RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 43 of 59
- SAI REGENCY2.9 yr overdueSAI DEVELOPERS · NEAR AYYAPPATEMPLE, GAURIPADA, ThaneP51700013647· filed Dec 2018 → now Aug 2023· 89.8% built· 14 complaints
- SAI VILLA2.9 yr overdueBUILT TECH BUILDERS & DEVELOPERS PVT. LTD. · BADALAPUR GAON, ThaneP51700015189· filed Dec 2022 → now Aug 2023· 90% built· 1 complaint
- BHOOMI AVENUE2.9 yr overdueBHOOMI ENTERPRISES · AMBERNATH (E), ThaneP51700029068· 90.9% built
- CHANDRA BHAGA2.9 yr overdueVITTHAL MAULI CONSTRUCTION COMPANY · KATEMANEVALI, ThaneP51700010487· filed Jun 2021 → now Aug 2023· 34.5% built
- VIRAJ HEIGHTS2.9 yr overdueVENKATESH DEVELOPERS · DHANORI, PuneP52100026384· 90.9% built· 1 complaint
- VEDANT RESIDENCY2.9 yr overdueVEDANT BUILDCON · Dhule (M Corp.), DhuleP49800012302· filed Aug 2020 → now Aug 2023· 90.9% built
- Pankaj Co-Op Housing Society Ltd.2.9 yr overdueAditya Associates · Sahakar Colony, Brahmin Society, Thane (W), ThaneP51700034605· 90.9% built
- SIDDHIVALLABH VASTU2.9 yr overdueASSOCIATED DEVELOPERS · NEAR MARUTI TEMPLE, SangliP53100028655· 81.8% built
- Sai Vishwa2.9 yr overdueGAURAV VISHVANATH AWATI · govind nagar, AhmednagarP52200032441· 90.9% built
- KST AANANDLAXMI2.9 yr overdueSARJERAO ANANDRAO PATIL · AGASHIVNAGAR, SataraP52700021105· 90.9% built
- RAHI RESIDENCY2.9 yr overdueSAMRUDDHI ASSOCIATES · LATUR, LaturP52400032536· 90.9% built
- Hundiwale2.9 yr overdueAditya Associates · Thane, ThaneP51700046290· 90.9% built
- NIRMAL ANAND CHS2.9 yr overdueNirmal Anand CHS LTD · Andheri, Mumbai SuburbanP51800007180· filed Sept 2022 → now Sept 2023· 90.9% built
- SHIV RUDRA APARTMENT2.9 yr overdueCHATURBHAI DHIRUBHAI KACHA · OPP GURUGOVIND SINGH SCHOOL, NashikP51600030020· 76.4% built
- SAIRAJ EMERALD2.9 yr overdueSAIRAJ ENTERPRISES · BADLAPUR WEST, ThaneP51700049097· 71.8% built
- URBAN REALTY2.9 yr overdueJ G ENTERPRISES · Gawade Mala, Bhistbag, AhmednagarP52200032512· 97.3% built
- FLORACITY2.9 yr overduePREETANSH REALTY LLP · SHENDRA, AurangabadP51500018071· 81.5% built
- Dhumravarna Heights2.9 yr overdueKanta Madhusudan Trivedi · Nagpur (M Corp.), NagpurP50500006544· filed Sept 2018 → now Sept 2023· 58.2% built
- PGD PINNACLE - A WING2.9 yr overduePGD Land LLP · KESHAVNAGAR, PuneP52100024896· 90.9% built
- MADHUBAN2.9 yr overdueDB CONSTRUCTIONS LLP · RAJARAM NAGAR, LaturP52400028254· 65% built
- Joyville Hinjawadi - I, Phase 62.9 yr overdueJoyville Shapoorji Housing Private Limited · Man Village, PuneP52100018502· 90.9% built
- Astha Apartment2.9 yr overduePritam Purshottam Patel · Shree Ram Nagar, NashikP51600027221· 81.8% built
- ROCKINFRA BLOSSOM2.9 yr overdueROCKINFRA CONSTRUCTION LLP · OPP. GOVT. COLONY BUS STOP, SangliP53100022164· 81.8% built
- AKSHAY FLORA2.9 yr overdueASHOK BHANDARI · KharadiP52100031279· 65.5% built
- TRICITY PALACIO2.9 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700002400· 95.5% built
- Casa Row Colony2.9 yr overdueCasa Builders · Bolhegoan, MIDC, AhmednagarP52200026735· 63.6% built
- PRUTHVI SHAKUN2.9 yr overduePRUTHVI ENTERPRISE · VILE PARLE (EAST), Mumbai SuburbanP51800018162· 18.2% built
- VRINDAVAN HEIGHTS PHASE II2.9 yr overdueKWALITY WORLD DEVELOPERS (AOP) · HADAPSAR, PuneP52100016466· 94.3% built
- Integrated IRS II2.9 yr overdueIntegrated Spaces Limited · Sector No. 21, RaigarhP52000005863· filed Mar 2019 → now Sept 2023· 90.9% built
- Green Residency2.9 yr overdueGreenlife Developers · Hirve Nagar, NashikP51600030462· 90.9% built
- Trinity Greens2.9 yr overdueRajmata Realty · Near Bhumkar chowk, PuneP52100021005· 75.8% built
- The Address2.9 yr overdueAAKASH BUILDCON BUILDERS AND DEVELOPERS · Sundarban Colony, NashikP51600028893· 90.9% built
- SAMRUDDHI GREENS2.9 yr overdueNAGNATH SHIVSHANKAR AKKALKOTE · UMA NAGRI, SolapurP52600000496· 86.4% built
- Maatr Waters2.9 yr overdueMaatr Enterprises · Village Barave, ThaneP51700026313· 90.5% built
- Nikunj2.9 yr overdueDMBhosale · Haveli, PuneP52100027080· 47.3% built
- Sai Millenium AS2.9 yr overdueSHIV CONSTRUCTIONS · Punawale, PuneP52100022267· 81.8% built
- Krishna Kunj Phase III2.9 yr overdueKrishna developr · Buypass Road, JalnaP51400027480· 81.8% built
- Upper Thane - Sereno A, B, B12.9 yr overdueLODHA DEVELOPERS LIMITED · Surai, ThaneP51700016243· 81.8% built· 2 complaints
- VENKATESH GRAFFITI GLOVER PHASE 3 - MHADA2.9 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100027217· 90.9% built
- Joyville Hinjawadi - I, Phase 52.9 yr overdueJoyville Shapoorji Housing Private Limited · Man Village, PuneP52100018500· 90.9% built· 2 complaints
- Upper Thane - Tiara C2.9 yr overdueLODHA DEVELOPERS LIMITED · Bhiwandi, ThaneP51700016437· 81.8% built
- PYRAMID COUNTY BHUKUM2.9 yr overduePRASAD LIFESPACES LLP · BHUGAON, PuneP52100000387· filed Mar 2022 → now Sept 2023· 88.6% built· 1 complaint
- LIGHT HALL F WING2.9 yr overdueGamma Constructions Pvt Ltd · Kurla, Mumbai SuburbanP51800026229· 90.9% built
- login2.9 yr overdueBombay Slum Redevelopment Corporation Pvt. Ltd. · Borivali, Mumbai SuburbanP51800006953· filed Sept 2022 → now Sept 2023· 90.9% built
- Sai Ashirwad residency2.9 yr overdueGLOBAL CONSTRUCTION SERVICES · RAHATA, AhmednagarP52200026987· 5.5% built
- SHIVDATTA APARTMENT2.9 yr overdueBHOLEHAR CONSTRUCTIONS · untwadi, NashikP51600013876· 63.6% built
- Universal 11 up Apartments2.9 yr overdueUNIVERSAL HOUSE PVT. LTD. · Shivaji Nagar, NagpurP50500022622· 82.9% built
- Riverwood Park Building No. 22.9 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004997· filed Apr 2021 → now Sept 2023· 99.1% built
- S. A. Patil Nagar Garden View CHS2.9 yr overdueShree Khodiyar Builders and Developers · Ambarnath, ThaneP51700032102· 70.4% built
- Krishna Vihar Row-House2.9 yr overdueKrishna Mega Projects LLP · Buypass Road, JalnaP51400027289· 72.7% built
- T-Villa2.9 yr overduePanchshil Infrastructure Holdings Pvt Ltd · WAGHOLI, PuneP52100010632· 11.4% built
- Indiabulls Sky Forest -A32.9 yr overdueIndiabulls Properties Private Limited · Elphinstone RoadP51900000616· 97.7% built· 29 complaints
- BROOKLYN PARK PHASE II2.9 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000110· filed Oct 2019 → now Sept 2023· 89.8% built· 13 complaints
- AARAMBH WING E - F2.9 yr overdueSATELLITE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800015057· filed Mar 2023 → now Sept 2023· 72.7% built· 3 complaints
- Indiabulls Sky Forest -A22.9 yr overdueIndiabulls Properties Private Limited · Ward GSouth, Mumbai CityP51900000467· 97.7% built· 28 complaints
- RUDRA HEIGHTS2.9 yr overdueSAGAR MANOJ GORADIA · Andheri, Mumbai SuburbanP51800026165· 90.9% built· 1 complaint
- NALANDA GARDEN B WING2.9 yr overdueM D CONSTRUCTIONS · HAVELI BANER, PuneP52100031155· filed Sept 2022 → now Sept 2023· 81.8% built
- DELTA WOODS2.9 yr overdueDelta venture · MIRA ROAD, ThaneP51700018070· 73.2% built· 2 complaints
- TANISHKA-III2.9 yr overdueDINESH PATNE & VAISHALI PATNE · WANADONGRI, NagpurP50500029959· 40.9% built
- NANDALAL RESIDENCY APARTMENT2.9 yr overdueRUSHIKESH BUILDERS & DEVELOPERS · Deolali (CB), NashikP51600009985· filed Jun 2018 → now Sept 2023· 95.5% built
- GULMOHAR2.9 yr overdueVAASTU VISHWA BUILDCON · Jalochi, PuneP52100020209· 61.8% built
- Anand Sagar2.9 yr overdueAkbar Mohamadali Kazi · ULWE, RaigarhP52000003192· filed Dec 2020 → now Sept 2023· 71.8% built
- Sunteck West World 1, Tivri, Naigaon East2.9 yr overdueSunteck Realty Limited · Tivri, PalgharP99000017606· 90.9% built· 27 complaints
- WATERS EDGE PHASE VI2.9 yr overdueOM SAGAR DEVELOPERS · Pimple Nilakh, PuneP52100001427· filed Sept 2022 → now Sept 2023· 75.5% built
- NB Coral2.9 yr overdueGanesh Associates · Saswad, PuneP52100026536· 88.2% built
- CHINTAMANI RESIDENCY2.9 yr overdueOM PROPERTIES · WARANALI ROAD, SangliP53100021047· 81.8% built
- Zinnea Housing and Commercial2.9 yr overdueSURANA BHANSALI NATEKAR · Chandani Chowk, PuneP52100006078· filed Mar 2021 → now Sept 2023· 97.7% built
- Lifestyle City Kalyan - Applause B2.9 yr overdueNirmal Lifestyle (Kalyan) Private Limited · Kalyan, ThaneP51700003543· filed Dec 2018 → now Sept 2023· 58.6% built· 26 complaints
- Lodha Amara - Tower 20, 212.9 yr overdueLODHA DEVELOPERS LIMITED · Kolshet, ThaneP51700016961· 81.8% built· 8 complaints
- NEXUS GULMOHAR WING C2.9 yr overdueDIAMOND NEXUS ASSOCIATES · CHARHOLI, PuneP52100022264· 81.8% built
- TRICITY PROMENADE2.9 yr overdueTRICITY REALTY LLP · Thane, ThaneP51700013737· 89.9% built
- SWAPNWEL RESIDENCY2.9 yr overdueSHRI GANESH DEVELOPERS · NEAR PDVP COLLEGE, SangliP53100025432· 90.9% built
- SHREE DATTA RESIDENCY2.9 yr overdueAbhijit Vijaykumar Borgave · NISHANT COLONY, SangliP53100027820· 90.9% built
- SHREE GANPATI SAHANIWAS2.9 yr overdueAMIT APPASAHEB JAGADALE · NEAR KRUPAMAI HOSPITAL, SangliP53100023589· 81.8% built
- Nyati Elan West III2.9 yr overduePSQUARE BUILDERS LLP · WAGHOLI, PuneP52100025599· 88.1% built
- PRIMUS2.9 yr overdueRANADE BAGADE CONSTRUCTIONS · BANER, PuneP52100026980· 90.9% built
- ADISHREE2.9 yr overdueMAHALAXMI DEVELOPERS AND BUILDERS · AMBEGAON BK, PuneP52100014388· filed Mar 2021 → now Sept 2023· 65.9% built
- Sunteck Pinnacle2.9 yr overdueSunteck Realty Limited · Borivali, Mumbai SuburbanP51800028821· 81.8% built
- HYDE PARK RESIDENCY F5 BUILDING PHASE2.9 yr overdueNEXUS BUILDERS AND DEVELOPERS PVT LTD · Thane, ThaneP51700027694· 86.8% built
- Upper Thane - Woodlands G,H,I2.9 yr overdueLODHA DEVELOPERS LIMITED · Anjur, ThaneP51700016245· 81.8% built· 5 complaints
- Shankeshwar Wisdom2.9 yr overdueNitin Chhaganlal Jain · Moshi, PuneP52100023359· 81.8% built
- VASANT VIHAR B WING2.8 yr overdueA R DEVELOPERS · NARHE, PuneP52100022836· 55.5% built
- THE GRENADIERS2.8 yr overdueBhima builders & developers · POST OFFICE, KolhapurP53000023950· 90% built
- Shreyas Happy Homes2.8 yr overdueShreyas Shelters · Bhor, PuneP52100004564· 83.6% built· 4 complaints
- Redevelopment of Om Yogeshwar CHS Ltd2.8 yr overdueVAMA LIFESTYLES · Adarsh, Mumbai SuburbanP51800032528· 82.6% built
- SUMAN COMPLEX2.8 yr overduePANKAJ PRAKASH SAWANT · Karjat, RaigarhP52000013923· 90.9% built
- Padmavati Residency2.8 yr overdueSachin Sukumar Dhanal · Mouje Nagdevwadi, KolhapurP53000029649· 63.6% built
- Bharat Ecovistas Phase III2.8 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Shilphata Junction, Thane, ThaneP51700015290· filed Dec 2021 → now Oct 2023· 81.8% built· 3 complaints
- PRIDE PARK2.8 yr overdueGAURAV VISHVANATH AWATI · morage wasti, AhmednagarP52200027233· 90.9% built
- Ambika Annex2.8 yr overdueAmbika Buildcon · Mayur Vihar Colony Karmyoginagar, NashikP51600023402· 81.8% built
- SADHANAA BUILDING2.8 yr overdueSIDAAN ENTERPRISE · Matunga, Mumbai CityP51900023932· filed May 2022 → now Oct 2023· 73.1% built· 1 complaint
- SHAMBHAVI2.8 yr overdueM/S KHARDE PATIL · NEAR WOODS ROYALE, PuneP52100023514· 90.9% built
- PADMAJA AVENUE2.8 yr overduePADMA BUILDCON · Near Happy Hands pay school, NashikP51600023198· 90.9% built
- PARK TITANIUM PHASE II2.8 yr overduePride Purple Properties · WAKAD, PuneP52100001274· filed Oct 2022 → now Oct 2023· 90.9% built· 2 complaints
- Laxminarayan Arcade2.8 yr overdueRajan Namdeo Pore · Wai, SataraP52700019419· 90.9% built
- PATELS ELYSIUM - 22.8 yr overdueAPACE REALTY · Ambarnath, ThaneP51700008491· 87.3% built
- SAHAYOG NILAYAM2.8 yr overdueSAHAYOG CONSTRUCTION · Manda, ThaneP51700008289· 90.6% built· 1 complaint
- JAL SRUSHTI2.8 yr overdueKARAD CITY ENTERPRISE PRIVATE LIMITED · Patan Colony, SataraP52700019323· 61.2% built
- VISION ACE PHASE 12.8 yr overdueVISION ACE · TATHAWADE, PuneP52100017748· 95% built
- SHANKAR PALACE2.8 yr overdueshree ramesh homes builders and developers · Thane, ThaneP51700012469· 90.9% built· 2 complaints
- Anthurium2.8 yr overdueAARTI ESTATES · Thane, ThaneP51700002317· 70% built
- ASHAR EDGE GALLERIA- PHASE I2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016033· 86.4% built
- SATYAM HEIGHTS APARTMENT2.8 yr overdueRAJU BABULAL KUMAWAT · MAUJE PIMPALGAON BAHULA, NashikP51600022714· 90.9% built
- MANIK SIGNIA2.8 yr overduePate Siddhashila Developers LLP · Shivajinagar (Bhamburda), PuneP52100022879· 95% built
- ASHAR EDGE WING B PHASE III2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016016· 94.5% built
- SHREEJI SPARSH2.8 yr overdueSKY LINE BUILDERS · GOVIND NAGAR, NashikP51600020981· 9.1% built
- RANJEET HEIGHTS CO OP HSG SOCIETY2.8 yr overdueRAJESH DINESH VYAS · RAMBAUG COLONY, PuneP52100026612· 81.8% built
- RAM-INDU APARTMENTS2.8 yr overdueAKASH CONSTRUCTION CO. · PANDE LAYOUT, NagpurP50500022483· 40.6% built
- ASHAR EDGE WING A PHASE II2.8 yr overdueMs ASHAR VENTURES · Thane, ThaneP51700016015· 96.4% built
- Nakshatra A-B2.8 yr overduePramukh Realty · Krishna Company Road, Dadra & Nagar HaveliP49600000067· 90.9% built
- Bright Aristo2.8 yr overdueBrightera Builders · Dhore Wasti, PuneP52100011377· filed Dec 2020 → now Oct 2023· 81.8% built· 1 complaint
- SANKESHWAR DARSHAN2.8 yr overdueM/s. Rishabraj Balaji Infra · BORIVALI EAST, MUMBAI, Mumbai SuburbanP51800024086· 82.7% built· 2 complaints
- SIDDHI ANAND RESIDENCY2.8 yr overdueANAND CONTRACTORS AND DEVELOPERS · BABRAS MALA, PuneP52100018538· 90.9% built
- Geras Adara2.8 yr overdueGera Realty Estates · Man, PuneP52100000889· 90.9% built
- JI TOWER2.8 yr overdueJADHAV CONSTRUCTION · BARAMATI, PuneP52100024294· 81.8% built· 2 complaints
- Riverwood Park Building No. 42.8 yr overdueShree Khidkaleshwar Property Developers Pvt. Ltd. · Thane, ThaneP51700004003· filed Oct 2022 → now Oct 2023· 94.1% built
- LEGACY MILLENNIA A2.8 yr overdueMILLENNIUM LEGACY DEVELOPERS · PUNAWALE, PuneP52100027317· 81.8% built
- JEEVAN CHS LTD2.8 yr overdueSHARDA VASTU NIRMITEE PVT. LTD. · PANCHPAKHADI, ThaneP51700023605· 90.9% built
- VISHNU VATIKA NX WING C1 E1 E2 PHASE 12.8 yr overdueVISHNU GROUP · BADLAPUR, ThaneP51700004777· 88.5% built
- SUMUKH HILLS2.8 yr overdueM/S.YOGSIDDHI DEVELOPERS · Borivali, Mumbai SuburbanP51800005591· 90% built· 3 complaints
- NEW FRIENDS SRA CHS LTD2.8 yr overdueM/S. VIRAJ ENTERPRIES · Andheri, Mumbai SuburbanP51800008637· 72.1% built
- Siddhivinayak Heights2.8 yr overdueShree Siddhivinayak Builders · Satara, SataraP52700015936· 90.9% built
- SAVANNAH AVALON2.8 yr overdueSavannah Real Estate Pvt. Ltd · Andheri, Mumbai SuburbanP51800020465· 81.8% built
- SAO KAMALABAI DREAM HOME PROJECT RESIDENCY2.8 yr overdueV R CONSTRUCTIONS · NEAR MADHUBAN HOTEL, AurangabadP51500013653· filed Nov 2018 → now Oct 2023· 90.9% built
- RISHABRAJ DIVINE2.8 yr overdueM/s. Rishabraj Balaji Infra · BORIVALI EAST, MUMBAI, Mumbai SuburbanP51800023315· 9.1% built
- ACE AASTHA BUILDING B2.8 yr overdueSAKSHI DEVELOPERS · OPP. TANISHQ ORCHID SOCIETY, PuneP52100016438· 83.6% built
- PATELS ELYSIUM - 32.8 yr overdueAPACE REALTY · Ambarnath(M Cl), ThaneP51700010280· 87.3% built
- Laxminarayan Arcade - I2.8 yr overdueRajan Namdeo Pore · Wai, SataraP52700019452· 90.9% built
- PALAVA AURORA A,D2.8 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015090· 77.3% built
- REDEVELOPMENT OF MALAD AMBER CHSL2.8 yr overduePRANAV CONSTRUCTIONS LIMITED · MUMBAI, Mumbai SuburbanP51800025354· 90.9% built
- PATELS ELYSIUM - 42.8 yr overdueAPACE REALTY · Ambarnath, ThaneP51700006142· 87.3% built
- PALAVA MILANO A,B,C,H,I,J2.8 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700015016· 78.2% built· 3 complaints
- SAI SWAMI APARTMENT2.8 yr overdueSUDHAKAR GARBAD MAHAJAN · SHIVAJI NAGAR, NashikP51600022770· 90.9% built
- Tokyo Bay Phase - 12.8 yr overduePuranik Tokyo Bay Private Limited · Thane, ThaneP51700000618· 90.9% built· 6 complaints
- Lodha Parel Project2.8 yr overdueMACROTECH DEVELOPERS LIMITED · Mumbai City, Mumbai CityP51900014910· 90.9% built
- VIVANTA LIFE VIPUL PHASE 12.8 yr overdueVIVANTA REALTY · Pimpri Chinchawad (M Corp.), PuneP52100001347· 81.8% built
- SIDHIVINAYAK RESIDENCY2.8 yr overdueSWARAJ CONSTRUCTION · Pimpri Chinchawad (M Corp.), PuneP52100007687· filed Dec 2021 → now Oct 2023· 52.7% built
- Lodha Patel Estate - Tower E, F2.8 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014869· 81.8% built· 7 complaints
- VASTUPURTI GALAXY2.8 yr overdueVAIBHAV DATTATRYA MUTRAK · BEHIND UDYOG BHAVAN, NashikP51600047258· 54.5% built
- Gokul Aura2.8 yr overdueMehta Ventures · Virar West, PalgharP99000035169· 90.9% built
- ELITE 12 PHASE 12.8 yr overdueS and S Associates · Pune City, PuneP52100031737· 90.9% built
- Ved - Ashritha Phase I2.8 yr overdueYogvinda Promoters & Developers Pvt. Ltd. · Katraj, PuneP52100002175· filed Aug 2019 → now Oct 2023· 40.9% built
- RAHMAT ARCADE2.8 yr overdueUNITED CONSTRUCTION CO · CHARATHE, SindhudurgP52900015496· filed Dec 2019 → now Oct 2023· 90.9% built
- NEELKANTH TIRTH CO. OP. HOUSING SOC. LTD.2.8 yr overdueMAVERICK REALTORS · MUMBAI, Mumbai SuburbanP51800012145· filed Jun 2021 → now Oct 2023· 99.1% built
- NS HEIGHTS2.8 yr overdueNS BUILDERS & DEVELOPERS · Andheri, Mumbai SuburbanP51800002156· filed Mar 2021 → now Oct 2023· 90.9% built· 1 complaint
- Kandivali Sai Prassana CHS Ltd2.8 yr overdueAshwin Enterprise · Kandivali West, Mumbai SuburbanP51800032312· 90.9% built
- SAI DARBAR2.8 yr overdueKAILAS SURESH SATELKAR · PILANKAR WADI, SindhudurgP52900033068· 72.7% built
- MAPLE GREENS2.8 yr overdueTHE SILWANT · Ukrul, RaigarhP52000013794· filed Mar 2021 → now Oct 2023· 90.9% built· 1 complaint
- 41 Estera Phase 22.8 yr overdueSamarttha Trimurti Properties · PUNAWALE, PuneP52100014226· filed Mar 2022 → now Nov 2023· 90.9% built
- KANCHAN VATIKA2.8 yr overdueNovel Build-con · Palghar, PalgharP99000026327· 90.9% built
- SATRA HARMONY2.8 yr overdueRRB REALTORS PVT LTD. · Kurla, Mumbai SuburbanP51800000726· filed Dec 2019 → now Nov 2023· 90.9% built· 7 complaints
- SANGAM GARDEN2.8 yr overdueKOUSTUBH RAJENDRA SHAH · Khed (CT), SataraP52700003276· filed May 2018 → now Nov 2023· 90.9% built
- Adhiraj Samyama Tower 2B2.7 yr overdueAdhiraj Constructions Private Limited · Panvel, RaigarhP52000003039· filed Jun 2021 → now Nov 2023· 80.4% built· 11 complaints
- HRESA - SAINAGAR APARTMENT PVT. LTD.2.7 yr overdueBHOLENATH DEVELOPERS LTD. · Kurla, Mumbai SuburbanP51800004835· filed Nov 2022 → now Nov 2023· 90.9% built
- Laxmi Paradise2.7 yr overdueAshtagandha Construtions · SHIVAJI NAGAR, RatnagiriP52800003415· 90.9% built
- Kartikya Residency2.7 yr overdueSunil Chamanlal Gupta · Adai, RaigarhP52000022323· filed Sept 2023 → now Nov 2023· 90.9% built
- Omkar2.7 yr overdueOmkar Developers · Vasai, PalgharP99000002389· 86.4% built
- PARITOSH D2.7 yr overdueSHARADA ALLIANCE SHELTERS · BALEWADI, PuneP52100023380· 65.5% built
- Samarth Glory2.7 yr overdueEkdanta Realtors · Near Mandlik Nagar, NashikP51600023373· 90.9% built
- THE ADDRESS PHASE-32.7 yr overdueSOL Developers · OPP. BORATE VASTI, MOSHI, PuneP52100020839· 78.8% built
- TULSI RESIDENCY2.7 yr overdueOM ENTERPRISE · RINGANWADA, DamanP49500000020· 90.9% built
- GOBIND REGENCY2.7 yr overdueSUKHMANI CONSTRUCTIONS · Khed, PuneP52100005810· 66.4% built
- REDEVELOPMENT OF PRAVESH CHSL2.7 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI EAST, Mumbai SuburbanP51800020989· 64.1% built
- MANGALMURTI APARTMENT2.7 yr overdueICCHAMANI DEVELOPERS · WADALA, NashikP51600028875· 90.9% built
- BHAVESHA CO-OPERATIVE HOUSING SOCIETY LTD2.7 yr overdueBEAUTIFUL PROPERTIES PRIVATE LIMITED · ANDHERI (WEST), Mumbai SuburbanP51800033264· 90.9% built
- SHRUTI APARTMENT2.7 yr overdueVIKRANT V RAIKAR HUF - - · Thane, ThaneP51700025732· 39.2% built
- MARBLE ARCH2.7 yr overdueAvvesh Developers LLP · Vasai-Virar City (M Corp), PalgharP99000011971· filed Dec 2019 → now Nov 2023· 90.9% built
- 61 IDEAL2.7 yr overdueSAMARTH BUILDERS · IDEAL COLONY, PuneP52100030155· 72.7% built
- SAMRUDDHI CHS2.7 yr overdueHASMUKH R HIRANI · Kurla, Mumbai SuburbanP51800007054· filed Dec 2019 → now Dec 2023· 90.9% built
- Prathamesh Excellencia2.7 yr overduePrathamesh Developers & Builders · Jeevan Nagar, Tathawade, PuneP52100020042· filed Mar 2023 → now Dec 2023· 95.5% built
- Sagar C.H.S2.7 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800003741· filed Dec 2019 → now Dec 2023· 81.8% built· 1 complaint
- CALLISTO2.7 yr overdueVIBRANT HOMES LLP · Sion EastP51900017567· filed Dec 2022 → now Dec 2023· 81.1% built
- Silver Park Residency Aster2.7 yr overdueSuyash Enterprises · KAMATGHAR, ThaneP51700015485· 90.9% built
- Oasis Gracia2.7 yr overdueOasis Developers · Vasai, PalgharP99000022370· filed Dec 2022 → now Dec 2023· 51.8% built
- Aaradhyam Phase I2.7 yr overdueJairaj Developers Unit 11 · -, PuneP52100016084· 74.1% built
- DP STAR TRILOK2.6 yr overdueDP BUILDHOMES LLP · Kurla, Mumbai SuburbanP51800003937· filed Dec 2022 → now Dec 2023· 87.3% built· 6 complaints
- RAGHUNATH RESIDENCY2.6 yr overdueJITENDRA BHAGWAN SHINDE · PANCHMUKHI MARUTI MANDIR, SangliP53100030124· 81.8% built
- Hari Har Residency2.6 yr overdueSHRI SWAMI SAMARTH CONSTRUCITON · Isbavi, SolapurP52600015244· 70.8% built
- SIDDHIVINAYAK PLAZA2.6 yr overdueMODEL DEVELOPERS AND BUILDERS · Satara, SataraP52700025198· 81.8% built
- Sai Ellouera2.6 yr overdueSAI LANDMARKS LLP · Wakad, PuneP52100009634· filed Dec 2020 → now Dec 2023· 85.5% built
- SAI SNEH2.6 yr overdueJAY DEVELOPERS · nashik, NashikP51600029867· 81.6% built
- SANSKAR RESIDENCY2.6 yr overdueSANSKARDEVELOPERS · CHOVISAWADI, PuneP52100005476· filed Jan 2021 → now Dec 2023· 81.8% built
- KRUSHNAKUNJ HOUSING SOCIETY2.6 yr overdueDISHA CONSTRUCTIONS · SAWANT NAGAR, PuneP52100023366· 81.8% built
- Ekta Cluster - I2.6 yr overdueEkta Developers · Bahadursheikh Naka, RatnagiriP52800015043· 90.9% built
- Ekta Cluster - II2.6 yr overdueEkta Developers · Bahadursheikh Naka, RatnagiriP52800016459· 90.9% built
- MDK Kunj2.6 yr overdueMDK Properties Pvt. Ltd. · Dhamanvane, RatnagiriP52800014430· 90.9% built
- Jyoti building2.6 yr overdueLAXMI BUILDERS · Andheri, Mumbai SuburbanP51800028489· 90.9% built
- MARATHON NEXWORLD AURA-12.6 yr overdueMATRIX ENCLAVES PROJECTS DEV. PVT. LTD · Betawade Gaon, ThaneP51700000652· filed Dec 2022 → now Dec 2023· 46.5% built· 32 complaints
- MAHAVIR DREAMLAND2.6 yr overdueMAHAVIR DREAMLAND · Bhiwandi, ThaneP51700012940· filed Dec 2022 → now Dec 2023· 81.8% built
- MANTRA 7 HILLS PHASE IV2.6 yr overdueMANTRA BUILDCRAFTS PRIVATE LIMITED · Haveli, PuneP52100001757· filed Dec 2022 → now Dec 2023· 90.9% built· 2 complaints
- CONCEPT ARENA2.6 yr overdueCONCEPT REALTY · Ambarnath, ThaneP51700003805· filed Jun 2021 → now Dec 2023· 14.4% built
- Puneville Phase II Cluster A2.6 yr overdueBENCHMARRK REALTY PRIVATE LIMITED · Punawale, PuneP52100000440· filed Dec 2022 → now Dec 2023· 90.9% built
- MARATHON NEXZONE ACRUX -22.6 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000001062· filed Dec 2022 → now Dec 2023· 72.7% built· 2 complaints
- K. D. HERMITAGE, B. NO. 22.6 yr overdueD. K. Enterprises · OPP. OVERHEAD WATER TANK, ThaneP51700017723· filed Dec 2022 → now Dec 2023· 72.7% built· 1 complaint
- 7 Plumeria Drive- Phase 22.6 yr overdueB A Consulting · Punawale, PuneP52100023970· 44.7% built
- VARDHAMAN PALM ROSE2.6 yr overdueCHHAJED ASSOCIATES · PUNAWALE, PuneP52100014575· 94.4% built· 1 complaint
- Shri Krishna Residency2.6 yr overdueRitseh Rafhesham Mantri · Double Jin, JalnaP51400030835· 90.9% built
- BADLAPUR ARCADE2.6 yr overdueMAHALAXMI BUILDERS & DEVELOPERS · BADLAPUR WEST, ThaneP51700015624· 90.9% built
- Menlo Homes Kharadi Next Phase I2.6 yr overdueMENLO REALTY LLP · Wagholi, PuneP52100005881· 81.8% built· 1 complaint
- Orange City Wholesale Market- Phase III2.6 yr overdueORANGE CITY MALLS PRIVATE LIMITED · Danagunj, NagpurP50500014953· 27.3% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.