RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 42 of 59
- SWAPNPURTI3.1 yr overdueUDAYRAJ DEVELOPERS · PUIKHADI, KolhapurP53000021379· 90.9% built
- BALAJI HIGHTS3.1 yr overduePANDURANG WAMAN KHARE · VISHRAMBAG, SangliP53100027265· 90.9% built
- Park Infinia - I1, I2, I3, J2, J3 and K13.1 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100017239· 89.1% built
- Aaradhyam Phase II3.1 yr overdueJairaj Developers Unit 11 · Tilekarnagar, PuneP52100027545· 86.4% built
- USHA JOSHI PARK PHASE B3.1 yr overdueJ K T BUILDERS & DEVELOPERS · Khadavali, ThaneP51700012148· filed Dec 2021 → now Jun 2023· 18.6% built
- Tulas3.1 yr overdueRajesh Raka · WANJOLA ROAD, JalgaonP49900026363· 81.8% built
- Samraat Apna Ghar Phase-I3.1 yr overdueM/S Shweta Infrastructure & Housing (I) Pvt. Ltd. · Someshwar -Satpur link Road near DJ Reva Meadows, NashikP51600020299· 89.1% built
- Ananta3.1 yr overdueNDG Projects LLP · Right Bhusari Colony, PuneP52100031934· filed Dec 2022 → now Jun 2023· 72.7% built
- Prabhus Atlantis3.1 yr overduePacific Builders · Near Wisdom Highschool, NashikP51600009658· 90.9% built· 2 complaints
- REDEVLOPMENT OF SUN AND MOON CHS LTD. BLDG NO. 12 AND 133.1 yr overdueKaustubh Construction Private Limited · Borivali, Mumbai SuburbanP51800007374· filed Dec 2019 → now Jun 2023· 81.8% built
- Konark Virtue3.1 yr overdueKonark Builders · kESHAVNAGAR, PuneP52100001587· filed Dec 2022 → now Jun 2023· 78.5% built· 3 complaints
- HILTON ENCLAVE WING A, B, B-13.1 yr overdueBHAVANI DEVELOPERS PVT LTD · Kurla, Mumbai SuburbanP51800012042· filed Jun 2021 → now Jun 2023· 90% built· 4 complaints
- Avika Periwinkle3.1 yr overdueM/S Avika Buildcon Pvt Ltd · Baner, PuneP52100029015· 90.9% built
- Altura3.1 yr overdueSigma Housing · Baner, PuneP52100028192· 60.6% built
- CHAITANYA KOHINOOR3.1 yr overdueCHAITANYA DEVELOPERS · Borivali, Mumbai SuburbanP51800024570· 90.9% built
- V N RESIDENCY APARTMENT3.1 yr overdueCENTURY BUILDERS AND DEVELOPERS · PANCHVATI, NashikP51600023215· 90.9% built
- SAI PAVITRA RESIDENCY3.1 yr overdueSAILAVKIK REALTY PRIVATE LIMITED · Thane, ThaneP51700021480· 81.8% built
- Swaraj Phase IV TUV3.1 yr overdueSim Realty · Borhadewadi Moshi, PuneP52100015606· 93.9% built
- STERLING BLOOMS3.1 yr overdueYASHADA GOVIND CITY CORPORATION · Pimpri Chinchawad (M Corp.), PuneP52100003148· filed Jun 2022 → now Jun 2023· 97% built
- AAKAR INDIGO 23.1 yr overdueAAKAR REALTIES · CHOVISAWADI, PuneP52100025648· 90.9% built
- Goodwill Unique Zest County Phase 23.1 yr overdueZENITH BUILDCON · Lohegaon, PuneP52100023942· 90.9% built
- DELTA CENTRAL3.1 yr overdueBALAJI CORPORATION · Panvel, RaigarhP51800001613· 97.3% built· 2 complaints
- EKA PHASE III - F BUILDING3.1 yr overdueAmit Builders · Pathardi, NashikP51600008507· filed Dec 2019 → now Jun 2023· 90.9% built· 3 complaints
- MARVEL TANISHQ3.1 yr overdueMARVEL PROPERTIES · Nashik, NashikP51600012755· 19.5% built
- MALATI- MANOHAR APT3.1 yr overdueSATISH MANOHAR DESHPANDE · Nashik (M Corp.), NashikP51600003147· filed Dec 2018 → now Jun 2023· 81.8% built
- SAI SPRING3.1 yr overdueMOHAN KEDARNATH KRISHNAVANSHI · KALYAN, ThaneP51700009813· 90% built
- CORAL PARK PHASE 23.1 yr overdueENKAY LIFE RELATORS PVT LTD · CHOVISAWADI, PuneP52100027697· 90.9% built
- AYESHA PLANET3.1 yr overdueANISA SUBHAN PATEL · TALOJA, RaigarhP52000027819· 81.8% built
- PRABHAT DARSHAN3.1 yr overdueSHIVALIK VENTURES PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800002608· 89.5% built
- Kanakshree Apartments3.1 yr overdueKanak Developments · undri, PuneP52100003928· filed Dec 2018 → now Jun 2023· 90.9% built
- NANDANVAN3.1 yr overdueKOSMOS DEVELOPERS · BORIVALI, Mumbai SuburbanP51800012073· filed Jun 2021 → now Jun 2023· 23.6% built
- RKL Anand ph13.1 yr overdueLUNKAD GRUH NIRMAN COMPANY · Tathawade, PuneP52100023493· 90.9% built
- AVIOR-AATMAN PHASE - III3.1 yr overdueAVIORENTERPRISES LLP · Pune City, PuneP52100029907· 81.8% built
- VIJAYSHRUSHTI3.1 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600011620· filed Dec 2018 → now Jun 2023· 86.4% built
- HAVA MAHAL CHS LTD3.1 yr overdueH RISHABRAJ PROJECTS · MALAD EAST MUMBAI, Mumbai SuburbanP51800027606· 90.9% built
- NAKSHATRA3.1 yr overduePADMAVATI LANDMARKS · Pune City, PuneP52100030557· 9.1% built
- Sukhwani Euphoria3.1 yr overdueSukhwani Buildtech · Near Kapil Akhila, PuneP52100028123· 87.3% built
- SHREE GALAXY HEIGHTS3.1 yr overdueV3 Reality · BADLAPUR AMBERNATH ROAD, ThaneP51700016371· filed Dec 2022 → now Jun 2023· 80% built
- YASHRAJ PRADAKSHINA3.1 yr overdueRAJENDRA MURLIDHAR GODBOLE · Haveli, PuneP52100000633· filed Jan 2021 → now Jun 2023· 90.9% built
- vedant imperial D phase 33.1 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007549· 63.2% built
- GOVIND ENCLAVE3.1 yr overdueGOVIND BHAUSAHEB MADHWAI · NEAR WATER TANK, NashikP51600025852· 95.5% built
- SAMARTH PLAZA APARTMENT3.1 yr overdueSHREE SAMARTH BUILDERS AND DEVELOPERS · Nashik (M Corp.), NashikP51600009652· filed Dec 2020 → now Jun 2023· 90.9% built
- Business Index3.1 yr overdueROONGTA INFRASPACE LLP · Makhamalabad, NashikP51600021649· 99.5% built
- SUMEET ANAND3.1 yr overdueGhansham jivandas Ahuja · DAHIVALI, RaigarhP52000007287· filed Dec 2018 → now Jun 2023· 90.9% built
- SWAMI HIGHT3.1 yr overdueBASAVESHWAR MAHALINGAYYA SWAMI · EAST SIDE OF NEW COURT BUILDING, SangliP53100022143· 81.8% built
- GULAB SADAN3.1 yr overdueBUTTEPATIL PROPERTIES · Haveli, PuneP52100029801· 81.8% built
- Hillside Apartment 4th Floor3.1 yr overduePratik Chandrakant Bhide · Talegaon Dabhade, PuneP52100027682· 94.5% built
- SAI ENCLAVE3.1 yr overdueASHOKKUMAR BHANJIBHAI LADANI · PANCHAVATI, OPP MANE NAGAR, NashikP51600030111· 81.8% built
- MESACON JEWEL WING A AND B3.1 yr overdueMESACON PROJECTS · Andheri, Mumbai SuburbanP51800023745· 62.1% built
- GANADHISH SANKUL B WING3.1 yr overdueM.S.PATIL AND ASSOCIATES · Pune City, PuneP52100021788· 90.9% built
- Shree Datta Samartha CHSL3.1 yr overdueShree Sai Swami Enterprises · Near Railway Station, ThaneP51700034066· 90.9% built
- JACOB SKYLINE APARTMENT3.1 yr overdueJACOB DANIEL CHARUVILA · BH EXPRESS INN HOTEL, NashikP51600025583· 90.9% built
- FIZA E GARIBNAWAZ3.1 yr overdueTRINITY BUILDCON · NEAR MASJID GARIBNAWAZ, SangliP53100022044· 81.8% built· 1 complaint
- KUL Utsav Phase I -Building G3.1 yr overdueKumar Builders · kondhwa BK, PuneP52100003489· filed May 2019 → now Jun 2023· 49.3% built
- AUDUMBER WING B3.1 yr overdueGPL SANKALP ASSOCIATES · Pune City, PuneP52100032612· 90.9% built
- Mohan Skyville3.1 yr overdueMOHAN LIFESPACES LLP · Kalyan, ThaneP51700003607· filed Jun 2019 → now Jun 2023· 81.8% built
- Shreeji Aura3.1 yr overdueSHREEJI REALTORS · Karjat, RaigarhP52000005330· filed Jun 2019 → now Jun 2023· 90.9% built· 2 complaints
- THE SPRINGS3.1 yr overdueSMS STAR DEVELOPERS LLP ·P99000005347· filed Sept 2019 → now Jun 2023· 81.3% built
- Varun Flora Township - Lotus Bldg3.1 yr overdueVertex Developers · Ujalaiwadi, KolhapurP53000025421· 79.5% built
- PANORAMA3.1 yr overdueEKTA SHUBHAM VENTURE · Kurla, Mumbai SuburbanP51800001112· filed Dec 2019 → now Jun 2023· 90.9% built· 2 complaints
- Kalpataru Ph-33.1 yr overdueAshoka Infraways Limited · Near Indian Oil Corporation Petrol Pump, Chunchale Shiwar, NashikP51600025437· 45.5% built
- INSTYLE RESIDENCY3.1 yr overdueT6 REALTY PVT LTD · Solapur, SolapurP52600001808· filed Jul 2019 → now Jun 2023· 90.9% built
- Maxima3.1 yr overdueOberoi Constructions Limited · Andheri, Mumbai SuburbanP51800017154· 99.6% built· 1 complaint
- VRAJ VILLA3.1 yr overdueSHREE INFRA PROJECT · CANAL ROAD, NashikP51600025502· 93.6% built
- Parmarth Niketan - Redevelopment of Mani Bhuvan3.1 yr overdueJ V Constructions & Developers · Borivali, Mumbai SuburbanP51800001745· filed Dec 2019 → now Jun 2023· 90.9% built
- WINSPACE AMELIO3.1 yr overdueBINI BUILDERS PRIVATE LIMITED · -, Mumbai SuburbanP51800010932· filed Jun 2021 → now Jun 2023· 90.9% built
- Rajashree Oyster Phase II3.1 yr overdueRajashree Construction · Near K.K.Wagh Agriculture College, NashikP51600010467· 87.9% built
- PRIDE3.1 yr overdueSalasar construction · Andheri, Mumbai SuburbanP51800027966· 90.9% built· 1 complaint
- UNIMONT EMPIRE3.1 yr overdueRSM ENTERPRISES · Khalapur, RaigarhP52000002714· 87.6% built
- HILL RIDGE3.1 yr overdueSIDHIVINAYAK REALTY CONSTRUCTION PRIVATE LIMITED · Mumbai, Mumbai SuburbanP51800009010· filed Dec 2018 → now Jun 2023· 90.9% built
- STAR GLORIOUS3.1 yr overdueSTARLITE CONSTRUCTIONS · Vasai-Virar City (M Corp), PalgharP99000008579· filed Dec 2019 → now Jun 2023· 90% built
- AMAR ORNATE-II3.1 yr overdueMALOJI AND SONS · HADAPSAR, PuneP52100027186· 81.8% built
- SHIVANJALI HEIGHTS3.1 yr overdueSHIVANJALI CONSTRUCTION · BADLAPUR WEST, ThaneP51700032585· filed Jun 2022 → now Jun 2023· 50% built
- Rosalia Apartments3.1 yr overdueKusum Associates · Andheri, Mumbai SuburbanP51800005568· filed Jul 2020 → now Jun 2023· 72.7% built· 5 complaints
- SAI VIDHATA3.1 yr overdueSAI SHRADDHA ASSOCIATES · Ulhasnagar, ThaneP51700030832· 81.8% built
- Lunawat Apex3.1 yr overdueNavya Prem Developers LLP · Aundh, PuneP52100025503· 81.8% built
- Rachana Corner3.1 yr overdueShree Construction Builders and Developers · Bhama nagar, AhmednagarP52200032268· 90.9% built
- Shivam Complex Phase - 13.1 yr overdueManoj Ramanand Prajapati · Lodhivali, RaigarhP52000015165· filed Dec 2020 → now Jun 2023· 90.9% built
- DARSHAN3.1 yr overdueArkade Developers Private Limited · VILE PARLE EAST, Mumbai SuburbanP51800027271· 67% built
- PARAG COMPLEX PHASE 13.1 yr overdueMALOO CONSTRUCTION · NEAR SANT GADGE BABA AMRAVATI UNIVERSITY, AmravatiP50300023712· 9.1% built
- OM SAI HEIGHTS II3.1 yr overdueCREATIVE ENTERPRISES · Palghar, PalgharP99000012565· filed Dec 2022 → now Jun 2023· 90.7% built
- AL HADI RESIDENTIAL COMPLEX3.1 yr overdueSAHYADRI GRIH NIRMAN · Thane, ThaneP51700012253· 44.8% built
- Laxmi Krupa CHS Ltd.3.1 yr overdueM/s. Shreepad Developers · Borivali, Mumbai SuburbanP51800011532· filed Dec 2019 → now Jun 2023· 68.2% built· 2 complaints
- BALAJI COMPLEX - PLOT NO 5, 6, 7 AND 83.1 yr overdueBALAJI INFRA · Khalapur, RaigarhP52000007536· filed Dec 2021 → now Jun 2023· 90.9% built
- THE CENTRUM3.1 yr overdueMANSION CREATORS · OPP SKYSCRAPER, PuneP52100027662· 30.5% built
- DEEP PRIDE ATO E WING3.1 yr overdueDEEP HOMES · Vasai, PalgharP99000010595· filed Dec 2018 → now Jun 2023· 90.9% built
- JAGAJJIVAN HEIGHTS3.1 yr overdueAavishkar Realtors · Kolhapur (M Corp.), KolhapurP53000001291· filed Dec 2019 → now Jun 2023· 81.8% built
- APEX ADDRESS3.1 yr overdueAPEX BUILDCON · NODE PUSHPAK, RaigarhP52000021012· 81.8% built
- Joyville Hinjawadi - I, Phase 33.1 yr overdueJoyville Shapoorji Housing Private Limited · Man Village, PuneP52100016775· 90.9% built
- PARADISE GRANDEUR3.1 yr overduePARIKH INVESTMENT AND DEVELOPMENT PVT. LTD. · Vasai, PalgharP99000004547· filed Dec 2020 → now Jun 2023· 36.4% built
- SEA GRAPES3.1 yr overdueNINE REALTY BUILDERS · Vasai, PalgharP99000002584· filed Dec 2019 → now Jun 2023· 90.7% built
- MARATHON NEXTOWN CORAL3.1 yr overdueMARATHON ENER-GEN LLP · Thane, ThaneP51700000952· filed Dec 2021 → now Jun 2023· 72.7% built· 2 complaints
- MESACON JEWEL WING C3.1 yr overdueMESACON PROJECTS · Andheri, Mumbai SuburbanP51800023909· 79.5% built
- UDYAM BIZBAY3.1 yr overdueKADU REALTY · Saswad, PuneP52100026686· 90.9% built
- JUHU ACROPOLIS3.1 yr overdueBHARAT REALTY VENTURE PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800017864· 90.9% built
- Florida Water Color II3.1 yr overdueONE EARTH · MUNDHAWA, PuneP52100000946· 63.6% built
- SAMRAJYA3.1 yr overdueGARVE PATIL CONSTRUCTION COMPANY · Haveli, PuneP52100014056· filed Dec 2019 → now Jun 2023· 60% built· 1 complaint
- Borivali Nirmala Sadan CHS LTD3.1 yr overdueShreenath Realty LLP · Borivali East, Mumbai SuburbanP51800029552· 60% built
- ROONGTA BELLAVISTA APARTMENT3.1 yr overdueROONGTA HOMES LLP · GOVIND NAGAR, NashikP51600019713· 81.8% built
- CRYSTAL SPIRES3.1 yr overdueLUXORA REALTORS PRIVATE LIMITED · Chitalsar Manpada, ThaneP51700009216· filed Jan 2021 → now Jun 2023· 84.8% built· 9 complaints
- SHREE VASTUPURAM3.1 yr overdueShivdatta Associates · Varnali, Vishrambag, SangliP53100021231· 69.1% built
- MADHULATA RESIDENCY3.1 yr overdueMANISH MADHUSUDAN AGRAWAL · Near old bus stand, YavatmalP51000011182· 29.7% built
- OMKAR COMPLEX - PHASE 13.1 yr overdueShree Omkar developers · SHRIRAM GOGATE HIGH SCHOOL, SindhudurgP52900018151· filed Jun 2021 → now Jun 2023· 27.3% built
- MOHINI CASTLE3.1 yr overdueMOHINI SHELTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800005492· filed Jun 2021 → now Jun 2023· 90.9% built
- RAVIRAJ APARTMENT3.1 yr overdueRAJENDRA GHORPADE · GANESH NAGAR, ThaneP51700020559· filed Dec 2022 → now Jun 2023· 72.7% built
- Ekdant Wing D3.1 yr overdueHemant Thombare · kothrud, PuneP52100015134· 33.6% built
- PALAVA ESTELA A, B, C3.1 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013158· 81.8% built· 4 complaints
- LINEA3.1 yr overdueRajeev Shivnath Sonkar · Hadapsar, PuneP52100002743· 45.8% built· 1 complaint
- Revanta3.1 yr overdueP4 PROPERTIES · RAVET, PuneP52100014793· 77.3% built
- SHIV GANGA3.1 yr overdueANJANI KUMAR COMPANY PRIVATE LIMITED · Borivali, Mumbai SuburbanP51800017043· 90.9% built
- TRIDENT BUSINESS CENTER3.1 yr overdueSHIRISH BHASKAR JADHAV · Haveli, PuneP52100008007· filed Jul 2020 → now Jun 2023· 81.8% built
- PALAVA AURELIA - C, H, I3.1 yr overduePalava Dwellers Private Limited · Palava, ThaneP51700013073· 54.5% built· 2 complaints
- SHRADDHA VALENCIA3.1 yr overdueOM VAISHNAVI DEVELOPERS · Kurla, Mumbai SuburbanP51800006947· 90.9% built
- PALAVA MARVELLA B,C,D,E,F,G3.1 yr overduePalava Dwellers Private Limited · ., ThaneP51700013462· 76.7% built· 4 complaints
- THE EVOQ3.1 yr overdueFUTURISTIC HOMES · ASHOK THEATRE, PuneP52100027486· 81.8% built
- Sunteck Icon, Kolekalyan, CST Road, Kalina, Santacruz East, Mumbai3.1 yr overdueSunteck Realty Limited · Andheri, Mumbai SuburbanP51800014845· 81.8% built
- SHUBHAMKROTI SAHANIWAS3.1 yr overdueSAMBHAJI SHANKAR DESHMUKH · NEAR JAIN MANDIR, SangliP53100030364· 90.9% built
- VARAD PAVAN3.1 yr overdueBHALCHANDRA VISHWANATH DESAI · NEAR HUMAN MANDIR, SangliP53100028118· 90.9% built
- ASHTALAXMI ANNEX3.1 yr overdueSHIVAJI GHAMJI DADAS · Near Cummins India, SataraP52700000099· 81.8% built
- ZAHRA LAND3.1 yr overdueZAHRA LAND DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000005947· 36.9% built
- BASERA CHS LTD3.1 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Andheri, Mumbai SuburbanP51800001959· 90.9% built
- GLOBAL RESIDENCY3.1 yr overdueGLOBAL HOUSING VENTURES · Borivali, Mumbai SuburbanP51800009478· 27.6% built· 2 complaints
- Atharva Patson Phinix PH II3.1 yr overdueM/S SAMRAT ATHARVA PATSON BUILDERS AND DEVELOPERS · Chakan (CT), PuneP52100006867· 7.9% built
- SKYSCRAPER PHASE 13.1 yr overdueVISHAL PROPERTIES · Tathwade, PuneP52100008605· 90.9% built· 1 complaint
- SRISHTI AANGAN3.1 yr overdueNEERAJ MOHAN DESAI HUF · SALAIWADA, SindhudurgP52900007953· 45.5% built
- Proposed Redevelopment of Vaid Mahal3.0 yr overdueLulu Enterprise · Ward ABCD, Mumbai CityP51900009905· 71.4% built
- Pranav Pushkaram3.0 yr overduePranav Builders · Tuljainagar, SangliP53100024862· 81.8% built
- AASHIRWAD AVENUE3.0 yr overdueRACHANA BUILDERS AND DEVELOPERS KUDAL · Kudal, SindhudurgP52900007098· 72.3% built
- KUMKUM Sector 7 Building 23 Wing F3.0 yr overdueKalash Developers · Vasai-Virar City (M Corp), PalgharP99000007366· filed Dec 2019 → now Jul 2023· 90.9% built
- EKTA PARKSVILLE PHASE I3.0 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000116· filed Dec 2019 → now Jul 2023· 98.9% built· 32 complaints
- MAHALAXMI NAGAR3.0 yr overdueMAHALAXMI HOMEMAKERS PRIVATE LIMITED · Chandrapada, PalgharP99000013575· 40.5% built
- BROOKLYN PARK PHASE III3.0 yr overdueEKTA PARKSVILLE HOMES PVT. LTD. · Vasai, PalgharP99000000148· filed Feb 2020 → now Jul 2023· 88.6% built· 17 complaints
- Vyankatesh City 43.0 yr overdueVYANKATESHA BUILDERS AND DEVELOPERS · Kalamana, NagpurP50500007447· 25.3% built· 1 complaint
- Princetown Tower - C33.0 yr overdueManikchand Kumar Properties · Undri, PuneP52100009077· 90.9% built
- NALINI - SUMANT3.0 yr overdueVINOD SUMANT UGEMUGE · Wardha (M Cl), WardhaP50400010094· filed Jan 2021 → now Jul 2023· 90.9% built· 1 complaint
- Dipti SkyCity Building 1 and 33.0 yr overdueDipti Home Makers Pvt Ltd · Ambarnath, ThaneP51700008856· 95.5% built
- INDRAPRASTHA-Phase-23.0 yr overdueM/s Apte Reality · Salgarwasti, SolapurP52600009835· 72.3% built
- Hubtown Countrywoods Building 53.0 yr overdueHubtown Limited · Tilekar Nagar Kondhwa Budruk, PuneP52100002695· 51.5% built
- RAGHUNATH VIHAR PHASE 13.0 yr overdueTRUST BUILDCON · Khalapur, RaigarhP52000008988· 30.3% built
- INDRADHANU Phase-33.0 yr overdueM/S Ganesh Ramchandra Apte · Solapur (M Corp.), SolapurP52600009419· 48.2% built
- Phoenix Ribereno IJBK3.0 yr overduePhoenix Realtors · Shirwal, SataraP52700006704· 90.9% built
- Vikrant3.0 yr overduePate P Square Developers LLP · Navi Peth, PuneP52100021513· 90.9% built
- RATHI PLANET3.0 yr overdueRATHI CONSRUCTION · Aurangabad (M Corp.), AurangabadP51500003407· 90.9% built
- Lodha Patel Estate - Tower A, B3.0 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014891· 81.8% built· 2 complaints
- RAGHU-NARAYANA RESIDENCY3.0 yr overdueD.S DEVELOPERS & BUILDERS · aurangabad, AurangabadP51500004562· 90.9% built
- NEW SAHARA APARTMENT3.0 yr overduePARVIN GAMIR SHAIKH · KHODE NAGAR, NashikP51600021896· 90.9% built
- 75 WESTGATE3.0 yr overdueSIDDHARTH RAMESH BANSAL · RAVET, PuneP52100021442· 1.8% built
- Rachana Samruddhi3.0 yr overdueRachana Developers · Pipla, NagpurP50500008630· 20.5% built
- KALYANJI ASHRAYA3.0 yr overdueB.Kalyanji Realty · VEENANAGAR, RaigarhP52000028681· 90.9% built
- VISION STARWEST PHASE - 13.0 yr overdueVISION CREATIVE INFRA · TATHAWADE, PuneP52100024346· 90.9% built
- SAISH HEIGHTS3.0 yr overdueSAISH BUILDERS AND DEVELOPERS · Satara, SataraP52700013112· 90.9% built
- METRO LIFE MAXIMA RESIDENCES PHASE I3.0 yr overdueRAMA SYNERGY SPACES · Next to Indira College of Commerce and Science, PuneP52100022178· 90.9% built· 26 complaints
- SAHAKAR PREMIER3.0 yr overduePREMIER REALTY · Thane, ThaneP51700002452· 27.3% built
- SRUSHTI COMPLEX3.0 yr overdueAAKAR DEVELOPERS · Bhingaloli, RatnagiriP52800005132· 9.3% built
- HEERA PALACE3.0 yr overdueM/S. OMKAR DEVELOPERS · WAI, SataraP52700023041· 81.8% built
- KALINA MARKET3.0 yr overdueKRISHNA ASSOCIATES · Mumbai, Mumbai SuburbanP51800005221· filed Jun 2018 → now Jul 2023· 51.8% built
- 74DownTown3.0 yr overdueAura Realtors · Baner Shroff Road Pune 411045, PuneP52100025327· 90.9% built
- Atharva Heights3.0 yr overdueAtharva Developers · INFRONT MARKET YARD, PuneP52100007912· 73.1% built
- YASHASWATI CHS LTD3.0 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800001279· 90.9% built
- Velentine Apartment 1 Wing D3.0 yr overdueVelentine Properties Private Limited · Andheri, Mumbai SuburbanP51800002036· 7.3% built
- Waterfront Tower3.0 yr overdueSea Kunal Corporation Pvt. Ltd. · Ward ABCD, Mumbai CityP51900006784· 90.9% built
- PEBBLES MARINA APARTMENTS3.0 yr overduePEBBLES INFRA PROJECTS LTD · Andheri, Mumbai SuburbanP51800012288· 56.4% built
- Lodha Patel Estate - Tower C, D3.0 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800014860· 81.8% built· 5 complaints
- VENKATESH PRIME3.0 yr overdueVENKATESH PROMOTERS AND BUILDERS · JADHAVWADI PHALTAN, SataraP52700022254· 90.9% built
- THARWANI MILLENNIUM CITY PHASE I3.0 yr overdueTHARWANI REALTORS · BADLAPUR, ThaneP51700023974· 95.9% built
- SAI KUNJ3.0 yr overdueCHOULWAR CONSTRUCTION · BAVDHAN, PuneP52100025939· filed Jan 2023 → now Jul 2023· 56.4% built
- SHREE ROYAL HEIGHT3.0 yr overdueROYAL'S RELATORS · Borivali, Mumbai SuburbanP51800022042· 81.8% built
- KRISHNA ENCLAVE3.0 yr overdueASHA DEVELOPERS · Andheri, Mumbai SuburbanP51800000004· 66.7% built
- RKH Blessings B andd C building3.0 yr overdueRKH DEVELOPERS · Moshi, PuneP52100006496· 21.1% built
- AARADHANA RESIDENCY - A3.0 yr overdueA C JAIN BUILDERS AND DEVELOPERS LLP · OPP GOPAL NAGAR, NashikP51600025195· filed Dec 2022 → now Aug 2023· 90.9% built
- MADHUKOSH HEIGHTS3.0 yr overdueGAURAV VISHVANATH AWATI · NEAR VIJAY HOTEL, AhmednagarP52200022069· 90.9% built
- ALANKAPURI3.0 yr overdueLAIGUDE DEVELOPERS · wadgaon, PuneP52100010797· 67.5% built
- SHIVAAY SQUARE3.0 yr overdueISHANAVI CONSTRUTECH PVT LTD · MEHRUN, JalgaonP49900032755· 76.8% built
- WEST AVENUE3.0 yr overdueRAINBOW CONSTRUCTIONS · PANDI BHIMSEN KALAMANDIR, PuneP52100016725· filed Feb 2023 → now Aug 2023· 38% built
- SUNSET HEIGHTS 23.0 yr overdueALFA CONSTRUCTIONS · BADLAPUR GAON, ThaneP51700018798· filed Jun 2022 → now Aug 2023· 90% built
- SULOCHAN PARK3.0 yr overdueASHWAMEDH SPACES PRIVATE LIMITED · Vanaj Paramhansnagar, PuneP52100029020· 90% built
- ARIHANT PARK PHASE 93.0 yr overdueMADAN NEMICHAND BAFANA · NEAR GANESH TEMPLE, AhmednagarP52200031254· 90.9% built
- NEST-IN3.0 yr overdueSUNIL JYOTIRAO KOKITKAR · NEAR Awati Motors, SangliP53100030183· 90.9% built
- MANGAL VASUDHA3.0 yr overdueMANGAL CONSTRUCTION · Jule Solapur, SolapurP52600034005· 10.1% built
- TWIN TOWERS3.0 yr overdueGAYATRI PROPERTIES · MANJARI Bk, PuneP52100005036· filed Aug 2022 → now Aug 2023· 81.8% built
- SHREE SANKET GARDEN3.0 yr overdueSHREE SANKET DEVELOPERS · Near Hotel Yash Garden, Nilgavhan Shivar, NashikP51600003519· filed Jan 2022 → now Aug 2023· 90.9% built
- Vishnu krupa Apartment3.0 yr overdueSomnath Shivaji Gaikwad · Choudhary parkP52100019404· 81.8% built
- Shiv-Darshan Residency3.0 yr overdueSomnath Shivaji Gaikwad · Dutta nagar, DighiP52100016219· 81.8% built
- addressOne - Phase 42.9 yr overduePeninsula Land Limited · Near Maharashtra Cricket Association Stadium Gahunje Pune, PuneP52100015803· 78.2% built· 4 complaints
- Legacy Millennia2.9 yr overdueINFINITY DEVELOPERS · Punawale, PuneP52100022379· 81.8% built
- HEMA KUNJ2.9 yr overdueBHADRANKAR ENTERPRISES LLP · Thane, ThaneP51700028739· 41.8% built· 1 complaint
- Ceratec Avika2.9 yr overdueAnand Dayanand Agarwal · Yewalewadi, PuneP52100013774· 14.1% built
- ANCHAL GALAXY2.9 yr overdueCLORIS CONSTRUCTION PRIVATE LIMITED · Palghar, PalgharP99000021893· 0% built· 1 complaint
- LAKHANI ROYALE2.9 yr overdueLAKHANI BUILDERS PVT LTD · Panvel, RaigarhP52000014323· 98.6% built
- Ramshraddha Apartment2.9 yr overdueM/S RAM GROUP · -, SataraP52700022388· 81.8% built
- Lodha Patel Estate - Tower G2.9 yr overdueMACROTECH DEVELOPERS LIMITED · Borivali, Mumbai SuburbanP51800016528· 90.9% built
- Joyville Virar Phase 52.9 yr overdueJoyville Shapoorji Housing Private Limited · virar, PalgharP99000019531· 99.8% built
- Aqua Millennium2.9 yr overdueMILLENNIUM LEGACY DEVELOPERS · RAVET, PuneP52100022420· 81.8% built
- KUMAR PALMCREST A4 BUILDING2.9 yr overdueKUMAR PROPERTIES AND PROMOTERS PRIVATE LIMITED · PISOLI, PuneP52100022295· 61.8% built
- DEVESH2.9 yr overdueOM CONSTRUCTION CO · BHAYANDAR, ThaneP51700007526· 36.4% built
- SHIV JIVDANI SADAN2.9 yr overdueSHUBHAM BUILDERS & DEVELOPERS · GARIBACHA WADA, ThaneP51700021173· filed May 2022 → now Aug 2023· 19.1% built
- Rajhans Helix 32.9 yr overdueRajhans Infracon (India) Private Limited · Kurla, Mumbai SuburbanP51800007413· filed Dec 2019 → now Aug 2023· 90.9% built
- INDOSHIVA TOWER2.9 yr overdueINDOSHIVA CONSTRUCTION · VAKHARBHAG, SangliP53100030141· filed Dec 2022 → now Aug 2023· 90.5% built
- RISHABRAJ PRIDE2.9 yr overdueRRIL LIMITED · DAHISAR WEST, Mumbai SuburbanP51800031144· 90.9% built
- Skyi Star Town Commercial2.9 yr overduePate Life Melange Developers Pvt Ltd · Bhukum, PuneP52100013211· filed Feb 2021 → now Aug 2023· 90% built· 4 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.