RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 49 of 61
- HARSH AVENUE2.2 yr overdueSHREE SWAMI BUILDCON · PANCHAK, NashikP51600048030· 38.6% built
- OM TRIMURTI2.2 yr overdueJE AND VEE INFRASTRUCTURE · OPP OBEROI MALL, Mumbai SuburbanP51800020394· filed Dec 2023 → now Aug 2024· 85.5% built· 1 complaint
- 52 PARK AVENUE2.2 yr overdueDAN KUTIR CHSL · Andheri, Mumbai SuburbanP51800032136· 90.9% built
- Supreme Elenor2.2 yr overdueSupreme Mega Constructions LLP · Kurla, Mumbai SuburbanP51800030270· 70.9% built
- RISHABRAJ RAMESHWAR2.2 yr overdueH RISHABRAJ REALTY · Borivali, Mumbai SuburbanP51800030723· 90.9% built
- SHIVAJI SANKUL42.2 yr overdueSUBHASH DEVIDAS BHARSAKALE · AMRAVATI, AmravatiP50300010756· 26.5% built
- Legacy Celestia2.2 yr overdueLegacy Lifespaces LLP · Wakad, PuneP52100030612· 90.9% built
- SIDDHIVINAYAK2.2 yr overdueSAACHI DEVELOPERS · KUPWAD, SangliP53100047420· filed Jul 2024 → now Sept 2024· 81.8% built
- OM RESIDENCY2.2 yr overdueOM CONSTRUCTION · NEAR VINAYAK PLAZA, CHURCH ROAD, KolhapurP53000045425· 90.9% built
- Nakshatra2.2 yr overdueANGAL & CO · Nimhan Mala, PuneP52100019074· 90.9% built· 5 complaints
- AADIGURU APARTMENT2.1 yr overdueRAJENDRA BUILDERS and DEVELOPERS · MAUJE GANGAPUR SHIWAR DHRUVA NAGAR NR MOTIWALA MEDICAL COLLEGE NASHIK, NashikP51600028773· 90.9% built
- SHIVSHAKTI HEIGHTS2.1 yr overdueNEHA BHAVANI DUBEY · ADGAON SHIWAR, NashikP51600031897· 90.9% built
- Earth Darshan2.1 yr overdueM/s. Earth Graphics · GirgaonP51900008314· filed Jun 2021 → now Sept 2024· 79.5% built
- ASHWA LUXORA2.1 yr overdueASHWAMEDH PRODUCTION · Near Kankavali Depot, SindhudurgP52900000637· filed Jun 2022 → now Sept 2024· 90.9% built
- DAHISAR GULISTAN CHS2.1 yr overdueDAHISAR GULISTAN CO OPERATIVE HOUSING SOCIETY LIMITED · DAHISAR EAST, ThaneP51700006563· filed Jun 2021 → now Sept 2024· 90.7% built
- Mi Casa2.1 yr overdueMarimagnum Constructions · UNDRI, PuneP52100009650· filed Mar 2020 → now Sept 2024· 96.4% built
- INDUS ROYAL2.1 yr overdueRAJIV SURESHRAO NAIK NIMBALKAR · KOLKI, SataraP52700028696· 81.8% built
- TROVE2.1 yr overdueKALASH PROPERTIES · BANER, PuneP52100031289· filed Sept 2023 → now Sept 2024· 95.5% built
- ANANT CORNER2.1 yr overdueASHAPURA DEVELOPERS · SECTOR 50, RaigarhP52000018083· filed Sept 2023 → now Sept 2024· 92.1% built
- Rustomjee Virar Avenue L1-L2 and L4 Wing K2.1 yr overdueKEYSTONE INFRASTRUCTURE PRIVATE LIMITED · Avenue L4, PalgharP99000020235· filed Sept 2023 → now Sept 2024· 50% built
- KRISHNA HEIGHTS2.1 yr overdueSHRI SANT LAHANUJI DEVELOPERS · GANESHPETH, NagpurP50500024678· 90.9% built
- Madhukosh2.1 yr overdueKakkad Housing · Balewadi, PuneP52100019179· 74.1% built
- Metropolis - Aquaris Phase 12.1 yr overdueANANT SQUARE · Kasarvadavli, ThaneP51700022961· 90.9% built
- REHMAT APARTMENT2.1 yr overduePARVIN GAMIR SHAIKH · MAUJE NASHIK - 4 SHIWAR, NashikP51600031833· 90.9% built
- SARA VATIKA2.1 yr overdueSAKAMBARI BUILDCON · NEAR PROPOSED ISKON TEMPLE, AurangabadP51500025439· 90.9% built
- BHAVIKA APARTMENT2.1 yr overdueNANDAN DEVELOPERS · GANGA SAGAR NAGAR, NashikP51600032550· 90.9% built
- NYATI EVOLVE I2.1 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100022030· 93.5% built
- Megapolis Saffron - A10 to A142.1 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park Phase 3, PuneP52100021609· 90.7% built
- AGAMI SAPPHIRE2.1 yr overdueAGAMI ENTERPRISES · BOISAR EAST, PalgharP99000020242· 89.1% built
- THE SILVER CREST2.1 yr overdueHI TECH ULTRA HOMES AND INFRASTRUCTURE PRIVATE LIMITED · Panvel, RaigarhP52000004729· filed Mar 2023 → now Sept 2024· 70% built
- VJ Town Centre2.1 yr overdueVilas Javdekar Eco Shelters Private Limited · Near Indira College, Wakad, PuneP52100028755· 84.1% built· 3 complaints
- MAHAVIR RESIDENCY2.1 yr overdueNIRMAN VENTURES · WALUJ MAHANAGAR-1, AurangabadP51500047819· 90.9% built
- United Courtyard Phase 22.1 yr overdueUnited Builders · Behind INOX, NashikP51600026084· 76.4% built
- SAMARTH HEIGHTS2.1 yr overdueSHILPA YOGESH KUMAWAT · MHASRUL SHIWAR, NashikP51600033804· 90.9% built
- AMBER HEIGHTS2.1 yr overdueACE CONSTRUCTION · Bhiwandi, ThaneP51700004978· filed Jun 2021 → now Sept 2024· 90.9% built
- CHANDAN HIRA2.1 yr overdueBALI SHELTERS LLP · GOREGAON WEST, Mumbai SuburbanP51800033253· 90.9% built
- Sai Shrushti2.1 yr overdueBhoomi Creation · Jaitala, NagpurP50500026488· 72.7% built
- EMPIRE TOWERS2.1 yr overdueSahakar Ventures · Borivali, Mumbai SuburbanP51800026306· 87.3% built
- School View Shreyas CHS Ltd2.1 yr overdueMAJESTIC ROYALE DEVELOPERS · MUMBAI, Mumbai SuburbanP51800046219· 54.5% built
- Devanshi Nirmiti2.1 yr overdueNirmiti Realty · Galinde nagar, PuneP52100045661· 81.8% built
- PRISM CITY-INDIGO2.1 yr overdueSWASTIK DIAMOND REALTY · CHARHOLI, PuneP52100030026· 88.2% built
- REDEVELOPMENT OF POPULAR TERRACE CHSL2.1 yr overduePRANAV CONSTRUCTIONS LIMITED · BORIVALI WEST MUMBAI, Mumbai SuburbanP51800029351· 90.9% built
- CHAIRMAN HEM CO-OP. HOUSING SOCIETY LTD.2.1 yr overdueJK INFRASTRUCTURES · INDIRANAGAR, NashikP51600034403· 90.9% built
- NANAWAREGADHAVERESIDENCY2.1 yr overdueSHRI DEVELOPERS · GAT NO-123 PLOT NO-11, PuneP52100024766· 27.3% built
- Avenue Park - I2.1 yr overdueCB Enterprises · pathanwadi, Mumbai SuburbanP51800005425· filed Jun 2022 → now Sept 2024· 73.5% built· 1 complaint
- VENKATESH GRAFFITI GLOVER PHASE 12.1 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAV NAGAR MUNDHWA, PuneP52100025621· 90.9% built
- AIM Avenue2.1 yr overdueAIM REALTORS PRIVATE LIMITED · Andheri, Mumbai SuburbanP51800028763· 77.7% built
- VJ IndiLife2.1 yr overdueVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · Pashan, PuneP52100028030· 86.8% built· 2 complaints
- PRIMA CASA APARTMENT2.1 yr overdueCASA COSTRUZIONE INFRATECH · PURNAWAD NAGAR NR PRASAD MANGAL KARYALAYA, NashikP51600031932· 90.9% built
- UDYAM BIZ CASA2.1 yr overdueKADU PROPERTIES LLP · Saswad, PuneP52100026231· filed Jun 2024 → now Sept 2024· 81.8% built
- PARLE NIMESH CO-OP. HSG. SOC. LTD.2.1 yr overdueCHINTAMANI COMMERCIAL VENTURES · VILE PARLE EAST, Mumbai SuburbanP51800030964· 90% built
- HILL CREST2.1 yr overdueUNIVERSAL INFRA · ULHASNAGAR, ThaneP51700030982· 59.5% built
- NILAY RESIDENCY2.1 yr overdueMANDAR UMESH KOKANE · A ward NALE COLONY, KolhapurP53000048555· 90% built
- SHRI HIMGIRI2.1 yr overduePYRAMID DEVELOPERS · Panvel, RaigarhP52000012130· filed May 2020 → now Sept 2024· 89.1% built
- NIRMALA PARADISE2.1 yr overduePokhriyal And Associates · BADLAPUR WEST, ThaneP51700030774· 81.8% built
- NYATI EVOLVE II2.1 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100022029· 85.1% built
- Lodha Splendora - River View2.1 yr overdueLODHA DEVELOPERS LIMITED · BHAYANDERPADA, ThaneP51700016375· 81.8% built· 4 complaints
- Shubhada2.1 yr overdueSugee Twelve Developers LLP · Shivaji Park, Dadar, Mumbai CityP51900027415· 40% built
- DHANASHREE AANAND 12.1 yr overdueAtria Constructions · HANDEWADI CHOWK, PuneP52100031055· 90.9% built
- Sukhakarta Residency2.1 yr overduePradeep Shridhar Phadke · swapnanagari vishrambag sangli, SangliP53100031334· 81.8% built
- Tulajai Sahniwas2.1 yr overdueChinmay Vastu · Gaonbhag,Sangli, SangliP53100027630· 79.1% built
- 27TH AVENUE2.1 yr overdueBLUE CONSTRUCTION COMPANY · BAVDHAN BUDRUKH, PuneP52100023239· filed Mar 2024 → now Sept 2024· 81.8% built
- AAKANKSHA RESIDENCY2.1 yr overdueSHARVIN BUILDERS LLP · KATRAJ, PuneP52100033307· filed Dec 2023 → now Sept 2024· 58.2% built
- AMAR VIJAY CHS LTD2.1 yr overdueJ.V. ENTERPRISES · STATION ROAD, ThaneP51700024853· 82.5% built
- NYATI EVOLVE III2.1 yr overdueNYATI GEETA ASSOCIATES · MUNDHWA, PuneP52100026448· 96.2% built
- Park Infinia - L2, L3, L4, K4, K5 and J42.1 yr overdueKumar Properties and Real Estate Pvt. Ltd. · Hadapsar, PuneP52100026185· 87.6% built
- Green City 42.1 yr overdueGREEN SPACE INFRA VENTURES · Mouza Gotal Panjari, NagpurP50500025013· 97% built
- Paramount F2.1 yr overdueKalpataru Homes Private Limited · Thane, ThaneP51700050624· 72.5% built
- NYATI EMPRESS2.1 yr overdueNYSHAA BUILDERS LLP · LOHEGAON, PuneP52100022492· 81.8% built
- Parshuram Krupa Apartment2.1 yr overdueSukruti Constructions · Madhli Galli, Tiwanda Chowk, NashikP51600045453· filed Dec 2023 → now Sept 2024· 81.8% built
- REDEVELOPMENT OF GALA APARTMENTS CHSL2.1 yr overduePRANAV CONSTRUCTIONS LIMITED · MALAD EAST, Mumbai SuburbanP51800029415· 90.9% built· 1 complaint
- Ramanand Residency2.1 yr overduePhadke Pradeep Shridhar HUF · Vidyanagar, SangliP53100030929· 65% built
- Sukhwani Araya2.1 yr overdueSukhwani Associates · Rahatani, PuneP52100031415· 81.8% built
- Shivneri2.1 yr overdueMS SWARAJYA BUILDTECH · Konark Nagar Adgaon, NashikP51600028553· 90.9% built
- IZARRA2.1 yr overdueORNO INFRAPROJECTS PVT LTD · Andheri, Mumbai SuburbanP51800018888· filed Dec 2022 → now Sept 2024· 90.9% built· 2 complaints
- MOONSTONE-WING A2.1 yr overdueB. J. ENTERPRISE · Vasai, PalgharP99000018357· 39.1% built
- SULOCHANA PARADISE2.1 yr overdueRIDDHI SIDDHI DEVELOPERS · JALKEWADI, SindhudurgP52900023285· 44.5% built
- REDEVELOPMENT OF TIARA CHSL2.1 yr overduePRANAV CONSTRUCTIONS LIMITED · MALAD WEST, Mumbai SuburbanP51800034818· 90.9% built
- PARLASHRAY CHSL2.1 yr overdueSai Ganesh Properties and Holdings LLP · VILE PARLE EAST, Mumbai SuburbanP51800033078· filed Mar 2024 → now Oct 2024· 90.9% built
- AMOGH HEIGHTS2.1 yr overdueAMOGH PROMOTERS & BUILDERS · PARVATI, PuneP52100025019· 50.9% built
- Atharva Heights2.1 yr overdueGAURAV VISHVANATH AWATI · near nirmal classes, ward no 6, AhmednagarP52200033871· 90.9% built
- SWAROOP NIKETAN2.1 yr overdueSWAROOP NIKETAN DEVELOPERS · Mangalwar Tale, SataraP52700023758· 81.8% built
- SUVIDHA SHARADA VIHAR2.1 yr overdueSUVIDHA SCHEMES · 1639A SADASHIV PETH, PuneP52100031448· 81.8% built
- Sheetal Residency Building No 12.1 yr overdueSHRI SADAGURU SHIVRAM CONSTRUCTIONS PVT LTD · PALSE, NashikP51600002772· 90.9% built
- Iris Shopping2.1 yr overdueHIRANANDANI PROPERTIES PRIVATE LIMITED · Hiranandani Meadows, ThaneP51700019505· filed Mar 2023 → now Oct 2024· 90.9% built
- VTP Beaumonde-Nation R2 T12.0 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100009535· filed Jan 2022 → now Oct 2024· 88% built· 25 complaints
- Yashodhan Heights2.0 yr overdueBHUSHAN SURYABHAN JADHAV · Nashik, NashikP51600034412· 97.3% built
- GOVIND PARADISE2.0 yr overdueGOVIND BHAUSAHEB MADHWAI · ADGAON, NashikP51600033749· 27.3% built
- Sai World Empire2.0 yr overdueParadisesuperstructures · Panvel, RaigarhP51700002446· filed Oct 2023 → now Oct 2024· 99.3% built· 2 complaints
- ARAVALLI SANKUL2.0 yr overdueARAVALLI ASSOCIATES · Bandhiwali, RaigarhP52000012183· filed Oct 2023 → now Oct 2024· 89.1% built
- SAI WORLD EMPIRE PHASE II2.0 yr overdueParadisesuperstructures · Kharghar sector 37, RaigarhP52000026796· filed Oct 2023 → now Oct 2024· 72.9% built· 3 complaints
- AASARA Crystal Heights2.0 yr overdueSandeep Shivaji Tapkir · Dehu Phata, PuneP52100022365· filed Oct 2023 → now Oct 2024· 90.5% built
- Kalpataru Serenity - Bldg. 22.0 yr overdueKalpataru Gardens Pvt. Ltd. · PUNE, PuneP52100015855· 89.5% built· 1 complaint
- GAURI SAKSHI APARTMENT2.0 yr overdueNANDAN DEVLOPERS · PIMPALGAON BAHULA SHIVAR, NashikP51600023859· 90.9% built
- Tara Towers2.0 yr overdueHublikar Constructions · Baner Residency Sakal Nagar, PuneP52100049226· 51.8% built
- Ambika Hill Crest2.0 yr overdueAmbika Buildcon · Mayur Vihar Nagar, NashikP51600029419· 90.9% built
- Godrej Hillside 12.0 yr overdueMahalunge Township Developers LLP · Mahalunge, PuneP52100022099· 81.8% built· 5 complaints
- Divyash Residency2.0 yr overdueNihar Estates LLP · Baner, PuneP52100053119· 78.2% built
- VISION ACE PHASE II2.0 yr overdueVISION ACE · OPP INDIRA SCHOOL NEAR AKSHRA SCHOOL TATHAWADE, PuneP52100022545· 94.8% built
- SHREE GANPATI RESIDENCY2.0 yr overdueSHREE GAJANAN DEVELOPERS · OLD JALNA, JALNA, JalnaP51400031943· filed Nov 2023 → now Oct 2024· 75.5% built
- POOJA BLOSSOM APARTMENT2.0 yr overduePOOJA CONSTRUCTION · DWARKA, NashikP51600023269· 90.9% built
- NISARG GREENS - Phase - 2 B2.0 yr overdueNND Ambernath LLP · Morivali, ThaneP51700022786· 0% built
- M SQUARE AVENUE2.0 yr overdueMSQUARE · ULWE, RaigarhP52000020994· 4.5% built
- NISARG GREENS - Phase - 2 C2.0 yr overdueNND Ambernath LLP · Morivali, ThaneP51700022586· 90.9% built
- PLOT NO. 10, VIVA,PIRANGUT,PUNE2.0 yr overduePACT REAL ESTATE PRIVATE LIMITED · Pirangut, PuneP52100002702· 72.1% built
- SHREERAM VRUNDAVAN2.0 yr overdueSHREERAM EMPIRE · JIJAMATA CHOWK, PuneP52100034163· 81.8% built
- Godrej Hillside 22.0 yr overdueMahalunge Township Developers LLP · Mahalunge, PuneP52100022153· 81.8% built· 3 complaints
- RAJ LAXMI RESIDENCY2.0 yr overdueAMARDEEP PANDHARINATH GHUGE · SATARA, AurangabadP51500018303· 90.9% built
- AV CRYSTAL2.0 yr overdueA V Crystal Housing LLP · Nallasopara East, PalgharP99000018477· 90.5% built
- SAMARA2.0 yr overdueCharisma Builders Ltd · Chembur, Mumbai, Mumbai SuburbanP51800020854· filed Mar 2024 → now Oct 2024· 81.8% built
- CAPITAL ONE2.0 yr overdueSWOJAS ICON CONSTRUCTIONS LLP · BHAMBURDA SHIVAJINAGAR, PuneP52100033168· 81.8% built
- AIKYAM2.0 yr overdueSHREENATH ASSOCIATES · NEAR VENKATESH IMPERIYA, PuneP52100048456· 55.5% built
- AUDUMBAR DARSHAN2.0 yr overdueAUDUMBAR ENTERPRISES · BADLAPUR EAST, ThaneP51700033432· filed Jan 2024 → now Oct 2024· 44.5% built
- Usha Enclave2.0 yr overduePATWARDHAN PROJECTS · Bhide Bag Behind Abhiruchi mall Vadgaon, PuneP52100031888· 73.6% built· 1 complaint
- SIMANDHAR INDUSRIAL ESTATE2.0 yr overdueSPACE INFRATECH · VASAI EAST, PalgharP99000034285· 81.8% built
- BHAGAVANTI HEIGHTS2.0 yr overdueSHIV GAJANAN CONSTRUCTION · Mehrun Shivar, JalgaonP49900049012· 49.1% built
- SHIVANCHI APARTMENT2.0 yr overdueJ J BUILDERS · NASHIK, NashikP51600048461· 90.9% built
- Anuraj Park2.0 yr overduePramod Ramkrishan Tayde · Raut Wadi, Near Umri Naka, AkolaP50100046911· 9.1% built
- KASHI ARCADE2.0 yr overdueVEDIT ENTERPRISES · TULINJ, PalgharP99000049487· 90.9% built
- MANGALAM ARCADE2.0 yr overdueMANGALAM ENTERPRISES · BADLAPUR EAST, ThaneP51700050434· filed Apr 2024 → now Oct 2024· 72.7% built
- Aims Sea View2.0 yr overdueAIMS PROMOTERS PVT LTD · Thane, ThaneP51700004956· filed Dec 2019 → now Oct 2024· 72.7% built· 22 complaints
- SHREE GANESH HERITAGE2.0 yr overdueHIMANSHU SHAM TENDULKAR · JAWHAR, PalgharP99000032281· 81.8% built
- BRIJ NIKUNJ APARTMENT2.0 yr overdueSANDEEP GULABCHAND GUPTA · INDIRA NAGAR, NashikP51600034476· 87.7% built
- SHIVDHARA HEIGHTS2.0 yr overdueSHREERAM BUILDERS AND DEVELOPERS · OPP ASHOKA MEDICOVER HOSPITAL, NashikP51600031989· 27.3% built
- VIGHNAHARTA2.0 yr overdueVIGHNAHARTA DEVELOPERS · PANVEL, RaigarhP52000048079· 30.9% built
- Karmaa Shubh Vastu2.0 yr overdueKarmaa Ventures · Pathardi, NashikP51600047592· 85.5% built
- OAK WOODS2.0 yr overdueS.V.ENTERPRISES · NAGZIRA, NashikP51600023506· 90.9% built
- ADORN ALCAZAR-I2.0 yr overdueHASIB AHMED SHAIKH · KONDHWA BUDRUK, PuneP52100019924· 90.9% built
- Chinmay Heritage Phase 22.0 yr overdueChinmay Heritage · Niranjan Society, PuneP52100028113· 63.6% built
- CRYSTAL PARADISE RESIDENCES2.0 yr overduePrithvi Sthapti LLP · Andheri, Mumbai SuburbanP51800015472· filed Jun 2024 → now Nov 2024· 72.3% built
- SAI SUMAN PRIDE2.0 yr overdueAADESHWAR CONSTRUCTION · GARKHEDA, AURANGABAD, AurangabadP51500047705· 79.5% built
- PLOT NO 8, VIVA, PIRANGUT1.9 yr overduePACT REAL ESTATE PRIVATE LIMITED · Mulshi, PuneP52100002113· 78.2% built
- GALAXY ABHINANDAN1.9 yr overdueAAKAR DEVELOPER · NAVALI, PalgharP99000051390· filed Nov 2023 → now Nov 2024· 90.9% built
- VAASTU TATHASTU1.9 yr overdueNilesh Arvind Manjarekar · REVTALE-MALVAN, SindhudurgP52900034388· 90.9% built
- VASTU SQUARE1.9 yr overdueAKS INFRASTRUCTURE · Nagpur, NagpurP50500046788· 96.4% built
- Gagan 1391.9 yr overdueGagangiri Constructions · Kurla, Mumbai SuburbanP51800029662· 90.9% built
- Aditya Apartments Condominium1.9 yr overdueKelkar Housing LLP · Mahaganesh Colony, Kothrud, PuneP52100035170· filed Sept 2024 → now Nov 2024· 90.9% built
- ATHARVA NAGARI VI1.9 yr overdueATHARVA INFRASTRUCTURES · PIPLA, NagpurP50500027148· 22.4% built
- Morivali Prarambh1.9 yr overdueSHREE KHODIYAR BUILDCON · Mauje, ThaneP51700047016· 86.4% built
- Nyati Plaza1.9 yr overdueNyati Landmark Projects LLP · KharadiP52100023288· filed Dec 2023 → now Nov 2024· 71.1% built
- ARUNODAY CLASSIC1.9 yr overdueVAISHNAVI GROUP OF CONSTRUCTION · TALEGAON STATION, PuneP52100021781· filed Dec 2023 → now Nov 2024· 54.1% built
- SWANAND BLDG NO 331.9 yr overdueHIRANIMANTHAN BUILDERS AND DEVELOPERS · Kurla, Mumbai SuburbanP51800004914· filed Dec 2019 → now Nov 2024· 90.9% built
- GURUKRUPA VYOM1.9 yr overdueGURUKRUPA REALCON INFRABUILD LLP · MUMBAI, Mumbai CityP51900031575· 90.9% built
- GRACE SQUARE TYPE D41.9 yr overdueSHREE SUMATINATH ENTERPRISES LLP · KAUSA, ThaneP51700016191· 90.9% built
- VIVANTA1.9 yr overdueB AND G VENTURES · MALIWADA, AhmednagarP52200048884· 63.6% built
- SAINAGARI PHASE 11.9 yr overdueSai Sharaddha Builders and Developers · Shendraban, AurangabadP51500007328· 66.7% built
- Swaroop Residency1.9 yr overdueSHREE CONSTRUCTION COMPANY · Soygaon, NashikP51600031720· filed Mar 2024 → now Dec 2024· 58.2% built
- PLANNING DESIGNING OBTAINING APPROVALS AND CONST OF 680 MIG TS ON S NO 126,127,1 TATHAWADE PUNE PH I1.9 yr overduePune Housing & Area Development Board · Bapu Buwaji Nagar, PuneP52100031648· 90.9% built· 1 complaint
- AMBAR RESIDENCY B BUILDING1.9 yr overdueMEHTA BUILDERS · JALOCHI, PuneP52100033604· 56.8% built
- Shivraj Apartments1.9 yr overdueSanjay Shivaji Gaikwad · Choudhary ParkP52100024741· 81.8% built
- GURUVIHAR1.9 yr overdueRACHANA DEVELOPERS · Mangalwar peth, SangliP53100011769· filed Nov 2019 → now Dec 2024· 82.9% built· 6 complaints
- AMRUT AURA1.9 yr overdueSIMMONI DEVELOPERS · MOSHI, PuneP52100032317· filed Dec 2023 → now Dec 2024· 80.9% built
- KRISH MANSION1.9 yr overdueKBAFNA INFRAA PRIVATE LIMITED · PALGHAR, PalgharP99000030304· 81.8% built
- HERITAGE HOUSE1.9 yr overdueGreen Tree Lifescapes LLP · Andheri, Mumbai SuburbanP51800033917· 0.9% built
- Avani Co-Operative Housing Society Ltd1.9 yr overdueAvani Co-Operative Housing Society Ltd · Panchavati, NashikP51600048205· 9.1% built
- BALWANT EMPIRE1.9 yr overdueUTTAM NAGESH ARAGE · SANGLI, SangliP53100033076· 90.9% built
- DATTAGANGA1.9 yr overdueGanesh LAnd Developers and Construction Private Limited · Dattaganga Complex, PalgharP99000018314· filed Feb 2021 → now Dec 2024· 51.8% built
- Ashiyana Infinity Phase 11.9 yr overdueAshiyana Dream Homes Pvt. Ltd. · Near Hanuman Temple, Opposite Mulgaon Industrial Estate, RaigarhP52000017538· 71.5% built
- SAPPHIRE HEIGHTS1.9 yr overdueSPACE CORPORATION · Thane, ThaneP51700003426· 60.9% built
- SAHARA EMERALD1.9 yr overdueSAHARA BUILDERS · BHEKRAINAGAR, PuneP52100033675· 9.4% built· 1 complaint
- ANAND EXCLUSIVE1.9 yr overdueANAND CONTRACTORES AND DEVELOPERS · BABRAS MALA INDAPUR, PuneP52100025418· 90.9% built
- CELESTIAL HEIGHTS1.9 yr overdueAYYAPPA DEVELOPERS PVT. LTD. · Borivali, Mumbai SuburbanP51800005812· filed Jan 2021 → now Dec 2024· 46.4% built· 16 complaints
- Sai City1.9 yr overdueRaju Dnyandev Gaikwad · Daund, PuneP52100003598· filed Dec 2022 → now Dec 2024· 90.9% built
- Chaitanya Srusti1.9 yr overdueCHAITANYA DEVELOPERS · Daund, PuneP52100003910· filed Feb 2021 → now Dec 2024· 63.6% built
- SOLITAIRE BUSINESS HUB KALYANINAGAR1.9 yr overdueCLASSIC PROMOTERS & BUILDERS PVT LTD · YERWADA, PuneP52100014846· filed Jun 2023 → now Dec 2024· 68% built· 7 complaints
- Sanghvi S3 Ecocity Orchid1.9 yr overdueSanghvi Premises Pvt Ltd · Near Dahisar Check Post, ThaneP51900008323· filed Dec 2023 → now Dec 2024· 71.8% built· 1 complaint
- Sanghvi S3 Ecocity Woods1.9 yr overdueSanghvi Premises Pvt. Ltd. · Near Dahisar Checkpost, ThaneP51900006575· filed Dec 2023 → now Dec 2024· 79.5% built
- DHRUV GOKULDHAM1.9 yr overdueDHRUV BUILDCON · Sundarwadi, AurangabadP51500007864· filed Dec 2023 → now Dec 2024· 88.9% built
- KINGS PRIDE1.9 yr overdueNilesh Laxmikant Kudalkar · GOVANDI EAST, MUMBAI, Mumbai SuburbanP51800023958· filed Dec 2023 → now Dec 2024· 82.5% built
- SILVER SCAPE/SILVER ENCLAVE1.9 yr overdueMalde Properties LLP · MULUND WEST, Mumbai SuburbanP51800009210· filed Dec 2023 → now Dec 2024· 45.5% built
- GARDEN COURT COMPLEX1.9 yr overdueOZONE PUNIT JV · ADARSHA NAGAR, PalgharP99000020722· filed Dec 2023 → now Dec 2024· 72.7% built
- INDRAPRASTHA CO-OPERATIVE HOUSING SOCIETY LIMITED1.9 yr overdueAGILE ENTERPRISES · Naupada, Thane West, ThaneP51700020576· filed Dec 2023 → now Dec 2024· 56.4% built
- GULMOHAR PARK B PHASE 21.9 yr overdueMercury Artharaj Landmarks AOP · DEHU, PuneP52100023073· filed Dec 2023 → now Dec 2024· 90.9% built
- Periwinkle1.9 yr overdueAJIT GIRDHARILAL NAHAR · -, PuneP52100017310· 86.4% built
- SHIVGANGA HILLS1.9 yr overdueMAHESHWAR ENTERPRISES · PATHARDI NASHIK, NashikP51600050161· 90.9% built
- DOSHI TARACHAND VALAMJI VANIK NIWAS1.9 yr overdueSHREE CUTCHI DASHA SHRIMALI VANIK GNYATI · Chembur, Mumbai SuburbanP51800045888· filed Dec 2023 → now Dec 2024· 90.9% built
- Yashwin Encore1.9 yr overdueVilas Javdekar Lifestyle Developers Pvt. Ltd. · Opposite Sayaji Hotel, PuneP52100017756· 95.6% built· 4 complaints
- AMAKIN MOHAMMADIYA COMPLEX PHASE III1.9 yr overdueRAJ CORPORATION · Kalyan, ThaneP51700010706· 38% built
- Mayfair The View1.9 yr overdueMAYFAIR HOUSING · Kurla, Mumbai SuburbanP51800020140· 82.6% built
- ROHAN ABHILASHA 2 WING B1.9 yr overdueROHAN BUILDERS & DEVELOPERS PRIVATE LIMITED · WAGHOLI, PuneP52100025681· 88.6% built
- SARTHAK HOMES WING A B C1.9 yr overdueSARTHAK INFRA · KARJAT, RaigarhP52000021869· 90.9% built
- Park Street1.9 yr overdueNawcon Infrastructure Pvt Ltd · Opp. Mount Litera Zee School, LaturP52400016239· 78.2% built
- PANSE PATIL HARMONY1.9 yr overdueAVANEESH BUILDCON LLP · BEHIND PURVA GARDEN HOTEL, SangliP53100024897· 90.9% built
- Thanekar Civic Phase II1.9 yr overdueThanekar Construction LLP · Chikhloli Badlapur, ThaneP51700048038· 51.1% built
- R R RESIDENCY - D WING1.9 yr overdueSHRI RADHE REALITIES PROJECT DEVELOPER · OPP NAZARANA TALKIES, ThaneP51700016057· 90.9% built
- SHANTI PLAZA1.9 yr overdueSAHYOG VASTU UDYOG · BH PALM HOTEL, WASAN NAGAR, NashikP51600025222· 80% built
- Mahalaxmi Alankar1.9 yr overdueMahalaxmi Builders · Aurangabad (M Corp.), AurangabadP51500001362· 90.9% built
- VEDANT RESIDENCY1.9 yr overdueATUL NAGESH DESHPANDE · TILAKWADI, YavatmalP51000024504· 85.5% built· 1 complaint
- SHRI GOVINDRAJ RESIDENCY1.9 yr overdueSHRI GOVINDRAJ CONSTRUCTION · KAUTHA, NandedP51100024429· 79.7% built
- Kalpataru Exquisite - Wing 21.9 yr overdueKalpataru Retail Ventures Private Limited · Wakad, PuneP52100001266· 61.8% built
- PROJECT AT S.NO 168 H NO 7/A/B/C/28B/30/8/29/3F/3Y1.9 yr overdueSUNGRACE INFRA PROJECTS · Ambegaon, PuneP52100007062· 68.2% built
- Plan S Business Park1.9 yr overdueM/s. Vishwa Green Realtors Private Limited · SHIRWANE, ThaneP51700002027· 62.4% built· 3 complaints
- Magnolia Business Centre1.9 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Pashan, PuneP52100021866· 90.9% built
- JAGDAMBA SIDDHI1.9 yr overdueJAGDAMBA ENTERPRISES · PEN, RaigarhP52000019338· 90.9% built
- Ashanand Residency G Building1.9 yr overdueAnand Deoram Tambe · Khed, PuneP52100019866· 30.9% built
- HerambASIA1.9 yr overdueHeramb developers · Agashivnagar, SataraP52700032922· filed Nov 2022 → now Dec 2024· 49.1% built
- JAYSHRI ROW HOUSE1.9 yr overdueJAYSHRI CONSTRUCTIONS · NR KALIKA NAGAR, NashikP51600024196· 81.8% built
- L AND T SEAWOODS RESIDENCES PHASE I1.9 yr overdueL&T SEAWOODS LIMITED · Thane, ThaneP51700020275· 81.8% built· 7 complaints
- Mont Vert Grande Plot 4 Bldg D1.9 yr overdueNiraj Kumar Associates Pvt Ltd · Pashan, PuneP52100020690· 90.9% built
- Hubtown Harmony B Wing1.9 yr overdueHeet Builders Private Limited · Matunga East, Mumbai CityP51900017709· 81.8% built
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.