complaints
- Shivam Greens2.6 yr overdueM.K.DEVELOPERS · Badlapur, ThaneP51700014478· 46.4% built
- Sunteck West World 2, Tivri, Naigaon East2.6 yr overdueSunteck Realty Limited · Tivri, PalgharP99000017627· 90.9% built· 8 complaints
- LODHA PARK2.6 yr overdueLODHA DEVELOPERS LIMITED · Ward GSouth, Mumbai CityP51900001339· filed Dec 2021 → now Dec 2023· 90.9% built· 73 complaints
- ANGEL REGENCY2.6 yr overdueANGEL DWELLERS INFRATECH PRIVATE LIMITED · KACHIMET, NagpurP50500025729· 13.6% built
- VANALIKA-PARADISE- III -3B2.6 yr overdueM/S. AVIOR MAJESTIQUE PROPERTIES · Mulshi, PuneP52100016963· 90.9% built· 2 complaints
- AMBER2.6 yr overdueDG Group & Shree Balaji Developers · IRRIGATION COLONY, NashikP51600022451· 18.2% built
- PLOT NO.7, VIVA, PIRANGUT2.6 yr overduePACT REAL ESTATE PRIVATE LIMITED · Pirangut, PuneP52100002681· 56.4% built
- Sayama Phase 32.6 yr overduePuranik Builders Limited · Lonavala (M Cl), PuneP52100002137· 81.8% built
- RAJ FLORENZA2.6 yr overdueRAJ REALTORS · Vijay Park, ThaneP51700001219· 90.9% built
- SAI MAULI APARTMENT2.6 yr overdueSHREE MAULI DEVELOPERS · AMBAD, NASHIK, NashikP51600020480· 95.5% built
- RAJ HOMES2.6 yr overdueRAJ HOMES · Thane, ThaneP51700019190· 85.9% built
- Shivoham Enclave2.6 yr overdueSiddheshwar Builders Pvt. Ltd. · EAST, Mumbai SuburbanP51800008766· filed Jun 2022 → now Dec 2023· 64.3% built
- VASANT OASIS LILLIUM BLDG 162.6 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000918· 36.7% built· 2 complaints
- PRIDE INDUSTRIAL ESTATE2.6 yr overdueRIDDHI DEVELOPERS · Vasai, PalgharP99000003219· 81.8% built
- Kush Solitaire2.6 yr overdueKush Buildcon LLP · Village Malad East Mumbai, Mumbai SuburbanP51800028906· 90.9% built
- ROYAL CASSIA A WING2.6 yr overdueROYAL CASSIA A WING · Haveli, PuneP52100019483· 90.9% built· 1 complaint
- Aapla Ghar Paud 2 Phase I2.6 yr overduePhoenix Ventures · Paud, PuneP52100002798· 12.7% built· 1 complaint
- Amrut Siddhi2.6 yr overdueJayshree Builders · Near Railway Station, ThaneP51700001930· 90.9% built
- ORCHID TOWERS2.6 yr overdueSAVALI CONSTRUCTIONS · PADMAWATI NAGARI, NEAR SANGRAM NAGAR, AurangabadP51500033091· 90.9% built
- Mont Vert Spectra2.6 yr overdueGoyal Patel Construction · Haveli, PuneP52100011564· 90.9% built
- SAVALIYA AVENUE2.6 yr overdueSHREE SAVALIYA HOUSING LLP · Goddeo Village, ThaneP51700021757· 50.5% built
- MARATHON EMINENCE2.6 yr overdueNEXZONE BUILDCON LLP · MULUND WEST, Mumbai SuburbanP51800016063· 81.8% built
- PATEL TRADE CENTER2.6 yr overdueKAVITA DEVELOPERS · Chiplun (M Cl), RatnagiriP52800010248· 90.9% built
- Nirman Milestone2.6 yr overdueNIRMAN VENTURE · Mukai Chowk, PuneP52100022161· 80% built· 1 complaint
- SHREE GOPAL APARTMENT2.6 yr overdueGOPAL DEVELOPERS · PIMPALGAON BAHULA SHIVAR, NashikP51600018624· 90.9% built
- ACROPOLIS2.6 yr overdueVORA ASSOCIATES · BORIVALI WEST, Mumbai SuburbanP51800004939· 90.5% built
- Trimurti Apartment2.6 yr overduePradip Gauru More · Mangaon, RaigarhP52000022600· 27.3% built
- UNIVERSE I PHASE I2.6 yr overdueGayasuddin Riyazuddin Khan · Thane, ThaneP51700009797· 90.9% built
- MANSH AVENUE2.6 yr overdueMANSH BUILDER AND DEVELOPER · Panvel, RaigarhP52000013017· 90.9% built
- CASALINO TOWERS - PHASE 12.6 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100014588· 18.2% built
- Srinivasa Enclave2.6 yr overdueSrinivasa Constructions · AMBEGAON KH, PuneP52100001331· 49.1% built
- ARKADE EARTH - GARDENIA2.6 yr overdueArkade Developers Private Limited · Kanjurmarg East, Mumbai SuburbanP51800010074· 88.5% built
- SKYLINE2.6 yr overdueRND BUILDERS & DEVELOPERS · DRONAGIRI, RaigarhP52000003774· 90.9% built
- Green Park Business Center2.6 yr overduePrafulla Bhimdeo Taware · Near to Rui Hospital, PuneP52100014188· 90.9% built
- PRATAPGAD2.6 yr overdueVASTUSHRI PROMOTORS AND DEVELOPERS · AURANGABAD, AurangabadP51500015280· 49.8% built
- Sahakar Premier2.6 yr overdueSahakar Infracon Projects Private Limited · Thane, ThaneP51700004386· 36.4% built
- AURIS SERENITY TOWER 22.6 yr overdueTRANSCON-SHETH CREATORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001413· 72.7% built· 18 complaints
- STAR PLUS2.6 yr overdueDEEPAK KALYANJI CHANDE · Opp Durga Udyan, NashikP51600014524· 89.1% built
- Ganeshwadi CHS LTD - S.R.A2.6 yr overdueAshok Rajaram Gupta · Bhatwadi, Mumbai SuburbanP51800010062· 2.7% built· 80 complaints
- INDRAYANI VATIKA2.6 yr overdueSANSKRUTI DEVELOPERS · PUNE, PuneP52100010977· 9.3% built
- VASANT OASIS CAMELIA BLDG 132.6 yr overdueNEEPA REAL ESTATES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800000921· 46.4% built· 8 complaints
- ATHARV PALACE2.6 yr overdueJAGRUTI ENTERPRISES · Andheri, Mumbai SuburbanP51800008512· 90.9% built
- SHREE RAJ VIHAR APARTMENT2.6 yr overdueRAHUL BHASKARRAO THAKARE · MAKHMALABAD PANCHVATI, NashikP51600017066· 90.9% built
- SAI SATYAM RESIDENCY2.6 yr overdueSAI SATYAM GROUP · WADEGHAR, ThaneP51700015767· 60.6% built
- KUBERAKSHE2.6 yr overdueAKSHAY BUILDERS · MARUTI NAKA, RaigarhP52000019698· 50.5% built
- Ruparel Elara2.6 yr overdueShree Siddhivinayak Infrastructure & Realty · Borivali, Mumbai SuburbanP51800014328· filed Dec 2019 → now Dec 2023· 56.4% built· 10 complaints
- MEMORIES 90 -PHASE I2.6 yr overdueM/s NAMO DEVELOPERS · -, PuneP52100016824· 76.8% built
- VRINDAVAN HOMES2.6 yr overdueSHREE RUJVE ENTERPRISES · Bandhiwali, RaigarhP52000011360· filed Dec 2022 → now Dec 2023· 86% built
- MAYUR CHS LTD2.6 yr overdueMahesh Shriram Borkar · NAUPADA, ThaneP51700024371· 90.9% built
- DHARA ICON2.6 yr overdueD R BHONDVE PROPERTIES · HAVELI, PuneP52100015049· 90.9% built
- AMAR BUSINESS ZONE2.6 yr overdueJAYASHRI KAILASH WANI · Baner, PuneP52100004353· 90.9% built
- 45 SHASHWAT AVENUE - B2.6 yr overdueSAMARTTHA PRISHA PROPERTIES · PUNAWALE, PuneP52100021932· 90.9% built· 5 complaints
- Daga Sapphire Infinity2.6 yr overdueDaga Infratech Pvt Ltd · CAMP, AmravatiP50300007253· filed Dec 2019 → now Dec 2023· 31.8% built· 2 complaints
- VRAJ BUNGALOW B2.6 yr overdueSHREE INFRA PROJECT · indiranagar, NashikP51600009649· 72.7% built
- Construction of 96 Ts EWS, 6 Ts MIG, 40 shops and 1 MHADA office on F P No 109 110 savedi Ahmednaga2.6 yr overdueNASHIK HOUSING & AREA DEVELOPMENT BOARD · Savedi, AhmednagarP52200019849· 50.9% built
- PYRAMID ELEMENTS2.6 yr overduePYRAMID INFRATECH CO · Thane, ThaneP51700013897· 81.8% built
- SHIVSHAKTI2.6 yr overdueATUL HARISHCHANDRA YELBHAR · CHAKAN NAGAR PALIKA, PuneP52100010645· filed Dec 2019 → now Dec 2023· 81.8% built
- DREAM DIVINE2.6 yr overdueDIVINE DEVELOPERS · KARANJADE, RaigarhP52000010021· 50.1% built
- ANTARA2.6 yr overdueSANRAJ REALTY · Yewalewadi, PuneP52100000698· 87.4% built
- ORCHID SQUARE PHASE 32.6 yr overdueM/S SQUAREFEET ECO HOUSING LLP · Ambarnath(M Cl), ThaneP51700014033· 81.8% built
- Parshvanath2.6 yr overdueACORP REALTY · Andheri, Mumbai SuburbanP51800017960· 90.9% built
- Ashanand Residency C building2.6 yr overdueAnand Deoram Tambe · Khed, PuneP52100006808· 81.8% built
- Utkarsha Phase - III2.6 yr overdueMakarand Madhav Kulkarni · Utkarsha Colony, Borude Mala, Ahmednagar., AhmednagarP52200019301· 90.9% built
- Castle Rock C and D Wing2.6 yr overdueHGP Community Pvt. Ltd. · Kurla, Mumbai SuburbanP51800000405· 90.9% built· 2 complaints
- AMAR LANDMARK2.6 yr overduePRITAM CONSTRUCTIONS PVT LTD · Haveli, PuneP52100015584· 81.8% built
- Om Shhraddha Height Phase II2.6 yr overdueOm Shhraddha Realty · Budhwar Peth, SolapurP52600006730· filed Jun 2021 → now Dec 2023· 81.8% built
- SHRI VENKATESH KRUPA2.6 yr overdueMODI DEVELOPERS · BADLAPUR, ThaneP51700023261· filed Dec 2022 → now Dec 2023· 46% built
- Kyan Resorts And Clubs Private Limited Phase 12.6 yr overdueKyan Resorts & Clubs Private Limited · Mothe Wengaon, RaigarhP52000009801· 69.4% built
- EASTWOODS2.6 yr overdueAnand Constructions · Vimannagar, PuneP52100022931· 52.3% built
- K T PREMIA2.6 yr overdueK T & CO · Bhiwandi, ThaneP51700002939· 90.9% built
- Arch Kusum2.6 yr overdueARCH DEVELOPERS · Padegaon, AurangabadP51500023812· 81.8% built
- VIDHI PREM2.6 yr overdueLOTUS CONSTRUCTION · Kalyan, ThaneP51700030057· 86.8% built
- PEARL HARMONY2.6 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800004224· filed Dec 2021 → now Dec 2023· 46.7% built
- SAI SHRADDHA PARK PH II WING M N O P PROJECT2.6 yr overdueGAURI SPACE CREATOR · Pimpri Chinchawad (M Corp.), PuneP52100009376· 70.2% built· 1 complaint
- Legacy Vista2.6 yr overdueLEGACY LIFESPACES LLP · Rahatani, PuneP52100024212· 86.4% built
- MAJESTIQUE OASIS2.6 yr overdueM/S. SHRADDHA DEVELOPERS · wagholi, PuneP52100013786· 71.1% built· 2 complaints
- Sunrise E2.6 yr overdueAgile Real Estate Pvt. Ltd. · Thane, ThaneP51700000925· 99.4% built· 1 complaint
- VJ One Avenue2.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Hinjawadi, PuneP52100025592· 76.1% built· 1 complaint
- SAFA PARK C BUILDING2.6 yr overdueSAFA BUILDERS & DEVELOPERS · PETH MAP, RatnagiriP52800015797· 90.9% built
- NINE STAR GRANDEUR2.6 yr overdueNINE STAR HOME MAKERS · SHIVAJI CHAUK, PalgharP99000021931· 3% built
- VRAJ BUNGALOW A2.6 yr overdueSHREE INFRA PROJECT · Indiranagar, NashikP51600009871· 72.7% built
- DECENT LIFE SPACE 12.6 yr overdueADINATH ASSOCIATES · PALGHAR EAST, PalgharP99000020318· 90.9% built
- JINDAL RESIDENCY2.6 yr overdueJindal Builders and Developers · NEAR TEHSILDAR OFFICE, PANVEL, RaigarhP52000016028· 90% built
- Sun Enclave2.6 yr overdueNaresh Ramchandra Mittal · Haveli, PuneP52100024848· 86.4% built
- ABHILASHA2.6 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Kothrud, PuneP52100024895· 9.1% built
- EVEREST SQUARE -A2.6 yr overdueVijay Narayan Chavanke · Kale Nagar Anandwali, Gangapur Road, NashikP51600017490· 54.1% built
- Om Avaneesh Apartment2.6 yr overdueINFINITI INFRAVENTURES · Zingabai Takli, NagpurP50500021756· 90.9% built
- SHREE PARSHVA ICON2.6 yr overdueAJIT BABULAL LODHA · LOHAGAON, PuneP52100016398· 90.9% built
- FOREST COUNTY-PH 32.6 yr overdueAjanta Enterprises · Near Eon IT parkP52100017681· 76.6% built
- Patil Chembers2.6 yr overdueBabasaheb Pandurang Patil · Vengurla, SindhudurgP52900009272· 81.8% built
- SHIVKRUPA PRESTIGE2.6 yr overdueSHIVKRUPA CONSTRUCTION · DHAYRI, PuneP52100023925· 62.7% built
- MARATHON NEXZONE ATLAS -22.6 yr overdueSANVO RESORTS PVT. LTD. · Panvel, RaigarhP52000000472· 72.7% built· 2 complaints
- WESTERN RIVER RESIDENCY2.6 yr overdueVGT Constructions · Bhosari, PuneP52100010759· filed Dec 2022 → now Dec 2023· 78.6% built
- TERRAFORM DWARKA2.6 yr overdueMoney Magnum Nest Pvt Ltd · Kurla, Mumbai SuburbanP51800002718· 91.2% built· 2 complaints
- SHAH KINGDOM PHASE I A WING2.6 yr overdueSHAH GROUP BUILDERS LTD · Navi Mumbai (M Corp.), ThaneP51700006697· 30.7% built· 2 complaints
- Dashmesh Crystal2.6 yr overdueDashmesh Infrastructure · kharvai naka, ThaneP51700020525· 90.9% built
- RITESH EMPIRE2.6 yr overdueSAPPHIRE DEVELOPERS · Kalyan, ThaneP51700013877· 95.5% built· 2 complaints
- S R SCHEME AT RAHUL NAGAR, SEWREE2.6 yr overdueSHIVSHAHI PUNARVASAN PRAKALP LTD · Ward FSouth, Mumbai CityP51900005130· 90.9% built
- SWARANAJALI RESIDENCY2.6 yr overdueSWARANJALI BUILDERS AND DEVELOPERS · GODOLI, SataraP52700014908· 28.9% built
- VIJAY CHS LTD2.6 yr overdueSAI LIFE DEVTAA REALTORS · Kurla, Mumbai SuburbanP51800008457· filed Dec 2022 → now Dec 2023· 90.9% built· 2 complaints
- GOKULDHAM RESIDENCY2.6 yr overdueOM BUILDERS AND DEVELOPERS · PRATAP MILL COMPOUND, JalgaonP49900015187· 4.6% built
- KAUSHIKS DREAM MAPLE2.6 yr overdueSHREE MARUTI DEVELOPERS · Ulawe, RaigarhP52000010908· 10.2% built· 1 complaint
- Navkar Tower Part 12.6 yr overdueNavkar Estate and Homes Pvt Ltd · Vasai, PalgharP99000007525· 90.4% built
- Tirupati Campus Phase - VII2.6 yr overdueVenkatesh Constructions · DHANORIP52100023292· 81.8% built
- POORVA SHRUSHTI A BUILDING2.6 yr overdueTejas Pooja Associates · WADGOAN KH, PuneP52100014650· 90.9% built
- BALAJI RESIDENCY2.6 yr overdueOM SWAYAMBHU SIDDHIVINAYAK BUILDERS AND DEVELOPERS · Kalyan, ThaneP51700010313· 80.9% built
- LAXMI VIMAL PRIDE2.6 yr overdueRoopa Sandip Londhe · WADALA SHIVAR, NashikP51600023969· 90.9% built
- Matru Ashish2.6 yr overdueKalpataru Limited · Mumbai City, Mumbai CityP51900019426· 70.2% built
- SAI SHRADDHA PARK WING B C D E F G H I J K L PROJECT2.6 yr overdueSHIVAM DEVELOPERS · CHIKHALI, PuneP52100005202· 65.5% built
- NIDHAAN HOUSE2.6 yr overdueNIDHAAN INFRACON PRIVATE LIMITED (FORMERLY KNOWN AS AJAB REAL ESTATE COMPANY PRIVATE LIMITED) · Andheri, Mumbai SuburbanP51800005536· 76.4% built
- KRISHNARAJ RESIDENCY2.6 yr overdueKRISHNA DEVELOPERS · HINDU MUSLIM CHOWK, OPP MSEB ,Khanbag, SangliP53100031056· 63.6% built
- RAJ HERITAGE 12.6 yr overdueRAJ REALTY BUILDERS AND DEVELOPERS PRIVATE LIMITED · RAMDEV PARK, ThaneP51700020259· 90.9% built
- SAMYAK ESTATE2.6 yr overdueSAMYAK REALTORS · NEAR LIEBHER CHOWK, AurangabadP51500022385· 81.8% built
- Kalpataru Woodsville2.6 yr overdueKalpataru Plus Sharyans · Kurla, Mumbai SuburbanP51800001512· 86.8% built· 1 complaint
- Emerald Isle - T102.6 yr overdueLarsen & Toubro Ltd. (Realty Division) · Kurla, Mumbai SuburbanP51800013052· 72.5% built· 4 complaints
- K.D. HILLS2.6 yr overdueKULSHREE ASSOCIATES · Katraj, PuneP52100013446· 33.2% built
- SEJAL VIHAR2.6 yr overdueNitin Laxman Jadhav · NEAR WATER TANK, NashikP51600023934· 9.1% built
- EXCEL CELESTIA RESIDENCY WING B AND C2.6 yr overdueEXCEL HOUSING · MOSHI DUDULGAON SHIV, PuneP52100015436· filed Dec 2022 → now Dec 2023· 95.5% built
- SHIV SAI RESIDENCY2.6 yr overdueSHIV SAI BUILDERS AND DEVELOPERS · AMBERNATH, ThaneP51700018693· 4.5% built
- SPAN ELITE2.6 yr overdueSPAN STRUCTURES · Pushpak Node, Vahal,, RaigarhP52000021503· 90.9% built
- Orange City Wholesale Market - Phase IV2.6 yr overdueORANGE CITY MALLS PRIVATE LIMITED · Danagunj, NagpurP50500015076· 27.3% built
- Wakad Business Bay2.6 yr overdueMihir Projects · Behind Tip Top International Hotel, PuneP52100021744· 90.9% built· 1 complaint
- AGARWAL PARAMOUNT2.6 yr overdueAGARWAL REALTORS · Vasai, PalgharP99000002207· 90.9% built
- ARIHANT ANAIKA PHASE II2.6 yr overdueARIHANT VATIKA REALTY PRIVATE LIMITED · KOYANA VELHE, RaigarhP52000014892· 78% built
- CLASSIC RESIDENCY2.6 yr overdueCLASSIC CONSTRUCTION CO. · Vasai, PalgharP99000005113· 90.9% built
- DATTANI VERTEX WING AB PHASE I2.6 yr overdueBRIJESH SATISH DATTANI · Vasai, PalgharP99000008090· 90.5% built
- PATELS RESIDENCY - E WING2.6 yr overduePARAM BUILDERS AND DEVELOPERS · AMBARNATH, ThaneP51700023093· 9.1% built
- CELLO MAGIC TOUCH PHASE 12.6 yr overdueCELLO MAGIC TOUGH · PALGHAR EAST, PalgharP99000018271· 36.4% built
- AMAN PLAZA2.6 yr overdueAMAN CONSTRUCTIONS · OPP NATIONAL ENGLISH SCHOOL, AhmednagarP52200014104· 90.9% built
- PEARL MAJESTIC2.6 yr overdueCHANDIWALA ENTERPRISES · Andheri, Mumbai SuburbanP51800015348· 90.9% built
- ARKADE EARTH - HAZEL2.6 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800022666· 90.9% built
- Ashford Royale Tower A2.6 yr overdueAshford Infotech Private Limited · Kurla, Mumbai SuburbanP51800003093· 92.5% built· 3 complaints
- B-SQUARE2.6 yr overdueSQUARE ESTATE · AMBAD, NashikP51600014876· 90.9% built
- HILLWOOD2.6 yr overdueSHREEJI LIFESPACES PRIVATE LIMITED · Mumbai City, Mumbai CityP51900012502· 32.3% built
- ARKADE EARTH - FERN2.6 yr overdueArkade Developers Private Limited · Kurla, Mumbai SuburbanP51800004750· 88.5% built· 1 complaint
- OM KAVISH EXCELLENCY2.6 yr overdueOM JAI KAVISH REALTORS · VALAN NAKA, PalgharP99000020278· 78.2% built
- Sandesh City Apartments 32.6 yr overdueSandesh Infrastructures Pvt Ltd · Jamtha, NagpurP50500012459· 91.2% built
- DREAM ONYX2.6 yr overdueOM SAI DEVELOPERS · ULWE, RaigarhP52000008835· 30.2% built
- SRISHTI PRIDE PHASE 1- WING A2.6 yr overdueKRISHNA ENTERPRISE · Kurla, Mumbai SuburbanP51800010994· 99.6% built
- Kalpataru Radiance A2.6 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000591· filed Jun 2022 → now Dec 2023· 98.3% built· 27 complaints
- CASALINO TOWERS PHASE II2.6 yr overdueSAI SIDDHI PROMOTERS AND BUILDERS · HANDEWADI, PuneP52100023594· 9.1% built· 1 complaint
- RAVITEJ2.6 yr overdueSRI KALPATRU REALTY PRIVATE LIMITED · DUDULGAON, PuneP52100019063· 88.8% built
- PRAVINKUMAR KHAMKAR INFRA DEVELOPERS AND CONSTRUCTION2.6 yr overduePravinkumar Maruti Khamkar · Ichalkaranji (M Cl), KolhapurP53000004382· 27.3% built
- Rite Civis2.6 yr overdueYashodanand Developers · Bhandup West, Mumbai SuburbanP51800030301· 42.3% built· 2 complaints
- MDM Zion2.6 yr overdueMDM REALTY LLP · Andheri West, Mumbai SuburbanP51800029740· 90.9% built
- JAYSHREE IMPERIA2.6 yr overdueCHAITALI CONSTRUCTION · ADGAON, NashikP51600032502· 36.4% built
- Our Town - Whispering Woods2.6 yr overdueKaiyomerz Cowas Palia · Dalkhan, ThaneP51700003884· filed Mar 2019 → now Dec 2023· 99.5% built· 3 complaints
- SUVIDHI APARTMENT2.6 yr overdueCOSMO LIFESCAPES LLP · YERWADA, PuneP52100015773· filed Jun 2022 → now Dec 2023· 81.8% built· 1 complaint
- Tisai Heights2.6 yr overdueTisai Construction · Katemanevali, Kalyan, ThaneP51700030323· 60% built
- Shreya Plaza2.6 yr overdueMane and Khot Associate · Near Laxmi Mandir, SangliP53100033574· 81.8% built
- Sai Proviso County2.6 yr overdueProviso Builders and Developers · Panvel, RaigarhP51700002042· filed Jun 2021 → now Dec 2023· 84% built· 4 complaints
- Plot no 3 and 4 house no.175,ward no.6,city survey no.101,154,155,159 sheet no.233,227 Mouza-Nagpur2.6 yr overdueMHADA (Nagpur Board) · Fule Market, Ganeshpeth, NagpurP50500052608· 90.5% built
- RUTUGANDH2.6 yr overdueNAKSHATRA BUILDCON · MHASKARNES COLONY 2, PuneP52100029278· 63.6% built
- SARTHAK2.6 yr overdueAmco Landmark LLP · Pune City, PuneP52100030813· 81.8% built
- AURA APARTMENTS - PHASE 2 11TH FLOOR2.6 yr overdueBHOLENATH DEVELOPERS LTD. · GHATLA, Mumbai SuburbanP51800009179· filed Oct 2018 → now Dec 2023· 54.5% built
- Mount N Glory Plot A Phase II2.6 yr overdueSancheti Associates Pvt. Ltd. · Kharadi, PuneP52100029286· 90.9% built
- SAI EMRALD2.6 yr overdueSAIESHWAR PROJECTSS · Pune (M Corp.), PuneP52100006251· filed Dec 2018 → now Dec 2023· 99.2% built· 1 complaint
- RUDRAKSHAM PH 12.6 yr overdueONKAR CONSTRUCTIONS · Haveli, PuneP52100003403· filed Jun 2021 → now Dec 2023· 90.9% built
- SURVAL HEIGHTS2.6 yr overdueGAYATRI DEVELOPERS · BADLAPUR EAST, ThaneP51700030228· 74.1% built
- ATHARVA ELITE2.6 yr overdueATHARVA INFRASTRUCTURES · PIPLA, NagpurP50500029403· 2.1% built
- VEDANT D52.6 yr overdueSAHEBRAO VITHAL SATRE · Thane, ThaneP51700048308· 60.9% built
- PRIME GROUP PROJECT GRAND SLAM2.6 yr overduePRIME GROUP · Dahisar, Mumbai SuburbanP51800034404· 90.9% built
- Suprabha-Shivam Lifestyle2.6 yr overdueShivam Lifestyle · Chembur, Mumbai SuburbanP51800029652· 90.9% built
- SAI DWARKA PHASE 12.6 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100009316· filed Dec 2018 → now Dec 2023· 81.8% built· 2 complaints
- SAMRUDDHI ISHA2.6 yr overdueSAMRUDDHI ENTERPRISES · KIVALE, PuneP52100006794· filed Dec 2018 → now Dec 2023· 70.9% built· 7 complaints
- ADESH HEIGHTS2.6 yr overdueSURESH NAMDEV LAGAD · KEDGAON, AhmednagarP52200030368· 63.6% built
- Shree Paras Empire Grand2.6 yr overdueDEEPAK NEMICHAND MODI · Near Axis Bank, NashikP51600032046· 72.7% built
- KANDIVALI BASANT BAHAR2.6 yr overdueWESTIN SANKALP DEVELOPERS · KANDIVALI WEST, MUMBAI, Mumbai SuburbanP51800031940· 40% built
- Revati Residency2.6 yr overdueGAURAV BHARAT SHAH · BIBWEWADI MUNJERI, PuneP52100029407· 63.6% built
- SANKALP VASTU2.6 yr overdueSANKALP REALTY · charholi, PuneP52100029957· 90.9% built
- ESSENCIA HEIGHTS2.6 yr overdueSanskruti & Aditya Associates · BALEWADI STADIUM, PuneP52100007045· filed Feb 2021 → now Dec 2023· 90.9% built
- SPACE HEIGHTS - PHASE 22.6 yr overdueSPACE ASSOCIATES · Waliv, PalgharP99000030163· 90.9% built
- GULAB SRUSHTI2.6 yr overdueBUTTEPATIL PROPERTIES · KOTHRUD, PuneP52100031652· 59.1% built
- VASANT VIHAR2.6 yr overdueAARADHYA INFRAPROJECTS · NEAR SHREE MAHADAV MANDIR, JalgaonP49900048286· 97.3% built
- WING D- DURVANKUR2.6 yr overdueM K PATIL DEVELOPERS · Badlapur (M Cl), ThaneP51700004981· filed Aug 2019 → now Dec 2023· 90.9% built
- R R Tilak Nagar2.6 yr overdueR K BUILDERS & DEVELOPERS · tilak nagar housing society, NandedP51100031887· 90.9% built
- YASHODA PARK2.6 yr overdueVARAD BHAGWANT DEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100001110· filed Jan 2022 → now Dec 2023· 54.5% built
- Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur2.6 yr overdueMHADA (Nagpur Board) · Ganesh Peth, NagpurP50500052672· 90.5% built
- Sahil Exotica2.6 yr overdueBOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · Andheri, Mumbai SuburbanP51800003978· filed Jun 2019 → now Dec 2023· 87.3% built· 1 complaint
- JAY AMBE CORNER2.6 yr overdueJAY AMBE DEVELOPERS · ULWE, RaigarhP52000047632· 90.9% built
- Revati Woodland2.6 yr overdueRevati Builders and Developers · ANANDVALLI, NASHIK, NashikP51600029633· 95.9% built
- GANGA LEGEND A2 AND B42.6 yr overdueLegends County Landmark Pvt Ltd · BAVDHAN, PuneP52100021020· 83.9% built· 4 complaints
- Tejas Society2.6 yr overdueRADHIKA SHELTERS · Shastri Nagar, ThaneP51700016283· filed Dec 2020 → now Dec 2023· 69.5% built
- PARIJAT HEIGHTS2.6 yr overdueNew Horizon Realty · Priyanka Nagari, PuneP52100005180· filed May 2020 → now Dec 2023· 55.5% built· 1 complaint
- ARIHANT ENCLAVE2.6 yr overdueM/s Arihant Enterprise · Andheri, Mumbai SuburbanP51800030594· 23.6% built
- NIRMAN VIVA -F2.6 yr overdueNIRMAN HOMES · Ambegaon Budruk, PuneP52100033468· 81.8% built
- Ashiyana Tower Building No 22.6 yr overdueAteeque Yusuf Khot · Bazar Peth, RaigarhP52000030920· 90% built
- SUDHA2.6 yr overdueSAMARTH REALTY · TEMBHODE, PalgharP99000022954· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- Sunshine Landmark2.6 yr overdueSunshine Landmark · Padmavatinagar, Patryacha Mala, SataraP52700030204· 81.8% built
- KRUPANIDHI2.6 yr overdueKONARK ENTERPRISES · Sawarde, RatnagiriP52800014795· filed Sept 2022 → now Dec 2023· 90.9% built
- EMPIRE2.6 yr overdueSHREE SIDDHIVINAYAK DEVELOPERS · IGATPURI, NashikP51600005114· filed Oct 2020 → now Dec 2023· 72.4% built· 6 complaints
- CRD Gardenia Apartments 6 - Phase III2.6 yr overdueDr Chandrashekhar Raghunath Dound · Palghar, PalgharP99000049411· 81.8% built
- MEENA PARK PLOT 2-42.6 yr overdueBENJAMIN MANWEL DSOUZA · RAWOOLWADA, SindhudurgP52900014880· filed Sept 2022 → now Dec 2023· 90.9% built
- Greenwoods2.6 yr overdueBKS galaxy realtors Pvt ltd · Panvel, RaigarhP52000001151· filed Jun 2021 → now Dec 2023· 96.4% built· 104 complaints
- Tanishq Samrudhi2.6 yr overdueLaxmikant Bhaskar Kothawade · Jijamata Colony, NashikP51600033607· 43.2% built
- Udyog Kalpak2.6 yr overdueKalpak Developers · Itkheda, AurangabadP51500029919· 90.7% built
- ARIHANT ESTATE2.6 yr overdueARIHANT CREATION · SATVALI, PalgharP99000030630· 33.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.