RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 34 of 61
- Ashiyanas Lake View Building No 24.6 yr overdueAteeque Yusuf Khot · Khalapur, RaigarhP52000000361· 90.9% built
- PLATINUM PALLAZO4.6 yr overduePLATINUM SQUARE · Chichwad, PuneP52100008686· filed Mar 2020 → now Mar 2022· 81.8% built· 1 complaint
- SAI ANKOOR4.6 yr overdueNarendra Jalinder Balwadkar · Balewadi, PuneP52100015931· 90.9% built· 1 complaint
- COLLINA4.6 yr overdueBHARUCHA & SONS REALTORS & DEVELOPERS PVT LTD · Kanhe, PuneP52100002704· 89.1% built· 2 complaints
- PARADISE4.6 yr overdueSHREE YASH DEVELOPERS · Thane, ThaneP51700016451· 90.9% built
- BENCHMARK4.6 yr overdueNG RATHI DEVELOPERS · UNDRI, PuneP52100015705· filed Mar 2021 → now Mar 2022· 90.9% built· 1 complaint
- KSHITHI4.6 yr overdueG AND S ASSOCIATES · BANER, PuneP52100000607· 81.8% built
- FORTUNE DP NANO4.6 yr overdueG B & ASSOCIATES · Daman, DamanP49500000001· filed Sept 2020 → now Mar 2022· 75.2% built
- SAI PLAZA4.6 yr overdueSAI MIRACLE DEVELOPERS · Haveli, PuneP52100009664· 79.5% built
- PRABHUPAD HEIGHTS4.6 yr overdueAMIT DASHRATH JAGDALE · OPP SANGLIKAR MALA, SangliP53100015019· 45.5% built
- gagangiri Elanza4.6 yr overduePalan Realty Private Limited · Kurla, Mumbai SuburbanP51800010768· 99.5% built
- ORBIT CONSTRUCTION4.6 yr overdueAKSHAY ANIL JAIN · NIMBHORA, AmravatiP50300015171· 28.5% built
- VRINDAVAN ARCADE4.6 yr overdueSAI KRIPA BUILDCON · SONAWANE MALLA, NashikP51600016570· 81.8% built
- MICASAA PHASE 24.6 yr overdueGAGAN GLOBAL DEVELOPERS · Wagholi, PuneP52100004919· filed Sept 2020 → now Mar 2022· 90.9% built
- TULSI ALAYA4.6 yr overdueTULSI CONSTRUCTIONS · ULWE, RaigarhP52000002347· filed Sept 2020 → now Mar 2022· 72.7% built
- SHREE SADGURU SADAN4.6 yr overduePRASHANT KASHINATH DONGRE · Thane, ThaneP51700020301· 55.3% built
- VENKATESH GRAFFITI PHASE 54.6 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100018950· 90.9% built
- ARIHANT ANMOL PHASE II4.6 yr overdueARIHANT VATIKA REALTY PRIVATE LIMITED · Ambarnath, ThaneP51700003112· filed Sept 2020 → now Mar 2022· 90.9% built· 4 complaints
- Jay Vanadana CHS Ltd4.6 yr overdueDAYANAND SANJEEV SHETTY · Thane, ThaneP51700011011· filed Sept 2020 → now Mar 2022· 9.3% built
- FUTURE HEIGHTS4.6 yr overdueFUTURE HOMES CONSTRUCTIONS · Panvel, RaigarhP52000006255· 48.2% built· 1 complaint
- WATERS EDGE PHASE V4.6 yr overdueOM SAGAR DEVELOPERS · PIMPLE NILAKH, PuneP52100002038· 90.9% built
- Sai Prasad4.6 yr overduePRASAD ESTATE · Panvel, RaigarhP52000007874· filed Sept 2019 → now Mar 2022· 90.9% built
- SETHIA SEA VIEW C AND D WING4.6 yr overduePrathamesh Land Developers · Borivali, Mumbai SuburbanP51800002308· filed Mar 2019 → now Mar 2022· 90.9% built· 6 complaints
- Nine Star Residency - Imperia4.6 yr overdueM/s A.K. Developers · Palghar, PalgharP99000015888· 48.2% built
- Shreeniwas4.6 yr overdueLAGOO APTE · Pune (M Corp.), PuneP52100014480· 35.3% built
- NYATI ELYSIA I4.6 yr overdueNITIN DWARKADAS NYATI · KHARADIP52100000860· 82.2% built
- RAVINA HIGHTS4.6 yr overdueRAVINA BUILDERS AND DEVELOPERS · VIJAYNAGAR, SangliP53100016041· 90.9% built
- LAMBODAR SECOND HOMES4.6 yr overdueSATISH RAMCHANDRA PARIT · BHAGAWATI NAGAR, RatnagiriP52800015583· 40.9% built· 1 complaint
- PATELS SIGNATURE4.6 yr overdueSERENE INFRATECH CO · Ambarnath, ThaneP51700001172· 38.2% built
- MITHILA DHAM4.6 yr overdueNAVAL RAMBAHADUR SINGH · Palghar, PalgharP99000006624· 61.8% built
- PLATINUM TOWER - 14.6 yr overdueAKSHAY GRUHPRAVESH LLP · Andheri, Mumbai SuburbanP51800000487· filed Mar 2020 → now Mar 2022· 90.9% built· 1 complaint
- MANORAMA NAGAR4.6 yr overdueARC ASSOCIATES · BADLAPUR, ThaneP51700021259· 39.8% built
- SHANKHESHWAR PLATINUM PHASE 24.6 yr overdueSHANKHESHWAR KREATERS · Kalyan-Dombivali (M Corp.), ThaneP51700013669· 90.9% built
- SHREE GANESH KRUPA4.6 yr overdueSHREE GAJANAN BUILDERS AND REALTORS · ANAND NAGAR, NashikP51600024064· 63.6% built
- AAHVAAN AVENUE4.6 yr overdueAAHVAAN CONSTRUCTIONS · ULWE, RaigarhP52000016026· 90.9% built
- DHRUV RESIDENCY-NX4.6 yr overdueKPZ ENTERPRISE · VANGANI WEST, RaigarhP52000014745· 81.8% built
- ARIHANT ALOKI PHASE II4.6 yr overdueARIHANT AASHIYANA PRIVATE LIMITED · Karjat, RaigarhP52000006314· 41.5% built· 1 complaint
- Natures Blessings phase I4.6 yr overdueNagarkar Developers · GORHE BDK, PuneP52100006429· filed Sept 2019 → now Mar 2022· 90.9% built· 2 complaints
- Bloomdale Duplex Home 64.6 yr overdueMahindra Bebanco Developers Limited · Khapri, NagpurP50500009336· filed Mar 2020 → now Mar 2022· 40.9% built· 1 complaint
- LomateResidency4.6 yr overdueHemant Ramesh Lomte · Vatannagar, PuneP52100019013· 90.9% built
- Mohan Willows Commercial4.6 yr overdueMOHAN LIFESPACES LLP · SHIRGAON, ThaneP51700024089· 90.9% built
- Aldea Espanola Phase V4.6 yr overduePuranik Buildcon Private Limited · Mahalunge, PuneP52100000572· 90.9% built
- NEW CUFFE PARADE -LODHA ALTIA4.6 yr overdueLODHA DEVELOPERS LIMITED · Ward FNorth, Mumbai CityP51900000629· 81.8% built· 5 complaints
- SHRADDHA COLONY4.6 yr overdueNACHIKETA DEVELOPERS · Palshi, AurangabadP51500014546· 90.9% built
- Retail C4.6 yr overduePersipina Developers Private Limited · Panvel, RaigarhP52000001411· 81.8% built
- SAKAAR RESIDENCY4.6 yr overdueGALAXY BUILDCON · PANDURANG CHOWK, NashikP51600021319· 81.8% built
- TIRUPATI HEIGHTS BUILDING A AND B4.6 yr overdueSAJANSING MOTILAL JARWAL · CIDCO Mahanagar 1, AurangabadP51500021589· 90.9% built
- MAULI APARTMENT4.6 yr overduePUSHPA DHANRAJ KHANDELWAL · FOREST COLONY, AmravatiP50300015336· 8.2% built
- WONDER RESIDENCY C WING BUILDING NO 24.6 yr overdueNEW GALAXY ENTERPRISES · GOKHIVIRE, VASAI, PalgharP99000020475· 90.9% built
- JAGANNATH PRIDE4.6 yr overdueMAYUR GROUP · Badlapur (M Cl), ThaneP51700004903· 90.9% built
- Jayshree Ram4.6 yr overdueRachana Construction · Panvel, RaigarhP52000018164· 90.9% built
- Cosmos Meluha4.6 yr overdueConcorde Realty · Thane, ThaneP51700009729· 64.8% built
- DANDEKAR RESIDENCY4.6 yr overdueJAYANT VISHNU DANDEKAR · NEAR VIJAYA BANK, PalgharP99000019704· 81.8% built
- SAT ANUPA CHS PHASE 14.6 yr overdueDISHA CONSTRUCTION · Andheri, Mumbai SuburbanP51800001640· filed Mar 2020 → now Mar 2022· 81.1% built· 1 complaint
- PARSHVA RESIDENCY WING D4.6 yr overduePARSHVA REALTORS · DIPALI PARK, ThaneP51700022768· 29.1% built
- VENKATESH VISHWA4.6 yr overdueTIRUPATI BUILDERS AND DEVELOPERS · AURANGABAD, AurangabadP51500011725· filed Mar 2019 → now Mar 2022· 50.9% built
- Signature Heights4.6 yr overdueSamruddhi Properties · Wakad, PuneP52100021583· 66.2% built
- PAYAL PRIDE4.6 yr overdueMIT ENTERPRISES · Thane, ThaneP51700016608· 81.8% built
- Skyi Star Town Phase III4.6 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100016286· 90.9% built· 1 complaint
- Bhaveshwar Nagar Building No. 34.6 yr overdueYog Reality · Kurla, Mumbai SuburbanP51800003355· filed Mar 2019 → now Mar 2022· 99.5% built· 1 complaint
- EMPIRE SQUARE PHASE II4.6 yr overdueEMPIRE PROPERTIES · Haveli, PuneP52100005190· filed Sept 2020 → now Mar 2022· 97% built· 1 complaint
- MAHAVIR PARADISE PHASE IV WING A4.6 yr overdueMAHAVIR ENTERPRISES · AMBERNATH WEST, ThaneP51700021364· 90.9% built
- BLDG NO-3 ROSE4.6 yr overdueM/s AMEYA BUILDERS & PROPERTY DEVELOPERS · YASHWANT NAGAR, PalgharP99000008563· filed Mar 2019 → now Mar 2022· 90.9% built
- SHANKAR PARVATI RESIDENCY4.6 yr overdueR. S. Construction · pen, RaigarhP52000012212· 90.9% built
- PRIDE CENTURY THE OVAL4.6 yr overdueABAD ESTATE AOP · Pannalal Nagar, AurangabadP51500013233· 90.9% built
- Sadashanti4.6 yr overdueDigamber Parulekar · Kothrud, PuneP52100020351· 81.8% built
- ARHAM VIEW4.6 yr overdueGALAXY ENTERPRISE · Uran, RaigarhP52000013784· 90.5% built
- TREEKAYA4.6 yr overdueSHREE PADMAMBA ASSOCIATE · Kolhapur (M Corp.), KolhapurP53000001913· 80.9% built
- NYATI ESTEBAN I4.6 yr overdueNYATI REALTORS LLP · Mohammaswadi, PuneP52100003767· filed Jun 2021 → now Mar 2022· 79% built· 14 complaints
- ACE AURUM - II PHASE 014.6 yr overdueAALIA HOMES · RAVET, PuneP52100015591· 90% built
- KOLOSUS GREEN CITY PHASE 14.6 yr overdueLEBBERTY PROMOTERSS AND BUILDERS · Pimpri Chinchawad (M Corp.), PuneP52100009898· filed Sept 2020 → now Mar 2022· 86% built
- Shree Residency4.6 yr overdueSHREE DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000001228· 61.8% built
- NIRMAN AAKASH4.6 yr overdueDEEPAK SHANKAR YASHWANTE · Kalyan, ThaneP51700011174· filed Oct 2018 → now Mar 2022· 78.9% built· 4 complaints
- SAPPHIRE4.6 yr overdueSai Nisarg Developers LLP · Pimpri Chinchawad (M Corp.), PuneP52100008695· 74.5% built
- YASHANAND CHSL OJASS CONSTRUCTIONS4.6 yr overdueOJASS CONSTRUCTIONS · Thane, ThaneP51700019814· 12.9% built
- VASUNDHARA4.6 yr overdueRIDDHI SIDDHI DEVELOPERS · AMBEGAON KH, PuneP52100006501· 50% built
- DSK GREEN4.6 yr overdueDSK INFRA PROJECT · NEW CHANDRAPUR, ChandrapurP50900002141· 50% built
- SHIV SAGAR4.6 yr overdueMAHADEV VELJI PATEL · SECTOR 26, RaigarhP52000015315· 0% built
- Jainam Greens4.6 yr overdueGood Earth Build Well Private Limited · Bhiwandi (M Corp.), ThaneP51700009367· filed Sept 2020 → now Mar 2022· 73.4% built
- EARTH HEIGHT II4.6 yr overdueEARTH INFRA · New Amar Nagar, NagpurP50500020114· 63.6% built
- Atul Avenue-A4.6 yr overdueNeelabh Builders And Developers · Haveli, PuneP52100016664· 81.8% built
- KAPADIA AVENUE4.6 yr overdueL J ENTERPRISE · Borivali, Mumbai SuburbanP51800012139· filed Mar 2019 → now Mar 2022· 90.9% built
- NYATI ELAN SOUTH EAST I4.6 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100016232· 78.8% built
- MANALI CHS LTD4.6 yr overdueSAINATH BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800009091· filed Sept 2020 → now Mar 2022· 90.9% built· 3 complaints
- Sandesh Dawa Bazar4.6 yr overdueSandes Infrastructures Pvt Ltd · Nagpur (M Corp.), NagpurP50500009347· 81.8% built
- ADINATH PRESIDIO4.6 yr overdueADINATH REALTY · Aurangabad (M Corp.), AurangabadP51500003981· filed Mar 2020 → now Mar 2022· 90.9% built
- CHAMPA SANSKRUTI APARTMENT4.6 yr overdueGAUTAM JAYANTILAL BHANDARI · MHASRUL, NashikP51600016062· 90.9% built
- NAMDEOWADI-14.6 yr overdueLAXMI BHAGWAN KSHIRSAGAR · LOKMANYA TILAK SCHOOL, WADI, NAGPUR, NagpurP50500015550· 41.4% built
- BLDG NO-1 M.BARIA EVEREST4.6 yr overdueMORESHWAR KRUSHNA BARIA · Vasai, PalgharP99000004326· filed Dec 2017 → now Mar 2022· 90.9% built· 6 complaints
- CRD Gardenia Apartments 2 - Phase II4.6 yr overdueDr Chandrashekhar Raghunath Dound · Velgaon, PalgharP99000019691· 52.3% built
- DELTA HIGH BLDG B PHASE I4.6 yr overdueSVASTI MAHAJAN REALTORS · BHUGAON, PuneP52100015089· 82.8% built· 1 complaint
- SHANTIVILLA4.6 yr overdueRIKHAV ASHIT SHAH · Vile Parle(West), Mumbai SuburbanP51800002468· 47.3% built
- AZHAAN RESIDENCY4.6 yr overdueBLUE PEARL DEVELOPERS · Ward E, Mumbai CityP51900009229· filed Sept 2020 → now Mar 2022· 82.7% built
- Mrudagandhar Phase 14.6 yr overdueThe United Group Of Builders And Developers · Ambeghar, RaigarhP52000000998· 31.4% built
- OMKAR APARTMENTS4.6 yr overduePINNACLE LIFESPACES · BADLAPUR, ThaneP51700015525· 90.9% built
- Shree Shambhavi Residency4.6 yr overdueRSDevelopers · Jule Solapur, SolapurP52600013062· 82.5% built
- KALP NISARG4.6 yr overdueBLS VENTURES · SHIRGAON, ThaneP51700015595· 90.9% built
- XRBIA EIFFEL CITY CHAKAN PH24.6 yr overdueXRBIA CHAKAN DEVELOPERS PRIVATE LIMITED · Chakan, PuneP52100003059· filed Sept 2020 → now Mar 2022· 86.8% built· 46 complaints
- PANCHARATNA COMPLEX4.6 yr overduePANCHARATNA DEVELOPERS · SHAHAPUR, KolhapurP53000016038· 72.7% built
- Tulsi Aadvik4.6 yr overdueRAJ GROUP · Kharvai, Badlapur - East, ThaneP51700015302· 66.2% built
- Adarsh Colony Phase 4 and 54.6 yr overdueAkash Construction · Bholegaon, AhmednagarP52200022885· 81.8% built
- SHASHWAT PARK - PHASE I- BUILDING 2 WING C D,BUILDING 3 WING E F, BUILDING 4 WING G H4.6 yr overdueSHASHWAT HOMES · Badlapur (M Cl), ThaneP51700008430· 81.5% built
- LEVANTE4.6 yr overdueAVICON INFRA LLP · NEARBY RAMSETH THAKUR STADIUM, RaigarhP52000012320· filed Sept 2020 → now Mar 2022· 56.6% built
- Anjani Enclave4.6 yr overdueGeeta Developers · Mira Road East, ThaneP51700014453· 81.8% built
- Swiss Boulevard4.6 yr overdueChaurang Associates · Kurla, Mumbai SuburbanP51700000636· 93.9% built
- DHANLAXMI APARTMENT BLDG NO.1 D Wing4.6 yr overdueBhagwati Abhilasha Conventure · Kalyan, ThaneP51700009900· filed Mar 2020 → now Mar 2022· 51.8% built
- TARANGAN APARTMENT4.6 yr overdueSTAR BUILDERS AND DEVELOPERS · PIMPALGAON BAHULA, NashikP51600025558· 57.3% built
- Shankar Parvati Residency Phase 24.6 yr overdueR. S. Construction · Pen (M Cl), RaigarhP52000013704· 90.9% built
- SAI HEIGHTS4.6 yr overdueKULSWAMINI MAHALAXMI DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000012928· filed May 2018 → now Mar 2022· 30.3% built
- SWOJAS GAURI4.6 yr overdueSWOJAS ENTERPRISES · ERANDWANA, PuneP52100020353· 4.5% built
- POLITE HARMONY COMMERCIAL CENTRE4.6 yr overduePOLITE PROMOTERS AND BUILDERS · CHIKHALI, PuneP52100024722· 90.9% built
- SHANTANIWAS CO-OP HOUSING SOCIETY4.6 yr overdueSAI CONSTRUCTION · DEOLALI NASHIK ROAD, NashikP51600017884· 90.9% built
- Sunrise Charkop Wing C4.6 yr overdueDhaval Housing AOP · Borivali, Mumbai SuburbanP51800004387· 88.6% built
- Basil Park C and D Wing4.6 yr overdueM/s Yogesh Enterprises · Haveli, PuneP52100011415· filed Dec 2019 → now Mar 2022· 81.8% built
- MUKTA AASHIYANA4.6 yr overdueMukta Builder · Thane, ThaneP51700004190· 87.3% built
- FORTUNE AVENUE4.6 yr overdueFORTUNE DEVELOPERS · BEHIND FORTUNE PLAZA, KolhapurP53000014570· 62.7% built
- JISHA ORCHID4.6 yr overdueYASH BUILDERS · RAHATANI, PuneP52100029044· 81.8% built
- KULSWAMINI APARTMENT4.6 yr overdueOM DEVELOPERS · SINNER FATA, NashikP51600011503· filed Jul 2021 → now Mar 2022· 53.6% built
- NAMAN SUDARSHAN4.6 yr overdueNaman Developers · SHIVAJINAGAR BHAMBURDA, PuneP52100030266· 86.4% built
- Riddhivinayak Apartment4.6 yr overdueJai Bajarang Construction · Navali, PalgharP99000014934· filed Nov 2019 → now Mar 2022· 87.7% built
- Roha Prime Square4.6 yr overduePrime Square Properties · Ashtami, RaigarhP51900014230· filed Dec 2020 → now Mar 2022· 90.9% built
- M/s SIMCO JYOTI4.6 yr overdueSURESH MITHALAL JAIN · Kamatghar, ThaneP51700013727· filed Sept 2019 → now Mar 2022· 90.9% built
- KAMAL CLASSIC4.6 yr overdueVENKATESHWARA BUILDCON · OLD SANGVI, PuneP52100029717· 70% built
- MANHATTAN4.6 yr overdueMAJESTIQUE HOUSING LLP · Wagholi, PuneP52100001192· 97.6% built
- The Wave Phase 14.6 yr overdueJineshwar Constructions · Nashik (M Corp.), NashikP51600010965· 90.9% built
- POORVA AANGAN4.6 yr overduePOORVA ASSOCIATES · Walhe, PuneP52100013892· 81.8% built
- MADHUBANAPARTMENT4.6 yr overdueGAURAV VISHVANATH AWATI · THATTE GROUND, AhmednagarP52200015569· 90.9% built
- SHARAD APARTMENTS CHS LTD4.6 yr overdueAAKAR CONSTRUCTIONS · Borivali, Mumbai SuburbanP51800003282· filed Dec 2017 → now Apr 2022· 90.9% built· 1 complaint
- Saidatta Developers Project Saidham4.6 yr overdueSai Datta Developers · mauje saturna, AmravatiP50300016082· 81.8% built
- Aditi Empire4.6 yr overdueRakhumai Developers · Vasai, PalgharP99000010761· 20% built
- CONSTRUCTION OF 448 TS EWS UNDER PMAY AND 32 SHOPS4.6 yr overdueNASHIK HOUSING AND AREA DEVELOPMENT BOARD · NEAR NEW ENGLISH SCHOOL, NashikP51600010485· 90.9% built
- ZEN COUNTY4.6 yr overdueZEN COUNTY · Sudhagad, RaigarhP52000004949· filed Oct 2020 → now Apr 2022· 81.8% built· 1 complaint
- Laxmi Chayya4.6 yr overdueLaxmikripa Developers · Nashik, NashikP51600008182· filed Oct 2020 → now Apr 2022· 22.7% built
- SAIKRUPA HEIGHTS4.6 yr overdueVIKRAM SANJAY POL · MALKAPUR, SataraP52700022390· 27.3% built
- Acropolis 24.6 yr overdueMillennium Developers · Vinode Wasti, PuneP52100015821· 90.9% built
- Nisarg Shrushti Phase-14.6 yr overdueArvel Realtors · Behind Mahavir Garden, PalgharP99000009330· filed Oct 2020 → now Apr 2022· 90.9% built
- SILVER OAKS VILLAS4.6 yr overdueNAVKAR CONSTRUCTION · NEAR MIT COLLEGE, AurangabadP51500020485· 90.9% built
- Aria4.5 yr overdueParinee Realtors Pvt. Ltd. · Andheri, Mumbai SuburbanP51800003167· filed Dec 2020 → now Apr 2022· 87.7% built
- VASANT NIWARA4.5 yr overdueM/s Niwara Builders & Developers · Kasaba Bawada, KolhapurP53000000207· 90.9% built
- SHREE TIRUMALA REGENCY APARTMENT4.5 yr overdueROONGTA HOMES LLP · DEEPALI NAGAR, NashikP51600016235· 81.8% built
- SUMANGAL PRIDE4.5 yr overdueSANDEEP SUDHAKAR KODGULE · SHANIWAR PETH, SataraP52700018807· 81.4% built
- ECO VALLEY PLUS4.5 yr overdueNAMRATA JALAN VENTURES · Kanhe, PuneP52100016509· 90.9% built
- SECTOR 37 TALOJA (RENAMED) /SECTOR 29 TALOJA (OLD)4.5 yr overdueCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED · SECTOR 29, RaigarhP52000017447· filed Oct 2021 → now Apr 2022· 78.2% built· 1 complaint
- SIDDHIVINAYAK COMPLEX4.5 yr overdueUSHA PRASAD TANPURE · RAHURI, AhmednagarP52200016389· 55.9% built
- Laxmi Vyankatesh Complex4.5 yr overdueNandkumar Vinayak Phadke · Satara, SataraP52700006159· 38.2% built
- Vishwa Vastu Apartments4.5 yr overduePatki-Joshi Engineers and Contractors Pvt. Ltd. · Nagala Park, KolhapurP53000020255· 90.9% built
- Bhandari Plaza4.5 yr overdueABHISHEK RADHESHYAM BHANDARI · Satara, SataraP52700009431· 90.5% built
- Kalpataru Yashodhan4.5 yr overdueKalpataru Property Ventures LLP · Andheri, Mumbai SuburbanP51800000442· 86.3% built· 2 complaints
- Laxmi Paresh Complex4.5 yr overdueManisha Nandkumar Phadke · Satara, SataraP52700004272· 38.2% built
- S K RESIDENCY4.5 yr overdueITTEHAD BUILDERS AND DEVELOPERS · Thane, ThaneP51700009469· filed Apr 2021 → now Apr 2022· 98.5% built
- Anant Vihar4.5 yr overdueQuality Developers · Satara, SataraP52700011558· 81.8% built
- Pollens Luxuria4.5 yr overdueSiddhivinayak infra · kalepadal, PuneP52100016336· 93.9% built· 1 complaint
- Sector 40 Kharghar4.5 yr overdueCity and Industrial Development Corporation Of Mahrastra Ltd · Kharghar, RaigarhP52000017448· filed Oct 2021 → now Apr 2022· 78.2% built
- ANSHUL CASA G BUILDING4.5 yr overdueM/S ANSHUL SIDDHI PROMOTERS AND BUILDERS · Wakad, PuneP52100001429· 90.9% built
- Shivalay4.5 yr overdueKedar Developers · MANJARI Bk, PuneP52100008842· 56.4% built
- HORIZON PALMS II4.5 yr overdueK M DEVELOPERS · OWALE, ThaneP51700011148· 88.3% built
- Keru Mata Niwas4.5 yr overdueShree Ambika Builders & Developers · Pushpak New, RaigarhP52000018652· filed Oct 2020 → now Apr 2022· 90.9% built· 1 complaint
- The Oasis4.5 yr overdueM/s. Universal Infra Developers · Thane, ThaneP51700004362· filed Apr 2020 → now Apr 2022· 87.3% built· 5 complaints
- Kalpataru Avenue4.5 yr overdueNeo Pharma Private Limited · Borivali, Mumbai SuburbanP51800003417· filed Jun 2021 → now Apr 2022· 76.3% built· 1 complaint
- Mohak City Florence4.5 yr overdueV.M.S Enterprises · Vasai, PalgharP99000011207· filed Oct 2020 → now Apr 2022· 90.9% built
- INDRAPRASTH COMPLEX4.5 yr overdueSWASTIK DEVELOPERS · Palghar, PalgharP99000001847· filed Jan 2019 → now Apr 2022· 90.9% built
- RACHANA ASHWINI4.5 yr overdueRachana Developers · BESIDE FIRE ENGINEERING COLLEGE JAGDISH NAGAR BOREGAON, NagpurP50500020724· 90.9% built
- SHREE LAXMI NABHANGAN4.5 yr overdueBHAGYALAXMI ENTERPRISES · Near Ram Mandir, PuneP52100016414· 73.5% built
- SIDDHIVINAYAK HEIGHTS4.5 yr overdueNIRMITI INFRAA · MALKAPUR, SataraP52700021933· 27.3% built
- Prathmesh Mangal4.5 yr overdueVivek Shankarrao Nikam · Satara, SataraP52700002519· 90.9% built
- Rajwada Nx4.5 yr overdueBhandari Limaye Developers & Contractors · Satara, SataraP52700011395· 90.9% built· 1 complaint
- Pancham Phase II at Nanded City4.5 yr overdueNanded City Development & Construction Co. Ltd. · Nanded City, PuneP52100000288· 99.2% built
- VRUNDAVAN NAGARI4.5 yr overdueRUKMANI BUILDERS AND DEVELOPERS · BEHIND MANTRI PARK, WashimP50200018767· 87.3% built
- TULJA NEST4.5 yr overdueTULJA BUILDERS · Sawantwadi (M Cl), SindhudurgP52900007799· 61.6% built
- Radha Classic4.5 yr overdueRadha Housing · Vadgaon Anand.(Aalephata), PuneP52100017411· filed Oct 2020 → now Apr 2022· 60% built
- VERDE RESIDENCE COLLECTION4.5 yr overdueSTRATFORD REALTY LLP · Yerwada, PuneP52100004841· filed Oct 2020 → now Apr 2022· 88.6% built· 1 complaint
- Constuction of 56 flats under EWS and 21 LIG at S.No. 11-12/3 at Mouza- Wanjara, Nagpur4.5 yr overdueMHADA (Nagpur Board) · North Nagpur, NagpurP50500002554· 86.4% built
- Ornate Heights4.5 yr overdueSADGURU BUILDERS & DEVELOPERS · Panvel, RaigarhP52000010371· filed May 2019 → now Apr 2022· 99.7% built
- Devakinagar4.5 yr overdueEmpire Developers · Palghar, PalgharP99000003256· filed Feb 2019 → now Apr 2022· 90.9% built
- Heramb Prime4.5 yr overdueMangesh Vitthal Wadekar · Satara, SataraP52700009659· 90.9% built
- The Palms4.5 yr overdueKetsun Enterprises · Pune (M Corp.), PuneP52100008404· filed Jun 2018 → now May 2022· 72.6% built
- Tulsi Sharnam4.5 yr overdueTulsi Infratech · Chikhloli west, ThaneP51700017417· 90.9% built
- Muktanand Co-op Housing Society4.5 yr overdueKuldeep s Pednekar · Kurla, Mumbai SuburbanP51800006384· filed May 2018 → now May 2022· 53.6% built· 2 complaints
- YOGA YOG CHS - CREST4.5 yr overdueHariom Sayaji Properties LLP · Andheri, Mumbai SuburbanP51800001550· 72.7% built· 1 complaint
- The Ghatkopar Nilkantha Chs Ltd4.5 yr overdueSchemaatics · Kurla, Mumbai SuburbanP51800012450· filed Jan 2021 → now May 2022· 90.9% built
- Vainta Residency4.5 yr overdueSthapatya Realtors · Kankavali, SindhudurgP52900007947· filed Jun 2018 → now May 2022· 90.9% built
- JD Villas4.5 yr overdueJD Villas · SATARA AREA, AurangabadP51500034527· 90.9% built
- Datta Digambar Apartment4.5 yr overdueManish Bhaskar Danke · In front of Vishrambag railway station, SangliP53100018975· 81.8% built
- Cluster G4.5 yr overdueShibam Associates · Neral, RaigarhP52000009953· 56.8% built
- NAGESHWAR PROPERTIES4.5 yr overdueSAMBHAJI BABAN BORADE · Haveli, PuneP52100006098· 90.9% built
- Chirag Infotech4.5 yr overdueAarsh Construction · Thane, ThaneP51700019942· 90.9% built
- VARAD IMPERIA4.5 yr overdueNAKSHATRA INFRA · NEAR LAMXI MANDIR, SangliP53100021313· 81.8% built
- SIDDHI HERITAGE4.5 yr overdueDOSTI DEVELOPERS · JALGAON, RatnagiriP52800016717· filed Dec 2021 → now May 2022· 90.9% built
- Konnark Gardens4.5 yr overdueNinath Bhausaheb Shingade · Chindran, RaigarhP52000009416· 70.3% built· 1 complaint
- VASTUVARAD4.5 yr overdueVASTUSHRDDHA BUILDERS · GOVT. COLONY, SangliP53100022472· 81.8% built
- Westernhills D 64.5 yr overdueHigh Seas Properties Private Limited · Pune, PuneP52100001257· filed Jan 2021 → now May 2022· 90.9% built
- Mahalaxmi City Phase II4.5 yr overdueGRUHLAXMI LIFE SPACE PRIVATE LIMITED · Bokhara, NagpurP50500002647· filed Nov 2020 → now May 2022· 52% built
- DOSTY HERITAGE4.5 yr overdueDOSTY INFRA · KARANJADE, RaigarhP52000016408· 0% built
- Ratnadeep4.5 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800007115· 81.8% built
- Panvelkar Estate - Stanford - Phase-II4.5 yr overduePanvelkar Infrastructures Private Limited · Mankivali, ThaneP51700014842· 90.9% built· 3 complaints
- GOKULDHAM APARTMENT4.4 yr overdueSHRINATHJI DEVELOPER · GANGAPUR ROAD, NashikP51600016370· 81.8% built
- Prime Builders and Developers - SadhuAdarsh4.4 yr overduePrime Builders and Developers · Andheri, Mumbai SuburbanP51800007720· filed Nov 2020 → now May 2022· 69.1% built
- MOTIRAM PURAM4.4 yr overdueNAYAN DILIP DALAL · Ambarnath, ThaneP51700001387· 18.2% built
- MADHU MILIND RESIDENCY4.4 yr overdueMUKUND SHRIDHAR SHRIKHANDE · Thane, ThaneP51700021149· 90.9% built
- HIMBINDU4.4 yr overdueM/s. Sahajanand Developers · Goregaon West, Mumbai SuburbanP51800003502· filed Dec 2018 → now May 2022· 52.7% built· 5 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.