RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 32 of 61
- SHREE GANESH LUXURIA4.9 yr overdueSHRINIVAS BUILDWELL · PRASHANT NAGAR, PATHARDI PHATA, NashikP51600022205· 71.8% built
- GLOBAL ARCADE4.9 yr overdueNINE ASSOCIATE DEVELOPERS · Vasai, PalgharP99000003305· filed Dec 2019 → now Dec 2021· 79.1% built
- Jangid Galaxy Tower 14.9 yr overdueJangid Contructions · THANE, ThaneP51700011991· filed Dec 2019 → now Dec 2021· 31.7% built· 6 complaints
- Aapla Ghar Lonikand4.9 yr overdueMIA Properties · Haveli, PuneP52100008033· filed Dec 2019 → now Dec 2021· 87.9% built· 4 complaints
- Kalpataru Ph-24.9 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600018371· 54.5% built
- Sea Jewel4.9 yr overdueSea Jewel Property Developers LLP · Borivali, Mumbai SuburbanP51800009552· 36.8% built
- ATRIA GRANDE PROJECT B4.9 yr overdueAtria Constructions · Handewadi, PuneP52100015620· 72.7% built
- Building D3 Eon Homes4.9 yr overdueHinjawadi Infradevelelopment Private Limited · Hinjwadi Ph-3, PuneP52100001860· 81.8% built
- SHIV AMRUT4.9 yr overdueSHIVA AMRUT ENTERPRISES · DIVA STATION, ThaneP51700021065· 44.4% built
- Crystal Tower4.9 yr overdueKSHITIJ PROMOTERS AND DEVELOPERS · Pashan, PuneP52100000082· filed Dec 2019 → now Dec 2021· 90.8% built· 1 complaint
- Ameya Woods4.9 yr overdueAmeya Squares · Vasai, PalgharP99000006892· 90.9% built
- UK SANGFROID4.9 yr overdueKeemaya Build Private Limited · Andheri, Mumbai SuburbanP51800007085· filed Dec 2019 → now Dec 2021· 61.8% built· 8 complaints
- Juhu Sheetal Co-operative Housing Society Ltd.4.9 yr overdueAmal Realtors Private Limited · Andheri, Mumbai SuburbanP51800000648· 90.9% built
- SAISH APARTMENT4.9 yr overdueANIKET CHAVAN AND ASSOCIATES · Songaon Tarf Satara, SataraP52700008293· 72.7% built
- OM PLATINA4.9 yr overduePUNJAB SHIVAJIRAO TAUR · Satara (CT), AurangabadP51500007102· filed Dec 2019 → now Dec 2021· 89.1% built
- Green Avenue 1B4.9 yr overduePARAM DEVELOPERS · Thane, ThaneP51700006081· 90.9% built
- OLIVE RESIDENCY4.9 yr overdueGOODWILL PROPERTIES · Thane (M Corp.), ThaneP51700013056· 81.8% built
- SHIRKE AND PATIL ASSOCIATES4.9 yr overdueSHIRKE AND PATIL ASSOCIATES · PIMPLE SAUDAGAR, PuneP52100016444· 68.2% built
- MARUTI SANKUL4.9 yr overdueOM SAI DEVELOPERS · Bopele, RaigarhP52000004469· filed May 2019 → now Dec 2021· 87% built
- ARCHIT GALAXY4.9 yr overdueV S ENTERPRISES · SERENE MEADOWS, NashikP51600014613· 90.9% built
- ALLURE WINGS A TO E4.9 yr overdueAADI PROPERTIES LLP · Kurla, Mumbai SuburbanP51800008521· 63.6% built· 9 complaints
- PARADISO BAY4.9 yr overdueATHARVA REALTY PRIVATE LIMITED · -, RaigarhP52000012241· 28.8% built
- SHIV VIHAR4.9 yr overdueROYAL CONSTRUCTION · CHARHOLI KHURD, PuneP52100016068· 18.2% built
- AMRUT PARK4.9 yr overdueAARADHANA DEVELOPERS · Nashik, NashikP51600011238· 81.8% built
- EMEZEKA PARK4.9 yr overdueINDRA PROPERTIES · Jadhavwadi, PuneP52100002604· 90.9% built· 1 complaint
- JANAI - BALAJI APARTMENTS4.9 yr overdueUNIQUE DEVELOPERS · Chhatrapati nagar, NagpurP50500007644· filed Dec 2018 → now Dec 2021· 84.5% built
- KIRANS SHREE SMARAN4.9 yr overdueKIRAN VASANT THANDRE · KASAR VADAVALI, ThaneP51700016457· 73.5% built
- Anant Greens Phase I4.9 yr overdueAnant Realty · Karjat, RaigarhP52000000955· 90.9% built
- SIDDHI PARK PLATINUM4.9 yr overdueVACK BUILDERS AND DEVELOPERS PVT LTD · Aurangabad (M Corp.), AurangabadP51500009751· 30.6% built
- ANAY RESIDENCY4.9 yr overdueGOVINDA CONSTRUCTION · DGP NAGAR NO.2, AMBAD, NASHIK, NashikP51600015947· 90.9% built
- SS BUILDERS BUILDING NO. 84.9 yr overdueS S BUILDERS · Vasai, PalgharP99000004466· filed Dec 2019 → now Dec 2021· 61.4% built
- NEELKANTH SHRUSHTI4.9 yr overdueASHAPURA COMBINES · Kalyan-Dombivali (M Corp.), ThaneP51700011819· 90.9% built
- Noble Nivas - Redevelopment4.9 yr overdueSHARADA LIFESPACES · Gultekadi, PuneP52100015411· 67.7% built
- EPIC PHASE II4.9 yr overdueSHIVSAGAR PROMOTERS & DEVELOPERS · Wagholi, PuneP52100005410· 73% built
- WHISTLINGWOODSPARK4.9 yr overdueVELANI DEVELOPERS · SHELU, RaigarhP52000012731· 89.1% built
- BLUE OCEAN ROW HOUSES APPARTMENT4.9 yr overdueBLUE OCEAN BUILDERS AND DEVELOPERS · Near Jain Mandir, NashikP51600013997· 63.6% built
- Shree Laxmi Residency4.9 yr overdueKSHITIJA INFRASTRUCTURE PVT LTD · Ward E, Mumbai CityP51900008576· 99.1% built· 1 complaint
- Premier Tower - Solitaire World4.9 yr overdueClassic Promoters and Builders Private Limited · Pune, PuneP52100013951· 81.8% built· 2 complaints
- CORNER VIEW RESIDENCY4.9 yr overdueKACHA BUILDERS & DEVELOPERS · BEHIND VISHAL LAWNS, PuneP52100022330· 90.9% built
- COSMOS SQUARE4.9 yr overdueSHRIPAL DEVELOPERS · Vasai, PalgharP51900010992· 32.7% built
- HARINIWAS4.9 yr overdueSHREE BALAJI CORPORATION · GOREGAON WEST, Mumbai CityP51900016435· 90.9% built
- Kesar Equinox4.9 yr overdueKESAR CORPORATION · Ward FNorth, Mumbai CityP51900005362· 23.6% built
- AIR MONT4.9 yr overduePRAGATI SPACES · Gahunje, PuneP52100005751· 75.5% built· 1 complaint
- SHREE SIDDHI APARTMENT4.9 yr overdueSHREE SIDDHIVINAYAK BUILDERS AND DEVELOPERS · Washind (CT), ThaneP51700009122· 90.9% built
- ZEE SWASTIK4.9 yr overdueZEE RPM BUILDERS AND DEVELOPERS LLP · Andheri, Mumbai SuburbanP51800010732· 19.7% built· 1 complaint
- Nakshatra Ozone4.9 yr overdueJSB Homes LLP · Tivari, PalgharP99000009297· filed Dec 2019 → now Dec 2021· 90.9% built
- EMH - 14.9 yr overdueVISTACORE LIFESPACE DEVELOPERS INDIA PVT LTD · Yadrav, KolhapurP53000010504· filed Jun 2018 → now Dec 2021· 59.1% built· 2 complaints
- SHREE SAMARTH KRUPA4.9 yr overdueJITENDRA SURYAKANT MANE · Mahad, RaigarhP51900009929· 72.7% built
- Elite Solitaire 154.9 yr overdueVIJAY ASSOCIATES (WADHWA) · Thane, ThaneP51700006610· 90.9% built· 9 complaints
- KRISHNA C AND D WING4.9 yr overdueNINA BUILDERS · BADLAPUR WEST, ThaneP51700015548· 81.8% built
- YUTHIKA ENCLAVE4.9 yr overdueAJIT DEVELOPERS AND COMPANY · Haveli, PuneP52100024706· 81.8% built
- Ornate Kallisto Phase I4.9 yr overdueOrnate Buildcon Developers · Bhiwandi, ThaneP51700011610· filed Dec 2019 → now Dec 2021· 81.8% built
- AASARA CO-OP. HOUSING SOCIETY LTD.4.9 yr overdueSHREE SAIBABA GRIHANIRMITI PRIVATE LIMITED · Thane, ThaneP51700012205· filed Dec 2019 → now Dec 2021· 44.8% built· 1 complaint
- SAMRUDHHI PLAZA -B4.9 yr overdueSUNITA LAXMAN GOMASE · PATHARDI SHIVAR, NashikP51600020247· 32.7% built
- KRISHNA ANANDAM 24.9 yr overdueKRISHNA CONSTRUCTIONS · Pannase Layout, NagpurP50500012118· 90.9% built
- Courtyard - Ivy4.9 yr overdueCOURTYARD REAL ESTATE PRIVATE LIMITED · Thane, ThaneP51700000611· 86.9% built· 3 complaints
- NEW GLOBAL E-BUILDING4.9 yr overdueCLASSIC CONSTRUCTION · Bhiwandi, ThaneP51700010601· 90.9% built
- YOGMALA APPARTMENT WING B4.9 yr overdueSWASTIK ESTATES · Jail Road, NashikP51600006719· filed Dec 2019 → now Dec 2021· 90.9% built
- PARIJATAK CO OP HSG SOC LTD4.9 yr overdueSUNRISE HOUSING · Kurla, Mumbai SuburbanP51800001974· filed Dec 2019 → now Dec 2021· 80% built
- Suvan Forett4.9 yr overdueL M Bafna · Haveli, PuneP52100001907· filed Dec 2019 → now Dec 2021· 90.9% built
- Atmosphere - C Wing4.9 yr overdueJRS Associates · AMBEGAON, PuneP52100000821· filed Dec 2019 → now Dec 2021· 90.9% built
- VENKATESH NIWAS4.9 yr overdueGANPATI BUILDERS & DEVELOPERS · Karjat, RaigarhP52000007518· 64.3% built
- NARAYANI PARK4.9 yr overdueSHIV CONSTRUCTION · NAGESHWAR COLONY, JalgaonP49900017375· 9.8% built
- MADHUMALTI PRESTIGE4.9 yr overdueVIKAS DEVLEKAR · Natraj naka, RatnagiriP52800010287· 90.9% built
- Ambika Nandan4.9 yr overdueLumbaram Modaram Patel · Pushpak New, RaigarhP52000018606· 90% built
- M SQUARE DREAMLAND4.9 yr overdueM SQUARE PROPERTIES · THITE VASTIP52100018686· 90.9% built
- Rajgad apartment4.9 yr overduePioneer Builders · snehal nagar, WardhaP50400015681· 90.9% built
- FORTUNE PARADISE4.9 yr overdueDARSHAK BHUPATRAI SHAH · Daman, DamanP49500000002· filed Dec 2019 → now Dec 2021· 81.8% built
- SHREE BALAJI RESIDENCY4.9 yr overdueANAND ASSOCIATES · BALAJI TOWNSHIP, Dadra & Nagar HaveliP49600000050· 90.9% built
- REGENT GALAXY4.9 yr overdueREGENT CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800001438· filed Dec 2018 → now Dec 2021· 99.1% built
- DB Commercial Phase II4.9 yr overduePune Buildtech Private Limited · Yerawada, PuneP52100003455· filed Dec 2019 → now Dec 2021· 60.9% built· 2 complaints
- CASITA ENCLAVE4.9 yr overdueM/S PLATINUM REALTORS · Vasai, PalgharP99000003868· 90.9% built
- THE ADDRESS-PHASE-14.9 yr overdueDARSHAK SHAH AND DHARMENDRA TANDEL · NEAR COAST GUARD, DamanP49500000006· 76.3% built
- DIVINE TOWERS4.9 yr overdueKABRA ESTATE AND INVESTMENT CONSULTANTS · MALAD WEST, Mumbai SuburbanP51800016392· 98.6% built
- TANISH PLATINUM4.9 yr overdueTANISH ASSOCIATES · CHARHOLI, PuneP52100004292· 43.3% built
- Imperial Blue4.9 yr overdueKesar Infra · DIGHIP52100015034· 90.9% built
- PRIME BUSINESS CENTER4.9 yr overdueTHE PRIME PROPERTIES · MAWAL, PuneP52100015422· 72.7% built
- SANDHU PALACE A WING4.9 yr overdueSANDHU BUILDERS · Andheri, Mumbai SuburbanP51800001610· 90.9% built· 1 complaint
- REGAL HEIGHTS4.9 yr overdueSUVIDHA ENTERPRISES · Vasai, PalgharP99000009178· 49.1% built
- VASTUVAIBHAV4.9 yr overdueMaheshdada Devlopers · CHIKHALI, PuneP52100014728· 55.9% built
- PANKAJ RESIDENCY4.9 yr overduePANKAJ HOMES · KARJAT, RaigarhP52000007097· 90.9% built
- FIA SAPPHIRE4.9 yr overdueNIMISH LAXMICHAND PASAD · PALGHAR, PalgharP99000014626· 90.9% built
- ORANGE AURA4.9 yr overdueORANGE REALTORS · Thane, ThaneP51700004783· 61.8% built
- SAI ANGAN4.9 yr overdueWALMIK RAGHUNATH KHAIRNAR · Nevali, RaigarhP52000004010· filed Dec 2019 → now Dec 2021· 48.4% built· 1 complaint
- LJTANNA PANORAMA C WING4.9 yr overdueLJTANNA REALTY LLP · Kalyan, ThaneP51700023193· 90.9% built
- KRUSHNAPURAM APARTMENT4.9 yr overdueSAMADHAN KRUSHNA GODSE · KRUSHNABAN COLONY, NashikP51600018546· 70.9% built
- SHRIHAAN RESIDENCY4.9 yr overdueRasika Construction · NEAR DR TIWARI HOSPITAL, RaigarhP52000001459· 90.9% built
- TOP TEN IMPERIAL4.9 yr overdueTOP TEN DEVELOPERS · Sangamner (MCL), AhmednagarP52200011619· filed Dec 2019 → now Dec 2021· 31.1% built
- LODHA PARK - TOWN HOUSES4.9 yr overdueLODHA DEVELOPERS LIMITED · Ward GSouth, Mumbai CityP51900016526· 67.3% built· 1 complaint
- Kiarah Terrazo4.9 yr overdueWellwisher Apartment · Haveli, PuneP52100002327· filed Dec 2019 → now Dec 2021· 57.7% built· 4 complaints
- SHRI KAMBESHWAR HEIGHTS4.9 yr overdueSHRI KAMBESHWAR & SONS · Vasai, PalgharP99000006801· 90.4% built
- TARA RESIDENCY4.9 yr overduePRASHANT RAJARAM MESTRY · Karvanchiwadi, RatnagiriP52800014165· 92.3% built
- 24K ATRIA4.9 yr overdueKOLTE-PATIL DEVELOPERS LIMITED · Haveli, PuneP52100000428· 45.5% built
- Kamalraj Datta Vihar A Bldng4.9 yr overdueKAMALRAJ ESTATE · MOSHI, PuneP52100002971· filed Dec 2019 → now Dec 2021· 90.9% built
- Pushp Complex4.9 yr overduePushpam Constructions · Phaltan (M Cl), SataraP52700001598· 81.8% built
- Dreams Carnival-A building4.9 yr overdueSam Developers · Charholi Phata, PuneP52100004235· 90.9% built
- YAMUNA HEIGHTS4.9 yr overdueSAINATH ENTERPRISES · Kurla, Mumbai SuburbanP51800002016· filed Dec 2019 → now Dec 2021· 46.2% built
- SAI RESIDENCY4.9 yr overdueSAI KRUPA PROMOTER AND DEVELOPER PRIVATE LIMITED · Kopargaon (M Cl), AhmednagarP52200014015· 72.7% built
- THE WOODS MAPLE AVENUE B WING4.9 yr overduePIMENTA DEVELOPERS · Vasai, PalgharP99000005658· 90.9% built
- KANTI AVENUE4.9 yr overdueMAHAVIR REALITY · Vasai, PalgharP99000006288· filed Mar 2018 → now Dec 2021· 95.5% built
- VIVAAN HEIGHTS4.9 yr overdueMAHAVIR PROPERTIES · Vasai, PalgharP99000009840· filed Dec 2019 → now Dec 2021· 90.9% built
- MORAJ MAA SMRITI4.9 yr overdueMORAJ BUILDING CONCEPTS PRIVATE LIMITED · Khalapur, RaigarhP52000005053· 72.1% built
- ARCH GULMOHAR B-WING4.9 yr overdueARCH DEVELOPERS · Aurangabad (M Corp.), AurangabadP51500013559· 81.8% built
- SIDDHIVINAYAK MAHIMA4.9 yr overdueSIDDHIVINAYAK HOMES · Panvel, RaigarhP52000000840· 90.9% built
- Venkatesh Heights4.9 yr overdueM/S Shree Balaji Foundation · Thane, ThaneP51700012201· filed Dec 2019 → now Dec 2021· 90.9% built
- SHILP DARSHAN COOP HOUSING SOCIETY4.9 yr overdueSHILP DARSHAN COOP HOUSING SOCIETY · PANCHAK, JAIL RAOD, NashikP51600014943· 90.9% built
- SILVER PALACE4.9 yr overdueHARE KRISHNA ENTERPRISES · ULWE, RaigarhP52000016353· 90.9% built
- DS VRINDAVAN4.9 yr overdueDSP DEVELOPERS · DHANORIP52100002095· 60.7% built
- CHAITRA MOHOR APARTMENT4.9 yr overdueG. K. INFRA · PANCHVATI, NashikP51600015023· 90.9% built
- Aaradhya Apartment4.9 yr overdueAnuraj Buildcon · Dwarka Nashik, NashikP51600014697· 90.9% built
- NISARG GREENS- Phase II A4.9 yr overdueNND Ambernath LLP · Morivali, ThaneP51700008839· 68.6% built
- MADHUKUNJ4.9 yr overdueADPLUS IMPRESSION PRIVATE LIMITED · 421308, ThaneP51700015121· 44.2% built
- Constn of 219 Ts and 172 MIG Ts on CTS No 128 A 12 Pt at Mahaveer nagar Kandivali W Mumbai4.9 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000040· filed Dec 2019 → now Dec 2021· 27.5% built
- Kalpataru Ph-14.9 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600014684· 39.4% built
- ATHARV SHAGUN4.9 yr overdueM/S ATHARV REALTY · Andheri, Mumbai SuburbanP51800005867· 90.9% built
- Oasis - Tower 14.9 yr overdueGlomore constructions · Borivali, Mumbai SuburbanP51800006404· filed Dec 2019 → now Dec 2021· 93.5% built· 44 complaints
- OMSHREE4.9 yr overdueJAY GANESH DEVELOPERS · Charholi Budruk, PuneP52100013484· 45.5% built
- Maple Terraces Building No. B-104.9 yr overdueMessrs. Axis Dwellings LLP · shelwali, PalgharP99000008935· filed Mar 2018 → now Dec 2021· 90% built
- THE PALMGROVE PHASE II4.9 yr overdueBEDEKAR BUILDERS AND DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000000720· 90.9% built
- TWIN TOWER4.9 yr overdueShraddha Spaces · Wakad, PuneP52100003875· 90.9% built
- EMPIRE ETERNITY4.9 yr overdueEMPIRE CONSTRUCTION · KHONDWA KHURD, PuneP52100015310· 90.9% built· 2 complaints
- ADINATH ASTHA4.9 yr overdueSHREE RIDDHI SIDDHI CONSTRUCTIONS · SECTOR-2A, RaigarhP52000014792· 90.9% built
- CLASSIC CENTRAL PLAZA4.9 yr overdueDayanand Venkappa Shetty · Devrukh (CT), RatnagiriP52800013081· filed Dec 2019 → now Dec 2021· 42.7% built
- KESAR SCION4.9 yr overdueKESAR HOUSING & DEVELOPMENT CO · Kurla, Mumbai SuburbanP51800003391· 23.6% built
- LALBAG PRESTIGE BUILDING B4.9 yr overdueRELIABLE CONSTRUCTION · Ambegaon, PuneP52100010952· filed Dec 2019 → now Dec 2021· 81.8% built
- Kalpataru Waterfront4.9 yr overdueKalpataru Plus Sharyans · Panvel, RaigarhP52000002819· 90.5% built· 1 complaint
- TULJAI SRUSHTI4.9 yr overdueTuljai Properties · NEAR KIDS PYARADISE SCHOOL, SangliP53100021168· 81.8% built
- Aarohi H4.9 yr overdueTeirth Developers and Suyojit Infrastructure Ltd · -, PuneP52100007298· 0% built
- Waves4.9 yr overdueGokhale Constructions · Wakad, PuneP52100003292· 60.6% built· 1 complaint
- SPLENDID COUNTY PHASE III4.9 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100016493· 90.9% built
- VISTAS CENTREPOINT4.9 yr overdueCavalcade Properties Private Limited · MOHAMMADWADI, PuneP52100016359· 81.8% built· 1 complaint
- SIDDHIVINAYAK UTOPIA - C WING4.9 yr overdueSIDHIVINAYAK BUILTHOME SPECALITIES PRIVATE LIMITED · Panvel, RaigarhP52000009789· 30% built
- SHUBH NILAYA4.9 yr overdueSHUBH REALTORS · Lohegaon, PuneP52100015446· 78.2% built
- BHOOMI CELESTIA B-WING4.9 yr overdueSASHWAT CONSTRUWELL PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800004768· 61.3% built
- SARA SANGAM PHASE 14.9 yr overdueJAGRUT SARA ASSOCIATES · BAJAJ NAGAR, AurangabadP51500016384· 89.1% built
- Parinee Adney4.9 yr overduePARINEE REALTY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800001852· filed Dec 2019 → now Dec 2021· 90.9% built· 31 complaints
- PARASNATH NAGARI BUILDING NO 54.9 yr overdueSHREE PARASNATH BUILDERS · Vasai, PalgharP99000007350· filed Dec 2019 → now Dec 2021· 63.3% built
- MULSHI VAIBAHV4.9 yr overdueYUVRAJ ASSOCIATES · Pirangut, PuneP52100011020· filed Dec 2019 → now Dec 2021· 76.4% built
- RAM VILLA4.9 yr overdueSHREE RUDRA ENTERPRISES · Uran, RaigarhP52000014853· 90.9% built
- Westen Tower4.9 yr overdueKalbhor and Lanke Birje Associates · Wakad, PuneP52100016419· 90.9% built
- SWASTIK SHRUSHTI4.9 yr overdueSWASTIK ASSOCIATES · Pimpri Chinchawad (M Corp.), PuneP52100002248· filed Dec 2019 → now Dec 2021· 14.7% built· 1 complaint
- Pristine Prolife III4.9 yr overduePRISTINE DEVELOPERS · WAKAD, PuneP52100000897· 95.5% built
- AAFCON DEVELOPERS ASHOKANAND CHSL4.9 yr overdueAAFCON DEVELOPERS · Borivali, Mumbai SuburbanP51800007787· 71.8% built
- VASUNDHARA CHS LTD - Phase II - A and B Wing4.9 yr overdueRELIABLE CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800005777· filed Dec 2019 → now Dec 2021· 39.6% built
- Embassy4.9 yr overdueKukreja embassy AOP · Nagpur (M Corp.), NagpurP50500009891· 53.6% built
- CONSTRUCTION OF 49 TS MIG4.9 yr overdueNASHIK HOUSING AND AREA DEVELOPMENT BOARD · Nashik, NashikP51600013395· 90.9% built
- ANKUR PRIME4.9 yr overdueANKUR DEVELOPERS · Mandlik Compound, RatnagiriP52800001653· 81.8% built
- GEETABAN RESIDENCY4.9 yr overdueBHAISHREE VENTURES · Near Railway Station, AurangabadP51500016327· 81.8% built
- Empire Palms4.9 yr overdueEMPIRE CONSTRUCTION ·P52000008505· filed Sept 2020 → now Dec 2021· 27.3% built
- INDUSTRIAL PROJECT4.9 yr overdueSUVIDHA BUILDERS AND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000009165· 81.8% built
- MAN ITELLIPARK - IT4.9 yr overdueMERINO SHELTERS PRIVATE LIMITED · NERUL, ThaneP51700010714· 6.4% built
- OXFORD PARADISE4.9 yr overdueROHAN ANIRUDHA SEOLEKAR · Sus, PuneP52100000867· 79% built
- TRIVENI MAJESTA - WING A - PHASE I4.9 yr overdueTRIVENI LIFESTYLE DEVELOPERS LLP · Kalyan, ThaneP51700003079· 90.9% built
- LAIJAI NAGARI 14/A/14.9 yr overdueKAMLESH BACHEWAR · Wadi Bk., NandedP51100002964· 63% built
- PRIDE PALMS QUEENS B2 PHASE 34.9 yr overdueLARKINS REALTORS · Thane, ThaneP51700007071· 80% built· 2 complaints
- JINENDRA ESTATE4.9 yr overdueOSWAL DEVELOPERS · SAUBHAGYA NAGAR, NashikP51600016250· 0% built· 1 complaint
- SHIV ORNATE4.9 yr overdueSHIVSHAKTI DEVELOPERS · Ulawe, RaigarhP52000004492· 55.5% built
- ULTRA OVATION4.9 yr overdueSANJEEV SITARAM DANGE · Nashik, NashikP51600005527· filed Dec 2020 → now Dec 2021· 34.5% built
- SAMRIDDHI4.9 yr overdueA G SUPERSTRUCTURES PVT LTD · Thane, ThaneP51700001636· filed Dec 2019 → now Dec 2021· 98.9% built
- DHRUVA4.9 yr overdueSANJEEVANI LANDSCAPE DHRUVA · PUNAWALE, PuneP52100000555· 42.5% built
- AARYA CASA4.9 yr overdueRAJVEER INFRA PROJECTS · Aurangabad (M Corp.), AurangabadP51500008230· filed Jul 2019 → now Dec 2021· 45.5% built· 1 complaint
- SUNDAR RESIDENCY G WING4.9 yr overdueNAVADITYA DEVELOPERS · Kalyan-Dombivali (M Corp.), ThaneP51700007150· filed Dec 2019 → now Dec 2021· 49.1% built
- Mohan Waters Edge I4.9 yr overdueMOHAN LIFESPACES LLP · Ambarnath, ThaneP51700002550· 89.1% built
- NAIR HEIGHTS4.9 yr overdueSHREE SAI DEVELOPERS · AMBERNATH, ThaneP51700011109· 31.8% built
- SUYOG ABHILASHA4.9 yr overdueSUYOG ADINATH · Jalochi, PuneP52100012264· filed Dec 2019 → now Dec 2021· 74.1% built
- VANAMALA4.9 yr overdueNAVINKUMAR SUBHASH CHORGHE · Vasai, PalgharP99000006045· 90.9% built
- NIRAJ RIVIERA - SHIRISH4.9 yr overdueShree Samarth Developers · Kalyan, ThaneP51700010779· 90.9% built
- SUBWAY RESIDENCY4.9 yr overdueRAJ ASSOCIATES · VIRAR, PalgharP99000010520· 41.4% built
- Mango Homes4.9 yr overdueAshirvad Projects · SHANKAR NAGAR, RaigarhP52000006969· 63.3% built
- Pearl Crest4.9 yr overdueRISHIRAJ DEVELOPERS PRIVATE LIMITED · Mumbai City, Mumbai CityP51900002961· filed Dec 2019 → now Dec 2021· 38.6% built· 2 complaints
- NEELKANTH INDUSTRY4.9 yr overdueSurendra Ramanlal Patel · Vasai East, PalgharP99000024700· 39.8% built
- RAMESHWARAM PALACE-B4.9 yr overduePYARELAL BHRIGUNATH SINGH · Titwala, ThaneP51700007432· filed Dec 2019 → now Dec 2021· 50% built
- The Crown Greens4.9 yr overdueInternational Biotech Park Limited · Maan, Hinjawadi, PuneP52100001864· 99.9% built· 1 complaint
- CHANDAN CHS LTD4.9 yr overdueAUM G M HEIGHTS · Andheri, Mumbai SuburbanP51800004733· 90.9% built
- Manjusha Regalia4.9 yr overdueSubhash Motiram Kasulkar · Nagpur (M Corp.), NagpurP50500002805· 73.3% built
- REGENCY PARK PHASE 14.9 yr overdueSAB VENTURES · Kalyan, ThaneP51700008733· 90.9% built
- Shankeshwar Dang Ikon Phase 24.9 yr overdueShree Shankeshwar Atharva Properties · Pimpri Chinchawad (M Corp.), PuneP52100002375· 72.7% built
- LOTUS - PHASE 1 B WING4.9 yr overdueRAVIKARAN CONSTRUCTION · Sus, PuneP52100007781· 69.1% built
- BLOOM RESIDENCY C BUILDING AND COMMERCIAL4.9 yr overdueBLOOM INFRASTRUCTURE · charholi kh, PuneP52100004126· 23.2% built· 1 complaint
- SANSKRITI-NAVYANGAN4.9 yr overdueM/S. AVIOR MERLIN BUILDCON LLP · Mulshi, PuneP52100000213· filed Mar 2020 → now Dec 2021· 87.9% built· 2 complaints
- SHAGUN CORNER4.9 yr overdueJETHALAL RANCHHOD PATEL · Ulawe, RaigarhP52000002987· 50.9% built· 1 complaint
- SPARSH4.9 yr overdueIndiapride Infraspaces · Thane, ThaneP51700001008· 35% built
- Bramha Exuberance C4.9 yr overdueBramhacorp Limited · KONDHWA, PuneP52100001076· 90.9% built· 1 complaint
- SHANTI GARDEN4.9 yr overdueKAMYA ENTERPRISES · Ambarnath, ThaneP51700007823· 90.9% built
- RUSTOMJEE VIRAR AVENUE D1 WING C AND WING D4.9 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · AVENUE D1, PalgharP99000017942· 81.8% built· 2 complaints
- SHOBHA HEIGHTS4.9 yr overdueANUP VIKAS PATIL · GADHINGLAJ, KolhapurP53000015035· 90.9% built
- AARYA4.9 yr overdueRAJA BUILDERS · Andheri, Mumbai SuburbanP51800006434· 67.3% built· 1 complaint
- GHARKUL4.9 yr overdueAJITKUMAR CHS LTD · Borivali, Mumbai SuburbanP51800014246· filed Dec 2019 → now Dec 2021· 27.3% built
- Siddhivinayak Solitaire4.9 yr overdueAshok Motiram Jaidhara · Ulwe, RaigarhP52000008999· 90.9% built
- SAVERA PARK4.9 yr overdueSAVERA DEVELOPERS · Baramati (M Cl), PuneP52100014418· 11.1% built
- Panvelkar Utsav Phase I4.9 yr overdueSai Swarg Enterprises · Valivli, ThaneP51700013199· 90.9% built
- Viraj City Phase II4.9 yr overdueBhuyekar Patil Construction Company · Kagal (M Cl), KolhapurP53000004289· 90.9% built
- SAI VISHWA4.9 yr overdueSai Reality · Anandvalli, NashikP51600019370· 90.9% built
- KANTI REGENCY4.9 yr overdueMAHAVIR PROPERTIES · Vasai, PalgharP99000010163· filed Dec 2019 → now Dec 2021· 90.9% built
- Pushp Vinod - 154.9 yr overdueVas Infrastructure Ltd. · Borivali, Mumbai SuburbanP51800007682· 50% built
- HYDE PARK RESIDENCY F4 BUILDING PHASE4.9 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700018186· 90.9% built
- CROWN PHASE 14.9 yr overdueSHREE SAMARTH REALITY · Karjat, RaigarhP52000013990· 90.3% built
- Irene4.9 yr overdueANGAL & CO · Erandwane, PuneP52100015640· 90.9% built
- EPIC PHASE 14.9 yr overdueSHIVSAGAR PROMOTERS & DEVELOPERS · Wagholi, PuneP52100016456· 50% built
- SAI ENCLAVE4.9 yr overdueM/S. RADHEYA CONSTRUCTION COMPANY · Vasai, PalgharP99000004529· 60.6% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.