RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 33 of 59
- Elite Solitaire 164.6 yr overdueVIJAY ASSOCIATES (WADHWA) · Thane, ThaneP51700009882· 90.9% built· 5 complaints
- 7 Plumeria Drive- Phase 14.6 yr overdueB A Consulting · Punawale, PuneP52100001152· 87.6% built· 1 complaint
- PALM NEST-PHASE I4.6 yr overdueNG RATHI PROPERTIES LLP · WAGHOLI, PuneP52100013717· 27.3% built
- VENKATESH NIWAS4.6 yr overdueGANPATI BUILDERS & DEVELOPERS · Karjat, RaigarhP52000007518· 64.3% built
- LAKE VIEW RESIDENCY4.6 yr overdueMAITREE DEVELOPERS · CHIKHALE, RaigarhP52000016746· 89.1% built
- Premier Tower - Solitaire World4.6 yr overdueClassic Promoters and Builders Private Limited · Pune, PuneP52100013951· 81.8% built· 2 complaints
- JOLLLY APARTMENT WING A AND B4.6 yr overdueRIEL INFRASTRUCTURE PVT LTD · Shahapur (CT), ThaneP51700010153· filed Dec 2019 → now Dec 2021· 82.3% built· 13 complaints
- NEO CITY PART 24.6 yr overdueMAHALAXMI SHELTERS · Near JSPM College, PuneP52100001867· 90.9% built· 1 complaint
- JEWELS ROYALE4.6 yr overdueJEWEL DEVELOPMENT CORP · GANESH BAUG, PuneP52100002343· 90.9% built
- RAJKUMAR HOUSING SOCIETY4.6 yr overdueAUDUMBAR CONSTRUWELL PVT.LTD. · Nashik, NashikP51600007446· filed May 2018 → now Dec 2021· 63.6% built
- UK SANGFROID4.6 yr overdueKeemaya Build Private Limited · Andheri, Mumbai SuburbanP51800007085· filed Dec 2019 → now Dec 2021· 61.8% built· 8 complaints
- SHREE SIDDHI APARTMENT4.6 yr overdueSHREE SIDDHIVINAYAK BUILDERS AND DEVELOPERS · Washind (CT), ThaneP51700009122· 90.9% built
- KETAN CLASSIC - B4.6 yr overdueANIL BHAUSAHEB MURKUTE · Savedi, AhmednagarP52200001268· filed Dec 2019 → now Dec 2021· 85.5% built
- Suyog Aura Phase II4.6 yr overdueShivram Developers · Haveli, PuneP52100003242· 81.8% built
- SIDDHI PARK PLATINUM4.6 yr overdueVACK BUILDERS AND DEVELOPERS PVT LTD · Aurangabad (M Corp.), AurangabadP51500009751· 30.6% built
- SAI LAXMI VILLAS4.6 yr overdueVINAY MAGANLAL KARNAVAT · NASHIK ROAD, NashikP51600016097· 89.1% built
- WHITE ASTER4.6 yr overdueSPS CONSTRUCTIONS · Panvel, RaigarhP52000000172· 90.9% built
- RAMESHWAR PARK - LILAC4.6 yr overdueRAMESHAWAR BUILDERS & DEVELOPERS · Dawale Gaon, Near Sai Baba Mandir, ThaneP51700017242· 55.9% built
- Shankeshwar Dang Ikon Phase 24.6 yr overdueShree Shankeshwar Atharva Properties · Pimpri Chinchawad (M Corp.), PuneP52100002375· 72.7% built
- Venkatesh Heights4.6 yr overdueM/S Shree Balaji Foundation · Thane, ThaneP51700012201· filed Dec 2019 → now Dec 2021· 90.9% built
- OXFORD PARADISE4.6 yr overdueROHAN ANIRUDHA SEOLEKAR · Sus, PuneP52100000867· 79% built
- SHRI RAJENDRA SRUSHTI4.6 yr overdueSRUSHTI DEVELOPERS · Palghar, PalgharP99000005173· 81.8% built
- ARADHYAM B WING4.6 yr overdueDHANESHWAR VISION DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100014371· 90.9% built
- AKSHAY GALAXY4.6 yr overdueA. P. BHANDARI DEVELOPERS · YEWALEWADI, PuneP52100001730· 97.3% built· 3 complaints
- Arihant Platino4.6 yr overdueArihant Vastu Nirman Pvt. Ltd · Nachane (CT), RatnagiriP52800000027· 89.1% built
- ANAY RESIDENCY4.6 yr overdueGOVINDA CONSTRUCTION · DGP NAGAR NO.2, AMBAD, NASHIK, NashikP51600015947· 90.9% built
- VASTUSHRI4.6 yr overdueBENKAR PROPERTIES · Dhayari (Part), PuneP52100004924· filed Dec 2018 → now Dec 2021· 90.5% built
- GANGA KINGSTON BUILDING G4.6 yr overdueVEDANT CONSTRUCTION · Mohammadwadi, PuneP52100015357· 23.6% built
- LODHA PARK - TOWN HOUSES4.6 yr overdueLODHA DEVELOPERS LIMITED · Ward GSouth, Mumbai CityP51900016526· 67.3% built· 1 complaint
- SANKHESHWAR HEIGHTS4.6 yr overdueKALYANI ENTERPRISES · Kalyan, ThaneP51700007243· 90.9% built
- AMRUT PARK4.6 yr overdueAARADHANA DEVELOPERS · Nashik, NashikP51600011238· 81.8% built
- MAHALAXMI APARTMENT4.6 yr overduePRAVIN VITTHAL MORE · Takli, SolapurP52600008133· 37.7% built
- Mohan Waters Edge II4.6 yr overdueMOHAN LIFESPACES LLP · BADLAPUR, ThaneP51700010737· 89.1% built
- SAI SANGAM APARTMENT4.6 yr overdueSUDHIR SUBHASH GHULE · CHUNCHALE SHIVAR, NashikP51600018027· 90.9% built
- SHREE SAI BABA CHS LTD4.6 yr overdueS M BUILDERS & DEVELOPERS · Andheri, Mumbai SuburbanP51800006163· filed Dec 2019 → now Dec 2021· 45% built
- BAY VIEW RESIDENCY PHASE 2 BLDG 34.6 yr overdueJM DEVELOPERS · Khalapur, RaigarhP52000006354· 70.5% built· 1 complaint
- NAMRATA BUSINESS CENTRE4.6 yr overdueNAMRATA DEVELOPERS · -, PuneP52100017272· 81.8% built
- JVM FLORENCIA4.6 yr overdueJVM REALTY · Thane, ThaneP51700005589· filed Dec 2018 → now Dec 2021· 72.7% built
- TOP TEN IMPERIAL4.6 yr overdueTOP TEN DEVELOPERS · Sangamner (MCL), AhmednagarP52200011619· filed Dec 2019 → now Dec 2021· 31.1% built
- Mount Castel4.6 yr overdueSancheti Space · WAGHOLI, PuneP52100003062· 90.9% built
- ATHARV SHAGUN4.6 yr overdueM/S ATHARV REALTY · Andheri, Mumbai SuburbanP51800005867· 90.9% built
- SHREE GANESH PRASAD4.6 yr overdueANON DEVELOPERS · Kurla, Mumbai SuburbanP51800002888· 82.5% built
- ROHAN MADHUBAN II WINGS A B C4.6 yr overdueRohan Promoters & Developers · Pune City, PuneP52100002297· 90.9% built
- Dhanya Sativali Nagri Building 104.6 yr overdueSandesh Lakhuji Jadhav · Vasai-Virar City (M Corp), PalgharP99000010377· 86.4% built
- Padmini Plaza4.6 yr overdueSudarshan Chougule · Jaysingpur (M Cl), KolhapurP53000012462· 90.9% built
- Shree Laxmi Gokuldham4.6 yr overdueShree Laxmi Realty · Belatgavhan, NashikP51600001646· filed Dec 2019 → now Dec 2021· 59.6% built
- Atmosphere - C Wing4.6 yr overdueJRS Associates · AMBEGAON, PuneP52100000821· filed Dec 2019 → now Dec 2021· 90.9% built· 23 complaints
- Emerald Isle - T94.6 yr overdueLarsen & Toubro Ltd. (Realty Division) · Kurla, Mumbai SuburbanP51800007280· 90% built· 2 complaints
- Nirmal Arcade4.6 yr overdueAkshar Developers · NIRMAN NAGRI, RaigarhP52000009439· 90.9% built
- SARA SANGAM PHASE 14.6 yr overdueJAGRUT SARA ASSOCIATES · BAJAJ NAGAR, AurangabadP51500016384· 89.1% built
- SHANTI GARDEN4.6 yr overdueKAMYA ENTERPRISES · Ambarnath, ThaneP51700007823· 90.9% built
- SHEEL ENCLAVES4.6 yr overduePODDAR INFRACON PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800004722· 90.9% built
- Anant Pride Wing II4.6 yr overdueANANT ESTATE DEVELOPER AND BUILDER PRIVATE LIMITED · Kolhapur (M Corp.), KolhapurP53000002082· 86.1% built
- Shlok - Phase 14.6 yr overdueDhankawade Patil Construction · NARHE, PuneP52100001466· filed Dec 2019 → now Dec 2021· 44.2% built
- Waves4.6 yr overdueGokhale Constructions · Wakad, PuneP52100003292· 60.6% built
- SUNSHREE4.6 yr overdueSANTOSH NAGESH SURWASE · Solapur (M Corp.), SolapurP52600013386· 90.9% built
- AUSTIN PLAZA4.6 yr overdueAUSTIN REAL INFRA LLP · MAHATHOBA CHOWK, PuneP52100003698· 78.6% built
- R M Dhariwal Greens Yavatmal Phase 14.6 yr overdueDhariwal And Chhoriya Developers LLP · Yavatmal, YavatmalP51000009219· filed Dec 2019 → now Dec 2021· 67% built· 1 complaint
- TOWN CENTRAL4.6 yr overdueVAIBHAV CONSTRUCTION · NEAR CENTRAL BUILDING, PuneP52100007390· filed Mar 2019 → now Dec 2021· 95.5% built· 2 complaints
- SAI LAVKIK HEIGHTS4.6 yr overdueSAILAVKIK REALTY PRIVATE LIMITED · Thane, ThaneP51700016119· 90.9% built
- SOLITAIRE BUSINESS PARK4.6 yr overdueCRESCENT REALTY DEVELOPERS PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010460· 40.9% built· 1 complaint
- KSP COMPLEX4.6 yr overdueSujata Krishnat Powar · CHARMALAY, RatnagiriP52800002005· 54.1% built
- SPLENDID COUNTY4.6 yr overdueYASHADA BUILDERS · LOHGAON, PuneP52100001057· 90.9% built
- AMAR SERENITY4.6 yr overdueAMAR BUILDERS AND DEVELOPERS · PASHAN, PuneP52100001203· 90.9% built
- Rustomjee Seasons - Wing B4.6 yr overdueKEYSTONE REALTORS LIMITED · Andheri, Mumbai SuburbanP51800000605· 90.9% built
- SHRIHAAN RESIDENCY4.6 yr overdueRasika Construction · NEAR DR TIWARI HOSPITAL, RaigarhP52000001459· 90.9% built
- SHANTAI4.6 yr overdueJANARDHAN SAKHARAM BHOIR · Thane, ThaneP51700008654· filed Dec 2019 → now Dec 2021· 81.8% built
- SS BUILDERS BUILDING NO. 84.6 yr overdueS S BUILDERS · Vasai, PalgharP99000004466· filed Dec 2019 → now Dec 2021· 61.4% built
- Mahalaxmi Residency4.6 yr overdueshree mahalaxmi homes · Kolhapur (M Corp.), KolhapurP53000000426· 61.8% built
- Raj4.6 yr overdueRajhas Enterprise · PANVEL, RaigarhP52000013982· 21.8% built
- Ambika Nandan4.6 yr overdueLumbaram Modaram Patel · Pushpak New, RaigarhP52000018606· 90% built
- PARASNATH NAGARI BUILDING NO 54.6 yr overdueSHREE PARASNATH BUILDERS · Vasai, PalgharP99000007350· filed Dec 2019 → now Dec 2021· 63.3% built
- JAI ESTATE PHASE III4.6 yr overdueSWARLAND DEVELOPERS LIMITED · Kalyan, ThaneP51700008354· 73.2% built
- WHITE JASMINE4.6 yr overdueSPS CONSTRUCTIONS · Panvel, RaigarhP52000000254· 90.9% built
- SAMRUDDHI PLAZA- A4.6 yr overdueLAXMAN EKNATH GOMASE · DAMODAR CHOWK PATHARDI PHATA NASHIK, NashikP51600015539· 36.4% built
- MAGNOVA MANOR PHASE 24.6 yr overdueMAGNOVA REALTY · Mulshi, PuneP52100004968· 27.3% built· 4 complaints
- PRIME BUSINESS CENTER4.6 yr overdueTHE PRIME PROPERTIES · MAWAL, PuneP52100015422· 72.7% built
- SAI SHIKHAR4.6 yr overdueN K PARIVAR BUILDERS & DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012192· filed Dec 2019 → now Dec 2021· 69.1% built
- KASTURI APPARTMENTS4.6 yr overdueSKY DEVELOPERS AND PROMOTERS INDIA PVT. LTD. · JSW MAIN GATE, NagpurP50500000856· filed Dec 2019 → now Dec 2021· 27.3% built
- Krishna Vihar Co-operative Housing Society Limited4.6 yr overdueBAL GANAPATI LAABH DEVELOPERS · Naupada, ThaneP51700019510· 48.3% built
- PALAASH RHYTHM4.6 yr overdueSPBDEVELOPER · chinchwad, PuneP52100002524· 9.1% built
- NAIR HEIGHTS4.6 yr overdueSHREE SAI DEVELOPERS · AMBERNATH, ThaneP51700011109· 31.8% built
- SPACE HEIGHTS4.6 yr overdueSPACE ASSOCIATES · Waliv, PalgharP99000008214· 43.6% built
- Valley of Grace4.6 yr overdueAnil Bajarang Channe · Sawantwadi (M Cl), SindhudurgP52900006039· 59.1% built
- NAVKAR CITY PHASE II PART I4.6 yr overdueNavkar Estate and Homes Pvt Ltd · naigaon, PalgharP99000009437· 89.9% built
- VALENCIA4.6 yr overdueBMC GROUP · Mulshi, PuneP52100008024· filed Dec 2019 → now Dec 2021· 81.8% built
- AAKRUTI BUILDING NO.24.6 yr overdueAAKRUTI BUILDERS & DEVELOPERS · Pen (M Cl), RaigarhP52000012245· 54.1% built
- Constn of 219 Ts and 172 MIG Ts on CTS No 128 A 12 Pt at Mahaveer nagar Kandivali W Mumbai4.6 yr overdueMAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY · Borivali, Mumbai SuburbanP51800000040· filed Dec 2019 → now Dec 2021· 27.5% built
- CLASSIC CENTRAL PLAZA4.6 yr overdueDayanand Venkappa Shetty · Devrukh (CT), RatnagiriP52800013081· filed Dec 2019 → now Dec 2021· 42.7% built
- Shreeji Gulmohar - Phase 14.6 yr overdueSHREE KRISHNA ENTERPRISES · JALGAON, RatnagiriP52800015084· 90.9% built
- RADHE REGAL RESIDENCY4.6 yr overdueSHRUTI BUILDCON · NEAR STAR CITYP52100004707· filed Dec 2019 → now Dec 2021· 90.9% built
- Maithili Empire4.6 yr overdueShree Ganesh Associates · Pimpri Chinchawad (M Corp.), PuneP52100010136· 90.9% built
- NEELKANTH SHRUSHTI4.6 yr overdueASHAPURA COMBINES · Kalyan-Dombivali (M Corp.), ThaneP51700011819· 90.9% built
- Indralok Phase I4.6 yr overdueHonest Enterprise · Kalyan-Dombivali (M Corp.), ThaneP51700010974· filed Dec 2019 → now Dec 2021· 90.9% built
- KRISHNA NISARGA4.6 yr overdueGOPAL KRISHNA DEVELOPERS · Kalyan, ThaneP51700006472· filed May 2023 → now Dec 2021· 90.9% built
- Riddhi Siddhi Apartments CHS4.6 yr overdueSobhaniye JP Developers · Ward FNorth, Mumbai CityP51900010722· 99.1% built
- ISHWAR SHUBHLAXMI4.6 yr overdueISHWAR REALITY · AMBARNATH, ThaneP51700029135· 90.9% built
- Prem Mannat4.6 yr overdueGeeta Builder Arihant Venture · Tajanemala, PuneP52100015202· 81.8% built· 1 complaint
- SWANANDI BLOSSOM4.6 yr overdueAHIRRAO BUILDCON PVT LTD · Gangapur Shiwar, NashikP51600012647· 90.9% built
- Govindbaug4.6 yr overdueM/S PIONEER DEVELOPERS · Dudulgaon, PuneP52100001469· filed Dec 2022 → now Dec 2021· 71.8% built
- LAXMI CASTELLO PHASE-II, B1, A-WING, B2, B-WING4.6 yr overdueLAXMI GLOBAL · KARJAT, RaigarhP52000028993· 90.9% built
- SAI APARTMENT4.6 yr overdueHARI OM BUILDERS AND DEVELOPERS · NAVAL NAGAR, PalgharP99000014827· 89.1% built
- NIDHAAN CLOVER - B4.6 yr overdueNIDHAAN BUILDCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800010930· 89.1% built
- GAJANAN VILLAS4.6 yr overdueDINESH EKNATH KHANDRE · DASAK, NashikP51600015044· 81.8% built
- CITY PRIDE4.6 yr overdueCITYMAKER BUILDER PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800012418· filed Sept 2018 → now Jan 2022· 70% built
- BALAJI PARK4.6 yr overdueNILESH DNYANESHWER KHOT · BEHIND WALCHAND COLEGE, KUPWAD, SangliP53100016080· 90.9% built
- Ujwal Arcad4.6 yr overdueUjwal Associates · Reshaimbag Layout, NagpurP50500026991· 14.5% built
- Neelkanth Gardens4.6 yr overdueNeelkanth Developers · purnvad nagar, AhmednagarP52200015130· 90.9% built
- Blue Dice4.6 yr overdueDHANRAJ KESARIMAL SONIGARA · Chikhali Bk., PuneP52100004228· filed Jan 2020 → now Jan 2022· 72.7% built
- SWAYAMBHU PLAZA4.6 yr overdueSHREE SAMARTHA ENTERPRISES · Janvali, SindhudurgP52900012193· filed Jan 2020 → now Jan 2022· 90.9% built
- VITTHALARPAN RESIDENCY-B4.6 yr overdueDHANRAJ HARICHAND KHANDELWAL · Amravati (M Corp.), AmravatiP50300004073· filed Aug 2020 → now Jan 2022· 25.3% built
- Belwalkar Shopping Center4.6 yr overdueKokan Builders & Contractor · Lanja (CT), RatnagiriP52800004500· filed Dec 2018 → now Jan 2022· 80.5% built
- PLATINUM4.5 yr overdueRND BUILDERS & DEVELOPERS · Uran, RaigarhP52000004590· filed Dec 2020 → now Jan 2022· 90.9% built· 1 complaint
- SWAMI KRUPA RESIDENCY4.5 yr overdueVISHWA DEVELOPERS · Alandi (M Cl), PuneP52100014477· 53.6% built
- Bhushan residency4.5 yr overduevilas bhupal awati · Kolhapur (M Corp.), KolhapurP53000003035· filed Sept 2018 → now Jan 2022· 64.5% built
- Saraswati Park4.5 yr overdueGokhale Constructions · Ideal Colony, PuneP52100004346· filed Jan 2020 → now Jan 2022· 90.9% built
- SHREEJI CENTRUM4.5 yr overdueSHREEJI CONSTRUCTION · Mumbai - Agra Highway Nasik, NashikP51600012350· 81.8% built
- ROYAL ABODE4.5 yr overdueKAWALI AND ASSOCIATES · Vasai, PalgharP99000015017· 90.9% built
- PADMINI HEIGHTS4.5 yr overdueSHRIKANT VISHWANATH KAVATHALKAR · Senanagar Colony, Mauze Mustafabad, Aurangabad, AurangabadP51500020187· 50.9% built
- D B HOUSE4.5 yr overdueKumar Properties · Miraj, SangliP53100010684· filed Jan 2020 → now Jan 2022· 64.5% built
- SHARAVATI RESIDENCY4.5 yr overdueBUILDNOVA CONSTRUCTIONS · Jalgaon, RatnagiriP52800009750· filed Jan 2021 → now Jan 2022· 63.6% built
- PALAVA - AURELIA - D TO G4.5 yr overduePalava Dwellers Private Limited · Kalyan, ThaneP51700000511· 81.8% built· 1 complaint
- GNP GALLERIA4.5 yr overdueGanadhish GNP · Kalyan, ThaneP51700004200· 81.8% built
- Bloomdale Row House 8 37 to 424.5 yr overdueMahindra Bebanco Developers Limited · MIHAN, NagpurP50500014681· 81.8% built
- ORIANA CREST4.5 yr overdueBALAJI BUILDERS · Mulshi, PuneP52100006821· 65.4% built
- SHREE SHARDUL NEST4.5 yr overdueSHARDUL ASSOCIATES · Amravati (M Corp.), AmravatiP50300007973· 90.9% built
- GNP GALAXY PHASE - II4.5 yr overdueROSHNI ENTERPRISES · Ambarnath, ThaneP51700002123· 81.8% built
- Sai Prasad4.5 yr overdueSai Prasad Developers · Vasai, PalgharP99000015349· 90.9% built
- AARKAY BLOSSOM4.5 yr overdueMAITRA BUILDTECH PRIVATE LIMITED · PANCHAVATI, NashikP51600015371· 90.9% built
- GNP ARCADIA4.5 yr overduePRIVA INFRACON · Kalyan, ThaneP51700004413· 81.8% built
- SHREE SHIVSAMARTH RESIDENCY4.5 yr overdueSHREE SHIV SAMARTH DEVELOPERS · Kurla, Mumbai SuburbanP51800009568· filed Dec 2018 → now Jan 2022· 78.4% built
- DNYARAJA HEIGHTS4.5 yr overdueLANDLORD LANDMARK PRIVATE LIMITED ·P52100005458· filed Jan 2021 → now Jan 2022· 90.9% built
- MEERA PARK ROYALE4.5 yr overdueSARASWATI BUILDCON · Ambarnath, ThaneP51700001561· filed Feb 2021 → now Jan 2022· 88.1% built
- SATYA SHANTI VIHAR4.5 yr overdueANWARHUSEN MAHAMUD SHAIKH · Solapur (M Corp.), SolapurP52600010948· filed Sept 2020 → now Jan 2022· 24.5% built
- Jeerawali Residency4.5 yr overdueGopuram Developers · Kurla, Mumbai SuburbanP51800008906· filed Jul 2018 → now Jan 2022· 89.4% built
- Ajinkya Heights4.5 yr overdueAnand Constructions · Gangapur, NashikP51600015402· 43.2% built
- KOHINOOR ENCLAVE4.5 yr overdueSTAR DEVELOPERS · JOGESHWARI WEST, RatnagiriP52800010119· 90.9% built
- AVNINDRA4.5 yr overdueATUL AMRUT DHANE · Haveli, PuneP52100026232· 81.8% built
- AJINKYA ROYAL4.5 yr overdueAJINKYA CONSTRUCTION · SABNISWADA, SindhudurgP52900015368· 90.9% built
- KUSUM PARK4.5 yr overdueSUNSHINE BUILDERS · Palghar, PalgharP99000009057· filed Dec 2021 → now Feb 2022· 54.1% built
- Sharvari Homes4.5 yr overdueVMG BUILDCON · Wadachi Wadi, PuneP52100022945· 81.8% built
- GURUPUSHP4.5 yr overduepushp devlopers · Kondhave, SataraP52700010140· 26% built
- SHREE GANESH BLISS4.5 yr overduePRAKASH RAMAN CHAUDHARI · UTTARA NAGAR, NashikP51600015415· 90.9% built
- MADHUVRUNDA CO-OPERATIVE HOUSING SOCIETY4.5 yr overdueAakar Constructions · ERANDWANE, PuneP52100018201· 64.5% built
- ALPINE4.5 yr overduePRAMODKUMAR CHAVGOUNDA CHOUGULE · SANGLI 100 FT, SangliP53100020363· 81.8% built
- AKSHA AMULYAM4.4 yr overdueConcord Properties · Pimpri Chinchawad (M Corp.), PuneP52100010533· filed Apr 2020 → now Feb 2022· 88.2% built
- PALI HILL NAVROZE PREMISES CHS LIMITED4.4 yr overdueKRYSHNAJAY DEVELOPERS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800001695· filed Feb 2021 → now Feb 2022· 97.7% built
- SKYE GRANDEUR4.4 yr overdueV K DEVELOPERS · GHATKOPAR EAST, Mumbai SuburbanP51800015316· 79.1% built
- ASHATHLAXMI CO-OPERATIVE HOUSING SOCIETY LIMITED4.4 yr overdueAVS Realtors · MATUNGA, Mumbai CityP51900012933· filed Nov 2020 → now Feb 2022· 80.9% built
- Sairaj Residency Apartment4.4 yr overdueGANESHA INFRA · Nashik, NashikP51600010878· 90.9% built
- MEERA AVALON4.4 yr overdueSARASWATI CORP · Ambarnath, ThaneP51700000986· filed Apr 2021 → now Feb 2022· 90.9% built
- ACE AURUM4.4 yr overdueACE AURUM · Opp. Bondave Vasti BRT Stop, Ravet Pune - 412101, PuneP52100000090· filed Aug 2021 → now Feb 2022· 90.9% built
- DNYANYOG4.4 yr overdueEKVIRA BUILDCON ·P52100006191· 13.4% built
- APOLLO 24.4 yr overdueM/S SHADOW BUILDERS AND DEVELOPERS PVT LTD · Panvel, RaigarhP52000007231· filed Dec 2018 → now Feb 2022· 46.2% built· 31 complaints
- SHIV APARTMENTS4.4 yr overdueKESHAV BUILDCON · Deulwadi, RaigarhP52000011817· filed Feb 2020 → now Feb 2022· 55.3% built
- RELIABLE HEIGHTS4.4 yr overdueRELIABLE REALITIES · Vanvaswadi, SataraP52700004651· filed Oct 2018 → now Feb 2022· 90.9% built
- RAJESHWARI ENCLAVE4.4 yr overdueRAJRATNA DEVELOPERS · Fursungi, PuneP52100013589· filed Jun 2018 → now Feb 2022· 77.3% built
- NARENDRA HEIGHTS4.4 yr overdueCONCRETE DEVELOPERS · Narendra Nagar, NagpurP50500015511· 80.5% built
- Riverdale Heights4.4 yr overdueDuville Estates Private Limited · KHARADIP52100008035· 95.3% built· 13 complaints
- PALAVA CLARA A to D, D14.4 yr overdueLodha Developers Limited · Kalyan, ThaneP51700000448· 81.8% built· 5 complaints
- ADITI PARK4.4 yr overdueAKRUTI BUILDCON · BARAMATI, PuneP52100015417· 63.6% built
- DATTA SAI SANKUL4.4 yr overdueSANDEEP SUBHASH MIRAJKAR · Kolhapur (M Corp.), KolhapurP53000006882· 90.9% built
- JP SYMPHONY4.4 yr overdueRISALI DEVELOPERS · Ambarnath, ThaneP51700002726· 89.1% built
- SUNDERBAN CO OP SOC4.4 yr overdueSUNDERBAN CO OP HSG SOC · PANCHAVATI, NashikP51600026666· 38.2% built
- KEYSTONE DEVELOPERS-GRUHYOG4.4 yr overdueVIRENDRASINH PRAVINSINH GHATGE · Kolhapur (M Corp.), KolhapurP53000001104· 90.9% built
- RAJESHREE TOWER4.4 yr overdueAB DEVELOPERS · Dadra & Nagar Haveli, Dadra & Nagar HaveliP49600000018· 90.9% built
- Siddhidata Park4.4 yr overdueABHIJIT PRAKASH JAITAPKAR · Oros, SindhudurgP52900010635· filed Sept 2019 → now Mar 2022· 81.8% built
- SHAHS RENUKA ENCLAVE4.4 yr overdueSHAH BUILDERS AND DEVELOPERS · KASAR MALA, NashikP51600016183· 63.6% built
- SOLITAIRE PALMS E4.4 yr overdueRAJKUMARI GULAB CHOITHRAMANI · Borhadewadi,Moshi, PuneP52100001927· filed Mar 2020 → now Mar 2022· 81.8% built· 2 complaints
- Decent Sargam4.4 yr overdueJAYANT PARMANAND CHHUTLANI · Om Colony, AmravatiP50300016146· 9.1% built
- Saee Grand4.4 yr overdueAVANI INFRASTRUCTURE · Shahunagar, SataraP52700020075· 90.9% built
- SEYA4.4 yr overdueSEYA PATE CONSTRUCTIONS LLP · SINHAGAD ROAD, PuneP52100001129· filed Sept 2020 → now Mar 2022· 43.6% built· 7 complaints
- Diksha Park Phase 44.4 yr overdueSudhir Dashrath Jadhav · Janavli, SindhudurgP52900019394· 90.9% built
- sai planet4.4 yr overdueirshad ali jabbar shaikh · Near to koaushal banglow, PuneP52100022566· 45.5% built
- SWAPNA SANKUL C AND D4.4 yr overdueM N SQUARE ASSOCIATES · Kuwarbav (CT), RatnagiriP52800008212· filed Sept 2020 → now Mar 2022· 81.8% built
- Bloomdale Duplex Home 64.4 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500009336· filed Mar 2020 → now Mar 2022· 40.9% built· 1 complaint
- PARADISE4.4 yr overdueSHREE YASH DEVELOPERS · Thane, ThaneP51700016451· 90.9% built
- VENKATESH VISHWA4.4 yr overdueTIRUPATI BUILDERS AND DEVELOPERS · AURANGABAD, AurangabadP51500011725· filed Mar 2019 → now Mar 2022· 50.9% built
- Basil Park C and D Wing4.4 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100011415· filed Dec 2019 → now Mar 2022· 81.8% built
- YASHANAND CHSL OJASS CONSTRUCTIONS4.4 yr overdueOJASS CONSTRUCTIONS · Thane, ThaneP51700019814· 12.9% built
- Gurukripa Heights4.4 yr overdueMount Estates Pvt. Ltd · Haveli, PuneP52100005161· filed Sept 2018 → now Mar 2022· 90.9% built
- Jay Vanadana CHS Ltd4.4 yr overdueDAYANAND SANJEEV SHETTY · Thane, ThaneP51700011011· filed Sept 2020 → now Mar 2022· 9.3% built
- AAHVAAN AVENUE4.4 yr overdueAAHVAAN CONSTRUCTIONS · ULWE, RaigarhP52000016026· 90.9% built
- LEVANTE4.4 yr overdueAVICON INFRA LLP · NEARBY RAMSETH THAKUR STADIUM, RaigarhP52000012320· filed Sept 2020 → now Mar 2022· 56.6% built
- PRIDE CENTURY THE OVAL4.4 yr overdueABAD ESTATE AOP · Pannalal Nagar, AurangabadP51500013233· 90.9% built
- RAVINA HIGHTS4.4 yr overdueRAVINA BUILDERS AND DEVELOPERS · VIJAYNAGAR, SangliP53100016041· 90.9% built
- MAHAVIR PARADISE PHASE IV WING A4.4 yr overdueMAHAVIR ENTERPRISES · AMBERNATH WEST, ThaneP51700021364· 90.9% built
- CHAMPA SANSKRUTI APARTMENT4.4 yr overdueGAUTAM JAYANTILAL BHANDARI · MHASRUL, NashikP51600016062· 90.9% built
- JAGANNATH PRIDE4.4 yr overdueMAYUR GROUP · Badlapur (M Cl), ThaneP51700004903· 90.9% built
- Nine Star Residency - Imperia4.4 yr overdueM/s A.K. Developers · Palghar, PalgharP99000015888· 48.2% built
- EARTH HEIGHT II4.4 yr overdueEARTH INFRA · New Amar Nagar, NagpurP50500020114· 63.6% built
- Adarsh Colony Phase 4 and 54.4 yr overdueAkash Construction · Bholegaon, AhmednagarP52200022885· 81.8% built
- Jainam Greens4.4 yr overdueGood Earth Build Well Private Limited · Bhiwandi (M Corp.), ThaneP51700009367· filed Sept 2020 → now Mar 2022· 73.4% built
- DHRUV RESIDENCY-NX4.4 yr overdueKPZ ENTERPRISE · VANGANI WEST, RaigarhP52000014745· 81.8% built
- Mohan Willows Commercial4.4 yr overdueMOHAN LIFESPACES LLP · SHIRGAON, ThaneP51700024089· 90.9% built
- ARHAM VIEW4.4 yr overdueGALAXY ENTERPRISE · Uran, RaigarhP52000013784· 90.5% built
- gagangiri Elanza4.4 yr overduePalan Realty Private Limited · Kurla, Mumbai SuburbanP51800010768· 99.5% built
- VRINDAVAN ARCADE4.4 yr overdueSAI KRIPA BUILDCON · SONAWANE MALLA, NashikP51600016570· 81.8% built
- Mrudagandhar Phase 14.4 yr overdueThe United Group Of Builders And Developers · Ambeghar, RaigarhP52000000998· 31.4% built
- MANALI CHS LTD4.4 yr overdueSAINATH BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800009091· filed Sept 2020 → now Mar 2022· 90.9% built· 3 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.