RERA projects past their possession deadline
11,768 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 50 of 59
- Jaliyan Heights Goregaon1.6 yr overdueJaliyan Developer · Goregaon East, Mumbai SuburbanP51800012880· filed Dec 2022 → now Dec 2024· 84.5% built· 2 complaints
- SAI ANAND1.6 yr overdueSHREENATHJI LIFE SPACES · BIBWEWADI, PuneP52100035202· filed Dec 2023 → now Dec 2024· 90.9% built
- Thanekar Civic Phase II1.6 yr overdueThanekar Construction LLP · Chikhloli Badlapur, ThaneP51700048038· 51.1% built
- Hubtown Seasons - Daintree1.6 yr overdueJoynest Premises Private Limited · Kurla, Mumbai SuburbanP51800002373· 81.8% built· 7 complaints
- SHANTI PLAZA1.6 yr overdueSAHYOG VASTU UDYOG · BH PALM HOTEL, WASAN NAGAR, NashikP51600025222· 80% built
- Pyramid Axis1.6 yr overduePyramid Prasad Buildcon LLP · main Baner Road, PuneP52100021464· 99.1% built
- VJ Grand Central1.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100026304· 89.5% built· 1 complaint
- HIGHLAND HAVEN BUILDING 7G MIST-A PHASE 61.6 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700004403· 52.3% built
- Puneet Sanjivani Phase 1 Floor 0 to Floor 161.6 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800015397· 90.9% built
- Periwinkle1.6 yr overdueAJIT GIRDHARILAL NAHAR · -, PuneP52100017310· 86.4% built
- REVANTA1.6 yr overdueSIDDHESH PADMAMBA BUILDERS & DEVELOPERS · Mali colony Takala, KolhapurP53000014790· 90.9% built
- VRINDAVAN1.6 yr overdueSOHAIL ISAQUE (ISAK) BAGWAN AND ISAQUE(ISAK) IBRAHIM BAGWAN · Jalochi, PuneP52100010752· 70.5% built
- Kalpataru Jade Residences C1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000676· 80.5% built· 5 complaints
- NIRVANA ECO HOMES1.6 yr overdueBALAJI CONSTRUCTION CO. · PALGHAR, PalgharP99000015865· 22.7% built
- PANAMA PARK1.6 yr overdueThe Kallyaanee Fortune Properties · Lohgaon, PuneP52100020820· 13.6% built
- Siddheshwar Residency 21.6 yr overdueSIDDHIVINAYAK ASSOCIATES · Taloja Majkur, RaigarhP52000023608· 74% built
- JAYSHRI ROW HOUSE1.6 yr overdueJAYSHRI CONSTRUCTIONS · NR KALIKA NAGAR, NashikP51600024196· 81.8% built
- KUMAR SELENA A BUILDING1.6 yr overdueKumar Construction and Properties Pvt Ltd · PASHAN, PuneP52100023773· 63.6% built
- Swapnapurti Sankul1.6 yr overdueGirijatmaj Developers · Khandala, SataraP52700002291· 83.7% built
- PROJECT AT S.NO 168 H NO 7/A/B/C/28B/30/8/29/3F/3Y1.6 yr overdueSUNGRACE INFRA PROJECTS · Ambegaon, PuneP52100007062· 68.2% built
- Yashwin Encore1.6 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Opposite Sayaji Hotel, PuneP52100017756· 95.6% built· 3 complaints
- PEARL OASIS1.6 yr overdueBAHIST ENTERPRISES PVT LTD · PATHANWADI, Mumbai SuburbanP51800016403· 79.5% built
- ARIHANT AAROHI PHASE II1.6 yr overdueARIHANT SUPERSTRUCTURES LIMITED · VILLAGE PADLE, ThaneP51700015328· 90.5% built· 5 complaints
- L AND T SEAWOODS RESIDENCES - NORTH TOWERS1.6 yr overdueL&T SEAWOODS LIMITED · L&T Seawoods, ThaneP51700026653· 71.8% built· 2 complaints
- GURUCHHAYA APARTMENT1.6 yr overdueUNIQUE BUILDERS · JALAN NAGAR, AurangabadP51500049582· 90.9% built
- SUKHWANI ASPIRE1.6 yr overdueBasant - Sukhwani · Kiwale, PuneP52100030795· 82.3% built
- L AND T SEAWOODS RESIDENCES PHASE I1.6 yr overdueL&T SEAWOODS LIMITED · Thane, ThaneP51700020275· 81.8% built· 6 complaints
- BAFNA CENTRUM PHASE-11.6 yr overdueSUN REALTORS · Palghar West, PalgharP99000018461· 90.9% built
- PRABHAT VANDAN APARTMENT1.6 yr overduePrabhat Developers · BEHIND DREAM CASTLE PANCHVATI, NashikP51600020991· 90.9% built
- PLATINUM TOWERS A WING1.6 yr overdueNISAR AHMED MOHARRAM ALI KHAN · NASHIK, NashikP51600023722· 23.8% built
- PEBBLES II F BUILDING1.6 yr overdueAbhinav Rainbow Developers & Promoters LLP · Bavadhan BK, PuneP52100000730· 81.8% built
- GAJANAN LEELA -VI1.6 yr overdueKAPITAL HOMES · WARDHA, WardhaP50400025374· 78.2% built
- Kalpataru Jade Residences E1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100001392· 73.5% built· 1 complaint
- PANSE PATIL HARMONY1.6 yr overdueAVANEESH BUILDCON LLP · BEHIND PURVA GARDEN HOTEL, SangliP53100024897· 90.9% built
- SHRI SAMARTH KRUPA APARTMENT1.6 yr overdueSHRINIWAS CONSTRUCTION · DHRUVA NAGAR, NashikP51600016723· 90.9% built
- Mahindra Happinest Kalyan Project A1.6 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Bhiwandi Kalyan Junction, ThaneP51700022981· 81.8% built· 4 complaints
- Ashanand Residency G Building1.6 yr overdueAnand Deoram Tambe · Khed, PuneP52100019866· 30.9% built
- Tirupati Regalia Phase-21.6 yr overdueVenkatesh Constructions · DhanoriP52100022720· 77.3% built
- KAILASH TOWER1.6 yr overdueKAILASH DEVELOPERS · VASAI, PalgharP99000008452· filed Dec 2019 → now Dec 2024· 90.9% built· 5 complaints
- GOVIND ENCLAVE1.6 yr overdueCONCRETE DEVELOPERS · DABHA, NAGPUR, NagpurP50500024602· 87.8% built
- Park Street1.6 yr overdueNawcon Infrastructure Pvt Ltd · Opp. Mount Litera Zee School, LaturP52400016239· 78.2% built
- Vaikunth Cluster 21.6 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003793· 90.9% built· 9 complaints
- Pranav Corner1.6 yr overduePranav Builders · Tuljainagar, SangliP53100047076· 64.5% built
- PRISTINE GREENS PHASE III1.6 yr overduePRISTINE PROPERTIES · PUNE, PuneP52100024045· 98.2% built· 2 complaints
- DEEP HEIGHTS1.6 yr overdueSUPER STAR DEVELOPERS · Vasai, PalgharP99000020604· 90.9% built
- SPAN SIGNATURE1.6 yr overdueANNAPURNA BUILDCON INFRA PVT LTD · Mira-Bhayandar (M Corp.), ThaneP51700011940· 81.8% built
- Aero East PH II1.6 yr overdueM/S MIRACLE GURUKRUPA DEVELOPERS · Undri, PuneP52100018765· 81.8% built
- AKSHAR RIVERGATE - PLOT F1.6 yr overdueEMPERIA REALTY · Panvel, RaigarhP52000014488· 90.9% built
- Rituworld Phase III M and N1.6 yr overdueMOHAN HARDASMAL THARWANI · badlapur, ThaneP51700006857· 90.9% built
- MY WORLD BUILDING B4-B5-B61.6 yr overdueSIMAR PRIDE VENTURES LLP · CHIKALTHANA, AurangabadP51500015814· 47.7% built
- Yashwin SukhNiwas1.6 yr overdueGROWISA ADVISORS · Hinjawadi, PuneP52100025982· 90.1% built
- DHANLAXMI ICON1.6 yr overdueHARI OM DEVELOPERS · Haveli, PuneP52100018523· 35.9% built
- JAGDAMBA SIDDHI1.6 yr overdueJAGDAMBA ENTERPRISES · PEN, RaigarhP52000019338· 90.9% built
- Solitaire C1.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000413· 90.9% built
- PARADISE MEADOWS1.6 yr overdueCREATIVE CONSTRUCTIONS · ROYAL COLONY, NashikP51600022204· 81.8% built
- Mulund Om CHS Ltd1.6 yr overdueSUNRISE HOUSING · Nahur Village Mulund - West, Mumbai SuburbanP51800022406· 81.8% built
- GANGA SERIO E F BUILDING1.6 yr overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100023713· 90.9% built· 2 complaints
- SHIVRAM RESIDENCY1.6 yr overdueMAHESHWAR ENTERPRISES · PATHARDI NASHIK, NashikP51600049208· 90.9% built
- ROHAN ANAND PHASE I1.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Somatane, PuneP52100023186· 90.6% built· 1 complaint
- ROHAN ABHILASHA 2 WING B1.6 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100025681· 88.6% built
- Rohini1.6 yr overdueThilayaparambil Kumaran Joshi · Thane, ThaneP51700013602· filed Jun 2021 → now Dec 2024· 90.9% built
- SARTHAK HOMES WING A B C1.6 yr overdueSARTHAK INFRA · KARJAT, RaigarhP52000021869· 90.9% built
- Building Wing A Phase I Sudarshan Apartment Karve Nagar Pune1.6 yr overdueAnubhavshri Realty Pvt. Ltd. · Village Hingne Budruk, PuneP52100023468· 61.8% built
- GANGA GLITZ G UNDRI PUNE1.6 yr overdueLegends County Landmark Pvt Ltd · UNDRI, PuneP52100024304· 81.8% built
- Megapolis Saffron - Shops1.6 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100034988· filed Dec 2023 → now Dec 2024· 70.6% built
- SIDDHIVINAYAK RIDDHIMA1.6 yr overdueSIDDHIVINAYAK HOMES · Koynavele, RaigarhP52000018157· 89.1% built
- NISHCHAY - WING E1.6 yr overdueSHREERAJ DEVELOPER LLP · REVENUE MAJUE DAHISAR, Mumbai SuburbanP51800015985· 89.5% built
- BLUE STAR RESIDENCY1.6 yr overdueTAMANNA BUILDERS & DEVELOPERS · SAWARDE, RatnagiriP52800021449· 37.3% built
- Kalpataru Jade Residences F1.6 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000869· 79.9% built· 4 complaints
- AUDERY AVENUE1.6 yr overdueMENEZES DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000013842· filed Dec 2018 → now Dec 2024· 81.4% built
- ACE AURUM III TOWER 061.6 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025056· 50.2% built
- Imperial Heritage - B,C Wing1.6 yr overdueShree Ganesh Ventures · Vasai, PalgharP99000020908· 90.9% built
- Kalpataru Exquisite - Wing 31.6 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100018100· 90.3% built
- Shree Ganesh Heights1.6 yr overdueShree Ganesh Developers · Haveli, PuneP52100051487· filed Dec 2023 → now Dec 2024· 90.9% built
- NEST LEAF1.6 yr overdueNEST INFRA · TEMBODE, PalgharP99000011341· 81.8% built· 1 complaint
- DOSHI TARACHAND VALAMJI VANIK NIWAS1.6 yr overdueSHREE CUTCHI DASHA SHRIMALI VANIK GNYATI · Chembur, Mumbai SuburbanP51800045888· filed Dec 2023 → now Dec 2024· 90.9% built
- Plan S Business Park1.6 yr overdueM/s. Vishwa Green Realtors Private Limited · SHIRWANE, ThaneP51700002027· 62.4% built· 3 complaints
- ATHARVA VISHWA1.6 yr overdueSIDDHIVINAYAK BUILDTECH · PANCHAVATI ANNEX, NashikP51600021240· 97.7% built
- KOHINOOR CORAL1.6 yr overdueYELLOWSTONE SKYSCRAPERS LLP · VILLAGE BHOIRWADI, TAL MULSHI, PuneP52100021279· 99.8% built
- SAKAR PLAZA1.6 yr overdueMUKTABEN PURUSHOTTAM NARODIA · ADGAON, NashikP51600022457· 81.8% built
- vedant imperial bunglow 1 to 8 phase 21.6 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007492· 48.5% built
- YashONE Wakad Central1.6 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100020910· 95.2% built
- Solus1.6 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000193· 90.9% built
- OSTWAL WOODS1.6 yr overdueSHREE OSTWAL BUILDERS LTD · OPP. UNION PARK, PalgharP99000019832· 48.2% built
- RAJGRUHI RESIDENCY TOWER D1.6 yr overdueAtria Constructions · KONDHWA BUDRUK, SHATRUNJAY MADIR ROAD, PuneP52100034436· 81.8% built· 5 complaints
- OM ARNESH APARTMENT1.6 yr overdueINFINITI INFRAVENTURES · ZINGABAI TAKLI NAGPUR, NagpurP50500032036· 81.8% built
- First City, Commercial Shopping-11.6 yr overdueNagpur Integrated Township Private Limited · MIHAN Non-SEZ area, NagpurP50500034615· 81.8% built· 1 complaint
- VRINDAVAN PARK1.6 yr overdueSIDDHIVINAYAK BUILDCON · GUT NO 305 PLOT NO 10 VRINDAVAN NAGAR NEAR SENT PETTER SCHOOL ADGAON SHIVAR NASHIK, NashikP51600029679· 95.5% built
- Badlani Business Center1.6 yr overdueBadlani Builders & Developers Pvt Ltd · Lakhala, WashimP50200054445· 81.8% built
- SARA PARIVARTAN-AMENITY BUILDING-A1.6 yr overdueSARA PROPERTIES · SARA PARIVARTAN, AurangabadP51500034773· 51.8% built
- PRIYANKA PARADISE1.6 yr overduePRIYANKA REGENCY LLP · Thane, ThaneP51700051357· 90.9% built
- FLORA1.6 yr overdueROYAL ENTERPRISE · Nr Ayyappa Temple, Dadra & Nagar HaveliP49600000107· 90.9% built
- Laxmi Kunj1.6 yr overdueGeeCee Ventures Limited · Andheri, Mumbai SuburbanP51800046721· 88.2% built
- Kohinoor Heights1.6 yr overdueVISHWA DEVELOPERS · Chikhali, PuneP52100033158· 90.9% built
- AMI PARK1.6 yr overdueNEXON INFRA · RAMKRISHNA PARAMHANS SOCIETY, SangliP53100045377· 63.5% built
- NYATI DEFENCE ENCLAVE II1.6 yr overdueNYATI BUILDERS PRIVATE LIMITED · NEAR NYATI WINDCHIMES, PuneP52100048851· 76% built
- JUPITER1.6 yr overdueCHARRUDATTA CHANDRASHEKHAR KKALE · KOTHARI LAY OUT, KACHHIMET, NagpurP50500048042· 90.9% built
- PUSHPAK HEIGHTS1.6 yr overdueJ K ASSOCIATES · VISHNUNAGAR, NAUPADA, ThaneP51700050747· 46.8% built
- DEVIPRABHA VAKRATUND1.6 yr overdueDEVIPRABHA REAL ESTATE · RAMNAGAR, NagpurP50500049031· 55.9% built
- PADMAVATEE VATIKA1.6 yr overdueABHAY MAHENDRA JAIN · NEAR MSEB POWER STATION 80FT MANDVI HIGHWAY RATANGIRI, RatnagiriP52800031497· 75.9% built
- Shrivishwa1.6 yr overdueGowardhan Builders & Developers · Behind Ebrahim & Sons Nachane Raod, Near MSEBE Office Maruti Mandir Ratnagiri, RatnagiriP52800032376· 90.9% built
- SHUBHARAMBH1.6 yr overdueCRYSTAL HOMES BUILDPRO LLP · AMBEGAON PATHAR, PuneP52100015870· filed Dec 2019 → now Dec 2024· 81.8% built
- GVC SAPTAGIRI GREENS II1.6 yr overdueGVC DEVELOPERS · KAUTHA, NandedP51100029308· 81.8% built
- Rachana Nakshatra1.6 yr overdueShree Construction Builders and Developers · Near Rachana Park, AhmednagarP52200046780· 90.9% built
- NEELKANTH DARSHAN1.6 yr overdueSKYTECH INFRA · KAMOTHE, RaigarhP52000034879· 84.5% built
- PRIMA -GLIDE PARK1.6 yr overdueJAGADGURU DEVELOPERS · LOHGAON, PuneP52100031920· 90.9% built
- SAI POOJA1.6 yr overdueSAIRAJ ENTERPRISES · BADLAPUR, ThaneP51700045755· 72.7% built
- Shree Kacharnath CHS Ltd1.6 yr overdueAMOGH ASSOCIATES · Chole Village, ThaneP51700047049· 85.5% built
- Geeta Heights1.6 yr overdueMAYUR GROUP (RD) · Rambaugh, ThaneP51700029333· 90.9% built
- Dipti Royal Arc1.6 yr overdueDipti Associates · Shivaji Park, Mumbai CityP51900034863· 84.1% built
- Vitthal Park1.6 yr overdueRAMESHWAR ASSOCIATES · Samarth nagar, NashikP51600032672· 27.3% built
- SHEEL APARTMENTS BY MAYFAIR1.6 yr overdueMAYFAIR HOUSING PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800031040· 82.7% built
- AARNA HILLS1.6 yr overdueRADHE GOVIND REALTORS · BANER, PuneP52100046166· 81.8% built
- MG Market1.6 yr overdueM.G.DEVELOPERS · Shahapur Road, KolhapurP53000007444· filed Jan 2021 → now Dec 2024· 81.8% built· 1 complaint
- a Familia1.6 yr overdueNidisha Buildcon LLP · Telco Colony Dattanagar, PuneP52100030581· 79.7% built
- Shakambari Business Center1.6 yr overdueS P Builders & Developers · Tapadiya Nagar, AkolaP50100052994· 81.8% built
- Kishor Kunj1.6 yr overdueGPL REALTY · kothrude, PuneP52100046478· 85% built
- ANAND AVENUE1.6 yr overdueDEEPAK PANDURANG MATALE · AMBAD, NashikP51600033614· 59.1% built
- Apoorva Rise1.6 yr overdueApoorva Housing · Chembur, Mumbai SuburbanP51800031714· 97.7% built
- Mokate Heritage1.6 yr overdueMokate Constructions · Kothrud, PuneP52100035155· 90.9% built
- SIDDHIVINAYAK ORCHID1.6 yr overdueSIDDHIVINAYAK BUILDERS & DEVELOPERS · Sadarbazar, SataraP52700030609· 81.8% built
- SATRA ONE1.6 yr overdueBLEU NOIR INFRASTRUCTURE DEVELOPMENT PVT. LTD. · GOREGAON WEST, Mumbai SuburbanP51800032891· 46.2% built· 1 complaint
- DP STAR TRIVENI1.6 yr overdueDP BUILDHOMES LLP · BHANDUP WEST, Mumbai SuburbanP51800004550· filed Dec 2021 → now Dec 2024· 85.5% built
- CENTRO1.6 yr overdueLUSHLIFE REAL ESTATE LLP · Autade Handewadi, PuneP52100014734· filed Sept 2022 → now Dec 2024· 50% built
- ND VILLA1.6 yr overdueND DEVELOPERS · PAKHALE MALA, SataraP52700032140· 72.7% built
- PRANAV HEIGHTS1.6 yr overdueSHRI SADGURU ASSOCIATES · GOLE COLONY, NashikP51600033716· 79.5% built
- Shree Ganesh Apartment1.6 yr overdueSHRI GANESH BUILDER AND DEVELOPERS · Ulhasnagar, ThaneP51700048692· 72.7% built
- STAR CHS LTD1.6 yr overdueHEALTH COLONIES & CONSTRUCTION PVT.LTD. · POWAI, Mumbai SuburbanP51800035098· 23.6% built
- TIRUPATI APPARTMENT1.6 yr overdueSATYEN CHANDRASHEKHAR DADHE · JAITALA, NagpurP50500030132· 73.7% built
- PITRUCHHAYA1.6 yr overdueMAITREE VENTURES · Pune City, PuneP52100030890· 9.1% built
- ARJUN HEIGHTS1.6 yr overdueSHRIRANG DNYANOBA DHODADE · Haveli, PuneP52100002334· filed Dec 2022 → now Dec 2024· 81.8% built· 1 complaint
- LAXMI ARCADE1.6 yr overdueSATISH KASHINATH GUJARATHI · NEAR POST OFFICE SHAHAPUR, ThaneP51700047732· 40% built
- PARVATI NANDAN1.6 yr overdueGANESH BABAN AHER · Pimpri Chinchawad (M Corp.), PuneP52100013305· filed Dec 2020 → now Dec 2024· 90% built
- VRINDAVAN PARK1.6 yr overdueJADHAV CIVIL PROJECT · Junnar, PuneP52100046916· 77.3% built
- MASTER BUSINESS CENTRE1.6 yr overdueMASTER BUSINESS CENTRE · Ambarnath, ThaneP51700055525· 68.2% built
- Anand Chintamani Phase II1.6 yr overdueVIHANG ASHOK SHAH · Vishrambag, SangliP53100030221· 90.9% built
- SHRI LAXMI KUNJ1.6 yr overdueV S BUILDERS & DEVELOPERS · Kolhapur (M Corp.), KolhapurP53000002755· filed Jun 2018 → now Dec 2024· 85% built
- ASHOKA ELLITE1.6 yr overdueJATIN JAIPRAKASH MALVIYA · A. V. G. Layout, Lakadganj, NagpurP50500046414· 31.8% built
- ALAG ASHTAPAD1.6 yr overdueCONTOUR DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800031922· 90.9% built
- MAHALAXMI TOWER1.6 yr overdueMAHALAXMI CONSTRUCTIONS · MANTRI COLONY, SangliP53100049431· 81.8% built
- SHRI RENUKA ASSOCIATES VANSHRI MAMURDI PROJECT1.6 yr overdueSHRI RENUKA ASSOCIATES · NEAR MAVAL GATE HOTEL, PuneP52100013840· filed Oct 2020 → now Dec 2024· 18.2% built
- Shiv ganga Apartment1.6 yr overdueSHREE SWAMI SAMARTH CONSTRUCTION · Ulhasnagar, ThaneP51700047981· 45.5% built
- SHREE LAXMI PRIDE1.6 yr overdueSHREE LAXMI VENTURE PVT LTD · PIPLA BESA, NagpurP50500030899· 92.4% built
- SUNDAR RESIDENCY F WING1.6 yr overdueNAVADITYA DEVELOPERS · GAURIPADA, ThaneP51700030083· 12.5% built
- GRUHYOG1.6 yr overduePRAVINSINH JAYSINGRAO GHATGE · Kolhapur (M Corp.), KolhapurP53000001246· filed Jan 2021 → now Dec 2024· 90.9% built· 1 complaint
- OM SAI HOME-D1.6 yr overdueM/S. INFINI DEVELOPERS · KAMATGHAR, ThaneP51700032786· 90.9% built
- PARTH RENAISSANCE1.6 yr overdueBIRARI INFRATECH · Nashik, NashikP51600029998· 72.7% built
- ANUSAYA NEST1.6 yr overdueRed Brick Habitants · CHOVISAWADI GAOTHAN, PuneP52100047088· 90.9% built
- PRITESH CHAMBERS1.6 yr overduePRALHAD LADU ARONDEKAR · Kumbharli, SindhudurgP52900011467· filed Mar 2019 → now Dec 2024· 90.9% built
- NEELAYA PROJECT 31.6 yr overdueNAIKNAVARE BUILDCON PVTLTD · TALEGAON, PuneP52100030648· 66.4% built
- SHREE GAJANAN HEIGHTS1.6 yr overdueSACHIN DEVELOPERS - - · DHULE, DhuleP49800034502· 81.8% built
- PARK ROYALE1.6 yr overdueMAHAVEER BUILDCON · COLLECTOR BUNGLOW AREA, JalgaonP49900032274· 27.3% built
- VRUKSHVELI1.6 yr overdueFORTUNE DEVELOPERS · SHANTI SHEELA SOCIETY, ERANDWANE, PLOT NUMBER 76/29, PuneP52100030782· 81.8% built
- OMKARA PARK WING B1.6 yr overdueOMKARA BUILDCON · Dhruv Nagar, NashikP51600045585· 81.8% built
- ALAG OLIVE1.6 yr overdueALAG OLIVE LLP · GHATKOPAR EAST, Mumbai SuburbanP51800032510· 89.5% built
- Shri Siddhivinayak Pride1.6 yr overdueShree Siddhivinayak Builders and Developers · Kolhapur (M Corp.), KolhapurP53000010585· filed Jun 2021 → now Dec 2024· 98.1% built
- URBANO1.6 yr overdueNG Rathi Associates · WAGHOLI, PuneP52100006449· filed Dec 2020 → now Dec 2024· 90.9% built· 3 complaints
- CYRSTAL PLAZA1.6 yr overdueMANGESH EKNATH THAKUR · Panvel, RaigarhP52000008712· filed Dec 2018 → now Dec 2024· 40% built· 12 complaints
- RENUKA1.6 yr overdueR K BUILDERS & DEVELOPERS · VASANT NAGAR, NandedP51100034604· 90.9% built
- SHREE KAMAL RESIDENCY1.6 yr overdueSHREE DEVELOPERS · KAMATHWADA, NashikP51600048846· 90.9% built
- RISHABRAJ GARDENIA1.6 yr overdueH RISHABRAJ REALTY · Andheri, Mumbai SuburbanP51800035106· 89.1% built
- RISHABRAJ VILLA STELLA1.6 yr overdueH RISHABRAJ REALTY · Borivali, Mumbai SuburbanP51800034790· 72.7% built
- Shri Residency1.6 yr overdueShri Associate · Kolhe Layout, YavatmalP51000047846· 22.7% built
- FIA CONSTRUCTION COMPANY A/C FIA ENIGMA1.6 yr overdueNIMISH LAXMICHAND PASAD · Palghar, PalgharP99000029742· 90.9% built
- SIDDHI VINAYAK APPARTMENT-21.6 yr overdueSIDDHI VINAYAK ENTERPRISES · DADRA, Dadra & Nagar HaveliP49600000158· 90.9% built
- LOTUS PARK1.6 yr overdueSAJANSING MOTILAL JARWAL · Tisgaon, AurangabadP51500034156· 90.9% built
- AVEN VISTA1.6 yr overdueMSK DEVELOPERS · PATHARDI, NashikP51600030853· 90.9% built
- RENDEZVOUS PREMISES CO-OP SOCIETY LTD1.6 yr overdueJGB BUILDERS LLP (CA to Owner) · Mumbai, Mumbai SuburbanP51800033783· 95.5% built
- BLUE SAPPHIRE1.6 yr overdueMODERN DEVELOPERS · Haveli, PuneP52100045946· 81.8% built
- IMPACT CASA1.6 yr overdueImpact Developers · LOHEGAON, PuneP52100033501· 36.4% built
- The Kings Way - A1, A2 and A31.6 yr overdueThe Kings Way AOP · ghorpadi, PuneP52100003300· filed Jun 2019 → now Dec 2024· 96.8% built· 1 complaint
- Silver Springs1.6 yr overdueMahalaxmi Developers · Kolhapur (M Corp.), KolhapurP53000009173· filed Feb 2019 → now Dec 2024· 90.9% built· 6 complaints
- GAIA CARNIVAL - ROW HOUSES1.6 yr overdueZambad Disha Pride Infrastructure LLP · Gut no. 308, South Republic, Near Sudhakar Nagar, Satara parisar, Aurangabad, AurangabadP51500030703· 90.9% built
- JUNNARE HEIGHTS1.6 yr overdueSAUMYA BUILDCON · GEN VAIDYA NAGAR, DWARKA, NashikP51600031205· filed Apr 2024 → now Dec 2024· 90.9% built
- SHREE SAI TOWERS1.6 yr overdueBRS BUILDERS AND DEVELOPERS · NERAL EAST, RaigarhP52000049335· 90.9% built
- SALEEL161.6 yr overdueGANGOTREE GREENBUILD · Sahakarnagar, PuneP52100029108· 81.8% built
- Rajshree Eleven East1.6 yr overduePanchsheel 1 Upgrade LLP · Kurla, Mumbai SuburbanP51800030117· 85.4% built
- Shree Ram Krupa CHSL1.6 yr overdueJ.B Realty · MCCH Society, RaigarhP52000034989· 90.9% built
- Saujanya Co-operative Housing Society Ltd. Nashik1.6 yr overdueADIRAJ CONSTRUCTION · NEAR KBT COLLEGE, NashikP51600047395· 90.9% built
- ARRPAN VIHAR1.6 yr overdueANANDA DEVELOPERS · HIRAWADI, NashikP51600031424· 90.9% built
- URBAN NEST BLDG - 11.6 yr overdueCLLARO ENTERPRISES LLP · BEVERLY PARK MIRA ROAD EAST, ThaneP51700046736· 90.9% built
- PLATINUM PARK1.6 yr overdueshreeji Developers · Andheri, Mumbai SuburbanP51800008722· filed Jun 2021 → now Dec 2024· 85.9% built· 22 complaints
- AMC AVENUE1.6 yr overdueKAMDHENU SPACES LLP · PUNE, PuneP52100033404· 81.8% built
- JOSEPH VILLA1.6 yr overdueK.PATELAND CO · GOREGAON EAST, Mumbai SuburbanP51800045891· 72.7% built
- SAI PRAKASH HEIGHTS1.6 yr overdueJAIN BUILDCON · GURUDATTA COLONY NEAR SHREE KRUSHNA COLONY, JalgaonP49900050466· 81.8% built
- SWAPNSHILP PLAZA1.6 yr overdueSHAHEEN MANSOOR BIJALI · NEAR VEERSHAIV BANK, KolhapurP53000033062· 50.9% built
- MMC Dwaraka1.6 yr overdueV R Kulkarni & Associates · Parwati, PuneP52100048861· 90.9% built
- KAUSHALYA HEIGHTS1.6 yr overdueMAULI DEVELOPERS · MAKHMALABAD, NashikP51600047905· 81.8% built
- Success Windsor Tower1.6 yr overdueSUCCESS INFRA · Haveli, PuneP52100029582· 90.9% built
- Sukruti Serenity1.6 yr overdueArihant Developers · Near Mehrun Lake, Mehrun Shivar, JalgaonP49900032651· 60% built
- BUILDARCH DAISY1.6 yr overdueBUILDARCH LAND DEVLOPERS PVT. LTD. · DADAR SHIVAJI PARK, Mumbai CityP51900030673· 81.8% built
- ADVENT NEEL1.6 yr overdueREGENT ASSOCIATES · Andheri, Mumbai SuburbanP51800032332· 78.9% built
- EKAANT1.6 yr overdueSAKET DILIP SHAH · PARVATI (SAHAKARNAGAR), PuneP52100033340· filed Aug 2023 → now Dec 2024· 90.9% built
- SHREE ADINATH PALACE1.6 yr overduePREM TOPANDAS JHAMNANI · TULSINAGAR, NagpurP50500032973· 90.9% built
- ELITE1.6 yr overdueSHRUSHTI DEVELOPERS · TEMBHODE, PalgharP99000035038· 90.9% built
- SIDDHIVINAYAK RESIDENCY1.6 yr overdueSAIRAJ DEVELOPERS · BADLAPUR, ThaneP51700033059· 72.7% built
- Shreeram Vaishali1.6 yr overdueADITYA REALTORS · Dombivali East, ThaneP51700032988· 60% built
- Krishna Kunj Phase IV1.6 yr overdueKrishna developr · Bypass Road, JalnaP51400050223· 63.6% built
- Sharda Heights1.6 yr overdueSWANAND REALTIES · near paithan gate, AurangabadP51500046206· 90.9% built
- HS ALAG1.6 yr overdueHS ALAG REALTY LLP · Kurla, Mumbai SuburbanP51800031693· 90.9% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.