RERA projects past their possession deadline
12,128 MahaRERA-registered projects are past the possession date currently on file and still report under 100% construction progress. Both figures are the promoter's own disclosure to the regulator.
Page 48 of 61
- GANDHI TOWERS2.4 yr overdueJAYSHREE SATISH GANDHI · DAUND, PuneP52100016096· 36.4% built
- SIYARAM PHASE II2.4 yr overdueMadhumalti Costruction Pvt Ltd · SAVEDI, AhmednagarP52200027000· 90.9% built
- Vista 3C2.4 yr overdueLuxora Infrastructure Private Limited · Mauza, NagpurP50500007884· filed Dec 2019 → now Jun 2024· 80% built· 4 complaints
- Oshi2.4 yr overdueSahyog Homes Limited · Oshiwara, Mumbai SuburbanP51800002965· filed Dec 2022 → now Jun 2024· 92.7% built· 8 complaints
- SAI BABA NAGAR2.4 yr overdueSai Developers · Mahim, PalgharP99000008318· filed Dec 2019 → now Jun 2024· 46.8% built
- PLATINUM TOWERS2.4 yr overdueLaxman Sopanrao Nimhan · wakad, PuneP52100016501· 90.9% built
- GREENVILLE BUILDING A42.4 yr overdueVision Realtors · HADAPSAR, PuneP52100052689· 90.9% built
- ELITE HOMES2.4 yr overdueCRYSTAL HOMES · NALASOPARA WEST, PalgharP99000026203· 90.9% built
- Supreme Evana2.4 yr overdueSupreme Mega Constructions LLP · Bandra West, Mumbai SuburbanP51800033931· 90% built
- SANJEEVANI HEIGHTS2.4 yr overdueOSWAL CREATIVE · Sudhagad, RaigarhP52000027812· 90.9% built
- DEVRAJ NISSARG2.4 yr overdueDEVRAJ BUILDERS AND DEVELOPERS · Baramati (M Cl), PuneP52100010031· filed Feb 2021 → now Jun 2024· 79.5% built· 1 complaint
- SHREE KRISHNA AVENUE2.4 yr overdueHemant Enterprises · KATHE GALLI, NashikP51600025635· 60.9% built
- Mahavir Kalp2.4 yr overdueRAJESH BUILDERS · Palghar, PalgharP99000021428· 90.9% built
- UNNATHI WOODS PHASE VII-B2.4 yr overdueUNNATHI ESTATES · KAVESAR, ThaneP51700015800· 89.8% built· 9 complaints
- TRIMURTI RESIDENCY2.4 yr overdueTRIMURTI CONSTRUCTIONS · SAVEDI, AhmednagarP52200030627· 86.4% built
- SAI SHILP RESIDENCY-POOJA2.4 yr overdueOM SAI BUILDCON · Nashik, NashikP51600012032· 90.9% built
- NANDANVAN2.4 yr overduePENTAGON PROPERTIES · Haveli, PuneP52100008374· filed Sept 2021 → now Jun 2024· 95.5% built
- VIJAY ANNEX2.4 yr overdueJAY DEVELOPERS · Nashik (M Corp.), NashikP51600012034· filed Dec 2018 → now Jun 2024· 90.9% built
- SAMRUDDHI PARK2.4 yr overdueSANSKAR BUILDERS AND DEVELOPERS · PATHARDI SHIVAR NEAR PANDAVLENI, NashikP51600027831· 90.9% built
- BLISS2.4 yr overduePRAMUKH REALTY · NR PRAMUKH VIHAR, Dadra & Nagar HaveliP49600000090· 90.9% built
- Barsana2.4 yr overdueVedbhumi Builders & Developers Pvt. Ltd. · Nagpur, NagpurP50500013341· filed Jul 2018 → now Jun 2024· 75% built
- Savannah2.4 yr overdueSim Properties · wagholi, PuneP52100027297· 51.5% built
- GAYATRI APARTMENT2.4 yr overdueSANTOSH RAMESH RAUT · Karjat, RaigarhP52000005736· filed Dec 2019 → now Jun 2024· 81.8% built
- Swapnalok Nagari, Building No -32.4 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100017102· 81.8% built
- DOSTI PLANET NORTH - PHASE 3 -DOSTI ONYX2.4 yr overdueCHALAMA INFRAPROPERTIES PRIVATE LIMITED · SHIL, ThaneP51700020162· 99.5% built· 1 complaint
- SAMYEKDARSHAN2.4 yr overdueDARSHAN BUILDERS & DEVELOPERS · NAVALI, PalgharP99000028611· 25.9% built
- ZIPRYA GOVIND TOWER2.4 yr overdueShivshkati Builders and Developers · Near Kopar Railway Station, ThaneP51700027822· filed Jun 2023 → now Jun 2024· 63.6% built
- Green park2.4 yr overdueAnishka Developers Pvt. Ltd. · Kondhwa Bk, PuneP52100000501· filed Dec 2022 → now Jun 2024· 98.2% built
- BHALCHANDRA VIHAR PHASE - IV/M32.4 yr overdueN B BHONDVE BUILDERS · RAVET, PuneP52100047005· 81.8% built
- Splendid Lake view2.4 yr overdueYASHADA HOMES · PASHAN, PuneP52100021727· 90.9% built
- NINE STAR PRIDE II BUILDING NO. 062.4 yr overdueNINE HOME REALTORS · Palghar, PalgharP99000026178· 45.5% built
- Yazarina One2.4 yr overdueKEYSTONE REALTORS LIMITED · Ward FNorth, Mumbai CityP51900000287· 90.9% built
- YAHAVI-TOWER-1-OAK2.4 yr overdueIMAGE REALTY PRIVATE LIMITED · OXFORD GOLF COURSE, PuneP52100028031· 81.8% built· 1 complaint
- LAXMI KIRAN2.4 yr overdueKIRAN ENTERPRISES · KARJAT, RaigarhP52000027810· 54.5% built
- ADDRESS 8172.4 yr overdueDESHPANDE INFRA · SAI BABA COLONY, KARANDEMALA, KASBA BAVADE, KOLHAPUR., KolhapurP53000032216· 90.9% built
- SPECTRUM2.4 yr overdueJOSHI BUILDCON LANDMARKS · Shivajinagar, PuneP52100032621· 68.2% built
- BRAMHA CITY2.4 yr overdueBHAGWAN PARASHARAM DHOOT · SHEVGAON, AhmednagarP52200045756· 36.4% built
- Swapnalok Nagari Commercial Building2.4 yr overdueSWAPNALOK DEVELOPERS · Bhor, PuneP52100017103· 81.8% built
- Swastick Heights2.4 yr overdueShree Swastick Builders · Vasai, PalgharP99000011121· filed Jan 2019 → now Jun 2024· 90.9% built
- ACORN PARK PHASE I2.4 yr overduePANTHEON ASSOCIATES LLP · wakad, PuneP52100028087· 86.4% built
- ARCHANA PARADISE WING A2.4 yr overdueKANIFNATH REALITY · MOHAMMADWADI, PuneP52100026701· 51.4% built
- AMBIKA HEIGHTS2.4 yr overdueRAJESH MAVJI CHHEDA · AMRAI CHOWK, ThaneP51700033336· 90.9% built· 1 complaint
- Yashwin Orizzonte - Phase I2.4 yr overdueVILAS JAVDEKAR GREENSCAPE DEVELOPERS LLP · Opposite Panchashil TowerP52100026213· 90.2% built
- JIGAR CONSTRUCTION VENUS2.4 yr overduePRAFUL HARIBHAI SENJALIA · Kalyan, ThaneP51700003962· filed Mar 2019 → now Jun 2024· 90.9% built
- CASA ABRIGO2.4 yr overdueTECHSTONE CONSTRUCTIONS LLP · HADAPSAR, PuneP52100026227· 90.9% built
- RADHE HARMONY2.4 yr overdueSTAR PROPERTIES · NEAR STAR CITYP52100021137· 90.9% built
- Ajit Mulund CHS2.4 yr overdueYug Developers · Mulund, Mumbai SuburbanP51800032940· filed Mar 2024 → now Jun 2024· 64% built
- VAGISHWARI RESIDENCY2.4 yr overdueRasika Constructions · Near Tiwari Hospital, RaigarhP52000026526· 90.9% built
- Yes Residency2.4 yr overdueYemul& Sancheti Associates · Hadapsar, PuneP52100010630· filed Dec 2018 → now Jun 2024· 79.5% built· 2 complaints
- SHAMBHAVI PRESTIGE2.4 yr overdueN K COMPANY · pune ahmednagar roadP52100027341· 90.9% built
- Sai Sparsh-A1, A22.4 yr overdueJalan Associates · Bhor, PuneP52100003561· filed Dec 2018 → now Jun 2024· 99.1% built
- FLORENZA VILLAS2.4 yr overdueMahesh Vithalrao Labhshetwar · Golwadi Village, AurangabadP51500002341· filed Dec 2019 → now Jun 2024· 56.6% built
- NL TAKSASILA2.4 yr overdueNAHALCHAND LALOOCHAND PVT. LTD. · KANDIVALI (WEST), Mumbai SuburbanP51800025643· 90.9% built
- IPSIT NAVODAY PHASE 52.4 yr overdueIPSIT ENTERPRISE · Palghar, PalgharP99000003777· filed Mar 2019 → now Jun 2024· 60.5% built
- Dynamic Grandeur2.4 yr overdueDYNAMIC REALTY ENTERPRISES · Undri, PuneP52100005396· 85% built
- REDEVELOPMENT OF KHATRI APARTMENTS COOPERATIVE HOUSING SOCIETY LIMITED2.4 yr overdueSRP REALTORS PRIVAYE LIMITED · Borivali, Mumbai SuburbanP51800009333· filed Dec 2019 → now Jun 2024· 90.9% built
- SRUSHTI RESIDENCY BUILDING E2.4 yr overduePappu Developers & Group · KANCHANGAON THAKURLI, ThaneP51700028176· 90.9% built
- TOWER E OF BUILDING NO 3-PHASE OF PROJECT NAMED VIVAREA BEING CONSTRUCTED ON PORTION OF PROJECT LAND2.4 yr overdueGENEXT HARDWARE & PARKS PRIVATE LIMITED · Ward E, Mumbai CityP51900019931· 99.7% built
- BALAJI VIBHA2.4 yr overdueANNASAHEB KALLAPPA UPADHYE · CHINTAMANI NAGAR, SangliP53100028397· 90.9% built
- ADI AVENTURA2.4 yr overdueADI HOMES · RAVET, PuneP52100016461· 87.9% built
- SAPTASHRUNGI VANDAN2.4 yr overduePRAGATI DEVELOPERS · NEAR EKTA GREEN VALLEY, NashikP51600027711· 72.7% built
- OM SAI HOME2.4 yr overdueM/S. INFINI DEVELOPERS · TEMGHAR, ThaneP51700019911· 87.3% built
- SHERLYN AVENUE2.4 yr overdueSHARAD SOPAN SHENDE · Pisoli, PuneP52100001087· filed Feb 2021 → now Jun 2024· 66.1% built
- SUDARSHAN HEIGHTS2.4 yr overdueDEEPAK VENKATRAO KULKARNI · ROSHAN HOUSING SOCIETY, AurangabadP51500027497· 69.5% built
- LAXMI AVENUE2.4 yr overdueLAXMAN SAIBANA MEHETRE · NEAR PRISTINE PROLIFE PHASE III, PuneP52100024445· 86.4% built
- OMKAR CHS LTD2.4 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Andheri, Mumbai SuburbanP51800003558· filed Jul 2023 → now Jun 2024· 90.9% built
- RAJAN DINAKAR PHATAK AND OTHERS2.4 yr overdueWESTIN SANKALP DEVELOPERS · Borivali, Mumbai SuburbanP51800028236· 89.1% built
- VISHNUPUSHP KUTIR2.4 yr overdueL P DEVELOPERS · GOKHIVARE, PalgharP99000050499· 90.9% built
- Morning Star2.4 yr overdueM/s. Star Enterprises · Bhabhola, PalgharP99000027877· 51.8% built
- Satyabhama CHS LTD2.4 yr overdueMahesh Shriram Borkar · GHANTALI, ThaneP51700032055· 90.9% built
- SAPPHIRE TOWERS2.4 yr overdueCHAURANG VENTURES · CHOVISAWADI, PuneP52100027242· 89.5% built
- AURORA2.4 yr overdueMagnum Developers · GAT NO.927 PART, PuneP52100030790· 81.8% built
- PRIYADARSHANI CHS LIMITED2.4 yr overdueANIRUDDHA GROUP SHILPALI PROJECT · Thane, ThaneP51700016267· filed Dec 2021 → now Jun 2024· 81.8% built
- VENKATESH GRAFFITI ELAN PHASE 22.4 yr overdueSHREE VENKATESH BUILDCON PVT LTD · KESHAVNAGAR MUNDHWA, PuneP52100026737· 90.9% built
- PRAYEJA CITY2.4 yr overduePRAYEJA CITY · Wadgaon Budruk, PuneP52100010668· filed Nov 2018 → now Jun 2024· 85.5% built· 12 complaints
- NYATI ELITE2.4 yr overdueNITIN DWARKADAS NYATI · UNDRI VILLAGE, PuneP52100045651· 83.5% built
- VIRKUD PLAZA2.4 yr overdueSANJARI BUILDERS · Palghar, PalgharP99000025589· 90.9% built
- ROYAL MIRAJ ARCADE2.4 yr overdueVishwas Bajirao Patil · Opp. Railway Station, KolhapurP53000002279· filed Dec 2022 → now Jun 2024· 75.9% built
- BRAHMAND RESIDENCY2.4 yr overdueBHAVI REALITY LLP · MASOLI, PalgharP99000002353· 90.9% built
- MORYA HEIGHTS2.4 yr overdueD B REALTY · DIGHIP52100028711· 81.8% built
- KASTURI2.4 yr overdueMORYA LANDMARKS · BEHIND SEASONS HOTEL NEAR CROMA MALL AUNDH, PuneP52100048116· filed Jan 2024 → now Jun 2024· 63.6% built
- AMEY2.4 yr overdueRanjekar Realty LLP · Kothrud, Pune, PuneP52100026733· 89.1% built
- AMAR SAHAVAS APARTMENT2.4 yr overdueAMAR INFRASTRUCTURES · SHIVAJI NAGAR, NashikP51600027690· 90.9% built
- TULSA PARK2.4 yr overdueSHREE SHIVAM DEVELOPERS · Kalyan, ThaneP51700005797· filed Jun 2021 → now Jun 2024· 57.4% built
- Dmellos Residency2.4 yr overdueM/s Ideal Properties · Manikpure Circle, PalgharP99000025569· 76.1% built
- Guruprasad Residency2.4 yr overdueHRISHIKESH SHRIPAD DESHPANDE · SHIVAJI COLONY, SangliP53100030791· 99.1% built
- Malpani Arcade2.4 yr overdueHEMANT VISHWANATH MALPANI · Tidke Colony, NashikP51600023448· 90.9% built
- RACHNA HOUSES2.4 yr overdueDNYANESHWAR KACHARU ILAG · SAPTASHRUNGI NAGAR SINNAR, NashikP51600029873· 90.9% built
- KANCHAN BUSINESS CENTER2.4 yr overdueNOVEL BUILDCON · PALGHAR, PalgharP99000020390· 90.9% built
- Mangalam homes2.4 yr overdueYashashree Group · Dudulgoan Moshi, PuneP52100021772· 61.4% built
- GAYATRREE LEGACY2.4 yr overdueGAYATRREE PROPERTIES · Chikhali, PuneP52100013335· filed Dec 2018 → now Jun 2024· 69.7% built· 5 complaints
- DESTINATION EL PROGRESO2.4 yr overdueEL PROGRESO VENTURES · MOSHI PRADHIKARAN, PuneP52100026761· 57.6% built
- KAILASH HEIGHTS2.4 yr overdueKAILASH DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000008653· filed Dec 2019 → now Jun 2024· 90% built
- KUMAR PALAASH B2.4 yr overdueKUMAR & POTNIS ASSOCIATES · NEAR KUMAR PRIMAVERAP52100027406· 96.4% built
- OM PARADISE2.4 yr overduePATADE PROPERTIES · Gadhinglaj, KolhapurP53000008750· filed Dec 2017 → now Jun 2024· 90.9% built
- BHALCHANDRA PROSPERA2.4 yr overdueN B BHONDAVE PROMOTERS · RAVET, PuneP52100031692· 89.2% built· 1 complaint
- Sukhniwas2.4 yr overdueAmol Ajit Ravetkar · Shivajinagar, PuneP52100009654· filed Feb 2021 → now Jun 2024· 90.9% built
- ISHAN SQUARE2.4 yr overdueADHIRAJBUILDERSANDDEV · RING ROAD, LaturP52400028717· 9.1% built
- DAHISAR SHIVANGAN WING A2.4 yr overdueYASH ENTERPRISES · DAHISAR EAST, Mumbai SuburbanP51800028519· 40% built· 3 complaints
- Megapolis Saffron - A3 to A92.4 yr overduePegasus Properties Pvt. Ltd. · Rajiv Gandhi Infotech Park, Phase 3, PuneP52100018779· 89.1% built
- Gagan Utopia2.4 yr overdueGAGAN BUILDSCAPES LLP · Mundhwa, PuneP52100005074· filed Dec 2019 → now Jun 2024· 63.3% built· 2 complaints
- KRISHNA VIHAR2.4 yr overdueKRISHNA CONSTRUCTION CO. · Zingabai Takli, NagpurP50500027765· 46.4% built
- Ganadhish Park2.4 yr overdueM/S. Ravindra Developers Pvt. Ltd. · Ambad Khurd, NashikP51600030411· 81.8% built
- SAI SHRUSHTI APARTMENT2.4 yr overdueSHREE VYANKTESH CONSTRUCTIONS · MAKHMALABAD SHIWAR, NashikP51600027386· 90.9% built
- GOKHALE SERENITY2.4 yr overdueSUDHIR MAHADEV GOKHALE · DHAYRI, PuneP52100028814· 73.3% built
- Arkade Serene2.4 yr overdueArkade Developers Private Limited · Sunder Nagar Malad West, Mumbai SuburbanP51800029961· 74.5% built
- VELSONS HEIGHTS2.4 yr overdueVELSONS DEVELOPERS · Vasai-Virar City (M Corp), PalgharP99000006958· filed Dec 2019 → now Jun 2024· 90.7% built
- PALAASH SADAPHULI PHASE 2 A1 WING2.4 yr overdueGS ASSOCIATES · Varale, PuneP52100005853· filed Apr 2018 → now Jun 2024· 81.8% built· 20 complaints
- MALOO MARVEL2.4 yr overdueRAJIV MOHANLAL MALOO · TUNGARESHWAR PHATA, PalgharP99000027988· 81.8% built
- NIDHAAN CLOVER - A2.4 yr overdueNIDHAAN BUILDCON PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800019932· 86.4% built
- 127 UPPER EAST2.4 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Andheri, Mumbai SuburbanP51800000454· filed Dec 2019 → now Jun 2024· 56.4% built· 1 complaint
- SARVESHWAR CO-OP HSG SOC2.4 yr overdueDALAL BUILDSCAPE · TALUKA AMBERNATH, ThaneP51700031253· 71.8% built· 1 complaint
- SAPTSHRUNGI KRUPA APARTMENT2.4 yr overduePRAKASH AMBADAS DAGALE(HUF) · NARHARI NAGAR, NashikP51600025426· 90.9% built
- Annapurna Avenue2.4 yr overdueANNAPURNA BUILDCON INFRA PRIVATE LIMITED · THANE, ThaneP51800000876· filed Jun 2019 → now Jun 2024· 90.9% built
- GVC SHAGUN CITY PHASE III2.4 yr overdueSHAGUN ASSOCIATES · KAUTHA, NandedP51100026123· 78.2% built
- Atlantis2.4 yr overdueZASH CONSTRUCTIONS · Mamdapur, RaigarhP52000006994· 90.9% built
- MANTRA CITY 360 PHASE042.4 yr overdueMANTRA ISLAND HOMES TALEGAON LLP · TALEGAON, PuneP52100001457· filed Oct 2019 → now Jul 2024· 90.9% built· 5 complaints
- 41 EVOKE PHASE 12.4 yr overdueKRIASLA ASSOCIATES · KOHALI GAS SERVICE, PuneP52100026277· 45.2% built· 2 complaints
- Acharat Baug2.4 yr overdueAnkur Premises Developers LLP · Andheri, Mumbai SuburbanP51800034682· 39.1% built
- Saraswati Sadan2.4 yr overdueLAKSHMI BUILDERS AND DEVELOPERS · Vile Parle East, Mumbai SuburbanP51800026655· 90.9% built
- PRIDE2.4 yr overdueMOHIT DILIP KHIVASARA · ICCHAMANI COLONY, NASIK, NashikP51600033498· 72.7% built
- Prem Belaire2.3 yr overdueM/s Aryan Infra · Kurla, Mumbai SuburbanP51800003675· filed Feb 2019 → now Jul 2024· 90.8% built· 1 complaint
- AABIEL HEIGHTS2.3 yr overdueDAICHI INFRA LLP · Meera Hospital, ThaneP51700006603· filed Aug 2022 → now Jul 2024· 90.9% built
- V M RESIDENCY2.3 yr overdueV M DEVELOPERS · PLOT NO 25/1, CTS NO 1665 AND 1668. S NO 54/2 AND 57/2, RaigarhP52000029118· 86.8% built
- DEVCHHAYA2.3 yr overdueHARSHAL ENTERPRISES · RAWALPADA DAHISAR EAST, Mumbai SuburbanP51800015406· filed Mar 2024 → now Jul 2024· 90.9% built
- Vtp Cygnus- Nation R1-Tower 82.3 yr overdueAshdan Developers Private Limited · Manjri, PuneP52100007722· filed Jul 2023 → now Jul 2024· 90.9% built· 24 complaints
- TATHASTU2.3 yr overdueASHA DEVELOPERS · VITA, SangliP53100030808· 25.9% built
- LOTUS PARK2.3 yr overdueSARTHAK CONSTRUCTIONS THROUGH PROPRIETOR RAJENDRA KESHERCHAND BORA · GOVIND NAGAR, NashikP51600028602· 90.9% built
- SHYAM KUNJ2.3 yr overdueBASONS CONSTRUCTIONS · Andheri, Mumbai SuburbanP51800046209· 90.9% built
- Saarrthi Swadesh2.3 yr overdueSiddharth Properties · Mawal, PuneP52100003849· filed Sept 2018 → now Jul 2024· 90.9% built· 3 complaints
- SIDHARTH APARTMENT2.3 yr overdueNIRMITI DEVELOPERS · NEAR CHINTAMANI SOCIETY, SangliP53100051440· 81.8% built
- MANALI DWARKAPURAM2.3 yr overdueSSD BUILDERS AND DEVELOPERS · Waluj Mahnagar 1, AurangabadP51500030314· 25% built
- Metro Life Bizz Bay2.3 yr overdueRAMA SYNERGY SPACES · Next to Indira College of Commerce and Science, PuneP52100022156· filed Jul 2023 → now Jul 2024· 90.9% built· 2 complaints
- Anmol Nayantara City Two phase 22.3 yr overdueBafna Realtors Pvt Ltd · Karmayogi nagar, NashikP51600000215· filed Jun 2021 → now Jul 2024· 81.8% built
- Gandharv Pearl Project I2.3 yr overdueVinayak Pandharinath Bhongale · DighiP52100046690· 79.5% built
- ALPHA 312.3 yr overduePARIKH REALTY · BEHIND VOLKSWAGEN SHOWROOM, OPP. AKASHWANI SANGLI, SangliP53100027305· filed Jun 2024 → now Jul 2024· 90.9% built
- TRIDENT2.3 yr overduePARANJAPE SCHEMES (CONSTRUCTION) LTD · Wakad, PuneP52100004511· filed Jul 2023 → now Jul 2024· 92.5% built· 2 complaints
- Sanghavi Paradise A Building2.3 yr overdueSanjay Walchand Sanghavi · Sanghavi Nagar, PuneP52100017993· filed Sept 2023 → now Jul 2024· 90.9% built
- SAIRAJ PHASE 2 WING-B2.3 yr overdueSUMAN VISHWANATH KOLHE · LAXMINAGAR, AhmednagarP52200030975· 72.7% built
- VIJAY SNEH2.3 yr overdueJAYDEVELOPERS · Nashik, NashikP51600008562· filed Dec 2018 → now Jul 2024· 90.9% built
- NIDHI TOWERS2.3 yr overdueRAJAN KUMAR MANCHANDA · Andheri, Mumbai SuburbanP51800008893· filed Jul 2022 → now Jul 2024· 90.9% built· 3 complaints
- NALINI VASANT VIHAR2.3 yr overdueDinesh Mohanlal Jain · NIVKHOL, RatnagiriP52800026079· 90.9% built
- Vaikunth Cluster 4A2.3 yr overduePEPL Developers Pvt Ltd · Balkum, ThaneP51700005256· 85.5% built
- SATYAM TULIP2.3 yr overdueOMSATYAM BUILDCONS PRIVATE LIMITED · Godhani (Rly), NagpurP50500030292· 90.9% built· 3 complaints
- UPPER THANE -SERENO A12.3 yr overdueLODHA DEVELOPERS LIMITED · ., ThaneP51700020191· 81.8% built
- Shravan Corner2.3 yr overdueSuraj Buildcon · Pimpri Chinchawad (M Corp.), PuneP52100013651· filed Oct 2018 → now Jul 2024· 60% built
- VIJAY ANAND2.3 yr overduePRASAD VYANKTESH KANT · GOKUL NAGARI, NashikP51600032715· 82.5% built
- Neelkanth Alpine2.3 yr overdueNeelkanth Infracon · Thane, ThaneP51700021881· 81.8% built
- AMBER VISTA2.3 yr overdueGURUKRUPA ENTERPRISES · Kalyan, ThaneP51700000456· 90.9% built
- LEGACY IVY2.3 yr overdueLEGACY LIFESPACES LLP · Punawale, PuneP52100029412· 77% built
- Charms City A122.3 yr overdueCharms Developers · Titwala, ThaneP51700034654· 2.3% built
- SAI BALAJI COMPLEX2.3 yr overdueSAI BALAJI COMPLEX · TONDLIKAR NAGAR, ThaneP51700030544· 90.9% built
- Shree Vaishnavi Heights2.3 yr overdueShree Vaishnavi Gold Homes · Thane, ThaneP51700006741· filed Dec 2022 → now Jul 2024· 90% built
- SWAPNA GANESHA APARTMENT2.3 yr overdueSWAPNAPURTI BUILDERS and DEVELOPERS · DUBERE NAKA, NashikP51600030412· 90.9% built
- Anmol Oasis2.3 yr overdueM/s Ekdant Housing · Bhaskar colony, ThaneP51700023557· 90.9% built
- SHREE RENUKA SANKUL2.3 yr overdueYOGESH YASHVANT MAHAJAN · NEAR GOL NAKA, AurangabadP51500051201· 45% built
- Vidya Residency2.3 yr overdueSukhkarta Builders · Gangapur Shivar, NashikP51600030109· 90.9% built
- LOTUS AVENUE2.3 yr overdueMAULI DEVELOPERS · CHOVISWADI, PuneP52100022298· 81.4% built
- Altavista - Phase 12.3 yr overdueSPENTA ENCLAVE PRIVATE LIMITED · Kurla, Mumbai SuburbanP51800001050· filed Dec 2019 → now Jul 2024· 90.9% built· 18 complaints
- AMARDEEP ALLIANCE2.3 yr overdueALLIANCE CITY DEVELOPERS REALTORS PVT LTD · St. Pius Church Mulund West, Mumbai SuburbanP51800024225· 90.9% built· 2 complaints
- NYATI EMBRACE I2.3 yr overdueNITIN DWARKADAS NYATI · UNDRI, PuneP52100002290· 39.4% built
- YASHVANT SRUSTI2.3 yr overdueINSTACROISSANCE LIMITED · Palghar, PalgharP99000007915· 90.9% built
- PEARL RESIDENCY - WING-B, RESIDENTIAL PHASE - III2.3 yr overdueGIRIRAJ ENTERPRISES · Andheri, Mumbai SuburbanP51800006592· 52.7% built
- Sun-Srushti Greens2.3 yr overdueSRUSHTI DEVELOPERS · Pimpri Chinchawad (M Corp.), PuneP52100009844· filed Dec 2019 → now Aug 2024· 80% built
- Eden Spaces Phase 22.3 yr overdueElysian Realty · Kiwale, PuneP52100025591· filed Jun 2023 → now Aug 2024· 86.4% built
- Kartikya Paradise - Building No.12.3 yr overdueKartikya Spaces · Karjat, RaigarhP52000017158· filed Dec 2022 → now Aug 2024· 85% built
- VRUNDAVAN2.2 yr overdueSHREE VASTURACHANA DEVELOPERS · DEVRUNG, ThaneP51700003306· filed Jun 2019 → now Aug 2024· 89.1% built· 4 complaints
- Pradnyaraj Buds2.2 yr overduePradnyaraj Properties · Munurwar Housing SocietyP52100024131· filed Dec 2023 → now Aug 2024· 67.7% built
- SANJEEVANI HOSPITAL2.2 yr overdueSHRADHA INFRAPROJECTS LIMITED · GOKULPETH, NagpurP50500045280· filed Mar 2024 → now Aug 2024· 81.8% built
- DEOGIRI VRINDAVAN2.2 yr overdueCITI HOMES · HARSUL, AurangabadP51500004708· 66.7% built
- DOLPHIN GARIMA2.2 yr overdueDOLPHIN VASTU · RAVET, PuneP52100030737· filed Dec 2023 → now Aug 2024· 81.8% built
- Shree Swami Samarth Krupa2.2 yr overdueShoreline Builders Pvt Ltd · Kurla, Mumbai SuburbanP51800018673· 19.8% built· 3 complaints
- Aaraadhy Imperial2.2 yr overdueNirmaan Realty · Tilak Nagar, ThaneP51700047256· 41.8% built
- NANDADEEP2.2 yr overdueM R Group · Karvanchiwadi, RatnagiriP52800008933· 38.6% built
- Mauli Plaza2.2 yr overdueMAULI ASSOCIATES · yashomangal colony, AmravatiP50300018935· 81.8% built
- SHRI SHIVANAND CHS2.2 yr overdueTrimity Constructions · BHASKAR COLONY, ThaneP51700024183· filed Jun 2023 → now Aug 2024· 81.4% built· 1 complaint
- Gayatri Complex2.2 yr overdueKanubhai Mohanbhai Lakkad · Kalyan, ThaneP51700009950· filed Dec 2019 → now Aug 2024· 81.6% built
- Bhakti Park2.2 yr overduePravin Haibatrao Shinde · Ambegaon, PuneP52100024924· filed Dec 2023 → now Aug 2024· 28.2% built
- MARIGOLD2.2 yr overdueSHRIJEEKRUPA REALTORS LLP · Navali Village, PalgharP99000033174· filed Jul 2024 → now Aug 2024· 78.2% built
- VENTURE CITY A AND D WING2.2 yr overdueVENTURE GROUP · DUDULGAON, PuneP52100019311· filed Dec 2022 → now Aug 2024· 90.9% built· 1 complaint
- REAL DREAM HOMES WING A AND B2.2 yr overdueREAL BUILDCON BUILDERS AND DEVELOPERS · GANESH NAGAR, PuneP52100021993· 99.5% built
- URICH MALL2.2 yr overdueSAWRABH BUILDERS · AARTI TALKIES, WardhaP50400022199· 32.7% built
- ANANDAM WORLD CITY PART OF TOWER A B AND D2.2 yr overdueGOLDBRICKS INFRASTRUCTURE PVT LTD · Nagpur (M Corp.), NagpurP50500004568· 90.9% built· 2 complaints
- SHRI JYOTIDARSHAN2.2 yr overdueDHANRAJ BABURAO PATWARI · AURANGABAD, AurangabadP51500022102· 95.5% built
- BALAJI AURA2.2 yr overdueRELIABLE REALTIES · TALOJA, RaigarhP51700003428· filed Sept 2022 → now Aug 2024· 97.7% built· 1 complaint
- MARATHA COMMERCIAL COMPLEX2.2 yr overdueDHANLAKSHMI BUILDERS AND DEVELOPERS · RISOD NAKA, WashimP50200051851· 81.8% built
- Dixit Sneh Sankul Phase 12.2 yr overdueSahasrabudhe & Kanitkar Associates · Nene Ghat, PuneP52100032280· filed Apr 2024 → now Aug 2024· 83.9% built
- Chaitanya Anand - Lunkhod CHSL2.2 yr overdueChaitanya Developers · Andheri West, Mumbai SuburbanP51800029553· filed May 2024 → now Aug 2024· 90.9% built
- JENNY PARK2.2 yr overdueDEEPAK POPATLAL OSWAL · DHARMAPURI, SataraP52700031500· 78.2% built
- United Athashri2.2 yr overdueTen Corner Developers LLP · Lohegaon, PuneP52100033894· filed Mar 2024 → now Aug 2024· 65.5% built
- Construction of 760 EWS tenaments on survey No 12 part at Talegaon Dabhade2.2 yr overduePUNE HOUSING AND AREA DEVELOPMENT BOARD · Joshiwada, PuneP52100019009· filed Jun 2022 → now Aug 2024· 86.8% built
- RISHABRAJ SUJAI2.2 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · MALAD EAST, Mumbai SuburbanP51800031075· 90.9% built
- SHUBHARAMBH2.2 yr overdueJAIKUMAR CONSTRUCTIONS LTD · PANCHAVATI ANNEX, NashikP51600030396· 85.5% built
- Kinjal Nine2.2 yr overdueHi Rock Construction Pvt Ltd · Ward E, Mumbai CityP51900004158· filed Oct 2020 → now Aug 2024· 90.9% built· 5 complaints
- RISHABRAJ AGNEL2.2 yr overdueRISHABRAJ ESTATE DEVELOPERS PVT LTD · Borivali, Mumbai SuburbanP51800030530· 90.9% built
- GOVINDA PRIDE2.2 yr overdueRADHE DEVELOPERS · BEHIND INOX CINEMA,WADALA SHIVAR, NashikP51600031509· 57.3% built
- THE VILE PARLE MEGHALAYA CHSL2.2 yr overdueDHRUV INFRASTRUCTURE · VILE PARLE EAST, Mumbai SuburbanP51800033919· 90.9% built
- ACE FLORENCE2.2 yr overdueAce properties · MULUND WEST, Mumbai SuburbanP51800034518· 90.9% built
- SANTACRUZ ANURAG MANDIR CHSL2.2 yr overdueS M CONSTRUCTIONS · SANTACRUZ, Mumbai SuburbanP51800050095· 90.9% built· 1 complaint
- MAKSKAP CENTRE2.2 yr overdueDILIP ESTATE & TOWN PLANNERS PVT LTD · Mumbai City, Mumbai CityP51900009030· filed Dec 2019 → now Aug 2024· 89.2% built· 2 complaints
Source: official MahaRERA registration filings. Construction progress and possession dates are promoter self-disclosure and are not independently audited. Figures update as new filings are synced.