RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 50 of 61
- YashONE Wakad Central1.9 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100020910· 95.2% built
- PEARL OASIS1.9 yr overdueBAHIST ENTERPRISES PVT LTD · PATHANWADI, Mumbai SuburbanP51800016403· 79.5% built
- SHRI SAMARTH KRUPA APARTMENT1.9 yr overdueSHRINIWAS CONSTRUCTION · DHRUVA NAGAR, NashikP51600016723· 90.9% built
- AKSHAR RIVERGATE - PLOT F1.9 yr overdueEMPERIA REALTY · Panvel, RaigarhP52000014488· 90.9% built
- DAULAT GARDENS1.9 yr overdueAhura Construction JV · Palghar, PalgharP99000001241· 79.8% built
- Ornate Kallisto Phase II1.9 yr overdueOrnate Buildcon Developers · Temghar, ThaneP51700018908· 90.9% built· 1 complaint
- DEEP HEIGHTS1.9 yr overdueSUPER STAR DEVELOPERS · Vasai, PalgharP99000020604· 90.9% built
- Aero East PH II1.9 yr overdueM/S MIRACLE GURUKRUPA DEVELOPERS · Undri, PuneP52100018765· 81.8% built
- ARIHANT AAROHI PHASE II1.9 yr overdueARIHANT SUPERSTRUCTURES LIMITED · VILLAGE PADLE, ThaneP51700015328· 90.5% built· 5 complaints
- Hubtown Harmony A Wing1.9 yr overdueHeet Builders Private Limited · Matunga East, Mumbai CityP51900017558· 81.8% built
- NOORI HEIGHT1.9 yr overdueFAROOQUE KHAN SHAMSHER KHAN PATHAN · CHUNCHALE, NashikP51600023651· 90.9% built
- GANGA SERIO E F BUILDING1.9 yr overdueGOEL GANGA LANDMARKS LLP · KHARADI, PuneP52100023713· 90.9% built· 3 complaints
- DHANLAXMI ICON1.9 yr overdueHARI OM DEVELOPERS · Haveli, PuneP52100018523· 35.9% built
- PRABHAT VANDAN APARTMENT1.9 yr overduePrabhat Developers · BEHIND DREAM CASTLE PANCHVATI, NashikP51600020991· 90.9% built
- REVANTA1.9 yr overdueSIDDHESH PADMAMBA BUILDERS & DEVELOPERS · Mali colony Takala, KolhapurP53000014790· 90.9% built
- OSTWAL WOODS1.9 yr overdueSHREE OSTWAL BUILDERS LTD · OPP. UNION PARK, PalgharP99000019832· 48.2% built
- MY WORLD BUILDING B1-B2-B31.9 yr overdueSIMAR PRIDE VENTURES LLP · CHIKALTHANA, AurangabadP51500015772· 31.8% built
- Kalpataru Exquisite - Wing 11.9 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100000298· 55.9% built· 1 complaint
- Mangeshi Jupiter1.9 yr overdueMangesh Dashrath Gaikar · Ambivali, ThaneP51700024517· 23.2% built
- MHADA - Yashwin Encore1.9 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Opposite Sayaji Hotel, PuneP52100020924· 90.9% built
- Hotel1.9 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000928· filed Dec 2020 → now Dec 2024· 90.9% built
- MARATHON NEXZONE ATRIA -21.9 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000495· 72.7% built· 3 complaints
- Parksyde Business Avenue1.9 yr overdueJaikumar real estates pvt. ltd. · Pathardi, NashikP51600010594· 90.9% built
- Kalpataru Jade Residences B1.9 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000926· 79.2% built· 3 complaints
- SWASTIK PEARL1.9 yr overdueSUVASYA BUILDERS AND DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800024910· 75.5% built
- GANGA LEGEND A3 AND B3..1.9 yr overdueLegends County Landmark Pvt Ltd · Bavdhan, PuneP52100000255· 73.8% built· 10 complaints
- Supreme Headquarter Bandra1.9 yr overdueSupreme Heights LLP · Near Link Square Mall, Mumbai SuburbanP51800025298· 90% built
- SHREE HARI DARSHAN BUILDING NO 71.9 yr overdueSHUBHAM ENTERPRISES · Thane, ThaneP51700010725· 27.3% built
- NAMAN RESIDENCY1.9 yr overdueShreemangal Infra · DHANSAR, RaigarhP52000019071· 49.3% built
- SAIKRUPA CHSL1.9 yr overdueC H PATIL AND SONS LLP · Near Eksar Talao, Mumbai SuburbanP51800011410· 69.5% built
- ATHARVA VISHWA1.9 yr overdueSIDDHIVINAYAK BUILDTECH · PANCHAVATI ANNEX, NashikP51600021240· 97.7% built
- iOS Tathawade1.9 yr overdueLinux Group · Tathawade, PuneP52100027952· filed Jul 2024 → now Dec 2024· 95.5% built· 58 complaints
- Forest Trails Highland Tower 9, 10 and 111.9 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LIMITED · Bhugaon, PuneP52100000067· filed Dec 2022 → now Dec 2024· 95.5% built· 14 complaints
- Palaj Heights1.9 yr overduePalaj Buildcon · Nashik, NashikP51600025799· 81.8% built
- KOHINOOR CORAL1.9 yr overdueYELLOWSTONE SKYSCRAPERS LLP · VILLAGE BHOIRWADI, TAL MULSHI, PuneP52100021279· 99.8% built
- MANTRA MAGIC PHASE 61.9 yr overdueMANTRA ISLAND HOMES CHIMBLI PRIVATE LIMITED · Chimbali, PuneP52100024209· 0% built
- Tirupati Regalia Phase-21.9 yr overdueVenkatesh Constructions · DhanoriP52100022720· 77.3% built
- Mulund Om CHS Ltd1.9 yr overdueSUNRISE HOUSING · Nahur Village Mulund - West, Mumbai SuburbanP51800022406· 81.8% built
- SPLENDID HOMES1.9 yr overdueSAGAR SHANTILALJI BHATEWARA · BANER PUNE, PuneP52100033350· filed Dec 2023 → now Dec 2024· 80% built
- GAJANAN LEELA -VI1.9 yr overdueKAPITAL HOMES · WARDHA, WardhaP50400025374· 78.2% built
- TATHAASTU1.9 yr overdueS S CONSTRUCTIONS · KAMATHWADE, NashikP51600030164· filed Dec 2023 → now Dec 2024· 52.7% built
- Intelligentia Spectrum Thane by Haware Properties1.9 yr overdueHaware Housing · Ghodbunder road, Thane, ThaneP51700019952· 63.6% built· 2 complaints
- DAGA PLAZZO1.9 yr overdueKAMLESH LAXMINARAYAN DAGA · OLD BIYANI SQUARE ,OPP. D MART, AmravatiP50300023098· 18.2% built
- Taj Regency1.9 yr overdueLOOKWELL LIFESPACE PVT LTD · Panvel, RaigarhP52000019142· 92.1% built
- Kalpataru Exquisite - Wing D1.9 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100016932· 72.5% built· 4 complaints
- GOODWILL BREEZA PHASE 11.9 yr overdueCHOICE REALTORS · Madhav nagarP52100020307· 98.6% built
- PARADISE MEADOWS1.9 yr overdueCREATIVE CONSTRUCTIONS · ROYAL COLONY, NashikP51600022204· 81.8% built
- Aishwaryam Hamara Abhimaan1.9 yr overdueSAI ESSEN DEVELOPERS · Moshi, PuneP52100020889· 9.1% built
- VRINDAVAN1.9 yr overdueSOHAIL ISAQUE (ISAK) BAGWAN AND ISAQUE(ISAK) IBRAHIM BAGWAN · Jalochi, PuneP52100010752· 70.5% built
- PRISTINE GREENS PHASE III1.9 yr overduePRISTINE PROPERTIES · PUNE, PuneP52100024045· 98.2% built· 2 complaints
- MEMORIES 90 - PHASE II1.9 yr overdueM/s NAMO DEVELOPERS · MOHAMMADWADI, PuneP52100020409· 66.8% built
- NISHCHAY - WING E1.9 yr overdueSHREERAJ DEVELOPER LLP · REVENUE MAJUE DAHISAR, Mumbai SuburbanP51800015985· 89.5% built
- TIRUMALA HILL APPARTMENT1.9 yr overdueMUKUND GOVINDRAO KULKARNI · GARKHEDA, AurangabadP51500022166· 77.8% built
- Solus1.9 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000193· 90.9% built
- Piramal Aranya - Wing A1.9 yr overdueGlider Buildcon Realtors Private Limited · Mumbai City, Mumbai CityP51900003324· 90.9% built· 11 complaints
- MARATHON NEXZONE ION -21.9 yr overdueSANVO RESORTS PVT. LTD. · PALASPE PHATA, RaigarhP52000000664· 72.7% built· 1 complaint
- Madhuvan 4 76B1.9 yr overdueMagarpatta City Development Co. Pvt. Ltd. · Mohammadwadi, PuneP52100025447· 9% built
- Legacy Aeon1.9 yr overdueLegacy Homes · Near Kalyan Bhel, PuneP52100020258· 77.3% built
- Imperial Heritage - B,C Wing1.9 yr overdueShree Ganesh Ventures · Vasai, PalgharP99000020908· 90.9% built
- Puneet Sanjivani Phase 1 Floor 0 to Floor 161.9 yr overduePuneet Developers · Kurla, Mumbai SuburbanP51800015397· 90.9% built
- Pyramid Axis1.9 yr overduePyramid Prasad Buildcon LLP · main Baner Road, PuneP52100021464· 99.1% built
- SAI ANAND1.9 yr overdueSHREENATHJI LIFE SPACES · BIBWEWADI, PuneP52100035202· filed Dec 2023 → now Dec 2024· 90.9% built
- PEBBLES II F BUILDING1.9 yr overdueAbhinav Rainbow Developers & Promoters LLP · Bavadhan BK, PuneP52100000730· 81.8% built
- SPAN SIGNATURE1.9 yr overdueANNAPURNA BUILDCON INFRA PVT LTD · Mira-Bhayandar (M Corp.), ThaneP51700011940· 81.8% built
- Kalpataru Jade Residences E1.9 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100001392· 73.5% built
- Vedant Imperial Bunglow 1 To 8 Phase 21.9 yr overdueMOHAN HARDASMAL THARWANI · Badlapur (M Cl), ThaneP51700007492· 48.5% built
- Kalpataru Jade Residences C1.9 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000676· 80.5% built· 5 complaints
- NISHCHAY WING F1.9 yr overdueSHREERAJ DEVELOPER LLP · Borivali, Mumbai SuburbanP51800009954· 87.7% built· 1 complaint
- Godrej RKS1.9 yr overdueGodrej Projects Development Limited · Chembur, Mumbai SuburbanP51800023915· 78.4% built· 8 complaints
- Ashanand Residency F Buidling1.9 yr overdueAnand Deoram Tambe · Khed, PuneP52100019921· 72.7% built
- CHARISHMA1.9 yr overdueM/S KREATIVE DEVELOPERS · D'SOUZA COLONY, NashikP51600030574· 25% built
- GURUCHHAYA APARTMENT1.9 yr overdueUNIQUE BUILDERS · JALAN NAGAR, AurangabadP51500049582· 90.9% built
- Megapolis Saffron - Shops1.9 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100034988· filed Dec 2023 → now Dec 2024· 70.6% built
- PLATINUM TOWERS A WING1.9 yr overdueNISAR AHMED MOHARRAM ALI KHAN · NASHIK, NashikP51600023722· 23.8% built
- Sorrento1.9 yr overdueHGP Community Pvt. Ltd. · Kurla, Mumbai SuburbanP51800021706· 90.9% built
- Pranav Corner1.9 yr overduePranav Builders · Tuljainagar, SangliP53100047076· 64.5% built
- Sea Palace1.9 yr overdueSanjeev Vasant Divekar · Thane, ThaneP51700005875· filed Dec 2018 → now Dec 2024· 54.5% built· 10 complaints
- LA PRENDA1.9 yr overdueD M LIFESPACES · Andheri, Mumbai SuburbanP51800022314· 88.6% built
- NEST LEAF1.9 yr overdueNEST INFRA · TEMBODE, PalgharP99000011341· 81.8% built· 1 complaint
- Kalpataru Jade Residences F1.9 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100000869· 79.9% built· 4 complaints
- L AND T SEAWOODS RESIDENCES - NORTH TOWERS1.9 yr overdueL&T SEAWOODS LIMITED · L&T Seawoods, ThaneP51700026653· 71.8% built· 2 complaints
- ACE AURUM III TOWER 061.9 yr overdueJHAMTANI REALTY PRIVATE LIMITED · RAVET, PuneP52100025056· 50.2% built
- Swapnapurti Sankul1.9 yr overdueGirijatmaj Developers · Khandala, SataraP52700002291· 83.7% built
- Vaikunth Cluster 21.9 yr overduePEPL Developers Pvt Ltd · Thane, ThaneP51700003793· 90.9% built· 9 complaints
- Goodwill Crescent1.9 yr overdueChoice Lifestyle · Keshav Nagar, PuneP52100022861· 90.8% built
- AUDERY AVENUE1.9 yr overdueMENEZES DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000013842· filed Dec 2018 → now Dec 2024· 81.4% built
- W-BIZ1.9 yr overdueAdi Siddhashila Associates · Wakad, PuneP52100024521· 53.9% built
- KAILASH TOWER1.9 yr overdueKAILASH DEVELOPERS · VASAI, PalgharP99000008452· filed Dec 2019 → now Dec 2024· 90.9% built· 5 complaints
- Hubtown Seasons - Daintree1.9 yr overdueJoynest Premises Private Limited · Kurla, Mumbai SuburbanP51800002373· 81.8% built· 7 complaints
- AKSHAY GALAXY - BUILDING B1.9 yr overdueA. P. BHANDARI DEVELOPERS · Yewalewadi, PuneP52100028684· 61.8% built
- RADHE KRISHNA RESIDENCY1.9 yr overdueMANGALAM INFRA · Dawale, ThaneP51700022023· 90.9% built
- Tranquility Annexe A and B Wing Phase 11.9 yr overdueK AND B ASSOCIATES · Manjri Stud Farm, PuneP52100019051· 90.9% built
- VJ Grand Central1.9 yr overdueVilas Javdekar Eco Shelters Private Limited · Wakad, PuneP52100026304· 89.5% built· 1 complaint
- Rituworld Phase III M and N1.9 yr overdueMOHAN HARDASMAL THARWANI · badlapur, ThaneP51700006857· 90.9% built
- ROHAN ANAND PHASE I1.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · Somatane, PuneP52100023186· 90.6% built· 1 complaint
- PHOENIX RESIDENCY1.9 yr overduePHOENIX INFRASPACE · Porwal Park, PuneP52100034724· filed Dec 2023 → now Dec 2024· 68.2% built
- Yashwin SukhNiwas1.9 yr overdueGROWISA ADVISORS · Hinjawadi, PuneP52100025982· 90.1% built
- Siddheshwar Residency 21.9 yr overdueSIDDHIVINAYAK ASSOCIATES · Taloja Majkur, RaigarhP52000023608· 74% built
- Shree Ganesh Heights1.9 yr overdueShree Ganesh Developers · Haveli, PuneP52100051487· filed Dec 2023 → now Dec 2024· 90.9% built
- Kalpataru Jade Residences G1.9 yr overdueAstrum Developments Private Limited · Haveli, PuneP52100018194· 78.5% built
- BAFNA CENTRUM PHASE-11.9 yr overdueSUN REALTORS · Palghar West, PalgharP99000018461· 90.9% built
- PRACHI RESIDENCY1.9 yr overduePRACHI DEVELOPERS · NR SHINDE ALI RICKSHAW STAND SHIRGAON, ThaneP51700018459· 90.9% built
- GOVIND ENCLAVE1.9 yr overdueCONCRETE DEVELOPERS · DABHA, NAGPUR, NagpurP50500024602· 87.8% built
- HIGHLAND HAVEN BUILDING 7G MIST-A PHASE 61.9 yr overdueSIDDHI KRISH DEVELOPERS · Thane, ThaneP51700004403· 52.3% built
- MY WORLD BUILDING B4-B5-B61.9 yr overdueSIMAR PRIDE VENTURES LLP · CHIKALTHANA, AurangabadP51500015814· 47.7% built
- Kalpataru Radiance B1.9 yr overdueKeyana Estate LLP · Borivali, Mumbai SuburbanP51800000810· filed Jun 2022 → now Dec 2024· 95.5% built· 33 complaints
- SIDDHIVINAYAK RIDDHIMA1.9 yr overdueSIDDHIVINAYAK HOMES · Koynavele, RaigarhP52000018157· 89.1% built
- INDRAYANI APT AND GANDHARI APT1.9 yr overdueSUPRIYA SUYASH PASTE · Veral, RatnagiriP52800014515· 56.3% built
- Mahindra Happinest Kalyan Project A1.9 yr overdueMAHINDRA HAPPINEST DEVELOPERS LIMITED(Formerly known as Mahindra Happinest Developers Pvt. LTD) · Bhiwandi Kalyan Junction, ThaneP51700022981· 81.8% built· 4 complaints
- Kalpataru Exquisite - Wing 31.9 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100018100· 90.3% built
- Hubtown Seasons - Ecuador Cloud1.9 yr overdueJoynest Premises Private Limited · Chembur East, Mumbai SuburbanP51800004432· 81.8% built
- HariRaaj Luxuria1.9 yr overdueRAAJ BUILDTECH · JAWAHAR COLONY, AurangabadP51500024158· 90.9% built
- RANGAI RESIDENCY1.9 yr overdueRAJRATNA PROMOTORS AND BUILDERS · BHOSARI, PuneP52100013661· filed Dec 2022 → now Dec 2024· 90.9% built
- PANAMA PARK1.9 yr overdueThe Kallyaanee Fortune Properties · Lohgaon, PuneP52100020820· 13.6% built
- Neelkanth Jyot CHS LTD.1.9 yr overdueSchemaatics · Ghatkopar, Mumbai SuburbanP51800022558· 41.4% built
- SUKHWANI ASPIRE1.9 yr overdueBasant - Sukhwani · Kiwale, PuneP52100030795· 82.3% built
- SAKAR PLAZA1.9 yr overdueMUKTABEN PURUSHOTTAM NARODIA · ADGAON, NashikP51600022457· 81.8% built
- SHIVRAM RESIDENCY1.9 yr overdueMAHESHWAR ENTERPRISES · PATHARDI NASHIK, NashikP51600049208· 90.9% built
- KUMAR SELENA A BUILDING1.9 yr overdueKumar Construction and Properties Pvt Ltd · PASHAN, PuneP52100023773· 63.6% built
- BLUE STAR RESIDENCY1.9 yr overdueTAMANNA BUILDERS & DEVELOPERS · SAWARDE, RatnagiriP52800021449· 37.3% built
- Solitaire C1.9 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000413· 90.9% built
- Jaliyan Heights Goregaon1.9 yr overdueJaliyan Developer · Goregaon East, Mumbai SuburbanP51800012880· filed Dec 2022 → now Dec 2024· 84.5% built· 2 complaints
- MANGALMURTI RESIDENCY1.9 yr overdueSHREE GANESH DEVELOPERS ·P52100003225· 99.1% built
- CELESTIAL1.9 yr overdueSU SHARDA EDIFICE LLP · Kurla, Mumbai SuburbanP51800001768· 99.7% built· 3 complaints
- GHANSHYAM ENCLAVE-GREEN MEADOWS-E WING1.9 yr overdueGHANSHYAM ENTERPRISES · BHABHOLA BANGLI ROAD, PalgharP99000003723· 90.9% built
- PRASUN SARVAM1.9 yr overduePrasun Associates · KharadiP52100021383· 18.5% built
- MANSAROVAR RESIDENCY D WING1.9 yr overdueKIRAN REALTY · Thane, ThaneP51700006054· 59.5% built
- GEMINI HEIGHTS III APARTMENT1.9 yr overdueVIKAS SHRIDATTA GEMINI · PATHARDI SHIWAR NR ANJANA LAWNS, NashikP51600023806· 90.9% built
- GODREJ NIRVAAN1.9 yr overduePRAKHHYAT DWELLINGS LLP · Bhadvad & Tembhgar, ThaneP51700022148· 74.4% built· 3 complaints
- Madhuvan 5 76C1.9 yr overdueMagarpatta City Development Co. Pvt. Ltd. · Mohammadwadi, PuneP52100025506· 18.9% built
- GANGA GLITZ G UNDRI PUNE1.9 yr overdueLegends County Landmark Pvt Ltd · UNDRI, PuneP52100024304· 81.8% built
- VaastuvivaE1.9 yr overdueB U BHANDARI VAASTU · Bhumkar Chowk, PuneP52100004510· 90.9% built
- SHUBHAM AURA1.9 yr overdueAVVAD REALTTY LLP · Kurla, Mumbai SuburbanP51800021965· 90.9% built
- NIRVANA ECO HOMES1.9 yr overdueBALAJI CONSTRUCTION CO. · PALGHAR, PalgharP99000015865· 22.7% built
- VASUNDHARA HEIGHTS1.9 yr overdueVASUNDHARA MRK PROPERTIES PVT LTD · MULUND WEST, Mumbai SuburbanP51800019256· 90.9% built
- Hirals Breeze1.9 yr overdueMangaldeep Associates & Developers · Rahatani, PuneP52100029974· filed Dec 2023 → now Dec 2024· 72.7% built
- Rohini1.9 yr overdueThilayaparambil Kumaran Joshi · Thane, ThaneP51700013602· filed Jun 2021 → now Dec 2024· 90.9% built
- AARADHYA EASTWIND1.9 yr overdueMICL DEVELOPERS LLP · Kurla, Mumbai SuburbanP51800020183· 90.9% built
- KANCHAN GEET1.9 yr overdueRaghukul Constructions Private Limited · SHIVAJI NAGAR, NagpurP50500018334· 77.7% built
- Royal Empire1.9 yr overdueSAI POOJA CONSTRUCTIONS · BADLAPUR, ThaneP51700019929· 89.5% built
- Solitaire B1.9 yr overdueROMA BUILDERS PRIVATE LIMITED · Thane, ThaneP51700000197· 90.9% built
- SAI BLISS1.9 yr overdueRAJ ENTERPRISES · KAMOTHE, RaigarhP52000034839· 90.9% built
- Building Wing A Phase I Sudarshan Apartment Karve Nagar Pune1.9 yr overdueAnubhavshri Realty Pvt. Ltd. · Village Hingne Budruk, PuneP52100023468· 61.8% built
- SARA PARIVARTAN-AMENITY BUILDING-A1.9 yr overdueSARA PROPERTIES · SARA PARIVARTAN, AurangabadP51500034773· 51.8% built
- Jindal Avenue1.9 yr overdueJindal Builders and Developers · PANVEL, RaigarhP52000031962· 81.8% built
- PARVATI NANDAN1.9 yr overdueGANESH BABAN AHER · Pimpri Chinchawad (M Corp.), PuneP52100013305· filed Dec 2020 → now Dec 2024· 90% built
- Rachana Nakshatra1.9 yr overdueShree Construction Builders and Developers · Near Rachana Park, AhmednagarP52200046780· 90.9% built
- RAVEERA1.9 yr overdueINFINITY LANDMARKS · PIMPLE NILAKH, PuneP52100032611· 62.3% built
- SAI POOJA1.9 yr overdueSAIRAJ ENTERPRISES · BADLAPUR, ThaneP51700045755· 72.7% built
- MMC Dwaraka1.9 yr overdueV R Kulkarni & Associates · Parwati, PuneP52100048861· 90.9% built
- Kumar Samruddhi A6 and A7 Building1.9 yr overdueVed Real Estate Developers Pvt Ltd · Sidheshwar NagarP52100030526· 38.6% built· 1 complaint
- NEELKANTH RESIDENCY PHASE - II1.9 yr overdueSHIVSHAKTI ASSOCIATES · CHIKHALI, PuneP52100033196· 88.2% built
- MONSOON MIST1.9 yr overdueNITIN DAYALAL KOTHARI · Igatpuri, NashikP51600019135· filed Mar 2020 → now Dec 2024· 81.8% built
- ALAG ARANYA1.9 yr overdueALAG AARCHIE LLP · Panth Nagar, Mumbai SuburbanP51800032034· 90.9% built
- Shree Kacharnath CHS Ltd1.9 yr overdueAMOGH ASSOCIATES · Chole Village, ThaneP51700047049· 85.5% built
- SHARAWATI APARTMENTS1.9 yr overdueRANADE REALTORS LLP · KOTHRUD, PuneP52100030474· 81.8% built
- Shri Residency1.9 yr overdueShri Associate · Kolhe Layout, YavatmalP51000047846· 22.7% built
- JUNNARE HEIGHTS1.9 yr overdueSAUMYA BUILDCON · GEN VAIDYA NAGAR, DWARKA, NashikP51600031205· filed Apr 2024 → now Dec 2024· 90.9% built
- PUSHPAK HEIGHTS1.9 yr overdueJ K ASSOCIATES · VISHNUNAGAR, NAUPADA, ThaneP51700050747· 46.8% built
- ELITE1.9 yr overdueSHRUSHTI DEVELOPERS · TEMBHODE, PalgharP99000035038· 90.9% built
- SIDDHIVINAYAK ORCHID1.9 yr overdueSIDDHIVINAYAK BUILDERS & DEVELOPERS · Sadarbazar, SataraP52700030609· 81.8% built
- Rajshree Eleven East1.9 yr overduePanchsheel 1 Upgrade LLP · Kurla, Mumbai SuburbanP51800030117· 85.4% built
- ALAG OLIVE1.9 yr overdueALAG OLIVE LLP · GHATKOPAR EAST, Mumbai SuburbanP51800032510· 89.5% built
- NIRMAN KANCHANGANGA1.9 yr overdueNIRMAN BUILDERS · PARVATI, PuneP52100030471· 90.9% built
- MATRUCHHAYA1.9 yr overdueM/s. Rishabraj Balaji Infra · BORIVALI EAST, Mumbai SuburbanP51800034195· 0% built· 1 complaint
- KARMA PALACE1.9 yr overdueSHREE SAI DEVELOPERS · TEMBHODE, PalgharP99000031586· 90.9% built
- PLATINUM PARK1.9 yr overdueshreeji Developers · Andheri, Mumbai SuburbanP51800008722· filed Jun 2021 → now Dec 2024· 85.9% built· 22 complaints
- VENKATESH VIOM1.9 yr overdueSHREE VENKATESH DEVELOPERS · BHUSARI COLONY, PuneP52100030481· 90.9% built
- LAXMI ARCADE1.9 yr overdueSATISH KASHINATH GUJARATHI · NEAR POST OFFICE SHAHAPUR, ThaneP51700047732· 40% built
- JOSEPH VILLA1.9 yr overdueK.PATELAND CO · GOREGAON EAST, Mumbai SuburbanP51800045891· 72.7% built
- Kishor Kunj1.9 yr overdueGPL REALTY · kothrude, PuneP52100046478· 85% built
- MITRAKUNJ1.9 yr overdueKishor B Sancheti · Parvati, PuneP52100049348· 72.7% built
- AVEN VISTA1.9 yr overdueMSK DEVELOPERS · PATHARDI, NashikP51600030853· 90.9% built
- RBI Employees Awantika Co Op Hsg Soc Ltd1.9 yr overdueGOVIND OJASS EDIFICE PVT. LTD. · Naupada, ThaneP51700048962· 72.7% built
- URBANO1.9 yr overdueNG Rathi Associates · WAGHOLI, PuneP52100006449· filed Dec 2020 → now Dec 2024· 90.9% built· 3 complaints
- PADMAVATEE VATIKA1.9 yr overdueABHAY MAHENDRA JAIN · NEAR MSEB POWER STATION 80FT MANDVI HIGHWAY RATANGIRI, RatnagiriP52800031497· 75.9% built
- IMPACT CASA1.9 yr overdueImpact Developers · LOHEGAON, PuneP52100033501· 36.4% built
- NILKANTH DHAM1.9 yr overdueNILKANTH INFRA · MAKHAMALABAD, NashikP51600030816· 90.9% built
- GAMI SOLITAIRE1.9 yr overdueANIL LAXMAN GAMI · KOPARKHAIRANE, ThaneP51700045909· 9.1% built
- Saujanya Co-operative Housing Society Ltd. Nashik1.9 yr overdueADIRAJ CONSTRUCTION · NEAR KBT COLLEGE, NashikP51600047395· 90.9% built
- BORIVALI SHALIMAR CO-OPERATIVE HOUSING SOCIETY LIMITED1.9 yr overdueTASMAI SHREE · Borivali, Mumbai SuburbanP51800045551· 90.9% built
- Anand Chintamani Phase II1.9 yr overdueVIHANG ASHOK SHAH · Vishrambag, SangliP53100030221· 90.9% built
- RAJGRUHI RESIDENCY TOWER D1.9 yr overdueAtria Constructions · KONDHWA BUDRUK, SHATRUNJAY MADIR ROAD, PuneP52100034436· 81.8% built· 5 complaints
- PRIMA -GLIDE PARK1.9 yr overdueJAGADGURU DEVELOPERS · LOHGAON, PuneP52100031920· 90.9% built
- ROHIT CO-OP HOUSING SOCIETY LTD1.9 yr overdueVEDANT CONSTRUCTION · Panchpakhadi, ThaneP51700045536· 89.1% built
- Grande View 7 Capital1.9 yr overdueChirag Developers · Ambegaon Budruk, PuneP52100001308· filed Dec 2018 → now Dec 2024· 90.9% built
- RENUKA1.9 yr overdueR K BUILDERS & DEVELOPERS · VASANT NAGAR, NandedP51100034604· 90.9% built
- Aditi Sadan CHSL1.9 yr overdueKelkar Pinnac Housing LLP · Sanewadi Aundh, PuneP52100045268· 81.8% built
- EKAANT1.9 yr overdueSAKET DILIP SHAH · PARVATI (SAHAKARNAGAR), PuneP52100033340· filed Aug 2023 → now Dec 2024· 90.9% built
- MG Market1.9 yr overdueM.G.DEVELOPERS · Shahapur Road, KolhapurP53000007444· filed Jan 2021 → now Dec 2024· 81.8% built· 1 complaint
- NANDANVAN1.9 yr overduePRIDE REALTY · KIRKATWADI, PuneP52100032704· 90.9% built
- SHUBHARAMBH1.9 yr overdueCRYSTAL HOMES BUILDPRO LLP · AMBEGAON PATHAR, PuneP52100015870· filed Dec 2019 → now Dec 2024· 81.8% built
- PITRUCHHAYA1.9 yr overdueMAITREE VENTURES · Pune City, PuneP52100030890· 9.1% built
- OM DATTATRAY CHS LTD1.9 yr overdueSHIV SHAKTI DEVELOPERS · SHIV GANGA NAGAR, ThaneP51700048053· 72.7% built
- SATRA ONE1.9 yr overdueBLEU NOIR INFRASTRUCTURE DEVELOPMENT PVT. LTD. · GOREGAON WEST, Mumbai SuburbanP51800032891· 46.2% built· 1 complaint
- Vitthal Park1.9 yr overdueRAMESHWAR ASSOCIATES · Samarth nagar, NashikP51600032672· 27.3% built
- Kalp Avenue1.9 yr overdueSuccess Aashirwad Infra · Moshi, PuneP52100029616· 50.9% built
- C D GURUDEV1.9 yr overdueCHETAN HARISHCHANDRA DESAI · VIRAR, PalgharP99000029320· 73.6% built
- ASHOKA ELLITE1.9 yr overdueJATIN JAIPRAKASH MALVIYA · A. V. G. Layout, Lakadganj, NagpurP50500046414· 31.8% built
- PUSHP-VATIKA1.9 yr overdueANISH SHAH & MANISH SHAH · Andheri, Mumbai SuburbanP51800031796· 85% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.