RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 46 of 59
- VIVAN CASITA2.6 yr overdueBORSE BROTHERS ENGINEERS AND CONTRACTORS PRIVATE LIMITED · Deopur, DhuleP49800021196· filed Dec 2022 → now Dec 2023· 90.9% built
- GREEN VIEW PARK2.6 yr overdueTANISHKA DEVELOPERS · CHETNA NAGAR, NashikP51600031380· 81.8% built
- Empire Estate 12.6 yr overdueJaved Yasin Kojar · Kaman village, PalgharP99000030913· 74.4% built
- Sunrise Orlem 2B Phase 32.6 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800006843· filed Jun 2021 → now Dec 2023· 83.6% built· 1 complaint
- BLUE BELLS PHASE 22.6 yr overdueKAVITA DEVRAM WALHEKAR · RAJIV GANDHI INFOTECH PARK, PHASE - II, MAAN, HINJAWADI, PuneP52100031327· filed Mar 2022 → now Dec 2023· 81.8% built
- ASHWA PLATINUM2.6 yr overdueASHWA PLATINUM · Kurla, Mumbai SuburbanP51800005636· filed Nov 2020 → now Dec 2023· 84.1% built· 10 complaints
- RAJ INAAYA2.6 yr overdueMAHALAXMI CONSTRUCTION · PALEGAON, ThaneP51700034259· 90.9% built
- Skyi Songbirds Phase C2.6 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000805· filed Nov 2020 → now Dec 2023· 91.6% built· 7 complaints
- VRINDANAND ELITE2.6 yr overdueMAKWANA AND TANMAY CONSTRUCTION · KONDHWA BUDRUK, PuneP52100030243· 53.3% built· 3 complaints
- SAI DWARKA PHASE 32.6 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100011408· filed Dec 2019 → now Dec 2023· 45.8% built· 1 complaint
- Mohan Altezza II2.6 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700007011· filed Dec 2019 → now Dec 2023· 90% built· 2 complaints
- SHIVRANG2.6 yr overdueRANJEKAR REALTY AOP · Sadashiv Peth, PuneP52100030980· 90.9% built
- MARY VILLA2.6 yr overdueH&D PROJECTS · Borivali, Mumbai SuburbanP51800031597· 81.8% built
- GREEN SPRINGS2.6 yr overdueVISION ASSOCIATES · Wai (Rural), SataraP52700001770· filed Jun 2019 → now Dec 2023· 81.8% built
- SATVIK WING B2.6 yr overdueM/s. JIGAR ENTERPRISE · Ambarnath, ThaneP51700029587· 45.5% built
- KRUSHNA LEELA APARTMENT2.6 yr overduePRAKASH TRAMBAK JAGPAT · NASHIK, NashikP51600029673· 90.9% built
- Pushpakunj Homes2.6 yr overdueBHAKTI BUILDERS · Near Lokmanya Hospital, PuneP52100031893· 72.7% built
- VITTLE EMPIRE2.6 yr overdueMIRACLE DEVLOPERS · NEAR TO BAL AASHRAMP52100013861· filed Jul 2019 → now Dec 2023· 81.8% built
- DHRUVA2.6 yr overdueANAND MUKUND GINDODIYA · PUSHPAK NAGAR, RaigarhP52000033930· 77.7% built
- CRD Gardenia Apartments 2 - Phase III2.6 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000049393· 81.8% built
- GALAXY MANSION X2.6 yr overdueGALAXY ASSOCIATES · MANEWADA, NagpurP50500030379· 81.8% built
- Shree Heights2.6 yr overdueAarc Constructions · Sahkar Nagar, AkolaP50100032701· 81.8% built
- Millennium Atlas2.6 yr overdueMillennium Developers · Tathawade,Pune, PuneP52100035007· 81.8% built
- STERLING COURT WING D2.6 yr overdueAPRAULIC CONSTRUCTION INVESTMENT AND FINANCE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002160· filed Sept 2020 → now Dec 2023· 90.9% built
- 18 Latitude Commercial2.6 yr overdueG D Square Developer · Punawale, PuneP52100008782· filed May 2019 → now Dec 2023· 81.8% built
- SWASTIK PHASE 12.6 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800002197· filed Dec 2019 → now Dec 2023· 49.2% built· 1 complaint
- SEYCHELLES2.6 yr overdueSHUBHAM ENTERPRISES · Andheri, Mumbai SuburbanP51800033314· 87.5% built
- Renuka Gulmohar Phase II2.6 yr overdueHaveli, PuneP52100001835· filed Dec 2024 → now Dec 2023· 82.1% built
- SHIVOM GALAXY2.6 yr overdueSHIVOM ENTERPRISES · Kalyan, ThaneP51700020888· filed Feb 2023 → now Dec 2023· 79.5% built
- Runwal Tower2.6 yr overdueVision Infra Developers · Daate Mala, KolhapurP53000000151· filed Dec 2019 → now Dec 2023· 81.8% built· 3 complaints
- NILKANTH APARTMENT2.6 yr overdueBAG BUILDCON · MHASRUL, NashikP51600033232· 81.8% built
- SAI SINDHU2.6 yr overdueSHREE VIGHNAHAR PROMOTERS AND BUILDERS PVT LTD · Junnar, PuneP52100001923· filed Jul 2019 → now Dec 2023· 67.7% built
- Nakshatra2.6 yr overdueKrishnaraj Developers · Kothrud, PuneP52100007857· filed Dec 2020 → now Dec 2023· 55.9% built
- ANANTRUKMINI2.6 yr overdueDAJIKAKA GADGIL DEVLOPERS .PVT.LTD . · Pune City, PuneP52100001340· filed Dec 2019 → now Dec 2023· 95.5% built· 1 complaint
- VARDHMAN CASTLE PHASE I2.6 yr overdueVENUS DEVELOPMENT CORPORATION · SANTACRUZ WEST, Mumbai SuburbanP51800033033· 0.2% built
- OMKAR HERITAGE2.6 yr overdueOMKAR LIFESPACES · RADHESHWARI NAGAR, PuneP52100046095· 78.2% built
- Velstand Phase 2 - formerly Kul scapes2.6 yr overduePathare Family · Tukaram NagarP52100005825· filed Jul 2020 → now Dec 2023· 99.7% built· 8 complaints
- SWASTIK ELEGANCE2.6 yr overdueSwastik Realtors · Swastik park Chembur, Mumbai SuburbanP51800031928· 90.9% built
- REGALIA2.6 yr overdueYASHODHAN SHANTI REALTORS · Vasai-Virar City (M Corp), PalgharP99000009586· filed Dec 2020 → now Dec 2023· 90.9% built
- Lucas Residency2.6 yr overdueSunita Developers · Ambernath West, ThaneP51700030052· 90.9% built
- Ashtavinayak City2.6 yr overdueManoj Dhruwkumar Peety · Ashtavinayak City, JalnaP51400050839· 10% built
- SHUBH AANGAN WING B2.6 yr overdueG D REALTORS PVT LTD · BHANDUP EAST, Mumbai SuburbanP51800029568· 90.9% built
- LAKE PARADISE2.6 yr overdueSADIQUE MAHAMOOD JALAL · ., RaigarhP52000033205· 52.7% built
- SAYALI APARTMENT-32.6 yr overdueDILIP BHIWAJI SONTAKKE · UMRED PARSODI, NagpurP50500033294· 81.8% built
- CRYSTAL HOMES2.6 yr overdueCRYSTAL CREATIONS · Pimpri Chinchawad (M Corp.), PuneP52100002053· filed Dec 2019 → now Dec 2023· 90.9% built
- SWOJAS ONE2.6 yr overdueUNITED DEVELOPERS · Haveli, PuneP52100030604· 81.8% built
- SAGAR ENCLAVE2.6 yr overdueANURAG DEVELOPERS · JAITALA, NagpurP50500031574· 90.9% built
- SATYAM ORCHID2.6 yr overdueOMSATYAM BUILDCONS PRIVATE LIMITED · GODHANI, NagpurP50500024105· 54.5% built
- Riddhi Siddhi Industrial Complex2.6 yr overdueRiddhi Siddhi Builders & Developers · Vasai, PalgharP99000002625· 81.8% built
- Casa Row Colony Phase - 22.6 yr overdueCASA DEVELOPERS · Near Moraya Park, AhmednagarP52200032505· 36.4% built
- JAY MALHAR RESIDENCY2.6 yr overdueSHREE BUILDER AND DEVELOPER · SADASHIV PETH, PuneP52100023318· 90.9% built
- BOLKAR NAKSHATRA A B C2.6 yr overdueGANESH TUKARAM BOLKAR · NEAR MOULE HALLL ASHOK NAGAR, NashikP51600025548· 90.9% built
- ANJNEYA RESIDENCY2.6 yr overdueSUREKHA SURESH DHAMANE · BANDAVANE NAGAR, NashikP51600033672· 39.1% built
- Nirman Vishnubaug2.6 yr overduePRIVEUS LIFESPACES LLP · ERANDWANE, PuneP52100023778· 90.9% built
- Kakad West End2.6 yr overdueKakad Realty Pvt Ltd · Mumbai City, Mumbai CityP51900003122· filed Jun 2022 → now Jan 2024· 90.9% built
- AASMAN CO-OPERATIVE HOUSING SOCIETY LTD2.6 yr overdueAasman Co-Operative Housing Society Limited · BODHALE NAGAR, NashikP51600033051· 90.9% built
- AMBAR RESIDENCY A BUILDING2.6 yr overdueMEHTA BUILDERS · JALOCHI, PuneP52100024670· 90.9% built
- SHIV SONAL PALACE CHS LTD2.5 yr overdueSAI PRASAD BUILDERS AND DEVELOPERS · AMBERNATH EAST, ThaneP51700034047· 27.3% built
- AVAANTI RESIDENCES AND PREMIUM COMMERCIAL SPACES2.5 yr overdueOLYMPIA · Haveli, PuneP52100009000· filed Jun 2020 → now Jan 2024· 89.3% built
- Primavera - B6 and S12.5 yr overdueKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · Sainathnagar VadgaonsheriP52100021093· 86.4% built
- Lodha Amara - Tower 6, 222.5 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700014760· 81.8% built· 9 complaints
- Shri Swami residency2.5 yr overdueShri construction and developers · Rui, PuneP52100026512· 49.1% built
- RAJARAM PALACE2.5 yr overdueSHREE KRUSHNA BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012517· 90.9% built
- Athena2.5 yr overdueM/s. Sahajanand Developers · Goregaon West, Mumbai SuburbanP51800003330· filed Mar 2020 → now Jan 2024· 62.7% built· 10 complaints
- CITI CHALET2.5 yr overdueBASONS CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800046606· 90.9% built
- Priyadarshan - J2.5 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100029119· 90.9% built
- K SQUARE2.5 yr overdueKHATRI AND KHATMODE ASSOCIATES · OPP VP COLLAGE, PuneP52100025484· 81.8% built
- Virar Bolinj Yogiraj CHS Ltd2.5 yr overdueShree Jivdani Samarpan Developers · Vasai-Virar City (M Corp), PalgharP99000004134· filed Dec 2020 → now Jan 2024· 90.9% built
- Geetanjali B2.5 yr overdueJOSHI BUILDCON LANDMARKS · Sahakarnagar, PuneP52100034370· 90.9% built
- Gandharva Excellence Project III A Commercial A Building C Building2.5 yr overdueVinayak Pandharinath Bhongale · Borhadewadi Moshi, PuneP52100026856· 29.8% built· 1 complaint
- ICON TOWER2.5 yr overdueGAIKWAD PROMOTERS · DANGE CHOWK HINJEWADI ROAD, PuneP52100030416· 81.8% built
- SUKAN CORNER APARTMENT2.5 yr overdueAPPULKUMAR VITHALBHAI RAKHOLIYA · PATHARDI, NashikP51600033941· 81.8% built
- SAI PAWAN APARTMENT2.5 yr overdueSAI GANRAJ DEVELOPERS · DAMODAR CHOWK, NashikP51600025940· 90.9% built
- Puneet Sanjivani Phase 2 Floor 17 to Floor 202.5 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017842· 90.9% built
- Puneet Sanjivani Phase 3 Floor 21 to Floor 232.5 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017800· 90.9% built
- OMSHANTI APARTMENT B2.5 yr overdueshivsai enterprises · PATHARDI, NashikP51600022812· 90.9% built
- PUSHKAR CO OP HSG SOCIETY PRAPOSED2.5 yr overdueAMEYA DEVELOPERS · OPP DNC HIGH SCHOOL, ThaneP51700025616· 28% built
- Laxmi Sanskruti2.5 yr overdueLAXMIDEVI DEVELOPERS · Jawahar Nagar, Goregaon West, Mumbai SuburbanP51800034219· 52.7% built
- VIMAL RESIDENCY2.5 yr overdueVIMAL DEVELOPERS · NILEMORE, PalgharP99000011244· filed Mar 2019 → now Feb 2024· 99.9% built· 1 complaint
- Pranav Flora2.5 yr overduePranav Builders · Laxmi Mandir Kupwad road, SangliP53100024613· 81.8% built
- Redevelopment of Om Divya Apartments Co-operative Housing Society Limited2.4 yr overdueM/s Shanti Developers · Borivali, Mumbai SuburbanP51800005768· filed Feb 2021 → now Feb 2024· 90.5% built
- Riverdale Residences-I2.4 yr overdueDuville Estates Private Limited · KHARADIP52100004692· filed Oct 2022 → now Feb 2024· 72.7% built· 31 complaints
- LUXOR2.4 yr overdueGAJANAN UTTAMRAO MANTE · NR BITWISE CO, BANER, PuneP52100022342· 90.9% built
- CHANDRALEKHA PRIDE2.4 yr overdueOM BUILDERS · CHETNA NAGGAR, NashikP51600049591· 45.5% built
- ASHAR ARIA2.4 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700017518· 85.9% built
- ANANDAM2.4 yr overdueA B Constructions · Gaurakshan Road, AkolaP50100045938· filed Dec 2023 → now Feb 2024· 81.8% built
- ESHAN CULTURE2.4 yr overdueESHAN DEVELOPERS · Mamurdi, PuneP52100009970· filed Dec 2019 → now Feb 2024· 67.3% built
- Swashraya Andheri CHS Ltd2.4 yr overdueDEM CONSTRUCTIONS LLP · nr Juhu Lane, Mumbai SuburbanP51800030781· 67.4% built
- RISHABRAJ VICINIA2.4 yr overdueH RISHABRAJ DEVELOPERS · GHATKOPAR EAST, Mumbai SuburbanP51800026330· 90.9% built
- V TEN RESIDENCY2.4 yr overdueV TEN REALTY PRIVATE LIMITED · Kalyan, ThaneP51700005357· filed Dec 2020 → now Feb 2024· 56.4% built· 1 complaint
- KHAR HIRA PREMISES CO OP SOCIETY LTD2.4 yr overdueL NAGPAL DEVELOPERS · Andheri, Mumbai SuburbanP51800031276· 78.2% built
- VRAJVIHAR APARTMENT2.4 yr overduePAL DEVELOPERS · JAYBHAVE NAGAR, NashikP51600015335· 27.3% built
- AARTI PRIME2.4 yr overdueAARTI ENTERPRISES · UPPER KHOPOLI, RaigarhP52000026364· 14.5% built
- ANAND PRIDE2.4 yr overdueANAND CONTRACTORES AND DEVELOPERS · BABRAS MALA, PuneP52100021410· 90.9% built
- THE FIRST2.4 yr overdueVAK ENTERPRISES · DEVKAR PANAND, KolhapurP53000028985· 75.9% built
- GOREGAON RASIK CO OP HSG SOCIETY LTD2.4 yr overdueAAKAR REAL ESTATE DEVELOPERS · GOREGAON WEST, Mumbai SuburbanP51800007636· filed Mar 2019 → now Mar 2024· 90.9% built
- PARAMOUNT2.4 yr overdueBUILDCON DEVELOPERS · NEAR BARAMATI BANK, PuneP52100045480· 48.7% built
- GAIKWAD MIRO2.4 yr overdueGAIKWAD DEVELOPERS · GAIKWAD NAGAR, PuneP52100016064· 81.8% built
- CASA RAMIRO2.4 yr overduePRESCOTT HOUSING LLP · Andheri, Mumbai SuburbanP51800033552· 90.9% built
- VITHAL HARI TOWER2.4 yr overdueVITHAL ENTERPRISES · Vasai, PalgharP99000006107· filed Mar 2023 → now Mar 2024· 46.4% built
- Gulmohar Pride2.4 yr overdueEarth Rise Buildcon LLP · GULMOHAR COLONY, SangliP53100028680· 81.8% built
- GOPAL SMRUTI2.4 yr overdueDATTA BABURAO GHAVAT · AMBERNATH, ThaneP51700029145· 90.7% built
- SHREE MADHULAXMI APARTMENT2.4 yr overduePANKAJ DINKAR SHILWATE · NEAR LOKMANYA HOSPITAL, NashikP51600034785· 30.9% built
- VISHNU BHASKAR CHS LTD2.4 yr overdueSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800015748· filed Sept 2019 → now Mar 2024· 90.9% built· 1 complaint
- MAHALAXMI PLAZA2.4 yr overdueP. S. ASSOCIATES · vmv road (nana nani park), AmravatiP50300023560· 81.8% built
- Rajdheera Business Square2.4 yr overdueRajdheera Properties · Talegaon Station, PuneP52100033395· filed Mar 2023 → now Mar 2024· 54.5% built
- OSWAL LIFESPACES - PHASE 12.4 yr overdueOSWAL LIFESPACES · Palghar, PalgharP99000002598· filed Mar 2023 → now Mar 2024· 81.8% built· 1 complaint
- DARSHAN BUSINESS PARK12.4 yr overdueSHANKHESHWAR ASSOCIATES · PEN, RaigarhP52000014189· filed Mar 2023 → now Mar 2024· 65.9% built
- AANCHAL D BUILDING2.4 yr overdueSWAN PROPERTIES · Haveli, PuneP52100005073· filed Mar 2023 → now Mar 2024· 90.9% built
- SWARAJYA2.4 yr overdueKaumudi Builders and Developers · Behind TV Tower, RatnagiriP52800016000· 90.9% built
- Balaji Greens2.4 yr overdueSathe Schemes · Near Sheetal Vihar society, RaigarhP52000015609· 90.9% built
- NANDAN PROBIZ2.4 yr overdueNANDAN ASSOCIATES · BALEWADI, PuneP52100001376· filed Mar 2022 → now Mar 2024· 81% built· 7 complaints
- SAWANT APPARTMENT2.4 yr overdueVARSHA DEVELOPERS · MAHALAXMI NAGAR, NashikP51600009245· filed Dec 2019 → now Mar 2024· 90.9% built
- LANDMARK2.4 yr overdueRAJESHWAR BUILDERS AND DEVELOPERS · GORAKSHAN ROAD, AkolaP50100023563· 81.8% built
- MARUTI2.4 yr overdueINVENTION REALTORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800012405· 86.8% built
- Spee Skytower Wing A and B2.4 yr overdueSpee Realtor · ParelP51900024490· 0% built· 2 complaints
- SAIDHAM PUSHYA2.4 yr overdueB.G.SOVANI AND ASSOCIATES · PAGZARI, RatnagiriP52800019793· 32.7% built
- RL CORPORATE SPACE2.4 yr overdueR L INFRASTRUCTURE & 2 Others · MOUZA KHAMLA, NagpurP50500035198· filed Mar 2023 → now Mar 2024· 76.8% built
- Neelkanth Valley II2.4 yr overdueNeelkanth Properties · Khalapur, RaigarhP52000016470· 90.9% built
- JD Park2.4 yr overdueJD Housing LLP · Cherpoli, ThaneP51700016060· 90.9% built
- SARA CITY C92.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015625· 90.9% built
- AURUS2.4 yr overdueKINGSTAY REAL ESTATE PRIVATE LIMITED · MUMBAI, Mumbai SuburbanP51800015024· 90.9% built
- Godrej Rejuve2.4 yr overdueOXFORD REALTY LLP · Keshavnagar, PuneP52100018720· 90.9% built· 9 complaints
- SARA CITY C102.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015649· 90.9% built
- THE METROPOLE2.4 yr overdueRaveshia Realtors · GHATKOPAR, Mumbai SuburbanP51900026208· 81.4% built· 14 complaints
- Maruti Bhuvan2.4 yr overdueSuresh Prabhushankar Sharma · Mogra, Mumbai SuburbanP51800005335· filed Mar 2019 → now Mar 2024· 72.7% built
- LEVERAGE GREENWOODS HARMONY2.4 yr overdueLeverage Spaces LLP · PIPLA, NagpurP50500023240· 48.9% built
- CHINTAMANI HABITAT LOTUS TYPE C - J2.4 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700005632· 71.8% built
- Shubh Aarambh2.4 yr overdueSHUBH ASSOCIATES · DADACHI WASTI, PuneP52100028760· 90.9% built
- AIM Residency Phase I2.4 yr overdueA M ENTERPRISES · Andheri, Mumbai SuburbanP51800015762· 90% built
- A P Pinnacle Phase 12.4 yr overdueA P Construction · Haveli, PuneP52100019457· 86.4% built
- SWARAJ SAHANIWAS2.4 yr overdueKUKADE LAYOUT (LIG)COOPERATIVE HOUSING SOCIETY LTD. · Near ERA international school, NagpurP50500020570· filed Mar 2022 → now Mar 2024· 70.5% built
- Legacy Liva2.4 yr overdueWhite Properties · Near Legacy Crest Project, PuneP52100024554· 90.9% built
- REGAL SQUARE PHASE III BLDG NO 72.4 yr overdueSQUAREFEET INFRASTRUCTURE LLP · TEMGHAR PADA, BHIWANDI, ThaneP51700021861· 90.9% built
- SAI DARSHAN2.4 yr overdueSAI SHRADDHA DEVELOPERS · TATHAWADE, PuneP52100026605· 29.1% built
- REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSL2.4 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI WEST MUMBAI, Mumbai SuburbanP51800026908· 86.7% built
- SARA CITY C82.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015654· 90.9% built
- HERAMB GARDEN2.4 yr overdueOMKARAA DEVELOPERS · LADAVALI, RaigarhP52000024674· 67.3% built· 1 complaint
- FLORIA BUILDING A2.4 yr overdueAKSHAY CHINTAN BUILDERS · Pune (M Corp.), PuneP52100003367· 46.4% built
- SARA CITY C112.4 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015547· 90.9% built· 1 complaint
- SARA VENKATESH F TYPE BUILDING2.4 yr overdueSARA TOWERS PVT LTD · BAJAJ NAGAR, AurangabadP51500032237· filed Mar 2023 → now Mar 2024· 81.8% built
- Gagan Commerce Centre2.4 yr overdueGagan I-Land Township Private limited · Sangamwadi, Pune, PuneP52100016445· 4.5% built
- SMIT VIJAY HEIGHTS2.4 yr overdueKUMARSHETH AND SONS · OPP. S.B.I. MAIN BRANCH, SangliP53100025167· 81.8% built
- Vaishali Residency2.4 yr overdueAmitkumar Suresh Dublay · VengurlaP52900014531· 86.4% built
- AAPLE GHAR TOWNSHIP A AND E WING2.4 yr overdueWabale Patil Urbanizers · Tandulwadi, PuneP52100016436· 90.9% built
- Krushnai Vihar Phase-I2.4 yr overdueKrushnai Associates · Shirur, PuneP52100001766· filed Sept 2020 → now Mar 2024· 90.5% built
- GOLD MAPLE2.4 yr overdueJAIN INFRA · NEAR ABHUSHAN PARK, AurangabadP51500017523· 72.7% built
- KALPAK HOMES KIRKATWADI PHASE II2.4 yr overdueSHUBHANKAR DEVELOPERS · KIRKATWADI, PuneP52100000741· filed Dec 2019 → now Mar 2024· 87.3% built· 7 complaints
- Legacy Riverside2.4 yr overdueSun Properties · Chikhali, PuneP52100025012· 90.9% built
- NCP Commercial Tower - Supremus2.4 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900021485· 81.8% built
- Sadanand Residency2.4 yr overdueBhavani Builders · Oras Bk., SindhudurgP52900007520· filed Mar 2019 → now Mar 2024· 89.5% built
- Majestique City D Building2.4 yr overdueMANISH DWARKADAS MAHESHWARI · Pune-Nagar Road, PuneP52100019947· 90.9% built
- VASTUSHRI2.4 yr overdueREAL LAND MARK DEVELOPERS LLP · NEAR PETROL PUMMP, SangliP53100032624· 90.9% built
- SILVER OAK PHASE 22.4 yr overdueBHASKAR RAMGONDA PATIL · NEAR RELIANCE PETROL PUMP, KolhapurP53000025215· 90.9% built
- ALANKAPURAM PH 3 A BUILDING2.4 yr overdueR K Lunkad Housing corporation · WADMUKHWADI, PuneP52100027434· 81.8% built
- PRANAM TOWERS2.4 yr overdueAMIS CONSTRUCTIONS LLP · CHOVISAWADI, PuneP52100016611· 18.2% built
- The Courtyard Phase II2.4 yr overdueMarc Developers · TARAKPUR, AhmednagarP52200022201· 90.9% built
- Mannat2.4 yr overdueEkram & Vikram Developers Private Limited · Dronagiri, RaigarhP52000019396· 9.1% built
- Makarani Pada Phase 12.4 yr overdueK D Builders · Borivali, Mumbai SuburbanP51800008606· 24.2% built· 1 complaint
- JAYHIND HILLSIDE2.4 yr overdueSAGAR JAYSING ERANDE · DUDULGAON, PuneP52100022761· 81.4% built
- Silver Crest Commercial Wing A and B2.4 yr overdueM/S Mahavir Realty · Wagholi, PuneP52100030182· filed Mar 2023 → now Mar 2024· 70.5% built
- ROHAN ABHILASHA 2 WING A2.4 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Wagholi, PuneP52100025655· 80% built
- TARANGAN APARTMENTS2.4 yr overdueHINDUSTAN BUILDERS · SHUKRAWAR PETH, PuneP52100051558· 86.8% built
- Raunak Residency2.4 yr overdueRahul Ramchandra Rathi · Deolali, NashikP51600024574· 81.8% built
- SAI SAGAR ENCLAVE VI2.4 yr overdueSAGAR PANDHARINATH BANKAR · MITRANGAN RESIDENCY , BEHIND JAWARKAR LAWN, AmravatiP50300016843· 30.9% built
- Motivilla2.4 yr overdueAAKAR SHIV INFRA VENTURE · Goregaon West, Mumbai SuburbanP51800033793· 90.9% built
- VALENCIA2.4 yr overdueSHETE PATIL DEVELOPERS · GANESH VIHAR COLONY, AhmednagarP52200029222· filed Apr 2023 → now Mar 2024· 76.8% built
- SHREE DATT GLORY2.4 yr overdueVILAS DATTATRAY KHAIRNAR · MHASRUL NASHIK, NashikP51600034624· 81.8% built
- Ace Courtyard2.4 yr overdueAce Signature Homes LLP · Mogharpada, ThaneP51700033813· 90.9% built
- TRINITY ARCADE2.4 yr overdueSURESH NAMDEO GAYKHE · PANCHAWATI, NashikP51600030716· 90.9% built
- KRUPA2.4 yr overdueAASAMANTA REALTY · GOREGAON EAST, Mumbai SuburbanP51800032389· 90.9% built
- CHANDRA-TARA2.4 yr overdueNIRMAAN ENGINEERS AND CONTRACTORS · CHURCH GATE, NashikP51600034999· 12.7% built
- THE JAMBLI GALLI CHS LTD2.4 yr overdueMAHAVIR CORPORATIONS · BORIVALI WEST, Mumbai SuburbanP51800045335· 81.8% built
- ICHHAMANI2.4 yr overdueSANKET BUILDTECH · NEAR RAMLEELA LAWNS, NashikP51600004120· filed Dec 2018 → now Mar 2024· 90.9% built
- SUPER MARKET2.4 yr overdueVSI BUILDERS AND DEVELOPERS · BHOR TOWNSHIP, NashikP51600034814· 18.2% built
- VEDANT PRIDE2.4 yr overdueVEDANT CONSTRUCTIONS · OPP OJASWI APARTMENT, PuneP52100033002· 81.8% built
- Laxmi Pooja Multi Family Residential Unit on Plot No 68-69 Part and 70-69 Part Kh no 1372.4 yr overduePOOJA CONSTRUCTIONS · Chinchbhawan, NagpurP50500047883· 90.9% built
- JAMDAR ERA2.4 yr overdueYogesh Suresh Dudhal · Baramati, PuneP52100048521· 90.9% built· 1 complaint
- DRUMADAL2.4 yr overdueRanjekar Realty LLP · Shivajinagar, Bhamburda, PuneP52100026105· filed Sept 2023 → now Mar 2024· 55.5% built
- SHREE SIDDHI BLDG NO 692.4 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800003413· filed Mar 2020 → now Mar 2024· 90.9% built
- VRUNDAVAN APARTMENT2.4 yr overdueSHREE ASSOCIATES · PANCHAVATI, NashikP51600030779· 90.9% built
- ACE AURUM COMMERCIAL2.4 yr overdueAALIA HOMES · OPP. SENTOSA RESORT, NEAR MUKAI CHOWK RAVET, PuneP52100030450· 90.9% built
- IMPERIAL PRIDE2.4 yr overdueIMPERIAL REALTY · PANCHAVATI, NashikP51600029696· 72.7% built
- MAYA HARMONY2.4 yr overdueMAYA DEVELOPERS · Kurla, Mumbai SuburbanP51800009358· filed Nov 2020 → now Mar 2024· 74.1% built
- AARAMBH2.4 yr overdueA TO Z CONSTRUCTION · ABHAY NAGAR, AhmednagarP52200031478· 90.9% built
- Prem Zephyr2.4 yr overdueAshwin Enterprises · Mulund West, Mumbai SuburbanP51800029011· 90.9% built
- SAMARTH SADAN2.4 yr overdueMODEL DEVELOPERS AND GENGAJE ASSOCIATES · SHANIWAR PETH SATARA, SataraP52700029437· 81.8% built
- SARA SANGAM GANGA BLDG2.4 yr overdueJAGRUT SARA ASSOCIATES · BAJAJNAGAR, AurangabadP51500030505· 90.9% built
- ZEAL REGENCY2.4 yr overdueBLUE BARON REALTORS · Vasai, PalgharP99000003182· filed Dec 2018 → now Mar 2024· 81.8% built· 14 complaints
- REDEVELOPMENT OF SILVERENE CHSL2.4 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800031840· 90.9% built
- Orchid Plaza2.4 yr overdueA J Associates · Jawahar Nagar, AkolaP50100052054· 81.8% built
- PROBITAS GLORY2.4 yr overdueMAHESH BHAGWANRAO SALUNKHE · BHADKAMKARNAGAR, SataraP52700031402· 63.6% built
- CASTLE O CLIFF2.4 yr overdueNASHIK, NashikP51600045924· 81.8% built
- Govind Leela Niketan2.4 yr overdueNiketan Construction · Powainaka, SataraP52700030353· 81.8% built
- Vidya Nidhi2.4 yr overdueLaxmi Aakar Realty · Goregaon West, Mumbai SuburbanP51800033588· 90.9% built
- Swarajya Apartment2.4 yr overdueKalash Developers Associates · Nashik, NashikP51600033621· 72.7% built
- LABH SAMARTH HEIGHT2.4 yr overdueM.V. LABH ASSOCIATES · Andheri, Mumbai SuburbanP51800011676· filed Dec 2018 → now Mar 2024· 90.9% built
- Yamuna Arcade2.4 yr overdueMarvel Trinity Infra LLP · Infront of Kotak Hospital, AkolaP50100029100· 90.9% built
- ROYAL RESIDENCY2.4 yr overdueS J BUILDER & DEVELOPERS · PIMPRI CHINCHWAD, PuneP52100045783· 81.8% built
- Tirupati Royal Homes2.4 yr overdueTIRUPATI CONSTRUCTION PROMOTERS & DEVELOPERS · KBP College Chowk, SolapurP52600047849· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.