RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 46 of 61
- MDM Zion2.9 yr overdueMDM REALTY LLP · Andheri West, Mumbai SuburbanP51800029740· 90.9% built
- OMKAR HERITAGE2.9 yr overdueOMKAR LIFESPACES · RADHESHWARI NAGAR, PuneP52100046095· 78.2% built
- KRUSHNA LEELA APARTMENT2.9 yr overduePRAKASH TRAMBAK JAGPAT · NASHIK, NashikP51600029673· 90.9% built
- Unnati-Phase 22.9 yr overdueSigma Realty · Nere, PuneP52100029549· 52.1% built
- Shreya Plaza2.9 yr overdueMane and Khot Associate · Near Laxmi Mandir, SangliP53100033574· 81.8% built
- Greenwoods2.9 yr overdueBKS galaxy realtors Pvt ltd · Panvel, RaigarhP52000001151· filed Jun 2021 → now Dec 2023· 96.4% built· 104 complaints
- YASHODA PARK2.9 yr overdueVARAD BHAGWANT DEVELOPERS · Sangli Miraj Kupwad (M Corp.), SangliP53100001110· filed Jan 2022 → now Dec 2023· 54.5% built
- SAI DWARKA PHASE 32.9 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100011408· filed Dec 2019 → now Dec 2023· 45.8% built· 1 complaint
- VARDHMAN CASTLE PHASE I2.9 yr overdueVENUS DEVELOPMENT CORPORATION · SANTACRUZ WEST, Mumbai SuburbanP51800033033· 0.2% built
- PARIJAT HEIGHTS2.9 yr overdueNew Horizon Realty · Priyanka Nagari, PuneP52100005180· filed May 2020 → now Dec 2023· 55.5% built· 1 complaint
- Velstand Phase 2 - formerly Kul scapes2.9 yr overduePathare Family · Tukaram NagarP52100005825· filed Jul 2020 → now Dec 2023· 99.7% built· 8 complaints
- Tisai Heights2.9 yr overdueTisai Construction · Katemanevali, Kalyan, ThaneP51700030323· 60% built
- CRYSTAL HOMES2.9 yr overdueCRYSTAL CREATIONS · Pimpri Chinchawad (M Corp.), PuneP52100002053· filed Dec 2019 → now Dec 2023· 90.9% built
- SATVIK WING B2.9 yr overdueM/s. JIGAR ENTERPRISE · Ambarnath, ThaneP51700029587· 45.5% built
- PRIME GROUP PROJECT GRAND SLAM2.9 yr overduePRIME GROUP · Dahisar, Mumbai SuburbanP51800034404· 90.9% built
- Tanishq Samrudhi2.9 yr overdueLaxmikant Bhaskar Kothawade · Jijamata Colony, NashikP51600033607· 43.2% built
- VRINDANAND ELITE2.9 yr overdueMAKWANA AND TANMAY CONSTRUCTION · KONDHWA BUDRUK, PuneP52100030243· 53.3% built· 3 complaints
- SWASTIK PHASE 12.9 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800002197· filed Dec 2019 → now Dec 2023· 49.2% built· 1 complaint
- ATLANTAIII2.9 yr overdueG K WONDERS · WAKAD, PuneP52100030916· 84.5% built
- STERLING COURT WING D2.9 yr overdueAPRAULIC CONSTRUCTION INVESTMENT AND FINANCE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002160· filed Sept 2020 → now Dec 2023· 90.9% built
- Suprabha-Shivam Lifestyle2.9 yr overdueShivam Lifestyle · Chembur, Mumbai SuburbanP51800029652· 90.9% built
- GREEN SPRINGS2.9 yr overdueVISION ASSOCIATES · Wai (Rural), SataraP52700001770· filed Jun 2019 → now Dec 2023· 81.8% built
- SEYCHELLES2.9 yr overdueSHUBHAM ENTERPRISES · Andheri, Mumbai SuburbanP51800033314· 87.5% built
- CRD Gardenia Apartments 2 - Phase III2.9 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000049393· 81.8% built
- SHUBH AANGAN WING B2.9 yr overdueG D REALTORS PVT LTD · BHANDUP EAST, Mumbai SuburbanP51800029568· 90.9% built
- VASANT VIHAR2.9 yr overdueAARADHYA INFRAPROJECTS · NEAR SHREE MAHADAV MANDIR, JalgaonP49900048286· 97.3% built
- KRUPANIDHI2.9 yr overdueKONARK ENTERPRISES · Sawarde, RatnagiriP52800014795· filed Sept 2022 → now Dec 2023· 90.9% built
- Revati Residency2.9 yr overdueGAURAV BHARAT SHAH · BIBWEWADI MUNJERI, PuneP52100029407· 63.6% built
- SAI SINDHU2.9 yr overdueSHREE VIGHNAHAR PROMOTERS AND BUILDERS PVT LTD · Junnar, PuneP52100001923· filed Jul 2019 → now Dec 2023· 67.7% built
- ESSENCIA HEIGHTS2.9 yr overdueSanskruti & Aditya Associates · BALEWADI STADIUM, PuneP52100007045· filed Feb 2021 → now Dec 2023· 90.9% built
- SAMRUDDHI ISHA2.9 yr overdueSAMRUDDHI ENTERPRISES · KIVALE, PuneP52100006794· filed Dec 2018 → now Dec 2023· 70.9% built· 7 complaints
- Shree Paras Empire Grand2.9 yr overdueDEEPAK NEMICHAND MODI · Near Axis Bank, NashikP51600032046· 72.7% built
- VEDANT D52.9 yr overdueSAHEBRAO VITHAL SATRE · Thane, ThaneP51700048308· 60.9% built
- ANANTRUKMINI2.9 yr overdueDAJIKAKA GADGIL DEVLOPERS .PVT.LTD . · Pune City, PuneP52100001340· filed Dec 2019 → now Dec 2023· 95.5% built· 1 complaint
- Plot No.02,House No.175,Ward No.06,C.S. No.101,154 and 159,Sheet No.233 and 227 Of Mouza-Nagpur2.9 yr overdueMHADA (Nagpur Board) · Ganesh Peth, NagpurP50500052672· 90.5% built
- JAYSHREE IMPERIA2.9 yr overdueCHAITALI CONSTRUCTION · ADGAON, NashikP51600032502· 36.4% built
- GREEN VIEW PARK2.9 yr overdueTANISHKA DEVELOPERS · CHETNA NAGAR, NashikP51600031380· 81.8% built
- Sunshine Landmark2.9 yr overdueSunshine Landmark · Padmavatinagar, Patryacha Mala, SataraP52700030204· 81.8% built
- Udyog Kalpak2.9 yr overdueKalpak Developers · Itkheda, AurangabadP51500029919· 90.7% built
- ADESH HEIGHTS2.9 yr overdueSURESH NAMDEV LAGAD · KEDGAON, AhmednagarP52200030368· 63.6% built
- ASHWA PLATINUM2.9 yr overdueASHWA PLATINUM · Kurla, Mumbai SuburbanP51800005636· filed Nov 2020 → now Dec 2023· 84.1% built· 10 complaints
- Mount N Glory Plot A Phase II2.9 yr overdueSancheti Associates Pvt. Ltd. · Kharadi, PuneP52100029286· 90.9% built
- Rite Civis2.9 yr overdueYashodanand Developers · Bhandup West, Mumbai SuburbanP51800030301· 42.3% built· 2 complaints
- MEENA PARK PLOT 2-42.9 yr overdueBENJAMIN MANWEL DSOUZA · RAWOOLWADA, SindhudurgP52900014880· filed Sept 2022 → now Dec 2023· 90.9% built
- Renuka Gulmohar Phase II2.9 yr overdueHaveli, PuneP52100001835· filed Dec 2024 → now Dec 2023· 82.1% built
- Tejas Society2.9 yr overdueRADHIKA SHELTERS · Shastri Nagar, ThaneP51700016283· filed Dec 2020 → now Dec 2023· 69.5% built
- ATHARVA ELITE2.9 yr overdueATHARVA INFRASTRUCTURES · PIPLA, NagpurP50500029403· 2.1% built
- SURVAL HEIGHTS2.9 yr overdueGAYATRI DEVELOPERS · BADLAPUR EAST, ThaneP51700030228· 74.1% built
- Skyi Songbirds Phase C2.9 yr overdueEnerrgia Skyi Developers · Bhugaon, PuneP52100000805· filed Nov 2020 → now Dec 2023· 91.6% built· 7 complaints
- SHIVRANG2.9 yr overdueRANJEKAR REALTY AOP · Sadashiv Peth, PuneP52100030980· 90.9% built
- Sahil Exotica2.9 yr overdueBOMBAY CONSTRUCTION & INFRAPROJECTS PVT LTD · Andheri, Mumbai SuburbanP51800003978· filed Jun 2019 → now Dec 2023· 87.3% built· 1 complaint
- WING D- DURVANKUR2.9 yr overdueM K PATIL DEVELOPERS · Badlapur (M Cl), ThaneP51700004981· filed Aug 2019 → now Dec 2023· 90.9% built
- VIVAN CASITA2.9 yr overdueBORSE BROTHERS ENGINEERS AND CONTRACTORS PRIVATE LIMITED · Deopur, DhuleP49800021196· filed Dec 2022 → now Dec 2023· 90.9% built
- Plot no 3 and 4 house no.175,ward no.6,city survey no.101,154,155,159 sheet no.233,227 Mouza-Nagpur2.9 yr overdueMHADA (Nagpur Board) · Fule Market, Ganeshpeth, NagpurP50500052608· 90.5% built
- VITTLE EMPIRE2.9 yr overdueMIRACLE DEVLOPERS · NEAR TO BAL AASHRAMP52100013861· filed Jul 2019 → now Dec 2023· 81.8% built
- RAJ INAAYA2.9 yr overdueMAHALAXMI CONSTRUCTION · PALEGAON, ThaneP51700034259· 90.9% built
- SUDHA2.9 yr overdueSAMARTH REALTY · TEMBHODE, PalgharP99000022954· filed Dec 2022 → now Dec 2023· 90.9% built· 1 complaint
- Sai Proviso County2.9 yr overdueProviso Builders and Developers · Panvel, RaigarhP51700002042· filed Jun 2021 → now Dec 2023· 84% built· 4 complaints
- Sunrise Orlem 2B Phase 32.9 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800006843· filed Jun 2021 → now Dec 2023· 83.6% built· 1 complaint
- R R Tilak Nagar2.9 yr overdueR K BUILDERS & DEVELOPERS · tilak nagar housing society, NandedP51100031887· 90.9% built
- GALAXY MANSION X2.9 yr overdueGALAXY ASSOCIATES · MANEWADA, NagpurP50500030379· 81.8% built
- Our Town - Whispering Woods2.9 yr overdueKaiyomerz Cowas Palia · Dalkhan, ThaneP51700003884· filed Mar 2019 → now Dec 2023· 99.5% built· 3 complaints
- SAGAR ENCLAVE2.9 yr overdueANURAG DEVELOPERS · JAITALA, NagpurP50500031574· 90.9% built
- AURA APARTMENTS - PHASE 2 11TH FLOOR2.9 yr overdueBHOLENATH DEVELOPERS LTD. · GHATLA, Mumbai SuburbanP51800009179· filed Oct 2018 → now Dec 2023· 54.5% built
- SWOJAS ONE2.9 yr overdueUNITED DEVELOPERS · Haveli, PuneP52100030604· 81.8% built
- Runwal Tower2.9 yr overdueVision Infra Developers · Daate Mala, KolhapurP53000000151· filed Dec 2019 → now Dec 2023· 81.8% built· 3 complaints
- Revati Woodland2.9 yr overdueRevati Builders and Developers · ANANDVALLI, NASHIK, NashikP51600029633· 95.9% built
- SAI DWARKA PHASE 12.9 yr overdueMAA SANKALP BUILDCON · YAWALEWADI, PuneP52100009316· filed Dec 2018 → now Dec 2023· 81.8% built· 2 complaints
- KANDIVALI BASANT BAHAR2.9 yr overdueWESTIN SANKALP DEVELOPERS · KANDIVALI WEST, MUMBAI, Mumbai SuburbanP51800031940· 40% built
- SHIVOM GALAXY2.9 yr overdueSHIVOM ENTERPRISES · Kalyan, ThaneP51700020888· filed Feb 2023 → now Dec 2023· 79.5% built
- Ashtavinayak City2.9 yr overdueManoj Dhruwkumar Peety · Ashtavinayak City, JalnaP51400050839· 10% built
- NILKANTH APARTMENT2.9 yr overdueBAG BUILDCON · MHASRUL, NashikP51600033232· 81.8% built
- SAI EMRALD2.9 yr overdueSAIESHWAR PROJECTSS · Pune (M Corp.), PuneP52100006251· filed Dec 2018 → now Dec 2023· 99.2% built· 1 complaint
- SPACE HEIGHTS - PHASE 22.9 yr overdueSPACE ASSOCIATES · Waliv, PalgharP99000030163· 90.9% built
- Lucas Residency2.9 yr overdueSunita Developers · Ambernath West, ThaneP51700030052· 90.9% built
- Ashiyana Tower Building No 22.9 yr overdueAteeque Yusuf Khot · Bazar Peth, RaigarhP52000030920· 90% built
- EMPIRE2.9 yr overdueSHREE SIDDHIVINAYAK DEVELOPERS · IGATPURI, NashikP51600005114· filed Oct 2020 → now Dec 2023· 72.4% built· 6 complaints
- DHRUVA2.9 yr overdueANAND MUKUND GINDODIYA · PUSHPAK NAGAR, RaigarhP52000033930· 77.7% built
- RUDRAKSHAM PH 12.9 yr overdueONKAR CONSTRUCTIONS · Haveli, PuneP52100003403· filed Jun 2021 → now Dec 2023· 90.9% built
- GANGA LEGEND A2 AND B42.9 yr overdueLegends County Landmark Pvt Ltd · BAVDHAN, PuneP52100021020· 83.9% built· 4 complaints
- JAY AMBE CORNER2.9 yr overdueJAY AMBE DEVELOPERS · ULWE, RaigarhP52000047632· 90.9% built
- ARIHANT ESTATE2.9 yr overdueARIHANT CREATION · SATVALI, PalgharP99000030630· 33.6% built
- SUVIDHI APARTMENT2.9 yr overdueCOSMO LIFESCAPES LLP · YERWADA, PuneP52100015773· filed Jun 2022 → now Dec 2023· 81.8% built· 1 complaint
- MARY VILLA2.9 yr overdueH&D PROJECTS · Borivali, Mumbai SuburbanP51800031597· 81.8% built
- Millennium Atlas2.9 yr overdueMillennium Developers · Tathawade,Pune, PuneP52100035007· 81.8% built
- Nakshatra2.9 yr overdueKrishnaraj Developers · Kothrud, PuneP52100007857· filed Dec 2020 → now Dec 2023· 55.9% built
- SANKALP VASTU2.9 yr overdueSANKALP REALTY · charholi, PuneP52100029957· 90.9% built
- SAYALI APARTMENT-32.9 yr overdueDILIP BHIWAJI SONTAKKE · UMRED PARSODI, NagpurP50500033294· 81.8% built
- NIRMAN VIVA -F2.9 yr overdueNIRMAN HOMES · Ambegaon Budruk, PuneP52100033468· 81.8% built
- LAKE PARADISE2.9 yr overdueSADIQUE MAHAMOOD JALAL · ., RaigarhP52000033205· 52.7% built
- GULAB SRUSHTI2.9 yr overdueBUTTEPATIL PROPERTIES · KOTHRUD, PuneP52100031652· 59.1% built
- SATYAM ORCHID2.9 yr overdueOMSATYAM BUILDCONS PRIVATE LIMITED · GODHANI, NagpurP50500024105· 54.5% built
- Casa Row Colony Phase - 22.9 yr overdueCASA DEVELOPERS · Near Moraya Park, AhmednagarP52200032505· 36.4% built
- BOLKAR NAKSHATRA A B C2.9 yr overdueGANESH TUKARAM BOLKAR · NEAR MOULE HALLL ASHOK NAGAR, NashikP51600025548· 90.9% built
- JAY MALHAR RESIDENCY2.9 yr overdueSHREE BUILDER AND DEVELOPER · SADASHIV PETH, PuneP52100023318· 90.9% built
- Riddhi Siddhi Industrial Complex2.9 yr overdueRiddhi Siddhi Builders & Developers · Vasai, PalgharP99000002625· 81.8% built
- ANJNEYA RESIDENCY2.8 yr overdueSUREKHA SURESH DHAMANE · BANDAVANE NAGAR, NashikP51600033672· 39.1% built
- Nirman Vishnubaug2.8 yr overduePRIVEUS LIFESPACES LLP · ERANDWANE, PuneP52100023778· 90.9% built
- Kakad West End2.8 yr overdueKakad Realty Pvt Ltd · Mumbai City, Mumbai CityP51900003122· filed Jun 2022 → now Jan 2024· 90.9% built
- AASMAN CO-OPERATIVE HOUSING SOCIETY LTD2.8 yr overdueAasman Co-Operative Housing Society Limited · BODHALE NAGAR, NashikP51600033051· 90.9% built
- AMBAR RESIDENCY A BUILDING2.8 yr overdueMEHTA BUILDERS · JALOCHI, PuneP52100024670· 90.9% built
- SHIV SONAL PALACE CHS LTD2.8 yr overdueSAI PRASAD BUILDERS AND DEVELOPERS · AMBERNATH EAST, ThaneP51700034047· 27.3% built
- AVAANTI RESIDENCES AND PREMIUM COMMERCIAL SPACES2.8 yr overdueOLYMPIA · Haveli, PuneP52100009000· filed Jun 2020 → now Jan 2024· 89.3% built
- RAJARAM PALACE2.8 yr overdueSHREE KRUSHNA BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600012517· 90.9% built
- Primavera - B6 and S12.8 yr overdueKEWAL REAL ESTATE DEVELOPERS PRIVATE LIMITED · Sainathnagar VadgaonsheriP52100021093· 86.4% built
- Shri Swami residency2.8 yr overdueShri construction and developers · Rui, PuneP52100026512· 49.1% built
- Lodha Amara - Tower 6, 222.8 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700014760· 81.8% built· 9 complaints
- ICON TOWER2.8 yr overdueGAIKWAD PROMOTERS · DANGE CHOWK HINJEWADI ROAD, PuneP52100030416· 81.8% built
- Priyadarshan - J2.8 yr overdueKumar Agro Products Pvt Ltd · Jai Bhavani Nagar, PuneP52100029119· 90.9% built
- CITI CHALET2.8 yr overdueBASONS CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800046606· 90.9% built
- Virar Bolinj Yogiraj CHS Ltd2.8 yr overdueShree Jivdani Samarpan Developers · Vasai-Virar City (M Corp), PalgharP99000004134· filed Dec 2020 → now Jan 2024· 90.9% built
- SAI PAWAN APARTMENT2.8 yr overdueSAI GANRAJ DEVELOPERS · DAMODAR CHOWK, NashikP51600025940· 90.9% built
- Geetanjali B2.8 yr overdueJOSHI BUILDCON LANDMARKS · Sahakarnagar, PuneP52100034370· 90.9% built
- Gandharva Excellence Project III A Commercial A Building C Building2.8 yr overdueVinayak Pandharinath Bhongale · Borhadewadi Moshi, PuneP52100026856· 29.8% built· 1 complaint
- K SQUARE2.8 yr overdueKHATRI AND KHATMODE ASSOCIATES · OPP VP COLLAGE, PuneP52100025484· 81.8% built
- SUKAN CORNER APARTMENT2.8 yr overdueAPPULKUMAR VITHALBHAI RAKHOLIYA · PATHARDI, NashikP51600033941· 81.8% built
- Athena2.8 yr overdueM/s. Sahajanand Developers · Goregaon West, Mumbai SuburbanP51800003330· filed Mar 2020 → now Jan 2024· 62.7% built· 10 complaints
- Puneet Sanjivani Phase 3 Floor 21 to Floor 232.8 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017800· 90.9% built
- Puneet Sanjivani Phase 2 Floor 17 to Floor 202.8 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800017842· 90.9% built
- OMSHANTI APARTMENT B2.8 yr overdueShivsai Enterprises · PATHARDI, NashikP51600022812· 90.9% built
- PUSHKAR CO OP HSG SOCIETY PRAPOSED2.7 yr overdueAMEYA DEVELOPERS · OPP DNC HIGH SCHOOL, ThaneP51700025616· 28% built
- Laxmi Sanskruti2.7 yr overdueLAXMIDEVI DEVELOPERS · Jawahar Nagar, Goregaon West, Mumbai SuburbanP51800034219· 52.7% built
- VIMAL RESIDENCY2.7 yr overdueVIMAL DEVELOPERS · NILEMORE, PalgharP99000011244· filed Mar 2019 → now Feb 2024· 99.9% built· 1 complaint
- Pranav Flora2.7 yr overduePranav Builders · Laxmi Mandir Kupwad road, SangliP53100024613· 81.8% built
- Redevelopment of Om Divya Apartments Co-operative Housing Society Limited2.7 yr overdueM/s Shanti Developers · Borivali, Mumbai SuburbanP51800005768· filed Feb 2021 → now Feb 2024· 90.5% built
- Riverdale Residences-I2.7 yr overdueDuville Estates Private Limited · KHARADIP52100004692· filed Oct 2022 → now Feb 2024· 72.7% built· 31 complaints
- ASHAR ARIA2.7 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700017518· 85.9% built
- LUXOR2.7 yr overdueGAJANAN UTTAMRAO MANTE · NR BITWISE CO, BANER, PuneP52100022342· 90.9% built
- ANANDAM2.7 yr overdueA B Constructions · Gaurakshan Road, AkolaP50100045938· filed Dec 2023 → now Feb 2024· 81.8% built
- CHANDRALEKHA PRIDE2.7 yr overdueOM BUILDERS · CHETNA NAGGAR, NashikP51600049591· 45.5% built
- KHAR HIRA PREMISES CO OP SOCIETY LTD2.7 yr overdueL NAGPAL DEVELOPERS · Andheri, Mumbai SuburbanP51800031276· 78.2% built
- RISHABRAJ VICINIA2.7 yr overdueH RISHABRAJ DEVELOPERS · GHATKOPAR EAST, Mumbai SuburbanP51800026330· 90.9% built
- V TEN RESIDENCY2.7 yr overdueV TEN REALTY PRIVATE LIMITED · Kalyan, ThaneP51700005357· filed Dec 2020 → now Feb 2024· 56.4% built· 1 complaint
- ESHAN CULTURE2.7 yr overdueESHAN DEVELOPERS · Mamurdi, PuneP52100009970· filed Dec 2019 → now Feb 2024· 67.3% built
- Swashraya Andheri CHS Ltd2.7 yr overdueDEM CONSTRUCTIONS LLP · nr Juhu Lane, Mumbai SuburbanP51800030781· 67.4% built
- VRAJVIHAR APARTMENT2.7 yr overduePAL DEVELOPERS · JAYBHAVE NAGAR, NashikP51600015335· 27.3% built
- AARTI PRIME2.7 yr overdueAARTI ENTERPRISES · UPPER KHOPOLI, RaigarhP52000026364· 14.5% built
- ANAND PRIDE2.7 yr overdueANAND CONTRACTORES AND DEVELOPERS · BABRAS MALA, PuneP52100021410· 90.9% built
- THE FIRST2.7 yr overdueVAK ENTERPRISES · DEVKAR PANAND, KolhapurP53000028985· 75.9% built
- GOREGAON RASIK CO OP HSG SOCIETY LTD2.7 yr overdueAAKAR REAL ESTATE DEVELOPERS · GOREGAON WEST, Mumbai SuburbanP51800007636· filed Mar 2019 → now Mar 2024· 90.9% built
- SUBODH2.7 yr overdueNEW HOMES CORPORATION · OWLA NAKA, ThaneP51700005802· filed Sept 2020 → now Mar 2024· 90.9% built
- PARAMOUNT2.7 yr overdueBUILDCON DEVELOPERS · NEAR BARAMATI BANK, PuneP52100045480· 48.7% built
- GAIKWAD MIRO2.7 yr overdueGAIKWAD DEVELOPERS · GAIKWAD NAGAR, PuneP52100016064· 81.8% built
- CASA RAMIRO2.6 yr overduePRESCOTT HOUSING LLP · Andheri, Mumbai SuburbanP51800033552· 90.9% built
- VITHAL HARI TOWER2.6 yr overdueVITHAL ENTERPRISES · Vasai, PalgharP99000006107· filed Mar 2023 → now Mar 2024· 46.4% built
- Gulmohar Pride2.6 yr overdueEarth Rise Buildcon LLP · GULMOHAR COLONY, SangliP53100028680· 81.8% built
- GOPAL SMRUTI2.6 yr overdueDATTA BABURAO GHAVAT · AMBERNATH, ThaneP51700029145· 90.7% built
- SHREE MADHULAXMI APARTMENT2.6 yr overduePANKAJ DINKAR SHILWATE · NEAR LOKMANYA HOSPITAL, NashikP51600034785· 30.9% built
- VISHNU BHASKAR CHS LTD2.6 yr overdueSUDHANSHU INFRASTRUCTURES PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800015748· filed Sept 2019 → now Mar 2024· 90.9% built· 1 complaint
- MAHALAXMI PLAZA2.6 yr overdueP. S. ASSOCIATES · vmv road (nana nani park), AmravatiP50300023560· 81.8% built
- Rajdheera Business Square2.6 yr overdueRajdheera Properties · Talegaon Station, PuneP52100033395· filed Mar 2023 → now Mar 2024· 54.5% built
- DARSHAN BUSINESS PARK12.6 yr overdueSHANKHESHWAR ASSOCIATES · PEN, RaigarhP52000014189· filed Mar 2023 → now Mar 2024· 65.9% built
- OSWAL LIFESPACES - PHASE 12.6 yr overdueOSWAL LIFESPACES · Palghar, PalgharP99000002598· filed Mar 2023 → now Mar 2024· 81.8% built· 1 complaint
- AANCHAL D BUILDING2.6 yr overdueSWAN PROPERTIES · Haveli, PuneP52100005073· filed Mar 2023 → now Mar 2024· 90.9% built
- REGAL SQUARE PHASE III BLDG NO 72.6 yr overdueSQUAREFEET INFRASTRUCTURE LLP · TEMGHAR PADA, BHIWANDI, ThaneP51700021861· 90.9% built
- SAIDHAM PUSHYA2.6 yr overdueB.G.SOVANI AND ASSOCIATES · PAGZARI, RatnagiriP52800019793· 32.7% built
- PRANAM TOWERS2.6 yr overdueAMIS CONSTRUCTIONS LLP · CHOVISAWADI, PuneP52100016611· 18.2% built
- TARANGAN APARTMENTS2.6 yr overdueHINDUSTAN BUILDERS · SHUKRAWAR PETH, PuneP52100051558· 86.8% built
- LEVERAGE GREENWOODS HARMONY2.6 yr overdueLeverage Spaces LLP · PIPLA, NagpurP50500023240· 48.9% built
- Spee Skytower Wing A and B2.6 yr overdueSpee Realtor · ParelP51900024490· 0% built· 2 complaints
- FLORIA BUILDING A2.6 yr overdueAKSHAY CHINTAN BUILDERS · Pune (M Corp.), PuneP52100003367· 46.4% built
- SAWANT APPARTMENT2.6 yr overdueVARSHA DEVELOPERS · MAHALAXMI NAGAR, NashikP51600009245· filed Dec 2019 → now Mar 2024· 90.9% built
- SAI DARSHAN2.6 yr overdueSAI SHRADDHA DEVELOPERS · TATHAWADE, PuneP52100026605· 29.1% built
- SARA CITY C112.6 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015547· 90.9% built· 1 complaint
- Legacy Riverside2.6 yr overdueSun Properties · Chikhali, PuneP52100025012· 90.9% built
- Vaishali Residency2.6 yr overdueAmitkumar Suresh Dublay · VengurlaP52900014531· 86.4% built
- SMIT VIJAY HEIGHTS2.6 yr overdueKUMARSHETH AND SONS · OPP. S.B.I. MAIN BRANCH, SangliP53100025167· 81.8% built
- KALPAK HOMES KIRKATWADI PHASE II2.6 yr overdueSHUBHANKAR DEVELOPERS · KIRKATWADI, PuneP52100000741· filed Dec 2019 → now Mar 2024· 87.3% built· 7 complaints
- AIM Residency Phase I2.6 yr overdueA M ENTERPRISES · Andheri, Mumbai SuburbanP51800015762· 90% built
- SWARAJ SAHANIWAS2.6 yr overdueKUKADE LAYOUT (LIG)COOPERATIVE HOUSING SOCIETY LTD. · Near ERA international school, NagpurP50500020570· filed Mar 2022 → now Mar 2024· 70.5% built
- MARUTI2.6 yr overdueINVENTION REALTORS PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800012405· 86.8% built
- VASTUSHRI2.6 yr overdueREAL LAND MARK DEVELOPERS LLP · NEAR PETROL PUMMP, SangliP53100032624· 90.9% built
- ALANKAPURAM PH 3 A BUILDING2.6 yr overdueR K Lunkad Housing corporation · WADMUKHWADI, PuneP52100027434· 81.8% built
- NCP Commercial Tower - Supremus2.6 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900021485· 81.8% built
- REDEVELOPMENT OF BORIVALI SHIVDARSHAN CHSL2.6 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI WEST MUMBAI, Mumbai SuburbanP51800026908· 86.7% built
- JD Park2.6 yr overdueJD Housing LLP · Cherpoli, ThaneP51700016060· 90.9% built
- Makarani Pada Phase 12.6 yr overdueK D Builders · Borivali, Mumbai SuburbanP51800008606· 24.2% built· 1 complaint
- Gagan Commerce Centre2.6 yr overdueGagan I-Land Township Private limited · Sangamwadi, Pune, PuneP52100016445· 4.5% built
- SARA VENKATESH F TYPE BUILDING2.6 yr overdueSARA TOWERS PVT LTD · BAJAJ NAGAR, AurangabadP51500032237· filed Mar 2023 → now Mar 2024· 81.8% built
- JAYHIND HILLSIDE2.6 yr overdueSAGAR JAYSING ERANDE · DUDULGAON, PuneP52100022761· 81.4% built
- SARA CITY C102.6 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015649· 90.9% built
- Raunak Residency2.6 yr overdueRahul Ramchandra Rathi · Deolali, NashikP51600024574· 81.8% built
- THE METROPOLE2.6 yr overdueRaveshia Realtors · GHATKOPAR, Mumbai SuburbanP51900026208· 81.4% built· 14 complaints
- Mannat2.6 yr overdueEkram & Vikram Developers Private Limited · Dronagiri, RaigarhP52000019396· 9.1% built
- Balaji Greens2.6 yr overdueSathe Schemes · Near Sheetal Vihar society, RaigarhP52000015609· 90.9% built
- AURUS2.6 yr overdueKINGSTAY REAL ESTATE PRIVATE LIMITED · MUMBAI, Mumbai SuburbanP51800015024· 90.9% built
- Legacy Liva2.6 yr overdueWhite Properties · Near Legacy Crest Project, PuneP52100024554· 90.9% built
- Silver Crest Commercial Wing A and B2.6 yr overdueM/S Mahavir Realty · Wagholi, PuneP52100030182· filed Mar 2023 → now Mar 2024· 70.5% built
- SAI SAGAR ENCLAVE VI2.6 yr overdueSAGAR PANDHARINATH BANKAR · MITRANGAN RESIDENCY , BEHIND JAWARKAR LAWN, AmravatiP50300016843· 30.9% built
- A P Pinnacle Phase 12.6 yr overdueA P Construction · Haveli, PuneP52100019457· 86.4% built
- Krushnai Vihar Phase-I2.6 yr overdueKrushnai Associates · Shirur, PuneP52100001766· filed Sept 2020 → now Mar 2024· 90.5% built
- SARA CITY C92.6 yr overdueJagrutsara Structures LLP · KHARABWADI, PuneP52100015625· 90.9% built
- HERAMB GARDEN2.6 yr overdueOMKARAA DEVELOPERS · LADAVALI, RaigarhP52000024674· 67.3% built· 1 complaint
- GOLD MAPLE2.6 yr overdueJAIN INFRA · NEAR ABHUSHAN PARK, AurangabadP51500017523· 72.7% built
- NANDAN PROBIZ2.6 yr overdueNANDAN ASSOCIATES · BALEWADI, PuneP52100001376· filed Mar 2022 → now Mar 2024· 81% built· 7 complaints
- Shubh Aarambh2.6 yr overdueSHUBH ASSOCIATES · DADACHI WASTI, PuneP52100028760· 90.9% built
- AAPLE GHAR TOWNSHIP A AND E WING2.6 yr overdueWabale Patil Urbanizers · Tandulwadi, PuneP52100016436· 90.9% built
- LANDMARK2.6 yr overdueRAJESHWAR BUILDERS AND DEVELOPERS · GORAKSHAN ROAD, AkolaP50100023563· 81.8% built
- RL CORPORATE SPACE2.6 yr overdueR L INFRASTRUCTURE & 2 Others · MOUZA KHAMLA, NagpurP50500035198· filed Mar 2023 → now Mar 2024· 76.8% built
- CHINTAMANI HABITAT LOTUS TYPE C - J2.6 yr overdueJASHNANI CONSTRUCTION PRIVATE LIMITED · Shahapur (CT), ThaneP51700005632· 71.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.